Loading...
HomeMy WebLinkAbout08/03/2010 06 2011-2016 Six-Year Transportation Improvement Program Amendment BUSINESS OF THE CITY COUNCIL • YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6 For Meeting of: August 3, 2010 ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six -year Transportation Improvement Program (TIP) by adding four projects to the six- year TIP. SUBMITTED BY: Michael Morales, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678 Brett Sheffield, Chief Engineer 576 -6797 SUMMARY EXPLANATION: The Six -year Transportation Improvement Program (TIP) is a list developed by the City that includes all of its transportation related projects. The City's existing six -year TIP has a list of projects that amount to around $175 million. Only projects that are listed as having funding secured are guaranteed to be constructed. • Each year near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its six -year TIP for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. Once the TIP has been approved by the City Council, it is then added to the Statewide Transportation Improvement Program (STIP). Only projects that are listed on the STIP can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP can be amended during the year to add projects that become available for federal or state , funding. The first step to amend the STIP is for the City to amend its six -year TIP. (continued on Page 2) Resolution X Ordinances Other (Specify) Amended STIP Contract Mail to (name and address): Phone: Funding Source: STP Grant and Transportation Enhancement Grant APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt resolution amending the STIP BOARD /COMMISSION RECOMMENDATION: COUNCIL ACTION: Page 2 Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the II 2010 -2015 planning period. The proposed amendments consist of the following projects: 1. 64 Avenue Roadway Widening, Washington Avenue to Tieton Drive (existing TIP project #65).., This project is proposed to be divided into two projects. The first project (updated priority #65) consists of improving 64 Avenue from Nob Hill Boulevard to Tieton Drive by constructing a 39- foot roadway with curb, gutter, sidewalk, illumination and stromwater treatment. The second project (TIP Project #82) consists of making the same improvements to 64 Avenue between Washington. Avenue and Nob Hill Boulevard. The project was divided into two projects because the maximum dollar amount available per project at the last call for projects to be funded by the Surface Transportation Program (STP) was $900,000. The City was successful in obtaining a $900,000 grant for this project. 2. Powerhouse/William 0. Douglas Trail Connector (TIP Project #83). The City was successful in obtaining a $283,278 Transportation Enhancement grant for this project, which will construct a pathway that will connect the Powerhouse Trail to the William 0. Douglas Trail. • 4110 • • RESOLUTION NO. R- 2010 - A RESOLUTION to amend the Six -year Transportation Improvement Program (TIP) for the period of 2011 through 2016 to include projects affecting the City's Transportation Plan. • WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -year TIP for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and' applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6-Year Transportation Improvement Plan for the period of 2010 to 2015 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, a public hearing has been held by the Yakima City Council on amending • the 6 -Year Transportation Improvement Plan on Tuesday, August 3, 2010, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2011 through 2016 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. • ADOPTED BY THE CITY COUNCIL this 3rd day of August, 2010. Micah Cawley, Mayor ATTEST: City Clerk 1111 Washington department of Transportation Six Year Transportation Improvem gram -„ • Agency: Yakima From 2011 to 016 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 . Project Identification Project Costs in Thousands of Dollars Federally F ' . A. PIN /Federal Aid No. B. Bridge No. y d Fund Source Information Expenditure Schedule Projects Only 4 m : o C. Project Title • > m w 0 c • Federal Funding (Local Agency) R/W 5 a Z D. StreetlRoad Name or Number o N Y Phase Federal Federal State 4th Required LL E o •— m State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road t- . Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (Hwy)* F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 • 11 12 13 14 15 16. 17 18 19 20 21 14 1 01 p 0.2 T CN 4/1/2011 STP(U) 1700 FMSIB 2000 4530 8230 3000 5230 EA • P CN .4/1/2011 DEMO 3281 AIP. 1500 4781 3000 1781 Yes Yakima Railroad Grade Separations- Phase 3 06 Martin Luther King, Jr. Blvd 07 G • • from: N. 1 st Sreet to: N. 1st Ave 08 0 9 /1/2009 Construct Grade Separation and adjacent roadway reconstruction including . Front Street • . Totals 4,981 3500 4530 13011 6000 7011 00 2 12 S N/A ALL 1/1/2011 5307 1601 I 1601 3202 3202 CE Transit Operating Expenditures 22 No Various fixed rates and locations 23 • ' . ' • from: N/A to: N/A 24 • Annual operating assistance from the FTA in support of our transit system; 31 , fixed conte, paratransit Dial -A -Ride and vanpool program Totals 1,601 • • 1601 3202. 3202 • RW 1/1/2011 STP(E) 150 150 150 . 