Loading...
HomeMy WebLinkAbout06/07/2016 08 2017-2022 Six-Year Transportation Improvement Program - Public HearingBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 8. For Meeting of: June 7, 2016 ITEM TITLE: Public hearing regarding: A) Adoption of the Six -year Transportation Improvement Program for the years 2017 to 2022, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element; and continue to a second Public Hearing at the June 21, 2016 Council Meeting SUBMITTED BY: Brett Sheffield, Chief Engineer, 576 -6797 SUMMARY EXPLANATION: Attached is the 2017 — 2022 Six-year Transportation Improvement Program (TIP), along with an explanation sheet that describes the information contained on the various columns of the Six-year TIP. The following projects have been added: • #18 16th Avenue and Tieton Drive Intersection Improvements • #20 64th Avenue and Ahtanum Road Intersection Improvements • #21 South 16th Avenue Sidewalks • #22 McClure Elementary School Safety Improvements • #23 McKinley Elementary School Safety Improvements Projects removed from the 2016 — 2021 TIP, as they were completed or the funds were obligated are: • #1 Yakima Railroad Grade Separations, Phase 4 • #47 Lincoln Avenue Corridor Safety Improvements The City Council and the public are welcome to add other arterial system projects to the list. The six- year TIP project listing will be finalized at the June 21St hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue will be used. The current plan for 2017 — 2022 includes thirteen projects that are funded. Funding for the remainder of the projects will continue to be sought. The funded projects are: #1 — North 1St Street Revitalization, `N' Street to SR 12 #2 — North 1St Street Revitalization, MLK to `N' Street #3 — Powerhouse Road Sidewalk #4 —Adams Elementary/Washington Middle School Sidewalk Improvements #5 — Garfield Elementary Safety Improvements #6 — Yakima Valley Transportation Company Preservation #7 — Spring Creek Road Reconstruction #8 — South 36th Avenue Reconstruction #9 — Sorenson Road Reconstruction #10 — Bravo Company Boulevard #12 — Northside Alley Pavers #16 — S. 80th Avenue Bridge #17 —Wide Hollow Bridge Six -year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21St Century (TEA-21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The act specifies the systems in which certain funds can be used, activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA LU requires each designated MPO to develop a Transportation Improvement Program (TIP) and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize State funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of the integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels; therefore, local agencies are required to hold at least one public hearing during the development of the six-year transportation program. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six-year TIP for 2017 to 2022. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. ITEM BUDGETED: NA STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: STAFF RECOMMENDATION: Continue public hearing to June 21, 2016 BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Interim City Manager Description Upload Date Type D STIP explanation 5/27/2016 Cowr Merno D 2017-2022 5127/2016 Go Merno 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or - Major Collector RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access Urban (Over 5000 pop) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements Description 07 - Resurfacing 14 - Bridge Program - Special 08 - New Bridge Construction 21 - Transit Capital Project 09- Bridge Replacement 22- Transit Operational 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety /Traffic Operation /TSM 13 - Environmentally Related 25 23 - Transit Planning 24 - Transit Training /Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C -Cable TV G -Gas O -Other P -Power S - Sewer (other than agency- owned) T -Telephone W - Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day/year in MM /DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. BIA - Bureau of Indian Affairs BR - Bridge Replacement or Rehab. CDBG - Community Development 5309(FG) Block Grant (HUD) CMAQ - Congestion Mitigation Air Quality DEMO - ISTEA Demo Project (Selected) Discretionary - Ferry Boat Discretionary, Public REV Lands Highways, or Scenic Byways DOD - Dept. of Defense IC - Interstate Construction IM - Interstate Maintenance NHS - National Highway System 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 FTA Discretionary for Capital Expenditures 5307 - FTA Urban Areas 5309(Bus)- Bus 5309(FG) - Fixed Guideways 5309(NS) - New Starts 5310 - FTA Elderly /Disabled 5311 - FTA Rural Areas REV - Rural Economic Vitality Program STP(C) - STP Statewide Competitive Program STP(E) - STP Transportation Enhancements STP(S) - STP Safety Including Hazard and RR STP(R) - STP Rural Regionally Selected STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial Preservation Program CHAP - City Hardship Assistance Program TPP - Transportation Partnershis Program AIP - Arterial Improvement Program PSMP - Pedestrian Safety & Mobility Program PTST - Public Transportation Systems Progra PWTF - Public Works Trust RAP - Rural Arterial Program SCP - Small City Program WSDOT - WSDOT funding OTHER - All other unidentified state funding 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded proiects but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded proiects only.) 27 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/7/16 & 6/21/16 From 2017 to 2022 Adoption Date: Resolution No.: 6/21/2016 Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. 