HomeMy WebLinkAboutR-2010-066 2011-2016 Six-Year Transportation Improvement Program; Amend Metropolitan Transportation PlanRESOLUTION NO. R-2010-66 A RESOLUTION to adopt the Six -Year Transportation Improvement Program for the period of 2011 through 2016 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Pian. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required .by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima City Council on June 1, 2010 and June 15, 2010, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2011 through 2016 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2011 through 2016, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 15th day of June, 2010. titi Micah Cawley, Mayor ATTEST: ,,,- City Clerk 0 Washing ate Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG 1111 Six Year Transportation Improvement *ram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: • Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length 0 a 5 Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase N N Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/VV Required Date (MMiY1) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th z 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21 -14 1 Yakima Railroad Grade Separations- Phase 3 Martin Luther King, Jr. Blvd •G from: N. 1st Sreet -to: N. 1st Ave Construct Grade Separation and adjacent roadway reconstruction including Front Street 01 06 07 08 P 0.2 T P 0 CN CN 4/1/2011 4/1 /2071 STP(U) ' DEMO 1700 3281 FMSIB AIP 2000 1500 4530 8230 4781 3000 3000 5230 1781 EA Yes 9/1/2009 Totals 4,981 3500 4530 13011 6000 7011 00 2 Transit Operating Expenditures Various fixed rates and locations from: N/A to: N/A Annual operating assistance from the FTA in support of our transit system; fixed conte, paratransit Dial -A -Ride and vanpool program 12 22 23 24 31 S N/A ALLI 1/1/2011 I 5307 I 16011 1601 3202! 32021 CE• No Totals 1,601 1601 3202 3202 00 3 William 0. Douglas Heritage Trails Bridge Restoration & Trailhead from: to: Trailhead restoration, right of wayacquisition 9 cQ partner with the William O. Douglas Foundation, including restoration of bridge , cleaning, rust removal and painting 32 13 10 S N/A G O P S T w RW CN 1/1/2011 1/1/2011 STP(E) STP(E) 150 285 1501 150 285 285 CE Yes 6/01/09 Totals 435 435 435 00 4 from: Street Asset Amenities (Transit) Route Maintenance, Repair and Improvements N/A to: N/A On going improvements to bus benches, shelters and signage infrastructure 22 31 S N/A ALL1 1/1/2011 5309(Bus) 280 50 ' 3301 50 100 100 80 CE No Totals 280 50 330 50 100 100 80 Report Date: May 25, 2010 Page 1 v. 5.7 - Supersedes previous editions VI/ Was11R1yton State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improveme rogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Tu. o c U U- ' w a� :o E a`. Z Project Identification A.. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road g g F. Describe Work to be Done Improvement Type(s) = in Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code . State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/Y1) Federal Fund.. Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 Continue Transit Service to Terrace Heights New University & Retail Links from: N/A to: N/A Extension of fixed route bus service only into the Terrace Heights area of Yakima County 22 S N/A ALL 1/1/2011 CMAQ 71 11 - 82 82 No Totals 71 11 82 82 14 6 Nob Hill Blvd and 64th Ave Improvements Nob Hill Blvd from: 53rd Ave to: 64th Ave Widen and reconstruct 64th Ave. to 33 -foot width with curb, gutter and sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter sidewalk and stormwater runoff treatment on the north side of Nob Hill. 03 05 07 12 1 3 P 71 C P T CN 1/1/2011 JOBS 925 9251 925 CE . No Totals 925 925 925 14 7 S 16th Ave & W Washington Ave Signal & Intersection. S 16th Ave from: S 16th Ave to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project 12 05 03 S N/A T CN CN 1/1/2011 7/1/2011 AIP AIP 880 1000 383 214 1263 1214 1263 1214 CE Yes 4/1/2010 Totals 1880 597 2477 2477 16 8 66th