HomeMy WebLinkAbout04/20/2010 10 Multi-Year Irrigation System Rebuild Project Update 410 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. JO For Meeting of 4/20/2010 ITEM TITLE: Update of the Multi -year Irrigation System Rebuild Project SUBMITTED BY: Dave Brown - Water /Irrigation Division Manager Mike Shane, Water /Irrigation Engineer CONTACT PERSON/TELEPHONE: Dave Brown — 509 - 576 -6480 SUMMARY EXPLANATION: Attached is an updated report to City Council on the multi -year Irrigation System Rebuild project. This project has its origins more than a decade ago and it is easy to lose track of its importance, progress, and status as time marches on. You will find a memo that contains the background, chronology of activities, the current activities, and the plan for the next few years and a detailed list of accomplishments. Included are the projects completed by the city Irrigation Crew. Our Crews have replaced some 27,515 II feet of mains (5.2 miles) and 1,233 services of the 159,234 feet of pipe that has been replaced to date. You will also find a table with the projects listed by system, a spreadsheet showing the finances and a map of the system showing the pipes that have been replaced. There are about three or four more years to complete the initial high priority projects. After the high priority projects are complete we will begin updating and refurbishing the medium priority parts of the irrigation system that were indentified in the December 1999 Master Irrigation Plan. The project is under budget and ahead of schedule. Once the report is accepted it will be posted to the City's web site. Resolution_ Ordinance Other (Specify) Report Contract _ Mail to (name and address): Funding Source APPROVED FOR SUBMITTAL: aim ��, City Manager STAFF RECOMMENDATION: Accept the report. COUNCIL ACTION: III • ----- `0 ,.). l '' Water / Irrigation Division - 1 � Working Together Toward Excellence in Service and Quality a V I t s,— 7 M 4 . . ' - 2301 Fruitvale Blvd. -- Yakima, WA 98902 ... ° y J-' - "Water is life and Infrastructure Makes it Happen" - DATE: April 20, 2010 TO: Honorable Mayor Cawley and City Council Members Dick Zais, City Manager FROM: Dave Brown, Water /Irrigation Manager Mike Shane, Water /Irrigation Engineer . RE: Irrigation System Rebuild Update Periodically, staff has provided the City Council an update of the multi -year Irrigation System Rebuild project. In that this project has its origins more than a decade ago, it is easy to lose • track of its importance, progress, and status as time marches on. Background: During the many Council Study Sessions, Meetings, Public Hearings, and Public Information Meetings over the past decade, plans for the future of the City's Irrigation System were discussed in detail. Based on those discussions, the City Council authorized the following plan of action: 1) Fund rehabilitation /replacement of the General Irrigation System replacement through a combination of revenue bonds ($10M) and funds generated through a CIP rate component. Total cost estimated to be $13- $14million; 2) Revenue bonds to be issued in two increments of $5M each. The first bond of $5 million was obtained in 2004, the second has yet to be issued, and $3 -$4 million difference between the bond proceeds and the estimated total project cost is planned to be funded from monies collected as part of the CIP rate; 3) Completion of the General Irrigation System replacement project scheduled for 2013; 4) The General Irrigation System project is considered the highest priority; 5) Bond