0 c t (a c z C. Project Title °J a c o a Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number > V o u � -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r _ o Code LL a F. Describe Work to Be Done E H N a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 North 1st Street Revitalization 3 S 0.42 P CN 1/1/2018 STP(U) 2,718 424 3,142 3,142 CE No North 1st Street 06 T from: 'N' Street to: SR 12 O Improve North 1st Street by rehabilitating the pavement C and lane markings, removing on- street parking, W enhancing street and pedestrian lighting, constructing S median islands and installing various pedestrian and decorative elements. Totals 2,718 424 3,142 3,142 14 2 North 1st Street Revitalization 06 S 0.98 P CN 1/1/2017 FASTLANE 8,500 TIB 1,500 0 10,000 6,500 3,500 CE Yes N. 1st Street 12 T from: MLK Blvd. to: 'N'Street G 12/31/2015 Improve North 1st Street by rehabilitating the pavement C and lane markings, removing on- street parking, W enhancing street and pedestrian lighting, constructing S median islands and installing various pedestrian and 0 decorative elements. Totals 8,500 10,000 6,500 3,500 17 3 Powerhouse Road Sidewalk 05 S 0.6 O CN TAP 245 245 245 CE No Powerhouse Road 12 C 11/1/20171 1 from: Cowiche Canyon Rd to: Mobile Home Park T Widen westbound lane to provide a 14 -foot wide shared bike lane and construct curb, gutter and sidewalk on the north side of the road. Totals 245 245 245 19 4 Adams Elem. /Washington M.S. Sidewalk Improvements 12 S N/A P CN 5/1/2017 SRTS 282 282 282 CE Yes Various Streets T 1 1 1 1 1 from: to: O 5/1/2017 This project will make various pedestrian safety improvements in the vicinity of Adams Elementary School and Washington Middle School, such as, constructing sidewalks, improving roadway crossings, installing flashers and installing fencing. Totals 282 282 282 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/7/16 & 6/21/16 From 2017 to 2022 Adoption Date: Resolution No.: 6/21/2016 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a F. Describe Work to Be Done � ,,, o +r a I I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 5 Garfield Elementary Safety Improvements 12 S N/A P CN 5/1/2017 SRTS 141 141 141 CE Yes Various Streets T from: to: O 1/1/2017 This project will make various pedestrian safety improvements in the vicinity of Garfield Elementary School, such as, constructing sidewalk, improving roadway crossings, installing flashers. Totals 141 141 141 14 6 Yakima Valley Transportation Company Preservation 03 S 0.02 O CN 1/1/2017 STP(E) 52 52 52 CE No Yakima Avenue from: Yakima Avenue to: 6th Avenue This project will remove and replace a portion of the existing trolley rail in the vicinity of the intersection of 6th Avenue and Yakima Avenue. Totals 52 52 52 17 7 Spring Creek Road Reconstruction 03 S 0.85 S CN 3/1/2017 SIED 1,100 820 1,920 1,920 SEPA Yes Spring Creek Road W from: Washington Ave. to: 36th Avenue 3/1/2017 Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 1,100 820 1,920 1,920 17 8 S. 36th Avenue Reconstruction 03 0.40 S CN 3/1/2017 SIED 520 385 905 905 SEPA Yes 36th Avenue W from: Spring Creek Rd. to: Sorenson Rd. 3/1/2017 Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 520 385 905 905 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a F. Describe Work to Be Done � ,,, o +r a I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 9 Sorenson Road Reconstruction 03 S 0.14 S CN 3/1/2017 SIED 180 140 320 320 Yes Sorenson Road W from: 36th Avenue to: 38th Avenue 3/1/2017 Widen roadway, install curb, gutter, sidewalk and street lights. Totals 180 140 320 320 16 10 Bravo Company Boulevard 01 S 0.65 P RW 1/1/2017 LIFT 800 200 1,000 1,000 CE Yes North 10th Street 06 T CN 1/1/2018 LIFT 4,480 1,120 5,600 5,600 from: 'H' Street to: Lincoln Ave. W 1/1/2018 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 5,280 1,320 6,600 1,000 5,600 16 11 E. 'H' Street Extension, Ph. 1 01 P 1.10 P RW 1/1/2017 500 500 500 CE Yes E. 'H' Street 08 T CN 1/1/2019 TIB 1,500 3,100 4,600 4,600 from: 1st Street to: 10th Street W 12/1/2018 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 3,600 5,100 500 4,600 00 12 Northside Alley Paver 07 S 3.5 P CN 1/1/2017 CMAQ 353 57 410 410 CE No Alleys between Folsom Ave. and Fruitvale Blvd. T from: 16th Avenue to: 6th Avenue C Pave the east /west gravel alleys between Folsom O Avenue and Fruitvale Boulevard from 16th Avenue to 6th Avenue Totals 353 57 410 410 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: 6/7/16 & 6/21/16 Amend Date: From 2017 to 2022 Adoption Date: Resolution No.: 6/21/2016 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund oE. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U_ a F. Describe Work to Be Done � ,,, o +r a I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 13 E. 'H'StreetExtension, Ph. 2 01 P 0.55 P RW 1/1/2019 STP(U) 432 68 500 500 CE Yes E. 'H' Street 08 T CN 1/1/2021 STP(U) 2,162 338 2,500 2,500 from: 10th Street to: 1 -82 W 1/1/2018 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage system. Totals 2,594 406 3,000 500 2,500 00 14 Cowiche Canyon Trail 28 P 2.00 RW 7/1/2019 CWA 105 105 105 Cowiche Canyon CN 1 1/1/2020 1 1 CWA 1,695 11695 1 1,695 from: Powerhouse Road to: Trailhead 1/1/2020 Construct a 10 -foot wide pathway, including two bridges over Cowiche Creek. Totals 1,800 105 1,695 14 15 E. Nob Hill Blvd. & Fair Ave. 1/S Improvements 03 P N/A P RW 1/1/2017 STP(U) 187 29 216 216 CE Yes Nob Hill Boulevard 04 T CN 6/1/2019 STP(U) 1,457 227 1,684 1,684 from: E. Nob Hill Blvd. to: Fair Ave. 31 W 1/1/2019 Widen Nob Hill Boulevard through the intersection, C construct left -turn lane, curb, gutter, sidewalk, street O lighting and drainage. Upgrade signal by installing mast arm structures. Totals 1,644 256 1,900 216 1,684 17 16 S. 80th Avenue Bridge 09 S 0.05 P PE 1/1/2017 DOE 25 0 25 25 CE No S. 80th Avenue T CN 1/1/2018 DOE 75 0 75 75 from: Wide Hollow Rd. to: Plath Ave. O Replace existing two -lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant in conjunction with the County's flood plain management project. Totals 100 75 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a EA ai cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, tM r_ o G a Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date LL a F. Describe Work to Be Done N H a- I Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 17 Wide