Loading...
HomeMy WebLinkAboutR-2023-093 Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element RESOLUTION NO. R-2023-093 A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2024 through 2029. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2024 to 2029 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on June 20, 2023 with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2024 through 2029 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 20th day of June, 2023. ATTEST: �PK,nnq```����11 Janice Deccio, Mayor * i Rosalinda Ibarra, City Cler'�� ��} --to" i 1 �oz i 1 s F` ,1„11„4\ 4.. igikiiiiii),.... \L):.... ) BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 9. For Meeting of: June 20, 2023 ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year Transportation I mprovement Program for the period of 2024 through 2029, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Public Works Director * Bill Preston, PE, City Engineer(509) 575-6754 SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The current plan for 2024 —2029 contains a list of two(2) projects that have not previously been on our six year TI P. The two projects include: 1. 40th Ave & Fruitvale Blvd Roundabout 2. Prasch Avenue Sidewalk Improvements Attached is the complete 2024 — 2029 Six-Year TIP, which describes all projects currently on the list. The City will continue to seek funding for projects that do not currently have secured funding. City Council and the public are welcome to add other arterial system projects to the TIP. The Six-Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STI P). The STI P is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-modal transportation network in the State of Washington. The STI P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest 2 priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TI P for 2024 to 2029. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: NA STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolutions ATTACHMENTS: Description Upload Date Type ❑ Resolution a 5/16/2023 Resolution ❑ Resolution b 5/16/2023 Resolution D 11P Update 5/18/2023 Backup Material alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, w k u 3 z a c D. Road Name cc Number m a a 5 7 d c E.Begin &End Termiri M 1 m o M a H d M F. Project Descripticn G.Structure ID a a a p >• a 03 1 YAK92 0807122 08.07/22 R-2022.089 04 COOPS 0.750 CE Yes TW With 1st Street ReVtalization,Phase3 Math 1st Street tdL K Boulevard to%I'Street Ficonstruct and widen roadway,bike lanes.curb and gutter.sidewalks,curb ramps. illumination.and signals. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 NHFP 2090 p00 0 0 2.090 p00 S CN 2023 NHPP 2.910000 0 0 2.910.000 S CN 2023 0 TIB 1,500 p00 0 1,500 p00 S CN 2023 0 0 3,411900 3.411.900 P CN 2023 NHPP 3.473000 0 0 3.473000 Totals 8,473 A00 1.500 000 3,411.900 13.384.900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 7,000000 8,384900 0 0 0 Tdals 7.000 000 6,384500 0 0 0 Page 1 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Title x. o G, m k u 3 z 3 D. Road Name K Number m a a 5 7 °' iO a . E.Begin &End Termini M 1 m oz 5� a 5� tvn w F. Project Descripticn G.Structure ID a a R. p M m M a 04 2 YAK11 0807122 06.07722 R-2022.089 01 0 P S T W 0.280 EA No Bravo Company Boulevard.Phase 1 Bravo Company Blvd Railroad Tracks to Tr Street Construct four-lane roadwaysection with median,bike lanes and roundabouts.install curb,gutter,sidewalk,sheet lighting and storm drainage system,along with water and sewersystems. