Loading...
HomeMy WebLinkAboutR-2023-115 Resolution adopting Yakima Transit's Transit Development Plan for 2023-2028 and Annual Report for 2022 RESOLUTION NO. R-2023-115 A RESOLUTION adopting Yakima Transit's Development Plan for 2023-2028 and annual report for 2022. WHEREAS, Yakima Transit is required, under RCW §35.58.2795, to prepare a Six-Year Transit Development Plan for the calendar year and the ensuing five years annually, consistent with the comprehensive plan required under the Growth Management Act; and WHEREAS, the Transit Development Plan 2023-2028, and 2022 Annual Report provides updated information to the Washington State Department of Transportation (WSDOT) on development of the various transit components undertaken by Yakima Transit and contains Yakima Transit's short-range and long-range priorities for public transportation, capital improvements, and significant operating changes planned for the system during that period; and WHEREAS, this document is used by WSDOT to prepare an annual report for the Washington State legislature summarizing the status of public transportation systems in the State; and WHEREAS, it is in the City's best interests to adopt the Transit Development Plan 2023- 2028 and 2022 Annual Report; and WHEREAS, On July 12, 2023, an open-record public hearing was held. No comments were received during the public hearing or by mail, now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: Yakima Transit's Transit Development Plan 2023-2028 and 2022 Annual Report are hereby approved and adopted for implementation, as of the date of this resolution's enactment by The Yakima City Council. ADOPTED BY THE CITY COUNCIL this 5th day of September, 2023. Janice Deccio, Mayor ATTEST: yFrA'� Rosalinda Ibarra, City Clerk kz.,) 1 .. a, ____,) BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.E. For Meeting of: September 5, 2023 ITEM TITLE: Resolution adopting Yakima Transit's Transit Development Plan for 2023-2028 and Annual Report for 2022 SUBMITTED BY: Scott Schafer, Public Works Director *Alvie Maxey, Transit Manager, 576-6415 Gregory Story,Assistant Transit Manager, 576-6422 SUMMARY EXPLANATION: Yakima Transit is required under RCW 35.58.2795 to prepare a Six-Year Transit Development Plan (Six-Year Plan)for the current calendar year and the ensuing five years annually. The annual plan is mandated to receive state and federal grant funding. The Six-Year Plan must be consistent with comprehensive plans adopted by counties, cities, and towns and is required to contain information as to how the municipality intends to meet state and local long-range priorities for public transportation, capital improvements, significant operating changes planned for the system, and how Yakima Transit intends to fund plan needs. The Six- Year Transit Development Plan is reviewed and updated each year and is used as a guide in planning Transit programs and capital projects. The Six-Year Plan must specifically set forth projects of regional significance for inclusion in the Transportation Improvement Plan within that region. In developing the Plan, Yakima Transit must also consider policy recommendations affecting public transportation contained in the State Transportation Policy Plan approved by the State Transportation Commission. ITEM BUDGETED: NA STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution. ATTACHMENTS: 2 Description Upload Date Type D Resolution TDP 8/21/2023 Resolution D Transit Dewlopment Plan 2023 7/27/2023 Backup Material D Public Hearing Notice 7/27/2023 Backup Material D Public Meeting Minutes 2023 7/27/2023 Backup Material 3 RESOLUTION NO. R-2023- A RESOLUTION Adopting Yakima Transit's Development Plan for 2023-2028 and annual report for 2022 WHEREAS, Yakima Transit is required, under RCW§35.58.2795, to prepare a Six-Year Transit Development Plan for the calendar year and the ensuing five years annually, consistent with the comprehensive plan required under the Growth Management Act; and WHEREAS, the Transit Development Plan 2023-2028, and 2022 Annual Report provides updated information to the Washington State Department of Transportation (WSDOT) on development of the various transit components undertaken by Yakima Transit and contains Yakima Transit's short-range and long-range priorities for public transportation, capital improvements, and significant operating changes planned for the system during that period; and WHEREAS, this document is used by WSDOT to prepare an annual report for the Washington State legislature summarizing the status of public transportation systems in the State; and WHEREAS, it is in the City's best interests to adopt the Transit Development Plan 2023- 2028 and 2022 Annual Report; and WHEREAS, On July 12, 2023, an open-record public hearing was held. No comments were received during the public hearing or by mail, now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: Yakima Transit's Transit Development Plan 2023-2028 and 2022 Annual Report are hereby approved and adopted for implementation, as of the date of this resolution's enactment by The Yakima City Council. ADOPTED BY THE CITY COUNCIL this 5th day of September, 2023. Janice Deccio, Mayor ATTEST: Rosalinda Ibarra, City Clerk 4 Yakima Transit Transit Development Plan • Yakima &2ir 4e, Tor Vac! Annual Report for 2022 And Six-Year Plan 2023-2028 Reported Annually Adopted by the Yakima City Council: Resolution 1 7zb Annual Report for 2022 &Transit Development Plan 2023—2028 5 Table of Contents Sec. Title Page Introduction 3 I. Organization 3 II. Physical Plant 5 III. Transportation Service 5 IV. Short&Long-Range Public Transportation Operating &Capital Improvement Projects 7 V. Community Enhancement Connections 9 VI. Program Funding 10 VII. Significant Operating &Capital Changes, 2022-2023 13 VIII. Summary 14 Appendix A: Operating Financial Data, 2022-2023 15 Appendix B: Public Hearing Notice 17 Appendix C: Six-Year Transit Improvement Plan -Project List 18 Appendix D: Service Data by Mode 19 Appendix E: Fixed-Route Map (Yakima) 21 Appendix£ Commuter Map (Ellensburg) 23 Appendix G: Other Service Data by Jurisdiction 24 Acknowledgements YAKIMA TRANSIT CITY OF YAKIMA Alvie Maxey, Transit Manager Scott Schafer, Public Works Director Greg Story,Assistant Transit Manager 2 1 -z Annual Report for 2022 & Transit Development Plan 2023—2028 6 INTRODUCTION The Transit Development Plan 2023-2028 and 2022 Annual Report provides updated information to the Washington State Department of Transportation(WSDOT) on development of public transportation components undertaken by Yakima Transit and includes Yakima Transit's 2022 accomplishments and proposed action strategies for 2023 to 2028. Under RCW § 35.58.2795,Yakima is required to prepare a Six-Year Transit Development Plan and annual report and submit it to WSDOT. WSDOT uses this document to prepare an annual report for the Washington State Legislature summarizing the status of State public transportation systems. The document is also used to notify the public about completed, current, or planned projects. In order for this document to be effective,the Yakima City Council must approve the document following a public hearing. This plan is required to be updated each year in order for Yakima Transit to fully inform the Federal Transit Administration,Washington State Department of Transportation,Yakima City Council, and the Public of projects that have been undertaken and are planned to be undertaken. Because this is a plan,not every project will be completed when planned in the document and some projects may never be started as a result of changed conditions or other factors. SECTION I: ORGANIZATION History In 1907,the City of Yakima's public transportation originated with a steel-rail streetcar system. The Yakima Valley Transportation Company operated the first transit service. Motorized buses were introduced in 1924 as a supplement to the rail streetcar routes. The City's all-electric streetcars were discontinued in 1947 when the services offered switched to an all-motor bus system. In 1957, a private provider began operating the bus system. The private provider discontinued service in 1966 and for four months no public transportation services were operated in the City of Yakima. In the fall of 1966, Yakima citizens voted to approve the State's first household tax to financially support a public transit system and public transit services were re-established under contract with a private provider. In October 1970,the City purchased the assets of the financially-troubled private provider and continued transit services as a City-owned and operated public transit system. In November 1980,Yakima citizens approved a 0.3%transit sales tax that replaced the City's household tax as the transit system's method of financial support. Currently,the Federal Transit Administration classifies Yakima Transit as a small urbanized transit system serving a population between 50,000 and 200,000 people. Yakima Transit's services include Fixed-route, Paratransit(Dial-A-Ride), and Commuter bus service between Yakima and Ellensburg. As a result of the American's with Disabilities Act, Dial-A-Ride services were added in 1992. The Yakima-Ellensburg Commuter started at the end of November 2011,to provide transportation services for faculty, staff, and students traveling to either the Yakima Valley Community College or Central Washington University. Those schools account for approximately 70%of Commuter ridership. In June 2014,Yakima Transit took the main partnership role in making sure the program is operated to meet partnership and community needs. Organizational Structure The Yakima City Council is ultimately responsible for Yakima Transit's operations. Several management layers help control Transit activities &programs including the City Manager, Public Works Director, Transit Manager and the Assistant Transit Manager. The City Manager and Public Works Director report 3 r:tir: Annual Report for 2022 & Transit Development Plan 2023—2028 7 back to the City Council on Transit activities and address Transit policies and finances. The Transit Manager oversees the daily operational activities of the Transit System,which is overseen by the Public Works Director and City Manager. As of December 31, 2022,Yakima Transit directly employed 57 employees in Administration, Fixed route, Paratransit, and Vanpool services. Transit staff positions are generally frontline positions. Yakima Transit A DivesIad or the City of Yakima Organizational Chart City Council D ELO Officer 1 City Manager ELO Officer Accounting, Purchasing, Police, FIR,Legal,IT,Etc Safety Officer Public Works Director Fleet&Facility Mgr Cihen's Advisory Committee Transit Manager Assistant Transit Manager Fixed Route Operations Supervisors(3) Specialist(11 Maintenance intenance Community Crew Leader(1) Transportation Coordinator(1) Operators(A3) h Service Workers(2) DA Ik(2) vehicle Cleaners(2) Office Assistant(t) F- ev Ji,'2 I Yakima Transit pays for various administrative services through the City of Yakima including Legal, Human Resources,Vehicle Maintenance, Purchasing, Information Technology, and Financial Services. 