00 3 32 S N/A G CN G STP(E) 285 285 285 C E Yes William 0. Douglas Heritage Trails 13 Bridge Restoration & Trailhead 10 P • S from: to: T 6/01/09 Trailhead restoration, right of way acquisition partner with the William O. W Douglas Foundation, including restoration of bridge, cleaning, rust removal • and painting Totals 435 435 • 435 ALL 1/1/2011 5309(Bus) 1 I 280 50 330 00 4 22 S N/A I 50 100 100 80 . CE Street Asset Amenities (Transit) 31 . No Route Maintenance, Repair and Improvements . ' from: N/A 'to: N/A On going improvements to bus benches, shelters and signage infrastructure Totals 280 50 330 50 100 100 80 Report Date: July 27, 2010 Page 1 • . v . 5.7 - Supersedes p revious editions : • . • • • Frif Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2011 to .2016 Co. No.: 39 Co . Name: Yakima Co. He aring Date: 6 - 15 - 2010 Ad option Date: 6 - 15 - 2010 . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 - Project Identification Project Costs in Thousands of Dollars Federally Funded A. PINIFederal Aid No. B. Bridge No. E' 2, Expenditure Schedule Projects Only �' g m aN , Fund Source Information u , (Local Agency) o o E C Project Title E ,I 3 c i . . Federal Funding R/W a 5 D. Street/Road Name or Number • t'- ° ; " j± a Required m I% P Z ti— w 2 = t; Phase Federal Federal State 4th o u_ Envir. Date E a, State Local Total E. Be ginning MP or Road - Ending MP or Road Start Fund Cost by Fund 1st 2nd 3rd Thru • 9 g g a (mm Code Phase Code Funds Funds Funds 6th Type (MMNY) F. Describe Work to be Done 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 ALL 1/1/2011 CMAQ . 11 82 82 • 00 5 . 22 S N/A • Continue Transit Service to Terrace Heights No New University & Retail Links from: N/A to: N/A Extension of fixed route bus service only into the Terrace Heights area of . Yakima County ' . Totals • 71 11 82 82 CN 1/1/2011 JOBS 925 . 1 925 925 14 6 03 P .71 C ( . CE No Nob Hill Blvd and 64th Ave Improvements 05 • • . Nob Hill Blvd . 07 T • from: 53rd Ave to: 64th Ave 12 ' Widen and re- construct 64th Ave. to 33 -foot width with curb, gutter and 13 sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter • sidewalk and stormwater runoff treatment on the north side of Nob Hill. Totals • 925 925 925 14 7 12 , N/A p CN 1/1/2011 AIP 880 383 1263 1263 CE • T CN 7/1/2011 AIP 1000 214 1214 1214 Yes S 16th Ave & W Washington Ave Signal & Intersection. 05 S 16th Ave 03 , from: S 16th Ave to: W Washington Ave 4/1/2010 • Included in Union Gap's Valley Mall Blvd. project Totals 1880 597 2477 2477 • 16 8 . 05 S .20 G CN 1/1/2011 I I 600 6001 600 CE 66th Ave. & Summitview Intersection 12 J J Yes ' N. 66th Avenue & Summitview P from: N. 66th Ave. to: Summitview Ave. S Widen for left turn lanes, intersection improvements, curb, gutter, handicap T 4/1/2010 ramps and lighting w C Totals 600 600 600 • • Report Date: July 27, 2010 Page 2 v. 5.7 - Supersedes - previous editions • • • • 0 . • fi . .0 • ,o. 71 Washington•Department of Transportation Six Year Transportation Improvemeneogram Agency: Y a k ima ' From 2 011 t0 2016 • Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 6 -15 -2010 Adoption Date: 6-15-20.10 City No.: 1485 MPO /RTPO: YVCOG . • Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded m` • A. PIN /Federal Aid No. B. Bridge No. d ^ .c v (Local Agency) Fund Source Information Expenditure Schedule Projects Only g w ..E•1:, o C. Project Title E y w c o = • . • 0 15 .E z Federal Funding R/W U li D. Street/Road Name or Number o y g 13 Phase Federal Federal State 4th Required u E. Beginning MP or Road - Ending MP or Road E r °' Start Fund Cost by Fund State Local Total Envir. Date Thru F. Describe Work to be Done li (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/� >7 1 2 3 4 5 . 6 7 8 9 10 11 12 13 14 15 16 17 . 18 19 20 21 00 9 03 S .50 S CN 1/1/2011 CMAQ 540 214 754 754 . CE . . Coolidge Road Widening and Paving. 05 W ' . Yes • 06 T from: 80th AVE. to: 88TH AVE. T • Widen roadway and pave with curb and gutter. • 9/1/2009 Totals • .540 • 214 754 754 00 10 21 S N/A ALL 1/15/2013 5309(NS) . 96 84 . 1801 180 CE Acquisition of new Dial -A -Ride paratransit vehicles No • from: N/A to: N/A ' Purchase new vehicles to replace older, less reliable units • • Totals 96' 84 180 180 ' 14 11 03 P N/A PE 1/1/2011 STP(U) 173 27 200 • 200 RW 1/1/2012 STP(U) 433 67 500 500 CE • E. Lincoln & 10th Street Roundabout 05 CN 6/1/2012 ' STP(U) 1125 175 1300 1300 Yes , 06 from: E. Lincoln to: E. MLK Jr. Blvd. 6/1/2011 Roundabout construction at intersection curb, gutter, sidewalk, & street lighting . Totals 1,731 2,7 242 2000 200 1800 • 12 12 03 P N/A O ALL 1/1/2011 STP(U) • 865 135 10001 1000 ' S.R.12 & 16th Avenue Interchange 06 . CE No • . Interchange • .. from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout Totals 865 135 1000 1000 • Report Date: July.27, 2010 ' Page 3 v. 5.7 - Supersedes previous editions • • • • • • Washington State Department of Transportation Six Year Transportation Improvement Program -en Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name:. Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: • Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded ill A. PIN /Federal Aid No. B. Bridge No. m ^ c d a , Fund Source Information Expenditure Schedule Projects Only c 2 � E y H c c w (Local Agency) u • m o f C. Project Title a J a F Funding R/W o a` Z D. Street/Road Name or Number o y ! ° _ Ph ase Federal Federal State 4th Required a E. Beginning MP or Road - Endin MP or Road E 1 . m S tart Fund Cost by Fund State Local Total Thru Envir. Date g g g y Funds Funds Funds 1st 2nd 3rd Type (MM/YY) - F. ,Describe Work to be Done a (mm/dd/YYYY) Code Phase Code 6th 1 2 3 4 5 6 7 • 8 9 10 11 12 13 14 15 16 17 18 . 19 20 21 . . 