HomeMy WebLinkAbout08/03/2010 06 2011-2016 Six-Year Transportation Improvement Program Amendment BUSINESS OF THE CITY COUNCIL
• YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6
For Meeting of: August 3, 2010
ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six -year
Transportation Improvement Program (TIP) by adding four projects to the six-
year TIP.
SUBMITTED BY: Michael Morales, Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678
Brett Sheffield, Chief Engineer 576 -6797
SUMMARY EXPLANATION:
The Six -year Transportation Improvement Program (TIP) is a list developed by the City that includes all of
its transportation related projects. The City's existing six -year TIP has a list of projects that amount to
around $175 million. Only projects that are listed as having funding secured are guaranteed to be
constructed.
• Each year near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its
six -year TIP for submittal to the Washington State Department of Transportation. This plan must include all
transportation projects for which state gas tax revenue of federal revenue will be used. Once the TIP has
been approved by the City Council, it is then added to the Statewide Transportation Improvement Program
(STIP). Only projects that are listed on the STIP can be approved by the Federal Highway Administration
(FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized
program of transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal
transportation network in the State of Washington.
The STIP can be amended during the year to add projects that become available for federal or state
, funding. The first step to amend the STIP is for the City to amend its six -year TIP.
(continued on Page 2)
Resolution X Ordinances Other (Specify) Amended STIP
Contract Mail to (name and address): Phone:
Funding Source: STP Grant and Transportation Enhancement Grant
APPROVED FOR SUBMITTAL: City Manager
STAFF RECOMMENDATION: Adopt resolution amending the STIP
BOARD /COMMISSION RECOMMENDATION:
COUNCIL ACTION:
Page 2
Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the II
2010 -2015 planning period. The proposed amendments consist of the following projects:
1. 64 Avenue Roadway Widening, Washington Avenue to Tieton Drive (existing TIP project #65)..,
This project is proposed to be divided into two projects. The first project (updated priority #65)
consists of improving 64 Avenue from Nob Hill Boulevard to Tieton Drive by constructing a 39-
foot roadway with curb, gutter, sidewalk, illumination and stromwater treatment. The second
project (TIP Project #82) consists of making the same improvements to 64 Avenue between
Washington. Avenue and Nob Hill Boulevard.
The project was divided into two projects because the maximum dollar amount available per
project at the last call for projects to be funded by the Surface Transportation Program (STP)
was $900,000. The City was successful in obtaining a $900,000 grant for this project.
2. Powerhouse/William 0. Douglas Trail Connector (TIP Project #83). The City was successful in
obtaining a $283,278 Transportation Enhancement grant for this project, which will construct a
pathway that will connect the Powerhouse Trail to the William 0. Douglas Trail.
•
4110
•
•
RESOLUTION NO. R- 2010 -
A RESOLUTION to amend the Six -year Transportation Improvement Program (TIP) for
the period of 2011 through 2016 to include projects affecting the City's
Transportation Plan. •
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -year
TIP for the construction or repair of streets in the City of Yakima for the ensuing six year
period, all as contemplated and required by State RCW 35.77.010 and' applicable Federal
law, and
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6-Year
Transportation Improvement Plan for the period of 2010 to 2015 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and
provided under RCW 36.70A.130(2B) and RCW 35.77.010, and
WHEREAS, a public hearing has been held by the Yakima City Council on amending
• the 6 -Year Transportation Improvement Plan on Tuesday, August 3, 2010, with proper
public notice as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2011 through 2016
for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation
Improvement Plan attached.
•
ADOPTED BY THE CITY COUNCIL this 3rd day of August, 2010.
Micah Cawley, Mayor
ATTEST:
City Clerk
1111
Washington department of Transportation Six Year Transportation Improvem gram
-„ •
Agency: Yakima From 2011 to 016
•
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 .
Project Identification Project Costs in Thousands of Dollars Federally F ' .
A. PIN /Federal Aid No. B. Bridge No. y d Fund Source Information Expenditure Schedule Projects Only
4 m : o C. Project Title • > m w 0 c • Federal Funding (Local Agency) R/W
5 a Z D. StreetlRoad Name or Number o N Y Phase Federal Federal State 4th Required
LL E o •— m State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road t- . Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (Hwy)*
F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 • 11 12 13 14 15 16. 17 18 19 20 21
14 1 01 p 0.2 T CN 4/1/2011 STP(U) 1700 FMSIB 2000 4530 8230 3000 5230 EA •
P CN .4/1/2011 DEMO 3281 AIP. 1500 4781 3000 1781 Yes
Yakima Railroad Grade Separations- Phase 3 06
Martin Luther King, Jr. Blvd 07 G •
• from: N. 1 st Sreet to: N. 1st Ave 08 0 9 /1/2009
Construct Grade Separation and adjacent roadway reconstruction including .
Front Street • .
Totals 4,981 3500 4530 13011 6000 7011
00 2 12 S N/A ALL 1/1/2011 5307 1601 I 1601 3202 3202 CE
Transit Operating Expenditures 22 No
Various fixed rates and locations 23 • ' . ' • from: N/A to: N/A 24
• Annual operating assistance from the FTA in support of our transit system; 31
, fixed conte, paratransit Dial -A -Ride and vanpool program
Totals 1,601 • • 1601 3202. 3202
•
RW 1/1/2011 STP(E) 150 150 150 .
00 3 32 S
N/A G CN G STP(E) 285 285 285 C E Yes
William 0. Douglas Heritage Trails 13
Bridge Restoration & Trailhead 10 P
• S
from: to: T 6/01/09
Trailhead restoration, right of way acquisition partner with the William O. W
Douglas Foundation, including restoration of bridge, cleaning, rust removal •
and painting Totals 435 435 • 435
ALL 1/1/2011 5309(Bus) 1 I 280 50 330
00 4 22 S N/A I 50 100 100 80
. CE
Street Asset Amenities (Transit) 31 . No
Route Maintenance, Repair and Improvements .
' from: N/A 'to: N/A
On going improvements to bus benches, shelters and signage infrastructure
Totals 280 50 330 50 100 100 80
Report Date: July 27, 2010 Page 1 • . v . 5.7 - Supersedes p revious editions : • .
•
•
•
Frif Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima • From 2011 to .2016
Co. No.: 39 Co . Name: Yakima Co.
He aring Date: 6 - 15 - 2010 Ad option Date: 6 - 15 - 2010 .
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PINIFederal Aid No. B. Bridge No. E' 2, Expenditure Schedule Projects Only
�' g m aN , Fund Source Information
u , (Local Agency)
o o E C Project Title
E ,I 3 c i . . Federal Funding R/W
a 5 D. Street/Road Name or Number • t'- ° ; " j± a Required
m I% P Z ti— w 2 = t; Phase Federal Federal State 4th o
u_ Envir. Date
E a, State Local Total
E. Be ginning MP or Road - Ending MP or Road Start Fund Cost by Fund 1st 2nd 3rd Thru
• 9 g g a (mm Code Phase Code Funds Funds Funds 6th Type (MMNY)
F. Describe Work to be Done
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21
ALL 1/1/2011 CMAQ . 11 82 82 •
00 5 . 22 S N/A •
Continue Transit Service to Terrace Heights No
New University & Retail Links
from: N/A to: N/A
Extension of fixed route bus service only into the Terrace Heights area of .
