HomeMy WebLinkAbout06/01/2010 08 Six-Year TIP Program for 2011 to 2016; MTP Amendment; Yakima UAC Plan Amendment BUSINESS OF THE CITY COUNCIL • YAKIMA, WASHINGTON • AGENDA STATEMENT Item No. For Meeting of June 1, 2010 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -year Transportation Improvement Program for the years 2011 to 2016, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: Michael Morales, Director of Community and Economic Development - • CONTACT PERSON/TELEPHONE: • Doug Mayo, City Engineer, 576 -6797. SUMMARY EXPLANATION: le Attached is the 2011 — 2016 Six -year TIP, along with an explanation sheet that describes the information contained on the various columns of the Six -year TIP. Two transit projects have been added to the six -year TIP. These projects are: • #78 Transit Operating Hours Expansion • #79 Terrace Heights /Moxee Route Expansion • #80 Kittitas — Yakima Commuter Bus Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1. Hold the Public Hearing to consider adoption of Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Continue Public Hearing to June 15, 2010 Council meeting for second Public Hearing and , possible adoption of plan. 11) BOARD /COMMISSION /COMMITTEE RECOMMENDATION: COUNCIL ACTION: Page Two Projects that that have been deleted from the 2010 — 2015 TIP as they were completed or the funds were obligated include: • #1 Yakima Railroad Grade Separations — Phase 2 • #4 YVT Trolley Barn /Powerhouse Rehabilitation • #5 William O. Douglas Trail • #28 Yakima Downtown Future Initiatives, Phase 4 Council and the public are welcome to add other arterial system projects to the list. The six -year TIP project listing will be finalized at today's hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. • A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used.. The current plan for 2011 — 2016 includes nine projects that are funded. Funding for the remainder of the projects will continue to be sought. Six -year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21 Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use • planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six -year transportation program. All local agencies are required to hold at least one public hearing during the development of the six -year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six -year TIP for 2011 to 2016. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth - Management Act. • i 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2- digit denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description • • 00- No Classification Rural (Under 5000 pop.) Urban (Over 5000 pop.) 01 - Interstate 11- Interstate 02 - Principal Arterials 12- Freeways & Expressways 06 - Minor Arterials 14- Other Principal Arterials 07 - Major Collector 16- Minor Arterial 08 - Minor Collector 17- Collector 09 - Local Access 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. Description 01- New construction on 07 - Resurfacing 14 - Bridge Program - Special new alignment 08 - New Bridge Construction 21 - Transit Capital Project 02- Relocation 09- Bridge Replacement 22- Transit Operational Project 03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning 04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin. • 05- Minor Widening 12 - Safety /Traffic Operation /TSM 13 31- Non Capital Improvement 06- Other Enhancements Environmentally Related 32 - Non Motor Vehicle Project 25 • 0 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. • P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV G - Gas 0 - Other P - Power S - Sewer (other than agency- owned) T - Telephone W - Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day /year in MM /DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds • to be used on this project. 26 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be • required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required "for Federally funded projects only.) • 27 • Washington State Department of Transportation • Six Year Transportation Improvement Program . Agency: Yakima . - From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: ' Project Identification Project Costs in Thousands of Dollars • Federally Funded A. PIN /Federal Aid No B . Bridge No. c f m Fund Source Information Expenditure Schedule Projects Only a� d_ N (Local Agency) • g N - ° C. Project Title E40.. „ a 0 _ m ro t F ederal Funding R/W • ti • v 0_ Z D. Street/Road Name or Number = r n g o_ Phase Fed eral Federal State 4th Required E~ o = E. Beginning MP or Road - Ending MP or Road o State Local Total Envir. Date Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done o_ (mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CN 4/1/2011 STP(U) 1700 FMSIB 2000 4530 8230 3000 5230 14 1 01 P 0.2 T CN 4/1/2011 DEMO 3281 AIP 1500 4781 3000 1781 - EA • Yakima Railroad Grade Separations- Phase 3 06 P. - Yes ' Martin Luther King, Jr. Blvd 07 G . from: N. 1st Sreet to: N. 1st Ave O • . - Construct Grade Separation and adjacent roadway reconstruction induding 08 • 9/1 /2009 Front Street • • Totals 4,981 3500 4530 13011 6000 7011 . 