11 13 ALL 1/1/2012 STP(U) 865 135 1000 1000 01 P N/A o EA 1 -82 & Lincoln Avenue Interchange P Yes 1 -82 Interchange G - • from: E. "G" Street to: 1 -82 6/2011 Reconstruct / extend off -ramp from existing 1 -82 off -ramp for Lincoln Avenue to E. "0" Street - - Totals 865 • 135 1000 ' 1000 . 14 14 12 P N/A P ALL 1/1/2012 STP(U) 865 135 10001 1000 CE E. Yakima Avenue & Fair Avenue Signalization W No . T . from: E. Yakima Avenue to: Fair Avenue S O Construct Traffic Signal Totals • 865 135 1000 1000 . ALL 1/2/2011 5316 131 131 2621 131 131 CE . 00 15 • 22 S Fixed route Bus Services to Moxee along SR 24 Corridor No SR 24 Hwy Corridor/Park & Ride Lots ' from: to: . JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park & Rlde lots along SR 24. • Totals 131 131 262 131 131 . RW 1/1/2012 STP(U) 173 27 200 200 14 16 31 P N/A O CN 4/1/2012 STP(U) 865 I 135 1000 1000 CE Yes E Nob Hill Blvd & Fair Ave 03 • E Nob Hill Blvd 04 P from: E Nob Hill Blvd • to: Fair Ave T • Intersection widening & new signal, curb, gutter and sidewalk, street lighting, W 4/1/2001 stormwater Totals 1,038 162 1200 1200 • Report Date: July 27, 2010 • Page 4 v. 5.7 - Supersedes previous editions • • ® • 0 0 . •411111■. Washington department of Transportation en • Six Year Transportation Improvemengram • - AAggency: Yakima From 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. • - Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. • B. Bridge No. • . c v Fund Source Information Expenditure Schedule Projects Only s y -D C. Project Title E CD a H c o a (Local Agency) - • -, co o E ; a w _, 0 r Federal Funding RNV . Z D. Street/Road Name or Number aF w 4 -6 Phase Federal Federal State 4th Required LL Envir. Beginning MP or Road - Ending MP or Road E r 5 °' S tart F un d C os t by Fund State Local Total Thru . Date F. Describe Work to be Done k (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Y1� ' 1 2• 3 4 5 6 7 8 9 . 10 11 12 13 14 15 16 17 18 19 20 - - 21 • 16 17 " 12 P N/A P PE 4/1/2011 • 13 13 13 ' CN 6/1/2011 214 214 214 CE S 3rd Ave & W Washington Ave Signal .T No . S 3rd Ave from: S 3rd Ave • to: W Washington Ave . Signal Upgrades . Totals • 227 ' 227 227 • 14 18 4579 12 P N/A P PE 6/1/2011 STP(U) 252 38 2901 290 • EA S 1st St. - E. Washington Ave. Intersection Improvement W Yes S 1st St. S from: S 1st St. to: E Washington Ave. T O Realign intersection, upgrade traffic signal • 01/01/11 Totals 252 38 290 290 • 17 19 4587 03 p 1.00 P ALL 4/1/2012 STP ' 2268 307 25751 525 2050 EA S 48th Ave. Reconstruction T Yes S 48th Avenue W from: Summitview Ave. to: Nob Hill Blvd. s Widen, curb, gutter, sidewalk, lighting, drainage O 4/1/2014 • • Totals 2 . 307 2575 . 525 2050 ' 14 20 03 P N/A O PE 1/1/2012 STP(U) 51 8 59 59 _ ' South 72nd Ave &MeadAvelntersection 12 P . CN 6/1/2012 STP(U) 383 61 444 444 CE Yes South 72nd Ave S from: South 72nd Ave to: Mead Ave T New intersection, signals, curb, gutter and sidewalk • W '" 6/10/2010 Totals • 434 69 503 503 • Report Date: July 27, 2010 Page 5 v. 5.7 . - Supersedes previous editions ' • • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 . • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG . Amend Date: Resolution No.: 2010-66 Project Identification Project Costs in Thousands of Dollars , ' . Federally Funded Expenditure Schedule • Projects Only A. PIN /Federal Aid No. B. Bridge No. • d ., c o u! at Fund Source Information ` o_ y c C. Project Title m " . e . o L . (Local Agency) R/W o f Project 0 d Federal Fundin U a Z D. Street/Road Name or Number a '- to B A. Phase Federal Federal State 4th Required LL E o 4, State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road t— m •o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (/yrytn y) F. Describe Work to be Done a _ (mrn C Phase Code 6th 1 2' 3 4 5 6 7 8 9 10.' 11 12 ' 13 14 15 16 17 18 • 19 20 21 16 21 4562 12 P N/A P ALL 4/4/2012 STP(U) 378 WSDOT 378 756' 756 CE Tieton Dr- S 5th Ave. Intersection Project ' W • Yes Tieton Drive T from: 5th Ave. Intersection to: O 4/1/2014 Replace traffic signal with roundabout S - Totals 378 378 756 756 16 22 01 P 1.1 0 PE 1/1/2012 STP(U) 2180 340 2520 2520 CE • E. 'H "Sf. Extension RW 1/1/2014 STP(U) 2180 340 2520 2520 08 S • CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E. "H" St. from: 1st St. to: Yakima River T W 1/1/2014 Construct road including water, sewer, curb, gutter and sidewalk for future development. Totals 5,559 2551 8110 2520 • 5590 PE 1/1/2012 STP(C) 700 108 808 808 17 23 01 P 1.3 0 RW 1/1/2013 STP(U) 5500 850 6350 6350 CE N. 10th St. Extension 06 3 CN 6/1/2013 STP(U) 7900 972 8872 8872 Yes N. 10th St. from: R St. to: 10th Street - Lincoln Ave. T Construct road including water, sewer, curb, gutter, sidewalk for future W • 1/1/2013 development. • I Totals • 14,100 1930 16030 808 15222 • . 00 24 23 P N/A PE 1/1/2011 5309(NS) 400 OTHER 100 5001 500 CE West Side Transit Center No • Acquire Property to Expand Operations • from: N/A ' .to: N/A • ' Locate and acquire property for the placement of a West Side Transit Center Operation Totals 400 100 500 500 Report Date: ,July 27, 2010 Pages v. 5.7 Supersedes previous editions • • • • 410 . 0 . 0 . . W Washington of Transportation Si Year Transportation Improvemenegram Agency: Yakima From 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 201 -66 • Project Identification Project Costs in Thousands of Dollars • Federally Funded • • A. PIN /Federal Aid No. B. Bridge No. c , .0 EX Expenditure Schedule Projects Only m 9 o v F und Source Infor p I y ` s N � C. Project Title o (Local Agency) '.. co . E ) ; 8 _, o r Federal Funding R/W v n Z D. Street/Road Name or Number a co 3 Phase Federal Federal State 4th Required u` E. Beginning MP or Road - Ending MP or Road E a Start Fund Cost b Fund State Local Total Thru Envir. Date y Funds Funds Funds 1st 2nd 3rd Type (Iynyyy) F. Describe Work to be Done a (mm/ddlyyyy) Code Phase Code 6th. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 • 17 25 06 P .60 P PE 4/1/2011 OTHER 6000 6000 6000 . • CE Yakima Downtown Future Initiatives, Phase 5 12 r W No S • from: 1st Street to: 9th Street T • Install Historic Lighting, Sidewalk Modification & Other Improvements. 0 . Exact improvement area(s) to be determined. Totals 6000 6000 6000 • PE 1/1/2011 STIP (S) 60 60 120 120 00 26 01 . p N/A CN 4/1/2012 STP(S) 180 AIP ' 240 420 420 CE Annual Signal Upgrades CN 4/1/2012 STIP (S) 360 360 360 No Local-Selection ' from: N/A to: N/A . Upgrade signals . • Totals 600 240 60 900 120 780 00 27 07 P N/A w CN 6/1/2011 STP(U) 228 32 2601 260 , • EA Various Overlay Projects/Selected on Local Priority S No • N/A from: N/A to: N/A . . . ' . Totals 228 • • 32 260 260 • PE 1/1/2011 STP(U) 100 14 114 114 • 19 28 03 P N/A P CN 3/1/2012 STP(U) 700 95 795 795 • CE Longfiber Rd & Washington Ave 05 S Yes Intersection • 06 W T from: to: 0 3/1/2012 • New intersection construction and reconstruction, 3 -lane and 5 -lane w /tum, , curb, gutter, sidewalks. ' Totals 800 109 909 114 795 Report Date: July 27, 2010 • Page 7 . • • v. 5.7 - Supersedes previous editions T Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2011 to 201 • Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City. No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule Projects Only F, ' A. PIN /Federal Aid No. B. Bridge No. m c a N Fund Source Information (Local Agency) 9.m .o C. Project Title a a a 0 r Federal Funding R/W U li Z D. Street/Road Name or Number a - N IS u Phase Federal Federal State 4th Required u` E. Beginning MP or Road - Ending MP or Road 1- o Start Fund Cost by Fund State Local Total 1st 2n d 3rd Thru Envir. Date F. Describe Work to be Done a (mMdd/yyyy) Code Phase Code Funds • Funds Funds 6th Type (M � 1 '2 3 4 5 6 7 8 9 10 11 12 13 14 15 .16 17 18 19 20 21 CN 4/1/2011 STP(U) 240 42 282 282 14 29 • 04 P .1 C CE. E Nob Hill Blvd & S 18th St 01 S . Yes E Nob Hill Blvd W from: S 18th St . to: E Nob Hill Blvd T . Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT. - 01/01/07 Project) possible curb, gutter and sidewalk - Totals 240 42 282 282 PE 1/1/2011 STP(E) 22 7 29 29 . 17 30 05 P .15 C CN 6/1/2011 STP(E) 75 20 951 95 • CE Zier Rd - S 75th Ave to S 72nd i4ve 06 Yes Zier Rd T - from: S 75th Ave S 72nd Ave P 6/1/2011 Minor widening, curb, gutter and sid Totals 97 27• 124 124 00 31 07 P N/A S PE 1/1/2011 50 50 50 CE . CN 6/1/2011 240 240 240 • Gravel Road B. No Various Areas - from: City Wide ' to: . • • Totals • 290 290 290 • 16 32 12 P N/A T CN 10/1/2013 STP(S) 504 74 578 I 578 CE Powerhouse Rd & Englewood Ave P Yes Powerhouse Rd 0 . from: Powerhouse Rd to: Englewood Ave S Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, C 10/1/2013 possible roundabout W • Totals 504 74 578 578 Report Date: July 27, 2010 Pages v. 5.7 - Supersedes previous editions • • • • ® ® d •7 11 Washington of Transportation ID Six Year Transportation Improvemertliogram . Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 . • • Project Identification Project Costs in Thousands of Dollars Federally Funded . c L- A. PIN /Federal Aid No. B. Bridge No.. 5 Fund Source Information Expenditure Schedule Projects Only t m . o C. Pro Title > <I, a 3 • o . ` c Federal Funding (Local Agency) RlW L'cc U li Z D. StreetlRoad Name or Number aF ce Z^ D. Phase Federal Federal State 4th Required • o . State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road E 1- o Start Fu nd Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/yy) F. Describe Work to be Done a (mm Code P hase Code 6th . .1 2 3 4 5 6 7 8 9 . ' 10 11 12 13 14 15 16 17 18 19 20. 21 PE 1/1/2013 STP(S) 25 4 29 29 14 33 12 P N/A P RW 6/1/2013 STP(S) 25 4 29 29 -CE S 48th Ave .& Summitview Ave Signalization • T CN 8/1/2014 STP(S) 554 81 635 635 Yes S 48th Ave from: S 48th Ave to: Summitview Ave 8/1/2013 Signalization Totals 604 89 693 58 635 14 34 01 P . W RW 1/1/2013 STP(E) 1047 163 1210 491 1210 CE W Lincoln Ave 8 'B' St Realignment 12 8 CN 1/1/2014 STP(E) 1801 281 2082 2082 Yes W Lincoln Ave . from: W 5th Ave - to: Custer St P Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights _ 1/1/2014 G C Totals 3,272 511 3783 491 1210 2082 16 35 12 P N/A w 1 1 1 1 1 1 1 1 1 1 CE School Safety Projects No Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features • . Totals • • • 14 36 03 P .85 C RW 1/1/2013 STP(C) 1 170 1260 630 1260 EA E Nob Hill Blvd. Reconstruction - 04 O G CN 1/1/2014 STP(C) 6539 1013 7552 7552 Yes E Nob H ill Blvd. 06 ' . from: S 6th Street to: S 18th Street P • S 1/1/2014 Major roadway widening and reconstructon to 5lanes with Intersection . T • improvements, curb, gutter, sidewalks, replacement or relocation of meters . an hydrants - W Totals • 8,175 1267 9442 630 1260 7552 , . v. 5.7. - Supersedes previous editions . • Report Date: July 27, 2010 . - Page 9 - ' • • • Washington State Department of Transportation Six Year Transportation Improvement Program - en Agency: Yakima From 2011 to 2016 - Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c r , ; E Schedule P rojects Only' �, N Fund Source Information 1 H -0 C. Project Title d: 2 d • -, m ,o E Project , a _1 0 s Fe de ral Fu nding L oca l Agency) R/W U p Z D. Street/Road Name or Number al- y g a Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r z °' Start Fund Cost by Fund State Local Total Thru Envir. Date . . F. Describe Work to be Done a (mm Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (yf/y/yyj 1 '2 .3 4 5 • 6 7 8 9 10 11 12 13 14 15 ' '16 17 18 .. 