HomeMy WebLinkAbout06/07/2016 08 2017-2022 Six-Year Transportation Improvement Program - Public HearingBUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDASTATEMENT
Item No. 8.
For Meeting of: June 7, 2016
ITEM TITLE: Public hearing regarding: A) Adoption of the Six -year
Transportation Improvement Program for the years 2017 to 2022,
and to amend the Metropolitan Transportation Plan; and B) Amend
the Yakima Urban Area Comprehensive Plan Capital Facilities
Element; and continue to a second Public Hearing at the June 21,
2016 Council Meeting
SUBMITTED BY: Brett Sheffield, Chief Engineer, 576 -6797
SUMMARY EXPLANATION:
Attached is the 2017 — 2022 Six-year Transportation Improvement Program (TIP), along with an
explanation sheet that describes the information contained on the various columns of the Six-year
TIP. The following projects have been added:
• #18 16th Avenue and Tieton Drive Intersection Improvements
• #20 64th Avenue and Ahtanum Road Intersection Improvements
• #21 South 16th Avenue Sidewalks
• #22 McClure Elementary School Safety Improvements
• #23 McKinley Elementary School Safety Improvements
Projects removed from the 2016 — 2021 TIP, as they were completed or the funds were obligated are:
• #1 Yakima Railroad Grade Separations, Phase 4
• #47 Lincoln Avenue Corridor Safety Improvements
The City Council and the public are welcome to add other arterial system projects to the list. The six-
year TIP project listing will be finalized at the June 21St hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue will
be used. The current plan for 2017 — 2022 includes thirteen projects that are funded. Funding for the
remainder of the projects will continue to be sought. The funded projects are:
#1 — North 1St Street Revitalization, `N' Street to SR 12
#2 — North 1St Street Revitalization, MLK to `N' Street
#3 — Powerhouse Road Sidewalk
#4 —Adams Elementary/Washington Middle School Sidewalk Improvements
#5 — Garfield Elementary Safety Improvements
#6 — Yakima Valley Transportation Company Preservation
#7 — Spring Creek Road Reconstruction
#8 — South 36th Avenue Reconstruction
#9 — Sorenson Road Reconstruction
#10 — Bravo Company Boulevard
#12 — Northside Alley Pavers
#16 — S. 80th Avenue Bridge
#17 —Wide Hollow Bridge
Six -year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21St Century (TEA-21) and previous Intermodal
Surface Transportation Efficiency Act (ISTEA) of 1991. The act specifies the systems in which certain
funds can be used, activities for which funds can be used and promotes the role of the Metropolitan
Planning Organizations (MPO) in the planning and programming of projects. SAFETEA LU requires
each designated MPO to develop a Transportation Improvement Program (TIP) and the state to develop
a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for
transportation projects. Projects listed in the STIP are the only projects that can be approved by the
Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize State
funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and
regional plans, along with the Washington Transportation System Plan (WTP), which provides a
backbone for developing projects for the intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest priority for
the available funding to the state's transportation program. Planning activities of state and local
governments are essential parts of the integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels; therefore,
local agencies are required to hold at least one public hearing during the development of the six-year
transportation program.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to
incorporate the adopted six-year TIP for 2017 to 2022. This will ensure that we are in compliance with
the Growth Management Act and that we are consistent with the Comprehensive Plan as
required. The amendment is limited to incorporate only those projects adopted in the STIP and is not
subject to the "once a year" change required under the laws of the Growth Management Act.
ITEM BUDGETED: NA
STRATEGIC PRIORITY:
APPROVED FOR SUBMITTAL:
STAFF RECOMMENDATION:
Continue public hearing to June 21, 2016
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Interim City Manager
Description Upload Date Type
D STIP explanation 5/27/2016 Cowr Merno
D 2017-2022 5127/2016 Go Merno
9. Appendices
A. Six Year Form Instructions
Heading
Agency
Enter name of the sponsoring agency.
County Number
Enter the OFM assigned number (see LAG Appendix 21.44).
City Number
Enter the OFM assigned number (see LAG Appendix 21.45).
MPO /RTPO
Enter the name of the associated MPO (if located within urbanized area) or
- Major Collector
RTPO (if located in a rural area).
Hearing Date
Enter the date of the public hearing.
Adoption Date
Enter the date this program was adopted by council or commission.
Resolution Number
Enter Legislative Authority resolution number (if applicable.)
Amendment Date
Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop)
01
- Interstate
02
- Principal Arterials
06
- Minor Arterials
07
- Major Collector
08
- Minor Collector
09
- Local Access
Urban (Over 5000 pop)
11- Interstate
12- Freeways & Expressways
14- Other Principal Arterials
16- Minor Arterial
17- Collector
19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route
Number; (e) Beginning and Ending Termini (mile post or street names); and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
01- New construction on
new alignment
02- Relocation
Project
03- Reconstruction
04- Major Widening
05- Minor Widening
06- Other Enhancements
Description
07 - Resurfacing 14 - Bridge Program - Special
08 - New Bridge Construction 21 - Transit Capital Project
09- Bridge Replacement 22- Transit Operational
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 - Safety /Traffic Operation /TSM
13 - Environmentally Related
25
23 - Transit Planning
24 - Transit Training /Admin.
31- Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C -Cable TV G -Gas
O -Other P -Power
S - Sewer (other than agency- owned) T -Telephone
W - Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month /day/year in MM /DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
BIA
- Bureau of Indian Affairs
BR
- Bridge Replacement or Rehab.
CDBG
- Community Development
5309(FG)
Block Grant (HUD)
CMAQ
- Congestion Mitigation Air Quality
DEMO
- ISTEA Demo Project (Selected)
Discretionary
- Ferry Boat Discretionary, Public
REV
Lands Highways, or Scenic Byways
DOD
- Dept. of Defense
IC
- Interstate Construction
IM
- Interstate Maintenance
NHS
- National Highway System
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
FTA Discretionary for Capital Expenditures
5307
- FTA Urban Areas
5309(Bus)-
Bus
5309(FG)
- Fixed Guideways
5309(NS)
- New Starts
5310
- FTA Elderly /Disabled
5311
- FTA Rural Areas
REV
- Rural Economic Vitality Program
STP(C)
- STP Statewide Competitive Program
STP(E)
- STP Transportation Enhancements
STP(S)
- STP Safety Including Hazard and RR
STP(R)
- STP Rural Regionally Selected
STP(U)
- STP Urban Regionally Selected
STP
- WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program
CHAP - City Hardship Assistance Program
TPP - Transportation Partnershis Program
AIP - Arterial Improvement Program
PSMP - Pedestrian Safety & Mobility Program
PTST - Public Transportation Systems Progra
PWTF - Public Works Trust
RAP - Rural Arterial Program
SCP - Small City Program
WSDOT - WSDOT funding
OTHER - All other unidentified state funding
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP
Too" program.)
16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded proiects but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded proiects only.)
27
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
6/7/16 & 6/21/16
From 2017 to 2022
Adoption Date:
Resolution No.:
6/21/2016
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
0
c
t
(a
c
z
C. Project Title
°J
a
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
> V
o
u
�
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
North 1st Street Revitalization
3
S
0.42
P
CN
1/1/2018
STP(U)
2,718
424
3,142
3,142
CE
No
North 1st Street
06
T
from: 'N' Street to: SR 12
O
Improve North 1st Street by rehabilitating the pavement
C
and lane markings, removing on- street parking,
W
enhancing street and pedestrian lighting, constructing
S
median islands and installing various pedestrian and
decorative elements.
Totals
2,718
424
3,142
3,142
14
2
North 1st Street Revitalization
06
S
0.98
P
CN
1/1/2017
FASTLANE
8,500 TIB 1,500
0
10,000
6,500
3,500
CE
Yes
N. 1st Street
12
T
from: MLK Blvd. to: 'N'Street
G
12/31/2015
Improve North 1st Street by rehabilitating the pavement
C
and lane markings, removing on- street parking,
W
enhancing street and pedestrian lighting, constructing
S
median islands and installing various pedestrian and
0
decorative elements.
