Loading...
HomeMy WebLinkAbout04/07/2009 08 2009-2014 Six-year Transportation Improvement Program (STIP) Amendment BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON Ill AGENDA STATEMENT Item No. S For Meeting of: April 7, 2009 ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six -year Transportation Improvement Program (STIP) by adding six projects to the STIP. SUBMITTED BY: William R. Cook, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678 Brett Sheffield, Chief Engineer 576 -6797 SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the 2009 -2014 planning years. The City of Yakima has identified a need to amend the current Six Year TIP to account for designated and potential funds from the American Recovery ; and Reinvestment Act (ARRA). The new projects include: 1) Nob Hill Boulevard Improvements; 2) dividing the Yakima Railroad Grade Separations, Phase 2 into separate phases; 3) Yakima Downtown Future Initiatives, Phase 4; 4) Summitview Avenue Grind and Overlay; 5) purchasing five new transit buses; and, 6) purchasing three new paratransit vehicles. The projects that have been designated to receive funds from the ARRA are: Nob Hill Boulevard Improvements (priority number 13 - $950,000); purchasing five new transit buses (priority number 5 _ • $2,000,000); and, purchasing three new paratransit vehicles (priority number 6 - $150,000). The Nob Hill Boulevard Improvement project consists of constructing curb, gutter, sidewalk, street lights, a storm drainage system and intersection improvements from 64 Avenue and 72 Avenue. The remaining three projects are candidates for ARRA funds or other funding as it may become available. (Continued on Page 2) Resolution X Ordinance Other (Specify) Contract Mail to (name and address): Phone: Funding Source: APPROVED FOR SUBMITTAL:, City Manager STAFF RECOMMENDATION: Adopt resolution amending the STIP BOARD /COMMISSION RECOMMENDATION: COUNCIL ACTION: III Page 2 Since we have secured enough funding to construct one underpass of the Yakima Railroad 9 9 P Grade Separation Project we are splitting the project shown into separate projects or phases. Current Phase 2 will become — Lincoln Avenue Underpass and new Phase 3 will be Martin Luther King, Jr. Boulevard Underpass. See STIP priority numbers 1 and 2. As the Lincoln and MLK Underpasses were planned to be constructed one at a time, it is perfectly feasible to break them into two separated phases. Phase 1 of the Yakima Railroad Grade Separations project, which relocated underground utilities, was completed in the summer of 2007. Lincoln Avenue Underpass construction is scheduled to begin in 2009. Lincoln Avenue is being constructed first because when a train blocks Lincoln Avenue during the need for an emergency response to the west side of the tracks the Fire Department response time will be at least two minutes shorter than having to travel to use the Walnut Street Underpass. We have requested $8,000,000 of ARRA funds to complete funding of the MLK Underpass. The Yakima Downtown Future Initiatives, Phase 4 project requests $1,000,000 of ARRA funds to provide new sidewalk and streetscape improvements to the north side of 'A' Street from 3rd Street to Naches Avenue and to the east side of Naches Avenue between Yakima Avenue and 'A' Street. This Phase 4 project is also in the current Senate Budget Proposal for $1,500,000 in state funds. See STIP priority number 69. The Summitview Avenue Grind and Overlay requests $2,000,000 of ARRA funds to replace the aging pavement from 14 Avenue to 56 Avenue. See STIP priority number 82. r • RESOLUTION NO. R -2009- A RESOLUTION to amend the Six -year Transportation Improvement Program (TIP) for the period of 2009 through 2014 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -year TIP for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year Transportation Improvement Plan for the period of 2009 to 2014 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and ill WHEREAS, a public hearing has been held by the Yakima City Council on amending t he 6 -Year Transportation Improvement Plan on Tuesday, March 24, 2009, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2009 through 2014 • for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. ADOPTED BY THE CITY COUNCIL this Jth day of April, 2009. Dave Edler, Mayor ATTEST: City Clerk Ill • e • 111 , . . . • . 0 . Washington State Department of Transportation - Six Year Transportation Impro Program - Agge en ncy: Yakima. . - From 2009 to 2014 Co..No.: 39 Co. Name: Yakima Co. • Hearing Date: , 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs In Thousands of Dollars Federally Funded A. PI /Federal Aid No, B. Bridge No. E d Fund Source Information Expenditure Schedule Projects Only N .Y 0..., 01 -p s w o E C Project Title m , " (Local Agency) - - L Federal Funding c U L2 D. Street/Road Name or Number • o >, ,co IS a Phase Federal Federal State 4th Required Li— LL E o m State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road o St Fund Cost by Fund 3rd Thru Funds Funds Funds 1st 2nd 3r Type (MM /VY) F. Describe Work to be Done 0 _ 1 = (mm/dd /yyyy) • Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 STP(U) . 500 OTHER 150 650 650 14 1 01 S 0.2 T RW 6/1/2009 STP(U) 1000 OTHER 1000 loon EA Yakima Railroad Grade Separations - Phase 2 06 P CN. 6/1/2009 STP(U) 8150 FMSIB 2500 1000 11650 6000 5650 Yes • Lincoln Ave. 07 G CN 6/1/2009 OTHER 1000 _ 1000 1000 from: N 1st St to: N 1st Ave 08 W CN 6/1/2009 AIP . 