Ave. & SummiNiew Intersection N. 66th Avenue & Summitview from: N. 66th Ave. to: Summitview Ave. Widen for left turn lanes, intersection improvements, curb, gutter, handicap ramps and lighting 05 12 S .20 G 0 P S T W C CN 1/1/2011 1 600 600 6001 CE Yes 4/1/2010 Totals 600 600 600 Report Date: May 25, 2010 • Page 2 v. 5.7 - Supersedes previous editions Washing ate Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Illgram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. ' B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded . Projects Only a> t °- 1 -, a` Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds . Total . Funds Envir. Type RW Required Date (MM/yr Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 . 00 9 Coolidge Road Widening and Paving. from: 80th AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. . 03 05 06 S .50 S W T T CN 1/1/2011 CMAQ 540 214 754 754 .. CE Yes 9/1/2009 Totals 540 ' 214- 754 754 00 10 Acquisition of new Dial -A -Ride paratransit vehicles from: N/A to: N/A Purchase new vehicles to replace older, less reliable units 21 S N/A ALL 1/15/2013 5309(NS) 96 84 1801 1801 1 CE No Totals 96 84 180 180 14 11 E. Lincoln & 10th Street Roundabout from: E. Lincoln to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, 8 street lighting 03 05 06 P N/A PE RW CN 1/1/2011 1/1/2012 6/1/2012 STP(U) STP(U) STP(U) 173 433 1125 27 67 175 200 500 1300 200 500 1300 • CE Yes 6/1/2011 Totals 1,731 27 242 2000 200 1800 12 ' 12 S.R.12 & 16th Avenue Interchange Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout 03 06 P N/A - 0 ALL 1/1/2011 STP(U) 865 135 10001 1000 CE No Totals 865 135 1000 1000 Report Date: May 25, 2010 Page 3 v. 5.7 - Supersedes previous editions Wa ton State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemeltrogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Coca/ Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 '17 18 19 20 21 11 13 1-82 & Lincoln Avenue interchange . 1-82 Interchange from: E. "G" Street to: 1-82 Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to F "G" Street. 01 P N/A O P G ALL 1/1/2012 STP(U) 865 ' 135 1000 1000 EA Yes 6/2011 Totals 865 135 1000 1000 14 14 E. Yakima Avenue & Fair Avenue Signalization from: E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 P N/A P W T S 0 ALLI 1/1/2012 STP(U) 865 135 10001 I 1000 CE No Totals 865 135 1000 1000 00 15 Fixed route Bus Services to Moxee along SR 24 Corridor SR 24 Hwy Corridor/Park & Ride Lots from: to: JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at Iwo Park 8 Rlde lots along SR 24. 22 S ALL 1/2/2011 5316 131 131 2621 131 131 CE No Totals 131 131 262 131 131 14 16 ENob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, stormwater _ 31 03 04 P N/A 0 C P T W RW CN 1/1/2012 4/1/2012 STP(U) STP(U) 173 865 27 135 200 1000 200 1000 CE. Yes 4/1/2001 Totals 1,038 162 1200 1200 Report Date: May 25, 2010 Page 4 v. 5.7 - Supersedes previous editions Washing tate Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Ogram From 2011 to 2016 7-15-2010 Hearing Date: Amend Date: Adoption Date: Resolution No.: 7-15-2010 c v ti U Priority I Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code ' State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/Y» Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1' 2 3 4 5 6 7 8 9 10 11 12 13. 14 15 16 17 . 18 19 20 21 16 17 - S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P N/A P T PE CN 4/1/2011 6/1/2011 .- 13 214 13 214 13 214 CE No' Totals 227 227 227. 