19 20 21 • PE 1/112012 STP(C) 91 14 105 105 17 37 • 01 P N/A W RW 1/1/2013 STP(C) 91 14 105 105 CE S 72nd Avenue &,W Washington Avenue 12 T CN 1/1/2014 STP(C) 544 86 630 630 Yes S 72nd Ave 06 from': S 72nd Ave to: W Washington Ave P Intersection improvement, possible roundabout 1/1/2013 ' . To tals 726 114 840 105 105 630 • PE 1/1/2012 STP(E) 23 5 28 28 17 38 04 P . W CN 7/1/2013 STP(E) • 1096 164 1260 1260 S 66th Avenue 03 T Yes S 66th Ave S • from: Scenic Drive to Summitview . P Widen roadway, curb, gutter, sidewalk and utilities . 7/1/2012 ' Totals 1,119 169 1288 28 .1260 . . . 14 39 12 P N/A W PE 1/1/2013 STP(U) 126 17 143 143 RW 1/1/2013 STP 63 8 71 71 CE 40th Avenue and Summitview Signal Upgrade S CN 6/6/2013 STP(U) 544 86 630 630 Yes • 40th Avenue T ' from: 40th'Avenue to: Summitview P Signal upgrade, radius improvements, tum lane extension 6/1/2012 • • Totals 733 • 111 844 • 844, 14 40 12 p N/A N/ PE 1/1/2013 STP 95 13 108 108 RW 1/1/2014 STP 63 8 71 71 CE . 40th Avenue and Englewood . T CN 1/1/2014 STP 145 20 165 165 . Yes • 40th Avenue S • from: 40th Avenue to: Englewood P . Replace traffic signal poles, upgrade controller 1/1/2013 . Totals 303 41 344 179 165 ' Report Date: July 27, 2010 Page 10 • v. 5.7 - Supersedes previous editions • • • . . ._ 110 0 . • • Washington department of Transportation • Six Year Transportation Improvemen. gram . Agency: Yakima From 2011 to 2016 '• Co. No.:_ 39 Co: Name: Yakima Co. • • . • Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 _ City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: 2010 -66 • • . Project Identification • Project Costs in Thousands of Dollars ' Federally Funded c ._ • A. PIN /Federal Aid No. B. Bridge No. E ^ v ar Fund Source Information Expenditure Schedule Projects Only g w C. Proeect Title E H 0) c o m (Local Agency) m `o E I d d 3 t Federal Funding R� U li Z D. Street/Road Name or Number o in :° Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - Ending MP or.Road 1-• °' ' Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done o ` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (hgnyyy) 1 2 3 4 5 6' 7 8 9 10 11 12 13 - 14 15 16 17 18 19 20 21 00 41 • 12 P N/A W PE 1/1/2013 STP 126 18 144 144 • 16th Avenue and Fruitvale Blvd T RW 6/1/2013 STP 63 8 71 • 71 CE S CN 1/1/2014 STP 315 43 358 358 Yes • 16th Avenue ' ' from: 16th Avenue', to: Fruitvale Blvd P ' • Replace traffic signal poles, radius improvements, ADA ramps O .1/1/2013 ' Totals -504 69 573 215 358 . • 14 42 12 p N/A W PE 1/1/2011 STP 32 5 . 37 37 CN' 1/1/2012 STP 126 17 143 143 . CE 1st Street and / Street T . No 1st Street • ' , - S • from: 1st Street to: [Street P ' . Replace and upgrade traffic signal equipment . 0 . Tota 158 22 180, 37 143 16 43 01 P 25 O PE 6/1/2014 STP(U) 820 189 1009 1009 RW 1/1/2015 STP(U) 3150 • 630 3780 3780 CE Washington Ave. Railroad Grade Separation P CN 1/1/2016 STP(U) 6552 1008 7560 7560 Yes . Washington Ave. S from: Longfibre Road to: T Railroad grade overpass including all utilities W 1/1/2016 • • Totals 10,522 1827 12349 . • 12349 . • 16 44 01 P 1.3 C P 1/1/2013 STP(U) 272 43 315 315 RW 6/1/2014 STP(U) 349 '55 404 404 CE Frontage Road & "H" St. Loop • G CN 1/1/2016 STP(U) 2352 340 2692 2692 Yes , N. 8th St. O . from: "H" St. to: 1 -82 P • C onstruct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S 1/1/2015 • future development and.Terrace Heights connection. T • W Totals 2,973 438 . 3411 - 315 3096 • Report Date: July 27, 2010 Page 11 , v. 5.7 - Supersed previous editions • • Washington State Department of Transportation Six Year Transportation ImprovementProgram. Agency: Yakima • From 2011 to 2016 Co. No.t 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 ' Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG " Amend Date: • Resolution No.: 2010 -66 • Project Identification Project Costs in Thousands of Dollars • Federally Funded A. PIN /Federal Aid No. B. Bridge No. - N N Fund Source Information • Expenditure Schedule . Projects Only • g— P 9 (Local Agency) o m .2 E C. Project Title o a w 3 o . Federal Funding R/W c U p` D. Street/Road Name or Number ° i- co .5 = - Phase Federal Federal State 4th Required u. E o - State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/Yl� F. Describe Work to be Done n. (mm C ode Phase Code 6th 1 2 . 3 4 5 6 7 8 9 10 11 12 13 14 15 ' 16 • 17 18. 19 20 21 14 45 04 P 3.5 G PE 1/1 STP(U) 1 120 17 137 137 • CE 16th Ave. Corridor • 16th Ave. 0 • • from: SR -12 to: Wapington Ave.Nalley Mall P S • . Widen roadway, curb, gutter, sidewalk, lighting. T • • W Totals 120 17 137 137 3.2 C PE 1/1/2013 STP(U) 120 17 1371 137 14 46 04 P CE 40th Ave. Corridor 0 40th Ave. • G from: SR -12 to: Washington Ave. P Widen roadway, curb, gutter, sidewalks, lighting. S • W T Totals 120 17 137 137 . • 14 47 .. 03 P 27 C PE 1/1/2012 STP(U) 120 17 1371 137 CE Nob Hill Corridor 04 G • Nob Hill 0 from: 1 -82 to: S. 16th Ave. P S • Widen roadway, sidewalk, curb, gutter, lighting T • • W Totals • 120 17 137 137 • • • • 14 48 04 P 2.0 c PE 1/1/2014 STP(U) 120 17 1371 137 • CE • S. 1st St/Main St. Corridor G S. 1st St. /Main St. 0 . from: Nob Hill Blvd. to: Barker Mill Bridge P S Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, ' T • lighting.., W Totals 120 17: 137 137 • • • Report Date:. July 27, 2010 Page 12 v. 5.7 - Supersedes previous editions . • e : . • 0 • . . 