HomeMy WebLinkAboutR-2010-067 Yakima Urban Area Comprehensive Plan Amendment Incorporating the 2011-2016 Six-Year Transportation Improvement ProgramRESOLUTION NO. R-2010-67 A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2011 through 2016. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year Transportation Improvement Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- year Transportation Improvement Plan for the period of 2011 to 2016 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, public hearings were held by the Yakima City Council on the Six-year TIP on June 1, 2010 and June 15, 2010, with proper public notice as required by RCW 35.77.010; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six -Year Transportation Improvement Program for the period of 2011 through 2016 for the City of Yakima shall be incorporated as an amendment to the Capital facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 15th day of June, 2010. ATTEST: aAst Micah.Cawley, M Mi . yor • s BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT ITEM TITLE: Public Hearing to consider: Item No. g For Meeting of June 1, 2010 A) Adoption of the Six-year Transportation Improvement Program for the years 2011 to 2016, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: Michael Morales, Director of Community and Economic Development - CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576-6797. SUMMARY EXPLANATION: Attached is the 2011 — 2016 Six-year TIP, along with an explanation sheet that describes the information contained on the various columns of the Six-year TIP. Two transit projects have been added to the six-year TIP. These projects are: • #78 Transit Operating Hours Expansion • #79 Terrace Heights/Moxee Route Expansion • #80 Kittitas — Yakima Commuter Bus Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1 Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Continue Public Hearing to June 15, 2010 Council meeting for second Public Hearing and , possible adoption of plan. BOARD/COMMISSION/COMMITTEE RECOMMENDATION: COUNCIL ACTION: Page Two Projects that that have been deleted from the 2010 — 2015 TIP as they were completed or the funds were obligated include: • #1 Yakima Railroad Grade Separations — Phase 2 • #4 YVT Trolley Barn/Powerhouse Rehabilitation • #5 William O. Douglas Trail • #28 Yakima Downtown Future Initiatives, Phase 4 Council and the public are welcome to add other arterial system projects to the list. The six-year TIP project listing will be finalized at today's hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used.. • The current plan for 2011 — 2016 includes nine projects that are funded. Funding for the0 remainder of the projects will continue to be sought. Six-year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. • Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six-year TIP for 2011 to 2016. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. • • 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit -code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Rural (Under 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access 1. Priority Numbers. (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. Description 00- No Classification Urban (Over 5000 pop.) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access Enter local agency number identifying agency project priority 3. Improvement Type Codes. Enter the appropriate federal code number. Description 01- New construction on 07 - Resurfacing 14 - Bridge Program -Special new alignment 08 - New Bridge Construction 21 - Transit Capital Project 02- Relocation 09- Bridge Replacement 22- Transit Operational Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety/Traffic Operation/TSM 13 - Environmentally Related 25 23 - Transit Planning 24 - Transit Training/Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C -Cable TV O - Other S - Sewer (other than agency -owned) W - Water G - Gas P - Power T - Telephone 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 • 0 0 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. RNV Certification. Click Yif Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required"for Federally funded projects only.) 27 