repayment is from the funds collected through revenues generated by the CIP ' rate. (Rates are to be set at a level sufficient to pay the costs of the rehabilitation /replacement project.) Note: The Irrigation Utility is an "Enterprise Fund ", which essentially means that the Utility should be self- sufficient. By law, the Utility may not support any other fund through its rate structure; however, rates must be set at a level that will cover all operating and capital costs of the Utility, including debt service (i.e.: payments on bonds and other debt). While it is unlawful III for revenue generated by the Utility to be used to support other funds, it is also unlawful to set David E. Brown Water /Irrigation Manager (509) 575 -6204 Fax (509) 575 -6187 dbrown @ci.yakima.wa.us rates at a level that is insufficient to cover the Utilities bond payments, as this would be an unconstitutional impairment of a contract. Therefore, a cost of service study is performed periodically to review the rate structure and ensure that rates are set at a prudent operating and legally authorized level. Chronology: • 1997 Irrigation System Formed including a Capital Improvement Fund • 1998 completed first General System upgrade project • December 1999 Master Irrigation Plan completed. The Plan included evaluation of all of the City owned irrigation systems, developed a Capital Improvement Plan (CIP) and identified eight systems rating a "high" priority for repair /replacement: 1) Capital Hill (Scheduled for replacement 2009/10 & 2010/11) 2) Nob Hill (Replacement Complete) 3) Hillcrest (Replacement Complete) 4) Brackett Park (Replacement Complete) 5) West Yakima (Replaced 2/3 of the system) 6) North Hillcrest A (Replacement Complete) 7) DeAtley Park (Replacement Complete) 8) General (ongoing project started in 1998) • The General System Phase 2 began in 2004 and is completed. • The General System Phase 3 began in 2007 and will be completed in the 2009/10 construction season. Current Activities: In addition to beginning the General Irrigation System Replacement Phase 4 /Stage 1 in the winter of 2010/2011, the east half Capital Hill System is currently under design and scheduled for replacement. With the replacement of the high priority systems nearly complete, remaining replacement projects will be based on funds available in the CIP budget and system repair history. Below is a list of the projects completed since 1997. Also attached is an.accounting of the funds collected and spent in the Capital Improvements Program, a table summarizing the completed projects and three maps. David E. Brown Water /Irrigation Manager (509) 575 -6204 Fax (509) 575 -6187 dbrown@ci.yakima.wa.us 2 • 1998/1999 General System by contractor: • 2,800 feet of 30" PVC • 1999/2001 Consultant/Staff - Irrigation Master Plan /Study Completed 2001/2002 General System by contractor: • 1,800 feet of 21" PVC • 1,800 feet of 12" PVC Fruitvale Canal System — 1,600 feet of 48" Hancor Pipe, 12 access manholes 2002/2003 General System by contractor: • • ! 