Loading...
HomeMy WebLinkAbout04/06/2010 08 2010-2015 Six-Year TIP Amendment [Transportation Improvement Plan]BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of: April 6, 2010 ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six-year Transportation Improvement Program (TIP) by adding four projects to the six-year TIP. SUBMITTED BY: William R. Cook, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576-6678 Brett Sheffield, Chief Engineer 576-6797 SUMMARY EXPLANATION: The Six-year Transportation Improvement Program (TIP) is a list developed by the City that includes all of its transportation related projects. The City's existing six-year TIP has a list of projects that amount to around $163 million. Only projects that are listed as having funding secured are guaranteed to be constructed. Each year near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its six-year TIP for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. Once the TIP has been approved by the City Council, it is then added to the Statewide Transportation Improvement Program (STIP). Only projects that are listed on the STIP can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP can be amended during the year to add projects that become available for federal or state funding. The first step to amend the STIP is for the City to amend its six-year TIP. (continued on Page 2) Resolution X Ordinances Other (Specify) Amended STIP Contract_ Mail to (name and address): Phone: Funding Source: APPROVED FOR SUBMITTAL '�� City Manager STAFF RECOMMENDATION: Adopt resolution amending the STIP BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Page 2 Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the 2010-2015 planning period. The proposed amendments consist of the following projects: 1. Nob Hill Boulevard — 49th Avenue to 64th Avenue (existing TIP project #9). This project is proposed to be divided into two phases. Phase 1 (updated TIP Project #9) consists of widening and installing curb, gutter and sidewalk on each side of 64th Avenue from its intersection with Nob Hill Boulevard to 400 feet north, and making improvements to the north side of Nob Hill Boulevard between 53rd Avenue and 64th Avenue, by widening and installing curb, gutter, sidewalk and stormwater treatment. Phase 2 (TIP Project #77) consists of making improvements to the south side of Nob Hill Boulevard between 49th Avenue and 64th Avenue and the north side of Nob Hill Boulevard from 49th Avenue to 53rd Avenue, by widening, installing curb, gutter, sidewalk and stormwater treatment, and overlaying the full width of Nob Hill from 49th Avenue to 64th Avenue. The project must be divided into phases in order to meet eligibility requirements for $925,000 of federal funds through the proposed JOBS bill. 2. 18th Street Underpass (TIP Project #78). Develop a Type, Size and Location report on the 18th Street Underpass todetermine how to repair or replace this bridge, which has the lowest structural deficiency, rating of all bridges in the city. The Federal Bridge Program has issued a, call for bridge projects, and staff proposes to apply for funds to address this issue. . 88th Avenue — Tieton Drive to Summitview Avenue (TIP Project #79). Construct sidewalk on the east side of 88th Avenue from Tieton Drive to Summitview Avenue to improve pedestrian safety on this school route that lacks sidewalks. 4. West Valley Transit Center (TIP Project #80). The City's Transit Division applied for a federal grant to purchase property for a West Valley Transit Center. This funding is for property purchase only. Once the property has been purchased, design of the facility can begin. RESOLUTION NO. R -2010- A RESOLUTION to amend the Six-year Transportation Improvement Program (TIP) for the period of 2010 through 2015 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year TIP for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year Transportation Improvement Plan for the period of 2010 to 2015 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, a public hearing has been held by the Yakima City Council on amending the 6 -Year Transportation Improvement Plan on Tuesday, April 6, 2010, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2010 through 2015 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. ADOPTED BY THE CITY COUNCIL this 6th day of April, 2010. ATTEST: Micah Cawley, Mayor City Clerk Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. •PINIFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done • Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars ' Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State - Funds Local Funds Total Funds Envir. Type RNV Required Date (Mnyyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th ' 6th . 