Yakima County '
. Totals • 71 11 82 82
CN 1/1/2011 JOBS 925 . 1 925 925
14 6 03 P .71 C ( . CE No
Nob Hill Blvd and 64th Ave Improvements 05 • •
. Nob Hill Blvd . 07 T
•
from: 53rd Ave to: 64th Ave 12 '
Widen and re- construct 64th Ave. to 33 -foot width with curb, gutter and 13
sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter
•
sidewalk and stormwater runoff treatment on the north side of Nob Hill. Totals • 925 925 925
14 7 12 , N/A p CN 1/1/2011 AIP 880 383 1263 1263 CE •
T CN 7/1/2011 AIP 1000 214 1214 1214 Yes
S 16th Ave & W Washington Ave Signal & Intersection. 05
S 16th Ave 03 ,
from: S 16th Ave to: W Washington Ave 4/1/2010
• Included in Union Gap's Valley Mall Blvd. project
Totals 1880 597 2477 2477
•
16 8 . 05 S .20 G CN 1/1/2011 I I 600 6001 600 CE
66th Ave. & Summitview Intersection 12 J J Yes
' N. 66th Avenue & Summitview P
from: N. 66th Ave. to: Summitview Ave. S
Widen for left turn lanes, intersection improvements, curb, gutter, handicap T 4/1/2010
ramps and lighting w
C Totals 600 600 600
•
•
Report Date: July 27, 2010 Page 2 v. 5.7 - Supersedes - previous editions
•
•
•
•
0 . •
fi . .0 •
,o.
71 Washington•Department of Transportation Six Year Transportation Improvemeneogram
Agency: Y a k ima ' From 2 011 t0 2016
•
Co. No.: 39 Co. Name: Yakima Co.
. Hearing Date: 6 -15 -2010 Adoption Date: 6-15-20.10
City No.: 1485 MPO /RTPO: YVCOG . • Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
m` • A. PIN /Federal Aid No. B. Bridge No. d ^ .c v (Local Agency) Fund Source Information Expenditure Schedule Projects Only
g w ..E•1:, o C. Project Title E y w c o =
• . • 0 15 .E z Federal Funding R/W
U li D. Street/Road Name or Number o y g 13 Phase Federal Federal State 4th Required
u E. Beginning MP or Road - Ending MP or Road E r °' Start Fund Cost by Fund State Local Total Envir. Date
Thru
F. Describe Work to be Done li (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/� >7
1 2 3 4 5 . 6 7 8 9 10 11 12 13 14 15 16 17 . 18 19 20 21
00 9 03 S .50 S CN 1/1/2011 CMAQ 540 214 754 754 .
CE . .
Coolidge Road Widening and Paving. 05 W ' . Yes
•
06 T
from: 80th AVE. to: 88TH AVE. T •
Widen roadway and pave with curb and gutter. •
9/1/2009
Totals • .540 • 214 754 754
00 10 21 S N/A ALL 1/15/2013 5309(NS) . 96 84 . 1801 180 CE
Acquisition of new Dial -A -Ride paratransit vehicles No
•
from: N/A to: N/A '
Purchase new vehicles to replace older, less reliable units • •
Totals 96' 84 180 180 '
14 11 03 P N/A PE 1/1/2011 STP(U) 173 27 200 • 200
RW 1/1/2012 STP(U) 433 67 500 500 CE
• E. Lincoln & 10th Street Roundabout 05 CN 6/1/2012 ' STP(U) 1125 175 1300 1300 Yes ,
06
from: E. Lincoln to: E. MLK Jr. Blvd. 6/1/2011
Roundabout construction at intersection curb, gutter, sidewalk, & street
lighting .
Totals 1,731 2,7 242 2000 200 1800
•
12 12 03 P N/A O ALL 1/1/2011 STP(U) • 865 135 10001 1000 '
S.R.12 & 16th Avenue Interchange 06 . CE No •
. Interchange
•
.. from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
Totals 865 135 1000 1000 •
Report Date: July.27, 2010 ' Page 3 v. 5.7 - Supersedes previous editions
•
•
•
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
-en Agency: Yakima From 2011 to 2016
Co. No.: 39 Co. Name:. Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: • Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
ill A. PIN /Federal Aid No. B. Bridge No. m ^ c d a , Fund Source Information Expenditure Schedule Projects Only
c 2 � E y H c c w (Local Agency)
u • m o f C. Project Title a J a F Funding R/W
o a` Z D. Street/Road Name or Number o y ! ° _ Ph ase Federal Federal State 4th Required
a E. Beginning MP or Road - Endin MP or Road E 1 . m S tart Fund Cost by Fund State Local Total Thru Envir. Date
g g g y Funds Funds Funds 1st 2nd 3rd Type (MM/YY) -
F. ,Describe Work to be Done a (mm/dd/YYYY) Code Phase Code 6th
1 2 3 4 5 6 7 • 8 9 10 11 12 13 14 15 16 17 18 . 19 20 21 . .
11 13 ALL 1/1/2012 STP(U) 865 135 1000 1000
01 P N/A o EA
1 -82 & Lincoln Avenue Interchange P Yes
1 -82 Interchange G
-
•
from: E. "G" Street to: 1 -82
6/2011
Reconstruct / extend off -ramp from existing 1 -82 off -ramp for Lincoln Avenue
to E. "0" Street - -
Totals 865 • 135 1000 ' 1000 .
14 14 12 P N/A P ALL 1/1/2012 STP(U) 865 135 10001 1000 CE
E. Yakima Avenue & Fair Avenue Signalization W No
. T .
from: E. Yakima Avenue to: Fair Avenue S
O
Construct Traffic Signal
Totals • 865 135 1000 1000 .
ALL 1/2/2011 5316 131 131 2621 131 131 CE .
00 15 • 22 S
Fixed route Bus Services to Moxee along SR 24 Corridor No
SR 24 Hwy Corridor/Park & Ride Lots '
from: to: .
JARC funded demonstration project to determine ridership potential to and
from the Moxee area including stops at two Park & Rlde lots along SR 24.
• Totals 131 131 262 131 131 .
RW 1/1/2012 STP(U) 173 27 200 200
14 16 31 P N/A O CN 4/1/2012 STP(U) 865 I 135 1000 1000 CE Yes
E Nob Hill Blvd & Fair Ave 03 •
E Nob Hill Blvd 04 P
from: E Nob Hill Blvd • to: Fair Ave T •
Intersection widening & new signal, curb, gutter and sidewalk, street lighting, W 4/1/2001
stormwater
Totals 1,038 162 1200 1200
•
Report Date: July 27, 2010 • Page 4 v. 5.7 - Supersedes previous editions
•
•
® • 0 0 .
