Loading...
HomeMy WebLinkAboutR-2023-125 Resolution authorizing a contract with Apollo Inc for the North 1st St Phase 3 Project 2580 RESOLUTION NO. R-2023-125 A RESOLUTION authorizing an agreement with Apollo Inc for the North 1st Street Phase 3 Project 2580. WHEREAS, the City is resuming its efforts to continue the reconstruction and improvements of North 1st Street from "J"to"MLK"consisting of reconstruction and widening of the roadway, bike lanes, curb and gutter, sidewalks, curb ramps, illumination, and signals; and WHEREAS, the N 1st Street Phase 3 project received federal funding of$2,090,000 and $2,910,000, and $4,857,474; and WHEREAS, the City desires to enter into a contract with Apollo Inc to perform the construction for the North 1st Street Phase 3 project; and WHEREAS, the City of Yakima used the procedure established by Washington State law for the bidding and awarding of public capital improvement projects; and WHEREAS, Apollo Inc was determined to be qualified to perform the needed construction work; and WHEREAS, the contract will be null and void if bond, certificate, and required insurance certificate and endorsement are not received within specified timeframe; and WHEREAS, the Scope of Work and Budget included in this contract meets the needs and requirements of the City of Yakima for this project; and WHEREAS, the City Council of the City of Yakima finds that entering into the contract with Apollo Inc for construction on the North 1st Street Phase 3 project is in the best interests of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute a contract with Apollo Inc, attached hereto and incorporated herein by this reference, not to exceed Ten Million Two Hundred Four- Seven Thousand Five Hundred Eighty-Four Dollars and Thirty-Nine Cents ($10,247,584.39) to provide construction services outlined in the contract. ADOPTED BY THE CITY COUNCIL this 19th day of September, 2023. 0 Janice De cio, Mayor ATTEST: =yPKtM4 N r 'i to gS Rosalinda Ibarra, City Cler,�� Hi Gco' CONTRACT} THIS AGREEMENT, made and entered in triplicate,this 1"1 day of & !20'23, by and between the City of Yakima , hereinafter called the Owner, and Apollo, Inc. a Washington Corporation, hereinafter called the Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows. I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $ 10,247,584.39 , for NORTH 1ST STREET REVITALIZATION PHASE 3, City of Yakima Project No. 2580, all in accordance with,and as described in the attached plans and specifications and the 2023 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof. Contract time shall begin on the first working day following the Notice to Proceed Date and shall be completed in three hundred forty(340)working days. If work has not commenced within the ten(10)days after the notice to proceed, the first chargeable working day shall be the eleventh (11th)working day after the date on which the City issues the Notice to Proceed. If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified in the Standard Specifications for each day said work remains uncompleted after expiration of the specified time, as liquidated damages. The Contractors shall provide and bear the expense of all equipment;work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima . II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III. INDEMNIFICATION. Contractor agrees to release, indemnify, defend, and hold harmless the City, its elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys, and volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration actions, investigations,and regulatory or other governmental proceedings arising from or in connection with this Contract or the acts,failures to act, errors or omissions of the Contractor, or any of Contractor's agents or subcontractors, in performance of this Contract, except for claims caused by the City's sole negligence. The City's right to indemnification includes attorney's fees and costs associated with establishing the right to indemnification hereunder in favor of the City. IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract, except as expressly provided herein. G\PROJECTS\2021\21061E\Spec\21061\21061 Spec docx 4-2 IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written. Countersigned: CITY OF YAKIMA CONTRACTOR this f 20 a.