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15.2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars • Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MMIYY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 Yakima Railroad Grade Separations- Phase 3 • Mahn Luther King, Jr. BlvdG from: N. 1st Sreet to: N. 1st Ave Construct Grade Separation and adjacent roadway reconstruction induding Front Street 01 06 07 08 P 0.2 T P. O CN CN 4/1/2011 4/1/2011 STP(U) DEMO 1700 3281 FMSIB AIP - 2000 1500 4530 8230 4781 3000 3000 5230 1781 - EA Yes 9/1 /2009 Totals 4,981 3500 4530 13011 6000 7011 00 2 Transit Operating Expenditures Various fixed rates and locations from: N/A to:' N/A Annual operating assistance from the FTA In support of our transit system; fixed conte, paratrensit Dial -A -Ride and vareool program 12 22 23 24 31 S N/A ALL 1/1/2011 5307 1601 16011 32021 32021 1 CE No Totals 1,601 1601 3202 3202 00 3 William O. Douglas Heritage Trails Bodge Restoration & Trailhead from: to: Trailhead restoration, right of way acquisition partner with the Wiliam 0. Douglas Foundation. Including restoration of bridge . deaning. rust removal and painting 32 13 10 S N/A O P S T w RW CN 1/1/2011 1/1/2011 STP(E) STP(E) 150 285 150 285 150 .285 CE Yes 6/01/09 Totals . 435 435 435 00 4 Street Asset Amenities (Transit) Route Maintenance, Repair and Improvements from: N/A to: N/A On going improvements to bus benches, shelters and signage Infrastructure 22 31 S WA ALL 1/1/2011 5309(Bus) 280 50 3301 50 100 100 80 CE. No ' Totals 280 50 330 50 100- 100 80 Report Date: May 25, 2010 Page 1 v. 5.7 - Supersedes previous editions hington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: • Functional Class Priority Number Project Identification � A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) 2 co Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/Yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds R/W Required Date (/yyin,yl Federal Fund Code Federal Cost by Phase 1st 2nd 3id 41h 6th Envir. Type 2 3 4 '5 6 7 8 9 10 11 12 13 14 15 16 17 18. 19 20 21 00 5 Continue Transit Service to Terrace Heights New University & Retail Links from: N/A to: N/A Extension of Ilxed route bus service only Into the Terrace Heights area of Yakima County • 22 S N/A ALL 1/1/2011 CMAQ 71 - 11 '82 82 No Totals 71 11 82 82 14 "6 Nob Hill Blvd and 64th Ave Improvements Nob Hill Blvd from: 53rd Ave - to: 64111 Ave Widen and reconstruct 64111 Ave. to 33 -foot width with curb, gutter and sidewalk from Nob Hill Blvd. to 400 feel north, Construct curb, gutter sidewalk and slormwater runoff treatment on the north side of Nob HilL 03 05 07 12 13 P .71 C P T CN 1 1/1/2011 . JOBS 9251 9251 9251 1 CE No Totals 925 925 925 14 7 S 16th Ave & W Washington Ave Signal & intersection. S 16th Ave from: S 16th Ave to: W Washington Ave Included in Union Gap's valley Mall Blvd. project 12 05 03 S N/A P T CN CN 1/1/2011 7/1/2011 AIP AIP 880 1000 383 214 1263 12741 1263 1214 CE Yes' 4/1/2010 Totals 1880 597 2477 2477 16 8 66th Ave. & SummiNiew Intersection N. 66111 Avenue & SummiNiew from: N. 66th Ave. to: SummiNiew Ave. Widen for left turn lanes, Intersection improvements. curb. gutter. handicap ramps and lighting 05 12 S -20 G 0 P s T W CN 1 1/1/2011 1 1 - 1 6001 6001 600 1 CE " Yes " • 4/1/2010 C Totals 600 600 600 Report Date: May 25, 2010 Page 2 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 3g Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E.State Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency)• Federally Funded Projects Only Project Phase l Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/1,y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 Coolidge Road Widening and Paving. - from: 801), AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 05 06 S .50 s W P T CN 1/1/2011 CMAC] 540 214 754 754 CE Yes 9/1/2009 Totals 540 214 754 754 00 10 Acquisition of new Diel -A -Ride paratransit vehicles from: N/A to: N/A Purchase new vehicles to replace older, less reliable units 21 S N/A ALL 1/15/2013 5309(NS) 96 84 1 1801 180 1 CE No Totals 96 84 180 180 14 11 E. Lincoln & 10th Street Roundabout. from: E. Lincoln • to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, & street lighting 03 05 06 p N/A PE RW CN 1/1/2011 1/1/2012 6/1/2012 STP(U) STP.