Hollow Road Bridge 9 S 0.05 P PE 1/1/2017 DOE 25 25 25 CE No Wide Hollow Road T CN 1/1/2018 DOE 75 75 75 from: 89th Avenue to: 88th Avenue O Replace existing two -lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant in conjunction with the County's flood plain management project. Totals 100 100 25 75 14 18 16th Ave. & Tieton Dr. Intersection Improvements 5 P 0.40 P PE 1/1/2018 STP(U) 260 40 300 300 CE Yes 16th Avenue 7 T RW 1/1/2019 STP(U) 3,460 540 4,000 3,460 from: 16th Ave. to: Tieton Dr. G CN 4/1/2021 STP(U) 1,300 200 1,500 1,500 4/1/2021 O Reconstruct and widen 16th Avenue and Tieton Drive C S by adding left -turn lanes for all movements at the W intersection. Upgrade the traffic signal. Totals 5,020 780 5,800 300 3,460 1,500 14 19 18th Street Underpass 12 P 0.02 P PE 1/1/2018 BRAC 240 60 300 300 CE No Yakima Avenue T CN 1/1/2019 BRAC 2,288 572 2,860 2,860 from: Yakima Ave. to: 18th Street O S Replace the bridge on E. Yakima Avenue that crosses W over 18th Street. Totals 2,528 632 3,160 300 2,860 17 20 64th Ave. & Ahtanum Intersection Improvements 12 P N/A P PE 1/1/2017 CMAQ 56 9 65 65 CE Yes 64th Avenue T RW 1/1/2018 CMAQ 43 7 50 50 from: 64th Ave. to: Ahtanum Rd. C CN 5/1/2018 CMAQ 433 67 500 500 5/1/2018 O Improve the 64th Avenue and Ahtanum Road intersection by constructing a westbound right -turn lane on Ahtanum and installing a traffic signal. Totals 532 83 615 65 550 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a F. Describe Work to Be Done � ,,, o +r a I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 South 16th Avenue Sidewalks 12 P 0.88 P PE 1/1/2017 PBP 54 6 60 60 CE Yes 16th Avenue T RW 6/1/2017 PBP 234 26 260 260 from: Washington Ave. to: Nob Hill Blvd. C CN 6/1/2018 PBP 369 41 410 410 6/1/2018 Install 7 -foot sidewalk on the west side of 16th O Avenue. Totals 657 73 730 320 410 19 22 McClure Elementary School Safety Improvements 12 P N/A P PE 1/1/2017 SRTS 46 46 46 CE Yes Various locations T RW 6/1/2017 SRTS 65 65 65 from: to: C CN 6/1/2018 SRTS 380 380 380 6/1/2018 O This project will make various pedestrian safety improvements in the vicinity of McClure Elementary School, such as, constructing sidewalk, ADA ramps and improving crosswalks. Totals 491 491 111 380 19 23 McKinley Elementary School Safety Improvements 12 P N/A P PE 1/1/2017 SRTS 50 50 50 CE No Various locations T CN 6/1/2018 SRTS 430 430 430 from: to: C O This project will make various pedestrian safety improvements in the vicinity of McKinley Elementary School, such as, replacing delapitated sidewalk, constructing ADA ramps, and installing a HAWK pedestrian crossing system. Totals 480 0 480 50 430 12 24 SR 12 & 16th Avenue Interchange 03 P N/A O PE 1/1/2018 STP(U) 86 14 100 100 CE No Westbound ramps of SR 12 06 CN 1/1/2019 STP(U) 779 121 900 900 from: 16th Avneue to: SR 12 Construct a roundabout where the westbound ramps intersect with N. 16th Avenue. Totals 865 135 1,000 100 900 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/7/16 & 6/21/16 From 2017 to 2022 Adoption Date: Resolution No.: 6/21/2016 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U_ a F. Describe Work to Be Done � ,,, o +r a I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 25 S. 1st St. & E. Washington Ave. 1/S Improvements 03 P N/A P PE 1/1/2018 STP(U) 260 40 300 300 CE Yes South 1st Street 06 W RW 1/1/2019 STP(U) 260 40 300 300 from: S. 1st Street to: E. Washington Ave. S CN 1/1/2020 STP(U) 1,211 189 1,400 1,400 1/1/2020 Realign intersection, widen E. Washington Avenue to T accommodate an additional lane, replace curb, gutter O and sidewalk, and install a new traffic signalization system. Totals 1,731 269 2,000 300 300 1,400 14 26 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2018 STP(U) 100 14 114 114 CE Yes Washington Avenue 05 T RW 1/1/2019 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2020 STP(U) 688 107 795 795 1/1/2020 S Improve the Washington Avenue and Longfiber Road O intersection by constructing an eastboung left -turn lane on Washington and a northbound left -turn lane on Longfiber, install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety flashing signal Totals 888 135 1,023 114 114 795 14 27 E. Nab Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2018 STP(U) 545 85 630 630 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2019 STP(U) 1,090 170 1,260 1,260 from: S. 6th Street to: S. 18th Street 06 W CN 1/1/2020 STP(U) 6,532 1,020 7,552 7,552 1/1/2020 S Reconstruct and widen roadway to 5 lanes with O intersection improvements, curb, gutter, sidewalk, P street lighting and drainage system G Totals 8,167 1,275 9,442 630 1,260 7,552 14 28 N. 40th Ave. & Summitview Ave. Intersection 12 P N/A P PE 1/1/2018 STP(U) 126 17 143 143 CE Yes N. 40th Avenue T RW 1/1/2019 STP(U) 130 20 150 150 from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2020 STP(U) 692 108 800 800 1/1/2020 Improve the intersection by constructing larger S corner radii, lengthening the turn lanes, and O upgrading the traffic signal system. Totals 948 145 1,093 143 150 800 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: 6/7/16 & 6/21/16 Amend Date: From 2017 to 2022 Adoption Date: Resolution No.: 6/21/2016 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a F. Describe Work to Be Done � ,,, o +r a I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 N. 16th Avenue & Fruitvale Blvd. 1/S 12 P N/A P PE 1/1/2018 STP(U) 126 18 144 144 CE Yes N. 16th Avenue T RW 1/1/2019 STP(U) 173 27 200 200 from: N. 16th Ave. to: Fruitvale Blvd. O CN 1/1/2020 STP(U) 400 62 462 462 1/1/2020 Improve the intersection by constructing larger curb S radii, installing ADA ramps, and upgrading the traffic W signal system. Totals 699 107 806 144 200 462 16 30 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2019 STP(S) 122 TPP 23 7 152 152 CE No E. Mead Avenue 06 T CN 1/1/2020 STP(S) 1,730 TPP 206 70 2,006 2,006 from: Rudkin Rd. to: Fair Ave. S Partner with Union Gap to reconstruct E. Mead C Avenue, install curb, gutter, sidewalk and storm G drainage system. O Totals 