HomeMy WebLinkAboutR-2010-066 2011-2016 Six-Year Transportation Improvement Program; Amend Metropolitan Transportation PlanRESOLUTION NO. R-2010-66
A RESOLUTION to adopt the Six -Year Transportation Improvement Program for the period
of 2011 through 2016 for the construction of streets and arterials streets in
the City of Yakima and amending the Metropolitan Transportation Pian.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the ensuing
six year period, all as contemplated and required .by State RCW 35.77.010 and applicable
Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City of Yakima, all as contemplated and
required by State and Federal law, and
WHEREAS, after public hearings on the matter, held at the regular meeting of the
Yakima City Council on June 1, 2010 and June 15, 2010, with proper public notice as required
by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as
the Six -Year Transportation Improvement Program for the period of 2011 through 2016 for the
construction of streets and arterial streets in the City of Yakima, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2011 through 2016, a copy of which
is attached hereto and by this reference made a part hereof, is hereby adopted as the official
Six -Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Metropolitan Transportation Plan along with Street Improvements, which are
also approved.
ADOPTED BY THE CITY COUNCIL this 15th day of June, 2010.
titi
Micah Cawley, Mayor
ATTEST:
,,,-
City Clerk
0 Washing ate Department of Transportation
Agency: Yakima
Co. No.: 39
Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
1111 Six Year Transportation Improvement *ram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
•
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
0
a
5
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
N
N
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/VV
Required
Date
(MMiY1)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
z
3
4
5
6
7
8
9
10
11.
12
13
14
15
16
17
18
19
20
21
-14
1
Yakima Railroad Grade Separations- Phase 3
Martin Luther King, Jr. Blvd •G
from: N. 1st Sreet -to: N. 1st Ave
Construct Grade Separation and adjacent roadway reconstruction including
Front Street
01
06
07
08
P
0.2
T
P
0
CN
CN
4/1/2011
4/1 /2071
STP(U) '
DEMO
1700
3281
FMSIB
AIP
2000
1500
4530
8230
4781
3000
3000
5230
1781
EA
Yes
9/1/2009
Totals 4,981 3500 4530 13011 6000 7011
00
2
Transit Operating Expenditures
Various fixed rates and locations
from: N/A to: N/A
Annual operating assistance from the FTA in support of our transit system;
fixed conte, paratransit Dial -A -Ride and vanpool program
12
22
23
24
31
S
N/A
ALLI 1/1/2011 I
5307
I 16011
1601
3202! 32021
CE•
No
Totals 1,601 1601 3202 3202
00
3
William 0. Douglas Heritage Trails
Bridge Restoration & Trailhead
from: to:
Trailhead restoration, right of wayacquisition
9 cQ partner with the William O.
Douglas Foundation, including restoration of bridge , cleaning, rust removal
and painting
32
13
10
S
N/A
G
O
P
S
T
w
RW
CN
1/1/2011
1/1/2011
STP(E)
STP(E)
150
285
1501 150
285 285
CE
Yes
6/01/09
Totals 435 435 435
00
4
from:
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
N/A to: N/A
On going improvements to bus benches, shelters and signage infrastructure
22
31
S
N/A
ALL1 1/1/2011
5309(Bus)
280
50
'
3301 50
100
100
80
CE
No
Totals 280 50 330 50 100 100 80
Report Date: May 25, 2010
Page 1
v. 5.7 - Supersedes previous editions
VI/
Was11R1yton State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improveme rogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Tu.
o
c U
U- '
w a�
:o E
a`. Z
Project Identification
A.. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
=
in
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
. State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/Y1)
Federal
Fund..
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
5
Continue Transit Service to Terrace Heights
New University & Retail Links
from: N/A to: N/A
Extension of fixed route bus service only into the Terrace Heights area of
Yakima County
22
S
N/A
ALL
1/1/2011
CMAQ
71
11
-
82
82
No
Totals 71 11 82 82
14
6
Nob Hill Blvd and 64th Ave Improvements
Nob Hill Blvd
from: 53rd Ave to: 64th Ave
Widen and reconstruct 64th Ave. to 33 -foot width with curb, gutter and
sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter
sidewalk and stormwater runoff treatment on the north side of Nob Hill.
03
05
07
12
1 3
P
71
C
P
T
CN
1/1/2011
JOBS
925
9251 925
CE
. No
Totals 925 925 925
14
7
S 16th Ave & W Washington Ave Signal & Intersection.