00 2 12 S N/A ALL 1/1/2011 5307 1601 16011 32021 32021 1 1 CE • Transit Operating Expenditures 22 No Various fixed rates and locations 23 • from: N/A to:' N/A 24 Annual operating assistance from the FTA In support of our transit system; 31 fixed cents, paratrensit Dial -A -Ride and varg ool program Totals 1,601 1601 3202 3202 • RW 1/1/2011 STP(E) 150 • 150 1 150 00 3 32 S N/A O CN 1/1/2011 STP(E) 285 285 .285 CE . Yes William O. Douglas Heritage Trails • 13 . Bodge Restoration & Trailhead 10 P S from: to: T 6/01/09 • • Trailhead restoration, fight of way acquisition partner with the Wiliam O. W Douglas Foundation. Including restoration of bridge . deaning. rust removal and painting Totals • 435 435 435 • 00 4 22 S WA ALL 1/1/2011 5309(Bus) 280 50 3301 50 100 100 80 CE. • Street Asset Amenities (Transit) 31 No ' Route Maintenance, Repair and Improvements - • • . from: N/A to: N/A On going improvements to bus benches, shelters and signage Infrastructure Totals 280 50 330 50 100 100 80 • • Repoli Date: May 25, 2010 Page 1 • ' v. 5.7 - Supersedes previous editions • • • e 1 . • • hington State Department of Transportation • • 41) Six Year Transportation Improvement Program . Agency: Yakima " From 2011. to 2016 Co. No.: 39 • Co. Name: Yakima Co. City No.: 1485 • MPO /RTPO: YVCOG Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 • • Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Ald No. B. Bridge No. c m w w CO v m Fund Source Information Expenditure Schedule Projects Only La rz E C. Project Title € d 5 d r°0 ; (Local Agency) • > r Federal Funding v a Z D. Street/Road Name or Number p = a R/W LL Li - rn o u P hase Federal Federal State Required • E. Beginning MP or Road - Ending MP or Road € - D .o Start Fund Cost by Fund State Local Total 4th Envir. Date F. Describe Work to be Done o_ (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd aid 6th Type (/yyin y 1 2 3 4 •5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • 00 5 22 S N/A ALL 1/1/2011 CMAQ 71 - 11 . 82 82 I I • Continue Transit Service to Tenace Heights No New University & Retail Links • from: N/A to: N/A Extension of Ilxed route bus service only Into the Terrace Heights area of • Yakima County • Totals 71 11 82 82 14 "6 03 P .71 C CN I 1/1/2011 • JOBS 9251 I 9251 9251 I Nob Hill Blvd and 64th Ave Improvements 05 P CE Nob Hill Blvd 07 T No • • from: 53rd Ave - to: 64th Ave 12 Widen and reconstruct 64th Ave. to 33-foot width with curb, gutter and 13 • sidewalk from Nob Hill Blvd. to 400 feel north, Construct curb, gutter sidewalk and stormwater runoff treatment on the north side of Nob HilL Totals 925 925 925 14 7 12 S N/A P CN 1/1/2011 AIP 880 383 1263 1263 S 16th Ave & W Washington Ave Signal & Intersection. 05 T CN 7/1/2011 AIP 1000 214 1214 1214 CE S 16th Ave 03 Yes' • from: S 16th Ave to: W Washington Ave Included in Union Gap's valley Mall BNd. project 4/1/2010 Totals 1880 597 2477 2477 • • 16 8 05 S zo G CN 1/1/2011 I . I I 6001 6001 600 I 66th Ave. & SummiNiew Intersection 12 0 CE Yes • , N. 66th Avenue & SummiNiew P from: N. 66th Ave. to: SummiNiew Ave. S • Widen for left turn lanes, Intersection improvements. curb. gutter. handicap T 4/1 /2010 W ramps and lighting C Totals 600 600 600 Report Date: May 25, 2010 Page 2 v. 5.7 - Supersedes previous editions • • • • • • • • IIII l. Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima ' From 2011 to 2016 Co. No.: 3g Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: . Project Identification Project Costs in Thousands of Dollars Federally Funded c 8. A. PIN /Federal Aid No. B. Bridge No. E rn i m Fund Source Information Expenditure A Sch edule Projects Only o m '..="-° C. Project Title 1 d 3 3 8 t Federal Funding 8 y) R/W c 0 c a 0 D. Street/Road Name or Number o " • e z' 0- Required t - ca _ 5 Envir. Phase Federal Federal State 4th r i Z E o m State Local Total Date E. Beginning MP or Road - Ending MP or Road 1 - D o Start Fund Cost by Fund 2nd 3 Funds Funds Funds 1st 2nrd Thru Type (MM YY) F. Describe Work to be Done o- (mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7" 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • 00 9 03 S .50 S CN 1/1/2011 CMAt] 540 214 754 754 CE Coolidge Road Widening and Paving. - 05 W Yes 06 T T " from: 801), AVE. to: 88TH AVE. 9/1/2009 Widen roadway and pave wlih curb and gutter. Totals 540 214 754 754 00 10 21 S N/A ALL 1/15/2013 5309(NS) I 96 84 1 1801 180 1 1 CE Acquisition of new Dial -A -Ride paratransit vehicles No from: N/A to: N/A Purchase new vehicles to replace older, less reliable units Totals 96 84 180 180 PE 1/1/2011 STP(U) 173 27 • 200 200 14 11 03 P N/A " RW 1/1/2012 STP.(U) 433 57 500 500 CE E. Lincoln & 10th Street Roundabout. 05 CN 6/1/2012 STP(U) 1125 175 1300 1300 Yes 06 from: E. Lincoln • lo: E. MLK Jr. Blvd. 6/1/2011 Roundabout construction at intersection curb, gutter, sidewalk, & street - lighting Totals 1,731 27 242 2000 200 1800 ALL 1/1/2011 STP(U) 865 135 1000 1 1000 12 12 03 P N/A o • CE S.R.12 & 16th Avenue Interchange 06 No Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout . Totals 865 135 1000 1000 • Report Date: May 25, 2010 Page 3 v. 5.7 - Supersedes previous editions • • 0 :. . III . • shin gton State Department of Transportation ID V� Six Year Transportation Improvement Program • Agency: Yakima From 2011 t0 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7-15-2010 Adoption Date: 7 -15 -2010 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • • Project Identification Project Costs in Thousands of Dollars Federally