Loading...
HomeMy WebLinkAboutR-2024-006 Resolution authorizing a Grant Agreement with the Federal Transit Administration to provide funding assistance for Bus ITS Equipment Upgrades RESOLUTION NO. R-2024-006 A RESOLUTION authorizing a Grant Agreement with the US. Department of Transportation, Federal Transit Administration to provide funding assistance for Bus ITS Equipment Upgrades. WHEREAS, in 2023, the US. Department of Transportation, Federal Transit Administration (FTA) opened up a grant funding opportunity under Federal Transit Administration FY2020-2023 Section 5339(a) Small Urban - Bus Intelligent Transportation System (ITS) Equipment Upgrades; and WHEREAS, Yakima Transit applied for funding on May 23, 2023, and the City of Yakima (City) was awarded a grant in the amount of$914,320 which requires a 20% match; and WHEREAS, the funding will be for the purchase and installation of software and equipment to replace Yakima Transit's existing ITS; including post-installation software updates; and WHEREAS, in order to receive this funding, it is necessary for the City and the FTA to enter into Grant Agreement WA-2023-071-00 setting forth the terms, conditions, and requirements for allocating this funding; now; therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to enter into Grant Agreement WA-2023-071-00 with US. Department of Transportation, Federal Transit Administration, attached hereto and incorporated herein by this reference, to fund Bus ITS Equipment upgrades in the amount of Nine Hundred Fourteen Thousand Three Hundred Twenty Dollars ($914,320). ADOPTED BY THE CITY COUNCIL this 2nd day of January, 2024. / a ti., (7e/ =,tp,KI14,1 h��'1 Patricia Byers, Mayor ATTEST: _• _ SEAL•i * , fn UA/` ��`\\RINGsalinda Ibarra, City Clerk DOT FTA U.S. Department of Transportation Federal Transit Administration Award Federal Award Identification Number WA 2023 071 00 (FAIN) Temporary Application Number 1750-2023-2 Award Name FY2020-2023 Section 5339(a) Small Urban - Bus ITS Equipment Upgrades Award Status Active (Executed) Award Budget Number 0 Period of Performance Start Date 9/25/2023 Original Period of Performance End Date 3/31/2024 Current Period of Performance End Date 3/31/2024 Revision#: 0 Budget Period Start Date 9/25/2023 Budget Period End Date 3/31/2024 Part 1 : Recipient Information Name: CITY OF YAKIMA Recipient ID Recipient OST Type Recipient Alias UEI DUNS 1750 City CITY OF YAKIMA FJNNX1XFJ9K3 078212651 Location Type Address City State Zip Headquarters 129 N 2ND ST YAKIMA WA 98901 Physical Address 129 N 2ND ST YAKIMA WA 98901 Mailing Address 129 N. 2ND STREET YAKIMA WA 98901 Union Information Union Name AMERICAN FEDERATION OF STATE COUNTY AND MUNICIPAL EMPLOYEES, AFL-CIO Address 1 307 N 3rd Street, Suite 4 Address 2 City Yakima State Washington Zipcode 98901 Contact Name Eddie Allan Telephone 5094527887 Fax 5095751999 E-mail eddiea@council2.com Website http://www.council2 com/ Part 2: Award Information Title: FY2020-2023 Section 5339(a) Small Urban - Bus ITS Equipment Upgrades FAIN Award Status Award Application Cost Date Last Updated From Type Center Created Date TEAM? WA-2023- Active Grant Region 10 5/23/2023 5/23/2023 No 071-00 (Executed) Award Executive Summary This application includes$201,225 in FY2020 funds, $241,401 in FY2021 funds, $232,330 in FY2022 funds, and $239,364 in FY2023 funds, for a total of$914,320 Section 5339 (a) small urban formula funding. The funding is for the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes post-installation software support. Frequency of Milestone Progress Reports (MPR) Annual Frequency of Federal Financial Reports (FFR) Annual Does this application include funds for research and/or development activities? This award does not include research and development activities. Pre-Award Authority This award is using Pre-Award Authority Does this application include suballocation funds? Recipient organization is suballocated these apportioned funds and can apply for and receive these funds directly. Will this Grant be using Lapsing Funds? Yes, this Grant