1,852 77 2,158 152 2,006 17 31 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2018 STP(U) 223 35 258 258 CE Yes South 48th Avenue 05 T RW 1/1/2019 STP(U) 519 81 600 600 from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2020 STP(U) 1,485 232 1,717 1,717 1/1/2020 S Reconstruct and widen 48th Avenue, install curb, O gutter, sidewalk, street lighting and drainage system. Totals 2,227 348 2,575 258 600 1,717 17 32 Powerhouse Rd. & Englewood Ave. 1/S 12 P N/A P PE 1/1/2019 STP(S) 43 7 50 50 CE Yes Powerhouse Rd. T RW 1/1/2020 STP(S) 87 13 100 100 from: Powerhouse Rd. to: Englewood Ave. C CN 1/1/2021 STP(S) 500 78 578 578 1/1/2021 Realign intersection, install curb, gutter, sidewalk and S safety flashing signal. Possibly construct a O roundabout. W Totals 630 98 728 50 678 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W E z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund oE. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U_ a F. Describe Work to Be Done � ,,, o +r a I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 W. Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2018 STP(E) 424 67 491 491 CE Yes W. Lincoln Avenue 12 T RW 1/1/2019 STP(E) 1,047 163 1,210 1,210 from: N. 5th Ave. to: Custer St. W CN 1/1/2020 STP(E) 1,801 281 2,082 2,082 1/1/2020 S O Realign W. Lincoln Avenue, install curb, gutter, P sidewalks, street lighting, drainage. G Totals 3,272 511 3,783 491 1,210 2,082 14 34 N. 34th Ave. & Fruitvale Blvd. 1/S Improvements 12 P N/A P PE 1/1/2019 STP(U) 63 5 68 68 CE Yes Fruitvale Boulevard T RW 1/1/2020 STP(U) 87 13 100 100 from: Fruitvale Blvd. to: N. 34th Ave. O CN 1/1/2021 STP(U) 556 87 643 643 1/1/2021 S Improve intersection by installing a traffic signal W system, curb, gutter and sidewalk. Widen leg south of Fruitvale to inlcude a left -turn lane Totals 706 105 811 68 743 16 35 Tieton Dr. & S. 5th Ave. 1/S Improvements 12 P N/A P PE 1/1/2018 STP(U) 69 11 80 80 CE Yes Tieton Drive W RW 1/1/2019 STP(U) 104 16 120 120 from: Tieton Dr. to: S. 5th Ave. S CN 6/1/2020 STP(U) 865 135 1,000 1,000 5/1/2020 Remove existing traffic signal and construct a T roundabout, remove and replace curb, gutter, O sidewalk, street lighting and drainage Totals 1,038 162 1,200 80 120 1,000 17 36 Yakima Downtown Future Initiatives, Phase 5 06 P N/A P PE 1/1/2018 OTHER 500 500 500 CE No 12 T CN 4/1/2019 OTHER 5,500 5,500 5,500 from: 1st Street to: 9th Street C Install historic lighting, sidewalk modifications and S other improvements. Exact improvement area(s) to be determined Totals 6,000 6,000 500 5,500 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a EA ai cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r- 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 37 E. Nab Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2018 STP(U) 50 8 58 58 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2019 STP(U) 50 8 58 58 from: E. Nob Hill Blvd. to: S. 18th Street W CN 1/1/2020 STP(U) 346 54 400 400 1/1/2020 Widen south leg for double left turn from westbound S Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 446 70 516 58 58 400 14 38 S. 48th Ave. & Summitview Ave. Signalization 12 P N/A P PE 1/1/2019 STP(S) 25 4 29 29 CE Yes Summitview Avenue T RW 6/1/2019 STP(S) 25 4 29 29 from: Summitview Ave. to: S. 48th Ave. CN 1/1/2020 STP(S) 554 81 635 635 1/1/2020 Install traffic signal at the intersection of Summitview Avenue and 48th Avenue. Totals 604 89 693 58 635 14 39 S. 72nd Ave. & W. Washington Ave. 1/S 12 P N/A P PE 1/1/2018 STP(C) 91 14 105 105 CE Yes S. 72nd Avenue 06 T RW 1/1/2019 STP(C) 91 14 105 105 from: s. 72nd Ave. to: W. Washington Ave. O CN 1/1/2020 STP(C) 544 86 630 630 1/1/2020 Improve intersection by installing a traffic signal S system or roundabout. W Totals 726 114 840 105 105 630 14 40 N. 40th Ave. & Englewood Ave. Intersection 12 P N/A P PE 1/1/2019 STP(U) 43 7 50 50 CE No N. 40th Avenue T CN 6/1/2019 STP(U) 260 40 300 300 from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller. Totals 303 47 350 350 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r_ 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a M o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done E H N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41 Nab Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2020 STP(S) 55 8 63 63 CE Yes Nob Hill Boulevard T RW 1/1/2021 STP(S) 107 19 126 126 from: S. 16th Ave. to: S. 6th Street S CN 1/1/2022 STP(S) 327 51 378 378 1/1/2022 Construct sidewalk in locations where it doesn't exist W on the south side of Nob Hill Totals 489 78 567 567 14 42 E. Yakima Ave. & Fair Ave. Signalization 12 P N/A P PE STP(U) 86 14 100 100 CE No Yakima Avenue T CN 11/1/20191 6/1/2020 STP(U) 519 1 1 81 600 600 from: E. Yakima Ave. to: Fair Ave. W Install traffic signal at the intersection of Yakima S Avenue and Fair Avenue. O Totals 605 95 700 100 600 16 43 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2018 20 20 20 CE No S. 3rd Avenue T CN 9/1/2018 210 210 210 from: S. 3rd Ave. to: W. Washington Ave. Upgrade the traffic signalization system 230 230 230 Totals 230 230 230 19 44 75th Avenue Improvements 01 P 0.50 P PE 1/1/2019 STP(U) 87 13 100 100 CE Yes 75th Avenue 08 W RW 1/1/2020 STP(U) 173 27 200 200 from: Mead Ave. to: Nab Hill Blvd. S CN 1/1/2021 STP(U) 1,038 162 1,200 1,200 1/1/2021 T Construct a new two -lane roadway and widen O portions of existing roadway, install curb, gutter, sidewalk, street lighting and storm drainage system. Totals 1,298 202 1,500 100 1,400 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a EA ai cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r- 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 45 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2018 STP(U) 86 14 100 100 CE Yes 66th Avenue 04 T RW 1/1/2019 STP(U) 173 27 200 200 from: Summitview Ave. to: Scenic Dr. W CN 1/1/2020 STP(U) 1,096 164 1,260 1,260 1/1/2020 Reconstruct and widen roadway to three lanes, install S curb, gutter, sidewalk, storm drainage system and O utilities. Totals 