HomeMy WebLinkAbout04/06/2010 08 2010-2015 Six-Year TIP Amendment [Transportation Improvement Plan]BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of: April 6, 2010
ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six-year Transportation
Improvement Program (TIP) by adding four projects to the six-year TIP.
SUBMITTED BY: William R. Cook, Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576-6678
Brett Sheffield, Chief Engineer 576-6797
SUMMARY EXPLANATION:
The Six-year Transportation Improvement Program (TIP) is a list developed by the City that includes all of
its transportation related projects. The City's existing six-year TIP has a list of projects that amount to
around $163 million. Only projects that are listed as having funding secured are guaranteed to be
constructed.
Each year near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its
six-year TIP for submittal to the Washington State Department of Transportation. This plan must include all
transportation projects for which state gas tax revenue of federal revenue will be used. Once the TIP has
been approved by the City Council, it is then added to the Statewide Transportation Improvement Program
(STIP). Only projects that are listed on the STIP can be approved by the Federal Highway Administration
(FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized
program of transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal
transportation network in the State of Washington.
The STIP can be amended during the year to add projects that become available for federal or state
funding. The first step to amend the STIP is for the City to amend its six-year TIP.
(continued on Page 2)
Resolution X Ordinances Other (Specify) Amended STIP
Contract_ Mail to (name and address): Phone:
Funding Source:
APPROVED FOR SUBMITTAL '�� City Manager
STAFF RECOMMENDATION: Adopt resolution amending the STIP
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
Page 2
Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the
2010-2015 planning period. The proposed amendments consist of the following projects:
1. Nob Hill Boulevard — 49th Avenue to 64th Avenue (existing TIP project #9). This project is
proposed to be divided into two phases. Phase 1 (updated TIP Project #9) consists of widening
and installing curb, gutter and sidewalk on each side of 64th Avenue from its intersection with
Nob Hill Boulevard to 400 feet north, and making improvements to the north side of Nob Hill
Boulevard between 53rd Avenue and 64th Avenue, by widening and installing curb, gutter,
sidewalk and stormwater treatment. Phase 2 (TIP Project #77) consists of making
improvements to the south side of Nob Hill Boulevard between 49th Avenue and 64th Avenue
and the north side of Nob Hill Boulevard from 49th Avenue to 53rd Avenue, by widening,
installing curb, gutter, sidewalk and stormwater treatment, and overlaying the full width of Nob
Hill from 49th Avenue to 64th Avenue.
The project must be divided into phases in order to meet eligibility requirements for $925,000 of
federal funds through the proposed JOBS bill.
2. 18th Street Underpass (TIP Project #78). Develop a Type, Size and Location report on the 18th
Street Underpass todetermine how to repair or replace this bridge, which has the lowest
structural deficiency, rating of all bridges in the city. The Federal Bridge Program has issued a,
call for bridge projects, and staff proposes to apply for funds to address this issue.
. 88th Avenue — Tieton Drive to Summitview Avenue (TIP Project #79). Construct sidewalk on the
east side of 88th Avenue from Tieton Drive to Summitview Avenue to improve pedestrian safety
on this school route that lacks sidewalks.
4. West Valley Transit Center (TIP Project #80). The City's Transit Division applied for a federal
grant to purchase property for a West Valley Transit Center. This funding is for property
purchase only. Once the property has been purchased, design of the facility can begin.
RESOLUTION NO. R -2010-
A RESOLUTION to amend the Six-year Transportation Improvement Program (TIP) for
the period of 2010 through 2015 to include projects affecting the City's
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year
TIP for the construction or repair of streets in the City of Yakima for the ensuing six year
period, all as contemplated and required by State RCW 35.77.010 and applicable Federal
law, and
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year
Transportation Improvement Plan for the period of 2010 to 2015 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and
provided under RCW 36.70A.130(2B) and RCW 35.77.010, and
WHEREAS, a public hearing has been held by the Yakima City Council on amending
the 6 -Year Transportation Improvement Plan on Tuesday, April 6, 2010, with proper public
notice as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2010 through 2015
for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation
Improvement Plan attached.
ADOPTED BY THE CITY COUNCIL this 6th day of April, 2010.
ATTEST:
Micah Cawley, Mayor
City Clerk
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. •PINIFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done •
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars '
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State -
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(Mnyyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th '
6th .
1
2
• 3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18-
19
20
21
14
1
Yakima Railroad Grade Separations - Phase 2
Lincoln Ave.
from: N 1st St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconstructon,
including realignment of Front Street.
01
06 .
