HomeMy WebLinkAbout04/07/2009 08 2009-2014 Six-year Transportation Improvement Program (STIP) Amendment BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
Ill AGENDA STATEMENT
Item No. S
For Meeting of: April 7, 2009
ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six -year
Transportation Improvement Program (STIP) by adding six projects to the STIP.
SUBMITTED BY: William R. Cook, Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678
Brett Sheffield, Chief Engineer 576 -6797
SUMMARY EXPLANATION:
Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the
2009 -2014 planning years. The City of Yakima has identified a need to amend the current Six Year
TIP to account for designated and potential funds from the American Recovery ; and Reinvestment Act
(ARRA). The new projects include: 1) Nob Hill Boulevard Improvements; 2) dividing the Yakima
Railroad Grade Separations, Phase 2 into separate phases; 3) Yakima Downtown Future Initiatives,
Phase 4; 4) Summitview Avenue Grind and Overlay; 5) purchasing five new transit buses; and, 6)
purchasing three new paratransit vehicles.
The projects that have been designated to receive funds from the ARRA are: Nob Hill Boulevard
Improvements (priority number 13 - $950,000); purchasing five new transit buses (priority number 5 _ • $2,000,000); and, purchasing three new paratransit vehicles (priority number 6 - $150,000). The Nob
Hill Boulevard Improvement project consists of constructing curb, gutter, sidewalk, street lights, a storm
drainage system and intersection improvements from 64 Avenue and 72 Avenue. The remaining
three projects are candidates for ARRA funds or other funding as it may become available.
(Continued on Page 2)
Resolution X Ordinance Other (Specify)
Contract Mail to (name and address): Phone:
Funding Source:
APPROVED FOR SUBMITTAL:, City Manager
STAFF RECOMMENDATION: Adopt resolution amending the STIP
BOARD /COMMISSION RECOMMENDATION:
COUNCIL ACTION:
III
Page 2
Since we have secured enough funding to construct one underpass of the Yakima Railroad
9 9 P
Grade Separation Project we are splitting the project shown into separate projects or
phases. Current Phase 2 will become — Lincoln Avenue Underpass and new Phase 3 will
be Martin Luther King, Jr. Boulevard Underpass. See STIP priority numbers 1 and 2. As
the Lincoln and MLK Underpasses were planned to be constructed one at a time, it is
perfectly feasible to break them into two separated phases.
Phase 1 of the Yakima Railroad Grade Separations project, which relocated underground
utilities, was completed in the summer of 2007. Lincoln Avenue Underpass construction is
scheduled to begin in 2009. Lincoln Avenue is being constructed first because when a train
blocks Lincoln Avenue during the need for an emergency response to the west side of the
tracks the Fire Department response time will be at least two minutes shorter than having to
travel to use the Walnut Street Underpass. We have requested $8,000,000 of ARRA funds
to complete funding of the MLK Underpass.
The Yakima Downtown Future Initiatives, Phase 4 project requests $1,000,000 of ARRA
funds to provide new sidewalk and streetscape improvements to the north side of 'A' Street
from 3rd Street to Naches Avenue and to the east side of Naches Avenue between Yakima
Avenue and 'A' Street. This Phase 4 project is also in the current Senate Budget Proposal
for $1,500,000 in state funds. See STIP priority number 69.
The Summitview Avenue Grind and Overlay requests $2,000,000 of ARRA funds to replace
the aging pavement from 14 Avenue to 56 Avenue. See STIP priority number 82.
r
•
RESOLUTION NO. R -2009-
A RESOLUTION to amend the Six -year Transportation Improvement Program (TIP) for
the period of 2009 through 2014 to include projects affecting the City's
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -year
TIP for the construction or repair of streets in the City of Yakima for the ensuing six year
period, all as contemplated and required by State RCW 35.77.010 and applicable Federal
law, and
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year
Transportation Improvement Plan for the period of 2009 to 2014 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and
provided under RCW 36.70A.130(2B) and RCW 35.77.010, and
ill WHEREAS, a public hearing has been held by the Yakima City Council on amending
t he 6 -Year Transportation Improvement Plan on Tuesday, March 24, 2009, with proper
public notice as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2009 through 2014
• for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation
Improvement Plan attached.
ADOPTED BY THE CITY COUNCIL this Jth day of April, 2009.
Dave Edler, Mayor
ATTEST:
City Clerk
Ill
•
e •
111 , .
. .
•
. 0
. Washington State Department of Transportation - Six Year Transportation Impro Program
- Agge en ncy: Yakima. . - From 2009 to 2014
Co..No.: 39 Co. Name: Yakima Co. • Hearing Date: , 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs In Thousands of Dollars Federally Funded
A. PI /Federal Aid No, B. Bridge No. E d Fund Source Information Expenditure Schedule Projects Only
N .Y 0..., 01 -p
s w o E C Project Title m , " (Local Agency)
- - L Federal Funding c U L2 D. Street/Road Name or Number • o >, ,co IS a Phase Federal Federal State 4th Required Li—
LL E o m State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road o St Fund Cost by Fund 3rd Thru
Funds Funds Funds 1st 2nd 3r Type (MM /VY)
F. Describe Work to be Done
0 _ 1 = (mm/dd /yyyy) • Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2009 STP(U) . 500 OTHER 150 650 650
14 1 01 S 0.2 T RW 6/1/2009 STP(U) 1000 OTHER 1000 loon EA
Yakima Railroad Grade Separations - Phase 2 06 P CN. 6/1/2009 STP(U) 8150 FMSIB 2500 1000 11650 6000 5650 Yes
• Lincoln Ave. 07 G CN 6/1/2009 OTHER 1000 _ 1000 1000
from: N 1st St to: N 1st Ave 08 W CN 6/1/2009 AIP . 3000 3000 3000 "4!30/09
Construct Grade Separations and adjacent roadway reconstructon, S - .
including realignment of Front Street. • -
Totals 9,650 6650 1000 17300 7650 9650 •
PE 1/1/2009 STP(U) 175 25 200 200
14 2 01 P 0.2 T CN 6/1/2009 STP(U) 2400 FMSIB 2000 3975 8375 • 8375 EA
Yakima Railroad Grade Separations- Phase 3 06 G '
• 6/1/2009 ARRA - 8000 OTHER 1500 9500 2000 7500 - Yes
Martin Luther King, Jr. Blvd 07
from: N. 1st Sreet to: N. 1st Ave • O
•
08 4/30/09
Construct Grade Separation and adjacent roadway reconstruction including
Front Street •
• Totals 10,575 3500 4000 18075 200 10375 7500
14 3 01 S 1.0 p CN 4/1/2009 3840 36401 3840, EA
16TH AVENUE REALIGNMENT 08 0 Yes
16TH AVENUE REALIGNMENT
from: AHTANUM ROAD to: WASHINGTON AVENUE . . W '
Realign 16111 Avenue out of the runway safety area of the Yakima Air S 11/2007
Terminal. Includes FAA funds.