(U) STP(U) 173 433 1125 27 57 175 200 500 1300 200 500 1300 - - CE Yes 6/1/2011 Totals 1,731 27 242 2000 200 1800 12 12 S.R.12 & 16th Avenue Interchange Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout 03 06 P N/A o ALL 1/1/2011 STP(U) 865 135 1000 1 1000 CE No Totals 865 135 1000 1000 Report Date: May 25, 2010 Page 3 v. 5.7 - Supersedes previous editions Ashington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class I Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) = y Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (min/cid/my) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RNV Date (mm/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 13 1-82 & Lincoln Avenue Interchange 1-82 Interchange from: E. "G" Street to: 1-82 Reconstruct / extend oft -ramp from existing 1-82 off -ramp for Lincoln Avenue to E. '0" Street 01 P N/A o P G ALL 1/1/2012 STP(U) 865 135 1000 ' 1000 EA Yes 6/2011 Totals 865 135 1000 1000 14 14 E - Yakima Avenue & Fair Avenue SIgnalization from: E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 P N/A P W T S 0 ALL 1/1/2012 STP(U) 865 1 135 1000 1000 CE No Totals 865 135 1000 1000 00 15 Fixed route Bus Services to Moxee along SR 24 Corridor SR 24 Hwy Corridor/Park & Ride Lots from:lo: JARC funded demonstration project to determine ridership potential to and from the Moxee area Including stops at two Park 8 Ride lots along SR 24. 22 S ALL 1 1/2/2011 5316 1 1311 I 131 I 262.1 131 131 CE No Totals 131 131 262 131 131 14 16 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd • to: Fair Ave Intersection widening 8 new signal, curb. gutter and sidewalk, street lighting, stormwater 31 03 04 P • N/A O C P T W RW CN 1/1/2012 4/1/2012 STP(U) STP(U) 173 865 ( . 27 135 200 1 1000 200 1000 4I CE Yes 4/1 /2001 Totals 1,038 162 1200 1200 Report Date: May 25, 2010 Page 4 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) g rn Total Length Utllity Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. -Type RAN Required Date (MM/W1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21 16 17 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P N/A P T PE CN 4/1/2011 6/1/2011 13 214 13 214 13 214 CE No Totals 227 227 227 14 18 4579 S Ist St. - E. Washington Ave. Intersection improvement S1stSt. • from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A tp S T p PEI 6/1/2011 STP(U) 252 I 38 I 2901 2901 I EA Yes 01/01/11 Totals 252 • 38 290 290 17 19 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 P T W S p ALL 4/1/2012 STP 1 2268 1 307 25751 525 20501 EA Yes 4/1/2014 Totals 2,268 307 2575 525 2050 14 20 • South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection. signals. curb, gutter and sidewalk 03 12 P WA P S T W PE CN 1/1/2012 6/1/2012 STP(U) STP(U) 51 383 8 61 59 444 59 444 CE Yes 6/10/2010 Totals 434 69 503 503 Report Date: May 25, 2010 Page 5 v. 5.7 - Supersedes previous editions 4-, shington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional I Class o E a z Project Identification A. PIN/Federal Aid No- B. Bridge No. C. Project Title( D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) y Total Length I v 0 Project Costs in Thousands of Dollars Expenditure Schedule Local A enc Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type Required Date (MM/Y1/ Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th fish • 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 4562 Tielon Dr • S 5th Ave. Intersection Project neon Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A P W T O S ALL 4/4/2012 STP(U) 378 WSDOT 378 756 756 CE Yes 4/1 /2014 Totals 378 378 756 756 16 22 E. 1-1" St. Extension E. -H"St from: 1st St. to: Yakima River Construct road including water, sewer, curb, gutter and sidewalk for future development 01 08 P 1.1 0 P S T W PE RW CN 1/1/2012 1/1/2014 6/1/2014 STP(U) ' STP(U) STP(U) 2180 2180 1199 340 340 1871 2520 2520 3070 •2520 2520 3070 -CE Yes 1/1 /2014 Totals 5,559 2551 8110 2520 5590 17 23 N. 10th St. Extension N. 10Th SL from: R St. to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future development 01 06 P 1.3 0 3 T W PE RW CN 1/1/2012 1/1/2013 6/1/2013 STP(C) STP(U) STP(U) 700 5500 