•411111■.
Washington department of Transportation
en • Six Year Transportation Improvemengram •
- AAggency: Yakima From 2011 to 2016
• Co. No.: 39 Co. Name: Yakima Co. •
- Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. • B. Bridge No. • . c v Fund Source Information Expenditure Schedule Projects Only
s y -D C. Project Title E CD a H c o a (Local Agency)
- • -, co o E ; a w _, 0 r Federal Funding RNV
. Z D. Street/Road Name or Number aF w 4 -6 Phase Federal Federal State 4th Required
LL Envir. Beginning MP or Road - Ending MP or Road E r 5 °' S tart F un d C os t by Fund State Local Total Thru . Date
F. Describe Work to be Done k (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Y1�
' 1 2• 3 4 5 6 7 8 9 . 10 11 12 13 14 15 16 17 18 19 20 - - 21
•
16 17 " 12 P N/A P PE 4/1/2011 • 13 13 13 '
CN 6/1/2011 214 214 214 CE
S 3rd Ave & W Washington Ave Signal .T No
. S 3rd Ave
from: S 3rd Ave • to: W Washington Ave .
Signal Upgrades . Totals • 227 ' 227 227 •
14 18 4579 12 P N/A P PE 6/1/2011 STP(U) 252 38 2901 290 • EA
S 1st St. - E. Washington Ave. Intersection Improvement W Yes
S 1st St. S
from: S 1st St. to: E Washington Ave. T
O
Realign intersection, upgrade traffic signal • 01/01/11
Totals 252 38 290 290
•
17 19 4587 03 p 1.00 P ALL 4/1/2012 STP ' 2268 307 25751 525 2050
EA
S 48th Ave. Reconstruction T Yes
S 48th Avenue W
from: Summitview Ave. to: Nob Hill Blvd. s
Widen, curb, gutter, sidewalk, lighting, drainage O 4/1/2014
• • Totals 2 . 307 2575 . 525 2050 '
14 20 03 P N/A O PE 1/1/2012 STP(U) 51 8 59 59 _ '
South 72nd Ave &MeadAvelntersection 12 P . CN 6/1/2012 STP(U) 383 61 444 444 CE Yes
South 72nd Ave S
from: South 72nd Ave to: Mead Ave T
New intersection, signals, curb, gutter and sidewalk • W '" 6/10/2010
Totals • 434 69 503 503
•
Report Date: July 27, 2010 Page 5 v. 5.7 . - Supersedes previous editions '
•
•
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2011 to 2016 . •
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG . Amend Date: Resolution No.: 2010-66
Project Identification Project Costs in Thousands of Dollars , ' . Federally Funded
Expenditure Schedule • Projects Only
A. PIN /Federal Aid No. B. Bridge No. • d ., c o u! at Fund Source Information
` o_ y c C. Project Title m " . e . o L . (Local Agency)
R/W
o f Project 0 d Federal Fundin
U a Z D. Street/Road Name or Number a '- to B A. Phase Federal Federal State 4th Required
LL E o 4, State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road t— m •o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (/yrytn y)
F. Describe Work to be Done a _ (mrn C Phase Code 6th
1 2' 3 4 5 6 7 8 9 10.' 11 12 ' 13 14 15 16 17 18 • 19 20 21
16 21 4562 12 P N/A P ALL 4/4/2012 STP(U) 378 WSDOT 378 756' 756 CE
Tieton Dr- S 5th Ave. Intersection Project ' W • Yes
Tieton Drive T
from: 5th Ave. Intersection to: O
4/1/2014
Replace traffic signal with roundabout S -
Totals 378 378 756 756
16 22 01 P 1.1 0 PE 1/1/2012 STP(U) 2180 340 2520 2520 CE •
E. 'H "Sf. Extension RW 1/1/2014 STP(U) 2180 340 2520 2520
08 S • CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes
E. "H" St.
from: 1st St. to: Yakima River T
W 1/1/2014
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
Totals 5,559 2551 8110 2520 • 5590
PE 1/1/2012 STP(C) 700 108 808 808
17 23 01 P 1.3 0 RW 1/1/2013 STP(U) 5500 850 6350 6350 CE
N. 10th St. Extension 06 3 CN 6/1/2013 STP(U) 7900 972 8872 8872 Yes
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave. T
Construct road including water, sewer, curb, gutter, sidewalk for future W • 1/1/2013
development. • I Totals • 14,100 1930 16030 808 15222 • .
00 24 23 P N/A PE 1/1/2011 5309(NS) 400 OTHER 100 5001 500 CE
West Side Transit Center No
•
Acquire Property to Expand Operations •
from: N/A ' .to: N/A • '
Locate and acquire property for the placement of a West Side Transit
Center Operation
Totals 400 100 500 500
Report Date: ,July 27, 2010 Pages v. 5.7 Supersedes previous editions
•
•
•
•
410 .
0 .
0 . .
W Washington of Transportation Si Year Transportation Improvemenegram
Agency: Yakima From 2011 to 2016 •
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 201 -66 •
Project Identification Project Costs in Thousands of Dollars • Federally Funded •
•
A. PIN /Federal Aid No. B. Bridge No. c , .0 EX Expenditure Schedule Projects Only
m 9 o v F und Source Infor p I y
` s N � C. Project Title o (Local Agency)
'.. co . E ) ; 8 _, o r Federal Funding R/W
v n Z D. Street/Road Name or Number a co 3 Phase Federal Federal State 4th Required
u` E. Beginning MP or Road - Ending MP or Road E a Start Fund Cost b Fund State Local Total Thru Envir. Date
y Funds Funds Funds 1st 2nd 3rd Type (Iynyyy)
F. Describe Work to be Done a (mm/ddlyyyy) Code Phase Code 6th.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21
• 17 25 06 P .60 P PE 4/1/2011 OTHER 6000 6000 6000 . • CE
Yakima Downtown Future Initiatives, Phase 5 12 r W No
S •
from: 1st Street to: 9th Street T
• Install Historic Lighting, Sidewalk Modification & Other Improvements. 0
. Exact improvement area(s) to be determined.
Totals 6000 6000 6000
• PE 1/1/2011 STIP (S) 60 60 120 120
00 26 01 . p N/A CN 4/1/2012 STP(S) 180 AIP ' 240 420 420 CE
Annual Signal Upgrades CN 4/1/2012 STIP (S) 360 360 360 No
Local-Selection '
from: N/A to: N/A .
Upgrade signals . •
Totals 600 240 60 900 120 780
00 27 07 P N/A w CN 6/1/2011 STP(U) 228 32 2601 260 ,
• EA
Various Overlay Projects/Selected on Local Priority S No •
N/A
from: N/A to: N/A . . . ' .