Totals
8,500
10,000
6,500
3,500
17
3
Powerhouse Road Sidewalk
05
S
0.6
O
CN
TAP
245
245
245
CE
No
Powerhouse Road
12
C
11/1/20171
1
from: Cowiche Canyon Rd to: Mobile Home Park
T
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
Totals
245
245
245
19
4
Adams Elem. /Washington M.S. Sidewalk Improvements
12
S
N/A
P
CN
5/1/2017
SRTS
282
282
282
CE
Yes
Various Streets
T
1
1
1
1
1
from: to:
O
5/1/2017
This project will make various pedestrian safety
improvements in the vicinity of Adams Elementary
School and Washington Middle School, such as,
constructing sidewalks, improving roadway crossings,
installing flashers and installing fencing.
Totals
282
282
282
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
6/7/16 & 6/21/16
From 2017 to 2022
Adoption Date:
Resolution No.:
6/21/2016
Project Costs
in Thousands
of
Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
-Fa
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
> V
u
Start
Federal Fund
o
E. Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
U-
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
I
Phase
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
5
Garfield Elementary Safety Improvements
12
S
N/A
P
CN
5/1/2017
SRTS
141
141
141
CE
Yes
Various Streets
T
from: to:
O
1/1/2017
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementary
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers.
Totals
141
141
141
14
6
Yakima Valley Transportation Company Preservation
03
S
0.02
O
CN
1/1/2017
STP(E)
52
52
52
CE
No
Yakima Avenue
from: Yakima Avenue to: 6th Avenue
This project will remove and replace a portion of the
existing trolley rail in the vicinity of the intersection
of 6th Avenue and Yakima Avenue.
Totals
52
52
52
17
7
Spring Creek Road Reconstruction
03
S
0.85
S
CN
3/1/2017
SIED
1,100
820
1,920
1,920
SEPA
Yes
Spring Creek Road
W
from: Washington Ave. to: 36th Avenue
3/1/2017
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
1,100
820
1,920
1,920
17
8
S. 36th Avenue Reconstruction
03
0.40
S
CN
3/1/2017
SIED
520
385
905
905
SEPA
Yes
36th Avenue
W
from: Spring Creek Rd. to: Sorenson Rd.
3/1/2017
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
520
385
905
905
Agency:
Yakima
Co. No.:
39
City No.:
1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs in Thousands
of
Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
-Fa
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
> V
u
Start
Federal Fund
o
E. Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
U-
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
9
Sorenson Road Reconstruction
03
S
0.14
S
CN
3/1/2017
SIED
180
140
320
320
Yes
Sorenson Road
W
from: 36th Avenue to: 38th Avenue
3/1/2017
Widen roadway, install curb, gutter, sidewalk and
street lights.
Totals
180
140
320
320
16
10
Bravo Company Boulevard
01
S
0.65
P
RW
1/1/2017
LIFT
800
200
1,000
1,000
CE
Yes
North 10th Street
06
T
CN
1/1/2018
LIFT
4,480
1,120
5,600
5,600
from: 'H' Street to: Lincoln Ave.
W
1/1/2018
Construct new roadway including water, sewer, curb,
S
gutter, sidewalk, street lighting and storm drainage
O
system.
Totals
5,280
1,320
6,600
1,000
5,600
16
11
E. 'H' Street Extension, Ph. 1
01
P
1.10
P
RW
1/1/2017
500
500
500
CE
Yes
E. 'H' Street
08
T
CN
1/1/2019
TIB
1,500
3,100
4,600
4,600
from: 1st Street to: 10th Street
W
12/1/2018
Construct new roadway including water, sewer, curb,
S
gutter, sidewalk, street lighting and storm drainage
O
system.
Totals
3,600
5,100
500
4,600
00
12
Northside Alley Paver
07
S
3.5
P
CN
1/1/2017
CMAQ 353
57
410
410
CE
No
Alleys between Folsom Ave. and Fruitvale Blvd.
T
from: 16th Avenue to: 6th Avenue
C
Pave the east /west gravel alleys between Folsom
O
Avenue and Fruitvale Boulevard from 16th Avenue to
6th Avenue
Totals
353
57
410
410
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date: 6/7/16 & 6/21/16
Amend Date:
From 2017 to 2022
Adoption Date:
Resolution No.:
6/21/2016
Project Costs
in Thousands
of Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
> V
u
Start
Federal Fund
oE.
Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
U_
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
6th
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
13
E. 'H'StreetExtension, Ph. 2
01
P
0.55
P
RW
1/1/2019
STP(U)
432
68
500
500
CE
Yes
E. 'H' Street
08
T
CN
1/1/2021
STP(U)
2,162
338
2,500
2,500
from: 10th Street to: 1 -82
W
1/1/2018
Construct new roadway including water, sewer, curb,
S
gutter, sidewalk, street lighting and storm drainage
system.
Totals
2,594
406
3,000
500
2,500
00
14
Cowiche Canyon Trail
28
P
2.00
RW
7/1/2019
CWA 105
105
105
Cowiche Canyon
CN
1 1/1/2020
1
1 CWA 1,695
11695
1
1,695
from: Powerhouse Road to: Trailhead
1/1/2020
Construct a 10 -foot wide pathway, including two
bridges over Cowiche Creek.
Totals
1,800
105
1,695
14
15
E. Nob Hill Blvd. & Fair Ave. 1/S Improvements
03
P
N/A
P
RW
1/1/2017
STP(U)
187
29
216
216
CE
Yes
Nob Hill Boulevard
04
T
CN
6/1/2019
STP(U)
1,457
227
1,684
1,684
from: E. Nob Hill Blvd. to: Fair Ave.
31
W
1/1/2019
Widen Nob Hill Boulevard through the intersection,
C
construct left -turn lane, curb, gutter, sidewalk, street
O
lighting and drainage. Upgrade signal by installing mast
arm structures.
Totals
1,644
256
1,900
216 1,684
17
16
S. 80th Avenue Bridge
09
S
0.05
P
PE
1/1/2017
DOE 25
0
25
25
CE
No
S. 80th Avenue
T
CN
1/1/2018
DOE 75
0
75
75
from: Wide Hollow Rd. to: Plath Ave.
O
Replace existing two -lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
Totals
100
75
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands
of Dollars
Federally
Funded
Qn
Project Identification
Expenditure Schedule
projects
Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
EA
ai
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
tM
r_
o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
LL
a
F. Describe Work to Be Done
N
H
a-
I
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
17
Wide Hollow Road Bridge
9
S
0.05
P
PE
1/1/2017
DOE 25
25
25
CE
No
Wide Hollow Road
T
CN
1/1/2018
DOE 75
75
75
from: 89th Avenue to: 88th Avenue
O
Replace existing two -lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
Totals
100
100
25
75
14
18
16th Ave. & Tieton Dr. Intersection Improvements
5
P
0.40
P
PE
1/1/2018
STP(U)
260
40
300
300
CE
Yes
16th Avenue
7
T
RW
1/1/2019
STP(U)
3,460
540
4,000
3,460
from: 16th Ave. to: Tieton Dr.
G
CN
4/1/2021
STP(U)
1,300
200
1,500
1,500
4/1/2021
O
Reconstruct and widen 16th Avenue and Tieton Drive
C S
by adding left -turn lanes for all movements at the
W
intersection. Upgrade the traffic signal.
Totals
5,020
780
5,800
300
3,460
1,500
14
19
18th Street Underpass
12
P
0.02
P
PE
1/1/2018
BRAC
240
60
300
300
CE
No
Yakima Avenue
T
CN
1/1/2019
BRAC
2,288
572
2,860
2,860
from: Yakima Ave. to: 18th Street
O
S
Replace the bridge on E. Yakima Avenue that crosses
W
over 18th Street.