Totals 3840 3840 3840
00 4 03 P N/A G PE 1/1/2009 STP(E) 18 32 50 50
CN 6/1/2009 STP(E) 1900 285 21851 . 2185 EA
_
YVT Railway Rehabilitation & Museum 8 No
3rd Ave -
from: 3rd Ave to: Pine St T -
W .
Car Barn, Museum Restoration and Pathway P
• • Totals 1,918 317 2235 2235
v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 1 .
•
•
IOW
izi Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A . PIN /Federal Aid No. B Bridge No. c f. m Fund Source Information Expenditure Schedule Projects Only
45 E
el, ...., H c ai ( Agency) -
o :o C. Project Title n m s o t Federal Funding R/W
•
E U n` - = D. Street/Road Name or Number ° - � in a Ph ase Fed eral Federal State 4th Required
o •- State Local Total Envir. Date
LL E. Beginning MP or Road - Ending MP or Road E r o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (M 5)
F. Describe Work to be Done a. (mm/dd/yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 '17 18 19 20 21
00 5 21 S ALL 4/15/2009 ARRA - FTA 2000 2000 2000 CE
Purchase of 5 (five) transit buses - 35 foot low floor versions - No
from: - to: .
Acquire 5 (five) Gillig 35" low floor transit buses through the federal stimulus •
program to replace 5 (five) unreliable Thomas buses
Totals 2,000 . 2000 2000 -
00 6 21 S ALL 4/15/2009 ARRA - FTA 150 30 180 I 180 CE
Acquisition of 3 (three) new Paratransit vehicles for Dial -A -Ride No
•
from: to:
Purchase 3 (three) new Paratransit vehicles to replace 3 (three) older simila
, unreliable units
• Totals 15 0 30 180 180
CN 1/1/2009 5307 1655 1655 3310 3310
00 7 12 S • N/A I CE
Transit Operating Expenditures 22 No
Various Funding Areas 23
from: N/A to: N/A 24
Supplemental Funding for Transit Service Operating Expenses 31
_ Totals 1,655 1655 3310 3310
PE 1/1/2009 ' STP(E) 36 - 36 36 ,
00 8 03 S N/A C RW 1/1/2009 STP(E) 205 205 205 CE
YVT Trolley Barn /Powerhouse Rehabilitation G CN 1/1/2009 STP(E) 255 255 255 Yes
S 3rd Ave O -
P .
from: to: S 06/01/07
Minor car barn and powerhouse restoration including property purchase T -
W Totals 496 496 496
Report Date: January 31, 2008 Page 2 v. 5.7 - Supersedes previous editions
III ,i,
411
0 0 • '
0
•
P Six Year Transportation Improvement Program
v7 .-
Agge Yakima Washington State Department of Transportation From • 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: . 7/1/2008 Adoption Date: 7 -15 -2008
City No.:, 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification , Project Costs in Thousands of Dollars • Federally Funded
T A. PIN /Federal Aid No. B. Bridge No. , ^ r CO d e , • Fund Source Information Expenditure Schedule Projects Only
c = E w o N (Local Agency) cp , m $ E C. Project Title > J o L Federal Funding R/W
. U i i- 2 D. Street /Road Name or Number Li to z - a Phase Federal Federal State • 4th Required
Li_ E. Beginning MP or Road - Ending MP or Road E I 5 o Start Fund Cost by Fund State Local Total Envir. Date
1st 2nd 3rd Thru
F. Describe Work to be Done a (mm/ddiyyyy) Code Phase . Code Funds Funds Funds 6th Type (M>)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
•
00 9 22 S N/A ALL 1/1/2009 WSDOT 50 50 50
CE
Street Asset Amenities (Transit) 31 No .
Route Maintenance, Repair and Improvements
from: to: • _
Maintenance of Shetters, Benches and Signage throughout our Transit -
Route System
Totals - 50 50 50
00 10 32 S 1.0 O CN 4/1/2009 STP(E) 525 5251 525
CE
William O. Douglas Trail 08 P • - No-
6th Ave Pathway & Bridge Decking 06 S
•
from: to: w
Build pathway and install pathway decking on Neches River bridge with - T • -
partner William 0. Douglas Trail Fundation
-
Totals 525 525 525
00 11 32 S N/A G PE 1/1/2009 STP(E) 65 65 65
RW 1/1/2009 STP(E) 150 150 150 CE
. William O. Douglas Heritage Trails 13 P CN 1/1/2009 STP(E) 285 . . 285 285 Yes
Bridge Restoration & Trailhead 10
from: to: S
. Trailhead restoration, right of way acquisition partner with the William O. T 6/01/09
Douglas Foundation, including restoration of bridge , cleaning, rust removal W
and painting Totals - 500 500 500
00 • - 22 S N/A ALL 1/1/2009 WSDOT 51 9 601 60 ,
Transit Service to Terrace Heights No
New University & Retail Links
from: to:
• Provide Transit service to this growing area of Yakima County to include the •
new University & Retail Shops. '
Totals • 51 9 60 60
Report Date: January 31, 2008 • , Page 3
v. 5.7 - Supersedes previous editions
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
•
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008
•
City No.: 1485 MPO /RTPO: YVCOG Amend Date: • Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m a .6 A. PIN /Federal Aid No. . B. Bridge No. E o v a� Fund Source Information Expenditure Schedule Projects Only
. m v
(Local Agency)
o m : o E C. Project Title L Federal Funding R/W
c U ti D. Street /Road Name or Number ° - N !°. a • Phase Federal Federal State 4th Required
LL ti- o State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY)
F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 • • 11 12 13 14 15 16 17 18 19 20 21
PE 2/6/2009 - 150 150 150
14 13 06 S 0.55 P CN 6/1/2009 ARRA: 950 950 950 CE No
Nob Hill Blvd. Improvements .