7900 108 850 972 808 6350 8872 808 6350 8872 CE Yes i/1 /2013 Totals 14,100 1930 16030 808 15222 00 24 West Side Transit Center Acquire Property to Expand Operations from: N/A to: N/A Locate and acquire property for the placement of a West Side Transit Center Operation 23 P N/A PE 1 1/1/2011 1 5309(NS) 4001 OTHERI 1 1001 5001 5001CE No _ Totals 400 100 500 500 Report Date: May 25, 2010 Page 6 v. 5.7 - Supersedes previous editions Washington State Department of Transportation AIF -Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes • Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (m r✓ddiyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type WW Required Date (MM 1 Y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 25 Yakima Downtown Future Initiatives, Phase 5 from: 1st Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined 06 12 P 60 P W S T O PE 4/1/2011 OTHER 6000 6000 6000 CE No Totals 6000 6000 6000 00 26 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A • PE ON CN 1/1/2011 4/1/2012 4/1/2012 STIP (S) STP(S) STIP (S) 60 180 360 AIP 240 60 . 120 420 360 120 420 360 CE No Totals 600 240 60 900 120 780 00 27 - Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 P N/A WCN S 6/1/2011 STP(U) 2281 I 32 2601 260 EA No Totals 228 32 260 260 19 28 Longliber Rd & Washington Ave Intersection from: to: New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn. curb, gutter, sidewalks. 03 05 06 p N/A P S w T O PE CN 1/1/2011 3/1/2012 STP(U) STP(U) ' 100 700 14 . 95 114 795 - 114 795 CE Yes 3/1/2012 Totals 800 109 909 114 795 Report Date: May 25, 2010 Page 7 v. 5.7 - Supersedes previous editions . shIngton State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. ' C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only a t o_ ° o` Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MMM') Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th 61h 1 2 3 4 5 6 7 8 9 10. 11 12 13 14 15 16 17 18 19 20 21 14 29 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; Ole to WSDOT Project) possible curb, gutter and sidewalk : 04 01 P .1 C S W T CN 4/1/2011 STP(U) 240 — 42 282 282 CE Yes 01/01/07 Totals 240 42 282 282 17 30 ZierRd-S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk ' 05 06 - P .15 C S T P PE CN 1/1/2011 6/1/2011 STP(E) STP(E) 22 75 7 20 29 95 29 95 CE Yes 6/1/2011 Totals 97 27 124 124 00 31 Gravel,Road B.S.T. Various Areas from: City Wide to: ' 07 P N/A s PE CN 1/1/2011 6/1/2011 50 240 50 2401 50 240 CE No Totals 290 290 290 16 32 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection. realignment. curb, gutter, sidewalk. Safety Flashing Signal, possible roundabout 12 P N/A T P O S C W _ CN 10/1/2013 STP(S) 504 I 74 5781 1 5781 CE Yes 10/1/2013 Totals 504 74 578 578 Report Date: May 25, 2010 Page 8 v. 5.7 - Supersedes previous editions Washington State Department of Transportation QIP Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency), Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds plef YP Type RNV Required Date (MM YY) Federal Fund Code Federal Cost by Phase l st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 14 33 S48thAve 4SummitviewAve Signa/ization S 48th Ave from: S 48th Ave to: Summitview Ave Signalizatlon 12 - P N/A P T PE RW CN 1/1/2013 6/1/2013 8/1/2014 STP(S) STP(S) STP(S) 25 25 554 4 4 81 29 29 635 - 29 29 635 CE Yes 8/1/2013 Totals 604 89 693 58 635 14 34 W Lincoln Ave & 'B' St Realignment- W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P •5 W S P p G C PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(E) _ STP(E) STP(E) 424 1047 1801 67 163 281 491 1210 2082 491 1210 - 2082 CE Yes 1/1/2014 Totals 3,272 511 3783 491 1210 2082 16 35 ' . School Safety Projects Various Locations - Citywide Irom: to: Crossing flashers, sidewalks, signing, other features 12 P N/A W 1 1 1 1 1 1 1 1 1 1 1 CE No Totals 14 36 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection Improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants 03 04 06 . P .85 C GG P g T W PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) 546 1090 6539 84 170 1013 630 1260 7552 630 1260 7552 EA Yes 1/1/2014 Totals 8,175 1267 9442 630 1260 7552 Report Date: May 25, 2010 Page 9 v. 5.7 - Supersedes previous