Loading...
HomeMy WebLinkAboutR-2023-056 Resolution authorizing a contract with Insituform Technologies, LLC. for Project SC2560 Cured-In-Place Pipe Rehabilitation of Sanitary Sewer MainsRESOLUTION NO. R-2023-056 A RESOLUTION authorizing a Contract with Insituform Technologies, LLC. for Project SC2560 Cured -In -Place Pipe Rehabilitation of Sanitary Sewer Mains WHEREAS, the City of Yakima (City) maintains the Wastewater Collections System in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City's Wastewater Division has identified pipeline segments that require rehabilitation or replacement; and WHEREAS, this and future projects will stabilize current conditions of the City's wastewater pipe system and reduce infiltration of groundwater which will save treatment costs, improve collection system reliability, and limit the need for upgrades to the Wastewater Treatment Plant; and WHEREAS, by Resolution R-2020-034, the City entered into an Agreement with HLA Engineering and Surveying (HLA) to prepare the plans and contract documents for the rehabilitation of City's sanitary sewer main lines in various locations within the City, and WHEREAS, the City's Wastewater Division requires construction services for the rehabilitation of approximately 18,000 linear feet of deficient collections system pipes; and WHEREAS, The City used the procedure established by the State of Washington for competitively bidding projects; and WHEREAS, Insituform, Inc. submitted the low bid and has the ability to perform the contact specified work; and WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and its residents to enter into a Contract with Insituform Technologies, LLC. to perform the work detailed in the contract documents for the rehabilitation of approximately 18,000 linear feet of aging City sanitary sewer main lines by means of cured -in -place pipe; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Contract with Insituform Technologies, LLC., in the amount of ONE MILLION FOUR HUNDRED THIRTY-ONE THOUSAND THREE HUNDRED DOLLARS ($1,431,300), for the rehabilitation of approximately 18,000 linear feet of aging City of Yakima sanitary sewer main lines by means of cured -in -place pipe in various locations within the City. ADOPTED BY THE CITY COUNCIL this 18th day of April, 2023. ATTEST: ILL Sonya Cia r Tee, City Clerk 4 94 ell) Janice Deceit°, Mayor r 444.;414 t 4444 0 r 4 CONTRACT IWI-X. THIS AGREEK8ENT, mode and entered in trip|icube, this ay of April ^ 2023_ by and between the City of Yakima . hereinafter called the Owner, and |nadufonnTechnologies, LLC ~ _ a Washington Corporation, hereinafter called the VV[[NESSETH: That in consideration of the terms and conditions contained herein and attached and made a pad of this agreement, the parties hereto covenant and agree as follows: i The Contractor shall do all work and furnish all bxo|u. materials, labor and equipment for THE 8|O AMOUNT OF: $ . for3O23 Citywide Wastewater C|PP Rahmbi|itad|on, City of Yakima Project No. SC2560. all in accordance with, and as doaohbod in the attached plans and specifications and the2U23 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made part hereof, and shall perform any alterations in or additions bothe work provided under this contract and every part thereof. Contract time ohoU begin on the first working day following the NnUoa to Proceed Date and uhoU be completed in one hundred twenty-five (125) working days. If work has not commenced within the ton (10) days after the notice to prnoeed, the first chargeable working day uhuU be the eleventh (11th) working day after the date onwhich the City issues the Notice UuProceed. Ifsaid work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified in the Standard Specifications for each day said work remains uncompleted after expiration of the specified time, aaliquidated damages. The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever that may be required for the transfer of mm&*hu|a and for constructing and completing the work provided for in this ountnoot and every port thereof, except such as are mentioned in the specifications hobafurnished bythe City ofYakima. U. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and 0ocomplete and finish the same according bothe attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the oomo according to the attached specifications and the nohadu|a ufunit oritemized prices honu0o ottanhed, at the time and in the manner and upon the conditions provided for inthis contract. Ui INDEMNIFICATION. Contractor agrees b/release, indemnify, defend, and hold harmless the City, its elected and appointed officials, officers, employees, agenbo, reproeonbaUvoa, insurers, attorneys, and volunteers from all liabilities, |oaneu, damagoo, and expenses related to all c|uima, euito, arbitration octiona, invaotigaUonw, and regulatory orother governmental proceedings arising from or in connection with this Contract or the aotu, failures to aut, errors or omissions of the Conbactor, or any of Contractor's agents or uubuonbaotom, in performance of this Contnect, except for n|oimo oouuod by the Chy'o uo|a negligence. The City'u right to indemnification includes ottumey'o fees and costs associated with establishing the right toindemnification hereunder infavor ofthe City. K/ The Contractor for himself, and for his heiro, axooutom, administrabona, sucoeaaono, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. V. It is further provided that noliability shall attach to the City ofYakima byreason ofentering IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written. Countersigned: CITY OF YAKIMA this t ` stay of 20c f Corporation,, CITY CONTRA{ T NO1 RESOLUTION NO G:\PROJECTS\2022\22146E\Spec\22146 Spec.docx CONTRACTOR Insituform Technologies, LLC Contractor Whittney Bch ulte (Print Name) Contracting& Attesting Officer (President, Owner, etc.) ddress; 580 Goddard Avenue, Chesterfield, MO 63005 4-3 ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.1. For Meeting of: April 18, 2023 Resolution authorizing a contract with I nsituform Technologies, LLC. for Project SC2560 Cured -In -Place Pipe Rehabilitation of Sanitary Sewer Mains Scott Schafer, Director of Public Works *Mike Price, Wastewater/Stormwater Division Manager 509-249- 6815 SUMMARY EXPLANATION: City of Yakima (City) Project SC2560 rehabilitates approximately 18,000 linear feet of aging and deficient concrete and clay sewer pipe in the seven locations identified on the attached Project Location Map. Rehabilitating deficient sewer lines reduces groundwater infiltration, improves collection system reliability, and decreases treatment costs at the Wastewater Treatment Plant. The Project will utilize cured -in -place pipe technology to minimize surface disturbances. The City previously entered into an Agreement with HLA Engineering and Land Surveying, Inc. under City Contract 2020-034 to provide engineering design, bidding, and construction services for the pipe rehabilitation. The City utilized the procedure established by the State of Washington for competitively bidding projects. Two contractors submitted bids, with I nsituform Technologies, LLC. submitting the lowest bid. The Contract in an amount not to exceed $1,431,300 is attached for City Council review. The Project is funded by Wastewater Capital Fund 476. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution ATTACHMENTS: Description 0 Resolution Insituform VVWC Upload Date 4/3/2023 Yes Public Safety Type Resolution 2 0 Cctract 128/2023 Contract 0 Project Location kiap 3/15/2023 Backup Material Project Location Map 2023 CITYWIDE WASTEWATER CIPP REHABILITATION PROJECT NO. SC2560 VICINITY MAP NOT TO SCALE 0 PROJECT LOCATIONS