1,355 205 1,560 100 200 1,260 17 46 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2018 STP(C) 109 27 136 136 CE No Rudkin Road 06 T CN 1/9/1900 STP(C) 945 TPP 945 106 1,996 1,996 from: E. Viola Ave. to: Rainier PI. W S Reconstruct roadway, install curb, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. Totals 1,054 945 133 2,132 136 1,996 17 47 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2020 STP(C) 272 43 315 315 CE Yes Englewood Avenue 06 T RW 1/1/2021 STP(C) 349 55 404 404 from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2022 STP(C) 2,329 363 2,692 2,692 1/1/2022 S O Widen roadway to three lanes, install curb, gutter, C sidewalk, street lighting and storm drainage system. Totals 2,950 461 3,411 3,411 17 48 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/2020 STP(U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW 1/1/2021 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2022 STP(U) 11164 182 1,346 1,346 1/1/2022 Widen roadway to three lanes, install curb, gutter, S sidewalk, street lighting and storm drainage system, water and sewer lines. Totals 1,473 230 1,703 1,703 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a EA ai cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r- 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 49 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2020 TIB 131 20 151 151 CE Yes S. 80th Avenue T RW 1/1/2021 TIB 382 59 441 441 from: Tieton Drive to: Zier Road O CN 1/1/2022 TIB 1,667 260 1,927 1,927 1/1/2022 S Widen roadway to three lanes, install curb, gutter, W sidewalk, street lighting and storm drainage system. C Totals 2,180 339 2,519 2,519 17 50 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2020 STP(U) 218 34 252 252 CE Yes Englewood Avenue 05 T RW 1/1/2021 STP(U) 327 51 378 378 from: N. 24th Ave. to: N. 40th Ave. 06 W CN 1/1/2022 STP(U) 21789 435 3,224 3,224 1/1/2022 S Reconstruct and widen roadway to three lanes, install O curb, gutter, sidewalk, street lighting and storm drainage system. Install sewer and water lines. Totals 3,334 520 3,854 3,854 17 51 88th Avenue Improvements 06 P 0.48 P PE 1/1/2019 STP(U) 43 7 50 50 CE Yes 88th Avenue 12 T RW 1/1/2020 STP(U) 52 8 60 60 from: Tieton Dr. to: Summitview Ave. C CN 6/1/2020 STP(U) 285 45 330 330 6/1/2020 G Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. Totals 380 60 440 50 390 17 52 64th Avenue Improvements 03 P 1.00 P PE 1/1/2019 STP(U) 200 32 232 232 CE No 64th Avenue 04 T CN 1/1/2020 STP(U) 1,600 249 1,849 1,849 from: Washington Ave. to: Nob Hill Blvd. 06 W C Widen roadway to three lanes, install curb, gutter, G sidewalk, street lighting and storm drainage system. O 1,800 281 2,081 232 1,849 0 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a EA ai cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r_ 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 53 1 -82 & Lincoln Avenue Interchange 01 P N/A O PE 1/1/2018 STP(U) 260 40 300 300 CE Yes Lincoln Avenue P RW 1/1/2019 STP(U) 173 27 200 200 from: E. V Street to: 1 -82 G CN 6/1/2020 STP(U) 1,730 270 2,000 2,000 6/1/2020 Reconstruct /extend off -ramp from existing 1 -82 off - ramp for Lincoln Avenue to E. V Street. 2,163 337 2,500 300 200 2,000 14 54 16th Avenue Corridor Improvement 04 P 3.50 P PE 1/1/2019 STP(U) 120 17 137 137 16th Avenue T from: SR 12 to: Washington Ave. W C G Study to determine strategies for improving the 16th O Avenue corridor S 120 17 137 137 14 55 40th Avenue Corridor Improvements 04 P 3.20 P PE 1/1/2019 STP(U) 120 17 137 137 40th Avenue T from: SR 12 to: Washington Ave. W C G Study to determine strategies for improving the 40th O Avenue corridor. S Totals 120 17 137 137 14 56 Nab Hill Boulevard Corridor Improvements 03 P 2.70 P PE 1/1/2019 STP(U) 120 17 137 137 Nob Hill Boulevard 04 T from: 1 -82 to: 16th Ave. O S W Study to determine strategies for improving the Nob C Hill Boulevard corridor. G 120 17 137 137 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2017 to 2022 Hearing Date: 6/7/16 & 6/21/16 Adoption Date: 6/21/2016 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, tw r- o G Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund c o E. Beginning MP or Road - Ending MP or Road a a ;� o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done N H 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 57 North /South Connector to West Valley 01 P 6.00 P PE 1/1/2019 STP(U) 432 68 500 500 CE Yes Unknown Road 04 T from: Ahtanum Rd. to: Summitview Ext. 06 W S Corridor study to determine the best location for a C north /south limited access route in West Valley. City G and County joint project. O 432 68 500 500 14 58 S. 1st Street /Main Street Corridor Improvements 01 P 2.00 P PE 1/1/2019 STP(U) 120 17 137 137 No S. 1st Street /Main Street T from: Nob Hill Blvd. to: Barker Mill Bridge O S Joint project with Union Gap. Stucy to determine W strategies for improving the 1st Street /Main Street C corridor. G 120 17 137 137 'IT Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn a- Project Identification (Local Agency) Projects Only Federal Funding R/W U E A. PIN /Federal Aid No. B. Bridge No. (a c t Qn c C. Project Title E m c '0 o c- Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number o V i u -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r FU _ o Code U_ a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 5 E. Lincoln Avenue & 10th Street Roundabout 03 P N/A P CN 1/1/2015 TIB 1,440 360 1,800 1,800 CE Yes Martin Luther King, Jr. Boulevard 05 from: E. Lincoln Ave. to: N. 10th Street 06 1/1/2015 Construct a roundabout at the intersection of Lincoln Avenue, 10th Street and MLK, Jr. Boulevard. Install curb, gutter, sidewalk, street lighting and drainage. Totals 1,440 360 1,800 1,800 12 6 SR 12 & 16th Avenue Interchange 03 P N/A O PE 1/1/2015 STP(U) 86 14 100 100 CE No Westbound ramps of SR 12 06 CN 1/1/2016 STP(U) 779 121 900 900 from: 16th Avneue to: SR 12 Construct a roundabout where the westbound ramps intersect with N. 16th Avenue. Totals 865 135 1000 100 900 11 7 