•
T
from: 64th Ave to: 72nd Ave - /
Construct curb, gutter, sidewalk, street lights, storm drain and intersection
improvements
Totals 950 150 1100 1100
PE 1/1/2009 TPP 200 300 500 - 500
14 14 04 P ,77 P RW 1/1/2009 200 200 200 EA
Nob Hill Blvd C CN 1/1/2009 STP(U) 1000 TPP 1300 2000 4300 4300 Yes
Nob Hill Blvd 6
0
from: 49th Ave to: 64th Ave
S 12/01/09
Widen, curb, gutter, sidewalk, lighting, drainage
T
W Totals 1,000 . 1500 2500 5000 5000
PE 1/1/2009 • . STIP (S) 60 60 120 120
00 15 01 P N /A. CN 4/1/2009 STP(S) 180 AIP 240 420 420 CE
Annual Signal Upgrades CN 4/1/2009 STIP (S) 360 • 360 360 No
Local Selection
•
from: N/A to: N/A
Upgrade signals
Totals 600 240 60 900 120 780
N/A w CN 6/1/2009 STP(U) 228 32 2601 260
00 16 07 P EA
Various Overlay Prolects/Selected on Local Priority S No
•
N/A
from: N/A to: N/A •
Totals 228 32 260 260
v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 4
e „ .
0 .
0 ' 0
•
w
Washington State Department of Transportation . Six Year Transportation Improvement Program _ •
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing,Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
• Project Identification Project Costs in Thousands of Dollars Federally Funded
t — Expenditure Schedule Projects Only
A. PIN /Federal Aid Na. B. Bridge No. `c N Fund Source Information
c m n 0 1 rn c o 7 I (Local Agency) –
2 co $ E C. Project Title t F edera l F un di ng R/W
c U i 0 D. Street /Road Name or Number ° F in o Ph ase F Federal State 4th Required
o E r, Phase Local Total Envir. Date
LL E. Beginning MP or Road - Ending MP or Road E o Start Fund • Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM /YY)
F. Describe Work to be Done a (mm dd yyy Code Phase Code - 6th '
1 2 - 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 20 21•
PE 1/1/2009 100 100 100 •
00 17 32 P N/A CN 1/1/2009 • 900 900 900 EA
Storm Drains /Vegetation - No
Local Selection -
from: City Wide to: '
City Wide .
Totals woo 1000 1000 '
PE 1/1/2010 STP(C) 109 27 136 136 '
17 18 03 P * •76 W CN 1/1/2011 STP(C) 945 TPP • 945 106 1996 • - 1996 CE
Reconstruction Rudkin Rd 06 No .,
Rudkin Rd P •
from: E Viola Ave lo: Rainier Place S
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
Totals 1,054 945 133 2132 136 1996
PE 9/1/2010 STP(S) 122 TPP 23 7 152 152
16 19 03 P .76 C CN 4/1/2010 STP - 1730 TPP 206 70 2006 2006 CE No
E Mead Ave Reconstruction 06
E Mead Ave 0
from: Rudkin Rd to: Fair Ave P
Partner with City of Union Gap, reconstruct, excavate ballast, top course, s - -
curb, gutter, storm, acp _ T
Totals 1,852 229 77 2158 152 2006
PE 1/1/2010 • STP(U) 100 14 114 114 ,
19 20 03 P N/A P CN 1/1/2011 STP(U) 700 95 795 795 CE •
Longtiber Rd & Washington Ave 05 Yes
' Intersection 06 W
T
from: " to:
New intersection construction and reconstruction, 3 -lane and 5 -lane w /turn, - - 7/1/2009
curb, gutter, sidewalks.
• Totals • 800 109 909 114 795
Report Date: January 31, 2008 Page 5 v. 5.7 - Supersedes previous editions
•
1 Washington State Department of Transportation
•
41111k. •
'� Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: '
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. c d Fund Source Information Expenditure Schedule Projects Only
m iu °1- co a y (Local Agency)
g m . o C. Project Ti t federal Fundin R/W
c U ti M D. Street /Road Name or Number ° j in g a Ph ase F e d era l Federal State 4th Required
Z o f o - State Local Total Envir. Date
E. Beginning MP or Road - End MP or Road E 1 - 5 °' Sta • Fund Cost by Fund 1st 2nd 3rd Thru
F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM y>7
• 1 2 3 4 • 5 6 7 ' 8 .9 10 11 12 13 14 15 16 17 18 19 20 21
14 21 04 P 1 CN 1/1/2009 STP(U) 240 . 42 282 282 CE •
E Nob Hill Blvd & S 18th St _ 01 S Yes
E Nob Hill Blvd W
from: S 18th St to: E Nob Hill Blvd T
Widen south leg for double LT from west bound Nob Hill; (Tie to W SOOT 01/01/07
Project) possible curb, gutter and sidewalk
Totals • 240 42 282 282
PE 4/1/2009 CMAO 24 3 27 27
16 22 01 P N/A S CN 7/1/2009 CMAO 480 65 5451 545 CE
Roadway City Wide Shoulder Improvements No
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
_ Totals 504 68 572 572
14 23 31 S N/A O PE 1/1/2009 STP(U) 72 11 ' 831 83 CE
E Nob Hill Blvd & Fair Ave 03 C Yes •
E Nob Hill Blvd 04
from: E Nob Hill Blvd to: Fair Ave T
Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, W - 10/01/2009 .
slormwater .
Totals 72 11 83 83 .
17 24 04 P 1.3 O PE. 1/1/2009 AIP 131 20 151 151
• RW 1/1/2010 AIP 382 59 441 441 EA
S 80th Ave - Tieton Dr to Zier Rd P CN 6/1/2010 AIP 1667 .260 1927 1927 Yes
S 80th Ave •
from: Tieton Dr to: Zier Rd T
W 01/01/09
Major widening, curb, gutter, sidewalk
S
Totals • 2180 339 2519 151 2368
•
•
•
v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 6
e
0
. .
• .
0 • e
..
. • .
. .
• • . .
wa Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. '
Hearing Date: 7/1/2008 . Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date:. Resolution No.:
Project Identification Project Costs in Thousands of Dollars ' Federally Funded
v — Expenditure Schedule Projects Only
�, Y � A. PIN /Federal Aid No. B. Bridge No. d.. � „ a , Fund Source Information I S g m : E C. Project Title w m , o c Federal Funding (Local Agency R/W
g U 0_ Z D. Street /Road Name or Number ti- t o • m -6 Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E 1- = d Start Fund Cost by Fund Stat Local Tot Envir. Date
g g g ° MM /Y y Fund F un d s F un d s 1st 2nd 3rd Thru Type (
F. Describe Work to be Done a ( m rr v dd yyyy) C Phase Cod 6th »
1 2 - 3 - 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
• PE 1/1/2009 STP(E) 22 7 29 29
17 25 05 S .15 C CN 6/1/2009 STP(E) ' . 75 20 95 95 CE'
Zier Rd - S 75th Ave to S 72nd Ave 06 S Yes
Zier Rd T ' • from: S 75th Ave to: S 72nd Ave P .