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 0 0 8.000000 0000 000 Totals 0 0 6000,000 6,000000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 3000 000 3.000 000 0 0 0 Tdals 3,000000 3,000000 0 0 0 Page 2 �_ Washington State Six Year Transportation Improvement Program -/' Department of Transportation From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a a 3. A. PIN/Project No. B.STIP 10 x a ` a ti k C. Project Tille x m G m k d 3 z cO. Road Name a Number = a a o a °' iO . E.Begin &End Termini M ' m i 5-1 a 5� F. Project Description G.Structure ID a a 2 p M m M a DD 3 11485(024) YAK 80 06.7/22 06.7/22 R-2022-069 28 1.000 CE Yes Cowiche Canyon Trail-Phase 1 Cowiche Canyon Trail Powerhouse Road to Cow iche Canyon Lane Construct a pathway,including pedesbian bridge over Cowiche Creek Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 0 CWA 2,316,700 0 2,316,700 Totals 0 2,316,700 ft 2,316,700 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 600000 1,716700 0 0 0 Tdals 600000 1,716700 0 0 0 Page S alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, m k u 3 z a c D. Road Name cc Number m a a 5 7 °' iO a . E.Begin &End Termini M 1 m oz 5� a 5� tvn d F. Project Description G.Structure ID a a R. p M >• M a 14 4 /9939(028) YAK98 0807122 08.07/22 R-2022.089 21 0 P S T W 0.050 CE Yes S.72nd Atenue and W.Washington Pomnue Improtements S.72nd Atenue S.72nd Atenue to W.Washington Ale. Improve intersection by constructing a roundabout. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Furds Total Finds S CN 2023 0 OTHER 800000 0 800.000 Totals 0 800000 0 800.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 800 A00 0 0 0 0 Tdals 800A00 0 0 0 0 Page 4 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a m A. PIN/Project No. B.STIP ID x a ` = A 5 C. Project Tille n W. c. e k u 3 z a c O. Road Name cc Number m a a 5 7 d . E.Begin &End Termini M 1 m oz 5� a 5� H d M F. Project Descripticn G.Structure 10 a a R. p M >• M a 03 5 /000S(473) YAK44 0807/22 08.07122 R-2022.089 21 0 P S T W 0.200 CE Yes 34th Avenue&Fruitvale Boulevard,and 341h Po.enue and River Road Roundabouts 34th Avenue Rver Road to Fruilvale Boulevard Improve the intersedions of River Road&Fruilvale Boulevard,and N.34th Avenue and River Road by installing roundabouts. Fundng Status PIese Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CM 2023 HSIP 788,308 0 87,590 875,898 S CM 2023 0 OTHER 1,000 A00 0 1,000A00 P CM 2023 NHPP 1,228 p00 0 0 1,228 A00 Totals 2,016$08 1,000 900 87,590 3,103$98 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 300 900 2,803$98 0 0 0 Tdals 300900 2,803$98 0 0 0 Page 5 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, m k u 3 z 2 D. Road Name cc Number m a a 5 7 °' iO d m E.Begin &End Termini M 1 m oz 5� a 5� H d F. Project Description G.Structure ID a a R. p M >• M a 19 6 YAK88 0607122 06.07/22 R-2022.089 28 C 0 P T 0.300 CE No Robertson Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinityof Robertson Elementary School,pith as new sidewalk and constructing ADAramps. Fundng Status Phase Phase Start Year(YYYY) Federal Fur4 Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 0 SRTS 410,560 0 440,560 Totals 0 440,580 0 440,560 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 440560 0 0 0 0 Toals 440560 0 0 0 0 Page 6 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, w k u 3 z a c D. Road Name cc Number m a a 5 7 d . E.Begin &End Termini M 1 m oz 5� a 5� H d M F. Project Descripticn G.Structure ID a a R. p M >• M a 03 7 YAK115 12.08/22 12.08/22 R-2022-089 04 0.100 CE No 2023 City Safety-Systemic Pedestrian Safety Improvements,Signal Upgrades; Curb Exensions at 5th Ale.and'D'St.US N.51h Avenue Lincoln Ave to Cherry Ave Upgrade signal controllers at 10 intersecionsto allow for leading pedestrian intenels. hstall curb extensions Mille intersection of 5th Avenue and'D'St.to improve pedestrian safety. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S PE 2023 HSIP 45,000 0 0 45,000 S CN 2023 HSIP 272,000 0 0 272,000 Totals 317,000 0 0 317,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &Sth PE 45000 0 0 0 0 CN 272 A00 0 0 0 0 Toals 317000 0 0 0 0 Page 7 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Title n o G, m k u 3 z a c O. Road Name cc Number ro a a 5 7 d . E.Begin &End Termiri M 1 m oz 5-1 a 5� H d F. Project Description G.Structure 10 a a a p M >• M a 17 8 YAK70 0607122 06.07/22 R-2022.089 10 0.050 CE No Box Culvert Installations S.80th Avenue and Wide Hollow Road Wile Hollow Road to 801h Avenue hstall box culvert(s)adjacent to the 80th Avenue Bridge and Wde Hollow Bridgeto reduce feeding issues. Joint project with Yakima County. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P CN 2023 0 OTHER 176,000 0 176.000 Totals 0 176,000 0 176.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 176.000 0 0 0 0 Tdals 176000 0 0 0 0 Page 8 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Title n o G, m k u 3 z a c D. Road Name K Number m a a 5 7 d . E.Begin &End Termini M 1 m o � a 5� H d M F. Project Description G.Structure ID a a R. p M m M a 16 9 YAK10 0607122 08.07/22 R-2022.089 01 0 P S T W 0.550 EA Yes E."H"Street Edension, Phase 1 E."H"Street 1st Streetto 7th Street Construct new roadway inlcuding water,sewer,cult.gutter.sidewalk,sheet lighting and storm drainage system. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2024 BUILD 566.500 0 0 566.500 P CN 2025 BUILD 5.438,400 TIB 1,320 A00 0 6,758,400 Totals 6.004900 1,320 000 0 7.324.900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 566500 0 0 0 CN 0 0 6.758,400 0 0 Tdals 0 566500 6.758 A00 0 0 Page 9 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Title x. o G, a, k u 3 z 3 D. Road Name cc Number m a a 5 7 °' iO a . E.Begin &End Termini M 1 m oz 5� a 5� tvn w F. Project Descripticn G.Structure ID a a 2 p M >• M a 04 10 W4.13520 0807122 08.07/22 R-2022.089 01 S W 0.280 EA No Bravo Company Boulevard.Phase 2 Bravo Comp any Boulevard "H"Streetto Railroad Tracks Construct four-lane roadwaysection with median,bike lanes and roundabouts.install curb,gutter,sidewalk,street lighting and storm drainage system,along with water and sewersystems. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P CN 2025 0 OTHER 8.500 p00 0 8500 p00 Totals 0 6,500 A00 0 6500 A00 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 0 0 8500 A00 0 0 Tdals 0 0 6500A00 0 0 Page 10 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, a k u 3 z a c D. Road Name cc Number a a a 5 7 d . E.Begin &End Termini M 1 m oz 5� a 5� H d M F. Project Description G.Structure ID a a R. p M >• M a 07 11 YAK103 0607122 08.07722 R-2022.089 28 co P T 0.500 CE No Nob Hill Bementary School Safety tnprovements various streets various locations to various locations This project will make various pedestrian safety improvements in tie vicinityof Nob HII Bemenbry School,such as new sidewalk and constructing ADAramps. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Furds State Find Code State Finds Local Funds Total Finds P PE 2028 0 SRTS 101,200 0 101,200 P CN 2027 0 SRTS 642,400 0 642.400 Totals 0 743,600 0 743.600 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 101200 0 CN 0 0 0 0 642,400 Tdals 0 0 0 101200 642A00 Page 11 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x Cr. `m = A 5 C. Project Tille n o G, m k u 3 z a c D. Road Name cc Number ro a a 5 7 d c E.Begin &End Termiri M 1 m o M a H d M F. Project Descripticn G.Structure ID a a R. p >• a 07 12 Vt/A-13522 0807122 08.07/22 R-2022.089 28 CGPST 0.530 CE No W Browne Po,enue Sidewalk Browne Posenue 7th Po,enueto 18th Poenue Replace damaged sidewalk panels. Fundng Status Phase Phase Start Year(YYYY) Federal Fur4 Code Federal Funds State Find Code State Finds Local Funds Total Finds P ALL 2025 0 0 378,170 378,170 Totals 0 0 378,170 378,170 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &8th ALL 0 0 378,170 0 0 Toals 0 0 378,170 0 0 Page 12 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tine n o G, a k u 3 z a c D. Road Name cc Number ro a a 5 7 d c E.Begin &End Termiri M 1 m o M a H d M F. Project Descripticn G.Structure ID a a R. p >• a 07 13 Vt/A-13523 08.07122 08.07/22 R-2022.089 28 CGPST 0.200 CE No W Pacifc Pomnue Sidewalk Pacifc Pomnue Fair Entrance to.mil Property Construct sidewalk on south side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S ALL 2023 0 TIB 250.000 0 250.000 Totals 0 250.000 0 250.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &Sth ALL 250 p00 0 0 0 0 Toals 250A00 0 0 0 0 Page 13 alk -/a Washi gte to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m k A. PIN/Project No. B.STIP ID x a ` A 5 C. Project Tille n G, m k °' 3 z a c D. Road Name cc Number w a a 5 7 d 3 . E.Begin &End Termiri M ' m i 5-1 a 5� H d M F. Project Descripticn G.Structure ID a a R. p M i M a 03 14 /4566(007) 2143 06.07/22 06.07/22 R-2022.089 03 C 0 P T W CE Yes E Nob Hill Blvd&Fair Pole VS Improvements Nob Hill Blvd E Nob Hill Blvd to Fair Poe W den Nob Hill Boulevard through the intersection,construct left.tum lane,cult, gutter,sidewalk,street lighting and drainage. Upgrade signal.including mast ann structures. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2024 STP(US) 1,175,110 0 189,831 1,364941 Totals 1,175,110 0 189,831 1,364,941 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 0 1,364,941 0 0 0 Toals 0 1,364941 0 0 0 Page 14 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n W. G, m k u 3 z a c D. Road Name a Number ro a a 5 7 °' iO d c E.Begin &End Termiri M 1 m o M a d F. Project Descripticn G.Structure ID a a R. p m >• a 04 15 YAK104 0807122 08.07/22 R-2022.089 05 COOPS 1.530 CE No TW Tieton Drive Resurfacing Tieton Drive S.48th Po.e.to S.72nd Ate. Grind and overlay,and AOAcurb ramp replacement. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2025 0 TIB 97,000 24,280 121,280 P CN 2025 0 TIB 1,108$00 277,200 1,388 000 Totals 0 1,205$00 301,460 1,507260 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 121280 0 0 CN 0 0 1,388 A00 0 0 Tdals 0 0 1,507260 0 0 Page 15 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n W. G, m k u 3 z a c D. Road Name K Number m a n 5 g d . E.Begin &End Termini M 1 m o 5-1 a 5� H 0, el F. Project Descripticn G.Structure ID 43 a R. p M m M . 17 16 YAK93 0607122 05.07/22 R-2022.089 38 C 0 T 0.600 CE Yes Powerhouse Road Multi-Use Path Powerhouse Road Mobile Home Parkto Cow iche Canyon Rd. Construct 10-bot wide mild-use path tom40th Pomnue/US 12 intersection to Powerhouse Road. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2028 0 Ped/Bike Program 44,500 5,500 50,000 P CN 2028 0 Ped/Bike Program 341,835 42,250 384,085 Totals 0 386,335 47,750 434,085 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 50A00 0 CN 0 0 0 0 384,085 Tdals 0 0 0 50000 384085 Page 16 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n W. G, m k u 3 z a c D. Road Name cc Number ro a a 5 7 d c E.Begin &End Termiri M 1 m o M a H d M F. Project Descripticn G.Structure ID a a R. p >• a 07 17 YAK 107 0807122 08.07/22 R-2022.089 28 COPST 0.450 CE No W 88th Avenue Sidewalk 88th Avenue Tieton Drive to Summhview Avenue Construct sidewalk on east sde of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2023 0 SRTS 89.090 0 89.090 P CN 2024 0 SRTS 588.150 0 588.150 Totals 0 657.240 0 657.240 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 89A90 0 0 0 0 CN 0 588.150 0 0 0 Tdals 89 090 568.150 0 0 0 Page 17 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, m k u 3 z a c D. Road Name cc Number ro a a 5 7 d . E.Begin &End Termiri M 1 m oz 5� a 5� H d M F. Project Description G.Structure ID a a R. p M >• M a 16 18 YAK102 0607122 06,07722 R-2022.089 21 P T 0.030 CE No N 1st St&R St Signal N. 1st St. R Street to R Street hstall traffic signal at the intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2027 STP 66,990 0 10,395 77,385 P CN 2028 STP 401,709 0 62,722 484,431 Totals 468.699 0 73,117 541,816 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 0 77,385 CN 0 0 0 0 484,431 Tdals 0 0 0 0 541 2316 Page 18 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a m A. PIN/Project No. B.STIP ID x a ` g A 5 C. Project Tille n c. m k u 3 z c O. Road Name K Number ro n a 5 7 d iO a 3 . E.Begin &End Termiri M ' m i -i a 5� tvn d F. Project Description G.Structure 10 a a R. p M m M a 14 19 YAK57 0807122 08.07/22 R-2022.089 11 C P T 0.010 CE No 18th Street Underpass Yakima Aienue Yakima Aienue to 18th Street Replacethe bridge on E.Yakima Avenue that crosses over 18th Street. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2028 BR 311,970 0 77,970 389.940 P CN 2027 BR 2.974.380 0 743,590 3.717.950 Totals 3,286.330 0 821,560 4,107$90 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 354,490 0 CN 0 0 0 0 3,379950 Tdals 0 0 0 354490 3,379 S50 Page 19 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c a m A. PIN/Project No. B.STIP ID x a cD g A 5 C. Project Title n a.. e k u 3 z a c D. Road Name cc Number ro a a 5 7 °' iO d 3 c E.Begin &End Termini 0.1 .1.1. m i M a w F. Project Descripticn G.Structure ID a a R. p m >• a 04 20 YAK 108 0807122 08.07/22 R-2022.089 03 CGPST 0.030 CE No W S.1st Street and E.Washington Avenue Intersedion Improvements 1st Street Washington Aenue to Washington Avenue Realign intersection,widen E.Washington Ave.for additional lane,replace curb, gutter,sidewalk.and construct new signal. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P ALL 2027 0 0 2,705,725 2,705,725 Totals 0 0 2,705,725 2,705,725 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th ALL 0 0 0 0 2,705,725 Toals 0 0 0 0 2,705,725 Page 20 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a m A. PIN/Project No. B.STIP ID x a 'cD g A 3 5 C. Project Tille n G, m k °' 3 z a c D. Road Name cc Number ro a a 5 g °' iO d 3 c E.Begin &End Termiri M .1.1. m i a tvn d F. Project Descripticn G.Structure ID a a a p m >• a 14 21 YAK14 0807122 08.07/22 R-2022.089 21 COPST CE Yes W Washington laenue&Longfiber Road Intersection htprovements Washington Aaenue Washington Po.enue to Longiber Road hiprove the tftfashington Atenue/Longfiber Road intersection byconstruction of channelizanon.a signal,or a roundabout. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S PE 2023 0 0 100,000 100,000 P RW 2024 0 0 150,000 150,000 P CN 2025 0 0 1000,000 1000 000 Totals 0 0 1250,000 1,250000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 100000 0 0 0 0 RW 0 150.000 0 0 0 CN 0 0 1,000 p00 0 0 Tdals 100000 150,000 1,000000 0 0 Page 21 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, w k u 3 z a c D. Road Name cc Number ro a a 5 7 °' iO d c E.Begin &End Termiri M 1 m oz a w F. Project Descripticn G.Structure ID a a R. p m >• a 14 22 YAK84 0807122 08.07/22 R-2022.089 04 COOPS 0.400 CE Yes TW 18th Avenue and Tieton Drive htersecfion Improvements 18th Avenue 18th Avenue to Tieton Dive Reconstruct and widen 16th Avenue and Tieton Drive by adding let-ttm lanes for all movements atthe intersection. Upgradethe traffic signal. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2028 STP(UL) 358512 0 53592 412,104 P RW 2028 STP(UL) 1.498 507 0 233.893 1,732500 P CN 2028 STP(UL) 1,840583 0 252,483 1,893,188 Totals 3497$02 0 539,968 4,037,770 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 0 412.104 RW 0 0 0 0 1,732500 CN 0 0 0 0 1,893,188 Toals 0 0 0 0 4,037,770 Page 22 �_ Washington State Six Year Transportation Improvement Program -/' Department of Transportation From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a a 3. A. PIN/Project No. B.STIP 10 x a c g a ti k C. Project Tille x m G m k d 3 z cO. Road Name cc Number = sa a o a "' iO i c E.Begin &End Termiri Ma y q i < a F. Project Description G.Structure ID a a 2 P w il a 04 23 YAK 109 08.07122 06A7Q2 R-2022-069 28 CGPST 0.500 CE Yes W FairAtenue Sidewalk FairAtenue Pacifc Pomnue to Nob Hill Boulevard Construct sidewalk on west side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Fird Code Federal Ford: State Enid Code State Ends Local Funds Total Finds P ALL 2024 0 0 500 560 500 560 Totals ii II 500580 500580 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th ALL 0 500560 0 0 0 Totals 0 500 560 ii ii 0 Page 23 �_ Washington State Six Year Transportation Improvement Program -/' Department of Transportation From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a a 3. A. PIN/Project No. B.STIP 10 x a 'c0 a ti k C. Project Tille x m G w k d 3 z cO. Road Name cc Number = sa a o a "' iO i c E.Begin &End Termiri Ma y q i a F. Project Description G.Structure ID a a 2 p m 7 i a 04 24 YAK 110 06.7/22 06.07t22 R-2022-069 28 CGPST 1.500 CE Yes W Nob Hill Boulevard Sidewalk Nob Hill Boulevard 12th St en 14th Street Construct sidewalk on south side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Fird Code Federal Ford: State Prid Code State Finds Local Funds Total Frds P ALL 2028 0 0 175.868 175.i:B: Totals 0 0 175.868 175.%:E.%: Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th ALL 0 0 0 0 175$68 Totals 0 0 .. .. 175$68 Page 24 �_ Washington State Six Year Transportation Improvement Program -/' Department of Transportation From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: YVCDG Y hside N Outside m 3 c a a 3. A. PIN/Project No. B.STIP 10 x a `m a ti k C. Project Tille x m G m k 0 3 z cO. Road Name cc Number = sa n o 7 "' iO i c E.Begin &End Termiri Ma y q i a F. Project Descripticn G.Structure ID a a 2 p w 7 il a 04 75I YAK 111 08.7/22 08.07t22 R-2022-089 04 CGPST 1.500 CE No W 6th Avenue Roadway Irrproierrents 81h Abmnue Walnut Steetto River Road Reconstruct roadwayincluding trolleyprovisions. Fundng Status Ph se Prase Start Year(YYYY) Federal Fus Code Federal Eurd= State Find Code State Ftrids Local Fuss Total Finds S PE 2023 0 0 300.000 300,000 P PE 2023 0 0 700.000 700,000 P UN 2025 0 0 8.58080 8.584$80 Totals .. .. 