5,600 feet of 30" PVC • 2003/2004 - Consultant/Staff - Preliminary Design of the General Irrigation System DeAtley Park & Nob Hill Systems and a small portion of the General by contractor: • 600 feet of 6" HDPE (high density polyethylene) • 1,250 feet of 4" HDPE • 700 feet of 3" HDPE • 4,500 feet of 2" HDPE • 1 Pumps • 152 Services General System by Irrigation Division: • 1,600 feet of 4" PVC • 900 feet of 3" PVC • 115 services 2004/2005 General System by contractor: • 5,300 feet of 30" HDPE • 1,670 feet of 18" HDPE • 970 feet of 16" HDPE • 430 feet of 3" HDPE • 23 services Fruitvale Canal System by contractor: • 450 feet of concrete canal lining David E. Brown Water /Irrigation Manager • (509) 575 -6204 Fax (509) 575 -6187 dbrown @ci.yakima.wa.us 3 • General System by Irrigation Division: • 875 feet of 8" PVC • 200 feet of 6" PVC • 2,400 feet of 4" PVC • 800 feet of 3" PVC • 141 services 2005/2006 General System by contractor: • 2,385 feet of 16" HDPE • 875 feet of 14" HDPE • 1,025 feet of 12" HDPE • 3,390 feet of 10" HDPE • 1,210 feet of 8" HDPE • 85 feet of 3" HDPE • 103 Services General System by Irrigation Division: • 1,250 feet of 6" PVC • 1,800 feet of 4" PVC • 650 feet of 3" PVC • 137 services West Yakima System by contractor: • 135 feet of 10" HDPE • 2,000 feet of 8" HDPE • 2,800 feet of 6" HDPE • 1,275 feet of 4" HDPE • 3,800 feet of 3" HDPE • 1,800 feet of 2" HDPE • 270 services 2006/2007 General System by Irrigation Division: • 800 feet of 6" PVC • 1.320 feet of 4" PVC • 2,600 feet of 3" PVC • 202 services General System by contractor: • 575 feet of 24" steel casing • 650 feet of 18" HDPE • 2,670 feet of 16" HDPE • 1,830 feet of 14" HDPE • 60 feet of 12" HDPE • 400 feet of 10" HDPE • 2,380 feet of 8" HDPE David E. Brown Water /Irrigation Manager (509) 575 -6204 Fax (509) 575 -6187 dbrown @ci.yakima.wa.us 4 • • 1,090 feet of 6" HDPE • • • 185 feet of 3" HDPE • 25 services • Maclaren Reservoir by contractor: • Repaired cracks in the existing concrete reservoir, rehabilitated the existing weir box, installed a new aluminum ladder and slide gate, and installed a new outlet screen structure 2007/2008 General System by Irrigation Division: • 800 feet of 6" PVC • 1.320 feet of 4" PVC • 2,600 feet of 3" PVC • 202 services General System by contractor: • 123 feet of 24" DI • 5,026 feet of 6" HDPE • 3,781 feet of 4" HDPE • 1,599 feet of 3" HDPE • 2,298 of 2" HDPE • • 322 services Brackett Park System by contractor: • 3,060 feet of 2" HDPE • 45 services Glenn Drive Reservoir by contractor: • Replaced existing pump station, including pumps, building, valves and piping which provides service to the Glenn Drive, West Walnut, Belgold, West Chestnut and West Yakima irrigation systems. 2008/2009 General System by Irrigation Division • 1,000 feet of 4" PVC • • 3,700 feet of 3" PVC • 1,400 feet of 2" PVC • 280 services General System by contractor: • 2,410 feet of 6" PVC • 6,592 feet of 4" PVC • 890 feet of 4" HDPE • 510 feet of 3" PVC • 95 feet of 2" PVC • David E. Brown Water /Irrigation Manager • (509) 575 -6204 Fax (509) 575 -6187 dbrown @ci.yakima.wa.us 5 • • • 366 services Hillcrest, N. Hillcrest and Buena Vista Systems by contractor: • 945 feet of 6" HDPE • 330 fee of 6" PVC • 1,916 feet of 4" HDPE • 2,320 feet of 4" PVC • 1,604 feet of 3" HDPE • 2,132 feet of 3" PVC • 597 feet of 2" HDPE • 271 services 2009/2010 General System by Irrigation Division • 1,480 feet of 6" PVC • 1,400 feet of 4" PVC • 1,120 feet of 3" PVC • 92 services General System by contractor: • 8,755 feet of 4" PVC • 1,729 feet of 4" HDPE • 725 feet of 3" PVC • • 854 feet of 3" HDPE • 325 services Capitol Hill System by contractor: • 1,966 feet of 12" PVC • 1,644 feet of 6" HDPE • 1,543 fee of 6" PVC • 5,411 feet of 4" PVC • 355 feet of 3" HDPE • 3,180 feet of 3" PVC • 180 feet of 2" HDPE • 314 services Future Activities • General 308 System o Phase 4 — Replace 22,200 feet of pipe (Scheduled for 2010— 2013) • High Priority Systems to be replaced o Complete the second half of Capital Hill — Replace approx.10,000 feet of pipe (Scheduled for 2010/11) • Move the Fruitvale Canal Diversion • Pipe the Fruitvale Wasteway (Scheduled for design 2009/2010) • Refurbish the Medium Priority Irrigation Systems David E. Brown Water /Irrigation Manager (509) 575 -6204 Fax (509) 575 -6187 dbrown@ci.yakima.wa.us 6 • • o Complete the last 1/3 of the West Yakima system - Replace approx. 