Totals 228 • • 32 260 260 •
PE 1/1/2011 STP(U) 100 14 114 114 •
19 28 03 P N/A P CN 3/1/2012 STP(U) 700 95 795 795 • CE
Longfiber Rd & Washington Ave 05 S Yes
Intersection • 06 W
T
from: to: 0 3/1/2012
• New intersection construction and reconstruction, 3 -lane and 5 -lane w /tum, ,
curb, gutter, sidewalks. '
Totals 800 109 909 114 795
Report Date: July 27, 2010 • Page 7 .
•
•
v. 5.7 - Supersedes previous editions
T Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima • From 2011 to 201
•
Co. No.: 39 Co. Name: Yakima Co.
. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City. No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
Expenditure Schedule Projects Only
F, ' A. PIN /Federal Aid No. B. Bridge No. m c a N Fund Source Information (Local Agency)
9.m .o C. Project Title a a a 0 r Federal Funding R/W
U li Z D. Street/Road Name or Number a - N IS u Phase Federal Federal State 4th Required
u` E. Beginning MP or Road - Ending MP or Road 1- o Start Fund Cost by Fund State Local Total 1st 2n d 3rd Thru Envir. Date
F. Describe Work to be Done a (mMdd/yyyy) Code Phase Code Funds • Funds Funds 6th Type (M �
1 '2 3 4 5 6 7 8 9 10 11 12 13 14 15 .16 17 18 19 20 21
CN 4/1/2011 STP(U) 240 42 282 282
14 29 • 04 P .1 C CE.
E Nob Hill Blvd & S 18th St 01 S . Yes
E Nob Hill Blvd W
from: S 18th St . to: E Nob Hill Blvd T .
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT. - 01/01/07
Project) possible curb, gutter and sidewalk -
Totals 240 42 282 282
PE 1/1/2011 STP(E) 22 7 29 29
. 17 30 05 P .15 C CN 6/1/2011 STP(E) 75 20 951 95 • CE
Zier Rd - S 75th Ave to S 72nd i4ve 06 Yes
Zier Rd T
- from: S 75th Ave S 72nd Ave P 6/1/2011
Minor widening, curb, gutter and sid
Totals 97 27• 124 124
00 31 07 P N/A S PE 1/1/2011 50 50 50 CE
. CN 6/1/2011 240 240 240 •
Gravel Road B. No
Various Areas -
from: City Wide ' to: .
• • Totals • 290 290 290 •
16 32 12 P N/A T CN 10/1/2013 STP(S) 504 74 578 I 578 CE
Powerhouse Rd & Englewood Ave P Yes
Powerhouse Rd 0 .
from: Powerhouse Rd to: Englewood Ave S
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, C 10/1/2013
possible roundabout W •
Totals 504 74 578 578
Report Date: July 27, 2010 Pages v. 5.7 - Supersedes previous editions
• •
•
•
® ® d
•7 11 Washington of Transportation
ID Six Year Transportation Improvemertliogram
. Agency: Yakima From 2011 to 2016
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66 .
•
•
Project Identification Project Costs in Thousands of Dollars Federally Funded .
c L- A. PIN /Federal Aid No. B. Bridge No.. 5 Fund Source Information Expenditure Schedule Projects Only
t m . o C. Pro Title > <I, a 3 • o . ` c Federal Funding (Local Agency) RlW
L'cc U li Z D. StreetlRoad Name or Number aF ce Z^ D. Phase Federal Federal State 4th Required •
o . State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road E 1- o Start Fu nd Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/yy)
F. Describe Work to be Done a (mm Code P hase Code 6th .
.1 2 3 4 5 6 7 8 9 . ' 10 11 12 13 14 15 16 17 18 19 20. 21
PE 1/1/2013 STP(S) 25 4 29 29
14 33 12 P N/A P RW 6/1/2013 STP(S) 25 4 29 29 -CE
S 48th Ave .& Summitview Ave Signalization • T CN 8/1/2014 STP(S) 554 81 635 635 Yes
S 48th Ave
from: S 48th Ave to: Summitview Ave 8/1/2013
Signalization
Totals 604 89 693 58 635
14 34 01 P . W RW 1/1/2013 STP(E) 1047 163 1210 491 1210 CE
W Lincoln Ave 8 'B' St Realignment 12 8 CN 1/1/2014 STP(E) 1801 281 2082 2082 Yes
W Lincoln Ave
. from: W 5th Ave - to: Custer St P
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights _ 1/1/2014
G
C Totals 3,272 511 3783 491 1210 2082
16 35 12 P N/A w 1 1 1 1 1 1 1 1 1 1 CE
School Safety Projects No
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features •
. Totals •
•
•
14 36 03 P .85 C RW 1/1/2013 STP(C) 1 170 1260 630 1260 EA
E Nob Hill Blvd. Reconstruction - 04 O G CN 1/1/2014 STP(C) 6539 1013 7552 7552 Yes
E Nob H ill Blvd. 06
' . from: S 6th Street to: S 18th Street P •
S 1/1/2014
Major roadway widening and reconstructon to 5lanes with Intersection . T •
improvements, curb, gutter, sidewalks, replacement or relocation of meters .
an hydrants - W Totals • 8,175 1267 9442 630 1260 7552 ,
. v. 5.7. - Supersedes previous editions . •
Report Date: July 27, 2010 . - Page 9 - '
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
- en
Agency: Yakima From 2011 to 2016 -
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG
Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. c r , ; E Schedule P rojects Only'
�, N Fund Source Information 1
H -0 C. Project Title d: 2 d
• -, m ,o E Project , a _1 0 s Fe de ral Fu nding L oca l Agency) R/W
U p Z D. Street/Road Name or Number al- y g a Phase Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E r z °' Start Fund Cost by Fund State Local Total Thru Envir. Date .
. F. Describe Work to be Done a (mm Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (yf/y/yyj
1 '2 .3 4 5 • 6 7 8 9 10 11 12 13 14 15 ' '16 17 18 .. 19 20 21
• PE 1/112012 STP(C) 91 14 105 105
17 37 • 01 P N/A W RW 1/1/2013 STP(C) 91 14 105 105 CE
S 72nd Avenue &,W Washington Avenue 12 T CN 1/1/2014 STP(C) 544 86 630 630 Yes
S 72nd Ave 06
from': S 72nd Ave to: W Washington Ave P
Intersection improvement, possible roundabout 1/1/2013
' . To tals 726 114 840 105 105 630 •
PE 1/1/2012 STP(E) 23 5 28 28
17 38 04 P . W CN 7/1/2013 STP(E) • 1096 164 1260 1260
S 66th Avenue 03 T Yes
S 66th Ave S •
from: Scenic Drive to Summitview . P
Widen roadway, curb, gutter, sidewalk and utilities . 7/1/2012
' Totals 1,119 169 1288 28 .1260 . . .
