Loading...
HomeMy WebLinkAboutR-2023-061 Resolution authorizing an agreement with HLA Engineering and Land Surveying, Inc to provide Professional Construction Management, Observation and Administration Services for the Nob Hill Boulevard Resurfacing anA RESOLUTION RESOLUTION NO. R-2023-061 authorizing an Agreement with HLA Engineering and Land Surveying, Inc. to provide Professional Construction Management, Observation and Administration Services for the Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements Projects 2619 and 2612. WHEREAS, the Nob Hill Boulevard Resurfacing project received $1,335,000 from the Transportation Improvement Board (TIB) for design and construction with a minimum 20% local match required; and WHEREAS, the Pacific Avenue Sidewalk Improvements project received $250,000 from TIB for Complete Streets requiring no local match; and WHEREAS, the Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements projects will be combined into one construction project for ease of administration and reduced construction costs; and WHEREAS, the City of Yakima (City) has the need to perform construction management on the Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements Projects; and WHEREAS, the City used the procedure established by Washington State law for the bidding and awarding of public capital improvement projects; and WHEREAS, HLA was determined to be qualified to perform the needed professional construction management work and was selected to provide professional construction management, observation and administration services; and WHEREAS, the City Council of the City of Yakima finds that entering into the Professional Services Agreement with HLA Engineering and Land Surveying, Inc., for construction management on the Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements projects is in the best interests of the City and its residents; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute a Professional Services Agreement with HLA Engineering and Land Surveying, Inc., attached hereto and incorporated herein by this reference, not to exceed Two Hundred Thirty Thousand Nine Hundred Dollars ($230,900) to provide construction management services and services outlined in the Professional Services Agreement. ADOPTED BY THE CITY COUNCIL this 18th day ofApr, 2023. anice Deccio, Mayor ATTEST: Sonya CI ar Tee, City Clerk ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.N. For Meeting of: April 18, 2023 Resolution authorizing an agreement with HLA Engineering and Land Surveying, Inc to provide Professional Construction Management, Observation and Administration Services for the Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements Projects 2619 and 2612 Scott Schafer, Director of Public Works * Bill Preston, City Engineer - (509) 576-6754 SUMMARY EXPLANATION: The City of Yakima's Nob Hill Boulevard Resurfacing project includes resurfacing from 15th Ave to 28th Ave. Pacific Ave. Sidewalk Improvements constructs missing sidewalk segments along Pacific Ave. The City used the procedure established by Washington State law for the bidding and awarding of public capital improvement projects with HLA Engineering and Land Surveying, Inc. being selected to provide professional services for construction engineering and administration services on the projects in the amount not to exceed $230,900.00. The two projects will be combined into one construction project for ease of administration and reduction of construction costs. The Agreement has been attached for City Council review. The Nob Hill Resurfacing project is being state funded with a Transportation Improvement Board (TI B) Award of $1,335,000 requiring a 20% local match and the Pacific Ave. Sidewalk Improvements project, is being funded by a $250,000 Award for Complete Street with no local match required. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution ATTACHMENTS: Yes Public Safety scritk n Resolution HLA Projects D Consultant Agreement Upload Date 47512 023 3/31/2023 2 Type Resolutjon Contract Contract Supplemental Agreement Supplemental Agreement Number: 1 Original Contract Number: 2022-192 City Project Number: AT 2612/2619 Project Title: Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements HLA Project No. 22145C Revised Amount Payable this Supplement: Organization and Address: HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Execution Date of Supplement: Completion Date of Supplement: December 31, 2024 Original Amount Payable: $306,710 $537,610 (Increase of $230,900) Supplemental Agreement No. 1 The City of Yakima (CITY), Washington desires to supplement the Original Contract No. 2022-192 entered into with HLA Engineering and Land Surveying, Inc. on October 19, 2022, by Resolution No 2022-141. All provisions in the basic contract