3000 3000 3000 "4!30/09 Construct Grade Separations and adjacent roadway reconstructon, S - . including realignment of Front Street. • - Totals 9,650 6650 1000 17300 7650 9650 • PE 1/1/2009 STP(U) 175 25 200 200 14 2 01 P 0.2 T CN 6/1/2009 STP(U) 2400 FMSIB 2000 3975 8375 • 8375 EA Yakima Railroad Grade Separations- Phase 3 06 G ' • 6/1/2009 ARRA - 8000 OTHER 1500 9500 2000 7500 - Yes Martin Luther King, Jr. Blvd 07 from: N. 1st Sreet to: N. 1st Ave • O • 08 4/30/09 Construct Grade Separation and adjacent roadway reconstruction including Front Street • • Totals 10,575 3500 4000 18075 200 10375 7500 14 3 01 S 1.0 p CN 4/1/2009 3840 36401 3840, EA 16TH AVENUE REALIGNMENT 08 0 Yes 16TH AVENUE REALIGNMENT from: AHTANUM ROAD to: WASHINGTON AVENUE . . W ' Realign 16111 Avenue out of the runway safety area of the Yakima Air S 11/2007 Terminal. Includes FAA funds. Totals 3840 3840 3840 00 4 03 P N/A G PE 1/1/2009 STP(E) 18 32 50 50 CN 6/1/2009 STP(E) 1900 285 21851 . 2185 EA _ YVT Railway Rehabilitation & Museum 8 No 3rd Ave - from: 3rd Ave to: Pine St T - W . Car Barn, Museum Restoration and Pathway P • • Totals 1,918 317 2235 2235 v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 1 . • • IOW izi Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A . PIN /Federal Aid No. B Bridge No. c f. m Fund Source Information Expenditure Schedule Projects Only 45 E el, ...., H c ai ( Agency) - o :o C. Project Title n m s o t Federal Funding R/W • E U n` - = D. Street/Road Name or Number ° - � in a Ph ase Fed eral Federal State 4th Required o •- State Local Total Envir. Date LL E. Beginning MP or Road - Ending MP or Road E r o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (M 5) F. Describe Work to be Done a. (mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 '17 18 19 20 21 00 5 21 S ALL 4/15/2009 ARRA - FTA 2000 2000 2000 CE Purchase of 5 (five) transit buses - 35 foot low floor versions - No from: - to: . Acquire 5 (five) Gillig 35" low floor transit buses through the federal stimulus • program to replace 5 (five) unreliable Thomas buses Totals 2,000 . 2000 2000 - 00 6 21 S ALL 4/15/2009 ARRA - FTA 150 30 180 I 180 CE Acquisition of 3 (three) new Paratransit vehicles for Dial -A -Ride No • from: to: Purchase 3 (three) new Paratransit vehicles to replace 3 (three) older simila , unreliable units • Totals 15 0 30 180 180 CN 1/1/2009 5307 1655 1655 3310 3310 00 7 12 S • N/A I CE Transit Operating Expenditures 22 No Various Funding Areas 23 from: N/A to: N/A 24 Supplemental Funding for Transit Service Operating Expenses 31 _ Totals 1,655 1655 3310 3310 PE 1/1/2009 ' STP(E) 36 - 36 36 , 00 8 03 S N/A C RW 1/1/2009 STP(E) 205 205 205 CE YVT Trolley Barn /Powerhouse Rehabilitation G CN 1/1/2009 STP(E) 255 255 255 Yes S 3rd Ave O - P . from: to: S 06/01/07 Minor car barn and powerhouse restoration including property purchase T - W Totals 496 496 496 Report Date: January 31, 2008 Page 2 v. 5.7 - Supersedes previous editions III ,i, 411 0 0 • ' 0 • P Six Year Transportation Improvement Program v7 .- Agge Yakima Washington State Department of Transportation From • 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: . 7/1/2008 Adoption Date: 7 -15 -2008 City No.:, 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification , Project Costs in Thousands of Dollars • Federally Funded T A. PIN /Federal Aid No. B. Bridge No. , ^ r CO d e , • Fund Source Information Expenditure Schedule Projects Only c = E w o N (Local Agency) cp , m $ E C. Project Title > J o L Federal Funding R/W . U i i- 2 D. Street /Road Name or Number Li to z - a Phase Federal Federal State • 4th Required Li_ E. Beginning MP or Road - Ending MP or Road E I 5 o Start Fund Cost by Fund State Local Total Envir. Date 1st 2nd 3rd Thru F. Describe Work to be Done a (mm/ddiyyyy) Code Phase . Code Funds Funds Funds 6th Type (M>) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • 00 9 22 S N/A ALL 1/1/2009 WSDOT 50 50 50 CE Street Asset Amenities (Transit) 31 No . Route Maintenance, Repair and Improvements from: to: • _ Maintenance of Shetters, Benches and Signage throughout our Transit - Route System Totals - 50 50 50 00 10 32 S 1.0 O CN 4/1/2009 STP(E) 525 5251 525 CE William O. Douglas Trail 08 P • - No- 6th Ave Pathway & Bridge Decking 06 S • from: to: w Build pathway and install pathway decking on Neches River bridge with - T • - partner William 0. Douglas Trail Fundation - Totals 525 525 525 00 11 32 S N/A G PE 1/1/2009 STP(E) 65 65 65 RW 1/1/2009 STP(E) 150 150 150 CE . William O. Douglas Heritage Trails 13 P CN 1/1/2009 STP(E) 285 . . 285 285 Yes Bridge Restoration & Trailhead 10 from: to: S . Trailhead restoration, right of way acquisition partner with the William O. T 6/01/09 Douglas Foundation, including restoration of bridge , cleaning, rust removal W and painting Totals - 500 500 500 00 • - 22 S N/A ALL 1/1/2009 WSDOT 51 9 601 60 , Transit Service to Terrace Heights No New University & Retail Links from: to: • Provide Transit service to this growing area of Yakima County to include the • new University & Retail Shops. ' Totals • 51 9 60 60 Report Date: January 31, 2008 • , Page 3 v. 5.7 - Supersedes previous editions • • Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: • Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded m a .6 A. PIN /Federal Aid No. . B. Bridge No. E o v a� Fund Source Information Expenditure Schedule Projects Only . m v (Local Agency) o m : o E C. Project Title L Federal Funding R/W c U ti D. Street /Road Name or Number ° - N !