14 18 4579. S 1st St. - E. Washington Ave. Intersection Improvement S 1st St. from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A P W S T PE 6/1/2011 STP(U) 252 - 38 2901 290 EA Yes 01/01/11 Totals 252 38 290 290 17 19 4587 • S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 P T W S ALL 4/1/2012 STP 2268 307 25751 525 2050 EA Yes 4/1 /2014 Totals 2,268 307 2575 525 2050 14 20 South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 p N/A 0 P S T W PE CN 1/1/2012 6/1/2012 STP(U) STP(U) 51 383 8 61 59 444 59 444 CE. Yes 6/10/2010 Totals 434 69 .503 503 Report Date: May 25, 2010 Page 5 v. 5.7 Supersedes previous editions Wash on State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemerogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or NumberRequired E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency Federally Funded Projects Only Project Phase Phase Start (mm/ddyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Date (MM/Yl� Federal Fund ' Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A P `t't T 0 S ALL 4/4/2012 STP(U) 378 WSDOT 378 756 756 CE Yes 4/1/2014 Totals 378 378 756 756 16 22 E. 'H"St. Extension E. "H" St. from: 1st St. to: Yakima River Construct road including water, sewer, curb, gutter and sidewalk for 'future development. 01 08 P 1.1 0 S T W PE RW CN 1/1/2012 1/1/2014 6/1/2014 STP(U) STP(U) STP(U) 2180 2180 1199 340 340 1871 2520 2520 3070 2520 2520 3070 CE Yes 1/1/2014 Totals 5,559 2551 8110 2520 5590 17' 23 N. 10th St. Extension N. 10th St. from: R St; to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future development. 01 06 P 1.3 0 S T W PE RW CN 1/1/2012 1/1/2013 6/1/2013 STP(C) STP(U) STP(U) 700 5500 7900 108 850 972 808 6350 8872 808 6350 8872 CE Yes 1/1/2013 Totals 14,100 1930 16030 808 15222 00 24 West Side Transit Center Acquire Property to Expand Operations from: N/A ' to: N/A Locate and acquire property for the placement of a West Side Transit Center Operation 23 P N/A PE 1/1/2011 5309(NS) 1 400 OTHER 100 5001 500 CE No Totals 400 100 500 500 Report Date: May 25, 2010 Page 6 v. 5.7 - Supersedes previous editions Washingt ate Department of Transportation Air Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • Six Year Transportation Improvement Alk ram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification... A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. StreevRoad Name or Number. E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Utility Codes Project Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required RequiredFederal Date (Awn) Fund Code Federal Cost by Phase 1st 2nd 3rd Thu 6th 2 ' 3 4 5 6 7 8 9 10 11 - 12 13 14 15 16 17 18 19 20 21 17 25 Yakima Downtown Future Initiatives, Phase 5 from: 1st Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. 06 12 P .60 P PE W S T 0 4/1/2011 OTHER 6000 6000 6000 CE No Totals 6000 6000 6000 .00 26 . Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 1/1/2011 4/1/2012 4/1/2012 STIP(S) STP(S) STIP (S) 60 180 360 AIP 240 60 120 420 360 120 420 360 . CE No Totals 600 240 60 900 120 780 00 27 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 P N/A wCN S 6/1/2011 STP(U) 228 32 2601 260 EA No Totals 228 32 260 260 19 28 LongliberRd & WashingtonAve Intersection from: to: New intersection construction and reconstruction, 3 -lane and 5 -lane w/tum, curb, gutter, sidewalks. 03 05 06 P N/A PE p s CN W T O 1/1/2011 3/1/2012 STP(U) STP(U) 100 700 14 95 114 114 7951 795 CE Yes 3/1/2012 Totals 800 109 909 114 795 Report Date: May 25, 2010 Page 7 v. 5.7 - Supersedes previous editions Wast11llgtonn State Department of Transportation iii Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG • Six Year Transportation Improveme ikrogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Um c U u_ `m :o E fi m Z Protect IdentificationProject A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road F. Describe Work to be Done Improvement Type(s) . g in Total Length Utility Codes Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code • State Funds Local Funds Total Funds Envir. Type RAW Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 E Nob Hill Blvd &,S 18th St E Nob Hill Blvd' . from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P .1 C S W T CN 4/1/2011 STP(U) 240. 42 282 282 CE Yes 01/01/07 Totals 240 42 282 282 17 30 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 P .15 C T P PE CN 1/1/2011 . 6/1/2011 STP(E) STP(E) 22 75 7 20 29 95 1 29 95 CE Yes 6/1/2011 Totals 97 27 124 124 00 31 Gravel Road B.S.T. Various Areas from: City Wide to: 07 P N/A S PE CN 1/1/2011 6/1/2011 50 240 501 240 50 240 CE No Totals 290 290 290 16 32 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P 0 S C W CN 10/1/2013 STP(S) . 