�J Apollo, Inc. ,a Corporation Co ctor By kt City an g K1Mq�y,, Attest: �yP h. / 4,/ 9C 4 (Print Name) `it l G * • • . too City Clerk 5 i •C AL ; # / • J �/i[._ // I/67 a • �tsr �f1� ...•*� Z�te (President,Owner,etc.) ,11- ,,"`NG�O ddress• 1133 W. Columbia Drive .��22 (� Kennewick,WA 99336 CITY CONTRACT NO' dpi`��q—'`2 U^ RESOLUTION NO' � gy7—i_S G\PROJECTS\2021\21061E\Spec\21061\21061 Spec docx 4-3 CONTRACT BOND CITY OF YAKIMA Bond No. 30200991 NORTH 1ST STREET REVITALIZATION PHASE 3 FED AID NO. NHFP-4579(013) TIB PROJECT NO. 8-4-180(025)-1 CITY OF YAKIMA PROJECT NO. 2580 HLA PROJECT NO. 21061 BOND TO CITY OF YAKIMA KNOW ALL PERSONS BY THESE PRESENTS: That we, the undersigned, Apollo, Inc. as principal, and Western Surety Company a corporation organized and existing under the laws of the State of SD , as a Surety corporation,and qualified under the laws of the State of Washington to become Surety upon bonds of contractors with municipal corporations, as Surety, are jointly and severally held and firmly bound to the City of Yakima in the penal sum of$ 10,247,584.39 for the payment of which sum we bind ourselves and our successors, heirs, administrators, or personal representatives, as the case may be This obligation is entered into in pursuance of the statutes of the State of Washington and the Ordinances of the City of Yakima. Dated at Kennewick , Washington, this 19th day of September , 2023 Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to action of the City of Yakima,on September 19 ,2023,the City Manager of said City of Yakima, has let or is about to let to the said Apollo. Inc. , the above bounden Principal, a certain Contract,the said Contract being numbered HLA Project No.21061,and providing for the construction of NORTH 1ST STREET REVITALIZATION PHASE 3 which Contract is referred to herein and is made a part hereof as though attached hereto, and WHEREAS, the said Principal has accepted, or is about to accept, the said Contract, and undertake to perform the work therein provided for in the manner and within the time set forth; NOW, THEREFORE, if the said Apollo, Inc. shall faithfully perform all the provisions of said Contract in the manner and within the time therein set forth, or within such extensions of time as may be granted under said Contract, and shall pay all laborers, mechanics, sub- contractors and material men and all industrial insurance premiums,and all persons who shall supply said princi- pal or subcontractors with provisions and supplies for the carrying on of said work, and shall indemnify and hold the City of Yakima harmless from any damage or expense by reason of failure of performance as specified in said Contract,then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. G\PROJECTS\2021\21061E\Spec\21061\21061 Spec docx 4-5 CITY OF YAKIMA NORTH 1ST STREET REVITALIZATION PHASE 3 FED AID NO. NHFP-4579(013) TIB PROJECT NO. 8-4-180(025)-1 CITY OF YAKIMA PROJECT NO 2580 HLA PROJECT NO. 21061 SURETY Western Surety Company CONTRACTOR. 41 By����lu ISM My Apollo, Inc � (Attorney-in-face V CONTRACTOR NAME Name: Lori McKimmy, Attorney-in-Fact By: l J ¢¢ akt--De (Please Print or Type) AUTHORI4)i OFFICIAL'S SIGNATURE L Agent: Kenneth J. Frick Name: ci9ic SG� 1 C�C�t/'Or�,(�� (Please Print or Type) Address: 112 South Fourth Street Yakima, WA 98901 vfonwr 4/Surety Representative Name: •' 04 ' ,,O,i 4 Gabriel Longoria E tab; £A Surety Representative Phone ic1 O 60 am 206-799-4072 Surety Representative Email gabnel longoria@cna corn pp ved as to Form. Ci Attorney G WRO•ECTSt2021\21061E\Spec\21061121061 Spec docx 4-6 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Donna S Martinez, Rod Lewis, Kenneth J Frick, Lori McKimmy, Individually of Yakima,WA,its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bmd it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney,pursuant to the authority hereby given,are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof,duly adopted,as indicated,by the shareholders of the corporation. In Witness Whereof,WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 21 st day of July,2022. 