°. a • Phase Federal Federal State 4th Required LL ti- o State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 • • 11 12 13 14 15 16 17 18 19 20 21 PE 2/6/2009 - 150 150 150 14 13 06 S 0.55 P CN 6/1/2009 ARRA: 950 950 950 CE No Nob Hill Blvd. Improvements . • T from: 64th Ave to: 72nd Ave - / Construct curb, gutter, sidewalk, street lights, storm drain and intersection improvements Totals 950 150 1100 1100 PE 1/1/2009 TPP 200 300 500 - 500 14 14 04 P ,77 P RW 1/1/2009 200 200 200 EA Nob Hill Blvd C CN 1/1/2009 STP(U) 1000 TPP 1300 2000 4300 4300 Yes Nob Hill Blvd 6 0 from: 49th Ave to: 64th Ave S 12/01/09 Widen, curb, gutter, sidewalk, lighting, drainage T W Totals 1,000 . 1500 2500 5000 5000 PE 1/1/2009 • . STIP (S) 60 60 120 120 00 15 01 P N /A. CN 4/1/2009 STP(S) 180 AIP 240 420 420 CE Annual Signal Upgrades CN 4/1/2009 STIP (S) 360 • 360 360 No Local Selection • from: N/A to: N/A Upgrade signals Totals 600 240 60 900 120 780 N/A w CN 6/1/2009 STP(U) 228 32 2601 260 00 16 07 P EA Various Overlay Prolects/Selected on Local Priority S No • N/A from: N/A to: N/A • Totals 228 32 260 260 v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 4 e „ . 0 . 0 ' 0 • w Washington State Department of Transportation . Six Year Transportation Improvement Program _ • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing,Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded t — Expenditure Schedule Projects Only A. PIN /Federal Aid Na. B. Bridge No. `c N Fund Source Information c m n 0 1 rn c o 7 I (Local Agency) – 2 co $ E C. Project Title t F edera l F un di ng R/W c U i 0 D. Street /Road Name or Number ° F in o Ph ase F Federal State 4th Required o E r, Phase Local Total Envir. Date LL E. Beginning MP or Road - Ending MP or Road E o Start Fund • Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM /YY) F. Describe Work to be Done a (mm dd yyy Code Phase Code - 6th ' 1 2 - 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 20 21• PE 1/1/2009 100 100 100 • 00 17 32 P N/A CN 1/1/2009 • 900 900 900 EA Storm Drains /Vegetation - No Local Selection - from: City Wide to: ' City Wide . Totals woo 1000 1000 ' PE 1/1/2010 STP(C) 109 27 136 136 ' 17 18 03 P * •76 W CN 1/1/2011 STP(C) 945 TPP • 945 106 1996 • - 1996 CE Reconstruction Rudkin Rd 06 No ., Rudkin Rd P • from: E Viola Ave lo: Rainier Place S Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main Totals 1,054 945 133 2132 136 1996 PE 9/1/2010 STP(S) 122 TPP 23 7 152 152 16 19 03 P .76 C CN 4/1/2010 STP - 1730 TPP 206 70 2006 2006 CE No E Mead Ave Reconstruction 06 E Mead Ave 0 from: Rudkin Rd to: Fair Ave P Partner with City of Union Gap, reconstruct, excavate ballast, top course, s - - curb, gutter, storm, acp _ T Totals 1,852 229 77 2158 152 2006 PE 1/1/2010 • STP(U) 100 14 114 114 , 19 20 03 P N/A P CN 1/1/2011 STP(U) 700 95 795 795 CE • Longtiber Rd & Washington Ave 05 Yes ' Intersection 06 W T from: " to: New intersection construction and reconstruction, 3 -lane and 5 -lane w /turn, - - 7/1/2009 curb, gutter, sidewalks. • Totals • 800 109 909 114 795 Report Date: January 31, 2008 Page 5 v. 5.7 - Supersedes previous editions • 1 Washington State Department of Transportation • 41111k. • '� Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: ' Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c d Fund Source Information Expenditure Schedule Projects Only m iu °1- co a y (Local Agency) g m . o C. Project Ti t federal Fundin R/W c U ti M D. Street /Road Name or Number ° j in g a Ph ase F e d era l Federal State 4th Required Z o f o - State Local Total Envir. Date E. Beginning MP or Road - End MP or Road E 1 - 5 °' Sta • Fund Cost by Fund 1st 2nd 3rd Thru F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM y>7 • 1 2 3 4 • 5 6 7 ' 8 .9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 04 P 1 CN 1/1/2009 STP(U) 240 . 42 282 282 CE • E Nob Hill Blvd & S 18th St _ 01 S Yes E Nob Hill Blvd W from: S 18th St to: E Nob Hill Blvd T Widen south leg for double LT from west bound Nob Hill; (Tie to W SOOT 01/01/07 Project) possible curb, gutter and sidewalk Totals • 240 42 282 282 PE 4/1/2009 CMAO 24 3 27 27 16 22 01 P N/A S CN 7/1/2009 CMAO 480 65 5451 545 CE Roadway City Wide Shoulder Improvements No City Wide from: to: City Wide shoulder improvements, PM10 abatement. _ Totals 504 68 572 572 14 23 31 S N/A O PE 1/1/2009 STP(U) 72 11 ' 831 83 CE E Nob Hill Blvd & Fair Ave 03 C Yes • E Nob Hill Blvd 04 from: E Nob Hill Blvd to: Fair Ave T Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, W - 10/01/2009 . slormwater . Totals 72 11 83 83 . 17 24 04 P 1.3 O PE. 1/1/2009 AIP 131 20 151 151 • RW 1/1/2010 AIP 382 59 441 441 EA S 80th Ave - Tieton Dr to Zier Rd P CN 6/1/2010 AIP 1667 .260 1927 1927 Yes S 80th Ave • from: Tieton Dr to: Zier Rd T W 01/01/09 Major widening, curb, gutter, sidewalk S Totals • 2180 339 2519 151 2368 • • • v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 6 e 0 . . • . 0 • e .. . • . . . • • . . wa Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. ' Hearing Date: 7/1/2008 . Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date:. Resolution No.: Project Identification Project Costs in Thousands of Dollars ' Federally Funded v — Expenditure Schedule Projects Only �, Y � A. PIN /Federal Aid No. B. Bridge No. d.. � „ a , Fund Source Information I S g m : E C. Project Title w m , o c Federal Funding (Local Agency R/W g U 0_ Z D. Street /Road Name or Number ti- t o • m -6 Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E 1- = d Start Fund Cost by Fund Stat Local Tot Envir. Date g g g ° MM /Y y Fund F un d s F un d s 1st 2nd 3rd Thru Type ( F. Describe Work to be Done a ( m rr v dd yyyy) C Phase Cod 6th » 1 2 - 3 - 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 1/1/2009 STP(E) 22 7 29 29 17 25 05 S .15 C CN 6/1/2009 STP(E) ' . 