0 . ,: • Washington• Department of Transportation Six Year Transportation Improvemelogram . • -en Agency: Yakima • From 2011 to 2016 Co. No.: 39 'Co. Name: Yakima Co. Hearing Date: 6 - 15 - 2010 Adoption Date: 6 - 15 - 2010 City No.: 1485 . MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 - 66 Project Identification Project Costs in Thousands of Dollars Federally Funded T A. PIN /Federal Aid No. B. Bridge No. m m m Fund Source Information Expenditure Schedule Projects Only s m o f C P Title . E o W o (Local Agency) � . _ ; d ' 3 < .. F ederal Funding R/W • c 5 li = D. Street/Road Name or Number o >, o- Re z nt- co 5 r, Phase ' Federal Federal State 4th Envir. Required t ` o E. Beginning MP or Road - Ending MP or Road E r- °' Start Fund Cost by Fund State Local Total Thm Date IL' mm/d y Funds Funds Funds 1st 2nd . 3rd T (Miwyy) F. Describe Work to be Done a ( d/YYYY) Code Phase Code 6th 1 2, 3 4 5 6 7 8 9 10 11 12 . 13 14 15 16 17 18 19 • 20 21 00 49 32 P N/A • PE 1/1/2011 100 100 100 • EA Storm Drains/Vegetation CN 1/1/2011 900 900 900 Local Selection No from: City Wide to: . • . , City Wide • ' Totals 1000 1000 1000 17 50 03 P .76 W PE 1/1/2012 STP(C) 109 27 136 136 Reconstruction Rudkin Rd D6 T CN 1/1/2013 STP(C) 945 TPP 945 106 1996 1996- CE No . Rudkin Rd P . from: E Viola Ave - to: Rainier Place S •• Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main - - - Totals 1,054 945 133 2132 136 1996 .. 16 51 • 03 P .76 C PE 9/1/2012 STP(S) 122 TPP 23 7 152 152 ' E Mead Ave Reconstruction 06 G CN 4/1/2013 STP 1730 TPP 206 70 2006 2006 CE No • E Mead Ave • 0 - from: Rudkin Rd to: Fair Ave P • • Partner with City of Union Gap, reconstruct, excavate ballast, top course, _ - T • • curb, gutter, storm, acp - - . - Totals • 1,852 229 77 2158 152 2006- • 17 52 04 P 1.3 O PE 1/1/2012 AIP 131 20 151 151 • S 80th Ave - Tieton Or to Zier Rd C RW 1/1/2013 AIP 382 59 441 441 EA • S 80th Ave P CN 4/1/2013 AIP 1667 - 260 1927 1927 Yes from: Tieton Dr . - to: Rd T W 4/1/2012 Major widening, curb, gutter, sidewalk 3 Totals . 2180 339 2519 151' 2368 - • • • • • Report Date: July 27, 2010 Page 13 v: 5.7 - Su previous editions • • • Washington State Department of Transportation Six Year Transportation. Improvement Program Agency: Yakima • From .2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded m A. PIN /Federal Aid No. B. Bridge No. v ar Fund Source Information Expenditure Schedule Projects Only • o m 'o E C. Project Title E H w o m (Local Agency) v = Federal Funding R/W U a Z D. Street/Road Name or Number a� N 3 Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - Ending MP or Road E . 1- ° 1 Start Fund .Cost by Fund State Local Total Thru Envir. Date ° (m rn/dd/yyyy) Co de Phase Code Funds Funds Funds 1st 2nd 3rd Type (Mjwyy) F. Describe Work to be Done o 6th 1• 2 3 . 4 5 6 7 8 9 10 ': 11 12 13 14 15 16 • 17. 18 . . 19 20 21 17 53 05 P 1.0 W PE 1/1/2014 STP(C) 272 43 315 315 RW 6/1/2014 STP(C) 349 55 404 404 EA Englewood Ave - N 40th Ave to N 56th Ave 06 T CN 1/1/2015 STP(C) 2352 340 2692 2692 Yes ' . Englewood Ave from: N 40th Ave to: N 56th Ave P 1/1/2013 Widen roadway, curb, gutter, sidewalk C Totals 2,973 438 3411 3411 17 54 05 P 2 O PE 1/1/2013 STP(U) 219 34 253 253 • Englewood Ave - N 24th Ave to N 16th Ave W RW 6/1/2013 /2013 STP(U) 327 51 378 378 EA 06 CN 6/1/2014 STP(U) 2980 .244 3224 3224 Yes Englewood Ave S " from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 6/1/2013 Totals 3,526 329 3855 631 3224 • 14 55 12 P 2.5 P PE 1/1/2013 STP(S) 55 8 63 63 W Nob Hill Blvd Sidewalks T RW 6/1/2013 STP(S) 107 19 126 126 CE W CN 3/1/2014 STP(S) 321 57 378 378 Yes W Nob Hill Blvd • from: S.16th Ave to: S. 6th St. S • Install missing sidewalks on southside of Nob Hill. • 3/1/2013 • • Totals . 483 .84 567 189 378 • • 00 56 06 P 1:0 P PE 1/1/2013 STP(S) 57 • 7 64 64 Beech St Pedestrian Connection P RW 6/1/2013 STP(S) 189 . 25 '214 214 CE . • 32 CN 1/1/2014 STP(S) 504 68 572 572 Yes Beech St from: Fair Ave lo: Chalmers /Riverside . Construct pedestrian pathway under SR82 to Greenway 1/1/2013 ,Totals 750 . 100 850 278 572 • • • Report Date: July 27, 2010 Page 14 v. 5.7 - Supersedes previous editions • • III ® Q • , . Washington Department ill Six Year Transportation Improvemerlogram Agency: Yakima From 2011 to • 2016 Co. No.: 39 ' Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6,15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No.' B. Bridge No. m ^ g) 8 m Fund Source Information Expenditure Schedule Projects Only ` s N -0 C. Project Title - E c 2 (Local Agency) • m ,o E , c :° _1 . - L F ederal Funding R/W 7 U 6: Z D. Street/Road Name or Number aF. m .5 a Phase Federal Federal State 4th Required . u_ E. Beginning MP or Road - Ending MP or Road E i- ° ' Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th T yp e (M y) • • 1 , 2 _ , 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 • STP(S) 43 7 50 50 • 16 57 12 P 2.0 P- RW 6/1/2013 STP(S) 86 15 101 • 101 CE • W Lincoln Ave Sidewalks T CN 1/1/2014 STP(S) 572 88 660 660 Yes W Lincoln Ave S ' from: N 56th Ave to: N 29th Ave W Sidewalks, meters and fire hydrants replacement or relocation 1 /1/2014 Totals 701 110 811 • 151' 660 • PE 6/1/2013 STP(U) 820 189 1009 1009 14 58 01 P 25 W RW 1/1/2014 STP(U) 3150 630 3780 3780 CE . Mead Ave. Railroad Grade Separation T CN 1/1/2015 STP(U) 6552 1008 7560 7560 Yes Mead Ave. S from: Presson Place to: Maryland P Construct railroad overpass including all utilities O 1/1/2014 • Totals 10,522 1827 12349 1009 11340 ' • PE 6/1/2012 STP(U) 252 38 290 290 16 59 ' 01 P 4.0 O RW 1/1/2013 STP(U) 756 88 844 844 CE . City wide Pathway Connections 3 CN 1/1/2014 STP(U) 1890 315 2205 2205 Yes ' Y akima • from: • to: T Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, W _ 1/1/2013 ' WOD Trail, Greenway including N aches Rail Spur, signage and amenities • Totals ' 2,898 441 3339 290 .844 2205 PE 1/1/2013 STP(U) 63 5 68 68 . 