14 39 12 P N/A W PE 1/1/2013 STP(U) 126 17 143 143
RW 1/1/2013 STP 63 8 71 71 CE
40th Avenue and Summitview Signal Upgrade S CN 6/6/2013 STP(U) 544 86 630 630 Yes
• 40th Avenue T '
from: 40th'Avenue to: Summitview P
Signal upgrade, radius improvements, tum lane extension 6/1/2012
• • Totals 733 • 111 844 • 844,
14 40 12 p N/A N/ PE 1/1/2013 STP 95 13 108 108
RW 1/1/2014 STP 63 8 71 71 CE
. 40th Avenue and Englewood . T CN 1/1/2014 STP 145 20 165 165 . Yes
• 40th Avenue S
•
from: 40th Avenue to: Englewood P .
Replace traffic signal poles, upgrade controller 1/1/2013 .
Totals 303 41 344 179 165 '
Report Date: July 27, 2010 Page 10 •
v. 5.7 - Supersedes previous editions
• •
•
. .
._
110
0 . • •
Washington department of Transportation
• Six Year Transportation Improvemen. gram .
Agency: Yakima From 2011 to 2016 '•
Co. No.:_ 39 Co: Name: Yakima Co. • •
. • Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 _
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: 2010 -66
•
•
. Project Identification • Project Costs in Thousands of Dollars ' Federally Funded
c ._ • A. PIN /Federal Aid No. B. Bridge No. E ^ v ar Fund Source Information Expenditure Schedule Projects Only
g w C. Proeect Title E H 0) c o m (Local Agency)
m `o E I d d 3 t Federal Funding R�
U li Z D. Street/Road Name or Number o in :° Phase Federal Federal State 4th Required
t ` E. Beginning MP or Road - Ending MP or.Road 1-• °' ' Start Fund Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done o ` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (hgnyyy)
1 2 3 4 5 6' 7 8 9 10 11 12 13 - 14 15 16 17 18 19 20 21
00 41 • 12 P N/A W PE 1/1/2013 STP 126 18 144 144 •
16th Avenue and Fruitvale Blvd T RW 6/1/2013 STP 63 8 71 • 71 CE
S CN 1/1/2014 STP 315 43 358 358 Yes
• 16th Avenue '
' from: 16th Avenue', to: Fruitvale Blvd P '
• Replace traffic signal poles, radius improvements, ADA ramps O .1/1/2013
' Totals -504 69 573 215 358 .
• 14 42 12 p N/A W PE 1/1/2011 STP 32 5 . 37 37
CN' 1/1/2012 STP 126 17 143 143 . CE
1st Street and / Street T . No
1st Street • ' , - S
•
from: 1st Street to: [Street P '
. Replace and upgrade traffic signal equipment . 0
. Tota 158 22 180, 37 143
16 43 01 P 25 O PE 6/1/2014 STP(U) 820 189 1009 1009
RW 1/1/2015 STP(U) 3150 • 630 3780 3780 CE
Washington Ave. Railroad Grade Separation P CN 1/1/2016 STP(U) 6552 1008 7560 7560 Yes .
Washington Ave. S
from: Longfibre Road to: T
Railroad grade overpass including all utilities W 1/1/2016 •
• Totals 10,522 1827 12349 . • 12349 .
• 16 44 01 P 1.3 C P 1/1/2013 STP(U) 272 43 315 315
RW 6/1/2014 STP(U) 349 '55 404 404 CE
Frontage Road & "H" St. Loop • G CN 1/1/2016 STP(U) 2352 340 2692 2692 Yes
, N. 8th St. O
. from: "H" St. to: 1 -82 P •
C onstruct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S 1/1/2015 •
future development and.Terrace Heights connection. T
• W Totals 2,973 438 . 3411 - 315 3096
•
Report Date: July 27, 2010 Page 11 , v. 5.7 - Supersed previous editions
•
•
Washington State Department of Transportation Six Year Transportation ImprovementProgram.
Agency: Yakima • From 2011 to 2016
Co. No.t 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 ' Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG " Amend Date: • Resolution No.: 2010 -66
• Project Identification Project Costs in Thousands of Dollars • Federally Funded
A. PIN /Federal Aid No. B. Bridge No. - N N Fund Source Information • Expenditure Schedule . Projects Only •
g— P 9 (Local Agency)
o m .2 E C. Project Title o a w 3 o . Federal Funding R/W
c U p` D. Street/Road Name or Number ° i- co .5 = - Phase Federal Federal State 4th Required
u. E o - State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/Yl�
F. Describe Work to be Done n. (mm C ode Phase Code 6th
1 2 . 3 4 5 6 7 8 9 10 11 12 13 14 15 ' 16 • 17 18. 19 20 21
14 45 04 P 3.5 G PE 1/1 STP(U) 1 120 17 137 137 •
CE
16th Ave. Corridor •
16th Ave. 0
• •
from: SR -12 to: Wapington Ave.Nalley Mall P
S •
. Widen roadway, curb, gutter, sidewalk, lighting. T •
• W Totals 120 17 137 137
3.2 C PE 1/1/2013 STP(U) 120 17 1371 137
14 46 04 P CE
40th Ave. Corridor 0
40th Ave. • G
from: SR -12 to: Washington Ave. P
Widen roadway, curb, gutter, sidewalks, lighting. S •
W
T Totals 120 17 137 137 . •
14 47 .. 03 P 27 C PE 1/1/2012 STP(U) 120 17 1371 137 CE
Nob Hill Corridor 04 G •
Nob Hill 0
from: 1 -82 to: S. 16th Ave. P
S •
Widen roadway, sidewalk, curb, gutter, lighting T • • W Totals • 120 17 137 137 • • •
•
14 48 04 P 2.0 c PE 1/1/2014 STP(U) 120 17 1371 137 • CE •
S. 1st St/Main St. Corridor G
S. 1st St. /Main St. 0 .
from: Nob Hill Blvd. to: Barker Mill Bridge P
S
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, '
T •
lighting.., W
Totals 120 17: 137 137 •
•
• Report Date:. July 27, 2010 Page 12 v. 5.7 - Supersedes previous editions .
•
e : . • 0
• . .
0 . ,:
•
Washington• Department of Transportation Six Year Transportation Improvemelogram
. •
-en
Agency: Yakima • From 2011 to 2016
Co. No.: 39 'Co. Name: Yakima Co.