1 2 • 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18- 19 20 21 14 1 Yakima Railroad Grade Separations - Phase 2 Lincoln Ave. from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructon, including realignment of Front Street. 01 06 . 07 08 S 0.20 T P G O W S CN CN 1/1/2010 1/1/2010 STP(U) DEMO 2668 8270 FMSIB AIP 2200 3000 2000 6868 11270 6868 11270 EA Yes 9/1/09 Totals 10,938 5200 2000 18138 18138 14 2 Yakima Railroad Grade Separations- Phase 3 Martin Luther King, Jr. Blvd from: N. 1stSreet to: N. 1st Ave Construct Grade Separation and adjacent roadway reconstruction including Front Street 01 06 07 08 P 0.2 T G 0 CN CN 8/1/2010 8/1/2010 STP(U) ARRA- 650 8000 FMSIB AIP 2000 1500 3768 6418 9500 6418 9500 EA Yes 9/1/2009 Totals 8,650 3500 3768 15918 15918 00 3 Transit Operating Expenditures Various fixed rates and locations from: N/A to: N/A Annual operating assistance from the FTA in support of our transit system; fixed conte, paratransit Dial -A -Ride and vanpool program 12 22 23 24 31 S N/A ALL 1/1/2010 5307 1601 1601 32021 3202 I CE No Totals 1,601 1601 3202 3202 00 4 YVT Trolley Bam/Powerhouse Rehabilitation S 3rd Ave from: to: Minor car barn and powerhouse restoration including property purchase 03 S N/A C G O S S T W CN 1 1/1/2010 STP(E) ! 255 1 1 2551 255 I 1 CE Yes 06/01/07 Totals 255 255 255 Report Date: March 31, 2010 Page 1 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: 7-21-2009 4-6-2010 Adoption Date: 7-21-2009 Functional Class Priority Number Project Identification J A. PIN/Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds RD. Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru• 6th Envir. Type z 3 4 5 6 7 8 9 10 11 • 12 13 14 15 16 17 18 19 20 21 00 5 William 0. Douglas Trail 6th Ave Pathway & Bridge Decking • from: to: Build pathway and install pathway decking on Naches River bridge with partner William O. Douglas Trail Fundation 32 08 06 S 10 Q P S w T CN 1/1/2010 STP(E) 525 525 525 CE No Totals - 525 525 • 525 00 6 William 0. Douglas Heritage Trails Bridge Restoration & Trailhead from: to: Trailhead restoration, right of way acquisition partner with the William O. Douglas Foundation, including restoration of bridge , cleaning, rust removal and painting 32 13 10 S. N/A G o P s T W RW CN 1/1/2010 1/1/2010 STP(E) STP(E) 150 285 150 285 150 285 CE Yes 6/01/09 Totals 435 435 435 00 7 Street Asset Amenities (Transit) Route Maintenance, Repair and Improvements from: to: On going improvements to bus benches, shelters and signage infrastructure 22 31 �S N/A ALL 1/1/2010 1 50I 501 50 CE No Totals 50 50 50 00 8 Expanded Transit Service to Terrace Heights New University & Retail Links from: to: Extension of fixed route bus service only into the Terrace Heights area of Yakima County 22 S N/A ALL I 1/1/2010 CMAQ 33 7 40 40 No Totals 33 7 40 40 Report Date: March 31, 2010 Page 2 v. 5.7 - Supersedes previous editions 'W Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date:' 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project IdentificationProject A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only FProject Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RIW Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 9 Nob Hill Blvd and 64th Ave Improvements Nob Hill Blvd from: 53rd Ave to: 64th Ave Widen and re -construct 64th Ave. to 33 -foot width with curb, gutter and sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter sidewalk and stormwater runoff treatment on the north side of Nob Hill. 03 05 07 12 13 p .71 C P T CN 6/1/2010' JOBS 925 925 925 CE No Totals 925 • 925 925 14 10 