75 20 95 95 CE' Zier Rd - S 75th Ave to S 72nd Ave 06 S Yes Zier Rd T ' • from: S 75th Ave to: S 72nd Ave P . Minor widening, curb, gutter and sidewalk 03/01/09 Totals 97 27 _ 124 124 • 17 26 05 P 1.0 w PE 1/1/2012 STP(C) . 272 43 315 315 RW 6/1/2012 STP(C) - 349 - 55 404 404 EA Englewood Ave - N 40th Ave to N 56th Ave 06 • - T CN 1/1/2013 STP(C) • 2352 340 2692 2692 Yes Englewood Ave - • from: N 40th Ave to: N 56th Ave P • Widen roadway, curb, gutter, sidewalk o 04/01/11 C • . Totals 2,973 438 3411 3411 17 27 05 P 2 ' PE 1/1/2010 STP(U) 219 34 253 253 RW 1/1/201'1 STP(U) . 327 51 378 378 EA ' Englewood Ave - N 24th Ave to N 16th Ave 06 S CN 6/1/2012 STP(U) 2980 244 3224 3224 Yes • Englewo Ave - from: N 16th Ave to: N 24th Ave .. • ' Widen, curb, gutter and sidewalk, water and sewer lines - 01/01 /10 • Totals 3,526 329 3855 253 378 3224 PE 1/1/2011 STP(E) 252 34 286 286 00 '28 - 14 P .25 T CN 3/1/2012 STP(E) • 3150 412 3562 1 3562 CE Pedestrian Bridge 32 P No • Pedestrian Bridge . • from: N 10th St ' to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, . . power, handicap accessible, lights Totals 3,402 446 3848 • 286 3562 • • Report Date: January 31, 2008 Page 7 • v. 5/ - Supersedes previous editions • 2 1 V Washington State Department of Transportation Six Year Transportation Improvement Program. Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification _Project Costs In Thousands of Dollars Federally Funded To. Y 45 A. PIN /Federal Aid No. B. Bridge No. m o u u d . Fund Source Information Expenditure Schedule Projects Only S 2 ._ E rn c N - (Local Agency) u m o f C. Project Title i J a • Federal Funding • R/W g U li 2 D. Street /Road Name or Number a 1- 11 y Phase Federal Federal State 4th Required ii t ` E. Beginning MP or Road - Ending MP or Road E 5 o S • Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done n (mmiddyyyy) Code Phase Code Funds Funds Funds 6th Type (MM/Vm) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 4/1/2009 252 252 100 70 82 00 29 07 P N/A S CN 6/1/2009 CMAG . 195 38 233 233 CE Gravel RoadB.S.T. • No Various Areas from: City Wide to: Totals 195 • 290 485 100 '70 315 16 30 12 P N/A T CN 10/1/2010 STP(S) 504 74 5781 578 CE Powerhouse Rd & Englewood Ave P Yes Powerhouse Rd o from: Powerhouse Rd to: Englewood Ave S C • Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, 09/01/2009 W possible roundabout Totals 504 74 578 578 PE 1/1/2012 STP(S) 25 • . 4 29 29 14 31 12 P N/A P RW 6/1/2012 STP(S) 25 4 29 29 CE S 48th Ave & Summitview Ave Signalization • T CN 8/1/2013 STP(S) 554 81 635 • • 635 Yes S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 06/01/12 Totals • 604 89 693 693 16 32 12 P N/A P PE 4/1/2009 13 13 13 , T CN 6/1/2009 214 2141 214 CE • • S 3rd Ave & W Washington Ave Signal No S3rdAve from: S 3rd Ave to: W Washington Ave ' Signal Upgrades , • . Totals 227 227 227 • Report Date: January 31, 2008 Page 8 v. 5.7 - Supersedes previous editions • • • • IP 0 0 . . . . . 0 . . • Washington State Department of Transportation . Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 - Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: . 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded m a A. PIN /Federal Aid No. B. Bridge No. r t m : Fund Source Information / Expenditure Schedule Projects Only • m rn v CD • o w - C. Project Title E vf en c o w (Local Agency) m o E E o D o Federal Funding R/W o a z D. Street /Road Name or Number • c ~ N 23 a Phase Federal Federal State 4th Required E. Beginning MP or Road,- Ending MP or Road E i 5 d Start Fund Cost by Fund State Local Total Thru Envir. Date ° mrrVdd /yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mm/yy) F. Describe Work to be Done o 1 2 . 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 12 S N/A P PE 1/1/2009 . AIP 120 52 172 100 72 RW 6/1/2009 AIP 84 36 120 40 80 CE S 16th Ave & W Washington Ave Signal & Intersection. 05 T CN 6/1/2009 • - AIP 880 383 1263 1263 Yes s 16th Ave 03 ' from: S 16th Ave to: W Washington Ave • , Included in Union Gap's Valley Mall Blvd. project 3/1/2009 Totals 1084 471 1555 1403 152 14 34 12 P 2.5 P PE 1/1/2010 STP(S) 55 8 63 63 • RW 6/1/2010 STP(S) - 107 19 126 126 CE W Nob Hill Blvd Sidewalks T : CN 3/1/2011 STP(S) 321 - 57 378 • 378 Yes W Nob Hill Blvd W from: S 16th Ave to: S. 6th St. S Install missing sidewalks on southside of Nob Hill. • 09/01/08 Totals 483 84 567 189 378 00 35 - 06 P 1.0 P PE 1/1/2011 STP(S) 57 7 64' 64 ' • RW 6/1/2011 STP(S) 189 25 214 214 CE Beech St Pedestrian Connection 32 T CN 1/1/2012 • STP(S) 504 68 572 572 Yes Beech St from: Fair Ave to: Chalmers/Riverside ' Construct pedestrian pathway under SR82 to Greenway - - 09/01 /10 -. Totals 750 100 850 64 786 16 36 12 P 2 o P PE 1/1/2011 STP(S) 43 7 50 50 , RW 6/1/2011_ STP(S) 86 15 101 101 CE W Lincoln Ave Sidewalks - T CN 1/1/2012 STP(S) 572 88 660 660 Yes W Lincoln Ave S ' from: N 56th Ave to: N 29th Ave W Sidewalks, meters and fire hydrants replacement or relocation - '09/01/11 • Totals - 701 110 811 - 811 • • • Report Date: January 31, 2008 Page 9 v. 5.7 - Supersedes previous editions • I _ V A i Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima _ From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: • 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: . Project Identification - Project Costs in Thousands of Dollars Federally Funded E A. PIN /Federal Aid No. B. Bridge No. d o