editions All —r- ashington State Department of Transportation WO Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title j D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only• Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds ' Envir. Type RNV Required Date (MMMj Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 " 16 17 18 19 20 21 17 37 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection Improvement, possible roundabout 01 12 06 P N/A W T. P C PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) 91 91 544 14 14 86 105 105 630 105 105 630 CE Yes 1/1/2013 Totals 726 114 840 105 105 630 17 38 S 66th Avenue S 66th Ave " from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utiities 04 03 P 76 y,/ • T S P C PE CN 1/1/2012 7/1/2013 STP(E) STP(E) 23 1096 5 164 281 1260 28 1260 Yes 7/1 /2012 Totals 1,119 169 1288 28 1260 14 39 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview Signal upgrade, radius Improvements, turn lane extension 12 pRW N/A W S T P PE CN 1/1/2013 1/1/2013 6/6/2013 STP(U) STP STP(U) 126 63 544 17 8 86 143 71 630 143 71 630 CE Yes 6!1/2012 Totals 733 111 844' 844 • 14 40 40th Avenue and Englewood 401h Avenue from: 40th Avenue to: Englewood Replace traffic signal poles. upgrade controller "12 P WA WPE T S P D RW CN 1/1/2013 1/1/2014 1/1/2014 STP STP STP 95 63 145 13 8 . 20 108 71 165 108 71 165 CE Yes 1/1/2013 Totals 303 41 344 179 165 Report Date: May 25, 2010 Page 10 v. 5.7 - Supersedes previous editions 174 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement I Type(s) 2 N Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MMN") Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 41 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvate Blvd Replace tralllc signal poles, radius Improvements, ADA ramps 12 P N/A W T P o PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP STP STP 126 63 315 18 8 43 144 71 358 144 71 358 CE Yes 1/1/2013 Totals 504 69 573 215 358 14 42 1st Street and I Street 1st Street from: 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A YTV S P O PE CN 1/1/2011 1/1/2012 STP STP 32 126 5 17 37 143 37 143 CE No Totals 158 22 180 37 143 16 4301 Washington Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass Includng alt utaiitles P .25 O 1 3 T W PE RW CN 6/1/2014 1/1/2015 1/1/2016 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE Yes 1/1/2016 Totals . 10,522 1827 12349 12349 16 44 Frontage Road& "1-1* St. Loop N. 8th St. from: "H" SL to: 1-82 ' Construct new roadway, water, sewer, cutb, gutter. sidewalk and lighting for luture development and Terrace Heights connection. 01 P 1.3 C GO P T T W PE RW CN 1/1/2013 6/1/2014' 1/1/2016 STP(U) STP(U) STP(U) - 272 349 2352 43 55 340 315 404 2692 315 404 2692 CE Yes 1/1/2015 Totals 2,973 438 3411 315 - 3096 Report Date: May 25, 2010 Page 11 v. 5.7 - Supersedes previous editions 41 hington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement P1111 rogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Functional Class , Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddryyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds R/W Required Date (M1v1 yY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6 h Envir. Type 1 -e 3 4 5 6 7 8 9 10 11 12 13 '14 15 16 17 18 19 20 21 14 45 16IhAve. Corridor 16th Ave. Irom: SR -12 to: (a�shington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting. 04 P 3.5 C 0 O P S T W PE 1/1/2014 STP(U) 120 17 137 137 CE Totals 120 17 137 137 14 46 - 40th Ave. Corridor 40th Ave. from: SR -12 • to: Washington Ave, Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 • C , O G P S W T PE 1 1/1/2013 1 STP(U) 1 120 1 17 1371 1, 1371 CE Totals 120 17 137 137 14 47 Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter, lighting 03 04 P , 2.7 C G O P S T W PE 1 1/1/2012 1 STP(U) 1 120 1 1 17 1 1371 1 1371 1 CE Totals 120 17 137 137 14 48 S. 1st St/Main St. Corridor S. 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to widen roadway. curb. gutter. sidewalk, lighting. 04 P 2.0 C G O P S T W PE 1/1/2014 STP(U) (' 120 1 1 17 137 1 1 1 1 137 CE Totals , 120 17 137 137 Report Date: May 25, 2010 Page 12 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011. to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class • Priority Number Project Identification • A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done u`.