S 16th Ave & W Washington Ave Signal & Intersection.' S 16th Ave from: S 16th Ave •. to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project 12 05 03 S N/A p T RW 4/1/2010 1 l I 1 AIP 84 36+ 1201 40 80 CE Yes 4/1/2010 Totals 84 36 120 40 80 16 11 66th Ave. & Summitview Intersection N. 66th Avenue & Summitview• from: N. 66th Ave. to: Summitview Ave. Widen for lett turn lanes, intersection improvements, curb, gutter, handicap ramps and lighting 05 12 S • .20 G P T T W 0 CN 4/1/2010 600 600 600 CE Yes 4/1/2010 Totals 600 600 600 00 12 Coolidge Road Widening and Paving. from: 80th AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 • 05 06 S 50 S P T CN 1/1/2010 CMAQ 540 214 7541 754 CE Yes 9/1/2009 Totals 540 214 754 754 Report Date: March 31, 2010 Page 3 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 • Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local • Funds Total Funds Envir. Type R/W Required Date (MM/yy) Federal Fund Code Federal Cost by Phase 1st • 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 13 • Acquisition of new Dial -A -Ride paratransit vehicles from: to: Purchase new vehicles to replace older, less reliable units 21 S N/A ALL 1/15/2010 5310 96 84 - 180 180 - CE No Totals 96 84 180 180 14 14 E. Lincoln & 10th Street Roundabout from: E. Lincoln to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, & street lighting 03 05 • 06 P N/A PE RW CN 1/1/2010 1/1/2011 6/1/2011 STP(U) STP(U) STP(U) 173 433 1125 27 67 175 200 500 1300 200 500 1300 CE Yes 6/1/2011 Totals • 1,731 27 242 • 2000 200 1800 12 15 S.R.12 & 16th Avenue Interchange Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout 003 P N/A 0 ALL I 1/1/2010 1 STP(U) 865 I 135 I 1000 I 1000 CE No Totals 865 135 1000 1000 11 16 1-82 & Lincoln Avenue Interchange 1-82 Interchange from: E. "G" Street • to: 1-82 Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to E. 'G' Street. 01 P N/A O P G ALL 1/1/2011 STP(U) 865 • 135 1000 l EA Yes 6/2011 Totals 865 135 1000 Report Date: March 31, 2010 Page 4 v. 5.7 - Supersedes previous editions 4111 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. MPO/RTPO: City No.: 1485 YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: . 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification• A. PIN/Federal Aid No. B. Bridge No,e1 C. Project Title" D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done ,Improvement I Type(s) r m Total Length Utility Codes Project Costs in Thousands of Dollars • Expenditure Schedule (Local Agency) Federally Funded Projects Only a is o o_ Phase Start (mm/ddlyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RIVE Required Date (MM/1'Y) Federal Fund • Code Federal Cost by Phase' 1st 2nd 3rd Thu 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21 14 17 E. Yakima Avenue & Fair Avenue Signalization from: E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 p N/A P W T S 0 ALL 1/1/2010 STP(U) 865 135 1000 1000 CE No - Totals 865 135 1000 1000 00 18 Fixed route Bus Services to Moxee along SR 24 Corridor SR 24 Hwy Corridor/Park & Ride Lots from: to:' JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park & Rlde lots along SR 24. 22 S ALL 1/2/2010 . 5316 131 1 ' 131 1 2621 131 I 1 131 1 CE No Totals 131 131- 262 131 131 14 19 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 P _I N/A 0 C P T W RW CN 1/1/2011 4/1/2011 STP(U) STP(U) 173 . 865 27 135 200 1000 200 • 1000 CE Yes 4/1/2001 Totals 1,038 . 162 1200 200 1000 16 20 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 - P N/A p T PE CN 4/1/2010 6/1/2010 13 214 13 214 13 • 214 CE No Totals 227 227 227 Report Date: March 31, 2010 Page 5 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: 7-21-2009 Adoption Date: 7-21-2009 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Numbera. E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only a, Q/ ao` Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (Mnp y) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd. 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 4579 S 1st St. - E. Washington Ave. Intersection Improvement S 1st St. from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A P W S T O PE 6/1/2010 STP(U) 252. 