Totals
2,528
632
3,160
300
2,860
17
20
64th Ave. & Ahtanum Intersection Improvements
12
P
N/A
P
PE
1/1/2017
CMAQ
56
9
65
65
CE
Yes
64th Avenue
T
RW
1/1/2018
CMAQ
43
7
50
50
from: 64th Ave. to: Ahtanum Rd.
C
CN
5/1/2018
CMAQ
433
67
500
500
5/1/2018
O
Improve the 64th Avenue and Ahtanum Road
intersection by constructing a westbound right -turn
lane on Ahtanum and installing a traffic signal.
Totals
532
83
615
65
550
Agency:
Yakima
Co. No.:
39
City No.:
1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
-Fa
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
> V
u
Start
Federal Fund
o
E. Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
U-
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
South 16th Avenue Sidewalks
12
P
0.88
P
PE
1/1/2017
PBP
54
6
60
60
CE
Yes
16th Avenue
T
RW
6/1/2017
PBP
234
26
260
260
from: Washington Ave. to: Nob Hill Blvd.
C
CN
6/1/2018
PBP
369
41
410
410
6/1/2018
Install 7 -foot sidewalk on the west side of 16th
O
Avenue.
Totals
657
73
730
320
410
19
22
McClure Elementary School Safety Improvements
12
P
N/A
P
PE
1/1/2017
SRTS
46
46
46
CE
Yes
Various locations
T
RW
6/1/2017
SRTS
65
65
65
from: to:
C
CN
6/1/2018
SRTS
380
380
380
6/1/2018
O
This project will make various pedestrian safety
improvements in the vicinity of McClure Elementary
School, such as, constructing sidewalk, ADA ramps
and improving crosswalks.
Totals
491
491
111
380
19
23
McKinley Elementary School Safety Improvements
12
P
N/A
P
PE
1/1/2017
SRTS
50
50
50
CE
No
Various locations
T
CN
6/1/2018
SRTS
430
430
430
from: to:
C
O
This project will make various pedestrian safety
improvements in the vicinity of McKinley Elementary
School, such as, replacing delapitated sidewalk,
constructing ADA ramps, and installing a HAWK
pedestrian crossing system.
Totals
480
0
480
50
430
12
24
SR 12 & 16th Avenue Interchange
03
P
N/A
O
PE
1/1/2018
STP(U)
86
14
100
100
CE
No
Westbound ramps of SR 12
06
CN
1/1/2019
STP(U)
779
121
900
900
from: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
Totals
865
135
1,000
100 900
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
6/7/16 & 6/21/16
From 2017 to 2022
Adoption Date:
Resolution No.:
6/21/2016
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure
Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
> V
u
Start
Federal Fund
o
E. Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
U_
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
25
S. 1st St. & E. Washington Ave. 1/S Improvements
03
P
N/A
P
PE
1/1/2018
STP(U)
260
40
300
300
CE
Yes
South 1st Street
06
W
RW
1/1/2019
STP(U)
260
40
300
300
from: S. 1st Street to: E. Washington Ave.
S
CN
1/1/2020
STP(U)
1,211
189
1,400
1,400
1/1/2020
Realign intersection, widen E. Washington Avenue to
T
accommodate an additional lane, replace curb, gutter
O
and sidewalk, and install a new traffic signalization
system.
Totals
1,731
269
2,000
300
300
1,400
14
26
Washington Ave. & Longfiber Rd. Intersection
03
P
N/A
C
PE
1/1/2018
STP(U)
100
14
114
114
CE
Yes
Washington Avenue
05
T
RW
1/1/2019
STP(U)
100
14
114
114
from: Washington Ave. to: Longfiber Rd.
06
W
CN
1/1/2020
STP(U)
688
107
795
795
1/1/2020
S
Improve the Washington Avenue and Longfiber Road
O
intersection by constructing an eastboung left -turn
lane on Washington and a northbound left -turn lane
on Longfiber, install or replace curb, gutter, sidewalk,
street lighting, storm drainage and safety flashing
signal
Totals
888
135
1,023
114
114
795
14
27
E. Nab Hill Boulevard Reconstruction
03
P
0.85
C
PE
1/1/2018
STP(U)
545
85
630
630
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2019
STP(U)
1,090
170
1,260
1,260
from: S. 6th Street to: S. 18th Street
06
W
CN
1/1/2020
STP(U)
6,532
1,020
7,552
7,552
1/1/2020
S
Reconstruct and widen roadway to 5 lanes with
O
intersection improvements, curb, gutter, sidewalk,
P
street lighting and drainage system
G
Totals
8,167
1,275
9,442
630
1,260
7,552
14
28
N. 40th Ave. & Summitview Ave. Intersection
12
P
N/A
P
PE
1/1/2018
STP(U)
126
17
143
143
CE
Yes
N. 40th Avenue
T
RW
1/1/2019
STP(U)
130
20
150
150
from: N. 40th Ave. to: Summitview Dr.
W
CN
1/1/2020
STP(U)
692
108
800
800
1/1/2020
Improve the intersection by constructing larger
S
corner radii, lengthening the turn lanes, and
O
upgrading the traffic signal system.
Totals
948
145
1,093
143
150
800
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date: 6/7/16 & 6/21/16
Amend Date:
From 2017 to 2022
Adoption Date:
Resolution No.:
6/21/2016
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure Schedule
Projects Only
Fund Source Information
U
E
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
-Fa
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
D. Street /Road Name or Number
> V
u
Start
Federal Fund
o
E. Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
U-
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
N. 16th Avenue & Fruitvale Blvd. 1/S
12
P
N/A
P
PE
1/1/2018
STP(U)
126
18
144
144
CE
Yes
N. 16th Avenue
T
RW
1/1/2019
STP(U)
173
27
200
200
from: N. 16th Ave. to: Fruitvale Blvd.
O
CN
1/1/2020
STP(U)
400
62
462
462
1/1/2020
Improve the intersection by constructing larger curb
S
radii, installing ADA ramps, and upgrading the traffic
W
signal system.
Totals
699
107
806
144 200
462
16
30
E. Mead Avenue Reconstruction
03
P
0.76
P
PE
1/1/2019
STP(S)
122 TPP 23
7
152
152
CE
No
E. Mead Avenue
06
T
CN
1/1/2020
STP(S)
1,730 TPP 206
70
2,006
2,006
from: Rudkin Rd. to: Fair Ave.
S
Partner with Union Gap to reconstruct E. Mead
C
Avenue, install curb, gutter, sidewalk and storm
G
drainage system.
O
Totals
1,852
77
2,158
152
2,006
17
31
S. 48th Avenue Reconstruction
03
P
1.00
P
PE
1/1/2018
STP(U)
223
35
258
258
CE
Yes
South 48th Avenue
05
T
RW
1/1/2019
STP(U)
519
81
600
600
from: Summitview Ave. to: Nob Hill Blvd.
W
CN
1/1/2020
STP(U)
1,485
232
1,717
1,717
1/1/2020
S
Reconstruct and widen 48th Avenue, install curb,
O
gutter, sidewalk, street lighting and drainage system.
Totals
2,227
348
2,575
258 600
1,717
17
32
Powerhouse Rd. & Englewood Ave. 1/S
12
P
N/A
P
PE
1/1/2019
STP(S)
43
7
50
50
CE
Yes
Powerhouse Rd.
T
RW
1/1/2020
STP(S)
87
13
100
100
from: Powerhouse Rd. to: Englewood Ave.
C
CN
1/1/2021
STP(S)
500
78
578
578
1/1/2021
Realign intersection, install curb, gutter, sidewalk and
S
safety flashing signal. Possibly construct a
O
roundabout.