07
08
S
0.20
T
P
G
O
W
S
CN
CN
1/1/2010
1/1/2010
STP(U)
DEMO
2668
8270
FMSIB
AIP
2200
3000
2000
6868
11270
6868
11270
EA
Yes
9/1/09
Totals 10,938 5200 2000 18138 18138
14
2
Yakima Railroad Grade Separations- Phase 3
Martin Luther King, Jr. Blvd
from: N. 1stSreet to: N. 1st Ave
Construct Grade Separation and adjacent roadway reconstruction including
Front Street
01
06
07
08
P
0.2
T
G
0
CN
CN
8/1/2010
8/1/2010
STP(U)
ARRA-
650
8000
FMSIB
AIP
2000
1500
3768
6418
9500
6418
9500
EA
Yes
9/1/2009
Totals 8,650 3500 3768 15918 15918
00
3
Transit Operating Expenditures
Various fixed rates and locations
from: N/A to: N/A
Annual operating assistance from the FTA in support of our transit system;
fixed conte, paratransit Dial -A -Ride and vanpool program
12
22
23
24
31
S
N/A
ALL
1/1/2010
5307
1601
1601
32021
3202
I
CE
No
Totals 1,601 1601 3202 3202
00
4
YVT Trolley Bam/Powerhouse Rehabilitation
S 3rd Ave
from: to:
Minor car barn and powerhouse restoration including property purchase
03
S
N/A
C
G
O
S
S
T
W
CN 1
1/1/2010
STP(E) !
255
1 1
2551 255
I
1
CE
Yes
06/01/07
Totals 255 255 255
Report Date: March 31, 2010
Page 1
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
4-6-2010
Adoption Date: 7-21-2009
Functional
Class
Priority
Number
Project Identification
J
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
RD.
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru•
6th
Envir.
Type
z
3
4
5
6
7
8
9
10
11 •
12
13
14
15
16
17
18
19
20
21
00
5
William 0. Douglas Trail
6th Ave Pathway & Bridge Decking •
from: to:
Build pathway and install pathway decking on Naches River bridge with
partner William O. Douglas Trail Fundation
32
08
06
S
10
Q
P
S
w
T
CN
1/1/2010
STP(E)
525
525
525
CE
No
Totals - 525 525 • 525
00
6
William 0. Douglas Heritage Trails
Bridge Restoration & Trailhead
from: to:
Trailhead restoration, right of way acquisition partner with the William O.
Douglas Foundation, including restoration of bridge , cleaning, rust removal
and painting
32
13
10
S.
N/A
G
o
P
s
T
W
RW
CN
1/1/2010
1/1/2010
STP(E)
STP(E)
150
285
150
285
150
285
CE
Yes
6/01/09
Totals 435 435 435
00
7
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: to:
On going improvements to bus benches, shelters and signage infrastructure
22
31
�S
N/A
ALL
1/1/2010
1
50I 501 50
CE
No
Totals 50 50 50
00
8
Expanded Transit Service to Terrace Heights
New University & Retail Links
from: to:
Extension of fixed route bus service only into the Terrace Heights area of
Yakima County
22
S
N/A
ALL I
1/1/2010
CMAQ
33
7
40
40
No
Totals 33 7 40 40
Report Date: March 31, 2010
Page 2
v. 5.7 - Supersedes previous editions
'W Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:' 4-6-2010 Resolution No.: 2009-103
Functional
Class
Priority
Number
Project IdentificationProject
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
FProject Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RIW
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
9
Nob Hill Blvd and 64th Ave Improvements
Nob Hill Blvd
from: 53rd Ave to: 64th Ave
Widen and re -construct 64th Ave. to 33 -foot width with curb, gutter and
sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter
sidewalk and stormwater runoff treatment on the north side of Nob Hill.
03
05
07
12
13
p
.71
C
P
T
CN
6/1/2010'
JOBS
925
925
925
CE
No
Totals 925 •
925 925
14
10
S 16th Ave & W Washington Ave Signal & Intersection.'
S 16th Ave
from: S 16th Ave •. to: W Washington Ave
Included in Union Gap's Valley Mall Blvd. project
12
05
03
S
N/A
p
T
RW
4/1/2010
1
l
I
1 AIP
84
36+
1201
40
80
CE
Yes
4/1/2010
Totals
84
36
120 40 80
16
11
66th Ave. & Summitview Intersection
N. 66th Avenue & Summitview•
from: N. 66th Ave. to: Summitview Ave.
Widen for lett turn lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
S
• .20
G
P
T
T
W
0
CN
4/1/2010
600
600
600
CE
Yes
4/1/2010
Totals
600
600 600
00
12
Coolidge Road Widening and Paving.