7564.880 7.564$80 E.perditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 300 A00 ?SDpDo 0 0 0 PLL 0 0 8.584$80 0 0 L3als 300900 7oo,o0 6,564$80 0 0 Page 25 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille x o G, m k u 3 z a c D. Road Name cc Number ro asa 5 7 d c E.Begin &End Termini M x q z —1 a H d M F. Project Descripticn G.Structure ID a a R. p >• a 05 28 YAK 112 08.07/22 08.07/22 R-2022.089 04 CGPST 0.030 CE No W Powerhouse Road and Englewood Avenue Intersedion Improvements Powerhouse Road Englewood Aienue to Englewood Avenue hstall traffic signal at the intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P ALL 2028 0 0 1.014.431 1,014,431 Totals 0 0 1114.431 1.014431 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &Sth ALL 0 0 0 0 1.014.431 Toals 0 0 0 0 1.014431 Page 26 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: YVCDG Y hside N Outside m 3 c I m 2 A. PIN/Project No. B.STIP ID x Cr. ` A 5 C. Project Tille x m G, m k °' 3 z a c D. Road Name cc Number ro la a 5 a °' iO d 3 c E.Begin &End Termiri M x q i —1 a d F. Project Descripticn G.Structure ID a a R. p ,. i a 04 27 YAK 113 08.07122 08.07122 R-2022-089 28 COPST 0.010 CE No W Mead fhenue Pedestrian Signal Mead Aaenue 10th Atenue to 10th Po.enue hstall pedestrian signal atthe east leg of the intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P ALL 2028 0 0 418,030 418,030 Totals 0 0 418,030 418,030 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &61h ALL 0 0 0 0 418,030 Tdals 0 0 0 0 41800 Page 27 �_ Washington State Six Year Transportation Improvement Program -/' Department of Transportation From 2024 to 2029 Agency: Yakirra Courty: Yakirra MPO/RTPO: Yb1COG Y hside N Outside m 3 c a a 3. A. PIN/Project No. B.STIP 10 x a c0 g a ti k C. Project Tille x m G a k d 3 z cO. Road Name cc Number = sa a o a "' iO c E.Begin &End Termiri Ma y q i 'C a F. Project Descripticn G.Structure ID a a 2 p w a 04 ?x YAK 119 06.7/22 0607/22 R-2022-069 28 CGPST 0.120 CE Yes W N. 16th Aienue Sidewalk N. 16th Awnue Rver Road to%I'Street Construct sidewalk on west side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Ford Code Federal Ford: Mite End Code State Finds Local Funds Total Finds P ALL 2028 0 0 209.022 209.022 Totals it 0 209.022 209.022 Expenditure Schedule Phase 1st 2nd ,rd 4th 5th &Sth ALL 0 0 0 0 209 D22 Tdals 0 0 ii ii 209.022 Page 28 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tille n o G, m k u 3 z a c D. Road Name cc Number m a a 5 7 d . E.Begin &End Termini M 1 m oz 5� a 5� H d F. Project Description G.Structure ID a a a p M >• M a 00 29 Vt/A-143210807122 08.07/22 R-2022.089 28 0.100 No Ul@st Valley Schools Pedestrian Bridge S.75th Po,enue S.75th Po,enue to Wu/Community Park Construct new pedestrian bridge mertiflAde Hollow creek connecting S.75th Avenue to WV Park and schools Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P CN 2023 0 SRTS 2000 A00 0 2.000 p00 Totals 0 2,000000 0 2,000000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th CN 2000 A00 0 0 0 0 Tdals 2000A00 0 0 0 0 Page 29 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c a m 2 A. PIN/Project No. B.STIP ID x a ` g A 5 C. Project Tille n G, m k °' 3 z a c D. Road Name cc Number iv a a 5 7 d 3 . E.Begin &End Termini M .1.1. m i � a 5� H d M F. Project Descripticn G.Structure ID a a a p M >• M a 00 30 Ir1W-14324 1208122 12.08/22 R-2022.089 21 CE No 2023 City Safety-Systemic Pedestrian and Bicycle Data Collection to Collect pedestrian and bicycle counts at citystreet intersectionsto develop Lore local road nfetyplans. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S PE 2023 HSIP 280.000 0 0 280.000 Totals 260000 0 0 260000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 280 A00 0 0 0 0 Tctals 260A00 0 0 0 0 Federal Funds State Finds Local Funds Total Finds Grand Totals for Yakima 577,000 0 1500.000 2077 A00 Page 30 alk -/a UWashing opartme to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Title x s G, m k u 3 z a c D. Road Name a Number m a a 5 7 d . E.Begin &End Termini M ' m i � a 5� H w F. Project Descripticn G.Structure ID a a a p M >• M a 05 31 Vt/A.14955 1208/22 R-2022-NNN 04 0.750 CE Yes Coolidge Road from 72nd P e to 89h Ate- Roadway Improvements Coolidge Road 72nd Aenue to 89h Avenue Rehabilitate Busting pavement and update roadwayto current citystandards. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2024 0 0 200.000 200.000 P RW 2024 0 0 200.000 200.000 P CN 2025 0 0 1.100.000 1.100 A00 Totals 0 0 1.500.000 1.500000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 200 p00 0 0 0 RW 0 200 p00 0 0 0 CN 0 0 1.100900 0 0 Tdals 0 400000 1,100A00 0 0 Page 31 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c 'o. 0 c J ' A. PIN/Project No. B.STIP ID 3 0 3 a m ii 'C C. Project Tille x m S. m ,k d a z a D. Road Name cc Number m s- i 3 y u y c. —0 o- E.Begin &End Termiri M $ H w M F. Project Descripticn G.Structure ID n a 7 & ri n 00 WA15080 04.04/23 04/18/23 R-2023.N1N 05 co P T 0.850 CE No 2024 Nonhside Aley Paling Various Aleys N nth Po.enue to Wilco Street The city of Yakima will paw approximately4500 LF of noMhouth alleys between N nth Avenue and N 3rd Avenue,tom W D'Streetto IMllow Street. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Funds S PE 2023 CMAQ 50.000 0 0 50.000 S CN 2024 CMAQ 450.000 0 0 450.000 Totals 500.000 0 0 500.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &Sth PE 50A00 0 0 0 0 CN 0 450A00 0 0 0 Totals 50A00 450A00 0 0 0 Federal Funds State Finds Local Funds Total Funds Grand Totals fcr Yakima 500.000 0 0 500.000 Page 32 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: YVCDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x Cr. `m = A 5 C. Project Tine x o G, w k u 3 z a c D. Road Name cc Number m a n 5 g d„ . E.Begin &End Termiri m i � a 5� H d M F. Project Descripticn G.Structure ID a a a p M >• M a 03 WA15117 15 P S W No 40th Ate and Fruitvale Blvd Roundabout to Roundabout, Rectangular Rapid Flashing Beacons(RRFB),New Marked Crosswalk, Green Patement/BicwIe Intersection Crossing Markings,ADA Curb Ramps,Pudible Pedestrian Signal,Bicyde Wayfnding Signs/Markings,Shared•use Path/Trail Error Subreport could not be shown. Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &Bth 0 0 0 0 0 Tctals 0 0 0 0 0 Page 33 alk -/a WashiDeparngto to Tre ansportation Six Year Transportation Improvement Program From 2024 to 2029 Agency: Yakima Courty: Yakima MPO/RTPO: Yb1CDG Y hside N Outside m 3 c I m A. PIN/Project No. B.STIP ID x a `m = A 5 C. Project Tine x s G, w k u 3 z 2 D. Road Name cc Number w a n 5 a °' iO d . E.Begin &End Termini m 3z � a 5� H w M F. Project Descripticn G.Structure ID a a a p M >• M a 07 WA15118 28 P T No Prasch Aienue Sidewalk Improvements to Construct sidewalks against existing curbing on Prasch Avenue from S.16th/benue to S.20111 Avenue Error Subreport could not be shown. Expenditure Schedule Phase 1st 2nd 3rd dth 5th f.0th 0 0 0 0 0 Tctals 0 0 0 0 0 Page 34