504 74 5781 578 CE Yes 10/1/2013 TOtals 504 74 578 578 Report Date: May 25, 2010 Page 8 v. 5.7 - Supersedes previous editions Washing ate Department of Transportation -en Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement *ram From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 ' Adoption Date: 7-15-2010 Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B.- Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code• State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY)' Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 . 19 20 21 14 33. S 48th Ave & SummitviewAve Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalizalion 12 P N/A - ' P T PE RW CN 1/1/2013 6/1/2013 8/1/2014 - STP(S) STP(S) STP(S) 25 25 554 4 4 81 29 29 635 29 29 - 635 CE Yes 8/1/2013' Totals 604 89 693 58 • 635• 14 34 W Lincoln Ave & '8' St Realignment - W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P .5 Vy T P O G C PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(E) STP(E) STP(E) 424 1047 1801' 67 163 281 491 1210 2082 491 1210 2082 CE Yes 1/1/2014 Totals 3,272 511 3783 491 1210 2082 16 35 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 P N/A W 1 1 1 1 1 1 1 1 1 1 1 CE No Totals 14 36 - ENob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants 03 04 06 P .85 C G 0p S T 'N PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) 546 1090 6539 84 170 1013 630 1260 7552 630 1260 7552 EA • Yes 1/1/2014 Totals 8,175' 1267 9442 630 1260 7552 Report Date: May 25, 2010 Page 9 v. 5.7 - Supersedes previous editions AM. Was on State Department'of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemel rogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. • B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road . F. Describe Work to be Done Improvement Type(s) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Utility Codes Project Phase �5 m 5 Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 37 01 P N/A W PE RW 1/1/2012 1/1/2013 STP(C) STP(C) 91 91 14 14 105 105 105 105 CE S 72nd Avenue & W Washington Avenue 12 S CN 1/1/2014 STP(C) 544 86 630 630 Yes. S 72nd Ave from: S 72nd Ave to: W Washington Ave 06 P Intersection improvement, possible roundabout O 1/1/2013 Totals 726 114 840 105 105 630 17 38 04 P 76 W PE CN 1/1/2012 7/1/2013 STP(E) STP(E) 23 1096 5 164 28 1260 28 1260 S 66th Avenue 03 T Yes S 66th Ave from: Scenic Drive to: Summitview S P Widen roadway, curb, gutter, sidewalk and utilities O 7/1/2012 Totals 1,119 169 1288 28 1260 14 39 12 P N/A W PE RW 1/1/2013 1/1/2013 STP(U) STP 126 63 17 8 143 71 143 71 CE 40th Avenue and Summitview Signal Upgrade S CN 6/6/2013 STP(U) 544 86 630 630 Yes 40th Avenue from: 40th Avenue to: Summitview T P Signal upgrade, radius improvements, turn lane extension O 6/1/2012 Totals 733 111 844 844 14 40 12 p N/A W.PE RW 1/1/2013 1/1/2014 STP STP 95 63 13 8 108 71 108 71 CE 40th Avenue and Englewood T CN 1/1/2014 STP 145 20 165 165 Yes 40th Avenue S from: 40th Avenue to: Englewood P Replace traffic signal poles, upgrade controller O 1/1/2013 Totals 303 41 344 179 165 Report Date: May 25, 2010 Page 10 v. 5.7 - Supersedes previous editions Washingt ate Department of Transportation Wir Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement likram From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification • A. PIN/Federal Aid No. B. Bridge No. C. Project Title .D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) E m in Total Length I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only _ Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W , Required Date (MM/yY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 .15 16 17 18 19 20 21. 