Funded T.2 .F A. PIN /Federal Aid No. B Bridge No . u ^ rn . F Source Information Expenditure Schedule Projects Only . o m o C. Project Title 61 n a 8 L Federal Funding (Local Agency) Ft/VJ c.) • Z D. Street/Road Name or Number `o i a Phase F ederal Federal State 4th Required u E. Beginning MP or Road - Ending MP or Road E 1 Start Fund Cost by Fund State Local Tofal Thru Envir. Date • iy S' P' F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M 'n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2012 STP(U) 865 135 1000 1000 EA 11 13 01 P N/A 0 1-82 & Lincoln Avenue Interchange • P Yes 1-82 Interchange - G from: E. "G" Street to: I - Reconstruct / extend oft -ramp from existing 1-82 off-ramp for Lincoln Avenue 6/2011 . to E. Street ' ' Totals 865 135 1000 1000 . • • 14 14 12 P N/A P ALL 1/1/2012 STP(U) 865 1351 10001 1 000 CE • E. Yakima Avenue & Fair Avenue Slgnalization W No T from: E. Yakima Avenue to: Fair Avenue S • Construct Traffic Signal 0 Totals 865 135 1000 1000 00 15 22 S ALL 1 1/2/2011 5316 1 1311 1 131 1 2621 131 131 CE • Fixed route Bus Services to Moxee along SR 24 Corridor • No SR 24 Hwy Corridor /Park & Ride Lots • from: lo: JARC funded demonstration project to determine ridership potential to and from the Moxee area Including stops at two Park 8 Rlde lots along SR 24. Totals • 131 131 262 131 131 14 16 • 31 P • N/A 0 RW 1/1/2012 STP(U) 173 27 200 200 4I E Nob Hill Blvd &Fair Ave 03 C CN 4/1/2012 STP(U) 865 135 1000 1000 4 CE Yes - E Nob Hill Blvd 04 P . from: E Nob Hill Blvd • to: Fair Ave T • ' Intersection widening 8 new signal, curb. gutter and sidewalk, street lighting, W 4/1/2001 stormwater Totals • 1,038 162 1200 1200 • Report Date: May 25, 2010 Page 4 v. 5.7 - Supersedes previous editions • • • • 1 r71 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 'to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Ald No. B. Bridge No. s 5 d m Fund Source Information Expenditure Schedule • Projects Only c • d ...... . in g N (Local Agency) g y - C. Project Title I d O E U L Federal Funding RNd i Z D. Street/Road Name or Number n- w 9 u tj g C.1 Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E 2 o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date • F. Describe Work to be Done , (mm/ddryyyy) Code Phase Code Fund Funds Funds 6th Type tM 1 1 2' 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21 PE 4/1/2011 13 13 13 16 17 12 p N P CN 6/1/2011 214 214 214 CE S 3rd Ave & W Washington Ave Signal T • No S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades Totals 227 227 227 14 18 4579 12 P N/A 1 PEI 6/1/2011 STP(U) 252 I 38 1 2901 290 I I EA Yes S Ist St. - E. Washington Ave. Intersection improvement S1s1St. • S • from: S 1st St. to: E Washington Ave. T p 01/01/11 Realign intersection, upgrade vallic signal • • Totals 252 • 38 290 290 17 19 4587 03 P 1.00 P ALL 4/1/2012 STP 2268 307 25751 525 20501 EA • . S 48th Ave. Reconstruction T Yes S 48th Avenue W from: Summitview Ave. to: Nob Hill Blvd. S p 4/1/2014 Widen, curb, gutter, sidewalk, lighting, drainage • Totals 2,268 307 2575 525 2050 14 20 03 P PE 1/1/2012 STP(U) 51 8 59 59 N/A 0 CN 6/1/2012 STP(U) 383 61 444 444 CE Yes • South 72nd Ave & Mead Ave Intersection 12 South 72nd Ave S from: South 72nd Ave to: Mead Ave T New intersection. signals. curb, gutter and sidewalk • W 6/10/2010 Totals 434 69 503 503 Report Date: May 25, 2010 Page 5 • v. 5.7 - Supersedes previous editions • • • H. O 4111 • sht ngton State Department of Transportation . • . III �� S ix Year Transportation Improvement Program • Agency: Yakima • From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 - 15 - 2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • • • Project Identification Project Costs in Thousands of Dollars Federally Funded A PIN /Federal Aid No. B. Bridge No. c E X enditure Schedule Pro g d co v m Fund Source Information P jects Only • s N Project Title -0 C. P E g g o v (Local Agency) o f 8 v , O Federal Funding v a z D. Street/Road Name or Number ` o - re m = Phase Federal Federal State 4 Req ired E. B MP or Road - Ending MP or Road E F ' 0 Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a` (m ✓ddtyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd T Type (MM/Y11 1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • . 16 21 4562 12 P N/A P ALL 4/4/2012 STP(U) 378 I WSDOT 378 I 756 75 CE Tielon Dr • S 5th Ave. Intersection Project W neon Drive T • Yes from: 5th Ave. Intersection to: O Replace traffic signal with roundabout S 4/1 /2014 Totals 378 378 756 756 PE 1/1/2012 STP(U) 2180 340 2520 •2520 16 22 01 P 1.1 O RW 1/1/2014 • STP(U) 2180 . 