4 / 4"1- z Annual Report for 2022 & Transit Development Plan 2023—2028 8 Yakima Transit also contracts with private organizations for Paratransit&Commuter services. Medstar LLC, operates the Dial-A-Ride service and in 2022 employed approximately 38 employees consisting of an Office Manager, Dispatchers, Schedulers, Drivers,Vehicle Cleaners, and Mechanics. In 2022,A&A Motor coach operated the Yakima-Ellensburg Commuter,employing up to eight Drivers, a Supervisor, and a Maintenance person. Residents can address their Transit concerns directly to the City Council Members during any regularly scheduled Council meeting. The City Council also solicits public comments on transit specific issues during the review and adoption of the City's annual budget and Transit Development Plan. All City Council meetings and budget review meetings are broadcast live on local television and taped for rebroadcast online for those unable to attend the actual session. A Citizen's Advisory Committee meets quarterly and consists of members of the community with an interest in Transit,as well as individuals who use Transit on a daily basis. The group is updated on Yakima Transit's projects and goals. They are asked to provide input on proposed projects,give public and system user comments on services they would like to see in the system, and comment on future services Yakima Transit could provide. Community participation helps Yakima Transit address passenger concerns. SECTION II: PHYSICAL PLANT LOCATIONS Yakima Transit's administrative and operations offices are located at 2301 Fruitvale Boulevard.Yakima Transit's Human Resources, Legal, &Financial services are provided by the City of Yakima either at the Public Works Facility, City Hall, or the Legal Center. Yakima Transit has a Transit Center in the Downtown Yakima core at 4th Street and Walnut. Yakima Transit provides three park and ride lots throughout Yakima at the following locations: Yakima Public Works Facility at 2301 Fruitvale Blvd; Chesterly Park at 40th Avenue and Powerhouse Road; and the City of Yakima Information Center at Fair Avenue and Lincoln. SECTION III: TRANSPORTATION SERVICE Services During 2022,Yakima Transit served the City of Yakima with Fixed-Route, Paratransit,and Commuter services to Ellensburg with the Yakima-Ellensburg Commuter. (Maps at Appx E and F)Yakima Transit also promotes sidewalks,pathways, and bicycle routes.Yakima Transit provides the following connections to rail, air,and other fixed-route services: Union Gap Transit, Selah Transit,and the Community Connector(Lower Valley service). Fixed Route During 2022,Yakima Transit operated Fixed-route bus service along ten different routes that operate between the hours of 6:00am and 7:00pm within the City of Yakima: • 10 routes Monday -Friday(6:00am -7:00pm); • 10 routes on Saturdays (8:45am -6:00pm); and, • 7 routes on Sundays (8:00am-4:00pm). Weekday routes are operated on one hour and half-hour basis on most routes. Saturday& Sunday routes are operated on an hourly basis.Yakima Transit's system map, as illustrated in the Appendix E,depicts 5z Annual Report for 2022 & Transit Development Plan 2023—2028 9 the 2023 fixed routes. Over the next six years, some routes may be cut,modified, or discontinued to maintain or expand more efficient routes. Yakima Transit is continuously striving to provide an updated fleet for its passengers. Six diesel powered buses were placed on order in late 2021 with delivery in early 2023 and then two more from Gillig at the end of 2023. Future buses may potentially consist of electric or other alternative fuels meeting the State of Washington's alternative fuels regulations,if this is the most feasible option. Expansion routes outside of Yakima Transit's jurisdiction require service demand and funding support from either the State, Federal, or local jurisdictions (other than the City of Yakima). Paratransit (Dial A Ride) In 2022,Yakima Transit provided paratransit services in the City of Yakima. Dial-A-Ride services were available during the same operating schedule as fixed-route services. Under contract with Medstar, LLC, complementary paratransit services were available to residents,who qualify for service under the provisions of the Americans with Disabilities Act. Paratransit services are provided door-to-door to eligible clients and serves the areas within the city limits of Yakima and some trips into the city of Union Gap and Selah. Contractor costs at the end of 2022 were around$2.07 million for the year.Yakima Transit does not anticipate any major changes to the paratransit area of operation,except as it relates to any expansion of the fixed-route program and replacing vehicles.Yakima Transit will be exploring and researching the possibility of bringing the Paratransit program in-house in the future instead of having a contracted service. Park& Ride Lots Yakima Transit provides service to five park&ride lots: Chesterly Park at North 40th Ave and River Road, Gateway Center along Fair Avenue at I-82,the Public Works Facility at N. 23rd Avenue and Fruitvale Boulevard. The Yakima-Ellensburg Commuter utilizes the Firing Center Park&Ride Lot (Selah)and the Park&Ride lot located next to the Selah Civic Center in downtown Selah. School Service Yakima Transit provides weekday non-exclusive transportation service to Elementary, Middle, and High Schools. The School Districts do not provide transportation services for students who live within a mile of the school;however,the school district purchases youth passes for the students to use. In 2022, School District passes accounted for 14%of fixed-route fares(total youth fares accounted for 27%). School district passes are not discounted before that point. These routes run along the same route as normal routes and are generally filled up with more than 50-70 students boarding either before or after school. The school runs have the highest ridership per hour of all fixed-route runs and were initially setup because regular route buses were overcrowded making it difficult for other passengers to use the service either before or after school hours. Multimodal Connections Yakima Transit provides service to the following public transportation facilities/connections: • Greyhound Bus Terminal(5th Avenue &Walnut Street) • Lower/Upper Valley Community Connector(Yakima Transit Center) • Yakima-Ellensburg Commuter(Yakima Air Terminal,YVCC, and Yakima Transit Center) • Union Gap Transit&Yakima Airport(Routes 7 &9) • Selah Transit(1305 N 16'Avenue and 1206 N 40th Avenue) 6 -z Annual Report for 2022 & Transit Development Plan 2023—2028 10 Fare Structure Single-ticket fares &monthly fares as of November 