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
03
• 05
06
S
50
S
P
T
CN
1/1/2010
CMAQ
540
214
7541 754
CE
Yes
9/1/2009
Totals 540
214
754 754
Report Date: March 31, 2010
Page 3
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 • Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local •
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st •
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
13
•
Acquisition of new Dial -A -Ride paratransit vehicles
from: to:
Purchase new vehicles to replace older, less reliable units
21
S
N/A
ALL
1/15/2010
5310
96
84
-
180
180
-
CE
No
Totals 96 84 180 180
14
14
E. Lincoln & 10th Street Roundabout
from: E. Lincoln to: E. MLK Jr. Blvd.
Roundabout construction at intersection curb, gutter, sidewalk, & street
lighting
03
05
• 06
P
N/A
PE
RW
CN
1/1/2010
1/1/2011
6/1/2011
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
200
500
1300
CE
Yes
6/1/2011
Totals • 1,731 27 242 • 2000 200 1800
12
15
S.R.12 & 16th Avenue Interchange
Interchange
from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
003
P
N/A
0
ALL I 1/1/2010 1 STP(U)
865 I
135 I 1000 I
1000
CE
No
Totals 865 135 1000 1000
11
16
1-82 & Lincoln Avenue Interchange
1-82 Interchange
from: E. "G" Street • to: 1-82
Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue
to E. 'G' Street.
01
P
N/A
O
P
G
ALL
1/1/2011
STP(U)
865
• 135
1000 l
EA
Yes
6/2011
Totals 865 135 1000
Report Date: March 31, 2010
Page 4
v. 5.7 - Supersedes previous editions
4111
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
MPO/RTPO:
City No.: 1485
YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: . 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification•
A. PIN/Federal Aid No. B. Bridge No,e1
C. Project Title"
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
,Improvement I
Type(s)
r
m
Total Length
Utility Codes
Project Costs in Thousands of Dollars
•
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
a
is
o
o_
Phase
Start
(mm/ddlyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RIVE
Required
Date
(MM/1'Y)
Federal
Fund
• Code
Federal
Cost by
Phase'
1st
2nd
3rd
Thu
6th
1
2
3
4
5
6
7
8
9
10
11
12
13 .
14
15
16
17
18
19
20
21
14
17
E. Yakima Avenue & Fair Avenue Signalization
from: E. Yakima Avenue to: Fair Avenue
Construct Traffic Signal
12
p
N/A
P
W
T
S
0
ALL
1/1/2010
STP(U)
865
135
1000
1000
CE
No
-
Totals 865 135 1000 1000
00
18
Fixed route Bus Services to Moxee along SR 24 Corridor
SR 24 Hwy Corridor/Park & Ride Lots
from: to:'
JARC funded demonstration project to determine ridership potential to and
from the Moxee area including stops at two Park & Rlde lots along SR 24.
22
S
ALL
1/2/2010
.
5316
131
1
' 131
1 2621 131
I
1 131
1
CE
No
Totals 131 131- 262 131 131
14
19
E Nob Hill Blvd & Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
31
03
04
P
_I
N/A
0
C
P
T
W
RW
CN
1/1/2011
4/1/2011
STP(U)
STP(U)
173
. 865
27
135
200
1000
200
• 1000
CE
Yes
4/1/2001
Totals 1,038 . 162 1200 200 1000
16
20
S 3rd Ave & W Washington Ave Signal
S 3rd Ave
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
-
P
N/A
p
T
PE
CN
4/1/2010
6/1/2010
13
214
13
214
13
• 214
CE
No
Totals 227 227 227
Report Date: March 31, 2010
Page 5
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009 Adoption Date: 7-21-2009
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Numbera.
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
a,
Q/
ao`
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(Mnp y)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd.
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
4579
S 1st St. - E. Washington Ave. Intersection Improvement
S 1st St.
from: S 1st St. to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
T
O
PE
6/1/2010
STP(U)
252.
38
290
290
-
EA
Yes
01/01/11
Totals 252 38 290 290
•
17
22
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Summitview Ave. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
P
T
W
S
o
ALL
4/1/2011
STP
f
2268
307
25751
525
2050
EA
Yes
4/1/2014
Totals 2,268 307 2575 525 2050
14
23
South 72nd Ave & Mead Ave Intersection
South 72nd Ave .
from: South 72nd Ave . to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
P
WA
0
P
S
T
W
PE
CN
1/1/2011
6/1/2011
STP(U)
STP(U)
51
383
8
'61
59
444
59
444
CE
Yes
6/10/2010
Totals 434 69 503 503
16
24
4562
Tieton Dr- S 5th Ave. Intersection Project
Tieton Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
N/A
PCE
W
T
O
S
ALL
4/4/2011
STP(U)
378
WSDOT
378
756
7561
Yes
4/1/2014
Totals 378 378 756 756
Report Date: March 31, 2010
Page 6
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
IVIPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
Report Date: March 31, 2010
Page 7
v. 5.7 - Supersedes previous editions
VJ
Functional
Class
Priority
Number
Project Identification
A. PINlfederalAid No. B. Bridge No.
C. Project Title •
D. 'Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
• Projects Only
Project Phase
ivm
N
Fund Source Information
Expenditure
Federal Funding
State
Funds
Local
Funds
Total
.Funds
R/W
Re uired
q
(MwyY)
Federal
Fund
Code
Federal
Cost b
Phase
State
Fund
Code
1st
2nd
3rd
4th
6th
Envir.