Hearing Date: 6 - 15 - 2010 Adoption Date: 6 - 15 - 2010
City No.: 1485 . MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 - 66
Project Identification Project Costs in Thousands of Dollars Federally Funded
T A. PIN /Federal Aid No. B. Bridge No. m m m Fund Source Information Expenditure Schedule Projects Only
s m o f C P Title . E o W o (Local Agency)
� . _ ; d ' 3 < .. F ederal Funding R/W •
c 5 li = D. Street/Road Name or Number o >, o- Re
z nt- co 5 r, Phase ' Federal Federal State 4th Envir. Required
t ` o
E. Beginning MP or Road - Ending MP or Road E r- °' Start Fund Cost by Fund State Local Total Thm Date
IL' mm/d y Funds Funds Funds 1st 2nd . 3rd T (Miwyy)
F. Describe Work to be Done a ( d/YYYY) Code Phase Code 6th
1 2, 3 4 5 6 7 8 9 10 11 12 . 13 14 15 16 17 18 19 • 20 21
00 49 32 P N/A • PE 1/1/2011 100 100 100 • EA
Storm Drains/Vegetation CN 1/1/2011 900 900 900
Local Selection No
from: City Wide to: . • . ,
City Wide •
' Totals 1000 1000 1000
17 50 03 P .76 W PE 1/1/2012 STP(C) 109 27 136 136
Reconstruction Rudkin Rd D6 T CN 1/1/2013 STP(C) 945 TPP 945 106 1996 1996- CE No
. Rudkin Rd P .
from: E Viola Ave - to: Rainier Place S ••
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main - - -
Totals 1,054 945 133 2132 136 1996 ..
16 51 • 03 P .76 C PE 9/1/2012 STP(S) 122 TPP 23 7 152 152
' E Mead Ave Reconstruction 06 G CN 4/1/2013 STP 1730 TPP 206 70 2006 2006 CE No
•
E Mead Ave • 0 -
from: Rudkin Rd to: Fair Ave P • •
Partner with City of Union Gap, reconstruct, excavate ballast, top course, _ - T • •
curb, gutter, storm, acp - -
. - Totals • 1,852 229 77 2158 152 2006- •
17 52 04 P 1.3 O PE 1/1/2012 AIP 131 20 151 151
• S 80th Ave - Tieton Or to Zier Rd C RW 1/1/2013 AIP 382 59 441 441 EA •
S 80th Ave P
CN 4/1/2013 AIP 1667 - 260 1927 1927 Yes
from: Tieton Dr . - to: Rd T
W 4/1/2012
Major widening, curb, gutter, sidewalk 3
Totals . 2180 339 2519 151' 2368 -
•
•
•
•
• Report Date: July 27, 2010 Page 13 v: 5.7 - Su previous editions
•
•
•
Washington State Department of Transportation Six Year Transportation. Improvement Program
Agency: Yakima • From .2011 to 2016
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. PIN /Federal Aid No. B. Bridge No. v ar Fund Source Information Expenditure Schedule Projects Only •
o m 'o E C. Project Title E H w o m (Local Agency)
v = Federal Funding R/W
U a Z D. Street/Road Name or Number a� N 3 Phase Federal Federal State 4th Required
t ` E. Beginning MP or Road - Ending MP or Road E . 1- ° 1 Start Fund .Cost by Fund State Local Total Thru Envir. Date
° (m rn/dd/yyyy) Co de Phase Code Funds Funds Funds 1st 2nd 3rd Type (Mjwyy)
F. Describe Work to be Done o 6th
1• 2 3 . 4 5 6 7 8 9 10 ': 11 12 13 14 15 16 • 17. 18 . . 19 20 21
17 53 05 P 1.0 W PE 1/1/2014 STP(C) 272 43 315 315
RW 6/1/2014 STP(C) 349 55 404 404 EA
Englewood Ave - N 40th Ave to N 56th Ave 06 T CN 1/1/2015 STP(C) 2352 340 2692 2692 Yes '
. Englewood Ave
from: N 40th Ave to: N 56th Ave P
1/1/2013
Widen roadway, curb, gutter, sidewalk C
Totals 2,973 438 3411 3411
17 54 05 P 2 O PE 1/1/2013 STP(U) 219 34 253 253 •
Englewood Ave - N 24th Ave to N 16th Ave W RW 6/1/2013 /2013 STP(U) 327 51 378 378 EA
06 CN 6/1/2014 STP(U) 2980 .244 3224 3224 Yes
Englewood Ave S "
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines 6/1/2013
Totals 3,526 329 3855 631 3224
• 14 55 12 P 2.5 P PE 1/1/2013 STP(S) 55 8 63 63
W Nob Hill Blvd Sidewalks T RW 6/1/2013 STP(S) 107 19 126 126 CE
W CN 3/1/2014 STP(S) 321 57 378 378 Yes
W Nob Hill Blvd
•
from: S.16th Ave to: S. 6th St. S •
Install missing sidewalks on southside of Nob Hill.
•
3/1/2013
• • Totals . 483 .84 567 189 378 •
•
00 56 06 P 1:0 P PE 1/1/2013 STP(S) 57 • 7 64 64
Beech St Pedestrian Connection P RW 6/1/2013 STP(S) 189 . 25 '214 214 CE . •
32 CN 1/1/2014 STP(S) 504 68 572 572 Yes
Beech St
from: Fair Ave lo: Chalmers /Riverside .
Construct pedestrian pathway under SR82 to Greenway
1/1/2013
,Totals 750 . 100 850 278 572
•
•
•
Report Date: July 27, 2010 Page 14 v. 5.7 - Supersedes previous editions
•
•
III ® Q
•
, . Washington Department ill Six Year Transportation Improvemerlogram
Agency: Yakima From 2011 to • 2016
Co. No.: 39 ' Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6,15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
• Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No.' B. Bridge No. m ^ g) 8 m Fund Source Information Expenditure Schedule Projects Only
` s N -0 C. Project Title - E c 2 (Local Agency)
• m ,o E , c :° _1 . - L F ederal Funding R/W
7 U 6: Z D. Street/Road Name or Number aF. m .5 a Phase Federal Federal State 4th Required
. u_ E. Beginning MP or Road - Ending MP or Road E i- ° ' Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th T yp e (M y)
•
• 1 , 2 _ , 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2013 • STP(S) 43 7 50 50 •
16 57 12 P 2.0 P- RW 6/1/2013 STP(S) 86 15 101 • 101 CE
• W Lincoln Ave Sidewalks T CN 1/1/2014 STP(S) 572 88 660 660 Yes
W Lincoln Ave S '
from: N 56th Ave to: N 29th Ave W
Sidewalks, meters and fire hydrants replacement or relocation 1 /1/2014
Totals 701 110 811 • 151' 660
• PE 6/1/2013 STP(U) 820 189 1009 1009
14 58 01 P
25 W RW 1/1/2014 STP(U) 3150 630 3780 3780 CE
. Mead Ave. Railroad Grade Separation T CN 1/1/2015 STP(U) 6552 1008 7560 7560 Yes
Mead Ave. S
from: Presson Place to: Maryland P
Construct railroad overpass including all utilities O 1/1/2014
• Totals 10,522 1827 12349 1009 11340 '
• PE 6/1/2012 STP(U) 252 38 290 290
16 59 ' 01 P 4.0 O RW 1/1/2013 STP(U) 756 88 844 844 CE
. City wide Pathway Connections 3 CN 1/1/2014 STP(U) 1890 315 2205 2205 Yes '
Y akima •
from: • to: T
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, W _ 1/1/2013
' WOD Trail, Greenway including N aches Rail Spur, signage and amenities •
Totals ' 2,898 441 3339 290 .844 2205
PE 1/1/2013 STP(U) 63 5 68 68 .