S 16th Ave
from: S 16th Ave to: W Washington Ave
Included in Union Gap's Valley Mall Blvd. project
12
05
03
S
N/A
T
CN
CN
1/1/2011
7/1/2011
AIP
AIP
880
1000
383
214
1263
1214
1263
1214
CE
Yes
4/1/2010
Totals 1880 597 2477 2477
16
8
66th Ave. & SummiNiew Intersection
N. 66th Avenue & Summitview
from: N. 66th Ave. to: Summitview Ave.
Widen for left turn lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
S
.20
G
0
P
S
T
W
C
CN
1/1/2011 1
600
600
6001
CE
Yes
4/1/2010
Totals 600 600 600
Report Date: May 25, 2010 •
Page 2
v. 5.7 - Supersedes previous editions
Washing ate Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Illgram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. ' B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded .
Projects Only
a>
t
°-
1 -,
a`
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds .
Total .
Funds
Envir.
Type
RW
Required
Date
(MM/yr
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
• 19
20
21 .
00
9
Coolidge Road Widening and Paving.
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
.
03
05
06
S
.50
S
W
T
T
CN
1/1/2011
CMAQ
540
214
754
754
..
CE
Yes
9/1/2009
Totals 540 ' 214- 754 754
00
10
Acquisition of new Dial -A -Ride paratransit vehicles
from: N/A to: N/A
Purchase new vehicles to replace older, less reliable units
21
S
N/A
ALL
1/15/2013
5309(NS)
96
84
1801 1801
1
CE
No
Totals 96 84 180 180
14
11
E. Lincoln & 10th Street Roundabout
from: E. Lincoln to: E. MLK Jr. Blvd.
Roundabout construction at intersection curb, gutter, sidewalk, 8 street
lighting
03
05
06
P
N/A
PE
RW
CN
1/1/2011
1/1/2012
6/1/2012
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
200
500
1300
•
CE
Yes
6/1/2011
Totals 1,731 27 242 2000 200 1800
12
'
12
S.R.12 & 16th Avenue Interchange
Interchange
from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
03
06
P
N/A
-
0
ALL
1/1/2011
STP(U)
865
135
10001 1000
CE
No
Totals 865 135 1000 1000
Report Date: May 25, 2010
Page 3
v. 5.7 - Supersedes previous editions
Wa ton State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvemeltrogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Coca/ Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
'17
18
19
20
21
11
13
1-82 & Lincoln Avenue interchange .
1-82 Interchange
from: E. "G" Street to: 1-82
Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue
to F "G" Street.
01
P
N/A
O
P
G
ALL
1/1/2012
STP(U)
865
' 135
1000
1000
EA
Yes
6/2011
Totals 865 135 1000 1000
14
14
E. Yakima Avenue & Fair Avenue Signalization
from: E. Yakima Avenue to: Fair Avenue
Construct Traffic Signal
12
P
N/A
P
W
T
S
0
ALLI 1/1/2012
STP(U)
865
135
10001
I 1000
CE
No
Totals 865 135 1000 1000
00
15
Fixed route Bus Services to Moxee along SR 24 Corridor
SR 24 Hwy Corridor/Park & Ride Lots
from: to:
JARC funded demonstration project to determine ridership potential to and
from the Moxee area including stops at Iwo Park 8 Rlde lots along SR 24.
22
S
ALL
1/2/2011
5316
131
131
2621 131
131
CE
No
Totals 131 131 262 131 131
14
16
ENob Hill Blvd & Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting,
stormwater _
31
03
04
P
N/A
0
C
P
T
W
RW
CN
1/1/2012
4/1/2012
STP(U)
STP(U)
173
865
27
135
200
1000
200
1000
CE.
Yes
4/1/2001
Totals 1,038 162 1200 1200
Report Date: May 25, 2010
Page 4
v. 5.7 - Supersedes previous editions
Washing tate Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Ogram
From 2011 to 2016
7-15-2010
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
7-15-2010
c
v
ti U
Priority I
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
' State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/Y»
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1'
2
3
4
5
6
7
8
9
10
11
12
13.
14
15
16
17 .
18
19
20
21
16
17
-
S 3rd Ave & W Washington Ave Signal
S 3rd Ave
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
P
T
PE
CN
4/1/2011
6/1/2011 .-
13
214
13
214
13
214
CE
No'
Totals 227 227 227.
14
18
4579.
S 1st St. - E. Washington Ave. Intersection Improvement
S 1st St.
from: S 1st St. to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
T
PE
6/1/2011
STP(U)
252
-
38
2901 290
EA
Yes
01/01/11
Totals 252 38 290 290
17
19
4587 •
S 48th Ave. Reconstruction
S 48th Avenue
from: Summitview Ave. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
P
T
W
S
ALL
4/1/2012
STP
2268
307
25751
525
2050
EA
Yes
4/1 /2014
Totals 2,268 307 2575 525 2050
14
20
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
p
N/A
0
P
S
T
W
PE
CN
1/1/2012
6/1/2012
STP(U)
STP(U)
51
383
8
61
59
444
59
444
CE.
