Loading...
HomeMy WebLinkAboutYakima County - Sanitary Sewer Improvements and Funding (3) '31 ;3 AGREEMENT FOR SANITARY SEWER IMPROVEMENTS AND FUNDING THIS AGREEMENT is entered into between the City of Yakima, (hereinafter the "City ") whose address is 129 North 2 Street, Yakima, Washington 98901, and Yakima County, Washington (hereinafter the "County ") through its Public Works Department, whose address is 128 North 2 Street, Room 408 County Courthouse, Yakima, Washington 98901. 1. RECITALS. 1.1 The County intends to construct road improvement projects known as the following: C 2925; 90 Ave., N. (from Chestnut Ave., W. to Summitview Ave.) and C 2926; Yakima Ave. W. (from 88 Ave., N. to 90 Ave., N.); hereinafter "the Road Project ". 1.2 The City wants to have sanitary sewer and side sewer lines (hereinafter "the Sewer Project ") constructed at certain locations within the limits of the Road Project. The location of the Sewer Project is shown on Exhibit `A'. 1.3 The County and City agree that having the Sewer Project constructed in combination with the Road Project is mutually beneficial. 1.4 The City has determined that it is in its best interest to provide funding for the Sewer Project and to allow Yakima County to do the construction. 1.5 The Yakima County Engineer has determined that it is in the best interests of the County that the Yakima County Public Works Department contract for the construction of the Sewer Project within the same construction contract as the Road Project. NOW, THEREFORE IT IS HEREBY AGREED: 2. THE CITY SHALL: 2.1 Provide the design, details, specifications, and estimate for the Sewer Project to the County. 2.2 Review the County's final contract plans and specifications and provide written approval of the Sewer Project plans and specifications to the County before the advertisement of the project. 2.3 Review construction bids provided by the County and provide written notice of approval or disapproval of the Sewer Project bids to the County before the award of a construction contract. Written notice will be provided to the County no later than five working days following opening of bids. 1 •R 2.4 Review and approve all Source of Materials submittals regarding the Sewer Project. 2.5 Provide all on -site field inspection for the construction of the Sewer Project except those services to be provided by the County identified in items 3.5 and 3.6 of this agreement. The City shall provide 24 -hour prior notice for testing services identified in item 3.5 and 3.6 of this agreement. The field inspection will be consistent with the Washington State Department of Transportation's 2004 Standard Specifications for Road, Bridge, and Municipal Construction and Washington State Department of Transportation's Construction Manual. The City shall prepare Daily Inspector Reports consistent with the standard of the industry. The Daily Inspector Reports shall clearly identify all bid items and quantities to be paid and list any agreed to change order work or any work paid under the bid item Minor Changes. The City shall provide copies of the Inspector Daily Reports to the County at least once a week. 2.6 Prepare a monthly progress estimate of quantities used on the Sewer Project using the bid item schedule for the construction contract. The progress estimate shall be provided to the County no later than the 5 day of each month. The progress estimate shall include all work completed through the last day of the previous month. 2.7 Upon review and approval by the City of the amounts charged, provide monthly progress payments to the County for work performed on the Sewer Project by the contractor. Progress payments shall be made to the County no later than the 20 day of each month. The progress payment shall be based on the progress estimate provided for in item 2.6 of this agreement. 