Type
'
4
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17.
18
19
20
' 21
16
25
E. 'H" St. Extension
E. "H" St.
from: 1st St. to: .Yakima RiverT
Construct road including water, sewer, curb, gutter and sidewalk for future
development
01
08
P
1.1
0
O
P
S
W
PE
RW
CN
1/1/2011
1/1/2013
6/1/2014
STP(U)
STP(U)
STP(U)
2180
2180
1199
340
340
1871
2520
2520
3070
2520
2520
3070
CE
Yes
.1/1/2014
Totals 5,559 2551 8110 2520 5590
17
26•
N. 10th St. Extension
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave.
Construct road including water, sewer, curb, gutter, sidewalk for future
development
01
06
p
1.3
0
s
T
• W
PE
RW
CN
1/1/2012
1/1/2013
6/1/2013
STP(C)
STP(U)
STP(U)
700
5500
7900
108
850
972
-
808
6350
8872
808
6350
8872
CE
Yes
1/1/2013
Totals 14,100 1930 16030 808 15222
00
27
West Side Transit Center
Acquire Property to Expand Operations
from: to:
Locate and acquire property for the placement of a West Side Transit
Center Operation
23
S
N/A
PE1/1/2010 I I
-
1
OTHERI
50 1
50 50I
I
I
II
-
Totals 50 50 50
17
28
•
Yakima Downtown Future Initiatives, Phase 4
from: Between lst Street . ' to: and 8th Street•
On streets to be selected but contiguous to DFI's 1, 2& 3; Historic lighting
sidewalk rood's & more.
03
05
06
S
30
P
T
PE
CN
1/1/2010
6/1/2010
OTHER
OTHER
1000
75
75
1000
75
1000
CE
No
Totals 1000 75 1075 1075
Report Date: March 31, 2010
Page 7
v. 5.7 - Supersedes previous editions
v71Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
4-6-2010
Adoption Date: 7-21-2009
• _
To
c
4 m
._ °
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
3
acs
amSU
Fund Source Information
Expenditure
Federal Funding
State
Funds
Local
• Funds .
Total
Funds
RN1l
Required
Date
(MM7Yy)
Federal
Fund
Code
Federal
Cost by
Phase
State
Fund
Code
1st
2nd
3rd
4th
.Thru
6th
Envir.
Type
1
z
3
4
5
6
7
8
9
10
11
12
13
14.
15
16
17 .
18
19
20
21
17
29
Yakima Downtown Future Initiatives, Phase 5
from: lst Street to: 9th Street
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
06
12
P
.60
p
W
S
T
0
CN
4/1/2010
OTHER
6000
6000
6000
-
CE
No
Totals 6000 6000 6000
00
30Oi
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
P
N/A
PE
CN
CN
1/1/2010
4/1/2011
4/1/2011
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
• 240
60
120
420
360
120
•
420
360
CE
No
Totals 600 240 60 900 120 780
00
3107
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
P
N/A
W
S
CN
6/1/2010
STP(U)
228
32
2601 260
EA
No
Totals 228 32 260 260
19
32
Longfiber Rd & Washington Ave
Intersection
from: to:
New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn,
curb,.gutter, sidewalks.
03
05
06
p
N/A
p
S
W
T
o
PE
CN
1/1/2011
3/1/2012
STP(U)
STP(U)
100
700
14
95
114
795
•
114
795
CE
Yes
3/1/2012
Totals 800 109 909 114 795
Report Date: March 31, 2010
Page 8
v. 5.7 - Supersedes previous editions
,7® Washington State Department of Transportation
Agency: Yakima ..,
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009 Adoption Date: 7-21-2009
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.c,
C. Project Title
D. Street./Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
0
=
=°
(1)
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
ii
tj
4
a`
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RlW
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru 6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
33
E Nob Hill Blvd & S 18th St
E Nob Hill Blvd •
from: S 18th St - to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
1
c
S
W
T
CN
-
4/1/2011
STP(U)
-
240
-
42
282
-
282
CE
Yes
01/01/07
Totals 240 42 282 282
17
34.
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
S
15
c
S
T
P
PE
CN
1/1/2010
6/1/2011
STP(E)
STP(E)
22
75
7
20
29
95
29
95
T
CE
Yes
6/1/2011
Totals 97 27 124 124
00
35.