12,000 feet of pipe • Refurbish the Low Priority Irrigation Systems The accomplishments to date are significant, as is the work remaining to complete the adopted plan and provide for the integrity of the City owned irrigation systems. City staff is working to complete this work in as cost effective a manner as possible. Irrigation construction projects to date have been completed on schedule and within construction estimates. You will note that a number of projects were completed with in -house forces, depending on maintenance workload and project complexity these efforts on the part of City crews can result in significant savings, a change of pace and cross - training opportunities for the crews. • • • • • • • • • . David E. Brown Water /Irrigation Manager (509) 575 -6204 Fax (509) 575 -6187 dbrown @ci.yakima.wa.us 7 C ` \ ` � ' S� iior..kN,_. � 1= 98 L ar son District :661 664 Le nox � 98 Lar Lex � 11 \ - 253 MacLaren ■ 666 Arlington , ; :a.'N.,„ ,�' ( c a_ ~- - -_.__"1 __ -259 Capitol Hill ■688 Englewootl .0 FR t — E a m • 279 Nob Hill ■ 689 4th Street o Y- -r+' 308 General • 692 Lincoln Heights ' 9. 111 342 Loma Vista ® 712 Jefferson _ l� Ill.,. • 371 Hill Crest .715 South Glenn Drive '1� h Street �� h ,��� 1 -� � i�elICI�' 1 ® 378 Buena Vista :74828th Avenue South z 395 West Yakima • 758 Park Lane 401 ■ `` . 450 19th Avenue South © 793 23rd Avenue South Off e , ,, RUIT LE BL l — - _ �� I�® �`� O ,`�,, �`, EI 454 Bonnie Doone • .799 37th Avenue North . .' �■ – i-II = ;' -' ∎ ` ` � 1` �- ,` .5299th Avenue 817 Clinton Way c F E3 � �-.�_ F��I II I■ \,� �, `,,� `, s 534 West Chestnut 822 Glen View o ..,.., . ' Ra _ K� I� ,ta / `, out° ,\ 567 Glenn Drive 837 King m. � V IN■ ' -`, - ©t I' la , 1 \` ` ,`` a l � `�� `, `�`� ■ 585 Glenn r .842 Chestnut Park ® pi._ ��: I �� �,, ` `` +✓,, ` , ` • ` `,,� .601 25th Avenue .851 Rolling Green j ` C nim� N LE 621 ill C 1� � �,,,``, ot `` ,�� ■ 618 Pa uth %� i i" 'r,. :�r i iIM Il , '. �..�� u_ � �� \, ol ` ` � �, r.------ - = 1- 2 -- K: \ � � " }rJ ' r + ∎ ' '� �I , l``` � �\� f \ rth _ fff IP �41 1 ^ 11 1 : t J I J �� � 0 1 • • , \ " • - - 624 650 Browne Avenue 861 24th Avenue 11 I 4 . , rf1 jI [I � • 1 e "� M ^ `a' ' \\ •• `` i 0658 West Walnut 0996 Richey Road • 1.. _.. i rAliiill; X11 II I _ h � l , 1-.•,,.• • 0 ' `I � ,�� ` $ *,,( Existing Irrigation Mains ® 54.7. /�E.A yl .,� r� ua l��+ �� A �r ` �`` ,,``� `,,,, ,l !i!Ui!'!" II` r `i1 I . ,r ��� _�► ` � `�4����� �.,,,� 1 9, . 1 • , - :'O x 0 `,� , `� `. � 1 liftl II I II ISM v...Iii ' ill II (: 1► � m � uI lion n l - _ 1 I�i�a , ' �IEl ' 1 ► 11 II 1 - COPPER 1 If �"I ���� h IIII I iI,a� I,��a: a �d� _ MI I' 1 °, I 1 i . I II i y �... 