1 -82 & Lincoln Avenue Interchange 01 P N/A O PE 1/1/2013 STP(U) 260 40 300 300 CE No Lincoln Avenue P RW 1/1/2014 STP(U) 173 27 200 200 from: E. V Street to: 1 -82 G CN 6/1/2014 STP(U) 1,730 270 2,000 500 1,500 Reconstruct /extend off -ramp from existing 1 -82 off - ramp for Lincoln Avenue to E. V Street. Totals 2,163 337 2,500 300 700 1,500 14 8 E. Yakima Ave. & Fair Ave. Signalization 12 P N/A P PE STP(U) 86 14 100 100 CE No Yakima Avenue T CN 11/1/20151 6/1/2016 STP(U) 1 519 1 1 81 600 1 1 600 from: E. Yakima Ave. to: Fair Ave. W Install traffic signal at the intersection of Yakima S Avenue and Fair Avenue. O Totals 605 95 700 100 600 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R/W U E A. PIN /Federal Aid No. B. Bridge No. c (a t c C. Project Title E m c '0 o c- Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number o V i u -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r FO _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 9 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2013 20 20 20 CE No S. 3rd Avenue T CN 9/1/2013 210 210 210 from: S. 3rd Ave. to: W. Washington Ave. Upgrade the traffic signalization system Totals 230 230 230 14 10 S. 1st St. & E. Washington Ave. 1/S Improvements 03 P N/A P PE 1/1/2014 STP(U) 260 40 300 300 CE Yes South 1st Street 06 W RW 9/1/2014 STP(U) 260 40 300 100 200 from: S. 1st Street to: E. Washington Ave. S CN 9/1/2015 STP(U) 1,211 189 1,400 200 1,200 8/1/2015 Realign intersection, widen E. Washington Avenue to T accommodate an additional lane, replace curb, gutter O and sidewalk, and install a new traffic signalization system. Totals 1,731 269 2,000 400 400 1,200 17 11 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2014 STP(U) 223 35 258 200 58 CE Yes South 48th Avenue 05 T RW 1/1/2015 STP(U) 519 81 600 600 from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2016 STP(U) 1,485 232 1,717 1,485 12/1/2015 S Reconstruct and widen 48th Avenue, install curb, O gutter, sidewalk, street lighting and drainage system. Totals 2,227 348 2,575 200 658 1,485 14 12 S. 72nd Ave. & Mead Ave. 1/S Signalization 12 P N/A P PE SRTS 25 5 30 30 CE No S. 72nd Avenue T CN 11/1/20131 6/1/2013 SRTS 1 258 1 1 25 283 283 1 1 from: S. 72nd Ave. to: Mead Ave. W S Install traffic signal system. O Totals 283 30 313 313 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FU _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 13 Zier Road Improvements 06 P 0.15 P PE 1/1/2013 SRTS 25 5 30 30 CE No Zier Road T CN 6/1/2013 SRTS 236 25 261 261 from: 75th Ave. to: 72nd Ave. C Install curb, gutter and sidewalk on the south side of S Zier Road. Totals 261 30 291 291 16 14 Tieton Dr. & S. 5th Ave. 1/S Improvements 12 P N/A P PE 1/1/2015 STP(U) 69 11 80 80 CE Yes Tieton Drive W RW 1/1/2016 STP(U) 104 16 120 120 from: Tieton Dr. to: S. 5th Ave. S CN 6/1/2016 STP(U) 865 135 1,000 1,000 5/1/2016 Remove existing traffic signal and construct a T roundabout, remove and replace curb, gutter, O sidewalk, street lighting and drainage Totals 1,038 162 1,200 80 1,120 16 15 E. 'H'StreetExtension 01 P 1.10 P PE 1/1/2013 STP(U) 303 47 350 250 100 CE Yes E. 'H' Street 08 T RW 6/1/2014 STP(U) 303 47 350 150 200 from: 1st Street to: Yakima River W CN 1/1/2016 STP(U) 1,730 270 2,000 2,000 12/1/2015 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 2,336 364 2,700 250 250 2,200 17 16 N. 10th Street Extension 01 P 1.3 P PE 1/1/2013 STP(U) 700 108 808 700 108 CE Yes North 10th Street 06 T RW 6/1/2014 STP(U) 5,500 850 6,350 300 6,050 from: 'R' Street to: Lincoln Ave. W CN 1/1/2016 STP(U) 7,900 972 8,872 8,872 12/1/2015 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 14,100 1,930 16,030 700 408 6,050 8,872 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. (a c t c C. Project Title E m c '0 o c- Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number o V i u -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r FU _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 17 Yakima Downtown Future Initiatives, Phase 5 06 P 0.15 P PE 1/1/2014 OTHER 500 500 500 CE No 12 T CN 4/1/2015 OTHER 5,500 5,500 5,500 from: 1st Street to: 9th Street C Install historic lighting, sidewalk modifications and S other improvements. Exact improvement area(s) to be determined Totals 6,000 500 5,500 17 18 75th Avenue Improvements 01 P 0.50 P PE 1/1/2016 STP(U) 87 13 100 100 CE No 75th Avenue 08 W RW 1/1/2017 STP(U) 173 27 200 200 from: Mead Ave. to: Nab Hill Blvd. S CN 1/1/2018 STP(U) 11038 162 1,200 1,200 Construct portions of and widen roadway, install T curb, gutter, sidewalk, street lighting and storm O drainage system. Totals 1,500 1,500 14 19 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2014 STP(U) 100 14 114 114 CE Yes Washington Avenue 05 T RW 6/1/2014 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2015 STP(U) 700 95 795 795 12/1/2015 Widen Washington Avenue to 5 lanes and widen S Longfiber Road to 3 lanes, install or replace curb, O gutter, sidewalk, street lighting and Safety Flashing Signal. Totals 900 123 1,023 228 795 14 20 E. Nab Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2014 STP(U) 50 8 58 58 CE No E. Nob Hill Boulevard 04 T CN 6/1/2014 STP(U) 346 54 400 400 from: E. Nob Hill Blvd. to: S. 18th Street W Widen south leg for double left turn from westbound S Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 396 62 458 458 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FU _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 Powerhouse Rd. & Englewood Ave. 1/S 12 P N/A P PE 1/1/2014 STP(S) 43 7 50 50 CE Yes Powerhouse Rd. T RW 1/1/2015 STP(S) 87 13 100 100 from: Powerhouse Rd. to: Englewood Ave. C CN 6/1/2015 STP(S) 504 74 578 578 5/1/2015 S Intersection realignment, install curb, gutter, O sidewalk, Safety Flashing Signal. W Totals 634 94 728 50 678 14 22 S. 48th Ave. & Summitview Ave. Signalization 12 P N/A P PE 1/1/2015 STP(S) 25 4 29 29 CE Yes Summitview Avenue T RW 6/1/2015 STP(S) 25 4 29 29 from: Summitview Ave. to: S. 48th Ave. CN 1/1/2016 STP(S) 554 81 635 635 12/1/2015 Install traffic signalization system Totals 604 89 693 58 635 14 23 W. Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2014 STP(E) 424 67 491 491 CE Yes W. Lincoln Avenue 12 T RW 1/1/2015 STP(E) 1,047 163 1,210 1,210 from: W. 5th Ave. to: Custer St. W CN 1/1/2016 STP(E) 1,801 281 2,082 2,082 12/1/2015 S O Realign W. Lincoln Avenue. Install curb, gutter, P sidewalks, street lighting, drainage. G Totals 3,272 511 3,783 491 1,210 2,082 14 24 E. Nab Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2014 STP(C) 546 84 630 630 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2015 STP(C) 1,090 170 1,260 1,260 from: S. 6th Street to: S. 18th Street 06 W CN 1/1/2016 STP(C) 6,539 1,013 7,552 7,552 12/1/2015 S Reconstruct and widen roadway to 5 lanes with O intersection improvements, curb, gutter, sidewalk, P street lighting and drainage system G Totals 8,175 1,267 9,442 630 1,260 7,552 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FU _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 25 S. 72nd Ave. & W. Washington Ave. 1/S 12 P N/A P PE 1/1/2014 STP(C) 91 14 105 105 CE Yes S. 72nd Avenue 06 T RW 1/1/2015 STP(C) 91 14 105 105 from: s. 72nd Ave. to: W. Washington Ave. O CN 1/1/2016 STP(C) 544 86 630 630 12/1/2015 Improve intersection by installing a traffic signal S system or roundabout. W Totals 726 114 840 105 105 630 17 26 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2014 STP(E) 86 14 100 100 CE Yes 66th Avenue 04 T RW 1/1/2015 STP(E) 173 27 200 200 from: Summitview Ave. to: Scenic Dr. W CN 1/1/2016 STP(E) 1,096 164 1,260 1,260 12/1/2014 S Reconstruct and widen roadway, install curb, gutter, O sidewalk, storm drainage system and utilities. Totals 1,355 205 1,560 100 200 1,260 14 27 N. 40th Ave. & Summitview Dr. 1/S 12 P N/A P PE 1/1/2014 STP(U) 126 17 143 143 CE Yes N. 40th Avenue T RW 1/1/2015 STP(U) 63 8 71 71 from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2016 STP(U) 544 86 630 630 12/1/2015 Improve the intersection by constructing larger curb S radii, lenghtening the turn lanes, and upgrading the O traffic signal system. Totals 733 111 844 143 71 630 14 28 N. 40th Ave. & Englewood 1/S 12 P N/A P PE 1/1/2015 STP(U) 43 7 50 50 CE No N. 40th Avenue T CN 6/1/2015 STP(U) 260 40 300 300 from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller. Totals 303 47 350 350 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. (a c t c C. Project Title E m c '0 o c- Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number o V i u -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r FO _ o Code U- a F. Describe Work to Be Done E H N H � a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 N. 16th Avenue & Fruitvale Blvd. 1/S 12 P N/A P PE 1/1/2013 STP(U) 126 18 144 144 CE Yes N. 16th Avenue T RW 6/1/2013 STP(U) 173 27 200 200 from: N. 16th Ave. to: Fruitvale Blvd. O CN 3/1/2014 STP(U) 315 43 358 358 2/1/2014 Improve the intersection by constructing larger curb S radii, installing ADA ramps, and upgrading the traffic W signal system. Totals 614 88 702 344 358 14 30 N. 1st Street & '1' Street 1/S Improvement 12 P N/A P PE 1/1/2015 STP(E) 32 5 37 37 CE No N. 1st Street T CN 6/1/2015 STP(E) 126 17 143 143 from: N. 1st Street to: '1' Street W S Replace and upgrade traffic signal system O Totals 158 22 180 180 17 31 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2014 STP(C) 109 27 136 136 CE No Rudkin Road 06 T CN 1/1/2015 STP(C) 945 TPP 945 106 1,996 1,996 from: E. Viola Ave. to: Rainier PI. W S Reconstruct roadway, install curb, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. Totals 1,054 133 2,132 136 1,996 0 16 32 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2015 STP(S) 122 TPP 23 7 152 152 CE No E. Mead Avenue 06 T CN 1/1/2016 STP(S) 1,730 TPP 206 70 2,006 2,006 from: Rudkin Rd. to: Fair Ave. S Partner with Union Gap to reconstruct E. Mead C Avenue, install curb, gutter, sidewalk and storm G drainage system. O Totals 1,852 229 77 2,158 152 2,006 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal 4th U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FU _ o Code LL a F. Describe Work to Be Done E H N H � a Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 33 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2015 AIP 131 20 151 151 CE Yes S. 80th Avenue T RW 1/1/2016 AIP 382 59 441 441 from: Tieton Drive to: Zier Road O CN 1/1/2017 AIP 1,667 2601 1,927 1,927 12/1/2016 S Widen roadway, install curb, gutter, sidewalk, street W lighting and storm drainage system. C Totals 2,180 339 2,519 151 2,368 17 34 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2015 STP(C) 272 43 315 315 CE Yes Englewood Avenue 06 T RW 1/1/2016 STP(C) 349 55 404 404 from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2017 STP(C) 21352 340 2,692 2,692 12/1/2016 S Widen roadway, install curb, gutter, sidewalk, street O lighting and storm drainage system. C Totals 2,973 438 3,411 315 3,096 17 35 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/2015 STP(U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW 1/1/2016 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2017 STP(U) 1,164 182 1,346 1,346 12/1/2016 Widen roadway, install curb, gutter, sidewalk, street S lighting and storm drainage system. Totals 1,473 230 1,703 157 1,546 14 36 Nab Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2015 STP(S) 55 8 63 63 CE Yes Nob Hill Boulevard T RW 1/1/2016 STP(S) 107 19 126 126 from: S. 16th Ave. to: S. 6th Street S CN 1/1/2017 STP(S) 321 57 378 378 12/1/2017 Construct sidewalk in locations where it doesn't exist W on the south side of Nob Hill Totals 483 84 567 63 504 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal 4th U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FO _ o Code LL a F. Describe Work to Be Done E H N H � a Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 37 N. 34th Ave. & Fruitvale Blvd. 1/S Improvements 12 P N/A P PE 1/1/2015 STP(U) 63 5 68 68 CE No Fruitvale Boulevard T CN 1/1/2016 STP(U) 567 76 643 643 from: Fruitvale Blvd. to: N. 34th Ave. O Improve intersection