remain in effect except as expressly modified by this supplement. The changes to the Agreement are described as follows: Exhibit A: Scope of Services The attached Exhibit A - Scope of Services for additional tasks to be performed as part of this Supplemental Agreement include Construction Engineering services associated with eighty (80) contract days. Exhibit B: Construction Fees Payment for this supplemental work, as shown on Exhibit B is not to exceed $230,900, bringing the total amount of the Agreement to $537,610 (Original Task Order Amount of $306,710 plus Supplement No. 1 amount of $230,900). Exhibit C: Schedule of Rates Exhibit C shall be supplemented with the attached 2023 calendar year schedule of rates for the completion of the Agreement for Professional Services. If you concur with this supplement and agree to the changes as stated above, please sign the appropriate spaces below and return to this office for final action. By: .= Consultant Signature CITY CONTRACT RESOLUTION NO: City Manager Signature Date G:\Contracts & Task Orders\Yakima\2022\Nob Hill Blvd. Resurfacing & Pacific Ave Sidewalk Imp\CN Agreement12023-03-24 Contract No, 2022-192 Supplement 1.docx EXHIBIT A Scope of Services Nob Hill Boulevard Resurfacing and Pacific Avenue Sidewalk Improvements Project Proiect Management 1. Provide monthly status reports and invoices for work performed. 2. Maintain project files for Agency review. Assumptions: 1. City will prepare funding reimbursements. Construction Engineerinia and Administration (The construction contract duration k»eighty (8O)working days. The fee estimate assumes each working day consists of twelve (12) hours per day.) Coordinate and facilitate preconstruction meeting, including preconstruction agenda and meeting record. Prepare and issue Notice toProceed tuContractor. Furnish the field survey crew to set horizontal and vertical control for the project. Provide staking for construction, including but not limited tostructures, curb and gutter, eidmwa|k, nubgrada elevations, signing, and pavement markings. Provide submittal review for project materials oaprovided hythe Contractor parthospecifications. Maintain submittals list for duration of project. Respond tnContractor Request for Information (RF|). Administer construction meetings anticipated once per week during the duration of improvements. Furnish m qualified resident engineer (inspector) to observe construction and be at the project site during all significant work. The resident engineer ahoU provide surveillance of construction for substantial compliance with plans and specifications. |tioanticipated the Contractor may perform asphalt paving work at night and concrete curb/sidewalk work during the day, requiring two shifts to observe construction. Prepare daily progress reports. Prepare weekly statements ofworking days. Consult and advise the Agency during construction and report of the completed work with Agency representatives. Review acceptance sampling and testing for construction materials. Perform measurement and computation ofpay items. Recommend progress payments for the Contractor tothe Agency. Prepare proposed contract change orders and/or force account computations as required. Conduct final inspection with the Cuntnaotor. Agency, and HLA, and prepare punoh|iotofitems to be addressed bythe Contractor and provide tothe Agency. sAContractsxTask HVI Rvd, Resurfacing uPacific Ave oidevvam/"����Contract No, 2022-192 Supplement ,.docx Prepare and furnish reproducible record drawings and field nu1ma ofcompleted work in accordance with project field records. Prepare administrative documents to the appropriate agencies which have jurisdiction over funding, design, and construction of this project. Monitor the Contractor and Subcontractor's compliance with State labor standards during the construction phase of this project, including requests to sublet, intents to pay prevailing wages, affidavits of wages paid, employee wage interviews, and issuing letters of non-compliance and/or missing documentation. All project communications including owner, Contractor, utilities, and others shall be directed through HLA. Prepare and submit recommendation of project acceptance and Notice of Completion ofPublic Works Contract (NOC) for Agency review and processing. oAContracts^Task Hill Blvd. Resurfacing aPacific Ave- Sidewalk/mp\CN Contract No, u22-1mSupplement 1.docx EXHIBIT B Construction Fees The following spreadsheet shows the estimated time and expenses to perform said services. The maximum amount of compensation to the ENGINEER shall not exceed the amount indicated, but the ENGINEER reserves the right to move fee and hours between tasks as necessary to complete the PROJECT. Berried Tgs, Nett Hil0 Boulevard Rouedeckle and Nate Avenue Sidewalk knorinuernents 421150111 O2IIS 4242.12610 Duro Moder Zee zoo NOE 10514 DeseepRian 1 12.9are and Nods Noose clawed 2 29,6510,1 129..1.00401220110111099170 1.62090and 15.0 01217. So Pracand inteld S9tons195.2 NE 2155140,361 429094 12 1.523,1112 12.302024503002 6 1,55945.6 Coostruchon 6,769Eings.