340 2520 2520 -CE . E. '1 St. Extension 08 P CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E. - H" St. S from: 1st St. to: Yakima River T . Construct road including water, sewer, curb, gutter and sidewalk for future W 1/1/2014 development • Totals 5,559 2551 8110 2520 5590 PE 1/1/2012 STP(C) 700 108 808 808 17 23 01 P 1.3 0 RW 1/1/2013 STP(U) 5500 850 6350 6350 CE N. 10th St. Extension 06 3 CN 6/1/2013 STP(U) 7900 972 8872 8872 Yes N. 10Th SL T from: R St. to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future W - • 1/1 /2013 development • ' Totals 14,100 1930 16030 808 15222 PE I 1/1/2011 I 5309(NS) 4001 OTHER I 1001 5001 500 I CE ' 00 24 • 23 P N/A West Side Transit Center No Acquire Property to Expand Operations from: N/A to: N/A - . • Locate and acquire property for the placement of a West Side Transit Center Operation - _ • • Totals 400 100 500 500 • • Report Date: May25, 2010 Pages v. 5.7 - Supersedes previous editions . • • • • • • 411111b. - Washington State Department of Transportation Six Year Transportation Improvement Program • • v740 . • . Agency: Yakima • From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO/RTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars • Federally Funded m A PIN /Federal Aid No. B. Bridge No. m _ - rn m o , F Source Information Expenditure Schedule Projects Only ? Q1 v a _ o 0 ' (Local Agency) o m 'o E C. Project Title g d 3 U . Federal Funding 'RN✓ 0 a Z D. Street/Road Name or Number n i n Pha Fed eral Federal State 4th Required E. Be ginning MP or Road - Endin M or Road E t m ° Start Fund Cost b Fund State Local Total Thru Envir. Date g g g ° y Funds Funds Funds 1st 2n d 3rd Type F. Describe Work to be Done o. (mm C Phase Code 6th yp (M» 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 25 06 P .60 P PE 4/1/2011 OTHER 6000 6000 6000 . CE Yakima Downtown Future Initiatives, Phase 5 12 w No . S from: 1st Street to: 9th Street T O • Install Historic Lighting, Sidewalk Modification & Other Improvements. • Exact improvement area(s) to be determined Totals 6000 6000 6000 N /A • PE 1/1/2011 STIP (S) 60 60 120 120 00 26 Annual Signal Upgrades 01 . P CN 4/1/2012 STP(S) 180 AIP 240 420 420 - CE CN 4/1/2012 STIP (S) 360 360 360 No Local Selection ' from: N/A to: N/A - . • . Upgrade signals . Totals 600 240 60 900 120 780 00 27 07 P N/A w CN 6/1/2011 STP(U) 2281 I 32 2601 260 I EA • Various Overlay Projects/Selected on Local Priority S No N/A from: N/A to: N/A • ' Totals 228 32 260 260 PE 1/1/2011 STP(U) ' 100 14 114 1 114 19 28 .. 03 p N/A P CN 3/1/2012 STP(U) 700 ' 95 795 795 CE • • Longliber Rd & Washington Ave 05 S Yes Intersection 06 w • from: to: • o - 3/1/2012 • New intersection construction and reconstruction, 3 -lane and 5-lane w/turn, curb, gutter, sidewalks. Totals 800 109 909 114 795 • Report Date: May 25, 2010 Page 7 • v. 5.7 - Supersedes previous editions • • • • • • • 40 . . e . . . al • . shIngton State Department of Transportation • • • . Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification • Project Costs in Thousands of Dollars Federally Funded A. P IN /Federal Aid N o. B . Bride No. c $ Expenditure Schedule Pro Tv ., a1 g v _ rn d e Fund Source Information p Projects Only u m :o E ' C. Project Title 1 a U t Federal Funding (Local Agency) R/W U a Z D. Street/Road Name or Number o 21 L• o_ L 8.1-. m c Phase Federal Federal State 4th R quired E. Beginning MP or Road - Ending MP or Road E ° Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done L` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd Sin Type (Mtiyyy) 1 2 3 4 5 6 7 8 . 9 10. 11 12 13 14 15 16 17 18 19 20 21 • 14 29 04 P .1 C CN 4/1/2011 STP(U) I 240 42 282 282 . E Nob Hill Blvd & S 18th St 01 S _ CE . E Nob Hill Blvd W Yes from: S 18th St to: E Nob Hill Blvd T Widen south leg for double LT from west bound Nob Hill; Ole to WSDOT 01/01/07 Project) possible curb, gutter and sidewalk • Totals 240 42 282 282 . 17 30 05 P .15 C PE 1/1/2011 STP(E) 22 7 29 29 ZierRd -S 75th AvetoS72ndAve 06 S CN 6/1/2011 STP(E) 75 20 95 95 GE ' Zier Rd T Yes from: S 75th Ave to: S 72nd Ave P Minor widening, curb, gutter and sidewalk 6/1/2011 • Totals 97 27 124 124 PE 1/1/2011 50 50 50 00 31 07 P N/A S CN 6/1/2011 240 2401 240 CE Gravel,Road B.S.T. No Various Areas • from: City Wide to: • • Totals 290 290 290 16 32 12 P N/A T CN 10/1/2013 STP(S) 504 I 74 5781 1 5781 GE Powerhouse Rd & Englewood Ave P Powerhouse Rd O Yes from: Powerhouse Rd to: Englewood Ave S C Intersection. realignment. curb, gutter, sidewalk. Safety Flashing Signal. 10/1/2013 possible roundabout w Totals 504 74 578 578 v. 5.7 - Supersedes previous editions Report Date: May 25, 2010 Page 8 P P • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima .. From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN/Federel Aid No. B . B No. v _ rn d Fund Source Information Expenditure Schedule Projects Only To z. N � V g (Local Agency) . 4 . o E C . Project Title � v o t 0 Federal Funding R/W c 3 a = D. Street/Road Name or Number ° in a Ph ase Federal Federal State 4th Required • u. Z E Beginning MP or Road - Ending MP or Road E 1— m o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Type v Date • F. Describe Work to be Done rL (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th (MANYY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 14 33 12 P N/A P PE 1/1/2013 STP(S) 25 4 29 29 RW 6/1/2013 STP(S) 25 4 29 29 CE - . S48th Ave 4 Summitview Ave Signa/ization T CN 8/1/2014 STP(S) 554 81 635 635 Yes S 48th Ave from: S 48th Ave to: Summilview Ave - 8/1/2013 Signalizatlon ' Totals 604 89 693 58 635 PE 1/1/2012 STP(E) _ 424 ' 67 491 491 14 34 - 01 P • W RW 1/1/2013 STP(E) 1047 163 1210 1210 - CE ' W Lincoln Ave & 'B' St Realignment 12 T CN 1/1/2014 STP(E 1801 281 2082 2082 Yes W Lincoln Ave from: W 5th Ave to: Custer St P p 1/1/2014 Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G C Totals 3,272 511 3783 491 1210 2082 16 35 12 P N/A W 1 I 1 1 1 I 1 1 1 1 CE School Safety Projects No Various Locations - Citywide . from: to: . Crossing flashers, sidewalks, signing, other features Totals • 14 36 03 P PE 1/1/2012 STP(C) 546 84 630 630 • .85 C RW 1/1/2013 STP(C) 1090 170 1260 1 260 EA E Nob Hill Blvd. Reconstruction • 04 GO CN 1/1/2014 STP(C) 6539 • 1013 7552 7552 Yes E Nob Hill Blvd. 06 • from: S 6th Street to: S 18th Street g P - 1/1/2014 . . Major roadway widening and reconstruction to 5 lanes with intersection T Improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants W Totals 8,175 1267 9442 630 1260 7552 Report Date: May 25, 2010 • Page 9 v. 5.7 - Supersedes previous editions • . . 