Minor widening, curb, gutter and sidewalk 03/01/09
Totals 97 27 _ 124 124
•
17 26 05 P 1.0 w PE 1/1/2012 STP(C) . 272 43 315 315
RW 6/1/2012 STP(C) - 349 - 55 404 404 EA
Englewood Ave - N 40th Ave to N 56th Ave 06 • - T CN 1/1/2013 STP(C) • 2352 340 2692 2692 Yes
Englewood Ave - •
from: N 40th Ave to: N 56th Ave P •
Widen roadway, curb, gutter, sidewalk
o 04/01/11
C •
. Totals 2,973 438 3411 3411
17 27 05 P 2 ' PE 1/1/2010 STP(U) 219 34 253 253
RW 1/1/201'1 STP(U) . 327 51 378 378 EA
' Englewood Ave - N 24th Ave to N 16th Ave 06 S CN 6/1/2012 STP(U) 2980 244 3224 3224 Yes
• Englewo Ave -
from: N 16th Ave to: N 24th Ave .. • '
Widen, curb, gutter and sidewalk, water and sewer lines - 01/01 /10
• Totals 3,526 329 3855 253 378 3224
PE 1/1/2011 STP(E) 252 34 286 286
00 '28 - 14 P .25 T CN 3/1/2012 STP(E) • 3150 412 3562 1 3562 CE
Pedestrian Bridge 32 P No
• Pedestrian Bridge .
• from: N 10th St ' to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway, . .
power, handicap accessible, lights
Totals 3,402 446 3848 • 286 3562
•
•
Report Date: January 31, 2008 Page 7
•
v. 5/ - Supersedes previous editions
•
2 1 V Washington State Department of Transportation Six Year Transportation Improvement Program.
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification _Project Costs In Thousands of Dollars Federally Funded
To. Y 45 A. PIN /Federal Aid No. B. Bridge No. m o u u d . Fund Source Information Expenditure Schedule Projects Only
S 2 ._ E rn c N - (Local Agency)
u m o f C. Project Title i J a • Federal Funding • R/W
g U li 2 D. Street /Road Name or Number a 1- 11 y Phase Federal Federal State 4th Required
ii t ` E. Beginning MP or Road - Ending MP or Road E 5 o S • Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done n
(mmiddyyyy) Code Phase Code Funds Funds Funds 6th Type (MM/Vm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 4/1/2009 252 252 100 70 82
00 29 07 P N/A S CN 6/1/2009 CMAG . 195 38 233 233 CE
Gravel RoadB.S.T. • No
Various Areas
from: City Wide to:
Totals 195 • 290 485 100 '70 315
16 30 12 P N/A T CN 10/1/2010 STP(S) 504 74 5781 578 CE
Powerhouse Rd & Englewood Ave P Yes
Powerhouse Rd o
from: Powerhouse Rd to: Englewood Ave S
C • Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, 09/01/2009
W
possible roundabout
Totals 504 74 578 578
PE 1/1/2012 STP(S) 25 • . 4 29 29
14 31 12 P N/A P RW 6/1/2012 STP(S) 25 4 29 29 CE
S 48th Ave & Summitview Ave Signalization • T CN 8/1/2013 STP(S) 554 81 635 • • 635 Yes
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization 06/01/12
Totals • 604 89 693 693
16 32 12 P N/A P PE 4/1/2009 13 13 13 ,
T CN 6/1/2009 214 2141 214 CE
• • S 3rd Ave & W Washington Ave Signal No
S3rdAve
from: S 3rd Ave to: W Washington Ave '
Signal Upgrades ,
•
. Totals 227 227 227
•
Report Date: January 31, 2008 Page 8
v. 5.7 - Supersedes previous editions
•
•
•
•
IP 0
0 . . . . .
0 . .
•
Washington State Department of Transportation . Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014 -
Co. No.: 39 Co. Name: Yakima Co.
. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: . 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m a
A. PIN /Federal Aid No. B. Bridge No. r t m
: Fund Source Information / Expenditure Schedule Projects Only
• m rn v CD
• o w - C. Project Title E vf en c o w (Local Agency)
m o E E o D o Federal Funding R/W
o a z D. Street /Road Name or Number • c ~ N 23 a Phase Federal Federal State 4th Required
E. Beginning MP or Road,- Ending MP or Road E i 5 d Start Fund Cost by Fund State Local Total Thru Envir. Date
° mrrVdd /yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mm/yy)
F. Describe Work to be Done o
1 2 . 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 33 12 S N/A P PE 1/1/2009 . AIP 120 52 172 100 72
RW 6/1/2009 AIP 84 36 120 40 80 CE
S 16th Ave & W Washington Ave Signal & Intersection. 05 T CN 6/1/2009 • - AIP 880 383 1263 1263 Yes
s 16th Ave 03 '
from: S 16th Ave to: W Washington Ave • ,
Included in Union Gap's Valley Mall Blvd. project 3/1/2009
Totals 1084 471 1555 1403 152
14 34 12 P 2.5 P PE 1/1/2010 STP(S) 55 8 63 63 •
RW 6/1/2010 STP(S) - 107 19 126 126 CE
W Nob Hill Blvd Sidewalks T : CN 3/1/2011 STP(S) 321 - 57 378 • 378 Yes
W Nob Hill Blvd W
from: S 16th Ave to: S. 6th St. S
Install missing sidewalks on southside of Nob Hill. • 09/01/08
Totals 483 84 567 189 378
00 35 - 06 P 1.0 P PE 1/1/2011 STP(S) 57 7 64' 64 ' •
RW 6/1/2011 STP(S) 189 25 214 214 CE
Beech St Pedestrian Connection 32 T CN 1/1/2012 • STP(S) 504 68 572 572 Yes
Beech St
from: Fair Ave to: Chalmers/Riverside '
Construct pedestrian pathway under SR82 to Greenway - - 09/01 /10
-. Totals 750 100 850 64 786
16 36 12 P 2 o P PE 1/1/2011 STP(S) 43 7 50 50 ,
RW 6/1/2011_ STP(S) 86 15 101 101 CE
W Lincoln Ave Sidewalks - T CN 1/1/2012 STP(S) 572 88 660 660 Yes
W Lincoln Ave S '
from: N 56th Ave to: N 29th Ave W
Sidewalks, meters and fire hydrants replacement or relocation - '09/01/11 •
Totals - 701 110 811 - 811
•
•
•
Report Date: January 31, 2008 Page 9 v. 5.7 - Supersedes previous editions
•
I _
V A i Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima _ From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: • 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
. Project Identification - Project Costs in Thousands of Dollars Federally Funded