will use Lapsing Funds. Will indirect costs be applied to this application? This award does not include an indirect cost rate. Indirect Rate Details: N/A Requires E.O. 12372 Review No, this application does not require E 0 12372 Review. Delinquent Federal Debt No, my organization does not have delinquent federal debt. Award Description Purpose The purpose of this award is to provide funding for the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes post-installation software support. Activities to be performed: The funding is for the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes 5-years of post-installation software support. Upgrades to the ITS system include items such as: - MDT/AVL system (MDT,AVL with GPS) -ADA Automated Annunciators (with GPS Service) -Transit Destination Sign Systems and Retrofit - Security Cameras -Automated passenger counting hardware -Automated passenger counting software -Vehicle and Route Performance Tracking Software Expected outcomes: This project will increase the connectivity and safety for passengers Additionally, it will provide more effective information gathering to enable efficient route design and operations. Intended beneficiaries: City of Yakima, yakima Transit and Citizens of Yakima Subrecipient Activities: N/A Award Point of Contact Information First Last Name Title E-mail Address Phone Name Greg Story Assistant Transit gregory story@yakimawa.gov (509) 576 Manager 6422 abhishek.koirala@dot gov Transportation Program Specialist Award Budget Control Totals Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $914,320 Local $228,581 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $1,142,901 Award Budget Project FTA Non-FTA Total Number Budget Item Amount Amount Eligible Quantity Amount 114- WA-2023-071- 00 BUS: SUPPORT EQUIP $442,626.00 $110,657.00 $553,283.00 1 01-00 (114- AND FACILITIES Al) REHAB/ RENOVATE -ADP SOFTWARE/ WA 2023 071 11 44 08 HARDWARE $442,626 00 $110,657.00 $553,283.00 1 01-00 (FY 2020,2021 SECTION 5339 (a) 80/ 20) (00) 114- WA-2023-071- 00 BUS: SUPPORT EQUIP $471,694.00 $117,924.00 $589,618.00 1 02-00 (114- AND FACILITIES A2) REHAB/ RENOVATE WA-2023-071- 11 44 08 -ADP $471,694 00 $117,924.00 $589,618 00 1 02-00 SOFTWARE (FY2022/ 2023 Section 5339 (a) 80:20) (00) Discretionary Allocations This application does not contain discretionary allocations. Sources of Federal Financial Assistance PO Project Scope Scope Scope UZA Area Account Amendment Cumulative Number Number Name Number Suffix Code Name Class FPC Description Amount Amount Code BUS SU WA-2023 PPORT E WA-34- 071-01- QUIP AN 114-00( Al 5300 Washi 2020.25.3 00 Bus Form-F $201,225 $201,225 0127 00 D FACILI 114) 00 ngton 4.BF.2 ormula Alloc TIES BUS:SU WA-2023 PPORT E WA-34- 114-00( 5300 Washi 2021.25.3 Bus Form-F 0127 -071-01- QUIP AN 114) Al 00 ngton 4.BF.2 00 ormula Alloc $241,401 $241,401 00 D FACILI TIES BUS SU WA-2023 PPORT E WA-34- 114-00( A2 5300 Washi 2022 2J 3 Bus Form-F 0127 -071-02- QUIP AN 114) 00 ngton 4 BF 2 00 ormula Alloc $232,330 $232,330 00 D FACILI TIES BUS:SU WA-2023 PPORT E WA-34- 071-02 QUIP AN 114-00( A2 5300 Washi 2023.2J.3 00 Bus Form-F $239,364 $239,364 0127 00 D FACILI 114) 00 ngton 4.BF.2 ormula Alloc TIES Part 3: Project Information Project Title: FY2020/2021 Section 5339 (a) - Bus ITS Equipment Upgrades Project Number Temporary Project Number Date Created Start Date End Date WA-2023-071-01-00 1750-2023-2-P1 6/6/2023 8/2/2023 12/31/2023 Project Description This project includes$201,225 In FY2020 funds and $241,401 in FY2021 funds for a total of$442,626 Section 5339 (a)funding the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes 5-years of post-installation software support. Upgrades to the ITS system include items such as: - MDT/AVL system (MDT,AVL with GPS) -ADA Automated Annunciators(with GPS Service) -Transit Destination Sign Systems and Retrofit - Security Cameras -Automated passenger counting hardware -Automated passenger counting software -Vehicle and Route Performance Tracking Software Project Benefits This project will increase the connectivity