W
Totals
630
98
728
50
678
Agency:
Yakima
Co. No.:
39
City No.:
1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands
of
Dollars
Federally
Funded
Qn
Project Identification
1
Expenditure
Schedule
Projects Only
Fund Source Information
U
A. PIN /Federal Aid No. B. Bridge No.
EA
a,
cu
(Local Agency)
Federal Funding
R/W
E
z
C. Project Title
�,
a,
�n
�
-o
°
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
> V
u
Start
Federal Fund
oE.
Beginning MP or Road - Ending MP or Road
a a
+o
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
U_
a
F. Describe Work to Be Done
�
,,,
o
+r
a
I
Phase
6th
(MM /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
33
W. Lincoln Ave. & MLK Blvd. Realignment
01
P
0.50
C
PE
1/1/2018
STP(E)
424
67
491
491
CE
Yes
W. Lincoln Avenue
12
T
RW
1/1/2019
STP(E)
1,047
163
1,210
1,210
from: N. 5th Ave. to: Custer St.
W
CN
1/1/2020
STP(E)
1,801
281
2,082
2,082
1/1/2020
S
O
Realign W. Lincoln Avenue, install curb, gutter,
P
sidewalks, street lighting, drainage.
G
Totals
3,272
511
3,783
491
1,210
2,082
14
34
N. 34th Ave. & Fruitvale Blvd. 1/S Improvements
12
P
N/A
P
PE
1/1/2019
STP(U)
63
5
68
68
CE
Yes
Fruitvale Boulevard
T
RW
1/1/2020
STP(U)
87
13
100
100
from: Fruitvale Blvd. to: N. 34th Ave.
O
CN
1/1/2021
STP(U)
556
87
643
643
1/1/2021
S
Improve intersection by installing a traffic signal
W
system, curb, gutter and sidewalk. Widen leg south
of Fruitvale to inlcude a left -turn lane
Totals
706
105
811
68
743
16
35
Tieton Dr. & S. 5th Ave. 1/S Improvements
12
P
N/A
P
PE
1/1/2018
STP(U)
69
11
80
80
CE
Yes
Tieton Drive
W
RW
1/1/2019
STP(U)
104
16
120
120
from: Tieton Dr. to: S. 5th Ave.
S
CN
6/1/2020
STP(U)
865
135
1,000
1,000
5/1/2020
Remove existing traffic signal and construct a
T
roundabout, remove and replace curb, gutter,
O
sidewalk, street lighting and drainage
Totals
1,038
162
1,200
80
120
1,000
17
36
Yakima Downtown Future Initiatives, Phase 5
06
P
N/A
P
PE
1/1/2018
OTHER
500
500
500
CE
No
12
T
CN
4/1/2019
OTHER
5,500
5,500
5,500
from: 1st Street to: 9th Street
C
Install historic lighting, sidewalk modifications and
S
other improvements. Exact improvement area(s) to
be determined
Totals
6,000
6,000
500
5,500
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
Expenditure Schedule
projects Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
EA
ai
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
oa
r-
'o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
E. Nab Hill Blvd. & S. 18th Street 1/S Improvements
01
P
0.10
C
PE
1/1/2018
STP(U)
50
8
58
58
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2019
STP(U)
50
8
58
58
from: E. Nob Hill Blvd. to: S. 18th Street
W
CN
1/1/2020
STP(U)
346
54
400
400
1/1/2020
Widen south leg for double left turn from westbound
S
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals
446
70
516
58 58
400
14
38
S. 48th Ave. & Summitview Ave. Signalization
12
P
N/A
P
PE
1/1/2019
STP(S)
25
4
29
29
CE
Yes
Summitview Avenue
T
RW
6/1/2019
STP(S)
25
4
29
29
from: Summitview Ave. to: S. 48th Ave.
CN
1/1/2020
STP(S)
554
81
635
635
1/1/2020
Install traffic signal at the intersection of Summitview
Avenue and 48th Avenue.
Totals
604
89
693
58
635
14
39
S. 72nd Ave. & W. Washington Ave. 1/S
12
P
N/A
P
PE
1/1/2018
STP(C)
91
14
105
105
CE
Yes
S. 72nd Avenue
06
T
RW
1/1/2019
STP(C)
91
14
105
105
from: s. 72nd Ave. to: W. Washington Ave.
O
CN
1/1/2020
STP(C)
544
86
630
630
1/1/2020
Improve intersection by installing a traffic signal
S
system or roundabout.
W
Totals
726
114
840
105 105
630
14
40
N. 40th Ave. & Englewood Ave. Intersection
12
P
N/A
P
PE
1/1/2019
STP(U)
43
7
50
50
CE
No
N. 40th Avenue
T
CN
6/1/2019
STP(U)
260
40
300
300
from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
Totals
303
47
350
350
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
Expenditure Schedule
projects
Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
oa
r_
'o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
M
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
E H
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
41
Nab Hill Boulevard Sidewalk Improvements
12
P
2.50
P
PE
1/1/2020
STP(S)
55
8
63
63
CE
Yes
Nob Hill Boulevard
T
RW
1/1/2021
STP(S)
107
19
126
126
from: S. 16th Ave. to: S. 6th Street
S
CN
1/1/2022
STP(S)
327
51
378
378
1/1/2022
Construct sidewalk in locations where it doesn't exist
W
on the south side of Nob Hill
Totals
489
78
567
567
14
42
E. Yakima Ave. & Fair Ave. Signalization
12
P
N/A
P
PE
STP(U)
86
14
100
100
CE
No
Yakima Avenue
T
CN
11/1/20191
6/1/2020
STP(U)
519 1
1 81
600
600
from: E. Yakima Ave. to: Fair Ave.
W
Install traffic signal at the intersection of Yakima
S
Avenue and Fair Avenue.
O
Totals
605
95
700
100
600
16
43
S. 3rd Avenue & W. Washington Ave. Signal
12
P
N/A
P
PE
4/1/2018
20
20
20
CE
No
S. 3rd Avenue
T
CN
9/1/2018
210
210
210
from: S. 3rd Ave. to: W. Washington Ave.
Upgrade the traffic signalization system
230
230
230
Totals
230
230
230
19
44
75th Avenue Improvements
01
P
0.50
P
PE
1/1/2019
STP(U)
87
13
100
100
CE
Yes
75th Avenue
08
W
RW
1/1/2020
STP(U)
173
27
200
200
from: Mead Ave. to: Nab Hill Blvd.
S
CN
1/1/2021
STP(U)
1,038
162
1,200
1,200
1/1/2021
T
Construct a new two -lane roadway and widen
O
portions of existing roadway, install curb, gutter,
sidewalk, street lighting and storm drainage system.
Totals
1,298
202
1,500
100
1,400
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Qn
Project Identification
Expenditure Schedule
projects Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
EA
ai
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
oa
r-
'o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
45
S. 66th Avenue Improvements
03
P
0.76
P
PE
1/1/2018
STP(U)
86
14
100
100
CE
Yes
66th Avenue
04
T
RW
1/1/2019
STP(U)
173
27
200
200
from: Summitview Ave. to: Scenic Dr.
W
CN
1/1/2020
STP(U)
1,096
164
1,260
1,260
1/1/2020
Reconstruct and widen roadway to three lanes, install
S
curb, gutter, sidewalk, storm drainage system and
O
utilities.
Totals
1,355
205
1,560
100 200
1,260
17
46
Rudkin Road Reconstruction
03
P
0.76
P
PE
1/1/2018
STP(C)
109
27
136
136
CE
No
Rudkin Road
06
T
CN
1/9/1900
STP(C)
945 TPP 945
106
1,996
1,996
from: E. Viola Ave. to: Rainier PI.
W
S
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
Totals
1,054 945
133
2,132
136 1,996
17
47
Englewood Avenue Improvements
05
P
1.00
P
PE
1/1/2020
STP(C)
272
43
315
315
CE
Yes
Englewood Avenue
06
T
RW
1/1/2021
STP(C)
349
55
404
404
from: N. 40th Ave. to: N. 56th Ave.