2022. Fares are as follows: How much does it cost to ride the bus? One Way Monthly Fare Passes Adults (age 19 and Over) $1.00 $25.00 Reduced Fare (Persons 62/over, people with disabilities and Medicare Card holders, Reduced Fare ID card with photo required for $0.50 $9.00 reduced fare) Yakima Ellensburg Commuter $5.00 $150.00 Youths (18 and Under) Free Free Pre-School (under 6, accompanied by an adult) Free Free Transfers (See Transfer policy) Free Free For fixed-route bus service,day passes are still offered at three times the cost of a single fare, or twice the fare for passes obtained after 9:15am. Fixed-route transfers are available for"one free ride"on any bus, on any route, during one of three time periods each day. Morning transfer tickets are valid until 9:15am. Mid-day transfer tickets are honored from 8:45am to 3:15pm and afternoon/evening transfers are effective from 2:45pm until the close of service. The boarding time determines which transfer the passenger receives. Yakima-Ellensburg Commuter transfers to the fixed-route system are free with the purchase of a Commuter ticket. SECTION IV: SHORT & LONG-RANGE PUBLIC TRANSPORTATION OPERATING & CAPITAL IMPROVEMENT PROJECTS Local Operating Projects 1. Offer regional transit service connections to Kittitas County(Ellensburg/CWU Campus). Yakima Transit continues to operate the Yakima-Ellensburg service under contract. The current grant cycle runs from 7/01/21 — 6/30/23. Move Ahead WA Grant will provide funding from July 2023 to June 2025. When compared to previous years and before the 2020 pandemic,the ridership in 2019 had remained steady with a slight increase in ridership. In 2020 ridership fell by 85%. By 2022,this service has recovered to 2019 levels. This is partially due to Central Washington University being back in session. The Commuter bus will begin its route in each city at approximately 6:00 AM and will be arriving to their destination by 7:45 AM. On average,the Yakima-Ellensburg Commuter provides more passenger trips than each of the four State operated Intercity Transits (Apple, Grape,Gold, &Dungeness Lines)at less than 1/3 of the combined miles travelled and at roughly 1/3 the combined cost. Grants and partnership funding are required to continue to keep the service operational,with the fare box recovery averaging around 10%. 2. Fixed-Route Passenger Counters. In 2023,Yakima Transit is looking to purchase new software/IT equipment that assists in collecting data for reporting purposes. Yakima Transit is required to collect and report this data on an annual basis to the State (Washington State 7 / z Annual Report for 2022 & Transit Development Plan 2023—2028 11 Department of Transportation) and Federal (Federal Transit Authority) levels. This new technology will be fully implemented by the end of 2023. 3. Paratransit Passenger Counters. In late 2025 -mid 2026,Yakima Transit anticipates equipping the paratransit fleet with passenger counter tablets similar to the fixed-route system tablets. Yakima Transit is required to collect and report this data on an annual basis to the State (Washington State Department of Transportation) and Federal (Federal Transit Authority) levels. 4. Security Cameras. Bus security cameras were upgraded in 2019,giving Yakima Transit the ability to have live video feed. Local Capital Projects 1. Vehicle Replacement. a. Buses. All of Yakima Transit's fixed-route bus fleet are low-floor Gilligs. Six new buses were delivered in early 2023. b. Commuter.Yakima Transit does not own the vehicles used in the Yakima-Ellensburg Commuter. The vehicles are owned and operated by the service provider. c. Dial A Ride. Four new large Transit Vans were ordered in late 2022 for delivery in mid-2023. Up to 9 new vehicles will be ordered in 2023 for delivery in 2024 provided by new grants. d. Administrative. Four new Administrative vehicles may need to be ordered in 2024 or 2025 depending on use. 2. Continue to maintain/improve ADA amenities within the transit system.Yakima Transit continues its efforts to maintain and improve ADA access within the system. Yakima Transit plans to: • Purchase ADA accessible vehicles with ramps. • Work with the City Streets, Planning, and Engineering Departments to identify and partially fund sidewalk installations throughout the Transit system to help individuals with mobility issues get to the bus stop. 3. New Transit Base of Operations.Yakima Transit purchased 506 W Fruitvale Blvd in July 2022 for a new Transit Base of Operations in Yakima. Anticipated move in is early 2025 as the property is being leased back to the former owners as they build a new facility. The new Transit location will house Yakima Transit Administrative offices,vehicles, low maintenance garage, cleaning bay, ticket booth, etc. The new Transit location is also anticipated to help Yakima Transit switch over to alternative fuels. At some point in the future,Yakima Transit anticipates all the buses will have alternative fuel sources. 4. Build a new Westside Transfer location.Yakima Transit anticipates building a new Transfer station in west Yakima/West Valley within the next 6-10 years. This Transfer Station will not only offer improved services to the west Yakima and West Valley community,but it will support the Transit Center currently located in east Yakima, offering more efficient routes and connectivity throughout our entire system. Capital improvements over the next six years will depend on transit sales tax. If sales tax revenues decline,planned projects may be put on hold until revenue is available to do the project. Planned capital investments are listed in Appendix C. Major improvements planned include: vehicle replacement, fixed- route passenger shelters,bus stop improvements, and technology improvements. 