ITEM TITLE:. Final Contract Payment for Capitol Hill Irrigation System Improvements
City Project No.: IR2257 (Standard Motion V -B — Accept the project •
and approve the final payment)
SUBMITTED BY: Dave Brown — Water /Irrigation Manager
Mike Shane - Water /Irrigation Engineer
CONTACT PERSON/TELEPHONE: Dave Brown — Water /Irrigation Manager
509- 575 -6204
SUMMARY EXPLANATION:
This project replaced approximately 14,000 linear feet of irrigation main with new 2 ", 3 ", 4 ", 6"
and 12" PVC and HDPE irrigation pipe, installed 314 new service connections, and various
valves and appurtenances.
The project replaced the existing irrigation main and services in the neighborhoods between
South 12 Avenue and South 18 Avenue, from Summitview Avenue to McClaren Street.
0 Granite Northwest Inc. has filed a claim against the contractor's bond for payment of monies .
owed for materials and workmanship on the project. The City is aware of the claim and shall
follow required procedures to meet its statutory obligations. There is no reason to postpone the
acceptance of the project as a result of this claim..
Final inspection for this project was made and the recommendation is that the project be
accepted.
_ This Council action is to accept the project and approve the final construction costs.
Contractor: TTC Construction
Contract Award: 10/28/09
Contract Cost: $922,348.60
Final Contract Cost: $968,837.84
Amt. This Payment: -0-
The above total contract cost is for construction only and does not include engineering and other
costs.
_ Resolution _ Ordinance X Other (Specify) Final Contract Payment
_Contract _ Mail to (name and address):
iii Funding Sour Irr Fund
APPROVED FOR SUBMITTAL: �� � City Manager
STAFF RECOMMENDATION: Accept the project and approve final estimate.
COUNCIL ACTION:
•
•
•
Huibregtse, Louman Associates, Inc.
• CIVIL ENGINEERING • LAND SURVEYING • PLANNING Jeffrey T. Louman, PE
Theodore W. Pooler, PE
Dennis J.Whitcher, PE
July 9, 2010 Eric T. Herzog, PLS
y Michael T. Battle, PE
• Terry D.Alapeteri, PE
Gene W. Soules, PE
•
Heidi C. Herzog, PE
•
City of Yak
Timothy D. Fries, PLS
Justin L. Bellamy, PE
•
Water and Irrigation Division Stephanie J. Ray, PE
2301 Fruitvale Boulevard .
Yakima, WA 98902 .
• Attn: Mr. Mike Shane
Re: City of Yakima ,
CAPITOL HILL IRRIGATION SYSTEM IMPROVEMENTS
' City Project No.: IR2257
HLA Project No.: 09041C .
REVISED Letter of Final Progress Estimate and Project Acceptance
Dear Mr. Shane: .
Enclosed is Progress Estimate No. 8 designated as the Final for work performed by TTC
Construction, LLC, through June 3, 2010, in connection with their contract on the above
referenced project. The amount due the Contractor of $0.00 is net after retainage, as per the
ill contract documents. We recommend this Final Progress Estimate be considered and accepted
by the Yakima City Council.
This revised letter also serves as our recommendation for acceptance of this project by the City
of Yakima. We have reviewed the work performed by TTC Construction,, LLC on this project
and believe it has been completed satisfactorily. Please provide us a copy of the Council
resolution authorizing project acceptance. .
Enclosed for your action is the "Notice of Completion of Public Works Contract" to be completed
and sent to the'Department of Revenue in Olympia. Forward three (3) copies of the Notice of
Completion to the Department of Revenue as soon as the Yakima City Council has accepted .
the project.
A separate Notice of,Completion,•as required by the Washington State Department of Labor and
Industries is attached for your action. Forward one (1) copy of this Notice of Completion to the
Department of Labor and Industries as soon as the Yakima City Council has accepted the
project. •
•
The retainage on this project in the amount of $44,770.70 should be released to TTC Construc-
tion, LLC, after acceptance of the project and when the following conditions have been satisfied:
1. There are no liens or claims for labor and materials furnished on this project filed
. against the retainage or bond.
•
2. A full sixty (60) days have elapsed since the official acceptance of this project by
the City of Yakima.
S 3. The City has received Notice of Completion clearance from the Department of
Revenue, the Unemployment Security Department, and the Department of Labor
and Industry relative to this contract. Please provide a copy of each to our office.
G: \PROJECTS1200909041C YA Capitol Hill TTCIPROGRESS ESTIMATES\070910 REVISED PROGRESS EST NO 8 AND FINAL.LTR.rtf
•
801 North 39th Avenue Yakima,WA 98902 (509) 966 -7000 + FAX (509) 965 -3800 www.hlacivil.com
•
City of Yakima 1111
July 9, 2010
Page 2. •
•
4. The City has received the following from Huibregtse, Louman Associates, Inc.
(HLA):
•
a. HLA has confirmed that all punch list items identified during the final walk -
through inspection have been completed.
b. HLA has delivered two neatly marked 11 X 17 sets of record drawings and
one 11 X17 set of Inspector As -Built drawings to the City of Yakima on
May 11,2010.
c. A notarized certificate from the Contractor which states that'all labor and
materials furnished on this project have been paid for will be sent to the City
upon its arrival from the Contractor.
d. The required project labor and equal employment opportunity documents
were sent to the City on June 10, 2010.
We would appreciate receiving a co
PP g copy of •your Council Resolution authorizing release of
retainage. •
Please contact this office if you have questions or if we may furnish additional information.
Very truly yours,
Michael T. Battle, PE
MTB /crf •
Enclosure •
Copy: TTC Construction, LLC •
Steven Sziebert
Correspondence File
•
•
•
0
G9PROJECTS12009109041 C • YA Capitol Hill TTCIPROGRESS ESTIMATESI070910 REVISED PROGRESS EST NO 8 AND FINAL LTR.rtf