•
Gravel Road 8. S. T.
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
1/1/2011
6/1/2011
50
240
50
240
50
240
CE
No
Totals 290 • 290 290 .
16
36
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave •
Intersection, realignment, curb, gutter, sidewalk, Safely Flashing Signal,
possible roundabout
12
P
N/A
T
P
0
c
C
W
CN
10/1/2013
STP(S)
504
74
5781
.
578
CE
Yes
.10/1/2013
Totals 504 74 578 578
Report Date: March 31, 2010
Page 9
v. 5.7 - Supersedes previous editions
W,
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class.
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
m
0
aiFederal
o
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/Yl�
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
S 48th Ave & SummitviewAve Signalization
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization
12
P
N/A
P
T
PE
RW
CN
1/1/2013
6/1/2013
8/1/2014
-
STP(S)
STP(S)
STP(S)
25
25
554
4
4
81
29
29
.635
29
29
635
CE
Yes
8/1/2013
Totals 604 89 693 693
14.
38
W Lincoln Ave & 'B' St Realignment
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
• P
5
W
T
S
P
G
C
PE
RW
CN
1/1/2012
1/1/2013
1/1/2014
-
STP(E)
STP(E)
STP(E)
424
1047
1801
67
163
281
491
1210
2082
491
1210
2082
CE
Yes
1/1/2014
Totals 3,272 ' 511 3783 491 3292
16
39
School Safety Projects
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
12
P
N/A
W
PE
CN
1/1/2010
1/1/2010
PSMP
PSMP
13
239
2
48
15
287287
15
CE
No
Totals 252 50 302 302
14
40
E Nob Hill Blvd. Reconstruction
ENob Hill Blvd.
from: S 6th Street to: 5 18th Street
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
an hydrants
03
04
06
P
85
C
G
0
P
T
'N
PE
RW
CN
1/1/2012
1/1/2013
1/1/2014
STP(C)
STP(C)
STP(C)
546
1090
6539
84
170
1013
630
1260
7552
630
1260
7552
EA
Yes
1/1/2014
Totals 8,175 1267 9442 , 630 8812
Report Date: March 31, 2010
Page 10
v. 5.7 - Supersedes previous editions
411111.
071 Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
. Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
-c
.o
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
ederal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNVD.
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
. 4th
6th
1
2
3
4
5
-6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
41
S 72nd Avenue & W Washington Avenue
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
Intersection improvement, possible roundabout
01
12
06
P
N/A
W
S
T
P•
PE
RW
CN
1/1/2011
1/1/2012
' 1/1/2013
STP(C)
STP(C)
STP(C)
91
91
544
14
14
86
105
105
630
105
' 105
630
CE
Yes
1/1/2013
Totals 726 114 840 105 105 630
17
42
S 66th Avenue
S 66th Ave •
from: Scenic Drive to: Summitview
Widen roadway, curb, gutter, sidewalk and utilities
04
04
P.76
W
T
S
P
0
PE
CN
1/1/2011
7/1/2012
STP(E)
STP(E)
23
1096
5
164
28
1260.
28
1260
_
Yes
7!1/2012
Totals 1,119 169 1288 28 1260
14
43
40th Avenue and Summitview Signal Upgrade
40th Avenue
from: 40th Avenue to: Summitview •
Signal upgrade, radius improvements, tum lane extension
12
p
. N/A
W
S
T
P
PE
RW
CN
1/1/2012
1/1/2012
6/6/2012
STP(U)
STP
STP(U)
126
63
544
17
8
86
143
71
630
143
71
630
CE
Yes
6/1/2012,
Totals 733 111 844 844
14
44
40th Avenue and Englewood
40th Avenue
from: 40th Avenue to: Englewood
Replace traffic signal poles, upgrade controller
12
P
N/A
W
T
S
P
PE
RW
CN
1/1/2012
1/1/2012
1/1/2013
STP •
STP
STP
95
63
145
13
8
20
108
71
165
108
71
165
CE
Yes
1/1/2013
Totals 303 41 • 344 179 165
Report Date: March 31, 2010
Page 11
v. 5.7 - Supersedes previous editions
®.
v'i Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. • B. Bridge No.a,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
S3o
0)
Total Length
Utility Codes
Project Costs in Thousands of Dollars
' Expenditure Schedule
(Coca! Agency)
Federally Funded
Projects Only
co Federal
°'
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
. 20
21
00
45
16th Avenue and Fruitvale Blvd
16th Avenue
from: 16th Avenue to: Fruitvale Blvd
Replace traffic signal poles, radius improvements, ADA ramps
12
P
N/A
W
T
S
P
o
PE
RW
CN
1/1/2012
. 6/1/2012
1/1/2013
STP
STP
STP
126
63
315
18
8.
