Loading...
HomeMy WebLinkAbout04/19/2016 07 2016-2021 Six-Year Transportation Improvement Program AmendmentBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 7. For Meeting of: April 19, 2016 ITEM TITLE: Public Hearing and resolution to amend the 2016 through 2021 Six - year Transportation Improvement Program SUBMITTED BY: Brett Sheffield, PE, Chief Engineer- 509.576.6797 SUMMARY EXPLANATION: The Six -year Transportation Improvement Program (TIP) is a list developed by the City that includes all of its transportation related projects. The City's existing six -year TIP has a list of 55 projects that amount to around $95,000,000. Only projects that are on the list are eligible to spend federal and state funds. Each year, near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its six -year TI P for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. Once the TIP has been approved by the City Council, projects are eligible to be included on the Statewide Transportation Improvement Program (STI P). Only projects that are listed on the STI P can utilize federal funds. The STI P is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan, which provides a backbone for developing projects for the intermodal transportation network in the state of Washington. Once established, the STI P can be amended at anytime during the year to add projects, so that they become available for federal or state funding. The first step to amend the STI P is for the City to amend its six -year TIP. The proposed amendment would add the following project: #53, Cowiche Canyon Trail, and make available $200,000 of funding for the design engineering. Attached is a letter from the William O. Douglas Trail Foundation stating their support of the project. ITEM BUDGETED: NA STRATEGIC PRIORITY: NA APPROVED FOR SUBMITTAL: STAFF RECOMMENDATION: t Interim City Manager Staff recommends Council conduct the public hearing and approve the resolution. BOARD /COMMITTEE RECOMMENDATION: ATTACHMENTS: RESOLUTION NO. R -2016- A RESOLUTION to amend the Six -year Transportation Program (TIP) for the period of 2016 through 2021 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -year TIP for the construction of, and repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable federal law; and, WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP; and WHEREAS, this amendment is limited to incorporation of the projects listed in the 6- Year TIP for the period of 2016 to 2021 and the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided for under RCW 36 70A.130(2B) and RCW 35.77.010; and WHEREAS, a public hearing has been held by the Yakima City Council to amend the 6- Year TIP on Tuesday, April 19, 2016, with proper public notice as required by RCW 35.77.010, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Program for the period of 2016 through 2021 for the City of Yakima, shall be amended to include the projects as shown on the attached spreadsheet. ADOPTED BY THE CITY COUNCIL this 19th day of April, 2016. ATTEST: Sonya Claar Tee, City Clerk Holly Cousens, Mayor Pro Tern Agency: Yakima Six Year Transportation Improvement Program Co. No.: 39 Co. Name: Yakima Co. From 2016 to 2021 City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015 Amend Date: 2/16/2016 Resolution No.: 2016 -026 Project Costs in Thousands of Dollars Federal) Funded y Project Identification Fund Source information Expenditure Schedule Projects Only E A, . PIN /Federal Aid No. B. Bridge No. c FederalFundin g Local Agency) (Local y} %W R/ Z C. Project Title V. 'a ;i Phase ° — p.streetjROadNameorNumber °� — `m u Start Federal State Federal Fund State Local Total 4th" Envir. Required c o E. Beginning MP or Road - Ending MP or Road n n o Code Cost by Fund Code Funds Funds Funds Tat 2nd 3rd Thru Type Date w xi. F. Describe Work to Be pone :. } H ti° _ a` Phase 6th (MM /YY) 1 1 2 1 3 4 5 1 6 7 8 9 10 11 Y2 13 14 15_ 16 17 18! 19 20 21 00 53 Cowiche Canyon Trail 28 S 2.00 PE 1 /19/2016 CWA 200 0 200 200 Cowiche Canyon P RW 7/1/2019 CWA 105 0 105 105 from: Powerhouse Road to: Trailhead P CN 1/1/2020 CWA 1,695 0 1,695 1,695 1/1/2020 Construct a 10 -foot wide pathway, including two bridges over Cowiche Creek. 2,000 200 0 0 1,800 17 54 Spring Creek Road Reconstruction 03 S 0.85 S PE 2J1J2016 153 153 153 Spring Creek Road P W RW 5/1/2016 75 75 75 ram: Washington Ave. to: 36th Avenue P CN 9/15/2016 1,920 1,920 1,920 Widen roadway to three lanes, install curb, gutter, sidewalk and street lights: 2,148 17 55 S. 36th Avenue Reconstruction 63 S 2%1/2016 " 72 72 72 36th Avenue W RW '5J1/2016 25 25 25 from: Spring Creek Rd; to: Sorenson Rd. CN 9/15/2016 905 905 905 Widen roadway, install curb, gutter, sidewalk and street lights, 1,002 17 56 Sorenson Rood Reconstruction 03 0.14 S PE 2/1/2016 25 25 25 Sorenson Road W RW 5/1/2016 S 5 5 from: 36th Avenue to: 38th Avenue CN 9 /151zots 320 320 320 Widen roadway, install curb, gutter, sidewalk and street lights. 4#1 MPO/RTPO: YVCOG N Inside Y Outside April 7, 2016 Lo� =�ff Total Project Total Est. STIP Func Project Imp Length Environmental RW Begin End Cost of Amend, Cis Number PIN STIP ID Type Type Required Termini Termini Project No. 00 YAK80 28 2,000 CE Yes Powerhouse Road Trailhead 2,000,000 Cowiche Canyon Trai Construct a 10 -foot wide pathway, including two bridges over Cowiche Creek A= Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total PE 2016 0 CWA 200,000 0 200,000 Project Totals 0 200,000 0 200,000 Expenditure Schedule Phase list 2nd 3rd 4th 5th & 6th PE 200,000 0 0 0 0 Totals 200,000 0 0 0 0 Federal Funds State Funds Local Funds Total Agency Totals for Yakima 0 200,000 0 200,000 i� 129 N. 2nd Street Yakima, WA 98901 William 0. Douglas Trail Foundation (WODTF) supports the City's efforts to design and build a pedestrian/bicycle trail bridge across Lower Cowiche Creek. This paved pathway project will eventually connect to the Yakima Greenway as a unified community trail system. We look forward to working with City staff on the design process for the William 0. Douglas Trail bridge and pathway. +�����r�mf mf�����' jfiaR.�----` --'-~---~ of —'� ----- -- -------- -' '' ---- '