W
CN
1/1/2022
STP(C)
2,329
363
2,692
2,692
1/1/2022
S
O
Widen roadway to three lanes, install curb, gutter,
C
sidewalk, street lighting and storm drainage system.
Totals
2,950
461
3,411
3,411
17
48
Englewood Avenue Improvements
05
P
0.50
P
PE
1/1/2020
STP(U)
136
21
157
157
CE
Yes
Englewood Avenue
06
T
RW
1/1/2021
STP(U)
173
27
200
200
from: N. 16th Ave. to: N. 24th Ave.
W
CN
1/1/2022
STP(U)
11164
182
1,346
1,346
1/1/2022
Widen roadway to three lanes, install curb, gutter,
S
sidewalk, street lighting and storm drainage system,
water and sewer lines.
Totals
1,473
230
1,703
1,703
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands
of
Dollars
Federally
Funded
Qn
Project Identification
Expenditure Schedule
projects
Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
EA
ai
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
oa
r-
'o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
49
S. 80th Avenue Improvements
04
P
1.30
P
PE
1/1/2020
TIB
131
20
151
151
CE
Yes
S. 80th Avenue
T
RW
1/1/2021
TIB
382
59
441
441
from: Tieton Drive to: Zier Road
O
CN
1/1/2022
TIB
1,667
260
1,927
1,927
1/1/2022
S
Widen roadway to three lanes, install curb, gutter,
W
sidewalk, street lighting and storm drainage system.
C
Totals
2,180
339
2,519
2,519
17
50
Englewood Avenue Improvements
03
P
1.00
P
PE
1/1/2020
STP(U)
218
34
252
252
CE
Yes
Englewood Avenue
05
T
RW
1/1/2021
STP(U)
327
51
378
378
from: N. 24th Ave. to: N. 40th Ave.
06
W
CN
1/1/2022
STP(U)
21789
435
3,224
3,224
1/1/2022
S
Reconstruct and widen roadway to three lanes, install
O
curb, gutter, sidewalk, street lighting and storm
drainage system. Install sewer and water lines.
Totals
3,334
520
3,854
3,854
17
51
88th Avenue Improvements
06
P
0.48
P
PE
1/1/2019
STP(U)
43
7
50
50
CE
Yes
88th Avenue
12
T
RW
1/1/2020
STP(U)
52
8
60
60
from: Tieton Dr. to: Summitview Ave.
C
CN
6/1/2020
STP(U)
285
45
330
330
6/1/2020
G
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
Totals
380
60
440
50
390
17
52
64th Avenue Improvements
03
P
1.00
P
PE
1/1/2019
STP(U)
200
32
232
232
CE
No
64th Avenue
04
T
CN
1/1/2020
STP(U)
1,600
249
1,849
1,849
from: Washington Ave. to: Nob Hill Blvd.
06
W
C
Widen roadway to three lanes, install curb, gutter,
G
sidewalk, street lighting and storm drainage system.
O
1,800
281
2,081
232
1,849
0
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs
in Thousands of Dollars
Federally Funded
Qn
Project Identification
Expenditure Schedule
projects Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
EA
ai
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
oa
r_
'o
G
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
53
1 -82 & Lincoln Avenue Interchange
01
P
N/A
O
PE
1/1/2018
STP(U)
260
40
300
300
CE
Yes
Lincoln Avenue
P
RW
1/1/2019
STP(U)
173
27
200
200
from: E. V Street to: 1 -82
G
CN
6/1/2020
STP(U)
1,730
270
2,000
2,000
6/1/2020
Reconstruct /extend off -ramp from existing 1 -82 off -
ramp for Lincoln Avenue to E. V Street.
2,163
337
2,500
300 200
2,000
14
54
16th Avenue Corridor Improvement
04
P
3.50
P
PE
1/1/2019
STP(U)
120
17
137
137
16th Avenue
T
from: SR 12 to: Washington Ave.
W
C
G
Study to determine strategies for improving the 16th
O
Avenue corridor
S
120
17
137
137
14
55
40th Avenue Corridor Improvements
04
P
3.20
P
PE
1/1/2019
STP(U)
120
17
137
137
40th Avenue
T
from: SR 12 to: Washington Ave.
W
C
G
Study to determine strategies for improving the 40th
O
Avenue corridor.
S
Totals
120
17
137
137
14
56
Nab Hill Boulevard Corridor Improvements
03
P
2.70
P
PE
1/1/2019
STP(U)
120
17
137
137
Nob Hill Boulevard
04
T
from: 1 -82 to: 16th Ave.
O
S
W
Study to determine strategies for improving the Nob
C
Hill Boulevard corridor.
G
120
17
137
137
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
From 2017 to 2022
Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars
Federally Funded
Qn
Project Identification
Expenditure Schedule
projects Only
Fund Source Information
ci
E
A. PIN /Federal Aid No. B. Bridge No.
a
cu
o
(Local Agency)
Federal Funding
R/W
Fa
z
C. Project Title
E
a,
tw
r-
o
G
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
D. Street /Road Name or Number
o V
u
Start
Federal Fund
c
o
E. Beginning MP or Road - Ending MP or Road
a a
;�
o
Code
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
LL
a
F. Describe Work to Be Done
N
H
1 :3
a-
I
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
57
North /South Connector to West Valley
01
P
6.00
P
PE 1/1/2019 STP(U) 432 68 500 500
CE
Yes
Unknown Road
04
T
from: Ahtanum Rd. to: Summitview Ext.
06
W
S
Corridor study to determine the best location for a
C
north /south limited access route in West Valley. City
G
and County joint project.
O
432 68 500 500
14
58
S. 1st Street /Main Street Corridor Improvements
01
P
2.00
P
PE 1/1/2019 STP(U) 120 17 137 137
No
S. 1st Street /Main Street
T
from: Nob Hill Blvd. to: Barker Mill Bridge
O
S
Joint project with Union Gap. Stucy to determine
W
strategies for improving the 1st Street /Main Street
C
corridor.
G
120 17 137 137
'IT
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of
Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
a-
Project Identification
(Local Agency)
Projects Only
Federal Funding
R/W
U
E
A. PIN /Federal Aid No. B. Bridge No.
(a
c
t
Qn
c
C. Project Title
E
m
c
'0
o
c-
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
o V
i
u
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
FU
_
o
Code
U_
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
5
E. Lincoln Avenue & 10th Street Roundabout
03
P
N/A
P
CN
1/1/2015
TIB
1,440
360
1,800
1,800
CE
Yes
Martin Luther King, Jr. Boulevard
05
from: E. Lincoln Ave. to: N. 10th Street
06
1/1/2015
Construct a roundabout at the intersection of Lincoln
Avenue, 10th Street and MLK, Jr. Boulevard. Install
curb, gutter, sidewalk, street lighting and drainage.
Totals
1,440
360
1,800
1,800
12
6
SR 12 & 16th Avenue Interchange
03
P
N/A
O
PE
1/1/2015
STP(U)
86
14
100
100
CE
No
Westbound ramps of SR 12
06
CN
1/1/2016
STP(U)
779
121
900
900
from: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
Totals
865
135
1000
100
900
11
7
1 -82 & Lincoln Avenue Interchange
01
P
N/A
O
PE
1/1/2013
STP(U)
260
40
300
300
CE
No
Lincoln Avenue
P
RW
1/1/2014
STP(U)
173
27
200
200
from: E. V Street to: 1 -82
G
CN
6/1/2014
STP(U)
1,730
270
2,000
500 1,500
Reconstruct /extend off -ramp from existing 1 -82 off -
ramp for Lincoln Avenue to E. V Street.