E A. PIN /Federal Aid No. B. Bridge No. d o v w Fund Source Information Expenditure
Agency)
Projects Only
`g .o d C . Project Title % a Federal Fundin (Local 9 » R/W
.0 o �
c v — D. Street/Road Name or Number ' in = Ph ase F Federal State Re wired
q 4th Envir. i a Z E ~ f 5 ar Start Fund Cost by Fund Thru Sta Local Tdtal Date
l
E. Beginning MP or Road - Ending MP or R oad o y Funds Funds Funds 1st 2nd 3rd Type (Mfd/yy)
F. Describe Work to be Done a (mm/ddtyyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 -13 14 15 16 17 18 19 20 21
PE 1/1/2010 STP(E) 424 67 491 491
14 37 01 P - W RW 1/1/2011 STP(E) 1047 163 1210 1210 CE
W Lincoln Ave & 'B' St Realignment 12 T CN 1/1/2012 STP(E) 1801 281 • 2082 2082 Yes
• W Lincoln Ave - P
from: W 5th Ave to: Custer St 0 09/01/11
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G
C Totals 3,272 511 3783 491 3292
PE 1/1/2009 PSMP 13 2 15 15
16 38 12 P N/A W CN 1/1/2009 PSMP 239 48 2871 287 CE
School Safety Projects No
•
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
Totals 252 50 302 302
14 39 03 PE 1/1/2010 STP(C) 546 84 630 630
' P .85 C RW 1/1/2011 STP(C) 1090 170 1260 1260 EA
E Nob Hill Blvd. Reconstruction 04 G CN 1/1/2012 STP(C) • 6539 1013 7552 7552 Yes
•
E Nob Hill Blvd. 06
from: S 6th Street to: S 18th Street P
S 1/1/2010
Major roadway widening and reconstruction to 5.lanes with intersection T
•
improvements, curb, gutter, sidewalks, replacement or relocation of meters W
an hydrants Totals 8,175 1267 9442 9442
PE 1/1/2010 STP(C) 91 14 105 • 105 ,
• 17 40 01 P N/A W RW 1/1/2011 STP(C) 91 14 105 105 CE
S 72nd Avenue & W Washington Avenue 12 S CN 1/1/2012 STP(C) 544 86 630 630 Yes
S 72nd Ave ' 06 P
from: S 72nd Ave to: W Washington Ave 0
1/1/2011
Intersection improvement, possible roun
Totals 726 • 114 840 840
•
•
•
.
v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 10
III . 410 • 0
0 , . 0 .
' 0
•
Fa Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. - Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
• City'No.: 1485 MPO /RTPO:. YVCOG • Amend Date: Resolution No.:
•
- Project Identification Project Costs in Thousands of Dollars Federally Funded
• r N Expenditure Schedule Projects Only
A. PIN/Federal Aid No. B. Bridge No . c d _ , Fund Source Information
iv ° ^ in c a N (Local Agency)
o m o E C . Project Title > a a J ° -c Federal Funding R/W
3 n z D. Street /Road Name or Number ate i n a Phase Federal Federal State 4th Required
` E. Beginning MP or Road - Ending MP or Road E r ° 5 o Stan Fund . Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
' F. Describe Work to be Done 0_ (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM /rr)
1 2 3 4 5 6 7 - 8 9 10 11 12 13 ' 14 15 16 17 18 19 20 21
14 41 '. 4579 12 P N/A P PE 6/1/2009 STP 252 . 38 290 290
. . EA •
S 1st St. - E. Washington Ave. Intersection Improvement W Y es
S 1St St. S
from: S 1st St. to: E Washington Ave. T
O 01/01/11
Realign intersection, upgrade traffic signal
. Totals 252 38 290 290
4562 ALL 4/4/2010 STP(U) 378 .WSDOT 378 7561 i 756
16 42 12 P N/A P CE
Tieton Or - S 5th Ave. Intersection Project W No
Tieton Drive T
from: 5th Ave. Intersection to: O
Replace traffic signal with roundabout S
Totals . 378 378 756 756 -
17 43 4587 03 P 1.00 P ALL 4/1/2009 STP 2268 307 25751 • 525 2050
EA
. S 48th Ave. Reconstruction T No
S 48th Avenue • W
from: Summitview Ave. to: Nob Hill Blvd. S
O
Widen, curb, gutter, sidewalk, lighting, drainage '
Totals - 2,268 - 307 2575 525 2050
PE 1/1/2009 STP(U) 51 8 59 • 59
14 44 03 P N/A O CN 6/1/2009 STP(U) 383 61 444 444 - CE
South 72nd Ave & Mead Ave Intersection 12 8 • No
South 72nd Ave
. from: South 72nd Ave to: Mead Ave T •
New intersection, signals, curb, gutter and sidewalk W
• ' Totals 434 69 503 503
•
v. 5.7 - Supersedes previous editions
•
•
Report Date: January 31, 2008 Page 11
Washington State Department of Transportation Six Year T ransportatio n
en Improvement Program
Agency: Yakima . From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A . PIN /Federal Aid No. B Bridge No. m ^ d • r, Fund Source Information Ex (Local ure Projects Only
a, E e rn CO ° o y2 (Local Agency)
o m : o E C. Project Title > a 3 , 0 t Federal Funding R/W
c U ti m D. Street /Road Name or Number • o� y ; u a Phase Federal Federal State 4th .Required
Z o — State Local Total Envir. Date
u E. Beginning M or Road - Endin MP or Road E t- ° Sta rt Fun Cost by Fund 1st 2nd 3rd Thru
g g Ending i (mm/dd yyyy) Code Phase Code Funds Funds Funds 6th Type (Mp»
. F. Describe Work to be Done
1 2 3 4 -5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
• PE 1/1/2009 STP(E) 10 2 12 12
00 45 14 P N/A 0 CN' 7/1/2009 STP(E) 109 17 126 126 CE .
William O. Douglas Pathway 32 S No •
P •
from: Pine St to: Cowiche Canyon W
Pathway improvements, connections, and signage to Cowiche Canyon Trail. -
Totals 119 19 138 138 '
PE 1/1/2009 STP(E) 23 5 28 28
17 46 04 P 76 W CN 7/1/2009 STP(E) 1096 164 1260 1260 Yes
S 66th Avenue 03 . T T
S 66th Ave
. from: Scenic Drive . to: Summitview P
p 1/1/2009
Widen roadway, curb, gutter, sidewalk and utilities - '
Totals 1,119 169 1288 1288 _
PE - 1/1/2010 STP(S) 164. 25 189 189
16 47 05 P .20 G RW 6/1/2010 STP(S) 382 60 442 442 CE
66th Ave. & Summitview Intersection • 12 • P CN 7/1/2011 ' STP(S) 1090 170 1260 1260 Yes
N. 66th Avenue & Summitview
from: N. 66th Ave. ' to: Summitview Ave. S
T 1/1/2010 .