17 60 01 P N/A 0 CN 6/1/2013 STP(U) 567 76 6431 643 CE ' 34th Ave & River Rd In(orovements 12 P No Fruitvale Blvd. S from: 34th Ave. • ' to: River Rd. T . W . . • Intersection improvements including lumination, sewer, water, curb, water and sidewalks - Totals 630 . 81 711 711 . Report Date: July 27, 2010 Page 15 ' v. 5.7 - Supersedes previous editions • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 Co. NO.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 • City No.: 1485 MPO /RTPO: YVCOG .. Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars Federally Funded . A. PIN /Federal Ald No. B. Bridge No. c E. d d Fund Source Information Expenditure Schedule Projects Only s ` y - -° C. Project Title • m d L Federal Funding (Local Agency) m o f > a R/W 3 a Z D . StreeURoad Name or Number a� m 2 = u Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E I-- .o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date • . F. Describe Work to be Done . a, (mm Code Phase Code Funds Funds Funds 6th Type (MMY 'fl 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 .19 20 • 21 17 61 • 01 .P 1.0 O PE 1/1/2013 STP(U) 218 34 252 252 • RW 6/1/2014 STP(U) 327 51 • 378 378 CE Englewood Ave 05 S CN 1/1/2015 STP(U) 2980 244 3224 3224 Yes , ' Englewood Ave 12 from: 24th Ave to: 40th Ave T • Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines W 1/1/2015 and street lights. • Totals 3,525 329 3854 252 3602 PE 1/1/2014 STP(U) 120 17 137 1 137 . 14 62 01 P 6.0 C CE W. Yakima North/South Connector to West Valley • 04 G Unknown road 06 0 from: North - South to: in West Valley P City & County joint project to build/extend roadways. • T W Totals 120 17 137 137 • • 16 63 01 P 38 S 'PE 1/1/2014 100 1001 100 • Occidental Road Construction. W P • . from: 58th Ave. to: 64th Ave. T ' Construct roadway . . • • Totals • 100 • 100 100 • 00 64 01 P 27 PE 1/1/2014 100 1001 100 86th Ave. Road Construction • from:. Occidental . • to: Coolidge • . Construct roadway • Totals 100 100 100 Report Date: July 27, 2010 Page 16 v. 5.7 - Supersedes previous editions • . 4110 • ,- ID ,• • ' . 0 Washington epartment of Transportation Six.Year Transportation Improvemen. gram - Agge en ncy: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: 2010 -66 • . Project Identification Project Costs in Thousands of Dollars' Federally Funded To ,_ A. PIN /Federal Aid No. . B. Bridge No. m .S ; Fund Source Information Expenditure Schedule Projects Only g N • C . Pro Title E , o v' (Local Agenc , o E j a o t Federal Funding R/W U p` D. 'Street/Road Name or Number arT y Phase Federal Federal State .4th. Required • Li E. Beginning MP or Road - Ending MP or Road E 1- n ° Start Fu Cost b Fund State Local Total Thru Envir. Date g g g o by Funds F un d s F un d s 1st 2nd 3rd T (MMyy) F. Describe Work to be Done a (mrn Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 • 13 • 14 15 16 17 18 . 19 , 20 21 16 65 04 S 0.5 W ALL 1J1/2011 STP(U) 900 200. 1100 ' 200 900 EA 64th Ave. Roadway Widening. 06 G — 1 Z YES 03 P T . from: Nob Hill Blvd to: Tieton Drive. • Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. C 4/1/2011 • O ' Totals • 900 200 1100 200 900 00 66 03 P N/A G PE 1/1/2014 STP(E) 18 32 50 50 EA' C CN 6/1/2014 STP(E) 1900 285 . 2185 2185 No YVT Railway'Rehabilitation & Museum • 3rd Ave S from: 3rd Ave to: Pine St T W Car Barn, Museum Restoration and Pathway - • P . • Totals 1,918 317 2235 2235 ' 16 67 01 ID N/A S P 4/1/2012. CMAQ 24 3 27 27 CE CN 7/1/2012 CMAQ 480 65 545 545 Roadway City Wide Shoulder Improvements' No City Wide . from: to: . ' City Wide shoulder improvements, PM10 abatement. • • . • Totals • 504 • 68 572 572 • PE 1/1/2013 STP(E) 252 34 286 . 286 00 . 68 14 P .25 T CN 3/1/2014 STP(E) 3150 412 3562 3562 CE No ' Pedestrian Bridge 32 Pedestrian Bridge 0 • from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, - . power, handicap accessible, lights . . Totals 3,402 446 ' 3848 • 286 • 3562 • Report Date: July 27, 2010 Page 17 v. 5.7.- Supersedes previous editions • • • • • Washington State Department of Transportation Six Year Transportation Improvement Program • - Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars • Federally Funded A. PIN /Federal Aid No. B. Bridge No. e f- d a , Fu Source Information Expenditure Schedule Projects Only e Z' N � C. Project Title E) ; d ' 0 m (Local Agency) . m o c� r Federal Funding R!W g U n. D. Street/Road Name or Number . y ' •• Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E 1- IS m o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done a (mmldd/yyyy) Code Phase Code Funds Funds Funds 6th Type (mmiyy) 1 2 3 4 5 6 7 8 9 10 11 12 , 13 14 15 16 17 18 19 20 21 • 00 69 14 P N/A O PE 1/1/2011 STP(E) 10 2 12 12 CE CN 7/1/2011 STP(E) 109 17 126 126 (Mlliam O. Douglas Pathway 32 S No • P . from: Pine St - ' to: Cowiche Canyon W . Pathway improvements, connections, and signage to Cowiche Canyon Trail. Totals 119 19 138 138 • • . • 03 P N/A O PE 1/1/2014 STP(U) 315 38 353 353 00 70 YVTPafhway 32 3 CN 6/1/ STP(U) 945 126 1071 1071 CE No YVT Railway Corridor. from: to: T D • evelopment pathway in West Valley area including 53rd Ave, Wide Hollow, VV 64th Ave, Ahtanum including all utilities and signage Totals 1,260 164 1424 1424 . • 00 71 07 .1 5 G CN 6/1/2011 i f I ` I 25 251 25 CE City wide Alleys P ' No S from: to: VV ' Pave alleys throughout the city. T • • Totals • 75 75 25 25 • 25 • PE 1/1/2011 ARRA- 50 . 