38 290 290 - EA Yes 01/01/11 Totals 252 38 290 290 • 17 22 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 P T W S o ALL 4/1/2011 STP f 2268 307 25751 525 2050 EA Yes 4/1/2014 Totals 2,268 307 2575 525 2050 14 23 South 72nd Ave & Mead Ave Intersection South 72nd Ave . from: South 72nd Ave . to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 P WA 0 P S T W PE CN 1/1/2011 6/1/2011 STP(U) STP(U) 51 383 8 '61 59 444 59 444 CE Yes 6/10/2010 Totals 434 69 503 503 16 24 4562 Tieton Dr- S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A PCE W T O S ALL 4/4/2011 STP(U) 378 WSDOT 378 756 7561 Yes 4/1/2014 Totals 378 378 756 756 Report Date: March 31, 2010 Page 6 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. IVIPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: Report Date: March 31, 2010 Page 7 v. 5.7 - Supersedes previous editions VJ Functional Class Priority Number Project Identification A. PINlfederalAid No. B. Bridge No. C. Project Title • D. 'Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded • Projects Only Project Phase ivm N Fund Source Information Expenditure Federal Funding State Funds Local Funds Total .Funds R/W Re uired q (MwyY) Federal Fund Code Federal Cost b Phase State Fund Code 1st 2nd 3rd 4th 6th Envir. Type ' 4 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17. 18 19 20 ' 21 16 25 E. 'H" St. Extension E. "H" St. from: 1st St. to: .Yakima RiverT Construct road including water, sewer, curb, gutter and sidewalk for future development 01 08 P 1.1 0 O P S W PE RW CN 1/1/2011 1/1/2013 6/1/2014 STP(U) STP(U) STP(U) 2180 2180 1199 340 340 1871 2520 2520 3070 2520 2520 3070 CE Yes .1/1/2014 Totals 5,559 2551 8110 2520 5590 17 26• N. 10th St. Extension N. 10th St. from: R St. to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future development 01 06 p 1.3 0 s T • W PE RW CN 1/1/2012 1/1/2013 6/1/2013 STP(C) STP(U) STP(U) 700 5500 7900 108 850 972 - 808 6350 8872 808 6350 8872 CE Yes 1/1/2013 Totals 14,100 1930 16030 808 15222 00 27 West Side Transit Center Acquire Property to Expand Operations from: to: Locate and acquire property for the placement of a West Side Transit Center Operation 23 S N/A PE1/1/2010 I I - 1 OTHERI 50 1 50 50I I I II - Totals 50 50 50 17 28 • Yakima Downtown Future Initiatives, Phase 4 from: Between lst Street . ' to: and 8th Street• On streets to be selected but contiguous to DFI's 1, 2& 3; Historic lighting sidewalk rood's & more. 03 05 06 S 30 P T PE CN 1/1/2010 6/1/2010 OTHER OTHER 1000 75 75 1000 75 1000 CE No Totals 1000 75 1075 1075 Report Date: March 31, 2010 Page 7 v. 5.7 - Supersedes previous editions v71Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: 7-21-2009 4-6-2010 Adoption Date: 7-21-2009 • _ To c 4 m ._ ° Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase 3 acs amSU Fund Source Information Expenditure Federal Funding State Funds Local • Funds . Total Funds RN1l Required Date (MM7Yy) Federal Fund Code Federal Cost by Phase State Fund Code 1st 2nd 3rd 4th .Thru 6th Envir. Type 1 z 3 4 5 6 7 8 9 10 11 12 13 14. 15 16 17 . 18 19 20 21 17 29 Yakima Downtown Future Initiatives, Phase 5 from: lst Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. 06 12 P .60 p W S T 0 CN 4/1/2010 OTHER 6000 6000 6000 - CE No Totals 6000 6000 6000 00 30Oi Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals P N/A PE CN CN 1/1/2010 4/1/2011 4/1/2011 STIP (S) STP(S) STIP (S) 60 180 360 AIP • 240 60 120 420 360 120 • 420 360 CE No Totals 600 240 60 900 120 780 00 3107 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A P N/A W S CN 6/1/2010 STP(U) 228 32 2601 260 EA No Totals 228 32 260 260 19 32 Longfiber Rd & Washington Ave Intersection from: to: New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn, curb,.gutter, sidewalks. 