Yes
6/10/2010
Totals 434 69 .503 503
Report Date: May 25, 2010
Page 5
v. 5.7 Supersedes previous editions
Wash on State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvemerogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberRequired
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Date
(MM/Yl�
Federal
Fund '
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
21
4562
Tieton Dr - S 5th Ave. Intersection Project
Tieton Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
N/A
P
`t't
T
0
S
ALL
4/4/2012
STP(U)
378
WSDOT
378
756
756
CE
Yes
4/1/2014
Totals 378 378 756 756
16
22
E. 'H"St. Extension
E. "H" St.
from: 1st St. to: Yakima River
Construct road including water, sewer, curb, gutter and sidewalk for 'future
development.
01
08
P
1.1
0
S
T
W
PE
RW
CN
1/1/2012
1/1/2014
6/1/2014
STP(U)
STP(U)
STP(U)
2180
2180
1199
340
340
1871
2520
2520
3070
2520
2520
3070
CE
Yes
1/1/2014
Totals 5,559 2551 8110 2520 5590
17'
23
N. 10th St. Extension
N. 10th St.
from: R St; to: 10th Street - Lincoln Ave.
Construct road including water, sewer, curb, gutter, sidewalk for future
development.
01
06
P
1.3
0
S
T
W
PE
RW
CN
1/1/2012
1/1/2013
6/1/2013
STP(C)
STP(U)
STP(U)
700
5500
7900
108
850
972
808
6350
8872
808
6350
8872
CE
Yes
1/1/2013
Totals 14,100 1930 16030 808 15222
00
24
West Side Transit Center
Acquire Property to Expand Operations
from: N/A ' to: N/A
Locate and acquire property for the placement of a West Side Transit
Center Operation
23
P
N/A
PE
1/1/2011
5309(NS) 1
400
OTHER
100
5001 500
CE
No
Totals 400 100 500 500
Report Date: May 25, 2010
Page 6
v. 5.7 - Supersedes previous editions
Washingt ate Department of Transportation
Air
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
Six Year Transportation Improvement Alk ram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification...
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. StreevRoad Name or Number.
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Utility Codes
Project Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
RequiredFederal
Date
(Awn)
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thu
6th
2
' 3
4
5
6
7 8
9
10
11
- 12
13
14
15
16
17
18
19
20
21
17
25
Yakima Downtown Future Initiatives, Phase 5
from: 1st Street to: 9th Street
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
06
12
P
.60
P PE
W
S
T
0
4/1/2011
OTHER
6000
6000
6000
CE
No
Totals 6000 6000 6000
.00
26
.
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
1/1/2011
4/1/2012
4/1/2012
STIP(S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
120
420
360
120
420
360
.
CE
No
Totals 600 240 60 900 120 780
00
27
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
07
P
N/A
wCN
S
6/1/2011
STP(U)
228
32
2601 260
EA
No
Totals 228 32 260 260
19
28
LongliberRd & WashingtonAve
Intersection
from: to:
New intersection construction and reconstruction, 3 -lane and 5 -lane w/tum,
curb, gutter, sidewalks.
03
05
06
P
N/A
PE
p
s CN
W
T
O
1/1/2011
3/1/2012
STP(U)
STP(U)
100
700
14
95
114 114
7951
795
CE
Yes
3/1/2012
Totals 800 109 909 114 795
Report Date: May 25, 2010
Page 7
v. 5.7 - Supersedes previous editions
Wast11llgtonn State Department of Transportation
iii
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
•
Six Year Transportation Improveme ikrogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Um
c U
u_
`m
:o E
fi m
Z
Protect IdentificationProject
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
F. Describe Work to be Done
Improvement
Type(s) .
g
in
Total Length
Utility Codes
Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
•
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAW
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
E Nob Hill Blvd &,S 18th St
E Nob Hill Blvd' .
from: S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
.1
C
S
W
T
CN
4/1/2011
STP(U)
240.
42
282
282
CE
Yes
01/01/07
Totals 240 42 282 282
17
30
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
P
.15
C
T
P
PE
CN
1/1/2011 .
6/1/2011
STP(E)
STP(E)
22
75
7
20
29
95
1 29
95
CE
Yes
6/1/2011
Totals 97 27 124 124
00
31
Gravel Road B.S.T.