8z Annual Report for 2022 & Transit Development Plan 2023—2028 12 SECTION V: COMMUNITY ENHANCEMENT CONNECTIONS Throughout the City of Yakima,there are several planned or completed community enhancement projects. This section provides updates on transit connectivity to those programs/developments. Yakima Transit provides bus service to several annual community events including fare-free shuttle services to: the Central Washington State Fair,the City of Yakima's Fourth of July Fireworks Show, and the Arboretum's Christmas Luminaria Event. All of the transit services provided are open to the general public. SECTION VI: PROGRAM FUNDING FINANCIAL FORECAST Financial forecasting primarily pulls from past service levels, anticipated needs, and market trends. This analysis consists of Yakima Transit's projected revenue and expenses for maintaining efficient service levels, while still being able to maintain an active vehicle fleet. The long-term strategies adequately address capital vehicle replacement and operations. On average,total capital and operating expenses are around$11M annually. The projected Ending Cash Balance, includes anticipated capital investments. Revenues The information contained in this section breaks down revenue streams and considers the outlook of those revenue sources. Operating revenue consists mainly of local sales tax and grant funding. Revenue is also obtained from farebox,monthly bus passes,tickets, and reimbursements from other jurisdictions served. Total Revenue(in thousands) 2022 2023 2024 2025 2026 2027 2028 Sales Tax $ 6,700 $ 6,800 $ 7,011 $ 7,186 $ 7,300 _ $ 7,400 _ $ 7,400 Grants(Operating) $ 2,300 $ 2,500 $ 2,700 $ 2,700 _ $ 2,700 $ 2,800 $ 2,900 Grants(Capital) $ 450 $ 450 _ $ 450 $ 450 $ 450 $ 500 $ 500 Farebox Revenue $ 520 $ 625 $ 650 $ 675 $ 700 $ 700 $ 715 Other $ 150 $ 150 $ 160 $ 160 $ 170 $ 170 $ 180 Total Operating and Capital Revenues $10,120 $10,525 $10,971 $11,171 $11,320 $11,570 $11,695 Sales Taxes Yakima Transit utilizes a three tenths of one percent(0.3%) sales tax that was passed by voters in 1980. Sales tax revenue accounts for approximately 57%of total transit revenue in 2022. Sales tax revenues typically remains relatively consistent year to year with a slight fluctuation either up or down. Each one tenth of one percent equates to approximately$1.96M in revenue per year. Farebox Revenue Farebox revenue is one of the smaller funding parts to operating public transportation. Farebox revenue consists of Fixed-route, Dial-A-Ride, and Commuter funds. Passenger fares play an important role in funding transit services. A balance between the cost of the service and what a passenger is willing to pay must be maintained to ensure that users participate in the cost of providing the service. If the cost of the fare is too high, individuals who could drive may opt for the convenience of driving. 9 Annual Report for 2022 & Transit Development Plan 2023—2028 13 Farebox Revenue(in thousands) 2022 2023 2024 2025 2026 2027 2028 Fixed-Route Farebox Revenue $ 520 $ 625 $ 650 $ 675 $ 700 . $ 700 $ 715 Paratransit Farebox Revenue $ 70 $ 80 $ 85 $ 90 _ $ 95 _ $ 100 $ 105 Commuter Farebox Revenue $ 190 $ 190 $ 200 $ 200 $ 210 $ 210 $ 220 Total Fairbox Revenues $ 2,802 $ 2,918 $ 2,959 $ 2,990 $ 3,031 $ 3,037 $ 3,068 For 2022, farebox revenue accounted for 16%of all revenue. Yakima Transit ridership over the last year, had a count of approximately 455,000 passenger trips served. Grant Funds Yakima Transit utilizes both federal and state grants,which in 2022, accounted for approximately 40%of total revenue. State and Federal funding has remained at or near prior year levels. Federal formula allocations have continued to increase. Operating grants consist of the annual operating grant(apportionment), operating grants for ADA paratransit services (apportionment), and the Yakima-Ellensburg Commuter(discretionary). Grants include the following Projects: 2020 CARES ACT Grant In April of 2020 Yakima Transit received from the Federal Government$6,268,035 in emergency CARES Act funding. These funds were supplied to provide emergency relief during the Covid-19 Pandemic that started in February of 2020. These funds are intended to make up for shortfalls in public transits budgets due to loss in revenue and loss in ticket sales. This money can be used in a variety of ways to keep Yakima Transit operating. As of August 2021-2022,these funds are being used to pay for Personnel Protection Equipment(PPE) for drivers and office staff. The funds have also been used to install barriers in the fixed route fleet to protect drivers from direct exposure. Planned expenditures of this grant are to pay for any shortages, Paratransit, PPE,and any other costs over the next 4 years. This grant is non-renewable. 2023-2025 —Yakima-Ellensburg Commuter Yakima-Ellensburg Commuter—Yakima Transit receives funding from the State of Washington Department of Transportation for commuter bus service between Yakima and Ellensburg. This grant is called the Move Ahead Washington Grant. The service is done in partnership with the City of Selah, City of Ellensburg, and Central Washington University. Without partnership support,Yakima Transit would not be able to provide the service. The grant covers about 35%of the service, local funds account for approximately 48%of the cost, and the farebox revenue accounts for the remaining 17%. Cost: $1.0M Grant: $500K Status: Currently being used. 2021-2023— Paratransit Special Needs Formula Grant Paratransit Special Needs Formula Funds (PTSNF) -Yakima Transit receives an apportionment (roughly$240K every two years) from the Washington State Department of Transportation for paratransit services. Yakima Transit spends approximately$1.5M every year on paratransit services. Cost: $3M Grant: $240K Status: Currently being used. 10z Annual Report for 2022 & Transit Development Plan 2023—2028 14 2022—5307 Small Urban Operating Assistance Annual Grant -Yakima Transit receives FTA 5307 funding totaling approximately$2.3M annually. This grant is essential to maintain existing fixed-route bus services. Cost: $4.6M Grant: $2.3M Status: Currently being used. Operating Expenditures Yakima Transit's total operating expenses for 2022 were $10.2M. Major operating expenses include fuel, labor, insurance, and other costs. Employee costs were the primary factor for the increase along with technology upgrades. For 2023, operating expenses are anticipated to be steadily increasing. Yakima Transit operates fixed-route,paratransit, and commuter bus service. These modes of transportation are addressed by their overall cost to the budget including operating and capital costs. Operating Expenditures(in thousands) 2022 2023 2024 2025 2026 2027 2028 Fixed-Route Buses $ 850 $ 870 $ 890 $ 910 $ 931 $ 952 $ 974 Yakima-Ellensburg Commuter $ 520 $ 532 $ 544 $ 557 $ 570 $ 583 $ 596 Paratransit $ 1,600 $ 1,637 $ 1,674 $ 1,713 $ 1,752 $ 1,793 _ $ 1,334 Administrative $ 1,560 $ 1,596 $ 1,633 $ 1,670 $ 1,709 $ 1,748 _ $ 1,788 Total Operating Expenses $10,272 $10,500 $10,500 $11,000 S 11,500 $12,000 $12,500 Fixed-Route Yakima Transit spends most of its funds on the fixed-route bus service. In years in which buses are not purchased,the largest part of the cost is wages and benefits, accounting for nearly 70%of the total cost to provide the service. Maintenance (16%) and significantly increased fuel costs (7%)make up the next two highest expenses,with the rest being insurance, supplies, and equipment upgrades. In the chart above, fixed-route costs fluctuate because of the vehicle replacement program. In March 2023,Yakima Transit purchased six new transit buses,as part of Transit's ongoing bus replacement plan. Two bus purchases are on order with delivery date of late 2023. Dial-A-Ride Yakima Transit operates fixed-route bus services,which requires (by federal law)the Transit system to operate complementary paratransit services (Dial-A-Ride)to disabled individuals who cannot ride the fixed-route bus system. Currently,Medstar operates Dial-A-Ride under a contract with Yakima Transit. The farebox-recovery ratio for this service is usually around 5%in 2022. Yakima Transit leases vehicles to Medstar to help control maintenance costs and provide funds for replacement vehicles. Yakima-Ellensburg Commuter Yakima Transit contracts with A&A Motorcoach to provide this service. The farebox-recovery ratio for this service is usually at 17%. The City of Ellensburg and City of Selah participate in the Commuter service. Commuter provider contract renewal will occur in July 2023. Capital Funds Yakima Transit sets aside $800,000 to $1,000,000 annually in the capital reserve account for major capital projects like vehicle and facility replacement/expansion, as well as other smaller capital 11z Annual Report for 2022 & Transit Development Plan 2023—2028 15 improvement projects. When revenue exceeds actual costs,those additional funds are put into a reserve account for either capital or operating. With proposed capital facility improvements over the next six years,the amount set aside will need to continue in order to complete the anticipated projects. Most of the time,grant funding is used for a portion of capital projects,primarily to replace vehicles. General Forecast In the general forecast,the next several years show high expenditures as a result of vehicle replacement. Replacing vehicles are balanced out with the reserve account(ending cash balance) ensuring that Yakima Transit is financially healthy while upgrading the fleet. Yakima Transit's ideal vehicle replacement schedule is at a rate of 1.5 fixed-route buses and 3 paratransit vehicles each year. This schedule may grow or wane as funding allows.With the changes to the system, there is sufficient funding in the capital budget to allow for these purchases. Buses typically cost$550K, and Dial-A-Ride large passenger ADA equipped vans $105K. A general financial forecast is shown in Appendix A. SECTION VII: SIGNIFICANT OPERATING & CAPITAL CHANGES, 2023 — 2028 Other than vehicle replacement and equipment upgrades,Yakima Transit does not have any significant operating changes planned for 2023-2028. The single major project in 2024 will be a Needs Study and renovation of the new Transit Facility. Most other major projects are listed in the six-year transit improvement plan—project list, Appendix C. Maps of the current system are shown in Appendix E-G. There will be several changes and upgrades to the transit buses in 2023,including upgrading the modems, cameras, and bus computers, adding live video streaming capabilities to assist supervisors, dispatchers, and the Yakima Police Department and replacing the Doublemap system with a new program for passengers to track their buses. VIII. Summary Overall,Yakima Transit's revenues and expenses are stable. Capital projects that have been delayed for years have or are in the process of being completed or implemented. Other projects are still an option in the coming years. Services are anticipated to be more flexible so Yakima Transit can more fully serve the public. 12 'z Annual Report for 2022 & Transit Development Plan 2023—2028 16 APPENDIX A: OPERATING FINANCIAL DATA - 2022 Annual - & Budget 2023-2028 TRANSIT OPERATIONS 2022 2023 2024 2025 2026 2027 2028 Beginning Balance $6,800 $7,100 $9,685 $12,431 $15,007 $17,587 $20,167 Operating Revenues(in thousands) _ Sales Tax $6,700 $6,800 $7,011 $7,186 $7,300 $7,400 $7,400 Farebox _ $520 _ $625 $650 $675 $700 $700 $715 Commuter Fares $190 _ $190 $200 $200 $210 $210 522C Paratransit Fares S70 $80 $85 $90 $95 $100 S105 Federal Operating Grants _ $2,300 _ $2,500 $2,700 $2,700 $2,700 52,800 52,900 WSDOT Grants _ $700 _ $700 $700 $700 $700 $700 $700 Other S150 _ 5150 $160 S160 S170 S170 5180 Total Revenues $10,630 $11,045 $11,506 $11,711 $11,875 $12,080 $12,220 Operating Expenses 2022 2023 2024 2025 2026 _ 2027 2028 Yakima-Ellensburg Commuter _ 5520 5520 $650 $650 $700 $700 5750 Fixed Route Maintenance _ $850 5900 $1,000 $1,250 $1,250 $1,300 51,300 Transit Center Maintenance $55 S55 $60 