- i d 2Required 8.1- E Status Total Length Utility Codes Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start • (min/rid/my) Fund Source Information Federal Funding State Fund Code • State Funds Local Funds Total Funds Envir. Type RNV Date (MM YY) Federal Fund Code Federal Cost by Phase 1 sl 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 49 Storm Drains/Vegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2011 1/1/2011 100 900 100 900 100 900 _ EA No Totals 1000 1000 1000 17 50 Reconstruction Rudkfn Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P .76 yy T P S PE CN 1/1/2012 1/1/2013 STP(C) STP C 109 945 TPP 945 27 106 136 1996) 136 1996 CE No Totals 1,054 945 133 2132 136 1996 16 51 E Mead Ave Reconstruction E Mead Ave from: Rudkln Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb. gutter. storm, acp 03 06 P .76 C 0 P T PE CN 9/1/2012 4/1/2013 STP(S) STP 122 1730 TPP TPP 23 206 7 70 152 1 2006 152 2006 CE No Totals 1,852 229 77 2158 152 2006 17 52 S 80th Ave - Tieton Dr to Zier Rd S Both Ave from: Tieton Dr to: Zier Rd Major widening. curb, gutter, sidewalk 04 P. 1.3 O C T W s PE RW CN 1/1/2012 1/1/2013 4/1/2013 AIP AIP AIP 131 382 1667 20 59 260 151 441 1927 151 441. 1927 EA Yes 4/1/2012 Totals 2180 339 2519 151 2368 Report Date: May 25, 2010 Page 13 v. 5.7 - Supersedes previous editions Ashington State Department of Transportation Agency: Yakima Co. No.: City No.: 39 Co. Name: Yakima Co. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Pro• qam From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class . Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes, Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R W Required Date (M>7 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 •12 13 14 15 16 17 18 19 20 21 17 53 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 1.0 y/ S T P C PE RW CN - .1/1/2014 1 6/1/2014 1/1/2015 STP(C) STP(C) STP(C) - 272 349 2352 43 55 340 315 404 2692 315 404 2692 EA Yes 1/1/2013 Totals 2,973 438 3411 3411 17 54 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 241b Ave Widen, curb, gutter and sidewalk: water and sewer lines 05 06 P 2 p 5 PE RW CN 1/1/2013 6/1/2013 6/1/2014 STP(U) STP(U) STP(U) 219 327 2980 34 51 244 253 378 3224 . 253 378 3224 EA Yes 6/1/2013 Totals 3,526 329 3655 631 3224 14 55 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: S. 6th SL Install missing sidewalks on southside of Nob Hill. 12 P 25 P T W s PE RW CN 1/1/2013 6/1/2013 3/1/2014 STP(S) STP(S) STP(S) 55 107 321 8 19 57 63 126 378 63 126 378 CE Yes 3/1/2013 Totals 483 84 567 189 378 00 56 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under S682 to Greenway 06 32 P 10 P T PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 57 189 504 7 . 25 68 64 214 572 64 214 572 CE Yes 1/1/2013 Totals 750 100 • 850 278 • 572 Report Date: May 25, 2010 Page 14 v. 5.7 - Supersedes previous editions aa►. Washington State Department of Transportation -A'geency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. • C. Project Title j D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s)• Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mrr✓dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type FVW Required Date (MtiWYj Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 57 W Lincoln Ave Sidewalks W Lincoln Ave - from: N 56th Ave to: N 29th Ave Sidewalks, meters and tire hydrants replacement or relocation 12 P 2.0 P T S W PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 43 86 572 7 15 88 50 101 660 50 101 660 CE Yes 1/1/2014 Totals 701 110 811 151 660 14 58 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P 25 W T T P O PE RW CN 6/1/2013 1/1/2014 1/1/2015 STP(U) STP(U)- STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 - 1009 3780 7560 CE Yes ' 1/1/2074 Totals 10,522 • 1827 12349 1009 11340 16 59 ClrywldePathwayConnectlons Yakima from: to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail. Greenway Including Nachos Rap Spur, signage and amenities 01 P 4.0PE 0 S T W RW CN 6/1/2012 1/1/2013 1/1/2014 STP(U) STP(U) STP(U) 252 756 1890 38 88 315 