v w Fund Source Information Expenditure Agency) Projects Only `g .o d C . Project Title % a Federal Fundin (Local 9 » R/W .0 o � c v — D. Street/Road Name or Number ' in = Ph ase F Federal State Re wired q 4th Envir. i a Z E ~ f 5 ar Start Fund Cost by Fund Thru Sta Local Tdtal Date l E. Beginning MP or Road - Ending MP or R oad o y Funds Funds Funds 1st 2nd 3rd Type (Mfd/yy) F. Describe Work to be Done a (mm/ddtyyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 -13 14 15 16 17 18 19 20 21 PE 1/1/2010 STP(E) 424 67 491 491 14 37 01 P - W RW 1/1/2011 STP(E) 1047 163 1210 1210 CE W Lincoln Ave & 'B' St Realignment 12 T CN 1/1/2012 STP(E) 1801 281 • 2082 2082 Yes • W Lincoln Ave - P from: W 5th Ave to: Custer St 0 09/01/11 Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G C Totals 3,272 511 3783 491 3292 PE 1/1/2009 PSMP 13 2 15 15 16 38 12 P N/A W CN 1/1/2009 PSMP 239 48 2871 287 CE School Safety Projects No • Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features Totals 252 50 302 302 14 39 03 PE 1/1/2010 STP(C) 546 84 630 630 ' P .85 C RW 1/1/2011 STP(C) 1090 170 1260 1260 EA E Nob Hill Blvd. Reconstruction 04 G CN 1/1/2012 STP(C) • 6539 1013 7552 7552 Yes • E Nob Hill Blvd. 06 from: S 6th Street to: S 18th Street P S 1/1/2010 Major roadway widening and reconstruction to 5.lanes with intersection T • improvements, curb, gutter, sidewalks, replacement or relocation of meters W an hydrants Totals 8,175 1267 9442 9442 PE 1/1/2010 STP(C) 91 14 105 • 105 , • 17 40 01 P N/A W RW 1/1/2011 STP(C) 91 14 105 105 CE S 72nd Avenue & W Washington Avenue 12 S CN 1/1/2012 STP(C) 544 86 630 630 Yes S 72nd Ave ' 06 P from: S 72nd Ave to: W Washington Ave 0 1/1/2011 Intersection improvement, possible roun Totals 726 • 114 840 840 • • • . v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 10 III . 410 • 0 0 , . 0 . ' 0 • Fa Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. - Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 • City'No.: 1485 MPO /RTPO:. YVCOG • Amend Date: Resolution No.: • - Project Identification Project Costs in Thousands of Dollars Federally Funded • r N Expenditure Schedule Projects Only A. PIN/Federal Aid No. B. Bridge No . c d _ , Fund Source Information iv ° ^ in c a N (Local Agency) o m o E C . Project Title > a a J ° -c Federal Funding R/W 3 n z D. Street /Road Name or Number ate i n a Phase Federal Federal State 4th Required ` E. Beginning MP or Road - Ending MP or Road E r ° 5 o Stan Fund . Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date ' F. Describe Work to be Done 0_ (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM /rr) 1 2 3 4 5 6 7 - 8 9 10 11 12 13 ' 14 15 16 17 18 19 20 21 14 41 '. 4579 12 P N/A P PE 6/1/2009 STP 252 . 38 290 290 . . EA • S 1st St. - E. Washington Ave. Intersection Improvement W Y es S 1St St. S from: S 1st St. to: E Washington Ave. T O 01/01/11 Realign intersection, upgrade traffic signal . Totals 252 38 290 290 4562 ALL 4/4/2010 STP(U) 378 .WSDOT 378 7561 i 756 16 42 12 P N/A P CE Tieton Or - S 5th Ave. Intersection Project W No Tieton Drive T from: 5th Ave. Intersection to: O Replace traffic signal with roundabout S Totals . 378 378 756 756 - 17 43 4587 03 P 1.00 P ALL 4/1/2009 STP 2268 307 25751 • 525 2050 EA . S 48th Ave. Reconstruction T No S 48th Avenue • W from: Summitview Ave. to: Nob Hill Blvd. S O Widen, curb, gutter, sidewalk, lighting, drainage ' Totals - 2,268 - 307 2575 525 2050 PE 1/1/2009 STP(U) 51 8 59 • 59 14 44 03 P N/A O CN 6/1/2009 STP(U) 383 61 444 444 - CE South 72nd Ave & Mead Ave Intersection 12 8 • No South 72nd Ave . from: South 72nd Ave to: Mead Ave T • New intersection, signals, curb, gutter and sidewalk W • ' Totals 434 69 503 503 • v. 5.7 - Supersedes previous editions • • Report Date: January 31, 2008 Page 11 Washington State Department of Transportation Six Year T ransportatio n en Improvement Program Agency: Yakima . From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A . PIN /Federal Aid No. B Bridge No. m ^ d • r, Fund Source Information Ex (Local ure Projects Only a, E e rn CO ° o y2 (Local Agency) o m : o E C. Project Title > a 3 , 0 t Federal Funding R/W c U ti m D. Street /Road Name or Number • o� y ; u a Phase Federal Federal State 4th .Required Z o — State Local Total Envir. Date u E. Beginning M or Road - Endin MP or Road E t- ° Sta rt Fun Cost by Fund 1st 2nd 3rd Thru g g Ending i (mm/dd yyyy) Code Phase Code Funds Funds Funds 6th Type (Mp» . F. Describe Work to be Done 1 2 3 4 -5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 1/1/2009 STP(E) 10 2 12 12 00 45 14 P N/A 0 CN' 7/1/2009 STP(E) 109 17 126 126 CE . William O. Douglas Pathway 32 S No • P • from: Pine St to: Cowiche Canyon W Pathway improvements, connections, and signage to Cowiche Canyon Trail. - Totals 119 19 138 138 ' PE 1/1/2009 STP(E) 23 5 28 28 17 46 04 P 76 W CN 7/1/2009 STP(E) 1096 164 1260 1260 Yes S 66th Avenue 03 . T T S 66th Ave . from: Scenic Drive . to: Summitview P p 1/1/2009 Widen roadway, curb, gutter, sidewalk and utilities - ' Totals 1,119 169 1288 1288 _ PE - 1/1/2010 STP(S) 164. 25 189 189 16 47 05 P .20 G RW 6/1/2010 STP(S) 382 60 442 442 CE 66th Ave. & Summitview Intersection • 12 • P CN 7/1/2011 ' STP(S) 1090 170 1260 1260 Yes N. 66th Avenue & Summitview from: N. 66th Ave. ' to: Summitview Ave. S T 1/1/2010 . Widen for left turn lanes, intersection improvements, curb, gutter, handicap W ramps and lighting C Totals 1,636 255 1891 189 442 1260 PE 1/1/2010 STP(U) 126 17 ' 143 143 14 48 12 P N/A w RW 1/1/2010 STP 63 8 71 71 CE S 40th Avenue and Summitview Signal Upgrade CN 6/6/2010 STP(U) 544 86 630 630 Yes . 