2.8 Upon review and approval by the City of the amounts charged, provide a final payment to the County for all costs reasonably incurred by the County that are directly related to the Sewer Project. These costs shall include actual sewer construction costs made to the contractor, County personnel labor costs for time reasonably spent on the Sewer Project work, and material testing expenses. Final payment shall be made to the County no later than 30 days after the City receives the report of final costs from the County. 3. YAKIMA COUNTY SHALL: 3.1 Incorporate the City's Sewer Project design, details, and specifications into the County's Road Project. The Sewer Project construction bid items shall be listed under a separate pay schedule within the contract documents. 3.2 Provide a copy of the final plans and specifications for the construction project to the City Engineer for his review and approval before the advertisement of the project. 3.3 Provide a copy of the bid results to the City Engineer for his review and approval before the award of a construction contract. 3.4 Provide copies of all Source of Materials submittals for the Sewer Project to the City Engineer for his review and approval before use of the materials on the project. 3.5 Provide field inspection and material testing of trench excavation, trench backfilling, and pavement repair required for the Sewer Project. 3.6 Provide construction control surveying for the Sewer Project. 3.7 Make progress payments to the contractor. 3.8 Provide a monthly statement of progress payments made to the Contractor for the Sewer Project, and a bill requesting reimbursement for those costs. 3.9 Provide a statement of County personnel labor costs for time spent on the Sewer Project, including material testing costs, and a bill requesting reimbursement for those costs. 3.10 Provide a report of final costs for the Sewer Project to the City following completion of the construction contract. The report shall include a breakdown of costs incurred by the County. CITY OF YAKIMA ARD OF YAKIMA Cy NTY / COMMISSIONERS i f Richard A. Zais, City Manager ;`James M. Lewi., adman Date Signed esse S. Palacios, County Commissioner ' L� F � • ` vr4 tS { �� ✓ ` � i Ron F. Gamache, County FCxluss o%. tee--• *, ATTEST: ATTEST: o ' ' City Clerk %f Car,la NI War Cl; r , of the Board Contract No. .2 0 d `l / 0 7 Deputy Clerk of the Board City ' � Approved as to form: Authorized by City Resolution No. r✓� Deputy Prosecuting Attorney 14435 23010 23011 24010 24009 21003 I i 13409 1 94r 1I AVEIMUE ' -- -------- I 13421 1 LID - ---- -.1 i - - - -- - . 24007 13422 13423 JUANITA DR 23004 23006 ' • 1 13434 1 13433 __. 1 • ' , , - ---- 13432 14403 ' 24020 1 24019 . 23009 23007 , 23002 24004 • . 1 24002 1 ' 1 13436 13435 ' 23003 ' - - --- - .....L. „ -- Summitview Ave SUMMITVIEW AVE ,-- • , - nn a, 111 1 . ‘ 31500 31513 • 1 ; 31470 j 31471 1 1 43 32424 • \ L'' \ . \- -/4 32475 31478 i>1435,.. \ 1 -1 31501 • 1 32453 •-.. , -: . \ 3 . 31512 31469 . ---- ,. > 32420 \\ „. - ,, , < • --- , ' 31472 < Z 31510 _1 31466 ' 11/ ' . ,-- , 41410 • '" ' -. 1 '&1 9 1 ' ,\\,X'----------J ) ` 32478 1) -111)1 - 32431 , 31502 g 31511 1 ._____• = 32421 124 r .' 1 ,. .31 , 136" ' \\ \ ' 42015 1 w • ' 32425 1 \2% , ) 4147ap .'' 43 -. r•._ _ _ _ 31503 i - ,. • 31474" co 41413 0 z 32422 . 1 \ _ 32475 „ _32473 32432 -1 \\ . 1 ' - 1 31473 I (1' to ' 31480 1:,,\ , , 1 -1,457) 150 , 18 .?1c k ,s 32472 32433 w \' ) )31509 '- .__ALPINE CT 42016 32423 32426 4 K ‘ . ' \,........: .,, ,,,‘ '.,31505 , . 1 E - - -- ' 240. l ' , \ `f 32421 32471 32434 u, 11- 31481 1 / '_k. \L ,_. \3_,.-1;d56 ) 1 ,--- ' 31508 • 1 - 31467 41456 1 41457 31477 1 'co \ -----,W14, • ' ' ' >.i 3 2452 < 31506'31507 . 31466 31465 1 •, 5., 2 - --- i r; ,M,.. 1 z 41454 Si n1 z ,,.111,\ 1 41453 1 32001 L 32427 32482 32470 32435 31482 31455 _ ,L) 1 \ 3 L22 t e , [ 2-11-1 . N z 32469 32436 3- \\ . ' i i2 I 1) 32463 31454 31434 42007 --- 1 1 1 13245° 32451 31475 31476 ,Av 31433 31432 31431 3143013142931428 31483 e\ .. _ ---- - ' W BARGE ST • I 1 32497 r , • ' , 42 32008 32498 1 ) 32484 1 r 'c • 32468 32437 31485 31489 ,, ,144 - 1, 31453 - - - 1 32449 31484 ' . ' \ i x / X\„1 )/ 1421 31422 31423 31424 314253142L7 • 41403 32512 1 32513 32514 w ' 32465 1 Cr> 32467 32438 \ •. 