411 . • . . 111) • . . AI ash ton State De artment of Transportation • . ,. • 9 P P Six Year Transportation Improvement Program • . Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded c " a1 A PIN /Federal Aid No. B. Bridge No. m v . N Fund Source Information Expenditure Schedule Projects Only • g y P . C. Project Title E H n . G, m (Local Agency) o E d v . Federal Funding R/W c v a Z D. Street/Road Name or Number a y .. a Phase Federal Fed eral State 4th ' Required LL E. Beginning MP or Road - Ending MP or Road E 1 2 7 ar Start Fund Cost b Fund State Local Total Thru Envir. Date F. Describe Work to " be Done a (rum/cidtyyyy) Code Phase Code Funds Funds Fund 1st 2nd 3rd 6th Type (lynNyt) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 " 16 17 18 19 20 21 • • 17 37 01 P N/A y/ PE 1/1/2012 STP(C) 91 14 105 105 • RW 1/1/2013 STP(C) 91 14 105 105 CE S 72nd Avenue & W Washington Avenue 12 T . CN 1/1/2014 STP(C) 544 • 86 630 630 Yes S 72nd Ave 06 P ' from: S 72nd Ave to: W Washington Ave • C 1/1/2013 Intersection Improvement, possible roundabout • Totals - 726 114 840 105 105. 630 • 17 38 04 P 76 y,/ PE 1/1/2012 STP(E) 23 5 28 28 CN 7/1/2013 STP(E) 1096 164 1260 1260 S 66th Avenue 03 • T • Yes S 66th Ave S • from: Scenic Drive to: Summitview P • ' Widen roadway, curb, gutter, sidewalk and unities o 7/1 /2012 Totals 1,119 169 1288 28 . 1260 • N /A W PE 1/1/2013 STP(U) 126 17 143 143 • 14 39 12 p RW 1/1/2013 STP 63 8 71 71 CE 40th Avenue and Summitview Signal Upgrade S CN 6/6/2013 STP(U) 544 • 86 630 630 Yes • 40th Avenue T . from: 40th Avenue to: Summitview P Signal upgrade, radius Improvements, turn lane extension • 6/1/2012 • • Totals 733 111 844' 844 • • 14 40 "12 P WA yy PE 1/1/2013 STP 95 13 108 108 T RW 1/1/2014 STP 63 8 71 • 71 CE 40th Avenue and Englewood CN 1/1/2014 STP 145 20 165 165 Yes 401h Avenue S • _ from: 40th Avenue • to: Englewood P Replace traffic signal poles. upgrade controller D 1/1/2013 . • Totals 303 41 344 179 165 • • v. 5.7 - Supersedes previous editions Report Date: May 25, 2010 Page 10 . • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 . t0 2016 Co. No.: 39 . Co. Name: Yakima Co. Hearing Date: 7 - 15 - 2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • • • Project Identification Project Costs in Thousands of Dollars Federally Funded u Expenditure Schedule Projects Only A. PIN/Federal Aid No. B Bridge No. m m Fund Source Information .16 y (Local Agency) s y C. Projec Title IE 0 ° 9 R/W o Federal Funding o a Z D. Street/Road Name or Number o . - N 5 a Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - E MP or Road E 1- f o Start Fu nd Cost by Fund State Local Total 1st 2nd • � 3rd Thru Enve Date F. Describe Work to be Done o- (mm/dd/ Code Phase Code Funds Funds Funds 6th .Typ (MMM) • 1 2 3 4 5. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 STP 126 18 144 144 00 41 12 P N/A W RW 6/1/2013 STP 63 8 71 71 CE 16th Avenue and Fruitvale Blvd T CN 1 /1 /2014 STP 315 43 358 358 Yes 16th Avenue P from: 16th Avenue to: Fruitvate Blvd O • 1/1/2013 Replace traffic signal poles, radius Improvements, ADA ramps Totals 504 69 573 215 358 PE 1/1/2011 STP 32 5 37 14 42 12 P 1st Street and (Street N/A W CN 1 /7!2012 STP 126 17 143 I 37 ' ' • 143 CE No 1st Street S . . from: 1st Street to: I Street P O Replace and upgrade traffic signal equipment • Totals 158 22 180 37 143 PE 6/1/2014 STP(U) 820 189 1009 1009 16 43 01 P 25 • O RW 1/1/2015 STP(U) 3150 630 3780 3780 CE Washington Ave. Railroad Grade Separation 3 CN 1/1/2016 STP(U) 6552 1008 7560 7560 Yes Washington Ave. T . from: Longfibre Road to: yl 1/1/2016 Railroad grade overpass Includng all uta ttles Totals . 10,522 1827 12349 12349 16 44 01 P 1.3 C PE 1/1/2013 STP(U) 272 43 315 315 • RW 6/1/2014' STP(U) 349 55 404 404 CE Frontage Road& "1-1' St. Loop GO CN 1/1/2016 STP(U) - 2352 340 2692 2692 - Yes N. 8th St. from: "H" SL to: 1 -82 ' P T 1/1/2015 Construct new roadway, water, sewer, cutb, gutter. sidewalk and lighting for T future development and Terrace Heights connection. • W Totals 2,973 438 3411 315 - 3096 • • Report Date: May 25, 2010 Page 11 v. 5.7 - Supersedes previous editions • • 0 0 .. ip . • . • • hington State Department of Transportation • • 4 Six Year Transportation Improvement Program . Agency: Yakima • Co. No.: 39 Co. Name: Yakima Co. From 2011 to 2016 • CityNo.: 1485 MPO /RTPO: YVCOG Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 Amend Date: Resolution No.: Project Identification Project Costs In Thousands of Dollars Federally Funded To A. PIN /Federal Aid No. B. Bridge No. 6 m c n • z,, v rn .8 o, Fund Source Information Expenditure Schedule Projects Only o N C. Project Title E. = d o m (Local Agency) 0 c D. Street/Road Name or Number 'o :? -' >, a Federal Funding RJW t i a