Totals
2,163
337
2,500
300 700 1,500
14
8
E. Yakima Ave. & Fair Ave. Signalization
12
P
N/A
P
PE
STP(U)
86
14
100
100
CE
No
Yakima Avenue
T
CN
11/1/20151
6/1/2016
STP(U)
1 519
1
1 81
600
1 1
600
from: E. Yakima Ave. to: Fair Ave.
W
Install traffic signal at the intersection of Yakima
S
Avenue and Fair Avenue.
O
Totals
605
95
700
100
600
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R/W
U
E
A. PIN /Federal Aid No. B. Bridge No.
c
(a
t
c
C. Project Title
E
m
c
'0
o
c-
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
o V
i
u
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
FO
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
9
S. 3rd Avenue & W. Washington Ave. Signal
12
P
N/A
P
PE
4/1/2013
20
20
20
CE
No
S. 3rd Avenue
T
CN
9/1/2013
210
210
210
from: S. 3rd Ave. to: W. Washington Ave.
Upgrade the traffic signalization system
Totals
230
230
230
14
10
S. 1st St. & E. Washington Ave. 1/S Improvements
03
P
N/A
P
PE
1/1/2014
STP(U)
260
40
300
300
CE
Yes
South 1st Street
06
W
RW
9/1/2014
STP(U)
260
40
300
100 200
from: S. 1st Street to: E. Washington Ave.
S
CN
9/1/2015
STP(U)
1,211
189
1,400
200
1,200
8/1/2015
Realign intersection, widen E. Washington Avenue to
T
accommodate an additional lane, replace curb, gutter
O
and sidewalk, and install a new traffic signalization
system.
Totals
1,731
269
2,000
400 400
1,200
17
11
S. 48th Avenue Reconstruction
03
P
1.00
P
PE
1/1/2014
STP(U)
223
35
258
200
58
CE
Yes
South 48th Avenue
05
T
RW
1/1/2015
STP(U)
519
81
600
600
from: Summitview Ave. to: Nob Hill Blvd.
W
CN
1/1/2016
STP(U)
1,485
232
1,717
1,485
12/1/2015
S
Reconstruct and widen 48th Avenue, install curb,
O
gutter, sidewalk, street lighting and drainage system.
Totals
2,227
348
2,575
200
658 1,485
14
12
S. 72nd Ave. & Mead Ave. 1/S Signalization
12
P
N/A
P
PE
SRTS
25
5
30
30
CE
No
S. 72nd Avenue
T
CN
11/1/20131
6/1/2013
SRTS
1 258 1
1 25
283
283
1
1
from: S. 72nd Ave. to: Mead Ave.
W
S
Install traffic signal system.
O
Totals
283
30
313
313
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure
Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FU
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
13
Zier Road Improvements
06
P
0.15
P
PE
1/1/2013
SRTS
25
5
30
30
CE
No
Zier Road
T
CN
6/1/2013
SRTS
236
25
261
261
from: 75th Ave. to: 72nd Ave.
C
Install curb, gutter and sidewalk on the south side of
S
Zier Road.
Totals
261
30
291
291
16
14
Tieton Dr. & S. 5th Ave. 1/S Improvements
12
P
N/A
P
PE
1/1/2015
STP(U)
69
11
80
80
CE
Yes
Tieton Drive
W
RW
1/1/2016
STP(U)
104
16
120
120
from: Tieton Dr. to: S. 5th Ave.
S
CN
6/1/2016
STP(U)
865
135
1,000
1,000
5/1/2016
Remove existing traffic signal and construct a
T
roundabout, remove and replace curb, gutter,
O
sidewalk, street lighting and drainage
Totals
1,038
162
1,200
80
1,120
16
15
E. 'H'StreetExtension
01
P
1.10
P
PE
1/1/2013
STP(U)
303
47
350
250
100
CE
Yes
E. 'H' Street
08
T
RW
6/1/2014
STP(U)
303
47
350
150
200
from: 1st Street to: Yakima River
W
CN
1/1/2016
STP(U)
1,730
270
2,000
2,000
12/1/2015
Construct new roadway including water, sewer, curb,
S
gutter, sidewalk, street lighting and storm drainage
O
system.
Totals
2,336
364
2,700
250
250
2,200
17
16
N. 10th Street Extension
01
P
1.3
P
PE
1/1/2013
STP(U)
700
108
808
700
108
CE
Yes
North 10th Street
06
T
RW
6/1/2014
STP(U)
5,500
850
6,350
300
6,050
from: 'R' Street to: Lincoln Ave.
W
CN
1/1/2016
STP(U)
7,900
972
8,872
8,872
12/1/2015
Construct new roadway including water, sewer, curb,
S
gutter, sidewalk, street lighting and storm drainage
O
system.
Totals
14,100
1,930
16,030
700
408
6,050
8,872
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands
of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
(a
c
t
c
C. Project Title
E
m
c
'0
o
c-
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
o V
i
u
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
FU
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
17
Yakima Downtown Future Initiatives, Phase 5
06
P
0.15
P
PE
1/1/2014
OTHER 500
500
500
CE
No
12
T
CN
4/1/2015
OTHER 5,500
5,500
5,500
from: 1st Street to: 9th Street
C
Install historic lighting, sidewalk modifications and
S
other improvements. Exact improvement area(s) to
be determined
Totals
6,000
500 5,500
17
18
75th Avenue Improvements
01
P
0.50
P
PE
1/1/2016
STP(U)
87
13
100
100
CE
No
75th Avenue
08
W
RW
1/1/2017
STP(U)
173
27
200
200
from: Mead Ave. to: Nab Hill Blvd.
S
CN
1/1/2018
STP(U)
11038
162
1,200
1,200
Construct portions of and widen roadway, install
T
curb, gutter, sidewalk, street lighting and storm
O
drainage system.
Totals
1,500
1,500
14
19
Washington Ave. & Longfiber Rd. Intersection
03
P
N/A
C
PE
1/1/2014
STP(U)
100
14
114
114
CE
Yes
Washington Avenue
05
T
RW
6/1/2014
STP(U)
100
14
114
114
from: Washington Ave. to: Longfiber Rd.
06
W
CN
1/1/2015
STP(U)
700
95
795
795
12/1/2015
Widen Washington Avenue to 5 lanes and widen
S
Longfiber Road to 3 lanes, install or replace curb,
O
gutter, sidewalk, street lighting and Safety Flashing
Signal.
Totals
900
123
1,023
228 795
14
20
E. Nab Hill Blvd. & S. 18th Street 1/S Improvements
01
P
0.10
C
PE
1/1/2014
STP(U)
50
8
58
58
CE
No
E. Nob Hill Boulevard
04
T
CN
6/1/2014
STP(U)
346
54
400
400
from: E. Nob Hill Blvd. to: S. 18th Street
W
Widen south leg for double left turn from westbound
S
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals
396
62
458
458
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure
Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FU
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
21
Powerhouse Rd. & Englewood Ave. 1/S
12
P
N/A
P
PE
1/1/2014
STP(S)
43
7
50
50
CE
Yes
Powerhouse Rd.
T
RW
1/1/2015
STP(S)
87
13
100
100
from: Powerhouse Rd. to: Englewood Ave.
C
CN
6/1/2015
STP(S)
504
74
578
578
5/1/2015
S
Intersection realignment, install curb, gutter,
O
sidewalk, Safety Flashing Signal.
W
Totals
634
94
728
50
678
14
22
S. 48th Ave. & Summitview Ave. Signalization
12
P
N/A
P
PE
1/1/2015
STP(S)
25
4
29
29
CE
Yes
Summitview Avenue
T
RW
6/1/2015
STP(S)
25
4
29
29
from: Summitview Ave. to: S. 48th Ave.
CN
1/1/2016
STP(S)
554
81
635
635
12/1/2015
Install traffic signalization system
Totals
604
89
693
58
635
14
23
W. Lincoln Ave. & MLK Blvd. Realignment
01
P
0.50
C
PE
1/1/2014
STP(E)
424
67
491
491
CE
Yes
W. Lincoln Avenue
12
T
RW
1/1/2015
STP(E)
1,047
163
1,210
1,210
from: W. 5th Ave. to: Custer St.