and safety for passengers. Additionally, it will provide more effective information gathering to enable efficient route design and operations. Additional Information None provided. Location Description Yakima Transit operates within the City of Yakima, with one exception: Yakima Transit has one commuter route to, and from, the City of Ellensburg, WA. This commuter route travels from the Yakima airport, to Central Washington University(Ellensburg), back to the Yakima Airport through a contract with an over-the-road coach company. This commuter route is funded by a grant from Washington State DOT (WSDOT) (with non-federal funds only) Project Location (Urbanized Areas) UZA Code Area Name 530000 Washington 532520 Yakima,WA Congressional District Information State District Representative Washington 4 Dan Newhouse Program Plan Information STIP/TIP Date 6/9/2023 Description. This activity was approved in the current 2023 -2026 STIP, ID#FTA 5339, Amendment 23- 05 Federal Approval date 6/9/2023. UPWP Date: N/A Description: N/A Long Range Plan Date. N/A Description: N/A Project Control Totals Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $442,626 Local $110,657 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $553,283 Project Budget Project FTA Non-FTA Total Number Budget Item Amount Amount Eligible Quantity Amount 114- WA-2023-071- 00 BUS: SUPPORT EQUIP $442,626.00 $110,657.00 $553,283.00 1 01-00 (114- AND FACILITIES Al) REHAB/ RENOVATE -ADP SOFTWARE/ WA-2023-071- 11.44.08 HARDWARE $442,626 00 $110,657.00 $553,283.00 1 01-00 (FY 2020,2021 SECTION 5339 (a) 80/ 20) (00) Project Budget Activity Line Items Budget Activity Line Item: 11.44.08 - REHAB/RENOVATE -ADP SOFTWARE/HARDWARE(FY 2020,2021 SECTION 5339 (a) 80/20) (00) Scope Name/Code Line Line Item Name Activity Quantity Item# BUS. SUPPORT EQUIP REHAB/RENOVATE REHAB/RENOVATE BUS AND FACILITIES (114- 11.44.08 -ADP SOFTWARE SUPPORT FACIL/EQUIP 1 00) Extended Budget Description This activity line item includes$201,225 in FY 2020 and $241,401 in 2021 Section 5339 (a) small urban formula funding for the purchase and installation of software and equipment to replace the existing intelligent Transportation System (ITS), and includes post-installation software support. Upgrades to the ITS system include items such as: - MDT/AVL system (MDT,AVL with GPS) -ADA Automated Annunciators (with GPS Service) -Transit Destination Sign Systems and Retrofit - Security Cameras -Automated passenger counting hardware -Automated passenger counting software -Vehicle and Route Performance Tracking Software MATCH RATIO Federal/non-Federal match ratio is 80/20, Local match is from Local Tax Funds Estimated Useful Life: The Estimated Useful Life of the replacement system is 5-7 years STIP This activity was approved in the current 2023 -2026 STIP, ID# FTA 5339, Amendment 23-05 Federal Approval date 6/9/2023. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item. Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $442,626 Local $110,657 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $553,283 Milestone Name Est. Completion Description Date RFP/Ifb Date 8/2/2023 RFP sent out to potential contractors and listed on City site. Contract Award Date 9/25/2023 Award letter sent to winning contractor. Initial Delivery Date 10/6/2023 Hardware and software install begins. Final Delivery Date 11/30/2023 Final hardware items and software should be installed by this date. Contract Close-out 12/31/2023 Contract closeout and all final problems solved. Date/Project End Date Project Environmental Findings Finding: Class II(c) -Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws Categorical Exclusion Description Type 05.Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety, security, accessibility and effective communication within or adjacent to existing right-of-way, such as: the deployment of Intelligent Transportation Systems and components; installation and improvement of safety and communications equipment, including hazard elimination and mitigation; installation of passenger amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or upgrading to current standards. Date Description Date Class Ilc CE Approved Scope Name/ Line Item Line Item Name QuantityFTA Total Code Number Amount Eligible Cost BUS. SUPPORT REHAB/RENOVATE-ADP EQUIP AND 11.44.08 SOFTWARE/HARDWARE 1 $442,626.00 $553,283.00 FACILITIES (114- (FY 2020,2021 SECTION 00) 5339 (a) 80/20) (00) Project Title: FY2022/2023 Section 5339 (a) - Bus ITS Equipment Upgrades Project Number Temporary Project Number Date Created Start Date End Date WA-2023-071-02-00 1750-2023-2-P2 8/8/2023 8/2/2023 12/31/2023 Project Description This project includes$232,330 in FY 2022 and $239,364 in 2023 Section 5339 (a)funding the purchase and installation of software and equipment to replace the existing Intelligent Transportation System ITS), and includes 5-years of post-installation software support. Upgrades to the ITS system include items such as: - MDT/AVL system (MDT,AVL with GPS) -ADA Automated Annunciators (with GPS Service) -Transit Destination Sign Systems and Retrofit - Security Cameras -Automated passenger counting hardware -Automated passenger counting software -Vehicle and Route Performance Tracking Software Project Benefits This project will increase the connectivity and safety for passengers. Additionally, it will provide more effective information gathering to enable efficient route design and operations. Additional Information None provided. Location Description Yakima Transit operates within the City of Yakima, with one exception: Yakima Transit has one commuter route to, and from, the City of Ellensburg, WA. This commuter route travels from the Yakima airport, to Central Washington University(Ellensburg), back to the Yakima Airport through a contract with an over-the-road coach company. This commuter route is funded by a grant from Washington State DOT (WSDOT) (with non-federal funds only). Project Location (Urbanized Areas) UZA Code Area Name 530000 Washington 532520 Yakima,WA Congressional District Information State District Representative Washington 4 Dan Newhouse Program Plan Information STIP/TIP Date. 6/9/2023 Description: This activity was approved in the current 2023 -2026 STIP, ID#FTA 5339, Amendment 23- 05 Federal Approval date 6/9/2023. UPWP Date. N/A Description: N/A Long Range Plan Date: N/A Description: N/A Project Control Totals Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $471,694 Local $117,924 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $589,618 Project Budget Project FTA Non-FTA Total Number Budget Item Amount Amount Eligible Quantity Amount 114- WA-2023-071- 00 BUS: SUPPORT EQUIP $471,694.00 $117,924.00 $589,618.00 1 02-00 (114- AND FACILITIES A2) REHAB/ RENOVATE -ADP WA-2023-071- SOFTWARE 02-00 11.44 08 (FY2022/ $471,694.00 $117,924.00 $589,618.00 1 2023 Section 5339 (a) 80:20) (00) Project Budget Activity Line Items Budget Activity Line Item: 11.44.08 - REHAB/RENOVATE-ADP SOFTWARE (FY2022/2023 Section 5339 (a) 80:20) (00) Scope Name/Code Line Line Item Name Activity Quantity Item# BUS: SUPPORT EQUIP REHAB/RENOVATE REHAB/RENOVATE BUS AND FACILITIES (114- 11.44.08 -ADP SOFTWARE SUPPORT FACIL/EQUIP 1 00) Extended Budget Description This activity line item includes$232.330 in FY 2022 and $239,364 in 2023 Section 5339 (a) small urban formula funding for the purchase and installation of software and equipment to replace the existing intelligent Transportation System (ITS), and includes post-installation software support. pgrades to the ITS system include items such as: - MDT/AVL system (MDT,AVL with GPS) -ADA Automated Annunciators (with GPS Service) -Transit Destination Sign Systems and Retrofit - Security Cameras -Automated passenger counting hardware -Automated passenger counting software -Vehicle and Route Performance Tracking Software MATCH RATIO Federal/non-Federal match ratio is 80/20, Local match is from Local Tax Funds Estimated Useful Life: The estimated useful life of the replacement system is 5-7 years. STIP This activity was approved in the current 2023 -2026 STIP, ID#FTA 5339, Amendment 