43
144
71
358
144
71
• .358
CE
.Yes
1/1/2013
Totals 504 69 573 215 358
14
46
.
1st Street and I Street
1st Street
from: 1st Street to: I Street
Replace and upgrade traffic signal equipment
12
P
N/A
W
T
S
P
0
PE
CN
1/1/2010
1/1/2011
STP
STP
32
126
5
17
37
143
37
:
143
CE
No
Totals 158 22 180 37 143
16
47
Washington Ave. Railroad Grade Separation
Washington Ave.
from: Longfibre Road to:
Railroad grade overpass including all utilities
01
P
25
O
P
S
T
W
PE
RW
6/1/2013
1/1/2014
• STP(U)
STP(U)
820
3150
-
189
630
1009
3780
1009
3780
CE
Yes
1/1/2016
Totals 3,970 819 4789 4789
16
48
Frontage Road & "H" St. Loop
N. 8th St.
from: "H" St. to: 1-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
C
C
0
P
S
T
W
PE
RW
1/1/2013
6/1/2014
STP(U)
STP(U)
-
272
349
43
55
315
404
315
404
CE
Yes
1/1/2015
Totals 621 - . 98 719 719
Report Date:. March 31, 2010
Page 12
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date: 4-6-2010
Resolution No.: 2009-103
Functional .
Class
Priority
Number
Project Identification_
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
StateRequired
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
ype
R NV
Date
(M Y
Federal
Fund
Code
Federal
Cost by4th
Phase
lst
2nd
3rd
Th6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
• 16
17
18
19
20
21
14
49
16th Ave. Corridor
16th Ave.
from: SR -12 to: Kaahington Ave.Nalley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
04
P
3.5
C
G
0
P
S
T
W
PE
1/1/2013
STP(U)
120
17
137
137
CE
Totals
120
17
137 137
14
50
40th Ave. Corridor
40th Ave.
from: SR -12 - to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
C
0
G
P
S
W
T
PE
1/1/2012
STP(U)
120
17
1371
137
CE
•
Totals
120
17
137 137
14
51
Nob Hill Corridor
Nob Hill
from: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter,lighting -
03
04
P
2.7
C
G
0
P
ST
W
PE
1/1/2011
STP(U)
120
117
1371
137
CE
Totals
120
17
137 137
14
52
S. 1st St/Main St. Corridor •
S. 1st St./Main St.O
from: Nob Hill Blvd. • to: Barker Mill Bridge
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk,
lighting.
04
-
P
2.0
C
G
P
T
T
W
PE
1/1/2013
STP(U)
120
17
1371
137
CE
Totals
120
17
137 137
Report Date: March 31, 2010
Page 13
v. 5.7 - Supersedes previous editions
®Is
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009 Adoption Date: 7-21-2009
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
53.
Storm Drains/Vegetation
Local Selection
from: City Wide to:
City Wide
32
• P
N/A
PE
CN
1/1/2010
1/1/2010
100
900
100
900
100
900
EA
No
Totals 1000 1000 1000
17
54
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
-76
W
T
P
S
PE
CN
1/1/2011
1/1/2012
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1996
136
1996
CE
No
Totals 1,054 945 133 2132 136 1996
16
55
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
76
0
G
0
P
S
T
PE
CN
9/1/2010
4/1/2011
STP(S)
STP
122
1730
TPP
TPP
23
206
7
70
152
2006
152
2006
CE
No
Totals 1,852 229 77 2158 152 2006
17
56
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk -
04
P
1.3
O
C
P
T
W
S
PE
RW
CN
1/1/2011
1/1/2012
4/1/2012
AIP
AIP
AIP
131
382
1667
20
59
260
151
441
1927
151
441
1927
EA
Yes
4/1/2012
Totals 2180 339 2519 151 2368
Report Date: March 31, 2010
Page 14
v. 5.7 - Supersedes previous editions
71 Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name:
MPO/RTPO:
Yakima Co.
YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
To
g N
.2 m
c 5
t?
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Numbera.
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
a
m
L
°
nom`
Phase
Start
(m�dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
1
2
3 •
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
57
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb, gutter, sidewalk
05
06
P
1.0
W
S
T
P
_
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP(C)
STP(C)
STP(C)
272
349
2352
43
55
340
315
404
2692
315
404.
2692
EA
Yes
1/1/2013
Totals 2,973 438 3411 3411
17
58
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave
from: N 16th Ave to: N 24th Ave •
Widen, curb, gutter and sidewalk, water and sewer lines
05
06
P
2
O PE
S
RW
CN
1/1/2012
6/1/2012
6/1/2013
STP(U)
STP(U)
STP(U)
219
327
2980
34
51
244
-
253
378
3224
-
253
378
. 3224
EA
Yes
6/1/2013
Totals 3,526 329 3855 631 3224
14
59
IN Nob Hill Blvd Sidewalks
W Nob Hill Blvd
from: S 16th Ave to: S. 6th St.