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
1/1/2011
6/1/2011
50
240
501
240
50
240
CE
No
Totals 290 290 290
16
32
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout
12
P
N/A
T
P
0
S C
W
CN
10/1/2013
STP(S)
. 504
74
5781
578
CE
Yes
10/1/2013
TOtals 504 74 578 578
Report Date: May 25, 2010
Page 8
v. 5.7 - Supersedes previous editions
Washing ate Department of Transportation
-en
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement *ram
From 2011 to 2016
Hearing Date:
Amend Date:
7-15-2010 ' Adoption Date: 7-15-2010
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B.- Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code•
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)'
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
. 19
20
21
14
33.
S 48th Ave & SummitviewAve Signalization
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalizalion
12
P
N/A
-
'
P
T
PE
RW
CN
1/1/2013
6/1/2013
8/1/2014
-
STP(S)
STP(S)
STP(S)
25
25
554
4
4
81
29
29
635
29
29
-
635
CE
Yes
8/1/2013'
Totals 604 89 693 58 • 635•
14
34
W Lincoln Ave & '8' St Realignment -
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
P
.5
Vy
T
P
O
G
C
PE
RW
CN
1/1/2012
1/1/2013
1/1/2014
STP(E)
STP(E)
STP(E)
424
1047
1801'
67
163
281
491
1210
2082
491
1210
2082
CE
Yes
1/1/2014
Totals 3,272 511 3783 491 1210 2082
16
35
School Safety Projects
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
12
P
N/A
W
1 1 1 1 1 1 1 1 1 1 1
CE
No
Totals
14
36
-
ENob Hill Blvd. Reconstruction
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
an hydrants
03
04
06
P
.85
C
G
0p
S
T
'N
PE
RW
CN
1/1/2012
1/1/2013
1/1/2014
STP(C)
STP(C)
STP(C)
546
1090
6539
84
170
1013
630
1260
7552
630
1260
7552
EA
•
Yes
1/1/2014
Totals 8,175' 1267 9442 630 1260 7552
Report Date: May 25, 2010
Page 9
v. 5.7 - Supersedes previous editions
AM.
Was on State Department'of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvemel rogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. • B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road .
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Utility Codes
Project Phase
�5
m
5
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7 8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
37
01
P
N/A
W PE
RW
1/1/2012
1/1/2013
STP(C)
STP(C)
91
91
14
14
105
105
105
105
CE
S 72nd Avenue & W Washington Avenue
12
S CN
1/1/2014
STP(C)
544
86
630
630
Yes.
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
06
P
Intersection improvement, possible roundabout
O
1/1/2013
Totals 726 114 840 105 105 630
17
38
04
P
76
W PE
CN
1/1/2012
7/1/2013
STP(E)
STP(E)
23
1096
5
164
28
1260
28
1260
S 66th Avenue
03
T
Yes
S 66th Ave
from: Scenic Drive to: Summitview
S
P
Widen roadway, curb, gutter, sidewalk and utilities
O
7/1/2012
Totals 1,119 169 1288 28 1260
14
39
12
P
N/A
W PE
RW
1/1/2013
1/1/2013
STP(U)
STP
126
63
17
8
143
71
143
71
CE
40th Avenue and Summitview Signal Upgrade
S CN
6/6/2013
STP(U)
544
86
630
630
Yes
40th Avenue
from: 40th Avenue to: Summitview
T
P
Signal upgrade, radius improvements, turn lane extension
O
6/1/2012
Totals 733 111 844 844
14
40
12
p
N/A
W.PE
RW
1/1/2013
1/1/2014
STP
STP
95
63
13
8
108
71
108
71
CE
40th Avenue and Englewood
T CN
1/1/2014
STP
145
20
165
165
Yes
40th Avenue
S
from: 40th Avenue to: Englewood
P
Replace traffic signal poles, upgrade controller
O
1/1/2013
Totals 303 41 344 179 165
Report Date: May 25, 2010
Page 10
v. 5.7 - Supersedes previous editions
Washingt ate Department of Transportation
Wir
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement likram
From 2011 to 2016
Hearing Date:
Amend Date:
7-15-2010
Adoption Date:
Resolution No.:
7-15-2010
Functional
Class
Priority
Number
Project Identification •
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
.D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
E
m
in
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only _
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W ,
Required
Date
(MM/yY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
.15
16
17
18
19
20
21.