03 05 06 p N/A p S W T o PE CN 1/1/2011 3/1/2012 STP(U) STP(U) 100 700 14 95 114 795 • 114 795 CE Yes 3/1/2012 Totals 800 109 909 114 795 Report Date: March 31, 2010 Page 8 v. 5.7 - Supersedes previous editions ,7® Washington State Department of Transportation Agency: Yakima .., Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: 7-21-2009 Adoption Date: 7-21-2009 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No.c, C. Project Title D. Street./Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) 0 = =° (1) Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only ii tj 4 a` Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RlW Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 E Nob Hill Blvd & S 18th St E Nob Hill Blvd • from: S 18th St - to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 c S W T CN - 4/1/2011 STP(U) - 240 - 42 282 - 282 CE Yes 01/01/07 Totals 240 42 282 282 17 34. Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 c S T P PE CN 1/1/2010 6/1/2011 STP(E) STP(E) 22 75 7 20 29 95 29 95 T CE Yes 6/1/2011 Totals 97 27 124 124 00 35. • Gravel Road 8. S. T. Various Areas from: City Wide to: 07 P N/A S PE CN 1/1/2011 6/1/2011 50 240 50 240 50 240 CE No Totals 290 • 290 290 . 16 36 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave • Intersection, realignment, curb, gutter, sidewalk, Safely Flashing Signal, possible roundabout 12 P N/A T P 0 c C W CN 10/1/2013 STP(S) 504 74 5781 . 578 CE Yes .10/1/2013 Totals 504 74 578 578 Report Date: March 31, 2010 Page 9 v. 5.7 - Supersedes previous editions W, Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class. Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only m 0 aiFederal o a Phase Start (mm/dd/yyyy) Fund Source Information Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/Yl� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 37 S 48th Ave & SummitviewAve Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 12 P N/A P T PE RW CN 1/1/2013 6/1/2013 8/1/2014 - STP(S) STP(S) STP(S) 25 25 554 4 4 81 29 29 .635 29 29 635 CE Yes 8/1/2013 Totals 604 89 693 693 14. 38 W Lincoln Ave & 'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 • P 5 W T S P G C PE RW CN 1/1/2012 1/1/2013 1/1/2014 - STP(E) STP(E) STP(E) 424 1047 1801 67 163 281 491 1210 2082 491 1210 2082 CE Yes 1/1/2014 Totals 3,272 ' 511 3783 491 3292 16 39 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 P N/A W PE CN 1/1/2010 1/1/2010 PSMP PSMP 13 239 2 48 15 287287 15 CE No Totals 252 50 302 302 14 40 E Nob Hill Blvd. Reconstruction ENob Hill Blvd. from: S 6th Street to: 5 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants 03 04 06 P 85 C G 0 P T 'N PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) 546 1090 6539 84 170 1013 630 1260 7552 630 1260 7552 EA Yes 1/1/2014 Totals 8,175 1267 9442 , 630 8812 Report Date: March 31, 2010 Page 10 v. 5.7 - Supersedes previous editions 411111. 071 Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional . Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only -c .o a Phase Start (mm/dd/yyyy) Fund Source Information ederal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNVD. Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd . 4th 6th 1 2 3 4 5 -6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 41 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 06 P N/A W S T P• PE RW CN 1/1/2011 1/1/2012 ' 1/1/2013 STP(C) STP(C) STP(C) 91 91 544 14 14 86 105 105 630 105 ' 105 630 CE Yes 1/1/2013 Totals 726 114 840 105 105 630 17 42 S 66th Avenue S 66th Ave • from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 04 P.76 W T S P 0 PE CN 1/1/2011 7/1/2012 STP(E) STP(E) 23 1096 5 164 28 1260. 28 1260 _ Yes 7!1/2012 Totals 1,119 169 1288 28 1260 14 43 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview • Signal upgrade, radius improvements, tum lane extension 12 p . N/A W S T P PE RW CN 1/1/2012 1/1/2012 6/6/2012 STP(U) STP STP(U) 126 63 544 17 8 86 143 71 630 143 71 630 CE Yes 6/1/2012, Totals 733 111 844 844 14 44 40th Avenue and Englewood 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller 12 P N/A W T S P PE RW CN 1/1/2012 1/1/2012 1/1/2013 STP • STP STP 95 63 145 13 8 20 108 71 165 108 71 165 CE Yes 1/1/2013 Totals 303 41 • 344 179 165 Report Date: March 31, 2010 Page 11 v. 5.7 - Supersedes previous editions ®. v'i Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. • B. Bridge No.a, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) S3o 0) Total Length Utility Codes Project Costs in Thousands of Dollars ' Expenditure Schedule (Coca! Agency) Federally Funded Projects Only co Federal °' a Phase Start (mm/dd/yyyy) Fund Source Information Funding State Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 . 