Z `1 = Phase Federal Federal State State Local 4th Required E. Beginning MP or Road - Ending MP or Road E _ o Stt Ll Total • Start Fund Cost by Fund Date F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Envir. T yp e (M1v11 Y) a • 1 2 3 4 5 6 7 8 9 10 11 12 13 '14 15 16 17 18 19 20 21 14 45 04 P 3.5 C PE 1/1/2014 STP(U) 120 1 17 137 137 16lhAve. Corridor 0 CE 16th Ave. 0 Irom: SR -12 to: (a�shington Ave.Nalley Mall P Widen roadway, curb, gutter, sidewalk, lighting. S T W Totals 120 17 137 137 14 46 - 04 P 3.2 C PE 1/1/2013 1 STP(U) 120 1 17 1371 1, 1371 40th Ave. Corridor • 0 CE 40th Ave. G from: SR -12 • to: Washington Ave. P Widen roadway, curb, gutter, sidewalks, lighting. S W T Totals 120 17 137 137 14 47 03 p 2.7 C PE 1 1/1/2012 1 STP(U) 1 120 1 1 17 1 1371 1 1371 1 Nob Hill Corridor . 04 , G CE Nob Hill ' 0 ' - from: 1 -82 lo: S. 16th Ave. P Widen roadway, sidewalk, curb, gutter, lighting S T W Totals 120 17 137 137 04 P 2.0 C PE 1/1/ STP(U) 120 1 14 48 O 1 .1 . 1 17 137 1 1 1 1 1 137 CE • S. 1st St/Main St. Corridor G S. 1st St. /Main St. 0 from: Nob Hill Blvd. to: Barker Mill Bridge P Joint project with Union Gap to widen roadway. curb. gutter. sidewalk, S - • lighting. T • W Totals , 120 17 137 137 • • Report Date: May 25, 2010 Page 12 v. 5.7 - Supersedes previous editions . • • • • • • • Washington State Department of Transportation Six Year Transportation Impr Program Agency: Yakima From 2011. to 2016 Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification • Project Costs In Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. u` rn 2 N Fund Source Information Expenditure Schedule Projects Only E 2 C. Pro ect Title € ., ; d ro (Local Agency) m - o E 1 v t Federal Funding RN/ 15 a Z D. Street/Road Name or Number `o in z. 0- Phase Federal Federal State • 4th Required LL E. Beginning MP or Road - Ending MP or Road E 10 o Start • Fund Cost by Fund State Local Total 1 sl 2nd 3rd Thru Envir. Date F. Describe Work to be Done a: (mn✓dd/yyyyq Code Phase Code Funds Funds Funds 6th Type (M MYY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • • 00 49 32 P N/A PE 1/1/2011 100 100 100 EA CN 1/1/2011 900 900 900 Storm Drains/Vegetation No Local Selection . from: City Wide to: • • City Wide . . - Totals 1o00 1000 loon • 17 50 03 P .76 yy PE 1/1/2012 STP(C) 109 27 136 136 • ' CN 1/1/2013 STP (C) 945 TPP 945 106 • 1996) 1996 GE • Reconstruction Rudkin Rd 06 T No Rudkin Rd P - from: E Viola Ave to: Rainier Place S Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main • • Totals 1,054 945 133 2132 136 1996 PE 9/1/2012 STP(S) 122 TPP 23 7 152 1 152 16 51 03 P .76 C CN 4/1/2013 STP 1730 TPP 206 70 2006 2006 CE • . E Mead Ave Reconstruction 06 G No E Mead Ave from: Rudkln Rd to: Fair Ave P ' Partner with City of Union Gap, reconstruct, excavate ballast, top course, T curb. gutter. storm, acp • Totals 1,852 229 77 2158 152 2006 17 52 04 P 1.3 O PE 1/1/2012 AIP 131 20 151 151 • RW 1/1/2013 AIP 382 59 441 441 EA S 80th Ave - Tieton Dr to Zier Rd C CN 4/1/2013 AIP 1667 260 1927 1927 Yes S 60th Ave • T • from: Tieton Dr to: Zier Rd . 4/1/2012 Major widening. curb, gutter, sidewalk s • , Totals 2180 339 2519 151 2368 ' • Report Date: May 25, 2010 Page 13 v. 5.7 - Supersedes previous editions • • • 0 • . . • . • • . . • •. .• . . . • . . • �73 shi t State Department of Transportation 0 . .. ng on p P Six Year Transportation Improvement Pro am Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 - City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars • Federally Funded c A. PIN/Federal Aid No. B. Bridge No. d m v �, Fund Source Information Expenditure Schedule Projects Only o N •° C. Project Title d a 0 • , c , o m (Local Agency) • m 5 E „ r Federal Funding R/W • v a Z D. Street/Road Name or Number • a p- u) .. = 6 Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - Ending MP or Road > r 01 Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done ao` (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/y11 1 2 3 4 5 6 7 8 9 10 11 •12 13 14 15 16 17 18 19 20 21 17 53 05 P 1.0 w PE .1/1/2014 STP(C) 272 43 315 315 • Englewood Ave - N 40th Ave 10 N 56th Ave S R W 6/1 /2014 STP(C) 349 55 404 404 EA • 06 T CN 1/1/2015 STP(C) 2352 340 2692 2692 Yes Englewood Ave • from: N 40th Ave to: N 56th Ave P - Widen roadway, curb. gutter, sidewalk • - 1/1/2013 C • . Totals 2,973 438 3411 3411 • 2 p PE 1/1/2013 STP(U) 219 34 • 253 . 253 • 17 54 05 P RW 6/1/2013 STP(U) 327 51 378 378 EA • Englewood Ave - N 24th Ave to N 16th Ave 06 5 CN 6/1/2014 STP(U) 2980 244 3224 3224 Yes • • Englewood Ave . • from: N 16th Ave • to: N 241b Ave Widen, curb, gutter and sidewalk: water and sewer lines 6/1/2013 Totals 3,526 329 3655 • 631 3224 . 14 55 12 P 25 P PE 1/1/2013 STP(S) 55 8 63 63 W Nob Hill Blvd Sidewalks T RW 6/1/2013 STP(S) 107 19 126 126 CE W CN 3/1/2014 STP(S) 321 57 378 378 Yes W Nob Hill Blvd from: S 16th Ave to: S. 6th SL s • Install missing sidewalks en southside of Nob Hill. 3/1/2013 • T otals 483 84 567 189 378 00 56 • 06 P 10 P PE 1/1/2013 STP(S) 57 7 64 64 RW 6/1/2013 STP(S) 189 - 25 214 214 CE Beech St Pedestrian Connection 32 T CN 1/1/2014 STP(S) 504 68 572 572 Yes • . Beech St from: Fair Ave to: Chalmers /Riverside . Construct pedestrian pathway under S682 to Greenway 1/1/2013 Totals 750 100 850 278 • 572 • Report Date: May 25, 2010 Page 14 v. 5.7 - Supersedes previous editions • • Washington State Department of Transportation • Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7-15-2010 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • . Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c m Fund Source Information Expenditure Schedule Projects Only o N 1 • C. Project Title E H y c o m (Local Agency) c 5 D. StreeURoad Name or Number g a m -r . a Federal Funding R/Wr a al- co IS i.,. ,, Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Dale • F. Describe Work to be Done a ( mrr✓dd/yyyy) C ode Phase Code Funds Funds Funds 6th Type (MM/Y) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 57 12 P 2.0 P PE 1/1/2013 STP(S) 43 7 50 50 RW 6/1/2013 STP(S) 86 15 101 101 CE W Lincoln Ave Sidewalks T CN 1/1/2014 STP(S) 572 88 660 660 Yes W Lincoln Ave - S from: N 56th Ave to: N 29th Ave W - Sidewalks, meters and fire hydrants replacement or relocation 1/1 /2014 Totals 701 110 811 151 660 • 14 58 01 P 25 W PE 6/1/2013 STP(U) 820 189 1009 1009 Mead Ave. Railroad Grade Separation T RW 1/1/2014 STP(U) 3150 630 3780 3780 CE T CN 1/1/2015 STP(U) 6552 1008 7560 7560 Yes Mead Ave. • from: Presson Place to: Maryland P O Construct railroad overpass including all utilities 1/1/2074 _ Totals 10,522 • 1827 12349 1009 11340 16 59 01 P 4.0 0 PE 6/1/2012 STP(U) 252 38 290 290 ClrywldePathway Connectlons 0 RW 1/1/2013 STP(U) 756 88 844 844 , CE S CN 1/1/2014 STP(U) 1890 315 2205 2205 Yes • . Yakima T • from: lo: W • 1/1/2013 Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail. Greenway Including Neches Rail Spur, signage and amenities Totals 2,898 441 3339 290 844 2205 ' 17 60 01 P N/A 0 PE 1/1/2013 STP(U) 63 5 • 68 68 CN 6/1/2013 STP(U) 567 • 76 643 643 • CE 341h Ave & River Rd Improvements 12 P . No Fruitvale Blvd. S • from: 34th Ave. to: River Rd. T Intersection Improvements including lumination, sewer, water, curb. water W • and sidewalks " • Totals 630 81 711 711 • • Report Date:. May 25, 2010 Page 15 v. 5.7 - Supersedes previous editions • • • p • • • shington State Department of Transportation • If/ Year Transportation Improvement Pro am . Agency: Yakima From 2011 to 2016 . Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: ' Project Identification Project Costs in Thousands of Dollars Federally Funded m a� A. PIN /Federal Aid No. B. Bridge No. d rn m m Fund Source Information Expenditure Schedule Projects'Only o 2 - Q C. Project Title v ; d m (Coca! Agency) 5 D. Street/Road Name or Number r i ;, 0- Federal Funding q/yV o a t- cn - .6 Phase Federal Federal State • 4th Required t ` E Beginning MP or Road - Ending MP or Road E 1-- n °' 1st 2nd 3rd Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done a (mm /yyyy) Code Phase Code Funds Funds Funds 6th Type (M>7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 • 19 20 21 17 61 01 P 1.0 0 PE 1/1/2013 STP(U) 218 34 252 252 RW 6/1/2014 STP(U) 327 51 378 378 CE . Englewood Ave 05 8 CN 1/1/2015 STP(U) 2980 244 3224 3224 Yes • Englewood Ave 12 T from: 24th Ave to: 40th Ave W 1/1/2015 • Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines . and streel lights. Totals 3,525 329 3854 252 3602 14 62 01 P 6.0 C PE 1/1/2014 STP(U) 120 I 17 1371 1 1 1 137 CE • W. Yak/ma North/South Connector to West Valley 04 G Unknown road 06 O P from: North - South to: in West Valley S • City Si County joint project to build/extend roadways. T W Totals 120 17 137 137 16 63 01 P 38 S PE 1/1/2014 1 I 1001 1001 1 100 Occidental Road Construction. W - • P from: 58th Ave. to: 64th Ave. T Construct roadway • Totals 100 100 100 00 64 01 P z7 PE 1/1/2014 100 tool I 100 • • . 86th Ave. Road Construction . fr om: Occidental to: Coolidge ' Construct roadway • Totals 100 100 100 Report Date: May 25, 2010 Page 16 v. 5.7 - Supersedes previous editions • • • I 71 Washingt State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded m A. PIN /Federal Aid No. B. Bridge No. 6 m �, Fund Source Information Expenditure Schedule Projects Only c m v N (Local Agency) o N - 2 C. Project Title � � ° o f „ 3 v t Federal Funding R/W T5 g v ti z D. Street/Road Name or Number a N a Phase Federal Federal State 4th Required ` E. Beginning MP or Road - Ending MP or Road E 1- S St a rt Fund Cost by F State Local Total 1 sl 2nd 3rd Thru Emir. Date F. Describe Work to be Done • a (mm/dd/yyyyl Code Phase Code Funds Funds Fund 6th Type (MM t Y) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2014 STP(U) 120 17 137 137 16 65 04 P 1.5 W EA 641h Ave. Roadway Widenina. - 06 G - YES P T • from: Washington Avenue. to: Tielon Drive. C 7/4/2014 Wide Roadway,Curb, Gutter. Sidewalks, Lighting, Drainage. o Totals 120 17 137 137 00 66 03 P N/A G PE 1/1/2014 STP(E) 18 32 50 50 CN 6/1/2014 STP(E) 1900 285 2185 2185 EA YVT Railway Rehabilitation & Museum C - No 3rd Ave S from: 3rd Ave to: Pine St T . W Car Barn. Museum Restoration and Pathway P Totals 1,918 317 2235 2235 PE 4/1/2012 CMAQ 24 3 27 1 27 16 67 01 P WA S CN 7/1/2012 CMAQ 480 65 545 545 CE Roadway City Wide Shoulder Improvements No City Wide from: to: City Wide shoulder Improvements, PM10 abatement Totals 504 68 572 572 00 68 14 P .25 T PE 1/1/2013 STP(E) 252 34 286 286 • P CN 3/1/2014 STP(E) 3150 412 35621 3562 CE Pedestrian Bridge 32 No Pedestrian Bridge - 0 from: N 10th St to: Yaldma Greenway • Construct pedestrian