00
41
16th Avenue and Fruitvale Blvd
16th Avenue
from: 16th Avenue to: Fruitvale Blvd
Replace trail ic signal poles, radius improvements, ADA ramps
12
p
N/A
W
T
0
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP
STP
STP
•
126
63
315
18
8
43
:- 144
71
358
144
71
358
CE
Yes
1/1/2013
Totals 504 69 ; 573 215 358
14
42
1st Street and I Street
1st Street
from: 1st Street to: [Street
Replace and upgrade traffic signal equipment
12
P
N/A
W
S
P
0
PE
CN
1/1/2011
1/1/2012
STP
STP
32
126
5
17
37
143
37
143
CE
No
Totals 158 22 180 37 143
16
43
Washington Ave. Railroad Grade Separation
Washington Ave.
from: Longfibre Road to:
Railroad grade overpass including all utilities
01
P
.25
0
S
W
PE
RW
CN
6/1/2014
1/1/2015
1/1/2016
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560
CE•
Yes
1/1/2016
Totals 10,522 1827 12349 12349
16
44
Frontage Road & "H"St. Loop
N. 8th St.
from: "H" St. to: 1-82
Construct new roadway, water, sewer, culb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
C
G
0
P
S
T
W
PE
RW
CN
1/1/2013
6/1/2014
1/1/2016
STP(U)
STP(U)
STP(U)
272
349
2352
43
55
340
315
404
2692
315
404
2692
CE
Yes
1/1/2015
Totals - 2,973 - 438 3411 315 3096
Report Date: May 25, 2010
Page 11
V. 5.7 - Supersedes previous editions
0Wast1R1§ton State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvemeerogram
From 2011 to 2016
Hearing Date: 7-15-2010. Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total .
Funds
Envir.
Type
RNV
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1•
4
45
16th Ave. Corridor
16th Ave.
from: SR -12 to: X.(a hington Ave.Nalley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
04
P
3.5
C
G
O
P
s
T
W
PE
1/1/2014
STP(U)
120
17
137
137
CE
Totals 120 17 137 137
14
46
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
C
O
G
P
S
W
T
PE
1/1/2013
STP(U)
120
17
. 1371
137
CE
Totals 120 17 137 137
14
47
Nob Hill Corridor
Nob Hill
from: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, lighting
03
04
P
2.7
C
G
0
P
S
T
W
PE
1/1/2012
STP(U)
120
17
1371
137
CE
Totals 120 17 137 137
14
48
S. 1st St/Main St. Corridor -
S. 1st St./Main St.
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk,
lighting. -
04
P
2.0
C
G
0
P
S
T
W
PE
1/1/2014
STP(U)
120
17
1371
137
CE
Totals 120 17 137 137
Report Date: May 25, 2010
Page 12
v. 5.7 - Supersedes previous editions
Washingt•ate Department of Transportation
-en
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name:
MPO/RTPO:
Yakima Co.
YVCOG
•
Six Year Transportation Improvement Aram
From 2011 to 2016
Hearing Date:
Amend Date:
7-15-2010 Adoption Date: 7-15-2010
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title .
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only.
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Enver.
Type
RAW.
Required
Date
(MMYh
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15-
16
17
18
19
20
21
00
49
-
Storm DrainsNegetation
Local Selection
from: City Wide - to:
City Wide
-
32
p
N/A
PE
CN
1/1/2011
1/1/2011
100
900
. 100
900
100
900
EA
No
-
Totals 1000 1000 1000
17
50
-
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
16
W
P
S
PE
CN
1/1/2012
1/1/2013
STP(C) ,
STP(C)
109
945
TPP
945
27
106
136
1996
.
136
1996
CE
No
Totals 1,054 945 133 2132 136 1996
16
51
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd i to: Fair Ave -
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
.76
C
0
P
S
T
PE
CN
9/1/2012
4/1/2013
STP(S)
STP
122
1730
TPP
TPP
_ 23
206
7
70
152
2006
1
152
2006
CE
No
Totals 1,852 229 77 2158 152 2006
17
52
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave
from: Tieton Dr -to: Zier Rd
Major widening, curb, gutter, sidewalk
04
p
1.3
0
C
T
s
PE
RW
CN
1/1/2012
1/1/2013
4/1/2013
AIP
AIP
AIP
131
382
1667
20
59
260
151
441
1927
151
441
1927
EA
Yes
4/1/2012 r
'.
Totals - 2180 339 2519 151 2368
Report Date: May, 25, 2010
Page 13
v. 5.7 - Supersedes previous editions
Wash on State Department of Transportation
Wieir
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvemeiprogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberRequired
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Date
(MM/Yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
53
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb, gutter, sidewalk
05
06
P
1.0
W
T
P
0
c
PE
RW
CN
1/1/2014
6/1/2014
1/1/2015
STP(C)
STP(C)
STP(C)
272
349
2352
43
55
340
315
404
2692
-
315
404
2692
EA
Yes
1/1/2013
Totals 2,973 438 3411 3411
17
54
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave •
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
05
06
P
2
0
S
PE
RW
CN
1/1/2013
6/1/2013
6/1/2014
STP(U)
STP(U)
-STP(U)
219
327
2980
34
51
244
253
378
3224
253
378
3224
EA
Yes
6/1/2013
Totals 3,526 329 3855 631 3224
14
55
W Nob Hill Blvd Sidewalks
W Nob Hill Blvd
from: S 16th Ave to: S. 6th St.