17 60 01 P N/A 0 CN 6/1/2013 STP(U) 567 76 6431 643 CE
' 34th Ave & River Rd In(orovements 12 P No
Fruitvale Blvd. S
from: 34th Ave. • ' to: River Rd. T
. W . .
•
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
-
Totals 630 . 81 711 711 .
Report Date: July 27, 2010 Page 15 ' v. 5.7 - Supersedes previous editions
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2011 to 2016
Co. NO.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 •
City No.: 1485 MPO /RTPO: YVCOG ..
Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars Federally Funded .
A. PIN /Federal Ald No. B. Bridge No. c E. d d Fund Source Information Expenditure Schedule Projects Only
s ` y - -° C. Project Title • m d L Federal Funding (Local Agency)
m o f > a R/W
3 a Z D . StreeURoad Name or Number a� m 2 = u Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E I-- .o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date •
. F. Describe Work to be Done . a, (mm Code Phase Code Funds Funds Funds 6th Type (MMY 'fl
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 .19 20 • 21
17 61 • 01 .P 1.0 O PE 1/1/2013 STP(U) 218 34 252 252
•
RW 6/1/2014 STP(U) 327 51 • 378 378 CE
Englewood Ave 05 S CN 1/1/2015 STP(U) 2980 244 3224 3224 Yes , '
Englewood Ave 12
from: 24th Ave to: 40th Ave T •
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines W 1/1/2015
and street lights.
• Totals 3,525 329 3854 252 3602
PE 1/1/2014 STP(U) 120 17 137 1 137 .
14 62 01 P 6.0 C CE
W. Yakima North/South Connector to West Valley • 04 G
Unknown road 06 0
from: North - South to: in West Valley P
City & County joint project to build/extend roadways. • T
W Totals 120 17 137 137
•
•
16 63 01 P 38 S 'PE 1/1/2014 100 1001 100 •
Occidental Road Construction. W
P
•
. from: 58th Ave. to: 64th Ave. T '
Construct roadway . .
• • Totals • 100 • 100 100
•
00 64 01 P 27 PE 1/1/2014 100 1001 100
86th Ave. Road Construction •
from:. Occidental . •
to: Coolidge • .
Construct roadway • Totals 100 100 100
Report Date: July 27, 2010 Page 16 v. 5.7 - Supersedes previous editions
•
. 4110 • ,-
ID ,• •
' . 0
Washington epartment of Transportation Six.Year Transportation Improvemen. gram
- Agge en ncy: Yakima From 2011 to 2016
Co. No.: 39 Co. Name: Yakima Co.
• Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: 2010 -66
•
. Project Identification Project Costs in Thousands of Dollars' Federally Funded
To ,_ A. PIN /Federal Aid No. . B. Bridge No. m .S ; Fund Source Information Expenditure Schedule Projects Only
g N • C . Pro Title E , o v' (Local Agenc
, o E j a o t Federal Funding R/W
U p` D. 'Street/Road Name or Number arT y Phase Federal Federal State .4th. Required
• Li E. Beginning MP or Road - Ending MP or Road E 1- n ° Start Fu Cost b Fund State Local Total Thru Envir. Date
g g g o by Funds F un d s F un d s 1st 2nd 3rd T (MMyy)
F. Describe Work to be Done a (mrn Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 • 13 • 14 15 16 17 18 . 19 , 20 21
16 65 04 S 0.5 W ALL 1J1/2011 STP(U) 900 200. 1100 ' 200 900 EA
64th Ave. Roadway Widening. 06 G — 1 Z YES
03 P
T
. from: Nob Hill Blvd to: Tieton Drive. •
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. C 4/1/2011
• O
' Totals • 900 200 1100 200 900
00 66 03 P N/A G PE 1/1/2014 STP(E) 18 32 50 50 EA'
C CN 6/1/2014 STP(E) 1900 285 . 2185 2185 No
YVT Railway'Rehabilitation & Museum •
3rd Ave S
from: 3rd Ave to: Pine St T
W
Car Barn, Museum Restoration and Pathway - •
P
. • Totals 1,918 317 2235 2235 '
16 67 01 ID N/A S P 4/1/2012. CMAQ 24 3 27 27 CE
CN 7/1/2012 CMAQ 480 65 545 545
Roadway City Wide Shoulder Improvements' No
City Wide .
from: to: . '
City Wide shoulder improvements, PM10 abatement.
•
• . • Totals • 504 • 68 572 572 •
PE 1/1/2013 STP(E) 252 34 286 . 286
00 . 68 14 P .25 T CN 3/1/2014 STP(E) 3150 412 3562 3562 CE No
' Pedestrian Bridge 32
Pedestrian Bridge 0
• from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway, - .
power, handicap accessible, lights .
. Totals 3,402 446 ' 3848 • 286 • 3562 •
Report Date: July 27, 2010 Page 17 v. 5.7.- Supersedes previous editions
•
•
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
•
- Agency: Yakima From 2011 to 2016
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG
Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars • Federally Funded
A. PIN /Federal Aid No. B. Bridge No. e f- d a , Fu Source Information Expenditure Schedule Projects Only
e Z' N � C. Project Title E) ; d ' 0 m (Local Agency) .
m o c� r Federal Funding R!W
g U n.
D. Street/Road Name or Number . y ' •• Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E 1- IS m o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mmldd/yyyy) Code Phase Code Funds Funds Funds 6th Type (mmiyy)
1 2 3 4 5 6 7 8 9 10 11 12 , 13 14 15 16 17 18 19 20 21
•
00 69 14 P N/A O PE 1/1/2011 STP(E) 10 2 12 12 CE
CN 7/1/2011 STP(E) 109 17 126 126
(Mlliam O. Douglas Pathway 32 S No
• P .
from: Pine St - ' to: Cowiche Canyon W .
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
Totals 119 19 138 138 • • .
• 03 P N/A O PE 1/1/2014 STP(U) 315 38 353 353
00 70
YVTPafhway 32 3 CN 6/1/ STP(U) 945 126 1071 1071 CE No
YVT Railway Corridor.
from: to: T
D
•
evelopment pathway in West Valley area including 53rd Ave, Wide Hollow, VV
64th Ave, Ahtanum including all utilities and signage
Totals 1,260 164 1424 1424 .
• 00 71 07 .1 5 G CN 6/1/2011 i
f I ` I 25 251 25 CE
City wide Alleys P ' No
S
from: to: VV '
Pave alleys throughout the city. T •
• Totals • 75 75 25 25 • 25 •
PE 1/1/2011 ARRA- 50 . 50 50 .