W
CN
1/1/2016
STP(E)
1,801
281
2,082
2,082
12/1/2015
S
O
Realign W. Lincoln Avenue. Install curb, gutter,
P
sidewalks, street lighting, drainage.
G
Totals
3,272
511
3,783
491
1,210
2,082
14
24
E. Nab Hill Boulevard Reconstruction
03
P
0.85
C
PE
1/1/2014
STP(C)
546
84
630
630
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2015
STP(C)
1,090
170
1,260
1,260
from: S. 6th Street to: S. 18th Street
06
W
CN
1/1/2016
STP(C)
6,539
1,013
7,552
7,552
12/1/2015
S
Reconstruct and widen roadway to 5 lanes with
O
intersection improvements, curb, gutter, sidewalk,
P
street lighting and drainage system
G
Totals
8,175
1,267
9,442
630
1,260
7,552
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure
Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FU
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
25
S. 72nd Ave. & W. Washington Ave. 1/S
12
P
N/A
P
PE
1/1/2014
STP(C)
91
14
105
105
CE
Yes
S. 72nd Avenue
06
T
RW
1/1/2015
STP(C)
91
14
105
105
from: s. 72nd Ave. to: W. Washington Ave.
O
CN
1/1/2016
STP(C)
544
86
630
630
12/1/2015
Improve intersection by installing a traffic signal
S
system or roundabout.
W
Totals
726
114
840
105
105
630
17
26
S. 66th Avenue Improvements
03
P
0.76
P
PE
1/1/2014
STP(E)
86
14
100
100
CE
Yes
66th Avenue
04
T
RW
1/1/2015
STP(E)
173
27
200
200
from: Summitview Ave. to: Scenic Dr.
W
CN
1/1/2016
STP(E)
1,096
164
1,260
1,260
12/1/2014
S
Reconstruct and widen roadway, install curb, gutter,
O
sidewalk, storm drainage system and utilities.
Totals
1,355
205
1,560
100
200
1,260
14
27
N. 40th Ave. & Summitview Dr. 1/S
12
P
N/A
P
PE
1/1/2014
STP(U)
126
17
143
143
CE
Yes
N. 40th Avenue
T
RW
1/1/2015
STP(U)
63
8
71
71
from: N. 40th Ave. to: Summitview Dr.
W
CN
1/1/2016
STP(U)
544
86
630
630
12/1/2015
Improve the intersection by constructing larger curb
S
radii, lenghtening the turn lanes, and upgrading the
O
traffic signal system.
Totals
733
111
844
143
71
630
14
28
N. 40th Ave. & Englewood 1/S
12
P
N/A
P
PE
1/1/2015
STP(U)
43
7
50
50
CE
No
N. 40th Avenue
T
CN
6/1/2015
STP(U)
260
40
300
300
from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
Totals
303
47
350
350
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of
Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
(a
c
t
c
C. Project Title
E
m
c
'0
o
c-
Phase
State
State
Local
Total
Envir.
Required
Federal
U
D. Street /Road Name or Number
o V
i
u
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
4th
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
FO
_
o
Code
U-
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
N. 16th Avenue & Fruitvale Blvd. 1/S
12
P
N/A
P
PE
1/1/2013
STP(U)
126
18
144
144
CE
Yes
N. 16th Avenue
T
RW
6/1/2013
STP(U)
173
27
200
200
from: N. 16th Ave. to: Fruitvale Blvd.
O
CN
3/1/2014
STP(U)
315
43
358
358
2/1/2014
Improve the intersection by constructing larger curb
S
radii, installing ADA ramps, and upgrading the traffic
W
signal system.
Totals
614
88
702
344 358
14
30
N. 1st Street & '1' Street 1/S Improvement
12
P
N/A
P
PE
1/1/2015
STP(E)
32
5
37
37
CE
No
N. 1st Street
T
CN
6/1/2015
STP(E)
126
17
143
143
from: N. 1st Street to: '1' Street
W
S
Replace and upgrade traffic signal system
O
Totals
158
22
180
180
17
31
Rudkin Road Reconstruction
03
P
0.76
P
PE
1/1/2014
STP(C)
109
27
136
136
CE
No
Rudkin Road
06
T
CN
1/1/2015
STP(C)
945 TPP
945
106
1,996
1,996
from: E. Viola Ave. to: Rainier PI.
W
S
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
Totals
1,054
133
2,132
136 1,996
0
16
32
E. Mead Avenue Reconstruction
03
P
0.76
P
PE
1/1/2015
STP(S)
122 TPP
23
7
152
152
CE
No
E. Mead Avenue
06
T
CN
1/1/2016
STP(S)
1,730 TPP
206
70
2,006
2,006
from: Rudkin Rd. to: Fair Ave.
S
Partner with Union Gap to reconstruct E. Mead
C
Avenue, install curb, gutter, sidewalk and storm
G
drainage system.
O
Totals
1,852
229
77
2,158
152
2,006
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands
of
Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FU
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
33
S. 80th Avenue Improvements
04
P
1.30
P
PE
1/1/2015
AIP
131
20
151
151
CE
Yes
S. 80th Avenue
T
RW
1/1/2016
AIP
382
59
441
441
from: Tieton Drive to: Zier Road
O
CN
1/1/2017
AIP
1,667
2601
1,927
1,927
12/1/2016
S
Widen roadway, install curb, gutter, sidewalk, street
W
lighting and storm drainage system.
C
Totals
2,180
339
2,519
151
2,368
17
34
Englewood Avenue Improvements
05
P
1.00
P
PE
1/1/2015
STP(C)
272
43
315
315
CE
Yes
Englewood Avenue
06
T
RW
1/1/2016
STP(C)
349
55
404
404
from: N. 40th Ave. to: N. 56th Ave.
W
CN
1/1/2017
STP(C)
21352
340
2,692
2,692
12/1/2016
S
Widen roadway, install curb, gutter, sidewalk, street
O
lighting and storm drainage system.
C
Totals
2,973
438
3,411
315
3,096
17
35
Englewood Avenue Improvements
05
P
0.50
P
PE
1/1/2015
STP(U)
136
21
157
157
CE
Yes
Englewood Avenue
06
T
RW
1/1/2016
STP(U)
173
27
200
200
from: N. 16th Ave. to: N. 24th Ave.
W
CN
1/1/2017
STP(U)
1,164
182
1,346
1,346
12/1/2016
Widen roadway, install curb, gutter, sidewalk, street
S
lighting and storm drainage system.
Totals
1,473
230
1,703
157
1,546
14
36
Nab Hill Boulevard Sidewalk Improvements
12
P
2.50
P
PE
1/1/2015
STP(S)
55
8
63
63
CE
Yes
Nob Hill Boulevard
T
RW
1/1/2016
STP(S)
107
19
126
126
from: S. 16th Ave. to: S. 6th Street
S
CN
1/1/2017
STP(S)
321
57
378
378
12/1/2017
Construct sidewalk in locations where it doesn't exist
W
on the south side of Nob Hill
Totals
483
84
567
63
504
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FO
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
37
N. 34th Ave. & Fruitvale Blvd. 1/S Improvements
12
P
N/A
P
PE
1/1/2015
STP(U)
63
5
68
68
CE
No
Fruitvale Boulevard
T
CN
1/1/2016
STP(U)
567
76
643
643
from: Fruitvale Blvd. to: N. 34th Ave.
O
Improve intersection installing a traffic signal system,
S
curb, gutter and sidewalk.
W
Totals
630
81
711
68
643
17
38
Englewood Avenue Improvements
03
P
1.00
P
PE
1/1/2015
STP(U)
218
34
252
252
CE
Yes
Englewood Avenue
05
T
RW
6/1/2016
STP(U)
327
51
378
378
from: N. 24th Ave. to: N. 40th Ave.