40th Avenue . T from: 40th Avenue to: Summitview P - o 1/1/2010 Signal upgrade, radius improvements, turn lane extension • Totals 733 111 844 844 v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 12 • 4 10 • . 1110 . iiio ___ 0 : . . - 0 0 • • .• Washington State Department of Transportation Six Year Transportation Improvement Pro Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 - 15 - 2008 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars • Federally Funded T A. PIN /Federal Aid No. B. Bridge No. d w ' - F Source Informatio Expenditure Schedule Projects Only o 1-3 C . Project Title d 'a ui c - o m (Local Agency) ro o a ii F e d eral F un di ng R/W v a Z D. Street/Road Name or Number al- i n i s = - T ' ' Phase- Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E o St Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MMJY 1 2 • 3 4 5 • 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 12 P N/A W PE 1/1/2010 STP 95 13 108 108 • RW 1/1/2010 STP 63 8 71 71 CE 40th Avenue and Englewood T CN 1/1/2011 STP • ' 145' 20 165 165 Yes 40th Avenue S from: 40th Avenue to: Englewood P _ Replace traffic signal poles, upgrade controller 1/1/2010 Totals 303 41 344 344 00 50 12 P N/A W PE 1/1/2010 STP 126 18 144 144 RW 6/1/2010 STP 63 8 71 71 CE . 16th Avenue and Fruitvale Blvd T CN 1/1/2011 STP 315 43 358 358 Yes 16th Avenue - - S from: 16th Avenue to: Fruitvale Blvd P • Replace traffic signal poles, radius improvements, ADA ramps 6/1 /2010 • Totals 504 69 573 573 • • 14 51 12 P N/A W PE 1/1/2010 STP 32 5 " 37 37 i st Street and 1 Street T CN 1/1/2011 STP 126 17 143 1 143 CE No 1st Street S • from: 1st Street to: I Street P • Replace and upgrade traffic signal equipment Totals - 158 22 180 180 14 52 01 P .25 W PE 6/1/2011 STP(U) • 820 189 1009 1009 , T RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Mead Ave. Railroad Grade Separation _ CN 1/1/2013 STP(U) 6552 1008 7560. 7560 Yes Mead Ave. S from: Presson Place to: Maryland P 0 1/1/2012 Construct railroad overpass including all utilities - Totals 10,522 1827 12349 4789 7560 • V. 5.7 - Supersedes des revious editions Report Date: January 31, 2008 Page 13 p P • Washington State Department of Transportation • Six Year Transportation Improvement Program • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded To A. PIN /Federal Aid No. B Brid No c .c to �, Fund Source Information Expenditure Schedule Projects Only a� v N (Local Agency) N _ rA P. m : o E C. Project Title e c . 3 ci .. Federal Funding R/W • o 6 2 D. Street /Road Name or Number ai- in . — a Phase • Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E o o Start Fund Cost by Fund State . Local Total 1st 2nd 3rd Thru Envier. Date • F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type (MM Y)7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 53 01 P .25 PE 6/1/2011 STP(U) 820 189 1009 1009 • RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Washington Ave. Railroad Grade Separation S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes Washington Ave. from: Longfibre Road to: T Railroad grade overpass including all utilities W 1/1/2012 Totals 10,522 1827 12349 12349 • PE 6/1/2011 .STP(U) 252 38 290 290 16 54 01 P 4.0 0 RW 1/1/2012 STP(U) 756 88 844 844 CE Citywide Pathway Connections 8 CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes Yakima from: to: T • W 1/1/2012 Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities Totals 2,898 441 3339 • 290 3049 PE 1/1/2011 STP(U) 2180 340 2520 2520 16 55 01 P 1.1 0 RW 1/1/2013 STP(U) 2180 340 2520 2520 CE E. 'H "St. Extension 08 8 CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E. "H" St. • from: 1st St. to: Yakima River W 1/1/2013 Construct road including water, sewer, curb, gutter and sidewalk for future development. Totals • 5,559 2551 8110 . 8110 • 01 P 1.3 PE 1/1/2012 STP(C) 700 108 808 808 17 56 • RW 1/1/2013 STP(U) 5500 850 6350 6350 CE N. 10 th St. Extension 06 S CN 6/1/2013 STP(U) 7900 972 8872 • 8872 Yes N. 10th St. from: R St. to: 10th Street - Lincoln Ave. • T W 1/1/2013 Construct road including water, sewer, curb, gutter, sidewalk for future development. ' Totals 14,100 1930 16030 16030 Report Date: January 31, 2008 Page 14 v. 5.7 - Supersedes previous editions . . II . III • 0 ' . 0 ' 0 Washington State Department of Transportation Six Year Transportation Improvement Program -en ncy: Yakima Agency: From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7 -1 -2008 Adoption Date: - 7 -15 -2008 . City No.: 1485 MPO /RTPO: •YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • A P IN /Federal Aid No. B. Bridge No. c r ^ Expenditure Schedule Projects Only m >, g �^ v �, Fund Source Information C m . - C . Project Title E a t Federal Funding (Local Agency) a. v li z D. Street /Road Name or Number n . in S a Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E 5 o State Local Total Envir.. Date • • Start Fund Cost by Fund 1st 2nd 3rd Thru F. Describe Work to be Done d (mm / yyyy) Code Phase Co F un d s Funds Funds 6th Type (MM /Y>7 1 2 3 4 5 6 7. 8 9 10, 11 12 •13 14 15 16 17 18 19 20 21 PE 1/1/2012 STP(U) .315 • 38 353 353 CN 6/1/2012 STP(U) 945 • 126 1071 1071 C 00 57 03 P N/A O 32 E No YVT Pathway - YVT Railway Corridor. P S from: to: • T Development pathway in West Valley area including 53rd Ave, Wide Hollow, W 64th Ave, Ahtanum including all utilities and signage . Totals 1,260 164 1424 1424 PE 1/1/2011 STP(U) 63 5 68 68 • 17 58 01 . p N/A 0 CN . 