14 72 06 P 2.64 CN 6/1/2011 ARRA- 1950 1950 1950 CE
SummifviewAve. Grind & Overlay • 07 No
•
from: 14th Ave • to: 56th Ave
Grind 0.20' of AC? & replace with 0.20' of HMA, and install required ADA .
ramps
Totals 2,000 2000 2000 • •
Report Date: July 27, 2010 Page 18 V. 5.7. - Supersedes previous editions
•
0 .
• •
•
Washington department of Transportation
III Six Year Transportation Improvemegram •
- A ` g e 'cy: Yakima From 2011 to 2016
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
Project Identification Project Costs in Thousands of Dollars - Federally Funded
m A. PIN /Federal Aid No. • B . Bridge No. c r ; Fund Source Information Expenditure Schedule Projects Only
c ti : ar d °' y (Local Agency)
B y n C. Project Title E H W 5 o m
m o E I ; m ' L Federal Funding RNV
o di: Z D . StreetlRoad Name or Number aF y 2 ' u - Phase Federal Federal State 4th Required -
E. Beginning MP or Road - Ending MP or Road E l o - °' Start Fund Cost by Fund State Local Total Thru Envir. Date
( mnvdd/ Funds Funds Funds 1st 2nd 3rd Type (MM/YY
F. Describe Work to be Done a yr/A Code Phase Code 6th
1 : 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16• 17 18 19 20 21
17 73 03 P 0.50 W ALL 1/1/2014 STP(U) 1298 202 1500 I 1500
• River Road Improvements 05 • G CE Yes • .
06 P
O
. from: 6th Ave to: 16th Ave
07
Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage T 6/1/2015
. Totals 1,298 202 1500 • 1500
74 05 p 0.97 C CN 7/1/2012 ' STP(U) 2700 421 3121 f 3121 . .
CE
. Nob Hill Blvd 06 P No
07 T
G
from: 49th Avenue to: 64th Avenue
12 0
Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width 13 .
Totals 2,700 421 3121 3121 ,
75 1 • 10 P .01 P PE 4/1/2011 BRAC 50I I 501 50 .
N/A
18th Street Underpass 11 T No •
•C •
from: Yakima Ave to: 18th Street '
Repair or replace 18th Street Underpass •
•
• Totals 50 50 . 50
PE 1/1/2012 WSDOT 50 50 50
76 • 06 P 0.48 C CE
RW 2/1/2012 WSDOT 25 25 25
88th Avenue . - 12
• P CN 6/1/2012 WSDOT 320 - 10 330 330 Yes
from: Tieton Drive to: Summitview Ave 13 G
Construct curb, gutter, sidewalk and stormwater runoff treatment on the east .
• side of 88th.
• Totals • 395 10 405 • 405 . - . .
•
v. 5.7 - Supersedes previous editions
Report Date: July 27, 2010 • Page 19
•
•
•
•
Washington State Department of Transportation Six Year. Transportation Improvement Program
Agency: Yakima From 2011 to 2016
Co. No.: 39 Co. Name: Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010
City No.: 1485 MPO /RTPO: • YVCOG . Amend Date: Resolution No.: 2010 -66'
•
• Project Identification Project Costs in Thousands of Dollars „,,.. Federallunded
m A. PIN /Federal Aid No. B. Bridge No.
.... rn d N Fund Source Information Expenditure Schedule Projects Only
c y � E7 H c c co (Local Agency)
g m o E C. Project Title > II = rs U T Federal Funding ”. RM/
g U ti 2 D. Street/Road Name or Number o.1- tn S Phase Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E t°2 o S tart Fund • Cost by Fund State • Local Total 1st 2nd 3rd Thru Envir. Date
. F. Describe Work to be Done a` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16. 17 18 19 20 21 .
77 23 P N/A g PE 4/1/2013 5309(Bus) • 15000 1000 16000 2000 14000
Westside Transit Center (Transit) • Yes
from: N/A to: N/A
Construct a West Side Transit Center (Park & Ride Facility)
Totals - 15,000 1000 16000 • 2000 14000
78 23 P ALL 3/1/2011 5307 428 4281 428 CE
Transit Operating Hours Expansion -
from: to:
Expand Transit Operating Hours an hour later into the evening except for '
one route that will be expanded an hour earlier .
'Totals 428 428 428
79 23 P ALL 1/1/2011 5307 288 2881 288 CE
Terrace Heights Moxee Route Expansion - .
• from: to:
Expand route service to Terrace Heights and Moxee
• Totals • 288 288 • 288 •
80 23 P ALL 1/1/2011 5307 602 6021 602 CE
Kittitas- Yakima Commuter Bus .
from: • to:
•
Expand Route Service to Kittitas County - • '
Totals 602 602 -602 •
Report Date: July 27, 2010 Page 2 v. 5.7 - Supersedes previous editions .
•
•
•
'®
. e ' •
•
Washington department of Transportation Six Year Transportation Improvemengram
Agency: Yakima From '2011 to 2016
Co. No.: 39 Co. Name:. Yakima Co.
Hearing Date: 6 -15 -2010 Adoption Date: 6 -15 -2010 .
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: 2010 -66
Project Identification ' Project Costs in Thousands of Dollars Federally Funded
A. PIN/Federal Aid No. • B. Bridge No. e L v
@ g d v �, Fund Source Information Expenditure Schedule Projects Only
sin . E C. ProectTitle. d r d a (Local Agency)
t m o f j a, a o t F ederal Funding R/W
U = D. Street/Road Name or Number 8 a °' Required
a Z . E. Beginning MP or Road - Ending MP.or Road E ~ w I- o Start Federal I Cost by Fund State Local Total 1st 2nd 3rd Thu Tnvi Date
• F. Describe Work to be Done d (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 •
81 23 S N/A ALL 1/1/2011 CMAQ • 200 200 200 CE •
Sunday Bus Service • :No
from: to: •
Expand existing bus service to operate every two hours four times per route '
•
on Sunday •
Totals 200 200 200
16 82 03 P 1.0 W ALL 1/1/2012 STP(U) 1800 281 20811 200 1881 CE
64th Ave. Roadway Widening 04 G Yes
06 P
from: Washington Ave to: Nob Hill Blvd T O 1/1/2013
Widen roadway, curb, gutter, sidewalks, lighting and drainage
• C.
Totals 1,800 281 2081 200 ' 1881
00 83 32 S 1.5 G ALL ,-4/-/2619 283 2831 33 250 CE •
' Powerhouse/William O Douglas Trail Connector • P `41 1201 0 No
T
from: Powerhouse/Williow St. to: 6th Ave /I Street C
Paved pathway
. O .
• Totals 283 . 283 33 250 • . •
. . I Grand Totals for Yakima 132,034 15,463 27,833 175,330 28,954 26955 38,160 81,261 •
• Report Date: July 27, 2010 Page 21
V. 5.7 - Supersedes previous editions
•
•