20 21 00 45 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 P N/A W T S P o PE RW CN 1/1/2012 . 6/1/2012 1/1/2013 STP STP STP 126 63 315 18 8. 43 144 71 358 144 71 • .358 CE .Yes 1/1/2013 Totals 504 69 573 215 358 14 46 . 1st Street and I Street 1st Street from: 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A W T S P 0 PE CN 1/1/2010 1/1/2011 STP STP 32 126 5 17 37 143 37 : 143 CE No Totals 158 22 180 37 143 16 47 Washington Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass including all utilities 01 P 25 O P S T W PE RW 6/1/2013 1/1/2014 • STP(U) STP(U) 820 3150 - 189 630 1009 3780 1009 3780 CE Yes 1/1/2016 Totals 3,970 819 4789 4789 16 48 Frontage Road & "H" St. Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 C C 0 P S T W PE RW 1/1/2013 6/1/2014 STP(U) STP(U) - 272 349 43 55 315 404 315 404 CE Yes 1/1/2015 Totals 621 - . 98 719 719 Report Date:. March 31, 2010 Page 12 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional . Class Priority Number Project Identification_ A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding StateRequired Fund Code State Funds Local Funds Total Funds Envir. ype R NV Date (M Y Federal Fund Code Federal Cost by4th Phase lst 2nd 3rd Th6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 • 16 17 18 19 20 21 14 49 16th Ave. Corridor 16th Ave. from: SR -12 to: Kaahington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting. 04 P 3.5 C G 0 P S T W PE 1/1/2013 STP(U) 120 17 137 137 CE Totals 120 17 137 137 14 50 40th Ave. Corridor 40th Ave. from: SR -12 - to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 C 0 G P S W T PE 1/1/2012 STP(U) 120 17 1371 137 CE • Totals 120 17 137 137 14 51 Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter,lighting - 03 04 P 2.7 C G 0 P ST W PE 1/1/2011 STP(U) 120 117 1371 137 CE Totals 120 17 137 137 14 52 S. 1st St/Main St. Corridor • S. 1st St./Main St.O from: Nob Hill Blvd. • to: Barker Mill Bridge Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, lighting. 04 - P 2.0 C G P T T W PE 1/1/2013 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 Report Date: March 31, 2010 Page 13 v. 5.7 - Supersedes previous editions ®Is Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: 7-21-2009 Adoption Date: 7-21-2009 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 53. Storm Drains/Vegetation Local Selection from: City Wide to: City Wide 32 • P N/A PE CN 1/1/2010 1/1/2010 100 900 100 900 100 900 EA No Totals 1000 1000 1000 17 54 Reconstruction Rudkin Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P -76 W T P S PE CN 1/1/2011 1/1/2012 STP(C) STP(C) 109 945 TPP 945 27 106 136 1996 136 1996 CE No Totals 1,054 945 133 2132 136 1996 16 55 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P 76 0 G 0 P S T PE CN 9/1/2010 4/1/2011 STP(S) STP 122 1730 TPP TPP 23 206 7 70 152 2006 152 2006 CE No Totals 1,852 229 77 2158 152 2006 17 56 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk - 04 P 1.3 O C P T W S PE RW CN 1/1/2011 1/1/2012 4/1/2012 AIP AIP AIP 131 382 1667 20 59 260 151 441 1927 151 441 1927 EA Yes 4/1/2012 Totals 2180 339 2519 151 2368 Report Date: March 31, 2010 Page 14 v. 5.7 - Supersedes previous editions 71 Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: MPO/RTPO: Yakima Co. YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 To g N .2 m c 5 t? Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Numbera. E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only a m L ° nom` Phase Start (m�dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th 1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 57 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 1.0 W S T P _ PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(C) STP(C) STP(C) 272 349 2352 43 55 340 315 404 2692 315 404. 2692 EA Yes 1/1/2013 Totals 2,973 438 3411 3411 17 58 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave • Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 O PE S RW CN 1/1/2012 6/1/2012 6/1/2013 STP(U) STP(U) STP(U) 219 327 2980 34 51 244 - 253 378 3224 - 253 378 . 