bridge from Gateway area to Yakima Greenway. • power, handicap accessible, lights Totals 3,402 446 3848 286 3562 Report Date: May 25, 2010 Page 17 v. 5.7 - Supersedes previous editions 40 e • . • • Ashington I State Department of Transportation S Year Transportation Improvement Pro am Agency: Yakima From 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 • MPOIRTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars . Federally Funded • �., T A. PIN /Federal Aid No- B. Bridge No. d g m e , Fund Source Information ' Expenditure Schedule Projects Only . ' o 2 ° C. Project Title ; d l m (Local Agency) " C o D. Street/Road Name or Number L -' a F e d eral Funding R/W 7 t l Z a r- co ` F Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r = - t Start Fund Cost by Fund State Local Total Thru Envir- D . • F. Describe Work to be Done g (mm /ddyyyy) Code Phase Code Funds Funds Funds. 1st 2nd 3rd 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 69 14 P N/A O PE 1/1/2011 STP(E) • 10 2 12 12 CN 7/1/2011 STP(E) 109 17 126 126 CE William O. Douglas Pathway 32 S No P from: Pine St to: Cowiche Canyon W ' Pathway improvements, connections, and signage to Cowiche Canyon Trat. Totals 119 19 138 138 PE 1/1/2014 " STP(U) 315 38 353 1 353 00 70 03 P N/A O CN 6/1/2014 STP(U) 945 126 " 1071 1071 C E Y T Pathway 32 S No YVT Railway Corridor. T from: to: w Development pathway in West Valley area induding 53rd Ave, Wide Hollow, • - 64th Ave, Ahtanum including all utilities and signage Totals 1,260 164 1424 1424 . 00 71 07 P .5 G CN 6/1/2011 I 75 75 I 25 25 25 I CE City wide Alleys S No from: lo: T Pave alleys throughout the dty. T • Totals 75 75 25 25 25 ' PE 1/1/2011 ARRA- 50 50 50 14 72 06 P 2.64 CN 6/1/2011 ARRA- 1950 1950 1950 CE Surnmitw'ewAve. Grind & Overlay 07 I No ' from: 14th Ave to: 56th Ave • Oiled 0.20' of ACP & replace with 0.20' of Htv1A, and install required ADA ' ramps Totals 2,000 2000 2000 Report Date: May 25, 2010 Page 18 v. 5.7 - Supersedes previous editions • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2011 to 2016 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c L m Ot Fund Sourc Informati Expenditure Schedule ' Projects Only ` s ue C. Project Title € o (Local Agency) m o E o d -1 c1 , Federal Funding R/VV c v a` 2 D. Street/Road Name or Number o.- tn 5 a Phase Federal Federal State 4th Required U E. Beginning MP or Road - Ending MP or Road E t o - o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done o_ (mm/ddfyyyy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 73 03 P 0.50 W ALL 1/1/2014 STP(U) 1298 202 1 1500 1500 CE River Road Improvements 05 0 Yes 06 P from: 6th Ave to: 161h Ave 0 ()7 T 6/1 /2015 Reconstruct roadway, widen, curb. gutter, sidewalk. lighting and drainage Totals 1,298 202 1500 1500 74 05 P 0.97 C CN 7/1/2012 1 STP(U) 2700 1 421 1 31211 1 31211 1 CE Nob Hill Blvd 06 P No 07 T G from: 49th Avenue to: 64th Avenue 12 0 Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay lull width 13 Totals 2,700 421 3121 3121 • 75 10 P 01 P PE 4/1/2011 BRAG 50 501 5 1 1 tern Street Underpass 11 T N/A No C Irom: Yakima Ave to: 18th Street Repair or replace 16th Street Underpass • Totals 50 50 50 76 06 P 0.48 C PE 1/1/2012 WSDOT 50 50 50 88th Avenue C RW 2/1/2012 WSDOT 25 - 25 25 CE 12 T CN 6/1/2012 WSDOT 320 10 330 330 Yes from: Tieton Drive to: Summitvlew Ave 13 G Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 881h. Totals • 395 10 405 405 Report Date: May 25, zolo Page 19 v. 5.7 - Supersedes previous editions • e. 0 . • . • • Ashington State Department of Transportation 1111 Six Year Transportation Improvement Pro am Agency: Yakima • From. 2011 to 2016 • Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 7 -15 -2010 Adoption Date: 7 -15 -2010 Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded m Y ti C. Project Title A. PIN /Federal Aid No. B. Bridge No. i `c o m m a Fund Source Informat P E X enditure Schedule Projects Only y s tg - - - 0 e 3 d o (Local Agency) '1, ° E , v 3 o Federal Funding o a Z D. Street/Road Name or Number o . a R/W LL a F• i n 9 = Phase Federal Federal State 4 th Required • E. Beginning MP or Road - Ending MP or Road E 1 5 o Start . Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a (mm/ddi Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Y11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18, 19 20 21 77 23 P N/A s PE 4/1/2013 5309(Bus) 15000 I 1000 16000 2000 14000 . Westside Transit Center (Transit) . • Yes from: N/A to: N/A Construct a West Side Transit Center (Park & Ride Facility) - - - Totals 15,000 1000 16000 2000 14000 78 ALL 3/1/2011 5307 428 428 428 23 P Transit Operating Hours Expansion I I I I I I CE from: to: Expand Transit Operating Hours an hour later into the evening except for • one route that win be expanded an hour earlier . Totals 428 . 428 428 79 • ALL I 1/1/2011 5307 288 I I I I 2881 288 Terrace Heights Moxee Route Expansion 23 P CE • from: 10: Expand route seMce to Terrace Heights and Moxee • Totals 288 288 288 80 23 P ALL 1/1/2011 I 5307 602 I I I I 6021 602 Kittitas - Yakima Commuter Bus CE • from: to: • Expand Route Service to Kittitas County Totals 602 602 602 Grand Totals for Yakima 128,971 15,463 27,369 171,803 28,521 25605 36,279 81,398 • . Report Date: May 25, 2010 Page 20 V. 5.7 - Supersedes previous editions • • • • • • c