00 41 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace trail ic signal poles, radius improvements, ADA ramps 12 p N/A W T 0 PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP STP STP • 126 63 315 18 8 43 :- 144 71 358 144 71 358 CE Yes 1/1/2013 Totals 504 69 ; 573 215 358 14 42 1st Street and I Street 1st Street from: 1st Street to: [Street Replace and upgrade traffic signal equipment 12 P N/A W S P 0 PE CN 1/1/2011 1/1/2012 STP STP 32 126 5 17 37 143 37 143 CE No Totals 158 22 180 37 143 16 43 Washington Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass including all utilities 01 P .25 0 S W PE RW CN 6/1/2014 1/1/2015 1/1/2016 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE• Yes 1/1/2016 Totals 10,522 1827 12349 12349 16 44 Frontage Road & "H"St. Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, culb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 C G 0 P S T W PE RW CN 1/1/2013 6/1/2014 1/1/2016 STP(U) STP(U) STP(U) 272 349 2352 43 55 340 315 404 2692 315 404 2692 CE Yes 1/1/2015 Totals - 2,973 - 438 3411 315 3096 Report Date: May 25, 2010 Page 11 V. 5.7 - Supersedes previous editions 0Wast1R1§ton State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemeerogram From 2011 to 2016 Hearing Date: 7-15-2010. Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total . Funds Envir. Type RNV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1• 4 45 16th Ave. Corridor 16th Ave. from: SR -12 to: X.(a hington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting. 04 P 3.5 C G O P s T W PE 1/1/2014 STP(U) 120 17 137 137 CE Totals 120 17 137 137 14 46 40th Ave. Corridor 40th Ave. from: SR -12 to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 C O G P S W T PE 1/1/2013 STP(U) 120 17 . 1371 137 CE Totals 120 17 137 137 14 47 Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter, lighting 03 04 P 2.7 C G 0 P S T W PE 1/1/2012 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 14 48 S. 1st St/Main St. Corridor - S. 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, lighting. - 04 P 2.0 C G 0 P S T W PE 1/1/2014 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 Report Date: May 25, 2010 Page 12 v. 5.7 - Supersedes previous editions Washingt•ate Department of Transportation -en Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: MPO/RTPO: Yakima Co. YVCOG • Six Year Transportation Improvement Aram From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: 7-15-2010 Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title . D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only. Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Enver. Type RAW. Required Date (MMYh Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15- 16 17 18 19 20 21 00 49 - Storm DrainsNegetation Local Selection from: City Wide - to: City Wide - 32 p N/A PE CN 1/1/2011 1/1/2011 100 900 . 100 900 100 900 EA No - Totals 1000 1000 1000 17 50 - Reconstruction Rudkin Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P 16 W P S PE CN 1/1/2012 1/1/2013 STP(C) , STP(C) 109 945 TPP 945 27 106 136 1996 . 136 1996 CE No Totals 1,054 945 133 2132 136 1996 16 51 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd i to: Fair Ave - Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C 0 P S T PE CN 9/1/2012 4/1/2013 STP(S) STP 122 1730 TPP TPP _ 23 206 7 70 152 2006 1 152 2006 CE No Totals 1,852 229 77 2158 152 2006 17 52 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr -to: Zier Rd Major widening, curb, gutter, sidewalk 04 p 1.3 0 C T s PE RW CN 1/1/2012 1/1/2013 4/1/2013 AIP AIP AIP 131 382 1667 20 59 260 151 441 1927 151 441 1927 EA Yes 4/1/2012 r '. Totals - 2180 339 2519 151 2368 Report Date: May, 25, 2010 Page 13 v. 5.7 - Supersedes previous editions Wash on State Department of Transportation Wieir Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemeiprogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal AId No. B. Bridge No. C. Project Title D. Street/Road Name or NumberRequired E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Date (MM/Yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 53 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 1.0 W T P 0 c PE RW CN 1/1/2014 6/1/2014 1/1/2015 STP(C) STP(C) STP(C) 272 349 2352 43 55 340 315 404 2692 - 315 404 2692 EA Yes 1/1/2013 Totals 2,973 438 3411 3411 17 54 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave • from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 0 S PE RW CN 1/1/2013 6/1/2013 6/1/2014 STP(U) STP(U) -STP(U) 219 327 2980 34 51 244 253 378 3224 253 378 3224 EA Yes 6/1/2013 Totals 3,526 329 3855 631 3224 14 55 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: S. 6th St. Install missing sidewalks on southside of Nob Hill. 12 P 2.5 P T W S PE RW CN 1/1/2013 6/1/2013 3/1/2014 STP(S) STP(S) STP(S) 55 107 321 8 19 57 63 126 378 63 126 378 CE Yes 3/1/2013 Totals 483 84 567 189 378 00 56 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 P 1.0 p T PE R W CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 57 189 504 7 25 68 64 214 572 64 214 572 CE Yes 1/1/2013 Totals . 750 100 850 278 . 572 Report Date: May 25, 2010 Page 14 v. 5.7 - Supersedes previous editions 4111116. WiWashing ate Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Bram From 2011 to 2016 Hearing Date: • 7-15-2010 Adoption Date: 7-15-2010 • Report Date: May 25, 2010 Page 15 v. 5.7 - Supersedes previous editions Functional Class Priority Number Project Identification A. PIN/Federal Ald No. Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded B. Bridge No. C. Project Titlecci N Fund Source nformation Expenditure Schedule Projects Only Federal Funding (Local Agency) D. Street/Road Name or Number a RNV E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done s o- Phase Start (mm/ddiyyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th Envir. Type Required Date (MM/v1� 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18. '19' 16 57 W Lincoln Ave Sidewalks W Lincoln Ave from: N 561h Ave to: N 29th Ave • Sidewalks, meters and fire hydrants replacement or relocation 12 P 20 P T S w PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 43 86 572 ' 7 15 88 . - 50 101 660 50 101 660 20 CE 21 Yes 1/1/2014 Totals 701 110 811 151 14 58 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P 25 W T S P O PE RW CN 6/1/2013 1/1/2014 1/1/2015 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 660 3780 7560 CE • Yes 1/1/2014 Totals 10,522 1827 12349 1009 16 59 City wide Pathway Connections Yakima from:. to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths. WOD Trail, Greenway including Naches Rail Spur, signage and amenities 01 P 4.0 O P S T w PE RW CN 6/1/2012 1/1/2013 1/1/2014 STP(U) STP(U) STP(U) 252 756 1890 38 88 315 290 844 2205 290 844 11340 .2205 CE Yes 1/1/2013 Totals 2,898 441 3339 290 844 2205 17 60 from: Intersection • 34th Ave & River Rd Improvements Fruitvale Blvd. 34th Ave. to: River Rd. improvements including lumination, sewer, water, curb, water and sidewalks 01 12 " P N/A 0 P S T w PE • CN 1/1/2013 6/1/2013 STP(U) STP(U) 63 567 5 76 68 643 I 68 643 CE No Totals 630 81 711 711 Report Date: May 25, 2010 Page 15 v. 5.7 - Supersedes previous editions 4;7 Wash ton State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG • Six Year Transportation Improveme rogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: i g V, c U m : t` m o E m n. z Project Identification ,Project A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length I Utility Codes Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV . Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 61 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 0 8 T W PE RW CN 1/1/2013 6/1/2014 1/1/2015 STP(U) STP(U) STP(U) 218 327 2980 34 51 244 252 378 3224 252 378 3224 CE Yes • 1/1/2015 Totals 3,525 329 3854 252 3602 14 62 W. Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley City & County joint project to build/extend roadways. 01 04 06 P 6.0 C . G O P S T W PE 1/1/2014 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 16 63 Occidental Road Construction. from: 58th Ave. to: 64th Ave. Construct roadway 01 P 38 S W P T PE 1/1/2014 100 1001 100 Totals 100 100 100 00 64 86th Ave. Road Construction from: Occidental to: Coolidge Construct roadway 01 P 27 PE 1/1/2014 100 1001 100 Totals 100 100 100 Report Date: May 25, 2010 Page 16 v. 5.7 -Supersedes previous editions AIW Washingt ate Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement jram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Atd No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State4th Fund Code State Funds Local Funds Total Funds Envir. Type R/W . Required Date (MM/yY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ,15 16 17 18 19 20 21 16 65 64th Ave. Roadway Widening. from: Washington Avenue. to: Tieton Drive. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 06 P 1.5 WPE G P T C o 1/1/2014 STP(U) 120 17 137 137 EA YES 7/4/2014 Totals 120 17 137 137 00 66 YVT Railway Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 P N/A G C S T W P PE CN 1/1/2014 6/1/2014 STP(E) STP(E) 18 1900 32 285 50 2185 • 50 2185 EA - No Totals 1,918 317 2235 2235 16. 67 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder improvements, PM10 abatement. 01 P N/A S PE CN 4/1/2012 7/1/2012 CMAQ CMAQ 24 480 3 65 27 5451 27 545 CE No Totals 504 68 • 572 572 00 68 Pedestrian Bridqe Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights . 14 32 P .25 T P 0 PE CN 1/1/2013 3/1/2014 STP(E) STP(E) 252 3150 34 412 286 3562 286 3562 CE No i Totals 3,402 446 • 3848 286 3562 Report Date: May 25, 2010 Page 17 v. 5.7 - Supersedes previous editions WasflflRJton State Department of Transportation NI/ Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG • Six Year Transportation Improvemerogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: To s m .0 _ 3 v LL o f fi Z Project Identification A. PIN/Federal AId No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road • F. Describe Work to be Done E E 0 ci d ;ELI- E N m Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmldd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RAW Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ' 15 16 17 18 19 20 21 00 69 William O. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 P N/A 8 P ,W PE CN 1/1/2011 7/1/2011 STP(E) STP(E) 10 109 2 17 12 126 12 126 CE No Totals 119 19 138 138 00 70 YVT Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area Including 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03PE 32 P N/A 0 P S T W CN 1/1/2014 6/1/2014 STP(U) STP(U) 315 945 38 126 353 1071 353 1071 CE No • Totals 1,260 164 1424 1424 00 71 City wide Alleys from: to: . Pave alleys throughout the city. 07 P .5 G P S W T CN 6/1/2011 75 751 25 25 25 - CE No Totals 75 75 25 25 25 14 72 SummiNiew Ave. Grind & Overlay from: 14th Ave • to: 56th Ave Grind 0.20' of ACP 8 replace with 0.20' of HMA, and install required ADA ramps 06 07 P 2.64 PE CN 1/1/2011 6/1/2011 ARRA - ARRA - 50 1950 50 1950 50 1950 CE • No TOtaiS 2,000 2000 2000 Report Date: May 25, 2010, Page 18 v. 5.7 - Supersedes previous editions Washing Agency: . Yakima ate Department of Transportation Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement *ram From 2011 to 2016 Hearing Date: Amend Date: 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Types) Status Total Length Utility Codes Project Costs in Thousands of Dollars • Expenditure Schedule • (Local Agency) Federally Funded Projects Only ot m .c a Ts ,. i Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding StateRequired Code State Funds Local Funds Total Funds Envir. Type R/N/ . Date ' (MM�yy) Federal Fund. Code Federal Cost byFund Phase 1st 2nd 3rd 4th sib 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 73 River Road Improvements from: 6th Ave to: 16th Ave Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage 03 05 06 07 P 0.50 wALL G P O T 1/1/2014 STP(U) 1298 202 1500 1500 CE - Yes 6/1/2015 Totals 1,298 202 1500 1500 74 Nob Hill Blvd from: 49th Avenue to: 64th Avenue Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width 05 06 07 12 13 P 0.97 C P . T G O CN 7/1/2012 STP(U) 2700 421 3121 I 3121 CE No " Totals 2,700 421 3121 3121 75 18th Street Underpass from: Yakima Ave to: 18th Street Repair or replace 18th Street Underpass 10 11 P 01 P T �" PE 4/1/2011 BRAC 50 50 50 N/A No Totals 50 • 50 . . 