4 ,it ,,. ,i :I - . , t-I Iw I9 I1- IA N ,I .g II II -HDPE r , , ,. ,,� i 1i i s Il 1 , � A li IHtII r1 ; I 1 I. �mi �a r,. N OB HILL: � e ait_ IIIIIYI- —WOOD I �� - - r , _ �� II UP E NOB HILL 416 �I�F-' 1 1 """ '� i ll� � #IIIIIIIIiIi�lli�� Illll New Irrigation Mains -1"" IIP . U� Ih I IiIIIIIIIiIIII jIII7i I IIIII 1 1 ■ N � � e� i I II I rri i ...i I re 1 .: .,.1111!,,1_ gat on Mains W E ft w AIII - ® N I E R e p I a c e d 0 1,250 2,500 5,000 i : s Fe 11∎ _ u 1 9 9 �______ 0 illl 1 8 2 01 0 0 • . • irrigation System Improvement Fund - 479 Actual Revenues and Expenditures • For the years ended 1998 to 2009 Description - 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 • 2009 Total Beginning Fund Balance $ - $ 334,164 $ 596,314 $ 998,281 $ 960,034 $ 1,363,438 $ 1,395,637 $ 6,842,855 $ 6,494,996 $ 5,894,145 $ 4,511,272 $ 3,754,937 Revenues: Interest from Investments $ - $ 5,217 $ 20,890 $ 26,862 $ 23,248 $ 2,541 $ 34,471 $ 155,912 $ 167,654 $ 104,632 $ 28,124 $ 42,500 $ 612,052 Fruitvale Canal Div - 2010 - Bonneville grant $ 18,299 $ 46,973 $ 65,272 Bond Proceed (line of credit) $ 325;000 • $ 325,000 Bond Proceed (revenue bond) $ 5,031,294 $ 5,031,294 Operating transfer from CIP Rate $ 400,355 $ 509,799 $517,892 $'514,686 $ 516,083 $ 596,487 $ 1,244,657 $ 867,504 $ 901,811 $ 896,930 $ 896,926 $ 896,197 $ 8,759,327 Total Revenues ' $725,355 $ 515,016 $538,782 $ 541,548 $ 539,330 $ 617,328 $ 6,357,394 $ 1,023,416 $ 1,069,465 $ 1,001,562 $ 925,051 $ 938,697 $ 14,792,945 Expenditures: ' 29th and Castlevale to Jerome and 25th $ 351,191 $ 15,809 • $ 367,000 Irrigation Master Plan $ 172,867 $ 56,444 $. 4,967 $ 234,278 Operating Transfer (debt payment) $ 40,000 $ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 5,014 $ 365,014 25th & Jerome to 6th & Jerome $ 371 $ 312,223 $ 962 $ 5,067 • $ 318,623 48 " in Chesterly Park $182,604 $ 4,107 $ 186,711 F St Irrigation Reconstruction -1950 $ 35,048 $ 469,817 $ 12 $ 504,877 6th Ave & Walnut Reline $ 35,594 $ 35,594 DeAtley Park Replacement $ 14,426 $ 92,585 $ • 176 $ 107,186 Nob Hill System Replace $ 20,836 $ 210,562 $ 257 $ 231,655 Fruitvale Canal Diversion & Canal Lining , $ 34,376 $ 72,254 $ ,87,779 $ 3,150 $ 24,554 $ 88,395 $ 37,452 $ 347,959 General Irrigation System Rebuild Phase 2 $ 534,763 $ 767,466 $ 1,358,084 $ 1,062,969 $ 3,723,282 W Yakima Irrigation System Replacement Utility Billing System $ 500,599 $ 305,768 $ 806,367 15,000 1 $ 15,000 $ 15,000 MaClaren Reservoir Reline $ 2,481 $ 50,922 $ 5,034 - $ 58,437 General Irrigation System Rebuild Phase 3 $ 771,121 $ 1,570,915 $ 801,034 $ 3,143,069 Bracket Park Refurbishment $ 245,221 $ 31,118 $ 276,338 • Glen Drive Pump Platform $ 834 $ 229,649 $ 188,049 $ 418,532 ' Public Works Paving $ - $ 31,777 $ 18,500 $ 50,277 Hillcrest and Buna Vista Refirbishment $ 467,499 $ 310,818 $ 778,316 Capital Hill System $ - $ 650,882 •$ 650,882 Total Expenditures $ 391,191 $252,867 $136,815 $ 579,794 $ 135,926 $ 585,130 $ 910,176 $ 1,371,276 $ 1,670,316 $ 2,384,436 $ 2,382,786 $ 1,818,686 $ 12,619,397 Ending Fund Balance $ 334,164 $ 596,314 $ 998,281 $ 960,034 $ 1,363,438 $ 1,395,637 $ 6,842,855 $ 6,494,996 $ 5,894,145 $ 4,511,272 $ 3,053,536 $ 2,874,948 . • Pipe Replacements and Improvements Completed After the Irrigation Utility was Formed in 1997 Feet of Pipe Replaced in the General Irrigation System 1998/1999 2001/2002 2002/2003 2003/2004 2004/2005 2,800 3,600 5,600 2,500 12,645 Feet of Pipe Replaced in the General Irrigation System 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010 12,670 13,985 17,547 16,597 16,063 Fruitvale Canal 2001/2002 2004/2005 1,600 feet of Pipe and 12 Access Manholes 450' of Canal Lining DeAtley Park System and Nob Hill System West Yakima System 2003/2004 2005/2006 7,050' of Pipe and 1 Pumps 11,800' Maclaren Reservoir Bracket Park 2006/2007 2007/2008 Filled cracks and replaced outlet and inlet structure 4,720 Glenn Drive Reservoir Hillcrest, N. Hillcrest / Buena Capital Hill System Vista 2007/2008 2008/2009 2009/2010 Replaced pump station 9,844 14,273 Total Pipe Replaced 153,294 feet 29 miles • •