06
W
CN
6/1/2017
STP(U)
2,980
244
3,224
3,224
5/1/2017
S
Reconstruct and widen roadway, install curb, gutter,
O
sidewalk, street lighting and storm drainage system.
Totals
3,525
329
3,854
252
31602
14
39
North /South Connector to West Valley
01
P
6.00
P
PE
1/1/2015
STP(U)
432
68
500
500
CE
Yes
Unknown Road
04
T
from: Ahtanum Rd. to: Summitview Ext.
06
W
S
Corridor study to determine the best location for a
C
north /south limited access route in West Valley. City
G
and County joint project.
O
Totals
432
68
500
500
14
40
River Road Improvements
03
S
0.50
P
PE
1/1/2013
140
140
140
CE
Yes
River Road
05
T
RW
6/1/2013
150
150
150
from: S. 16th Ave. to: S. 6th Ave.
06
G
CN
3/1/2014
FMSIB 639
491
1,130
1,130
2/1/2014
07
W
Reconstruct and widen roadway, install curb, gutter,
O
sidewalk, street lighting and storm drainage system.
Totals
781
1,420
290 1,130
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FO
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
41
18th Street Underpass
12
P
N/A
P
PE
1/1/2015
BRAC
240
60
300
300
CE
No
Yakima Avenue
T
CN
1/1/2016
BRAC
2,288
572
2,860
2,860
from: Yakima Ave. to: 18th Street
O
Replace the bridge on E. Yakima Avenue that crosses
S
over 18th Street.
W
Totals
2,528
632
3,160
300
2,860
17
42
88th Avenue Improvements
06
P
0.48
P
PE
1/1/2015
WSDOT
50
0
50
50
CE
Yes
88th Avenue
12
T
RW
1/1/2016
WSDOT
25
0
25
25
from: Tieton Dr. to: Summitview Ave.
C
CN
1/1/2017
WSDOT
320
10
330
330
12/1/2016
G
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
Totals
395
10
405
50
355
16
43
64th Avenue Improvements
03
P
1.00
P
PE
1/1/2014
STP(U)
200
32
232
200
CE
No
64th Avenue
04
T
CN
1/1/2015
STP(U)
1,600
249
1,849
1,849
from: Washington Ave. to: Nob Hill Blvd.
06
W
C
Widen roadway, install curb, gutter, sidewalk, street
G
lighting and storm drainage system.
O
Totals
1,800
281
2,081
200 1,849
14
44
North 1st Street Revitalization
06
P
0.50
P
PE
1/1/2016
STP(U)
605
95
700
700
CE
No
N. 1st Street
12
T
CN
1/1/2017
STP(U)
5,165
806
5,971
5,971
from: M LK Blvd. to: 'N' Street
G
C
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various
pedestrian and decorative elements.
Totals
5,770
901
6,671
6,671
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
a-
Project Identification
(Local Agency)
Projects Only
Federal Funding
R/W
U
E
A. PIN /Federal Aid No. B. Bridge No.
E
c
t
c
C. Project Title
E
m
c
o
a
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
U
D. Street /Road Name or Number
V
o 2
i
u
>
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
a a
+r
FU
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
45
Tieton Dr. & 64th Ave. 1/S Improvements
13
P
N/A
P
PE
1/1/2014
STP(U)
87
13
100
100
CE
Yes
Tieton Drive
05
T
RW
1/1/2015
STP(U)
260
40
300
300
from: Tieton Dr. to: 64th Ave.
12
O
CN
1/1/2016
STP(U)
692
108
800
800
12/1/2015
S
Improve intersection by constructing a left -turn lane
W
on Tieton Drive, installing a traffic signal system, curb,
C
gutter, sidewalk and street lighting.
G
Totals
1,039
161
1,200
100 300
800
16
46
S. 80th Avenue Bridge
01
P
0.25
P
PE
1/1/2014
STP(U)
44
6
50
50
CE
Yes
S. 80th Avenue
T
CN
1/1/2015
STP(U)
433
67
500
500
from: Wide Hollow Rd. to: Plath
O
12/1/2016
Construct new bridge over Wide Hollow Creek. Joint
project with the County.
Totals
477
73
550
50 500
14
47
16th Avenue Corridor Improvement
04
P
3.50
P
PE
1/1/2015
STP(U)
120
17
137
137
CE
16th Avenue
T
from: SR 12 to: Washington Ave.
W
C
G
Widen roadway, install curb, gutter, sidewalk, street
O
lighting and storm drainage system.
S
Totals
120
17
137
137
14
48
40th Avenue Corridor Improvements
04
P
3.20
P
PE
1/1/2015
STP(U)
120
17
137
137
CE
40th Avenue
T
from: SR 12 to: Washington Ave.
W
C
G
Widen roadway, install curb, gutter, sidewalk, street
O
lighting and storm drainage system.
S
Totals
17
137
137
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO /RTPO: YVCOG
Six Year Transportation Improvement Program
Hearing Date:
Amend Date:
From 2013 to 2018
Adoption Date:
Resolution No.:
Project Costs
in Thousands of Dollars
Federally
Funded
Expenditure Schedule
cu
Fund Source Information
Qn
a-
Project Identification
(Local Agency)
Projects Only
Federal Funding
R /N/
U
E
A. PIN /Federal Aid No. B. Bridge No.
(a
c
t
Qn
c
C. Project Title
E
m
c
'0
o
c-
Phase
State
State
Local
Total
Envir.
Required
Federal
4th
U
D. Street /Road Name or Number
o V
i
u
-1
v
Start
Federal Fund
Cost by
Fund Code
Funds
Funds
Funds
1st
2nd
3rd
Thru
Type
Date
C
O
E. Beginning MP or Road - Ending MP or Road
�,
a a
+r
FO
_
o
Code
LL
a
F. Describe Work to Be Done
E H
N
H
�
a
Phase
6th
(M M /YY)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
49
Nab Hill Boulevard Corridor Improvements
03
P
2.70
P
PE
1/1/2015
STP(U)
120
17
137
137
CE
Nob Hill Boulevard
04
T
from: 1 -82 to: 16th Ave.
O
S
W
Widen roadway, install curb, gutter, sidewalk, street
C
lighting and storm drainage system.
G
Totals
120
17
137
137
14
50
S. 1st Street /Main Street Corridor Improvements
01
P
2.00
P
PE
1/1/2015
STP(U)
120
17
137
137
CE
S. 1st Street /Main Street
T
from: Nob Hill Blvd. to: Barker Mill Bridge
O
S
Joint project with Union Gap. Widen roadway, install
W
curb, gutter, sidewalk, street lighting and storm
C
drainage system.
G
Totals
120
17
137
137
16
51
Washington Ave. Railroad Grade Separation
01
P
0.25
P
PE
1/1/2015
STP(U)
1,730
270
2,000
2,000
CE
Yes
Washington Avenue
T
RW
6/1/2016
STP(U)
1,730
270
2,000
2,000
from: Russel Ln. to: Longfiber Rd.
W
CN
1/1/2018
STP(U)
8,650
1,350
10,000
10,000
12/1/2017
Construct railroad grade overcrossing, including all
O
utilities
S
Totals
12,110
11890
14,000
2,000
12,000
16
52
Mead Avenue Railroad Grade Separation
1
P
0.25
P
PE
1/1/2015
STP(U)
1,730
270
2,000
2,000
CE
Yes
Mead Avenue
T
RW
6/1/2016
STP(U)
1,730
270
2,000
2,000
from: Presson PI. to: Maryland
W
CN
1/1/2018
STP(U)
8,650
1,350
10,000
10,000
12/1/2017
Construct railroad grade overcrossing, including all
O
utilities
S
Totals
1,890
14,000
2,000
12,000