Install missing sidewalks on southside of Nob Hill.
12
P
2.5
P
T
W
S
PE
RW
CN
1/1/2013
6/1/2013
3/1/2014
STP(S)
STP(S)
STP(S)
55
107
321
8
19
57
63
126
378
63
126
378
CE
Yes
3/1/2013
Totals 483 84 567 189 378
00
56
Beech St Pedestrian Connection
Beech St
from: Fair Ave to: Chalmers/Riverside
Construct pedestrian pathway under SR82 to Greenway
06
32
P
1.0
p
T
PE
R W
CN
1/1/2013
6/1/2013
1/1/2014
STP(S)
STP(S)
STP(S)
57
189
504
7
25
68
64
214
572
64
214
572
CE
Yes
1/1/2013
Totals . 750 100 850 278 . 572
Report Date: May 25, 2010
Page 14
v. 5.7 - Supersedes previous editions
4111116.
WiWashing ate Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Bram
From 2011 to 2016
Hearing Date:
•
7-15-2010 Adoption Date: 7-15-2010
•
Report Date: May 25, 2010
Page 15
v. 5.7 - Supersedes previous editions
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No.
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Federally Funded
B. Bridge No.
C. Project Titlecci
N
Fund Source nformation
Expenditure Schedule
Projects Only
Federal Funding
(Local Agency)
D. Street/Road Name or Number
a
RNV
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
s
o-
Phase
Start
(mm/ddiyyyy)
Federal
Fund
Code
Federal
Cost by
Phase
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
1st
2nd
3rd
4th
Thru
6th
Envir.
Type
Required
Date
(MM/v1�
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18.
'19'
16
57
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 561h Ave to: N 29th Ave •
Sidewalks, meters and fire hydrants replacement or relocation
12
P
20
P
T
S
w
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP(S)
STP(S)
STP(S)
43
86
572
' 7
15
88
.
- 50
101
660
50
101
660
20
CE
21
Yes
1/1/2014
Totals
701
110 811
151
14
58
Mead Ave. Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass including all utilities
01
P
25
W
T
S
P
O
PE
RW
CN
6/1/2013
1/1/2014
1/1/2015
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
660
3780
7560
CE
• Yes
1/1/2014
Totals
10,522
1827
12349
1009
16
59
City wide Pathway Connections
Yakima
from:. to:
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths.
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
01
P
4.0
O
P
S
T
w
PE
RW
CN
6/1/2012
1/1/2013
1/1/2014
STP(U)
STP(U)
STP(U)
252
756
1890
38
88
315
290
844
2205
290
844
11340
.2205
CE
Yes
1/1/2013
Totals 2,898 441 3339 290 844 2205
17
60
from:
Intersection
•
34th Ave & River Rd Improvements
Fruitvale Blvd.
34th Ave. to: River Rd.
improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
"
P
N/A
0
P
S
T
w
PE
• CN
1/1/2013
6/1/2013
STP(U)
STP(U)
63
567
5
76
68
643 I
68
643
CE
No
Totals 630 81 711 711
Report Date: May 25, 2010
Page 15
v. 5.7 - Supersedes previous editions
4;7 Wash ton State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO:
YVCOG
•
Six Year Transportation Improveme rogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
i
g V,
c U
m :
t`
m
o E
m
n. z
Project Identification ,Project
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length I
Utility Codes
Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV .
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
61
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines
and street lights.
01
05
12
P
1.0
0
8
T
W
PE
RW
CN
1/1/2013
6/1/2014
1/1/2015
STP(U)
STP(U)
STP(U)
218
327
2980
34
51
244
252
378
3224
252
378
3224
CE
Yes
• 1/1/2015
Totals 3,525 329 3854 252 3602
14
62
W. Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley
City & County joint project to build/extend roadways.
01
04
06
P
6.0
C
. G
O
P
S
T
W
PE
1/1/2014
STP(U)
120
17
1371
137
CE
Totals 120 17 137 137
16
63
Occidental Road Construction.
from: 58th Ave. to: 64th Ave.
Construct roadway
01
P
38
S
W
P
T
PE
1/1/2014
100
1001
100
Totals 100 100 100
00
64
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
01
P
27
PE
1/1/2014
100
1001
100
Totals 100 100 100
Report Date: May 25, 2010
Page 16
v. 5.7 -Supersedes previous editions
AIW
Washingt ate Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement jram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Atd No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State4th
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W .