0.„siaiT"y WESTERN SURETY COMPANY oiV l O- 7/9 "w „ "° _746:2,77aul T Bruflat,Vice President State of South Dakota ) Jj ss County of Minnehaha On this 21st day of July,2022,before me personally came Paul T.Bruflat,to me known,who,being by me duly sworn,did depose and say that he resides in the City of Sioux Falls,State of South Dakota;that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said corporation. My commission expires M.BENT J E NOTABY PUBLIC SEAL s 112. . March 2,2026 SOUTH DAKOTA M.Bent,Notary Public CERTIFICATE I,L.Nelson,Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this 19th day of September,2023 tte,SuaET.P> WESTERN SURETY COMPANY 64 1 D^ = ;2z 4. L Nelson,Assistant Secretary Form F4280-7-20I2 Go to www.cnasurety.com >Owner/Obligee Services>Validate Bond Coverage,if you want to verify bond authenticity. Authorizing By-Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President,any Vice President,Secretary,any Assistant Secretary,or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds,policies,or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds,policies,undertakings,Powers of Attorney or other obligations ofthe corporation. The signature of any such officer and the corporate seal may be printed by facsimile. 1 F:dk l; �...: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.E. For Meeting of: September 19, 2023 ITEM TITLE: Resolution authorizing a contract with Apollo Inc for the North 1st St Phase 3 Project 2580 SUBMITTED BY: Scott Schafer, Director of Public Works * Bill Preston, PE, City Engineer(509) 576-6754 SUMMARY EXPLANATION: The City of Yakima's N 1st Street Phase 3 project #2580 includes the reconstruction of N 1st Street between MLK Blvd and "J" Street. The project includes excavation, surfacing, sidewalk, curb and gutter, storm drainage improvements, domestic water, landscaping, and irrigation work. The City used the procedure established by Washington State law for the bidding and awarding of public capital improvement projects with Apollo Inc being selected to provide construction on the projects in the amount not to exceed $10,247,584.39. The Agreement has been attached for City Council review. The project is funded with Federal NHFP and NHPP funds, Transportation Improvement Board funds, and Transportation Benefit District funds. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Description Upload Date Type ❑ Resolution 9/11/2023 Resolution 0 Contract 9/15/2023 Cotter Memo Change Order ),-1 City of Yakima Change Order Number 01 North First Street Revitalization Phase 3 Change Order Date 4/17/2024 Project: ^ (Name) 9 (Number) Fed Aid No. NHFP-4579(013)-HLA No 21061C Contract Number City of Yakima No. 2580 To: (Contractor) T September 25,2023 IB Project No.: 8 4 180(E025) i Contract Date Apollo, Inc. 1133 W Columbia Drive Kennewick,WA 99336 L J You are directed to make the following changes in this Contract: Lincoln Avenue Signal Pole Revisions Add Item No. 110-CO#1 SCH A-Lincoln Avenue Signal Pole Revisions-1 LS @$76,992.00 All related work shall be completed in accordance with the Standard Specifications,plans,specifications, and addenda Change Order Justification. This change order is being executed as requested by the City of Yakima's traffic signal division. The current location of the signal pole has resulted in a significant number of collisions by vehicles while turning at this corner. The relocation will create more space between the pole and traveling roadway. The contractor was asked to provide a cost proposal for the completion of this work. The Engineer reviewed the cost proposal and found it to be reasonable and necessary for the safety of the traveling public. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,induding any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 0.00 The Contract Sum prior to this Change Order $ 10,247,584.39 The Contract Sum will be: ® Increased 0 Decreased 0 Unchanged by this Change Order $ 76,992.70 The New Contract Sum including this Change Order will be $10,324,577.094.97324 .6.39 The Contract Time will be: NI Increased 0 Decreased 0 Unchanged by 4 working days The New Contract Time will be 344 working days Cont�c or ���777 Approval Recommended Approval Recom ed may/ Terry D.Ala^teteri,P t Engl r Scott Schaffer,Public By Tide / \\4. Date Date � Apollo, Inc. /J j / y / 7 t/ Bill Pressor dy Engineer/� Approved Date �1 ` Z l / Dave Zabell,Interim City Manager (f /21 By Date Date Based on Original to: ❑Contractor Copies to: ❑Region 0 Construction Administrator DOT Form 570-001 EF ❑OSC Accounting 0 City Engineering Revised 08/2021 CITY CONTRACT NO: 2023— (0 D RESOLUTION NO: 2023 - 2-S Change Order -1 City of Yakima ° �!�!!'° Change Order Number 02 North First Street Revitalization Phase 3 Change Order Date 4/17/2024 Project: (Name) 9 (Number) Fed Aid No.. NHFP-4579(013)-HLA No.21061C Contract Number City of Yakima No 2580 To: (Contractor) TIB Project No.: 8 4 180(025) 1 Contract Date September 25, 2023 Apollo, Inc 1133 W. Columbia Drive Kennewick,WA 99336 L J You are directed to make the following changes in this Contract: Box Culvert Removal at H Street and Unknown Encased Pipe Exploration Add Item No 111 -CO#2 SCH A-Box Culvert Removal at H Street and Unknown Encased Pipe Exploration 1 FA @$120,000.00 All related work shall be completed in accordance with the Standard Specifications, plans, specifications,and addenda and will be paid by force account. This change order is being executed to compensate the contractor for additional efforts which became necessary due to the discovery of a large box culvert and encased pipe within the roadway. While excavating for the installation of water services,these unknown obstructions were encountered. The City directed the contractor to proceed with the removal of the obstructions and the work was quantified utilizing the force account provisions of the contract. The first half of the obstructions were addressed and this change order allows for the second half to be removed later in the project when the contractor is working on the other side of the road. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,induding any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 76,992.70 76;992:00 The Contract Sum prior to this Change Order $10,324,577.091-0324,576.39 The Contract Sum will be: ® Increased 0 Decreased 0 Unchanged by this Change Order $ 120,000.00 The New Contract Sum including this Change Order will be $10,444,577.09 105444,576,3g The Contract Time will be: ® Increased 0 Decreased 0 Unchanged by 15 working days The New Contract Time will be 359 working days Contractor�G/v, Approval Recommended Approval Recom d Terry D.Ala eteri,PE,Pro' t Engine r -A Sc:: ' Schaffer Public W s Directo By ` ` By Te C�//� Apollo, Inc. 7i Ap Date / 6 C f/ 7/0 Bill Preston,C.y Engineer DavvepZroetY I tteenm City a'g r By G /// By Date //z'T Date Based on Original to: ❑Contractor Copies to: 0 Region ❑Construction Administrator DOT Forth 570-001 eF ❑OSC Accounting ❑City Engineering Revised 08/2021 CITY CONTRACT NO:20 _1(p RESOLUTION NO:1o^3-125 Change Order )1 19 City of Yakima 03 Change Order Number Project: (Name) North First Street Revitalization Phase 3 Change Order Date 4/17/2024 (Number) Fed Aid No.. NHFP-4579(013)-HLA No. 21061C Contract Number City of Yakima No. 2580 To: (Contractor) TIB Project No.:8 4 180(025) 1 Contract Date September 25,2023 Apollo, Inc. 1133 W. Columbia Drive Kennewick,WA 99336 L J You are directed to make the following changes in this Contract: Unlocated Fiber Line Repairs Add Item No. 112-CO#3 SCH A-Unlocated Fiber Line Repairs- 1 FA @$75,000.00 All related work shall be completed in accordance with the Standard Specifications, plans, specifications, and addenda and will be paid by force account. This change order became necessary due to an unlocated fiber line which was encountered during construction. When excavated,as directed by the City,the line was found to be serving the fire station on N. 1st Street,which consequently disabled communication services. The contractor performed emergency repairs of the fiber line to restore service. Work was tracked and quantified utilizing the force account provisions of the contract. This change order allows for the necessary lowering of conduits and new fiber connection across 1st Street to the Fire Dept. which will take place later in the project. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,including any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 196,992.70 496;002.00 The Contract Sum prior to this Change Order $10,444,577.091.p,44.4 57-639 The Contract Sum will be: Ills Increased ❑ Decreased 0 Unchanged by this Change Order $ 75,000.00 The New Contract Sum including this Change Order will be $10,519,577.09.0,444576,39 The Contract Time will be: fi Increased 0 Decreased 0 Unchanged by 15 working days The New Contract Time will be 374 working days Contra ? Approval Recommended Approva Rec m •e •d By Byrry D.Ala eterl,PE,Pro' ngineer Scott Schaffer, \�\ Title / A` Cy�� Date 41//7/ Date 5 /12y Apollo, Inc. Date ( /( 7` Bill Preston,City Engineer Approved Dave Z ell.Interim Cit an By By Date yj�'t Date 31'1,Vi Based on original to. 0 Contractor Copies to: 0 Region 0 Construction Administrator DOT Fa,,,570-001 EF 0 OSC Accounting ❑City Engineering Revised 08/2021 CITY CONTRACT NO: 7Q 23 - 1D RESOLUTION NO: 2.0�'3 — I2.q Change Order City of Yakima Change Order Number 01 North First Street Revitalization Phase 3 Change Order Date 4/17/2024 Project: (Name) 9 (Number) Fed Aid No NHFP-4579(013)-HLA No.21061C Contract Number City of Yakima No 2580 To: (Contractor) TIBProject No.:8 4 180(025) 1 Contract Date September 25,2023 Apollo, Inc. 1133 W.Columbia Drive Kennewick,WA 99336 L I You are directed to make the following changes in this Contract: Lincoln Avenue Signal Pole Revisions Add Item No. 110-CO#1 SCH A-Lincoln Avenue Signal Pole Revisions-1 LS @$76,992.00 All related work shall be completed in accordance with the Standard Specifications,plans,specifications, and addenda Change Order Justification. This change order is being executed as requested by the City of Yakima's traffic signal division. The current location of the signal pole has resulted in a significant number of collisions by vehicles while turning at this corner. The relocation will create more space between the pole and traveling roadway. The contractor was asked to provide a cost proposal for the completion of this work. The Engineer reviewed the cost proposal and found it to be reasonable and necessary for the safety of the traveling public. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,induding any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 0.00 The Contract Sum prior to this Change Order $ 10,247,584.39 The Contract Sum will be: II Increased 0 Decreased 0 Unchanged by this Change Order $ 76,992.70 The New Contract Sum including this Change Order will be $10,324,577.09a4:i,32.4,.r7,6r39 The Contract Time will be: M Increased 0 Decreased 0 Unchanged by 4 working days The New Contract Time will be 344 working days Contor Approval Recommended Approval Recom ed Terry D.Al,teteri,P t Engl r Scoff Schaffer,Public By By 44 By \\4 Tide n Date Apollo, Inc. Date Y / Bill Presto ity Engineer/� Approved Date �1 ' /� / Dave Zabell,Interim City Manager (� ��/z1 By Date Date Based on Original to: ❑Contractor Copies to: 0 Region 0 Construction Administrator DOT Fom,570.001 FF ❑OSC Accounting 0 City Engineering Revised 08/2021 CITY CONTRACT NO: 2023— (00 RESOLUTION NO: 2023 - ZS Change Order ( ;` City of Yakima NolOr Change Order Number 02 Project: (Name) North First Street Revitalization Phase 3 Change Order Date 4/17/2024 (Number) Fed Aid No. NHFP-4579(013)-HLA No.21061C Contract Number City of Yakima No 2580 To: (Contractor) rTIB Project No.:8 4 180(025) 1 Contract Date September 25, 2023 Apollo, Inc. 1133 W. Columbia Drive Kennewick,WA 99336 L J You are directed to make the following changes in this Contract: Box Culvert Removal at H Street and Unknown Encased Pipe Exploration Add Item No. 111 -CO#2 SCH A-Box Culvert Removal at H Street and Unknown Encased Pipe Exploration 1 FA @$120,000 00 All related work shall be completed in accordance with the Standard