23-05 Federal Approval date 6/9/2023. Will 3rd Party contractors be used to fulfill this activity line item? Yes, 3rd Party Contractors will be used for this line item Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $471,694 Local $117,924 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $589,618 Milestone Name Est. Completion Description Date RFP/Ifb Date 8/2/2023 RFP sent out to potential contractors and listed on City site. Contract Award Date 9/25/2023 Award letter sent to winning contractor. Initial Delivery Date 10/6/2023 Hardware and software install begins. Final Delivery Date 11/30/2023 Final hardware items and software should be installed by this date. Contract Close-out 12/31/2023 Contract closeout and all final problems solved. Date/Project End Date Project Environmental Findings Finding: Class 11(c) -Categorical Exclusions (C-List) Class Level Description Class II(c) consists of projects that do not have a significant environmental impact on the human or natural environment and are therefore categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement. FTA requires a sufficient project description to support a CE determination. The project may require additional documentation to comply with other environmental laws Categorical Exclusion Description Type 05.Activities, including repairs, replacements, and rehabilitations, designed to promote transportation safety, security, accessibility and effective communication within or adjacent to existing right-of-way, such as the deployment of Intelligent Transportation Systems and components; installation and improvement of safety and communications equipment, including hazard elimination and mitigation; installation of passenger amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or upgrading to current standards Date Description Date Class Ilc CE Approved Scope Name/ Line Item Line Item Name Quantity FTA Total Eligible Code Number Amount Cost BUS. SUPPORT REHAB/RENOVATE-ADP EQUIP AND 11.44.08 SOFTWARE (FY2022/2023 1 $471,694.00 $589,618.00 FACILITIES (114- Section 5339 (a) 80:20) 00) (00) Part 4: Fleet Details No fleet data exists for this application. Part 5: FTA Review Comments Application Review Comments Comment By Abhishek Koirala Comment Pre-Award Manager Returns Application Type Date 7/14/2023 Comment Please see my initial review comments sent via email on 07-14-2023. Comment By Abhishek Koirala Comment Pre-Award Manager Returns Application Type Date 8/10/2023 Comment Please see my comment sent via email on 08/10/2023 Application Review Comments Comment By Christopher Macneith Comment Application Details Type Date 8/11/2023 City of Yakima must comply with all applicable Federal laws and regulations related to this project, including the ADA Standards for Transportation Facilities, based on the U. S. Access Board's ADA Accessibility Guidelines. Found here: http://www.access-board. gov/guidelines-and-standards/transportation/facilities/ada-standards-for-transportation- facilities Comment Specifically, City of Yakima must comply with the ADA Standards for Transportation Facilities in the construction/renovation for the following project: -This project includes the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes 5-years of post-installation software support. Upgrades to the ITS system include items such as - MDT/AVL system (MDT, AVL with GPS) -ADA Automated Annunciators (with GPS Service) -Transit Destination Sign Systems and Retrofit-Security Cameras- Automated passenger counting hardware-Automated passenger counting software- Vehicle and Route Performance Tracking Software The following is a non-exhaustive list of ADA standards that City of Yakima must comply with when completing this project: Requirements to Remember for ADA Compliance in Construction Projects The ADA Standards issued by the Department of Transportation (DOT) apply to facilities used by state and local governments to provide designated public transportation services, including bus stops and stations, and rail stations Other types of facilities covered by the ADA