565 $70 $75 S8C Transit Administration 51,560 $1,570 $1,580 51,600 $1,650 _ $1,650 $1,700 _ Transit Marketing _ $65 $65 $70 T $70 $75 _ 575 $80 Fixed Route Operations _ $3,650 $3,700 __ $3,750 _ $3,800 $3,850 $3,900 53,950 Paratransit/ADA Operations $1,600 $1,650 $1,650 $1,700 $1,700 S1,800 51,800 Total Expenses $8,300 $8,460 $8,760 $9,135 $9,295 $9,500 $9,660 Operating Cash Flow _ $2,330 $2,585 $2,746 $2,576 $2,580 $2,580 $2,560 Net Cash Available $9,130 $9,685 $12,431 $15,007 $17,587 $20,167 $22,727 13 Annual Report for 2022 & Transit Development Plan 2023-2028 17 TRANSIT CAPITAL (in thousands) 2022 2023 2024 2025 2026 2027 2028 Beginning Capital Balance $13,631 _ $13,631 $9,402 $10,218 $9,839 $10,218 $9,839 !Revenues _ _ Sales Tax Revenue $1,300 $1,350 $1,350 $1,400 $1,400 $1,450 _ $1,450 FTA/WSDOT Capital Grants $450 $450 $450 $450 $450 $500 $500 Leases $21 _ $21 $21 $21 $21 $21 $21 Sale of Fixed Assets $80 $80 $80 $80 $80 $80 _ $80 Other Total Revenues $1,851 $1,901 $1,901 $1,951 $1,951 $2,051 $2,051 Capital Expenses 2022 2023 _ 2024 2025 2026 2027 2028 Minor Equipment Operating Equipment 5100 _ $100 5100 $1C0 5100 $100 _ 5100 Other Equipment _ Improvements other than Bldg_ $250 $230 $230 S230 S230 $230 _ $230 Transit Buses $0 55,500 $0 $2,000 So $2,000 _ $2,000 Facilities $5,800 _ _ Support Vehicles $0 $0 555 _ Paratransit/ADA Vehicles $0 $300 $700 $0 $200 $250 $250 Total Capital Expenses $6,150 _ $6,130 $1,085 $2,330 $530 $2,580 $2,580 _ Capital Cash Flow -$4,299 -$4,229 $816 -$379 $1,421 -$529 _ -$529 Ending Cash Balance $13,631 $9,402 $10,218 $9,839 $11,260 $9,689 $9,310 14 / "'-z Annual Report for 2022 & Transit Development Plan 2023-2028 18 APPENDIX B: PUBLIC HEARING NOTICE Wednesday,June 14,2023 Yakima Transit is submitting to the Washington State Department of Transportation its Six-Year Transit Development Plan and Annual Report. These documents address state and local long & short-range priorities, capital improvements, planned significant operating changes and, program funding sources for the following six years,and the summary of Yakima Transit's 2022 operations. Public notice of public involvement activities and time established for public review of and comments on the TIP will satisfy POP requirements. A public hearing on the submittal will be held Wednesday, July 12, 2023, at 5:30pm at Public Works, 2301 Fruitvale Blvd., Yakima, WA 98902. The meeting can also be attended via Zoom conference call. To join meeting, call US: +1 253 215 8782 or +1 971 247 1195 or 888 788 0099(Toll Free)or 833 548 0276 (Toll Free) or 833 548 0282 (Toll Free) or 877 853 5247 A draft document and additional meeting information including the link to join the meeting online will be available at www.yakimatransit.org on July 6, 2023. Final approval of the program is anticipated to go to the Yakima City Council on Tuesday, August 15, 2023. 15 e Annual Report for 2022 & Transit Development Plan 2023—2028 APPENDIX C: SIX-YEAR TRANSIT IMPROVEMENT PLAN - PROJECT LIST Yakima Transit Six-Year Transportation Improvement Plan - Project List 2023-2028 z Length (Funds Shown in Thousands) Federally > Fund Source Information Expense funded v � n } o ; Schedule Projects Project Identification o Status v v us v v 'm mal E d d w w 'm Phase c a y ai= E a = v u 0 o vc E " o d �, v a ;Federally Qa N q ra i N iiil CC 0 1 Acquisition of new Transit Buses-Purchase 2 new Transit Buses y Y In Progress FR 1.5yr 9/23 ARPA 1,500 0 G 0 1,500 1,500 0 CE No 2 New Paratransit Vans-Purchase 3 new Vans y In Progress DR Now 3/22 ARPA 328 0 0 0 328 328 0 CE No 3 Paratransit Operating Assistance 2023-2025-State Allocation forADA services y Y Annual Funds DR 2yr 8/23 WSDOT 0 320 2,450 0 2,770 1,385 1,385 CE No 4 Paratransit Operating Assistance 2025-2027-State Allocation for ADA Services N N Annual Funds DR 2yr 7/25 WSDOT 0 320 2,500 0 2,820 1,410 1,40G CE No 5 New Paratransit Vans-Purchase 6 new Vans Y Y In Progress DR 1yr 7/23 WSDOT 0 760 114 0 874 874 0 CE No 6 Yakima-Ellensburg Commuter-14 one-way trips during peak,12 during off peak Y Y In Progress Comm 2yr 8/23 WSDOT 0 500 200 25 725 362 362 CE No 7 Yakima-Ellensburg Commuter-14 one-way trips during peak,12 during off peak N N Planning Comm 2yr 7/25 WSDOT 0 500 200 25 725 362 362 CE No 8 Acquisition of New Transit Buses-Purchase 3 new Transit Buses N N Planning FR 1.5yr 7/25 5339 0 1,650 400 0 2,050 2,050 0 CE No 9 New Transit Operations Facility-Study,Remodel,Renovation Y N In Progress All .5yr 9/24 Local Tax 0 0 450 C 450 450 0 NA No 10 Annual FTA Operating Assistance-FY 2023 Transit Operating Grant-Fixed Routes Y N Annual Funds All Ann 7/23 5307 2,400 0 2,400 0 4,800 4,800 0 CE No 11 Annual FTA Operating Assistance-FY 2024 Transit Operating Grant-Fixed Routes N N Annual Funds All Ann 3/24 5307 2,400 0 _2,400 0 4,800 4,800 0 CE No 12 Annual FTA Operating Assistance-FY 2025 Transit Operating Grant-Fixed Routes N N Annual Funds All Ann 3/25 5307 2,400 0 2,400 0 4,800 4,800 0 CE No 13 Annual FTA Operating Assistance-FY 2026 Transit Operating Grant-Fixed Routes N N Annual Funds All Ann 3/26 5307 2,500 0 2,500 0 5,000 5,000 0 CE No 14 Annual ETA Operating Assistance-FY 2027 Transit Operating Grant-Fixed Routes N N Annual Funds All Ann 3/27 5307 2,500 0 2,500 0 5,000 5,000 0 CE No 15 Annual FTA Operating Assistance-FY 2028 Transit Operating Grant-Fixed Routes N N Annual Funds All Ann 3/28 5307 2,600 0 2,600 0 5,200 5,200 G CE No r 16 Acquisition of new Transit Buses-Purchase 2 new Transit Buses N N Planning FR 1.5yr 7/27 5339 0 1,200 450 0 1,650 1,650 0 CE No 17 Acquisition of new Transit Buses-Purchase 3 new Transit Buses N N Planning FR 1.5yr 7/29 5339 0 1,750 475 0 2,225 2,225 0 CE No 18 Downtown Transfer Center Renovation(DTTS) N N Planning All 2yr 7/30 5339 250 50 0 300 300 0 CE No 19 West Valley Transfer Center{WVTC)-Transfer CTR(Pop.Over 150k) N N Planned Expansion All 2yr 7/35 NA NA NA NA 0 0 0 0 NEPA NA (FR)Fixed Route,(DR)Dial A