Install missing sidewalks on Southside of Nob Hill.
12
P
2.5
P
T
w
S
PE
RW
CN
1/1/2012
6/1/2012
3/1/2013
STP(S)
STP(S)
STP(S)
55
107
321
8
19
57
63
126
378
63
126
378
CE -
Yes
3/1/2013
Totals 483 84 567 189 378
•
00-
..60
Beech St Pedestrian Connection
Beech St
from: Fair Ave to: Chalmers/Riverside
Construct pedestrian pathway under SR82 to Greenway
06
32
P
1.0
P
T
PE
RW
CN
1/1/2012
6/1/2012
1/1/2013
STP(S)
STP(S)
STP(S)
57
189
504
7
25
68
64
214
572
64
214
572
CE
Yes
1/1/2013
Totals 750 ' 100 850 278 .- 572
Report Date: March 31, 2010
Page 15
v. 5.7 - Supersedes previous editions
eiWashington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend. Date:
4-6-2010
Resolution No.: 2009 -
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
•
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
�mm
� �m
Fund Source Information
Expenditure
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
20
RNV
Required
Date
(MM/YY)
21
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
•
3rd
4th
Thru
6th
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
16
61
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 56th Ave to: N 29th Ave .
Sidewalks, meters and fire hydrants replacement or relocation
12
P
2 0
P
T
S
W
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP(S)
STP(S)
STP(S)
43
572
7
88
50
660
50
101
660
CE
Yes
1/1/2014
Totals 701 110 811 811
14
6201
Mead Ave. Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass including all utilities
P
25
W
T
S
P
O
PE
RW
CN
6/1/2012
1/1/2014
1/1/2013
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560
CE
Yes
1/1/2014
Totals 10,522 1827 12349 1009 11340
16
63
•
Citywide Pathway Connections
Yakima
from: to:
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
01
P
4.0
O
P
S
T
W
PE
RW
CN
6/1/2011
1/1/2012
1/1/2013
STP(U)
STP(U)
STP(U)
252
756
1890
38
88
315
290
844
2205
. 290
844
2205
CE
Yes
1/1/2013
Totals 2,898 441 3339 290 844 2205
17
64
34th Ave & River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
P
N/A
O
P
S
T
W
PE
CN
1/1/2012
6/1/2012
STP(U)
STP(U)
63
567
5
76
68
643
68
643
CE
No
Totals 630 - 81 711 711
Report Date: March 31, 2010
Page 16
v. 5.7 - Supersedes previous editions
71 Washington State Department of Transportation
Agency: Yakima
Co. No.:. 39
City No.: 1485
Co. Name:
MPO/RTPO:
Yakima Co.
YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date: 4-6-2010 Resolution No 2009 103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Roado
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
• Project Costs in Thousands of Dollars•
Expenditure Schedule
(Local Agency)
Federally Funded
Projects only
y
m
aL
Start
a
Phase
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local •
Funds
Total
Funds
Envir.
Type
R/VV
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thu
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16-
17
18
19
20
21
17
65
•Englewood
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines
and street lights.
01
05
12
P
1.0
0
P
S
T
W
PE
RW
CN
1/1/2012
6/1/2013
1/1/2015
STP(U)
STP(U)
STP(U)
218
327
2980
34
51
244
252
378
3224
252
378
3224
CE
Yes
1/1/2015
Totals 3,525 329 3854 252 3602
14
66
W. Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley -
City & County joint project to build/extend roadways.
01
04
06
P
6.0
C
G
O
P
S
T
W
PE
1/1/2013
STP(U)
120
17
1371
137
CE
Totals 120 17 137 • 137
16
67
Occidental Road Construction.
from: 58th Ave. to: 64th Ave:
Construct roadway
01
P
38
S
W
P
T
PE
1/1/2013
100
1001
1
100
Totals 100 100 100
00
68
86th Ave. Road Construction
from: Occidental to: Coolidge•
.
Construct roadway
01
P
27
PE
1/1/2013
100
1001
100
Totals 100 100 100
. Report Date: March 31, 2010
Page 17
v. 5.7 - Supersedes previous editions
4
Washington State Department of Transportation
Agency: Yakima.
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
-�
Fund Source Information
Expenditure
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
•
Envir.
Type
Required
Date
(MM/1
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
69
64th Ave. Roadway Widening.
from: Washington Avenue. to: Tieton Drive..