Required
Date
(MM/yY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
,15
16
17
18
19
20
21
16
65
64th Ave. Roadway Widening.
from: Washington Avenue. to: Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
WPE
G
P
T
C
o
1/1/2014
STP(U)
120
17
137
137
EA
YES
7/4/2014
Totals 120 17 137 137
00
66
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
P
N/A
G
C
S
T
W
P
PE
CN
1/1/2014
6/1/2014
STP(E)
STP(E)
18
1900
32
285
50
2185
•
50
2185
EA
-
No
Totals 1,918 317 2235 2235
16.
67
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
P
N/A
S
PE
CN
4/1/2012
7/1/2012
CMAQ
CMAQ
24
480
3
65
27
5451
27
545
CE
No
Totals 504 68 • 572 572
00
68
Pedestrian Bridqe
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights .
14
32
P
.25
T
P
0
PE
CN
1/1/2013
3/1/2014
STP(E)
STP(E)
252
3150
34
412
286
3562
286
3562
CE
No
i
Totals 3,402 446 • 3848 286 3562
Report Date: May 25, 2010
Page 17
v. 5.7 - Supersedes previous editions
WasflflRJton State Department of Transportation
NI/
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
•
Six Year Transportation Improvemerogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
To
s m
.0 _
3 v
LL
o f
fi Z
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road •
F. Describe Work to be Done
E
E 0
ci d
;ELI-
E
N
m
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mmldd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAW
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14 '
15
16
17
18
19
20
21
00
69
William O. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
14
32
P
N/A
8
P
,W
PE
CN
1/1/2011
7/1/2011
STP(E)
STP(E)
10
109
2
17
12
126
12
126
CE
No
Totals 119 19 138 138
00
70
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway in West Valley area Including 53rd Ave, Wide Hollow,
64th Ave, Ahtanum including all utilities and signage
03PE
32
P
N/A
0
P
S
T
W
CN
1/1/2014
6/1/2014
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No •
Totals 1,260 164 1424 1424
00
71
City wide Alleys
from: to: .
Pave alleys throughout the city.
07
P
.5
G
P
S
W
T
CN
6/1/2011
75
751 25
25
25
-
CE
No
Totals 75 75 25 25 25
14
72
SummiNiew Ave. Grind & Overlay
from: 14th Ave • to: 56th Ave
Grind 0.20' of ACP 8 replace with 0.20' of HMA, and install required ADA
ramps
06
07
P
2.64
PE
CN
1/1/2011
6/1/2011
ARRA -
ARRA -
50
1950
50
1950
50
1950
CE
•
No
TOtaiS 2,000 2000 2000
Report Date: May 25, 2010,
Page 18
v. 5.7 - Supersedes previous editions
Washing
Agency: . Yakima
ate Department of Transportation
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement *ram
From 2011 to 2016
Hearing Date:
Amend Date:
7-15-2010
Adoption Date:
Resolution No.:
7-15-2010
Functional
Class
Priority
Number
Project Identification
A PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Types)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
• Expenditure Schedule
• (Local Agency)
Federally Funded
Projects Only
ot
m
.c
a
Ts
,.
i
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
StateRequired
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/N/ .
Date '
(MM�yy)
Federal
Fund.
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
sib
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
73
River Road Improvements
from: 6th Ave to: 16th Ave
Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage
03
05
06
07
P
0.50
wALL
G
P
O
T
1/1/2014
STP(U)
1298
202
1500
1500
CE
-
Yes
6/1/2015
Totals 1,298 202 1500 1500
74
Nob Hill Blvd
from: 49th Avenue to: 64th Avenue
Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width
05
06
07
12
13
P
0.97
C
P .
T
G
O
CN
7/1/2012
STP(U)
2700
421
3121
I
3121
CE
No
"
Totals 2,700 421 3121 3121
75
18th Street Underpass
from: Yakima Ave to: 18th Street
Repair or replace 18th Street Underpass
10
11
P
01
P
T
�"
PE
4/1/2011
BRAC
50
50
50
N/A
No
Totals 50 • 50 . . 50
76
88th Avenue
from: Tieton Drive 1o: Summitview Ave
Construct curb, gutter, sidewalk and stormwater runoff treatment on the east
side of 881h.
06
12
13
P.