50 76 88th Avenue from: Tieton Drive 1o: Summitview Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 881h. 06 12 13 P. 0.48 C C T G PE RW CN 1/1/2012 2/1/2012 6/1/2012 WSDOT WSDOT WSDOT 50 25 320 10 50 25 330 50 25 330 CE Yes Totals 395 10 405 405 Report Date: May 25, 2010 Page 19 v. 5.7 - Supersedes previous editions uilnk Was on State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improveme rogram From 2011 to 2016 Hearing Date: 7-15-2010 Adoption Date: 7-15-2010 Amend Date: Resolution No.: Functional Class ,':-6 :o E C. if Project Identification A. PIN/Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir.• Type RNV Required Date (MMN>7 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 77 Westside Transit Center (Transit) from: N/A to: N/A Construct a West Side Transit Center (Park & Ride Facility) 23 P N/A s PE 4/1/2013 5309(Bus) 15000 1000 16000 2000 14000 Yes Totals 15,000 1000 16000 2000 14000 78 Transit Operating Hours Expansion from: to: Expand Transit Operating Hours an hour later into the evening except for one route that will be expanded an hour earlier 23 P ALL 3/1/2011 5307 428 4281 428 CE Totals 428 428 428 79 Terrace Heights Moxee Route Expansion from: to: Expand route service to Terrace Heights and Moxee 23 P ALL 1/1/2011 5307 288 2881 288 CE Totals 288 288 288 80 Kittitas-Yakima Commuter Bus from: to: Expand Route Service to Kittitas County 23 P ALL 1/1/2011 5307 602 6021 602 CE Totals 602 602 602 Report Date: May 25, 2010 Page 20 v. 5.7 - Supersedes previous editions Washingt to Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Oram Hearing Date: Amend Date: From 2011 to 2016 7-15-2010 Adoption Date: Resolution No.: 7-15-2010 Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) N ig y Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source nformation Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM yr) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 81 Sunday Bus Service from: to: Expand existing bus service to operate every two hours lour times per route on Sunday 23 S N/A ALL 1/1/2011 CMAQ 200 200 200 CE No Totals 200 200 200 Report Date: May 25, 2010 Grand Totals for Yakima 129,171 15,463 27,369 172,003 28,721 25605 36,279 81,398 Page 21 v. 5.7 - Supersedes. previous editions • s BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT ITEM TITLE: Public Hearing to consider: Item No. g For Meeting of June 1, 2010 A) Adoption of the Six-year Transportation Improvement Program for the years 2011 to 2016, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: Michael Morales, Director of Community and Economic Development - CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576-6797. SUMMARY EXPLANATION: Attached is the 2011 — 2016 Six-year TIP, along with an explanation sheet that describes the information contained on the various columns of the Six-year TIP. Two transit projects have been added to the six-year TIP. These projects are: • #78 Transit Operating Hours Expansion • #79 Terrace Heights/Moxee Route Expansion • #80 Kittitas — Yakima Commuter Bus Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1 Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Continue Public Hearing to June 15, 2010 Council meeting for second Public Hearing and , possible adoption of plan. BOARD/COMMISSION/COMMITTEE RECOMMENDATION: COUNCIL ACTION: Page Two Projects that that have been deleted from the 2010 — 2015 TIP as they were completed or the funds were obligated include: • #1 Yakima Railroad Grade Separations — Phase 2 • #4 YVT Trolley Barn/Powerhouse Rehabilitation • #5 William O. Douglas Trail • #28 Yakima Downtown Future Initiatives, Phase 4 Council and the public are welcome to add other arterial system projects to the list. The six-year TIP project listing will be finalized at today's hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used.. • The current plan for 2011 — 2016 includes nine projects that are funded. Funding for the0 remainder of the projects will continue to be sought. Six-year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. • Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six-year TIP for 2011 to 2016. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. •