(12719.24) 27.7919.1490117130,20144 479111 52 11014122309195 Rap.. seueudlis Blotentent of 33:16,1,572, 6605 10 121v01.1,11,1 ova tool (4 iBrepern 20002961095020 Foy Est/2E310s 12 Nevis. 113161als 1061,63 R051.111E- for Gompiians. 011152 Cont.. 13 P001.,0 and Subrral anun 09162 14 RM., 6121. Ls.. Standards 695709.3. 22 21267194 23E61426,3 219021477,E077E0.636091.1 prrourazzRIS HOURLY ESTIMATE' 73390644 0214920. 4200202 awn ease Festers Engineer r Land 426004 tit 06524302 9169. $7124, I PO 1,111.1 E 7 VE2,1 Ft 2 59 12 0 52 0 22 irt 10 0 0 2 0 0 12 0 I I 6 0 2 11 4 51 0 R0094400 Coaalaat 1E739,29:22349 1'942596,7 ,199579-713.4192 4091902199 160F274104 41/ 3 114 .46151: 373,6 2 0 52 .16 16 8001 0 90 30 4 0 I 20 0 2 1.1 I 4 0 11 0 Tolol 1.961 3 ED 13 12 SO 10515 115 24 14 20 14 17 14 20 T02312.91 27.95 MOS 4605 414,041 91 ON 5142,201 5,6 982 23000 d 14 59, 612 52 376 52 420 01 24B $5 310 'le Bejaia Beddow 52 Nee.. 114667.70 I esto-re suivrirdi StIkONS rig laS SE.e.044291342472e 20 6 2070 211 fos oso roo a 112 10141 rzio 242 191507.6 Ore 22204 02,130 Mediae' 122 SWANN SuilccantuNNNs EXPENSES 041 Evanson 122421430 c()MOtLail J of ratnOti porivis 30 CB l&wraterel Expensos atm%1 yolnt 35. 171711. 1(002 91 520 TENON, SZNStaata GAContracts & Task OrderstYakma120221Nob Hill Blvd. Resurfacing & Pacific Ave Sidewalk Imp \CN Agreement12023-03-24 Contract No 2022-192 Supplement 1.docx EXHIBIT C SCHEDULE OF RATES FOR H&AkEngineering and, Land Surveving,Inc. Effective January 1'2023, through December 31, 2023 Senior Principal Engineer $25O.00per hour Licensed Principal Engineer $223.00per hour Licensed Principal Land Surveyor $223.00per hour Licensed Professional Engineer $2O1.0Oper hour Other Licensed Professional $2O1.00per hour Project Engineer || $184.00per hour Licensed Professional Land Surveyor $181.UOper hour Project Engineer | $1O5.00per hour Contract Administrator ||| $151.00pmrhour Senior Planner $140.0Oper hour CAD Technician $145.0Oper hour Engineering Technician ||| 8130.00per hour Planner $130.0Oper hour Resident Engineer $136.00per hour Surveyor $134.00per hour Surveyor onTwo Man Crew $128.UOper hour Contract Administrator || $120.00 per hour Engineering Technician || $117.00per hour Surveyor onThree Man Crew $112.DOper hour Contract Administrator | $Q7.00per hour Engineering Technician | $Q7.0Oper hour Administrative/Clerical $97.00 per hour Vehicle Mileage Federal Rate oAo"ntr=tsvTask Hill Blvd ,Resurfacing & Pacific Ave, omevmwlmv\Gw*gr°em~muo23-0o-24Contract wvzo22'1mSupplement 1.do= Contract Supplemental Agreement Supplemental Agreement Organization and Address: Number: 2 HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Original Contract Number: Execution Date of Supplement: 2022-192 City Project Number: Completion Date of Supplement: AT2612/RT2619 December 31, 2024 Project Title: Original Amount Payable: Nob Hill Boulevard Resurfacing and Pacific $537,610 Avenue Sidewalk Improvements HLA Project No. 22145C Revised Amount Payable this Supplement: $552,610 (Increase of$15,000) Supplemental Agreement No. 2 The City of Yakima(CITY),Washington desires to supplement the Original Contract No.2022-192 entered into with HLA Engineering and Land Surveying, Inc. on October 19, 2022, by Resolution No. 2022-141, supplemented on April 19, 2023 by Resolution No. 2023-061. All provisions in the basic contract remain in effect except as expressly modified by this supplement. The changes to the Agreement are described as follows: Scope of Services The additional tasks to be performed as part of this Supplemental Agreement include Construction Engineering services associated with five (5) additional contract days required by the Contractor to complete Change Order No. 1 (catch basin improvements) and Construction Engineering related services. Construction Fees Payment for this supplemental work is not to exceed $15,000, bringing the total amount of the Agreement to $552,610 (Original Task Order and Supplement No. 1 Amount of $537,610 plus Supplement No. 2 amount of$15,000). If you concur with this supplement and agree to the changes as stated above,please sign the appropriate spaces below and return to this office for final action. By:A% ', i• �irrrz 17E By: I mo)Ic-a(y-4-- FYI=j DT • Consultant atur City Manager Signature CITY CONTRACT NO d� r- -�" j /� �-��— RESOLUTION NO. • I°' rain ( , )-D-3 Date \\fs02\General\Contracts&Task Orders\Yakima\2022\Nob Hill Blvd Resurfacing&Pacific Ave Sidewalk Imp\CN AgreemenS2023-07-18 22145C Contract No 2022-192 Supplement 2 docx