are subject to similar ADA Standards issued by the Department of Justice Both the DOT and DOJ standards are based on the United States Access Board ADA Accessibility Guidelines (ADAAG). DOT's ADA Standards (2006) are consistent with the Access Board's updated ADA and ADAAG) guidelines but includes a few additional requirements concerning: • Location of Accessible Routes (206.3) • Detectable Warnings on Curb Ramps (406.8) • Bus Boarding and Alighting Areas(810 2 2) • Rail Station Platforms (810.5.3) The complete ADA Standards for Transportation Facilities can be found at the US Access Board Website (ADA Standards for Transportation Facilities) Requirements to Remember for: Alterations or Additions to Facilities Altered or added portions of the facility must be made accessible. (DOT ADA Standard 201 and DOT ADA Regulation 49 C F.R. 37.43(a)(1).) The path of travel to the altered or added portion of the facility must be made accessible, to the maximum extent feasible (DOT ADA Regulation 49 C F.R. 37.43(a)( 2) and DOT ADA Standard 202.3.) If the path of travel cannot be made accessible, the grantee must submit to FTA an analysis demonstrating that the cost of making the path of travel accessible is disproportionate to(i e , > 20%)the cost of the alterations or additions to the primary function area (DOT ADA Standard 202.4 and DOT ADA Regulation 49 C.F.R. 37 43(e)( 1).) If the path of travel cannot be made accessible, the grantee must submit to FTA an analysis demonstrating that site-specific conditions prevent you from making the path of travel accessible. Include relevant diagrams and maps (DOT ADA Standard 202 4 and DOT ADA Regulation 49 C F.R. 37.43(b).) The information provided above is intended as technical assistance and applies only to the project as described. Should the project scope change or new information on the project be provided, FTA may require a re-evaluation of the project information as it relates to ADA and require additional information. This confirmation is not an express or implied promise of project compliance with the ADA. Part 6: Agreement UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION FEDERAL TRANSIT ADMINISTRATION GRANT AGREEMENT (FTA G-30) On the date the authorized U.S. Department of Transportation, Federal Transit Administration (FTA) official signs this Grant Agreement, FTA has obligated and awarded federal assistance as provided below. Upon execution of this Grant Agreement by the Recipient named below, the Recipient affirms this FTA Award, enters into this Grant Agreement with FTA, and binds its compliance with the terms of this Grant Agreement. The following documents are incorporated by reference and made part of this Grant Agreement: (1) "Federal Transit Administration Master Agreement," FTA MA(30), http://www.transit.dot.gov, (2)The Certifications and Assurances applicable to the FTA Award that the Recipient has selected and provided to FTA, and (3)Any Award notification containing special conditions or requirements, if issued. WHEN THE TERM "FTA AWARD" OR"AWARD" IS USED, EITHER IN THIS GRANT AGREEMENT OR THE APPLICABLE MASTER AGREEMENT, "AWARD"ALSO INCLUDES ALL TERMS AND CONDITIONS SET FORTH IN THIS GRANT AGREEMENT. FTA OR THE FEDERAL GOVERNMENT MAY WITHDRAW ITS OBLIGATION TO PROVIDE FEDERAL ASSISTANCE IF THE RECIPIENT DOES NOT EXECUTE THIS GRANT AGREEMENT WITHIN 90 DAYS FOLLOWING FTA's AWARD DATE SET FORTH HEREIN. FTA AWARD Federal Transit Administration (FTA) hereby awards a Federal Grant as follows: Recipient Information Recipient Name: CITY OF YAKIMA Recipient ID: 1750 UEI: FJNNX1XFJ9K3 DUNS: 078212651 Award Information Federal Award Identification Number: WA-2023-071-00 Award Name: FY2020-2023 Section 5339(a) Small Urban - Bus ITS Equipment Upgrades Award Start Date: 9/25/2023 Original Award End Date: 3/31/2024 Current Award End Date: 3/31/2024 Award Executive Summary: This application includes$201,225 in FY2020 funds, $241,401 in FY2021 funds, $232,330 in FY2022 funds, and $239,364 in FY2023 funds, for a total of$914,320 Section 5339 (a) small urban formula