6/1/2011 STP(U) 567 76 6431 643 CE 34th Ave & River Rd Improvements 12 P No Fruitvale Blvd. . S • from: 34th Ave. to: River Rd. T W • Intersection improvements including lumination, sewer, water, curb, water - and sidewalks ' Totals 630 81 711 711 • PE 1/1/2010 STP(U) 218 34 252 252 17 59 01 - P 1.0 0 RW 6/1/2011 STP(U) 327 51 378 378 CE Englewood Aye 05 8 CN 1/1/2012 STP(U) 2980 244 3224 3224 Yes Englewood 12 T from: 24th Ave to: 40th Ave • • W 6/1/2011 Reconstruct roadway, widen, curb, gutter and sidewalks.' Sewer, water lines - and street lights. . • Totals - 3,525 329 3854 630 3224 PE 1/1/2010 STP(U) 272 43 315 - 315 , 16 60 • 01 P 1.3 C RW 6/1/2010 STP(U) ' 349 55 404 404 CE Frontage Road& "H" St Loop GO CN 1/1/2011 STP(U) 2352. 340 2692 2692 Yes N. 8th St. . from: "H" St. to: 1 -82 P • S Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for • - 6/1 /2010 future development and Terrace Heights connection. T W Totals - 2,973 438 , 3411 719 2692 • • Report Date: January 31, 2008 Page 15 v. 5.7 - Supersedes previous editions • • • 71 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded H Y A. PIN /Federal Aid No. B. Bridge No. m ^ r u Fu Source Information Expenditure Schedule Projects Only C . _ C. Project Title E o ; v u m (Local Agency) _ 0 o f j o . Federal Funding • R/W 3 U a Z D. Street /Road Name or Number 8.1 in Y a Phase Federal Federal State 4th Required E. Be inning MP or Road - Endin MP or Road E H 5 d Sta rt • Cost by Fund State Local Total T hru Envir. Date g g g y • Funds Funds Funds 1st 2nd 3rd T F. Describe Work to be Done a (mm/dd/YYYY) Code Phase ' Code 6th Type (M h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CN 6/1/2009 75 75 25 25 25 00 61 07 P .5 G CE Citywide Alleys s No • from: to: W T Pave alleys throughout the city. Totals 75 75 25 25 25 PE 1/1/2010 STP(U) 120 17 137 1 137 14 62 03 P 2.7 G CE Nob Hill Corridor 04 • Nob Hill 0 from: 1 -82 to: S. 16th Ave. P T Widen roadway, sidewalk, curb, gutter, lighting T • W Totals 120 17 137 137 • 14 63 04 P 3.2 c PE 1/1/2011 STP(U) 120 17 1371 137 CE • 40th Ave. Corridor o . 40th Ave. G from: SR -12 to: Washington Ave. s Widen roadway, curb, gutter, sidewalks, lighting. w T Totals 120 17 137 137 14 64 04 P 3.5 G G 1/1/2012 STP(U) 120 17 1371 137 CE , 16th Ave. Corridor • 16th Ave. 0 from: SR -12 to: gap ingIon Ave.Nalley Mall P T Widen roadway, curb, gutter, sidewalk, lighting. T W Totals 120 17 137 137 Report Date: January 31, 2008 Page 16 v. 5.7 Supersedes previous editions .0 . 0 . . . 0 „ ' • Washington State Department of Transportation Six Year Transportation Improvement Program .71 Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. H earing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: ' Project Identification Project Costs in Thousands of Dollars Federally Funded y A. PIN /Federal Aid No. B. Bridge No. 'c „ Fund Source Information • Expenditure Schedule Projects Only c N , a E N 2 ° o (Local Agency) o m $ E C. Project Title > a m J ° L Federal Fund R/W c ii a = D. Street /Road Name or Number °� i n a Phase Federal Federal State 4th ' Required u z E o — State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road r . o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (mm Yt7 • F. Describe Work to be Done a (mai/cid / yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 •9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2012 STP(U) 120 17 137 137 14 65 04 ' P 2.0 C CE S. lst St/Main St. Corridor G S. 1st St. /Main St. i O • from: Nob Hill Blvd. to: Barker Mill Bridge P S Joint project with Union Gap to siden roadway, curb, gutter, sidewalk, T lighting. W Totals 120 17 137 137 14 66 01 P 6.0 C PE 1/1/2012 STP(U) 120 17 1371 137 CE W. Yakima North /South Connector to West Valley • 04 ' G Unknown road 06 0 • from: North - South to: in West Valley P S City 8 County joint project to build /extend roadways. T • W Totals 120 17 137 137 00 67 23 S N/A PE 1/15/2009 OTHER 100 1001 100 West Side Transit Center Placement Study • Acquire Property to Expand Operations from: to: Recent Annexations Mandate Transit Expansion to These Areas • _ Totals • 100 100 100 16 68 04 P 73 C CN 6/1/2009 432 68 5001 500 W. Nob Hill Blvd -S 68th Ave to S. 72nd Ave. 03 W W Nob Hill Blvd 0 • from: S. 68th Ave. i to: 72th P ' Reconstruct to minor arterial standards T Totals 432 68 500 500 - Report Date: January 31, 2008 • Page 17 v. 5.7 - Supersedes previous editions • • • • r a Washington State Department of Transportation v T en Six Year Transportation tation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 - - 2008 Adoption Date: 7 - 15 - 2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs In Thousands of Dollars Federally Funded A. PIN/Federal Aid No. B. Bridge No. m.. , Fund Source Information Expenditure Schedule Projects Only t3 �, �, r n . (Local Agency) o m $ E C. ProjectTltie - gi o 3 o 2 Federal Funding RIW c U a` D. Street/Road Name or Number �� N a Ph ase F e d e r al F ederal State 4th Required LL Z E. Beginning MP or Road - Ending MP or Road E t°- at Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done g a. (mm Code Phase Code Funds Funds Funds 6th Type (MitvvY) 1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 20 21 • PE 4/6/2009 ARRA- 75 OTHER 100 175 175 17 69 03 P - P CN 6/1/2009 ARRA- 925 OTHER 1400 2325 925 1400 CE Yakima Downtown Future Initiatives, Phase 4 05 T No • 06 from: "A" Street to: 3rd Street to Naches Install Historic lighting, sidewalk modifications and other improvements Totals 1,000 1500 2500 1100 1400 PE 5/1/2009 OTHER 400 400 400 17 70 06 S .60 W P CN 4/1/2010 OTHER 2600 2600 2600 CE No Yakima Downtown Future Initiatives, Phase 5 12 • S T from: 1st Street to: 9th Street 0 Install Historic lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. Totals 30 3000 3000 00 71 03 S 50 . W C 1/1/2009 I CMAQ I 540 I 214 754 I 7541 I ( CE NO Coolidge Road Widening and Paving. 