Widen for left turn lanes, intersection improvements, curb, gutter, handicap W
ramps and lighting C
Totals 1,636 255 1891 189 442 1260
PE 1/1/2010 STP(U) 126 17 ' 143 143
14 48 12 P N/A w
RW 1/1/2010 STP 63 8 71 71 CE
S
40th Avenue and Summitview Signal Upgrade CN 6/6/2010 STP(U) 544 86 630 630 Yes .
40th Avenue . T
from: 40th Avenue to: Summitview P -
o 1/1/2010
Signal upgrade, radius improvements, turn lane extension
•
Totals 733 111 844 844
v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 12
•
4 10 • .
1110 .
iiio
___
0 : .
. - 0 0
•
•
.•
Washington State Department of Transportation Six Year Transportation Improvement Pro
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 - 15 - 2008
• City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars • Federally Funded
T A. PIN /Federal Aid No. B. Bridge No. d w ' - F Source Informatio Expenditure Schedule Projects Only
o 1-3 C . Project Title d 'a ui c - o m (Local Agency)
ro o a ii F e d eral F un di ng R/W
v a Z D. Street/Road Name or Number al- i n i s = - T ' ' Phase- Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E o St Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MMJY
1 2 • 3 4 5 • 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 49 12 P N/A W PE 1/1/2010 STP 95 13 108 108 •
RW 1/1/2010 STP 63 8 71 71 CE
40th Avenue and Englewood T CN 1/1/2011 STP • ' 145' 20 165 165 Yes
40th Avenue S
from: 40th Avenue to: Englewood P _
Replace traffic signal poles, upgrade controller 1/1/2010
Totals 303 41 344 344
00 50 12 P N/A W PE 1/1/2010 STP 126 18 144 144
RW 6/1/2010 STP 63 8 71 71 CE .
16th Avenue and Fruitvale Blvd T CN 1/1/2011 STP 315 43 358 358 Yes
16th Avenue - - S
from: 16th Avenue to: Fruitvale Blvd P •
Replace traffic signal poles, radius improvements, ADA ramps 6/1 /2010
• Totals 504 69 573 573 •
• 14 51 12 P N/A W PE 1/1/2010 STP 32 5 " 37 37
i st Street and 1 Street T CN 1/1/2011 STP 126 17 143 1 143 CE
No
1st Street S •
from: 1st Street to: I Street P
• Replace and upgrade traffic signal equipment
Totals - 158 22 180 180
14 52 01 P .25 W PE 6/1/2011 STP(U) • 820 189 1009 1009 ,
T RW 1/1/2012 STP(U) 3150 630 3780 3780 CE
Mead Ave. Railroad Grade Separation _ CN 1/1/2013 STP(U) 6552 1008 7560. 7560 Yes
Mead Ave. S
from: Presson Place to: Maryland P 0 1/1/2012
Construct railroad overpass including all utilities -
Totals 10,522 1827 12349 4789 7560
•
V. 5.7 - Supersedes des revious editions
Report Date: January 31, 2008 Page 13 p P
•
Washington State Department of Transportation • Six Year Transportation Improvement Program
•
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To
A. PIN /Federal Aid No. B Brid No c .c to �, Fund Source Information Expenditure Schedule Projects Only
a� v N (Local Agency)
N _ rA
P. m : o E C. Project Title e c . 3 ci .. Federal Funding R/W •
o 6 2 D. Street /Road Name or Number ai- in . — a Phase • Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E o o Start Fund Cost by Fund State . Local Total 1st 2nd 3rd Thru Envier. Date
• F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type (MM Y)7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 53 01 P .25 PE 6/1/2011 STP(U) 820 189 1009 1009 •
RW 1/1/2012 STP(U) 3150 630 3780 3780 CE
Washington Ave. Railroad Grade Separation S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes
Washington Ave.
from: Longfibre Road to: T
Railroad grade overpass including all utilities W 1/1/2012
Totals 10,522 1827 12349 12349
•
PE 6/1/2011 .STP(U) 252 38 290 290
16 54 01 P 4.0 0 RW 1/1/2012 STP(U) 756 88 844 844 CE
Citywide Pathway Connections 8 CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes
Yakima
from: to: T
• W 1/1/2012
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
Totals 2,898 441 3339 • 290 3049
PE 1/1/2011 STP(U) 2180 340 2520 2520
16 55 01 P 1.1 0 RW 1/1/2013 STP(U) 2180 340 2520 2520 CE
E. 'H "St. Extension 08 8 CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes
E. "H" St. •
from: 1st St. to: Yakima River W 1/1/2013
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
Totals • 5,559 2551 8110 . 8110
• 01 P 1.3 PE 1/1/2012 STP(C) 700 108 808 808
17 56 • RW 1/1/2013 STP(U) 5500 850 6350 6350 CE
N. 10 th St. Extension 06 S
CN 6/1/2013 STP(U) 7900 972 8872 • 8872 Yes
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave. • T
W 1/1/2013
Construct road including water, sewer, curb, gutter, sidewalk for future
development. '
Totals 14,100 1930 16030 16030
Report Date: January 31, 2008 Page 14 v. 5.7 - Supersedes previous editions
. .
II .
III
•
0 ' .
0 '
0
Washington State Department of Transportation Six Year Transportation Improvement Program
-en ncy: Yakima
Agency: From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co.
. Hearing Date: 7 -1 -2008 Adoption Date: - 7 -15 -2008
. City No.: 1485 MPO /RTPO: •YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded •
A P IN /Federal Aid No. B. Bridge No. c r ^ Expenditure Schedule Projects Only
m >, g �^ v �, Fund Source Information
C m . - C . Project Title E a t Federal Funding (Local Agency) a. v li z D. Street /Road Name or Number n . in S a Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E 5 o State Local Total Envir.. Date •
• Start Fund Cost by Fund 1st 2nd 3rd Thru
F. Describe Work to be Done d (mm / yyyy) Code Phase Co F un d s Funds Funds 6th Type (MM /Y>7
1 2 3 4 5 6 7. 8 9 10, 11 12 •13 14 15 16 17 18 19 20 21
PE 1/1/2012 STP(U) .315 • 38 353 353
CN 6/1/2012 STP(U) 945 • 126 1071 1071 C
00 57 03 P N/A O 32 E No
YVT Pathway -
YVT Railway Corridor. P
S
from: to: • T
Development pathway in West Valley area including 53rd Ave, Wide Hollow, W
64th Ave, Ahtanum including all utilities and signage
. Totals 1,260 164 1424 1424
PE 1/1/2011 STP(U) 63 5 68 68
• 17 58 01 . p N/A 0 CN . 6/1/2011 STP(U) 567 76 6431 643 CE
34th Ave & River Rd Improvements 12 P No
Fruitvale Blvd. . S •
from: 34th Ave. to: River Rd. T
W
• Intersection improvements including lumination, sewer, water, curb, water -
and sidewalks '
Totals 630 81 711 711
•
PE 1/1/2010 STP(U) 218 34 252 252
17 59 01 - P 1.0 0 RW 6/1/2011 STP(U) 327 51 378 378 CE
Englewood Aye 05 8 CN 1/1/2012 STP(U) 2980 244 3224 3224 Yes
Englewood 12
T
from: 24th Ave to: 40th Ave • • W 6/1/2011
Reconstruct roadway, widen, curb, gutter and sidewalks.' Sewer, water lines -
and street lights.