funding. The funding is for the purchase and installation of software and equipment to replace the existing Intelligent Transportation System (ITS), and includes post-installation software support. Research and Development: This award does not include research and development activities Indirect Costs This award does not include an indirect cost rate. Suballocation Funds: Recipient organization is suballocated these apportioned funds and can apply for and receive these funds directly Pre-Award Authority: This award is using Pre-Award Authority Award Budget Total Award Budget. $1,142,901.00 Amount of Federal Assistance Obligated for This FTA Action (in U.S. Dollars): $914,320.00 Amount of Non-Federal Funds Committed to This FTA Action (in U.S Dollars): $228,581.00 Total FTA Amount Awarded and Obligated (in U.S. Dollars): $914,320.00 Total Non-Federal Funds Committed to the Overall Award (in U.S. Dollars). $228,581 00 Award Budget Control Totals (The Budget includes the individual Project Budgets(Scopes and Activity Line Items) or as attached) Funding Source Section of Statute CFDA Number Amount 5339—Buses and Bus Facilities Formula 5339-1 20526 $914,320 Local $228,581 Local/In-Kind $0 State $0 State/In-Kind $0 Other Federal $0 Transportation Development Credit $0 Adjustment $0 Total Eligible Cost $1,142,901 (The Transportation Development Credits are not added to the amount of the Total Award Budget.) U.S. Department of Labor Certification of Public Transportation Employee Protective Arrangements: DOL Decision. DOL Concurs-Certified DOL Review Date: 9/25/2023 DOL Certification Date: 9/25/2023 Special Conditions There are no special conditions. FINDINGS AND DETERMINATIONS By signing this Award on behalf of FTA, I am making all the determinations and findings required by federal law and regulations before this Award may be made. FTA AWARD OF THE GRANT AGREEMENT Awarded By: Susan Fletcher Regional Administrator FEDERAL TRANSIT ADMINISTRATION U.S. DEPARTMENT OF TRANSPORTATION Contact Info. susan.fletcher@dot.gov Award Date. 9/25/2023 EXECUTION OF THE GRANT AGREEMENT Upon full execution of this Grant Agreement by the Recipient, the Effective Date will be the date FTA or the Federal Government awarded Federal assistance for this Grant Agreement. By executing this Grant Agreement, the Recipient intends to enter into a legally binding agreement in which the Recipient: (1) Affirms this FTA Award, (2) Adopts and ratifies all of the following information it has submitted to FTA. (a) Statements, (b) Representations, (c) Warranties, (d) Covenants, and (e) Materials, (3) Consents to comply with the requirements of this FTA Award, and (4) Agrees to all terms and conditions set forth in this Grant Agreement. Executed By" Alvie Maxey Transit Manager CITY OF YAKIMA 9/27/2023 CITY CONTRACT NO" -0 RESOLUTION NO, ����„!// 1 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEM ENT Item No. 8.K. For Meeting of: January 2, 2024 ITEM TITLE: Resolution authorizing a Grant Agreement with the Federal Transit Administration to provide funding assistance for Bus ITS Equipment Upgrades SUBMITTED BY: Scott Schafer, Public Works Director * Alvie Maxey, Transit Manager Gregory Story,Assistant Transit Manager- (509)576-6422 SUMMARY EXPLANATION: The Federal Transit Administration (FTA) through FTA FY2020-2023 Section 5339(a) Small Urban - Bus Intelligent Transportation System (ITS) Equipment Upgrades has awarded the City of Yakima (City) grant funding in the amount of $914,320 to be used towards the purchase and installation of software and equipment to replace Yakima Transit's existing ITS; including post- installation software support. This funding requires a 20% match from the City which equates to $228,581. In order to receive this funding, it is necessary for the City and FTA to enter into Grant Agreement WA-2023-071-00 which has been attached for City Council review. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Description Upload Date Type D Resolution 12/28/2023 Resolution ❑ Award Letter WA-2023-071-00 12/28/2023 Backup Material