05 06 T T from: 80th AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. Totals 540 214 754 754 16 72 01 P 38 S PE 1/1/2012 100 1001 I I 100 Occidental Road Construction. W • . P • from: 58th Ave. to: 64th Ave. T Construct roadway Totals 100 100 100 Report Date: January 31, 2008 Page 18 v. 5.7 - Supersedes previous editions • . . 410• . • , 0 • Washington State Department of Transportation Six Year Transportation Improvement Program • -en Agency: Yakima • From 2009 to 2014 Co. No.:. 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: . 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars 'Federally Funded T A. PIN /Federal Aid No. B. Bridge No. t t m a� Fund Source Information Expenditure Schedule Projects Only . . 2 m : o E C. Project Title J _ F e d era l Fu n d i ng ( L oca l A g enc y) R/W U ti Z D . Street /Road Name or Number ai- i n a Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - Ending MP or Road E ,2 5 ° Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done 1i (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM /YY) 1 2 3 4 . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 73 01 P 27 • PE 1/1/2012 • 100 100 100 86th Ave. Road Construction . from: Occidental to: Coolidge • - Construct roadway • . • Totals 100 100 . • 100 . • 16 74 04 P 1:5 w PE 1/1/2012 STP(U) 120 17 1371 137 EA . 64th Ave. Roadway Widening. 06 G 1 YES • from: Washington Avenue. to: Tieton Drive. T , Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. C 7/4!2012 • O Totals • 120 • 17 137 137 ALL 1/1/2009 5309(Bus) 1540 15401 1540 CE 00 75 • 21 S N/A • . Purchase four new transit buses (replacements) . No On -going vehicle replacement program • from: to: Seek RFP's 10 acquire lour new transit buses that will replace units that are - • 18 years of age. (six years past federal standards) - Totals • 1540 1540 1540 00 76 21 S N/A ALL 6/1/2009 85 30 1151 115 , CE . Acquisition of new Dial -A -Ride paratransit vehicles No Replace several older vehicles - from: to: Upgrade Dial -A -Ride service by replacing several older vehicles with new - . models. Totals 85 30 • 115 115 • • Report Date: January 31, 2008 Page 19 v. 5.7 - Supersedes previous editions • • ili Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 t0 2014 Co. No.: 39 Co. Name: Yakima Co- Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c .c m Fund Source Information Expenditure Schedule Projects Only m E H d tl1 g c N (Local Agency) • s N .?^. - -O C- Project Title d — v t Federal Funding R/W a U a Z D . Street /Road Name or Number n N m d P ha se Federal Federal State 4th Required o State Local Total Envir. Date LL E- Beginning MP or Road - Ending MP or Road E o — o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM Y� F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11' 12 13 14 15 16 17 18 19 20 21 CN 4/1/2009 BR 1742 1742 1742 14 77 11 P 0.2 CE Nob Hill Overpass Repair - No • • from: 1st Street to: Ledwich Ave Make necessary repairs to Railroad Overpass (Bridge) - . Totals 1,742 1742 1742 PE 1/1/2009 STP(U) 173 27 200 200 14 78 03 P .N /A RW 1/1/2010 STP(U) 433 67 500 500 E. Lincoln 8 10th Street Roundabout 05 CN 6/1/2010 STP(U) 1125 175 1300 1300 Yes 06 from: E. Lincoln to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, 8 street 4/1/2010 lighting Totals 1,731 269 2000 200 1800 - 12 79 03 P N/A O ALL 1/1/2009 STP(U) 865 • 135 10001 1000 CE S.R.12 & 16th Avenue Interchange 06 • No Interchange from: 16th Avenue - to: S.R. 12 - - . . Upgrade Interchange by constructing a Roundabout Totals 865 135 1000 1000 ' 11 80 01 P N/A 0 1 1 1 1 1 1 1 1 1 1 1 EA • 1 -82 B Lincoln Avenue Interchange P Yes 1 -82 Interchange G from: E. "G" Street to: 1 -82 6/2011 Reconstruct / extend off -ramp from existing 1 -82 off -ramp for Lincoln Avenue ' toE.'•G" Street. Totals . • Page 20 V- - Supersedes previous editions Report Date: January 31, 2008 ID OP - . • . 0 . 0 . • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakirna Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485. MPO /RTPO:' YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded • Y A. PIN /Federal Aid No. B. Bridge No. i u N Fund Source Information Expenditure Schedule Projects Only 0 q •_ cl) o m o f C. Project Title _ E q >, ta m c o q (Local Agency) 0 U . Federal Funding I R/W 72 c U a z D. StreetlRoad Name or Number a � y m a Phase Federal ' Federal State 4th Required • LL • E. Beginning MP or Road - Ending MP or Road E 1 5 ° Start • Fund Cost by Fund •State Local Total 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done a (mm/ddiyyyy) Code Phase Code Funds Funds Funds 6th Type (MM /Y1) 1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 81 12 p N/A P ALL 1/1/2010 STP(U) 865 135 1000 1000 CE E . Yakima Avenue & Fair Avenue Signalization W • No T • from: E. Yakima Avenue to: Fair Avenue S • Construct Traffic Signal _ Totals 865 135 1000 1000 14 82 06 P 2.64 PE 4/6/2009 ARRA - 50 . 50 50 CN 6/1/2009 ARRA- '1950 1950 1950 CE Summitview Ave. Grind & Overlay 07 No • from: 14th Ave to: 56th Ave - Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA . ramps . Totals 2,000 2000 2000 ' Grand Totals for Yakima 129,965 20,094 33,605. 183,664 40,781 34775 37,505 70,603 • Report Date: January 31, 2008 Page 21 v 5. - Supersedes previous editions • •