290 844 2205 290 844 2205 , CE Yes 1/1/2013 Totals 2,898 441 3339 290 844 2205 17 60 34th Ave B River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. Intersection Improvements including lumination, sewer, water, curb. water and sidewalks 01 12 P N/A 0 P . S T W PE CN 1/1/2013 6/1/2013 STP(U) STP(U) " 63 567 5 76 681 643 68 643 CE No Totals 630 81 711 711 Report Date:. May 25, 2010 Page 15 v. 5.7 - Supersedes previous editions I7 Agency: Co. No.: City No.: shington State Department of Transportation Yakima 39 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Pro am From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional I Class oE "c = o- z Project Identification 9 C. Project Title A. PIN/Federal Aid No. B. Bride No. D. Street/Road Name or Number E Beginning MP or Road - Ending MP or Road F. Describe Work to be Done - Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects'Only ' Project Phase Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding State Fund Code State Local Funds Funds Total Funds Envir. Type R/N/ Required Date (tifn4/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd .4th 8 r 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 17 61 Englewood Ave Englewood Ave from: 24th Ave to: 401h Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 0 8 T W PE RW CN 1/1/2013 6/1/2014 1/1/2015 STP(U) STP(U) STP(U) 218 327 2980 34 51 244 252 378 3224 252 378 3224 CE Yes 1/1/2015 Totals 3,525 329 3854 252 3802 14 62 W. Yak/ma North/South Connector to West Valley Unknown road from: North - South 10: in West Valley City 8 County joint project to build/extend roadways. 01 04 06 P 6.0 C G O P s T W PE 1/1/2014 STP(U) 120 1 17 1371 1 - I 1 137 CE Totals 120 17 137 137 16 63 Occidental Road Construction. from: 58th Ave. to: 64th Ave. Construct roadway 01 P 38 S W P T PE 1/1/2014 - 1 1 1001 1001 1 100 Totals . 100 100 100 00 64 86th Ave. Road Construction from: Occidental to: Coolidge Construct roadway 01 P 27 PE 1/1/2014 100 1001 1 100 . Totals 100 100 100 Report Date: May 25, 2010 Page 16 v. 5.7 - Supersedes previous editions 411 II W11 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done g , -1-- E 2 N Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (m r✓ddiyyyyt Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 65 641h Ave. Roadway Widenina. - from: Washington Avenue. to: Tiielon Drive. Wide Roadway,Curb, Gutter. Sidewalks, Lighting, Drainage. 04 06 P 1.5 W G P T C Q PE 1/1/2014 STP(U) 120' 17 137 - 137 EA YES . 7/4/2014 Totals 120 17 137 137 00 66 YVT Railway Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Bain. Museum Restoration and Pathway 03 P N/A G C S T W P PE CN - 1/1/2014 6/1/2014 STP(E) STP(E) 18 1900 32 285 50 2185 50 2185 EA No Totals 1,918 317 2235 2235 16 67 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder Improvements, PM10 abatement 01 P WA S PE CN 4/1/2012 7/1/2012 CMAQ CMAQ 24 480 3 65 27 545 27 545 CE No Totals 504 68 572 572 • 00 68 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yadma Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway. power, handicap accessible, lights 14 32 P .25 T P Q PE CN 1/1/2013 3/1/2014 STP(E) STP(E) 252 3150 34 412 2861 3562 286 3562 CE No Totals 3,402 446 3848 286 3562 Report Date: May 25, 2010 Page 17 v. 5.7 - Supersedes previous editions v. ington State Department of Transportation sh Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPOIRTPO: YVCOG Six Year Transportation Improvement Pro am From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 ' Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No., B. Bridge No.. C. Project Title j D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s)^ • Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) " Federally Funded Projects,Only Project Phase I Phase Start (mm/ddyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds. Envir. Type RNV Required Date (MM YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th• Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 69 William O. Douglas Pathway from: Pine SI to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trat. 14 32 P N/A 0 S P w PE CN 1/1/2011 7/1/2011 STP(E) STP(E) • 10 109 2 17 12 126 12 126 CE No Totals 119 19 138 138 00 70 