Ride,(Comm)Commuter,(NA)Not Available,(CE)Categorical Exemption 16 1 : Annual Report for 2022 & Transit Development Plan 2023-2028 20 APPENDIX D: SERVICE DATA BY MODE Fixed-Route 2022 2023(Est.) 2024(Est.) _ 2025(Est.) 2026(EST.) Ridership 456,357 465,484 474,794 484,290 493,975 Service Days _ 356 356 357 356 356 Vehicle Service Mileage _ 710,402 710,000 710,00C _ 710,000 710,00C Vehicle Service Hours 60,425 57,00C 57,00C 57,000 57,0CC Operating Expenses $ 7,530,794 S 7,681,41C $7,835,038 $7,991,739 S 8,151,574 Fare Box Revenues(passes,tickets,&cash) 5 307,625 $ 320,000 $ 320,000 $ 320,000 S 320,00C Fare Box Return Ratio 0.04 0.04 0.04 0.04 0.04 Revenue/Passenger 0.67 _ 0.69 0.67 _ 0.66 0.65 Revenue/Mile 0.43 _ 0.45 0.45 0.45 0.45 Revenue/Hour 5.09 5.61 5.61 _ 5.61 5.61 Passenger/Mile 0.64 0.66 0.67 0.68 0.70 Passenger/Hour 7.55 8.17 8.33 8.50 8.67 Operating Cost/Passenger 16.50 16.50 16.50 16.50 16.50 Operating Cost/Mile _ 10.60 10.82 11.04 11.26 11.48 Operating Cost/Hour '' 124.63 134.76 137.46 140.21 143.01 Paratransit 2022 2023(Est.) 2024(Est.) 2025(Est.) 2026(Est.) Ridership 45,261 55,000 60,000 60,000 60,000 Service Days 356 356 357 356 356 Vehicle Service Mileage 258,268 255,75C 279,000 _ 279,000 279,00C Vehicle Service Hours 27,932 25,575 27,90C 27,900 27,9CC Operating Expenses _ S 2,074,856 $ 2,116,353 $2,158,680 $2,201,854 , S 2,245,891 Fare Box Revenues(passes,tickets,&cash) S 70,560 S 90,00C S 95,000 $ 95,000 S 95,CCC Fare Box Return Ratio:I. 0.03 0.04 0.04 0.04 0.04 Revenue/Passenger 1.56 1.64 1.58 1.58 1.58 Revenue/Mile _ 0.27 _ 0.35 0.34 0.34 0.34 Revenue/Hour _ 2.53 3.52 3.41 3.41 3.41 Passenger/Mile 0.18 0.22 0.22 0.22 0.22 Passenger/Hour 1.62 2.15 2.15 2.15 2.15 Operating Cost/Passenger 45.84 38.48 35.98 _ 36.70 37.43 Operating Cost/Mile 8.03 3.23 7.74 _ 7.39 3.05 Operating Cost/Hour ' 74.28 82.75 77.37 78.92 80.50 17 I,*2,i Annual Report for 2022 &Transit Development Plan 2023-2028 21 Commuter 2022 2023(Est.) 2024(Est.) 2025(Est.) 2026(EST.) Ridership 18,375 23,000 25,000 25,000 25,000 Service Days 252_ 252 253_ 252_ 252 Vehicle Service Mileage 149,427 149,427 149,427 149,427 149,427 Vehicle Service Hours 4444 $ 4,782 $ 4,782 $ 4,782 $ 4,783 Operating Expenses $ 520,302 $ 530,708 $ 541,322 $ 552,149 $ 563,192 Fare Box Revenues(passes,tickets,&cash) $ 193,082 $ 160,000 $ 165,000 $ 165,000 $ 165,001 Fare Box Return Ratio In 0.37 _ 0.30 0.30 _ 0.30 0.29 Revenue/Passenger 10.51 6.96 6.60 6.60 6.60 Revenue/Mile 1.29 _ 1.07 1.10 1.10 1.10 Revenue/Hour 43.45 _ 33.46 34.50 34.50 34.49 Passenger/Mile 0.12 0.15 0.17 0.17 0.17 Passenger/Hour 4.13 _ 4.81 5.23 _ 5.23 5.23 Operating Cost/Passenger 28.32 _ 23.07 21.65 _ 22.09 22.53 Operating Cost/Mile 3.48 3.55 3.62 3.70 3.77 Operating Cost/Hour 2' 117.08 110.97 113.19 115.46 117.74 18 - - Annual Report for 2022 & Transit Development Plan 2023-2028 22 APPENDIX E: FIXED-ROUTE MAP (Yakima) Brace 1 Summitview/Lincoln — 2 Tieton/Nob Hill r t� 3 Mead/Fruitvale w 'K tlalu: .. (.2 II mg Fruitvale/Mead Wil y.SStAw Swan Ave b Z ., �:. .. Enyicwwo Ave Crony Ara v, ,%�� 5 Nob Hill/Tieton z F. ,i 1 4mmam../ONM Av.: 6 Fair Ave./No.4th St. =,m .4. a.,- -s, N Wa 'A.m. l 0 on P y rk Ya ma Re onal Merl; -I 7 40th Ave./Washington _ _ center West',alley aINNEN y N b ' Yaklma a ey Mhdaren U P.,. Memorial Hospital Y ti 8 Lincoln/Summitview dva1e Rd 5R a 6• 0 D N c .1 Bonne Door y Ave A Cent II Washinc on al Blvd sate Fair 0 9 1st Street/Washington - ? - F 'at Hoc'ow Rd y a V G g i a `a q ¢ o Fj s 11 Ellensburg _ 4 n A . N u n `.� /or Rd _ ar W Remo SI lid j c I,l �j. . Q X' K .61r1'; Yakima Air $oath RA 1 M lermiiialAirport Broadway h f OCc,dental Rd F -�- a o v, a Ji Ahtaauo 19 117 '; Annual Report for 2022 &Transit Development Plan 2023—2028 23 APPENDIX F: COMMUTER MAP (Ellensburg) Cwnth.31 1'?1h phengbn .. UM'+elltg lad F 7thAy• • Ellensburg k I F 31.;1 A•:t E 1:t Ave FCardlo s Ave iar•r.ma Aye 1- MY711Il4) bi Fi'Jc Gtou Mao _-- �i = V'IiasY Park. ai E h#7,11 I,'w' w'Ate Ktli-lae, H4a� \\\\ tr.) ail • 20 z Annual Report for 2022 & Transit Development Plan 2023—2028 24 Wednesday,June 14,2023 Yakima Transit is submitting to the Washington State Department of Transportation its Six-Year Transit Development Plan and Annual Report. These documents address state and local long & short-range priorities, capital improvements, planned significant operating changes and, program funding sources for the following six years,and the summary of Yakima Transit's 2022 operations. Public notice of public involvement activities and time established for public review of and comments on the TIP will satisfy POP requirements. A public hearing on the submittal will be held Wednesday, July 12, 2023, at 5:30pm at Public Works, 2301 Fruitvale Blvd., Yakima, WA 98902. The meeting can also be attended via Zoom conference call. To join meeting, call US: +1 253 215 8782 or +1 971 247 1195 or 888 788 0099(Toll Free)or 833 548 0276 (Toll Free) or 833 548 0282 (Toll Free) or 877 853 5247 A draft document and additional meeting information including the link to join the meeting online will be available at www.yakimatransit.org on July 6, 2023. Final approval of the program is anticipated to go to the Yakima City Council on Tuesday, August 15, 2023. 25 Yakima Transit Annual Report for 2022 and Six-Year Plan for 2023-2028 Public Hearing July 12th, 2021, 5:30 PM Zoom Virtual Meeting Hosted by Gregory Story,Yakima Transit Assistant Manager In Attendance: Gregory Story,Transit Assistant Manager Yajaira Barajas, Office Assistant Zoom meeting was tested and confirmed accessible via the link published to Yakima Transit's website and social media accounts. Zoom meeting was tested and confirmed accessible via telephone numbers published in the Yakima Herald and to Yakima Transit's website and social media accounts. 5:30 PM—Zoom meeting called to order by Greg Story. No community participants were waiting. 5:45 PM—No community participants joined meeting. Meeting adjourned.