3224 EA Yes 6/1/2013 Totals 3,526 329 3855 631 3224 14 59 IN Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: S. 6th St. Install missing sidewalks on Southside of Nob Hill. 12 P 2.5 P T w S PE RW CN 1/1/2012 6/1/2012 3/1/2013 STP(S) STP(S) STP(S) 55 107 321 8 19 57 63 126 378 63 126 378 CE - Yes 3/1/2013 Totals 483 84 567 189 378 • 00- ..60 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 P 1.0 P T PE RW CN 1/1/2012 6/1/2012 1/1/2013 STP(S) STP(S) STP(S) 57 189 504 7 25 68 64 214 572 64 214 572 CE Yes 1/1/2013 Totals 750 ' 100 850 278 .- 572 Report Date: March 31, 2010 Page 15 v. 5.7 - Supersedes previous editions eiWashington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend. Date: 4-6-2010 Resolution No.: 2009 - Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done • Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule Local Agency) Federally Funded Projects Only Project Phase �mm � �m Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type 20 RNV Required Date (MM/YY) 21 Federal Fund Code Federal Cost by Phase 1st 2nd • 3rd 4th Thru 6th I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 16 61 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave . Sidewalks, meters and fire hydrants replacement or relocation 12 P 2 0 P T S W PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 43 572 7 88 50 660 50 101 660 CE Yes 1/1/2014 Totals 701 110 811 811 14 6201 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities P 25 W T S P O PE RW CN 6/1/2012 1/1/2014 1/1/2013 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE Yes 1/1/2014 Totals 10,522 1827 12349 1009 11340 16 63 • Citywide Pathway Connections Yakima from: to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities 01 P 4.0 O P S T W PE RW CN 6/1/2011 1/1/2012 1/1/2013 STP(U) STP(U) STP(U) 252 756 1890 38 88 315 290 844 2205 . 290 844 2205 CE Yes 1/1/2013 Totals 2,898 441 3339 290 844 2205 17 64 34th Ave & River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. Intersection improvements including lumination, sewer, water, curb, water and sidewalks 01 12 P N/A O P S T W PE CN 1/1/2012 6/1/2012 STP(U) STP(U) 63 567 5 76 68 643 68 643 CE No Totals 630 - 81 711 711 Report Date: March 31, 2010 Page 16 v. 5.7 - Supersedes previous editions 71 Washington State Department of Transportation Agency: Yakima Co. No.:. 39 City No.: 1485 Co. Name: MPO/RTPO: Yakima Co. YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No 2009 103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Roado F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes • Project Costs in Thousands of Dollars• Expenditure Schedule (Local Agency) Federally Funded Projects only y m aL Start a Phase (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local • Funds Total Funds Envir. Type R/VV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thu 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16- 17 18 19 20 21 17 65 •Englewood Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 0 P S T W PE RW CN 1/1/2012 6/1/2013 1/1/2015 STP(U) STP(U) STP(U) 218 327 2980 34 51 244 252 378 3224 252 378 3224 CE Yes 1/1/2015 Totals 3,525 329 3854 252 3602 14 66 W. Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley - City & County joint project to build/extend roadways. 01 04 06 P 6.0 C G O P S T W PE 1/1/2013 STP(U) 120 17 1371 137 CE Totals 120 17 137 • 137 16 67 Occidental Road Construction. from: 58th Ave. to: 64th Ave: Construct roadway 01 P 38 S W P T PE 1/1/2013 100 1001 1 100 Totals 100 100 100 00 68 86th Ave. Road Construction from: Occidental to: Coolidge• . Construct roadway 01 P 27 PE 1/1/2013 100 1001 100 Totals 100 100 100 . Report Date: March 31, 2010 Page 17 v. 5.7 - Supersedes previous editions 4 Washington State Department of Transportation Agency: Yakima. Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase -� Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds • Envir. Type Required Date (MM/1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 69 64th Ave. Roadway Widening. from: Washington Avenue. to: Tieton Drive.. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 06 P 1.5 W G P T C O PE 1/1/2013 STP(U) 120 17 137 137 EA YES 7/4/2014 Totals 120 17 137 137 00 70 • YVT Railway Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 p N/A G C S T W P PE CN 1/1/2013 6/1/2013 STP(E) STP(E) 18 1900 32 285 50 2185 50 2185 EA No Totals 1,918 317 2235 2235 16 71 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder improvements, PM10 abatement. 01 p N/A S PE CN 4/1/2011 7/1/2011 CMAQ CMAQ 24 480 3 65 27 545 27 545 CE No Totals 504 68 572 572 00 72 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 14 32 P .25 T P O _Totals PE CN 1/1/2012 3/1/2013 STP(E) STP(E) 252 3150 34 412 286 3562 286 3562 CE No 3,402 446 3848 286 3562 Report Date: March 31, 2010 Page 18 v. 5.7 - Supersedes previous editions V71 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name:. Yakima Co. City. No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 •IN - Functional Class N . Priority Number Pro Project Identification 1 A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road -" Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length H a, o y Project Costs in Thousands of Dollars Schedule. (Local Agency) Federally Funded Projects Only N . m L a j o d Phase Start mnddd/ ( YYYy) Fund Source Information • Expenditure - Federal Funding State Fund Code State Funds Local Funds Total Funds R/W Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th Envir. Type 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 73 William O. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 p N/A 0 S P VV PE CN 1/1/2010 7/1/2010 STP(E) STP(E) 10 109 2 17 12 126 12 126 CE No Totals 119 19 138 138 00. 74 YVT Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area including 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03 32 p N/A O P S T • w PE CN 1/1/2013. 6/1/2013 STP(U) STP(U) 315 945 38 126 353 1071 353 1071 CE No Totals 1,260 - 164 1424 . ' 1424 00- 75 Citywide Alleys from: • to: Pave alleys throughout the city. 07 P 5 G P S W T CN 6/1/2010 75 751 25 25 25 CE .No Totals 75 75' 25 25 25 14 75 Summitview Ave. Grind & Overlay from: 14th Ave to: 56th Ave Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA ramps 06 07 P 2.64 PE CN 1/1/2010 6/1/2010. ARRA- ARRA 50 1950 50 1950 50 1950 CE No Totals 2,000 . 2000 2000 Report Date: March 31, 2010 Page 19 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 To 4 N m c 0 t? Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done - Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars • Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start mm/dd/ ( yyyY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/VV Required q Date (lyyl/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 76 River Road Improvements from: 6th Ave to: 16th Ave Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage 03 05 06 07 P 0.50 W G P T T ALL 1/1/2014 STP(U) 1298 202 1500 • 1500 CE Yes 6/1/2015 Totals • 1,298 202 1500. 1500 77 Nob Hill Blvd from: 49th Avenue to: 64th Avenue Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width 05 06 07 12. 13 P 0.97 C P G G O CN 7/1/2011 STP(U) 2700 I f 421 1 3121 1 3121 CE No Totals 2,700 • 421 3121 3121 78 18th Street Underpass from: Yakima Ave to: 18th Street Repair or replace 18th Street Underpass • 10 11 . P .01 P T• c PE 4/1/2011 BRAC 50 501 50 N/A .. No Totals 50 50 • 50 79 88th Avenue from: Tieton Drive to: Summitview Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 88th. 06 12 13 P 0.48 C T G PE RW CN 1/1/2011 2/1/2011 6/1/2011 WSDOT WSDOT WSDOT 50 25 320 10 50 25 330 50 25 330 CE Yes Totals 395 10 405 405 Report Date: March 31, 2010 Page 20 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 7-21-2009 Adoption Date: 7-21-2009 Amend Date: 4-6-2010 Resolution No.: 2009-103 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/VV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th hru 6th 1 2 3 4 5 6 . 7 8 9 10 11 12 13 14 15. 16 17 18 19 20 21 80 Westside Transit Center (Transit) from: N/A to: N/A . Construct a West Side Transit Center (Park & Ride Facility) 23 P N/A PE 4/1/2013 5309(Bus) 15 1 16 2 2 12 Yes Totals . 15 1 16 2 2 12 Report Date:. March 31, 2010 r Yakima 118,433 20,119 25,770 164,322 39,375 29966 18,121 75,860 Page 21 v. 5.7 - Supersedes previous editions