Specifications, plans, specifications,and addenda and will be paid by force account. This change order is being executed to compensate the contractor for additional efforts which became necessary due to the discovery of a large box culvert and encased pipe within the roadway. While excavating for the installation of water services,these unknown obstructions were encountered. The City directed the contractor to proceed with the removal of the obstructions and the work was quantified utilizing the force account provisions of the contract. The first half of the obstructions were addressed and this change order allows for the second half to be removed later in the project when the contractor is working on the other side of the road. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,induding any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 76,992.70 76;992.00 The Contract Sum prior to this Change Order $10,324,577.09 10-324,576.39 The Contract Sum will be: ® Increased 0 Decreased 0 Unchanged by this Change Order $ 120,000.00 The New Contract Sum including this Change Order will be $10,444,577 09 10 444,57639 The Contract Time will be: ® Increased 0 Decreased 0 Unchanged by 15 working days The New Contract Time will be 359 working days Contractors, i i Approval Recommended Approval Recom d /I��v� Terry D.Ala eteri,PE,Pro' t Engin r Scott Schaffer,Public w s Directs By Title / M By By Date Z Date Apollo, Inc. �/ Bill Preston,C.y Engineer Approved Date ����Z/Z 7 � � Dave Ziferim City Aar' By jjj By Date `//y/ Date .5 -+' Based on Original to: 0 Contractor Copies to: 0 Region ❑Construction Administrator COT Farm s70-001 EF ❑OSC Accounting ❑City Engineering Revised 08/2021 2 CITY CONTRACT NO:20 _1c,a b RESOLUTION NO:1023—115 ... ' " Change Order i �l City of Yakima Change Order Number 03 North First Street Revitalization Phase 3 Change Order Date 4/17/2024 Project: (Name) 9 (Number) Fed Aid No.. NHFP-4579(013)-HLA No 21061C Contract Number City of Yakima No. 2580 To: (Contractor) TIBTI Project No.:8 4 180(025) 1 Contract Date September 25,2023 Apollo, Inc. 1133 W Columbia Drive Kennewick,WA 99336 L J You are directed to make the following changes in this Contract: Unlocated Fiber Line Repairs Add Item No. 112-CO#3 SCH A-Unlocated Fiber Line Repairs- 1 FA @$75,000.00 All related work shall be completed in accordance with the Standard Specifications, plans, specifications, and addenda and will be paid by force account. This change order became necessary due to an unlocated fiber line which was encountered during construction. When excavated,as directed by the City,the line was found to be serving the fire station on N. 1st Street,which consequently disabled communication services. The contractor performed emergency repairs of the fiber line to restore service. Work was tracked and quantified utilizing the force account provisions of the contract. This change order allows for the necessary lowering of conduits and new fiber connection across 1st Street to the Fire Dept. which will take place later in the project. Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,induding any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 10,247,584.39 Net change by previous Change Orders $ 196,992.70 496,092.00 The Contract Sum prior to this Change Order $10,444,577.0910444;678,ag The Contract Sum will be: Ili Increased 0 Decreased 0 Unchanged by this Change Order $ 75,000.00 The New Contract Sum including this Change Order will be $10,519,577.094.0,444 7$.. The Contract Time will be: I Increased 0 Decreased 0 Unchanged by 15 working days The New Contract Time will be 374 working days Contra7 ? Approval Recommended Approva Rec.m •e •d Terry D.Al etert,PE,Pro ngineer Scott Schaffer, •_' By 11 By Cyr 1 t--By Tide / e�I / 5 / �r Date 7�/7/ Date /`Y Apollo, Inc. ll[ Bit Preston,City Engineer Approved Date /� �(?' G ) Dave Z eft.Interim Cif ana By �v By Date 7///2./ r Date J1,"L1, 031i Basedon Original to• 0 Contractor Copies to: 0 Region 0 Construction Administrator DOT Form 5700211 EF El OSC Accounting 0 City Engineering Revised 00 CITY CONTRACT NO: 2a 9-3 -1( RESOLUTION NO: 20IS — 12-c