YVT Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area induding 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03 32 P N/A 0 P T w PE CN 1/1/2014 " 6/1/2014 STP(U) STP(U) 315 945 38 126 353 1071 1 353 1071 CE No Totals 1,260 164 1424 1424 00 71 City wide Alleys from: 10: Pave alleys throughout the dty. 07 P .5 G S w T CN 6/1/2011 I 75 75I 25 25 251 " CE No Totals 75 75 25 25 25 ' 14 72 Surnmitw'ewAve. Grind & Overlay from: 14th Ave to: 56th Ave Oiled 0.20' of ACP & replace with 0.20' of HMA, and install required ADA ramps 06 07 P 2.64 PE CN 1/1/2011 6/1/2011 ARRA- ARRA- 50 1950 50 "1950 1 50 1950 CE No Totals 2,000 2000 2000 Report Date: May 25, 2010 Page 18 v. 5.7 - Supersedes previous editions 41110. Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done, Improvement Type(s) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule ' (Local Agency) Federally Funded Projects Only Utility Codes Project Phase Phase Start (mm/ddfyyyy) Fund Source Information Funding State Code State Funds Local Funds Totai Funds Envir. Type RM/ Required Date (MM/Yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th stn 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 17 73 River Road Improvements from: 6th Ave i to: 161h Ave Reconstruct roadway, widen, curb. gutter, sidewalk. lighting and drainage 03 05 06 07 P 0.50 WALL G P 0 T 1/1/2014 STP(U) 1298 202 1500 1500 CE Yes ' 6/1 /2015 Totals 1,298 202 1500 1500 74 Nob Hill Blvd from: 49th Avenue to: 64th Avenue Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay lull width 05 06 07 12 13 P 0.97 C CN P T G 0 7/1/2012 STP(U) 2700 421 31211 31211 1 - CE No Totals 2,700 421 3121 3121 75 18th Street Underpass Irom: Yakima Ave to: 18th Street Repair or replace 18th Street Underpass 10 11 P 01 P PE T C 4/1/2011 BRAC 50 501 501 1 N/A No Totals 50 50 50 76 88th Avenue from: Tieton Drive to: Summitvlew Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 8818. 06 12 13 P 0.48 PE C C RW T CN G 1/1/2012 2/1/2012 6/1/2012 WSDOT WSDOT WSDOT 50 25 320 10 50 25 330 50 25 330 CE Yes .— Totals 395 10 405 405 Report Date: May 25, 2010 Page 19 v. 5.7 - Supersedes previous editions 10 . shington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Pro am From. 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution N Td m S o LL Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start . (mm/ddyyyy) Fund Source Information Federal Funding State•4ih Fund Code State Funds Local Funds Total Funds RNV Required Date (MM/Y11 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd Thru 6th Envir. Type 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18, 19 20 21 77 • Westside Transit Center (Transit) from: N/A to: N/A Construct a West Side Transit Center (Park & Ride Facility) 23 P N/A S PE 4/1/2013 5309(Bus) 15000 1000 16000 2000 14000 Yes Totals 15,000 1000 16000 2000 14000 78 Transit Operating Hours Expansion from: to: Expand Transit Operating Hours an hour later into the evening except for' one route that win be expanded an hour earlier 23 P ALL 3/1/2011 5307 428 I I 428 _ I 428 I I I CE Totals 428 . 428 428 79 Terrace Heights Moxee Route Expansion from: 10: Expand route service to Terrace Heights and Moxee • 23 P ALL I 1/1/2011 5307 288 I I I I 2881 288 CE Totals 288 288 288 80 from: Kittitas-Yakima Commuter Bus to: Expand Route Service to Kittitas County 29 P ALL 1/1/2011 5307 602 I I I I 6021• 602 CE Totals 602 602 602 . Report Date: May 25, 2010 128,971 15,463 27,369 171,803 28,521 25605 36,279 81,398 Page 20 v. 5.7 - Supersedes previous editions Washingt to Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Oram Hearing Date: Amend Date: From 2011 to 2016 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) N ig y Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source nformation Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM yr) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 81 Sunday Bus Service from: to: Expand existing bus service to operate every two hours lour times per route on Sunday 23 S N/A ALL 1/1/2011 CMAQ 200 200 200 CE No Totals 200 200 200 Report Date: May 25, 2010 Grand Totals for Yakima 129,171 15,463 27,369 172,003 28,721 25605 36,279 81,398 Page 21 v. 5.7 - Supersedes. previous editions