. • Totals - 3,525 329 3854 630 3224
PE 1/1/2010 STP(U) 272 43 315 - 315 ,
16 60 • 01 P 1.3 C RW 6/1/2010 STP(U) ' 349 55 404 404 CE
Frontage Road& "H" St Loop GO CN 1/1/2011 STP(U) 2352. 340 2692 2692 Yes
N. 8th St. .
from: "H" St. to: 1 -82 P •
S
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for • - 6/1 /2010
future development and Terrace Heights connection. T
W Totals - 2,973 438 , 3411 719 2692
•
•
Report Date: January 31, 2008 Page 15
v. 5.7 - Supersedes previous editions
•
•
•
71 Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima • From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 •
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
H
Y A. PIN /Federal Aid No. B. Bridge No. m ^ r u Fu Source Information Expenditure Schedule Projects Only
C . _ C. Project Title E o ; v u m (Local Agency)
_ 0 o f j o . Federal Funding • R/W
3 U a Z D. Street /Road Name or Number 8.1 in Y a Phase Federal Federal State 4th Required
E. Be
inning MP or Road - Endin MP or Road E H 5 d Sta rt • Cost by Fund State Local Total T hru Envir. Date
g g g y • Funds Funds Funds 1st 2nd 3rd T
F. Describe Work to be Done a (mm/dd/YYYY) Code Phase ' Code 6th Type (M h
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
CN 6/1/2009 75 75 25 25 25
00 61 07 P .5 G CE
Citywide Alleys s No
•
from: to: W
T
Pave alleys throughout the city.
Totals 75 75 25 25 25
PE 1/1/2010 STP(U) 120 17 137 1 137
14 62 03 P 2.7 G CE
Nob Hill Corridor 04 •
Nob Hill 0
from: 1 -82 to: S. 16th Ave. P
T
Widen roadway, sidewalk, curb, gutter, lighting
T
•
W Totals 120 17 137 137
• 14 63 04 P 3.2 c PE 1/1/2011 STP(U) 120 17 1371 137 CE •
40th Ave. Corridor o .
40th Ave. G
from: SR -12 to: Washington Ave. s
Widen roadway, curb, gutter, sidewalks, lighting. w
T Totals 120 17 137 137
14 64 04 P 3.5 G G 1/1/2012 STP(U) 120 17 1371 137 CE ,
16th Ave. Corridor •
16th Ave. 0
from: SR -12 to: gap ingIon Ave.Nalley Mall P
T
Widen roadway, curb, gutter, sidewalk, lighting.
T
W Totals 120 17 137 137
Report Date: January 31, 2008 Page 16 v. 5.7 Supersedes previous editions
.0
. 0 . .
. 0 „ ' •
Washington State Department of Transportation Six Year Transportation Improvement Program
.71 Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co.
H earing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
•
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
' Project Identification Project Costs in Thousands of Dollars Federally Funded
y
A. PIN /Federal Aid No. B. Bridge No. 'c „ Fund Source Information • Expenditure Schedule Projects Only
c N , a E N 2 ° o (Local Agency)
o m $ E C. Project Title > a m J ° L Federal Fund R/W
c ii a = D. Street /Road Name or Number °� i n a Phase Federal Federal State 4th ' Required
u z E o — State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road r . o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (mm Yt7 •
F. Describe Work to be Done a (mai/cid / yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 •9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2012 STP(U) 120 17 137 137
14 65 04 ' P 2.0 C CE
S. lst St/Main St. Corridor G
S. 1st St. /Main St. i O •
from: Nob Hill Blvd. to: Barker Mill Bridge P
S
Joint project with Union Gap to siden roadway, curb, gutter, sidewalk, T
lighting. W
Totals 120 17 137 137
14 66 01 P 6.0 C PE 1/1/2012 STP(U) 120 17 1371 137 CE
W. Yakima North /South Connector to West Valley • 04 ' G
Unknown road 06 0
•
from: North - South to: in West Valley P
S
City 8 County joint project to build /extend roadways. T
•
W Totals 120 17 137 137
00 67 23 S
N/A PE 1/15/2009 OTHER 100 1001 100
West Side Transit Center Placement Study •
Acquire Property to Expand Operations
from: to:
Recent Annexations Mandate Transit Expansion to These Areas • _ Totals • 100 100 100
16 68 04 P 73 C CN 6/1/2009 432 68 5001 500
W. Nob Hill Blvd -S 68th Ave to S. 72nd Ave. 03 W
W Nob Hill Blvd 0 •
from: S. 68th Ave. i to: 72th P '
Reconstruct to minor arterial standards T
Totals 432 68 500 500 -
Report Date: January 31, 2008 • Page 17 v. 5.7 - Supersedes previous editions
•
•
•
•
r a
Washington State Department of Transportation v T
en Six Year Transportation tation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 - - 2008 Adoption Date: 7 - 15 - 2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs In Thousands of Dollars Federally Funded
A. PIN/Federal Aid No. B. Bridge No. m.. , Fund Source Information Expenditure Schedule Projects Only
t3 �, �, r n . (Local Agency)
o m $ E C. ProjectTltie - gi o 3 o 2 Federal Funding RIW
c U a` D. Street/Road Name or Number �� N a Ph ase F e d e r al F ederal State 4th Required
LL Z E. Beginning MP or Road - Ending MP or Road E t°- at Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done g a. (mm Code Phase Code Funds Funds Funds 6th Type (MitvvY)
1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 20 21
•
PE 4/6/2009 ARRA- 75 OTHER 100 175 175
17 69 03 P - P CN 6/1/2009 ARRA- 925 OTHER 1400 2325 925 1400 CE
Yakima Downtown Future Initiatives, Phase 4 05 T No
• 06
from: "A" Street to: 3rd Street to Naches
Install Historic lighting, sidewalk modifications and other improvements
Totals 1,000 1500 2500 1100 1400
PE 5/1/2009 OTHER 400 400 400
17 70 06 S .60 W P CN 4/1/2010 OTHER 2600 2600 2600 CE No
Yakima Downtown Future Initiatives, Phase 5 12
•
S
T
from: 1st Street to: 9th Street
0
Install Historic lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
Totals 30 3000 3000
00 71 03 S 50 . W C 1/1/2009 I CMAQ I 540 I 214 754 I 7541 I ( CE NO
Coolidge Road Widening and Paving. 05
06 T
T
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
Totals 540 214 754 754
16 72 01 P 38 S PE 1/1/2012 100 1001 I I 100
Occidental Road Construction. W •
. P
•
from: 58th Ave. to: 64th Ave. T
Construct roadway
Totals 100 100 100
Report Date: January 31, 2008 Page 18 v. 5.7 - Supersedes previous editions
•
. .