31486 : 31490 31487 31491 314141 5\54, 42020 _ ¢11. • z \ 1 32448 • 32446 1 N ‘i F. \ \• 1 , -. , 1 , - 1 (Ln=,1 1) 32515 11 - 32486 1 32466 - 32440 32439 , 1 --) ----- -- \---,\ 1 \ 1 11 - )1 - . ,„,,:T:,,_ 32518 71 32499 32447 31486 ) \\\ — ` W YAKIMA AVE <1 32510 Z 32516 '17 32519 - - - 32487 32465 I. . . 41449 - -- 32500 -- 32441 ' , 1 . . ' 1 149 -2- -- 11 1 314821 ' cn '., `; _ W YAKIMA AVE - - 3248B ,. , 32464 • zr - 32506 1 3ir4 - 1 mot i ' r - •-, -' 1„ 3,\ r 1 1 1 -2 436 I _ 1 ' 32 32503 i I r - . % 22445 • , 3149 5314943 149 k 3250832507 ,-,„ -,„,„\ < .\.• ,,,„ si -----,-,-.. . - , \ _.\'''.=),,_-___.-_,_ 32502 32489 '/- \ 32433 32442 32443 32444 i 1 ' 324 - 93 L , 32490 32462 1 3114991498 o . t; 1 41450 1 324 32491 92 , 334 11495j 1 31447 , c c : c ' 31448 ,..s..ea 42021 41451 32496 4 32461 1 32460 . 32459 ,' . 1 a1497 1 -- 31405 3140)131400j . _ W CHESTNUT W Chestnut Ave " , I 43463 43464 ' . 33510 . - - 33494 34402 1 1 ' I , 1 -- -1-- ---- • 335111 , 33495 133496 . 33497,33498 1 33499 , . . ' 21' . 43411 43 1 ' „ cna 1 '" 33493 I 1 , 34412 34413 34012 7 43466 33504 33503 33502 33500 / 434fdoodwi 1 44412 44406 3314213 TORREY PINES LN 34409 1 , 34418 4 34414 ' 1 43412 , 43414 331 34419 3 '_34013 j 34011 . • _ °' 33442 33505 1 33506 33507 34410 a. 33417 4, 1 5 4 3413 - F. 44404 33 8 334-4-4 1 -- - - --- ---t 43415 1 r, „ I , CD I 43045 cv 33519 33514 j 335361E ' 34411 1 33 5 1 33445 _ 33136 ___ _ c :, 1 1 43416 NI , ot Vka. 43460 - *V. wre mit34 1,33446 33518 .I 33515 33535 1 I • 4) ' 33133 1 I; • 0 34420 1 34421 , • 44405 1 33413 1 , 33 1 1 33447 33517 :1133516 33534 co 34014 43417 ' - l ir ) -11 1 , 1 1, 11111111 .V" 0 33132 1 , _ W WALNUT ST I 34405 1 43404 1 43418 34010 0 1 " NI 4 I 3346 b425133427 33425 1 I ' 33491 1 - .).-.,,vn ) ' , 4 15 ,33426,33428i.. 33448 33520 33533 43004 V 4 :11 • 3 0 1 34404 _. ------ - --- W WALNUT ST 33449 . 3345 5 1 , ” 33523 33532 1 1 43905 4 1 / -- > --', 1 I 5 Scale -lin = 400ft , - . . 33458 33456 33450 1334541 ) 34416 43016 43006 ••••■••••• r 1 ■ , 1 1 , 01 i 33524 33531 33401 34403 34006 43007 , cc . 1 44420 1 I f - 33451 3340 1 1' i 344061 1 0 200 400 1 1 , • s94thlid Created: June 28, 2004 ‘47 4.T • SERVICE • E� „e1,4)::* u �c or s O vii . 4,0 J FAQ 4° VERN M. REDIFER, P.E. • DIRECTOR/COUNTY ENGINEER GARY N. EKSTEDT, P.E. - ASSISTANT DIRECTOR /TRANSPORTATION DONALD H. GATCHALIAN. P.E. - ASSISTANT DIRECTOR / ENVIRONMENTAL c ®aSIMrTif 128 North 2nd Street, Room 408 Courthouse, Yakima, Washington 98901 -2639 MAIN (509) 574 -2300 I FAX (509) 574 -2301 (Internet Address: www .pan.co.yakima.wa.us /pubworks/ July 6, 2004 City of Yakima Attention: K. Adams, City Engineer 129 N. First Street Yakima, WA 98901 RE: C 2925 90 Avenue, N.; (from Chestnut Ave.,W. to Summitview Ave); C 2926 Yakima Avenue, W. (from 88th Ave., N. to 90th Ave., N.); AGREEMENT FOR SANITARY SEWER IMPROVENMENTS AND FUNDING Yakima County intends to improve and pave with Hot Mix Asphalt portions of 90` Avenue, N.; (from Chestnut Ave.,W. to Summitview Ave); Yakima Avenue, W. (from 88th Ave., N. to 90th Ave., N.); this summer. The City of Yakima would the like the County to install the improvements as part of the road project. The County will do so according to the enclosed Agreement, which also places requirements on the City. Please review the enclosed Agreement, and if the City agrees to it, sign in the appropriate places and return to the County. Please call me at 574 -2336 if you have any questions. Sincerely, ' Joe McWalters Project Engineer G:\Projects \C 2922\seweragrcover.doc cc: Doug Mayo enclosure ACCOUNTING ENGINEERING MAINTENANCE 1 PERMIT SERVICES UTILITIES SOLID WASTE 5742280 574 -2300 574.2396 574 -2360 574 -2300 574 -2450