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
W
G
P
T
C
O
PE
1/1/2013
STP(U)
120
17
137
137
EA
YES
7/4/2014
Totals 120 17 137 137
00
70
•
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
p
N/A
G
C
S
T
W
P
PE
CN
1/1/2013
6/1/2013
STP(E)
STP(E)
18
1900
32
285
50
2185
50
2185
EA
No
Totals 1,918 317 2235 2235
16
71
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
p
N/A
S
PE
CN
4/1/2011
7/1/2011
CMAQ
CMAQ
24
480
3
65
27
545
27
545
CE
No
Totals 504 68 572 572
00
72
Pedestrian Bridge
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32
P
.25
T
P
O
_Totals
PE
CN
1/1/2012
3/1/2013
STP(E)
STP(E)
252
3150
34
412
286
3562
286
3562
CE
No
3,402 446 3848 286 3562
Report Date: March 31, 2010
Page 18
v. 5.7 - Supersedes previous editions
V71
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name:. Yakima Co.
City. No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
•IN -
Functional
Class
N . Priority
Number
Pro Project Identification
1
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road -" Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
H
a,
o
y
Project Costs in Thousands of Dollars
Schedule.
(Local Agency)
Federally Funded
Projects Only
N .
m
L
a
j
o
d
Phase
Start
mnddd/
( YYYy)
Fund Source Information
• Expenditure
-
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
R/W
Required
Date
(My)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
Envir.
Type
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
73
William O. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
14
32
p
N/A
0
S
P
VV
PE
CN
1/1/2010
7/1/2010
STP(E)
STP(E)
10
109
2
17
12
126
12
126
CE
No
Totals 119 19 138 138
00.
74
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway in West Valley area including 53rd Ave, Wide Hollow,
64th Ave, Ahtanum including all utilities and signage
03
32
p
N/A
O
P
S
T
• w
PE
CN
1/1/2013.
6/1/2013
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No
Totals 1,260 - 164 1424 . ' 1424
00-
75
Citywide Alleys
from: • to:
Pave alleys throughout the city.
07
P
5
G
P
S
W
T
CN
6/1/2010
75
751 25
25
25
CE
.No
Totals 75 75' 25 25 25
14
75
Summitview Ave. Grind & Overlay
from: 14th Ave to: 56th Ave
Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA
ramps
06
07
P
2.64
PE
CN
1/1/2010
6/1/2010.
ARRA-
ARRA
50
1950
50
1950
50
1950
CE
No
Totals 2,000 . 2000 2000
Report Date: March 31, 2010
Page 19
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date:
4-6-2010
Resolution No.: 2009-103
To
4 N
m
c 0
t?
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done -
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
• Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
mm/dd/
( yyyY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/VV
Required
q
Date
(lyyl/yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
76
River Road Improvements
from: 6th Ave to: 16th Ave
Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage
03
05
06
07
P
0.50
W
G
P
T
T
ALL
1/1/2014
STP(U)
1298
202
1500
• 1500
CE
Yes
6/1/2015
Totals • 1,298 202 1500. 1500
77
Nob Hill Blvd
from: 49th Avenue to: 64th Avenue
Widen, curb, gutter, sidewalk, lighting, drainage, grind and overlay full width
05
06
07
12.
13
P
0.97
C
P
G
G
O
CN
7/1/2011
STP(U)
2700
I
f
421
1 3121
1
3121
CE
No
Totals 2,700 • 421 3121 3121
78
18th Street Underpass
from: Yakima Ave to: 18th Street
Repair or replace 18th Street Underpass
•
10
11
.
P
.01
P
T•
c
PE
4/1/2011
BRAC
50
501 50
N/A
..
No
Totals 50 50 • 50
79
88th Avenue
from: Tieton Drive to: Summitview Ave
Construct curb, gutter, sidewalk and stormwater runoff treatment on the east
side of 88th.
06
12
13
P
0.48
C
T
G
PE
RW
CN
1/1/2011
2/1/2011
6/1/2011
WSDOT
WSDOT
WSDOT
50
25
320
10
50
25
330
50
25
330
CE
Yes
Totals 395 10 405 405
Report Date: March 31, 2010
Page 20
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7-21-2009 Adoption Date: 7-21-2009
Amend Date: 4-6-2010
Resolution No.: 2009-103
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/VV
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
hru
6th
1
2
3
4
5
6 .
7
8
9
10
11
12
13
14
15.
16
17
18
19
20
21
80
Westside Transit Center (Transit)
from: N/A to: N/A .
Construct a West Side Transit Center (Park & Ride Facility)
23
P
N/A
PE
4/1/2013
5309(Bus)
15
1
16
2
2
12
Yes
Totals . 15 1 16 2 2 12
Report Date:. March 31, 2010
r Yakima
118,433 20,119 25,770 164,322 39,375 29966 18,121 75,860
Page 21