410• .
• ,
0 •
Washington State Department of Transportation Six Year Transportation Improvement Program
• -en
Agency: Yakima • From 2009 to 2014
Co. No.:. 39 Co. Name: Yakima Co.
Hearing Date: 7/1/2008 Adoption Date: . 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars 'Federally Funded
T A. PIN /Federal Aid No. B. Bridge No. t t m a� Fund Source Information Expenditure Schedule Projects Only .
. 2 m : o E C. Project Title J _ F e d era l Fu n d i ng ( L oca l A g enc y) R/W
U ti Z D . Street /Road Name or Number ai- i n a Phase Federal Federal State 4th Required
t ` E. Beginning MP or Road - Ending MP or Road E ,2 5 ° Start Fund Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done 1i (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM /YY)
1 2 3 4 . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
00 73 01 P 27 • PE 1/1/2012 • 100 100 100
86th Ave. Road Construction .
from: Occidental to: Coolidge • -
Construct roadway • .
• Totals 100 100 . • 100 .
•
16 74 04 P 1:5 w PE 1/1/2012 STP(U) 120 17 1371 137 EA .
64th Ave. Roadway Widening. 06 G 1 YES
•
from: Washington Avenue. to: Tieton Drive. T ,
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. C 7/4!2012
• O
Totals • 120 • 17 137 137
ALL 1/1/2009 5309(Bus) 1540 15401 1540 CE
00 75 • 21 S N/A •
. Purchase four new transit buses (replacements) . No
On -going vehicle replacement program
•
from: to:
Seek RFP's 10 acquire lour new transit buses that will replace units that are - •
18 years of age. (six years past federal standards) -
Totals • 1540 1540 1540
00 76 21 S N/A ALL 6/1/2009 85 30 1151 115 ,
CE
. Acquisition of new Dial -A -Ride paratransit vehicles No
Replace several older vehicles -
from: to:
Upgrade Dial -A -Ride service by replacing several older vehicles with new -
. models.
Totals 85 30 • 115 115 •
•
Report Date: January 31, 2008 Page 19
v. 5.7 - Supersedes previous editions
•
•
ili Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 t0 2014
Co. No.: 39 Co. Name: Yakima Co- Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. c .c m Fund Source Information Expenditure Schedule Projects Only
m E H d tl1 g c N (Local Agency) •
s N .?^. - -O C- Project Title d — v t Federal Funding R/W
a U a Z D . Street /Road Name or Number n N m d P ha se Federal Federal State 4th Required
o State Local Total Envir. Date
LL E- Beginning MP or Road - Ending MP or Road E o — o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM Y�
F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11' 12 13 14 15 16 17 18 19 20 21
CN 4/1/2009 BR 1742 1742 1742
14 77 11 P 0.2 CE
Nob Hill Overpass Repair - No
•
• from: 1st Street to: Ledwich Ave
Make necessary repairs to Railroad Overpass (Bridge) -
. Totals 1,742 1742 1742
PE 1/1/2009 STP(U) 173 27 200 200
14 78 03 P .N /A RW 1/1/2010 STP(U) 433 67 500 500
E. Lincoln 8 10th Street Roundabout 05 CN 6/1/2010 STP(U) 1125 175 1300 1300 Yes
06
from: E. Lincoln to: E. MLK Jr. Blvd.
Roundabout construction at intersection curb, gutter, sidewalk, 8 street 4/1/2010
lighting Totals 1,731 269 2000 200 1800
- 12 79 03 P N/A O ALL 1/1/2009 STP(U) 865 • 135 10001 1000 CE
S.R.12 & 16th Avenue Interchange 06 • No
Interchange
from: 16th Avenue - to: S.R. 12 - - . .
Upgrade Interchange by constructing a Roundabout
Totals 865 135 1000 1000 '
11 80 01 P N/A 0 1 1 1 1 1 1 1 1 1 1 1 EA •
1 -82 B Lincoln Avenue Interchange P Yes
1 -82 Interchange G
from: E. "G" Street to: 1 -82
6/2011
Reconstruct / extend off -ramp from existing 1 -82 off -ramp for Lincoln Avenue
' toE.'•G" Street.
Totals .
• Page 20 V- - Supersedes previous editions
Report Date: January 31, 2008
ID
OP - .
•
. 0 . 0 .
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakirna Co.
Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485. MPO /RTPO:' YVCOG Amend Date: Resolution No.: •
Project Identification Project Costs in Thousands of Dollars Federally Funded
• Y A. PIN /Federal Aid No. B. Bridge No. i u N Fund Source Information
Expenditure Schedule Projects Only
0 q •_ cl) o m o f C. Project Title _ E q >, ta m c o q (Local Agency)
0 U . Federal Funding I R/W 72 c U a z D. StreetlRoad Name or Number a � y m a Phase Federal ' Federal State 4th Required •
LL • E. Beginning MP or Road - Ending MP or Road E 1 5 ° Start • Fund Cost by Fund •State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mm/ddiyyyy) Code Phase Code Funds Funds Funds 6th Type (MM /Y1)
1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 81 12 p N/A P ALL 1/1/2010 STP(U) 865 135 1000 1000 CE
E . Yakima Avenue & Fair Avenue Signalization W
•
No
T •
from: E. Yakima Avenue to: Fair Avenue S •
Construct Traffic Signal
_ Totals 865 135 1000 1000
14 82 06 P 2.64 PE 4/6/2009 ARRA - 50 . 50 50
CN 6/1/2009 ARRA- '1950 1950 1950 CE
Summitview Ave. Grind & Overlay 07 No
•
from: 14th Ave to: 56th Ave -
Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA .
ramps .
Totals 2,000 2000 2000
' Grand Totals for Yakima 129,965 20,094 33,605. 183,664 40,781 34775 37,505 70,603
• Report Date: January 31, 2008 Page 21
v 5. - Supersedes previous editions
•
•