50 50 . 14 72 06 P 2.64 CN 6/1/2011 ARRA- 1950 1950 1950 CE SummifviewAve. Grind & Overlay • 07 No • from: 14th Ave • to: 56th Ave Grind 0.20' of AC? & replace with 0.20' of HMA, and install required ADA . ramps Totals 2,000 2000 2000 • • Report Date: July 27, 2010 Page 18 V. 5.7. - Supersedes previous editions • 0 . • • • Washington department of Transportation III Six Year Transportation Improvemegram • - A ` g e 'cy: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification Project Costs in Thousands of Dollars - Federally Funded m A. PIN /Federal Aid No. • B . Bridge No. c r ; Fund Source Information Expenditure Schedule Projects Only c ti : ar d °' y (Local Agency) B y n C. Project Title E H W 5 o m m o E I ; m ' L Federal Funding RNV o di: Z D . StreetlRoad Name or Number aF y 2 ' u - Phase Federal Federal State 4th Required - E. Beginning MP or Road - Ending MP or Road E l o - °' Start Fund Cost by Fund State Local Total Thru Envir. Date ( mnvdd/ Funds Funds Funds 1st 2nd 3rd Type (MM/YY F. Describe Work to be Done a yr/A Code Phase Code 6th 1 : 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16• 17 18 19 20 21 17 73 03 P 0.50 W ALL 1/1/2014 STP(U) 1298 202 1500 I 1500 • River Road Improvements 05 • G CE Yes • . 06 P O . from: 6th Ave to: 16th Ave 07 Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage T 6/1/2015 . Totals 1,298 202 1500 • 1500 74 05 p 0.97 C CN 7/1/2012 ' STP(U) 2700 421 3121 f 3121 . . CE . Nob Hill Blvd 06 P No 07 T G from: 49th Avenue to: 64th Avenue 12 0 Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width 13 . Totals 2,700 421 3121 3121 , 75 1 • 10 P .01 P PE 4/1/2011 BRAC 50I I 501 50 . N/A 18th Street Underpass 11 T No • •C • from: Yakima Ave to: 18th Street ' Repair or replace 18th Street Underpass • • • Totals 50 50 . 50 PE 1/1/2012 WSDOT 50 50 50 76 • 06 P 0.48 C CE RW 2/1/2012 WSDOT 25 25 25 88th Avenue . - 12 • P CN 6/1/2012 WSDOT 320 - 10 330 330 Yes from: Tieton Drive to: Summitview Ave 13 G Construct curb, gutter, sidewalk and stormwater runoff treatment on the east . • side of 88th. • Totals • 395 10 405 • 405 . - . . • v. 5.7 - Supersedes previous editions Report Date: July 27, 2010 • Page 19 • • • • Washington State Department of Transportation Six Year. Transportation Improvement Program Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 City No.: 1485 MPO /RTPO: • YVCOG . Amend Date: Resolution No.: 2010 -66' • • Project Identification Project Costs in Thousands of Dollars „,,.. Federallunded m A. PIN /Federal Aid No. B. Bridge No. .... rn d N Fund Source Information Expenditure Schedule Projects Only c y � E7 H c c co (Local Agency) g m o E C. Project Title > II = rs U T Federal Funding ”. RM/ g U ti 2 D. Street/Road Name or Number o.1- tn S Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E t°2 o S tart Fund • Cost by Fund State • Local Total 1st 2nd 3rd Thru Envir. Date . F. Describe Work to be Done a` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16. 17 18 19 20 21 . 77 23 P N/A g PE 4/1/2013 5309(Bus) • 15000 1000 16000 2000 14000 Westside Transit Center (Transit) • Yes from: N/A to: N/A Construct a West Side Transit Center (Park & Ride Facility) Totals - 15,000 1000 16000 • 2000 14000 78 23 P ALL 3/1/2011 5307 428 4281 428 CE Transit Operating Hours Expansion - from: to: Expand Transit Operating Hours an hour later into the evening except for ' one route that will be expanded an hour earlier . 'Totals 428 428 428 79 23 P ALL 1/1/2011 5307 288 2881 288 CE Terrace Heights Moxee Route Expansion - . • from: to: Expand route service to Terrace Heights and Moxee • Totals • 288 288 • 288 • 80 23 P ALL 1/1/2011 5307 602 6021 602 CE Kittitas- Yakima Commuter Bus . from: • to: • Expand Route Service to Kittitas County - • ' Totals 602 602 -602 • Report Date: July 27, 2010 Page 2 v. 5.7 - Supersedes previous editions . • • • '® . e ' • • Washington department of Transportation Six Year Transportation Improvemengram Agency: Yakima From '2011 to 2016 Co. No.: 39 Co. Name:. Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 Project Identification ' Project Costs in Thousands of Dollars Federally Funded A. PIN/Federal Aid No. • B. Bridge No. e L v @ g d v �, Fund Source Information Expenditure Schedule Projects Only sin . E C. ProectTitle. d r d a (Local Agency) t m o f j a, a o t F ederal Funding R/W U = D. Street/Road Name or Number 8 a °' Required a Z . E. Beginning MP or Road - Ending MP.or Road E ~ w I- o Start Federal I Cost by Fund State Local Total 1st 2nd 3rd Thu Tnvi Date • F. Describe Work to be Done d (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • 81 23 S N/A ALL 1/1/2011 CMAQ • 200 200 200 CE • Sunday Bus Service • :No from: to: • Expand existing bus service to operate every two hours four times per route ' • on Sunday • Totals 200 200 200 16 82 03 P 1.0 W ALL 1/1/2012 STP(U) 1800 281 20811 200 1881 CE 64th Ave. Roadway Widening 04 G Yes 06 P from: Washington Ave to: Nob Hill Blvd T O 1/1/2013 Widen roadway, curb, gutter, sidewalks, lighting and drainage • C. Totals 1,800 281 2081 200 ' 1881 00 83 32 S 1.5 G ALL ,-4/-/2619 283 2831 33 250 CE • ' Powerhouse/William O Douglas Trail Connector • P `41 1201 0 No T from: Powerhouse/Williow St. to: 6th Ave /I Street C Paved pathway . O . • Totals 283 . 283 33 250 • . • . . I Grand Totals for Yakima 132,034 15,463 27,833 175,330 28,954 26955 38,160 81,261 • • Report Date: July 27, 2010 Page 21 V. 5.7 - Supersedes previous editions • •