installing a traffic signal system, S curb, gutter and sidewalk. W Totals 630 81 711 68 643 17 38 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2015 STP(U) 218 34 252 252 CE Yes Englewood Avenue 05 T RW 6/1/2016 STP(U) 327 51 378 378 from: N. 24th Ave. to: N. 40th Ave. 06 W CN 6/1/2017 STP(U) 2,980 244 3,224 3,224 5/1/2017 S Reconstruct and widen roadway, install curb, gutter, O sidewalk, street lighting and storm drainage system. Totals 3,525 329 3,854 252 31602 14 39 North /South Connector to West Valley 01 P 6.00 P PE 1/1/2015 STP(U) 432 68 500 500 CE Yes Unknown Road 04 T from: Ahtanum Rd. to: Summitview Ext. 06 W S Corridor study to determine the best location for a C north /south limited access route in West Valley. City G and County joint project. O Totals 432 68 500 500 14 40 River Road Improvements 03 S 0.50 P PE 1/1/2013 140 140 140 CE Yes River Road 05 T RW 6/1/2013 150 150 150 from: S. 16th Ave. to: S. 6th Ave. 06 G CN 3/1/2014 FMSIB 639 491 1,130 1,130 2/1/2014 07 W Reconstruct and widen roadway, install curb, gutter, O sidewalk, street lighting and storm drainage system. Totals 781 1,420 290 1,130 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal 4th U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FO _ o Code LL a F. Describe Work to Be Done E H N H � a Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41 18th Street Underpass 12 P N/A P PE 1/1/2015 BRAC 240 60 300 300 CE No Yakima Avenue T CN 1/1/2016 BRAC 2,288 572 2,860 2,860 from: Yakima Ave. to: 18th Street O Replace the bridge on E. Yakima Avenue that crosses S over 18th Street. W Totals 2,528 632 3,160 300 2,860 17 42 88th Avenue Improvements 06 P 0.48 P PE 1/1/2015 WSDOT 50 0 50 50 CE Yes 88th Avenue 12 T RW 1/1/2016 WSDOT 25 0 25 25 from: Tieton Dr. to: Summitview Ave. C CN 1/1/2017 WSDOT 320 10 330 330 12/1/2016 G Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. Totals 395 10 405 50 355 16 43 64th Avenue Improvements 03 P 1.00 P PE 1/1/2014 STP(U) 200 32 232 200 CE No 64th Avenue 04 T CN 1/1/2015 STP(U) 1,600 249 1,849 1,849 from: Washington Ave. to: Nob Hill Blvd. 06 W C Widen roadway, install curb, gutter, sidewalk, street G lighting and storm drainage system. O Totals 1,800 281 2,081 200 1,849 14 44 North 1st Street Revitalization 06 P 0.50 P PE 1/1/2016 STP(U) 605 95 700 700 CE No N. 1st Street 12 T CN 1/1/2017 STP(U) 5,165 806 5,971 5,971 from: M LK Blvd. to: 'N' Street G C Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. Totals 5,770 901 6,671 6,671 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn a- Project Identification (Local Agency) Projects Only Federal Funding R/W U E A. PIN /Federal Aid No. B. Bridge No. E c t c C. Project Title E m c o a Phase State State Local Total Envir. Required Federal 4th U D. Street /Road Name or Number V o 2 i u > -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date C O E. Beginning MP or Road - Ending MP or Road a a +r FU _ o Code LL a F. Describe Work to Be Done E H N H � a Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 45 Tieton Dr. & 64th Ave. 1/S Improvements 13 P N/A P PE 1/1/2014 STP(U) 87 13 100 100 CE Yes Tieton Drive 05 T RW 1/1/2015 STP(U) 260 40 300 300 from: Tieton Dr. to: 64th Ave. 12 O CN 1/1/2016 STP(U) 692 108 800 800 12/1/2015 S Improve intersection by constructing a left -turn lane W on Tieton Drive, installing a traffic signal system, curb, C gutter, sidewalk and street lighting. G Totals 1,039 161 1,200 100 300 800 16 46 S. 80th Avenue Bridge 01 P 0.25 P PE 1/1/2014 STP(U) 44 6 50 50 CE Yes S. 80th Avenue T CN 1/1/2015 STP(U) 433 67 500 500 from: Wide Hollow Rd. to: Plath O 12/1/2016 Construct new bridge over Wide Hollow Creek. Joint project with the County. Totals 477 73 550 50 500 14 47 16th Avenue Corridor Improvement 04 P 3.50 P PE 1/1/2015 STP(U) 120 17 137 137 CE 16th Avenue T from: SR 12 to: Washington Ave. W C G Widen roadway, install curb, gutter, sidewalk, street O lighting and storm drainage system. S Totals 120 17 137 137 14 48 40th Avenue Corridor Improvements 04 P 3.20 P PE 1/1/2015 STP(U) 120 17 137 137 CE 40th Avenue T from: SR 12 to: Washington Ave. W C G Widen roadway, install curb, gutter, sidewalk, street O lighting and storm drainage system. S Totals 17 137 137 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule cu Fund Source Information Qn a- Project Identification (Local Agency) Projects Only Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. (a c t Qn c C. Project Title E m c '0 o c- Phase State State Local Total Envir. Required Federal 4th U D. Street /Road Name or Number o V i u -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r FO _ o Code LL a F. Describe Work to Be Done E H N H � a Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 Nab Hill Boulevard Corridor Improvements 03 P 2.70 P PE 1/1/2015 STP(U) 120 17 137 137 CE Nob Hill Boulevard 04 T from: 1 -82 to: 16th Ave. O S W Widen roadway, install curb, gutter, sidewalk, street C lighting and storm drainage system. G Totals 120 17 137 137 14 50 S. 1st Street /Main Street Corridor Improvements 01 P 2.00 P PE 1/1/2015 STP(U) 120 17 137 137 CE S. 1st Street /Main Street T from: Nob Hill Blvd. to: Barker Mill Bridge O S Joint project with Union Gap. Widen roadway, install W curb, gutter, sidewalk, street lighting and storm C drainage system. G Totals 120 17 137 137 16 51 Washington Ave. Railroad Grade Separation 01 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes Washington Avenue T RW 6/1/2016 STP(U) 1,730 270 2,000 2,000 from: Russel Ln. to: Longfiber Rd. W CN 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017 Construct railroad grade overcrossing, including all O utilities S Totals 12,110 11890 14,000 2,000 12,000 16 52 Mead Avenue Railroad Grade Separation 1 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes Mead Avenue T RW 6/1/2016 STP(U) 1,730 270 2,000 2,000 from: Presson PI. to: Maryland W CN 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017 Construct railroad grade overcrossing, including all O utilities S Totals 1,890 14,000 2,000 12,000