0.48
C
C
T
G
PE
RW
CN
1/1/2012
2/1/2012
6/1/2012
WSDOT
WSDOT
WSDOT
50
25
320
10
50
25
330
50
25
330
CE
Yes
Totals 395 10 405 405
Report Date: May 25, 2010
Page 19
v. 5.7 - Supersedes previous editions
uilnk
Was on State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improveme rogram
From 2011 to 2016
Hearing Date: 7-15-2010 Adoption Date: 7-15-2010
Amend Date:
Resolution No.:
Functional
Class
,':-6
:o E C.
if
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.•
Type
RNV
Required
Date
(MMN>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
77
Westside Transit Center (Transit)
from: N/A to: N/A
Construct a West Side Transit Center (Park & Ride Facility)
23
P
N/A
s
PE
4/1/2013
5309(Bus)
15000
1000
16000
2000
14000
Yes
Totals 15,000 1000 16000 2000 14000
78
Transit Operating Hours Expansion
from: to:
Expand Transit Operating Hours an hour later into the evening except for
one route that will be expanded an hour earlier
23
P
ALL
3/1/2011
5307
428
4281 428
CE
Totals 428 428 428
79
Terrace Heights Moxee Route Expansion
from: to:
Expand route service to Terrace Heights and Moxee
23
P
ALL
1/1/2011
5307
288
2881 288
CE
Totals 288 288 288
80
Kittitas-Yakima Commuter Bus
from: to:
Expand Route Service to Kittitas County
23
P
ALL
1/1/2011
5307
602
6021 602
CE
Totals 602 602 602
Report Date: May 25, 2010
Page 20
v. 5.7 - Supersedes previous editions
Washingt to Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Oram
Hearing Date:
Amend Date:
From 2011 to 2016
7-15-2010
Adoption Date:
Resolution No.:
7-15-2010
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
N
ig
y
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source nformation
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM yr)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
81
Sunday Bus Service
from: to:
Expand existing bus service to operate every two hours lour times per route
on Sunday
23
S
N/A
ALL
1/1/2011
CMAQ
200
200
200
CE
No
Totals 200 200 200
Report Date: May 25, 2010
Grand Totals for Yakima
129,171 15,463 27,369 172,003 28,721 25605 36,279 81,398
Page 21
v. 5.7 - Supersedes. previous editions
•
s
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
ITEM TITLE: Public Hearing to consider:
Item No. g
For Meeting of June 1, 2010
A) Adoption of the Six-year Transportation Improvement Program for
the years 2011 to 2016, and to amend the Metropolitan
Transportation Plan; and
B) Amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element.
SUBMITTED BY: Michael Morales, Director of Community and Economic Development -
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576-6797.
SUMMARY EXPLANATION:
Attached is the 2011 — 2016 Six-year TIP, along with an explanation sheet that describes the
information contained on the various columns of the Six-year TIP. Two transit projects have been
added to the six-year TIP. These projects are:
• #78 Transit Operating Hours Expansion
• #79 Terrace Heights/Moxee Route Expansion
• #80 Kittitas — Yakima Commuter Bus
Continued on Page Two
Resolution X Ordinance Contract Other (Specify) Six -Year TIP
Funding Source
APPROVED FOR SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
1 Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and
amending the regional Metropolitan Transportation Plan and the Comprehensive Plan
Capital Facilities Element.
2. Continue Public Hearing to June 15, 2010 Council meeting for second Public Hearing and ,
possible adoption of plan.
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
Page Two
Projects that that have been deleted from the 2010 — 2015 TIP as they were completed or the
funds were obligated include:
• #1 Yakima Railroad Grade Separations — Phase 2
• #4 YVT Trolley Barn/Powerhouse Rehabilitation
• #5 William O. Douglas Trail
• #28 Yakima Downtown Future Initiatives, Phase 4
Council and the public are welcome to add other arterial system projects to the list. The six-year
TIP project listing will be finalized at today's hearing and sent to the Yakima Valley Conference of
Governments (YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working toward
common standards and coordinated planning for public projects that impact both the city and
surrounding county areas. Agreement on these issues will be the first step toward the goal of a
seamless transportation planning process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
of federal revenue will be used..
•
The current plan for 2011 — 2016 includes nine projects that are funded. Funding for the0
remainder of the projects will continue to be sought.
Six-year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous
Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies
the systems on which certain funds can be used, and activities for which funds can be used and
promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and
programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation
Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement
Program (STIP) as a condition to securing federal funds for the transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by
the State of Washington for approved State funding agencies. The STIP is a prioritized program
of transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
•
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land use
planning carried out by local governments. Citizen participation is an integral part of the planning
process at all levels. Local Agencies are required to develop and adopt a six-year transportation
program. All local agencies are required to hold at least one public hearing during the
development of the six-year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The
ranking will be integrated with other project needs and the total list will be reviewed and adjusted to
the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted six-year TIP for 2011 to 2016. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive
Plan as required. The amendment is limited to incorporate only those projects that adopted in the
STIP and is not subject to the "once a year" change required under the laws of the Growth
Management Act.
•