Loading...
HomeMy WebLinkAboutR-2023-014 Resolution authorizing supplemental agreement 1 with HLA Engineering and Land Surveying, Inc to provide Professional Construction Management, Observation and Administration Services for the Summitview Ave ProjecA RESOLUTION RESOLUTION NO. R-2023-014 authorizing a supplemental agreement with HLA Engineering and Land Surveying Inc providing professional construction management, observation and administration services for the Summitview Avenue Project 2566 (PROJECT) WHEREAS, the City had the need to perform construction management on the Summitview Avenue Resurfacing project; and WHEREAS, HLA Engineering and Land Surveying, Inc. (HLA) was selected to provide professional construction management, observation and administration services; and WHEREAS, the project required additional working days during construction; and WHEREAS, the City desires to supplement the existing agreement (Contract 2022-153) with HLA Engineering and Land Surveying, Inc, to account for the necessary additional 8 work days, and the costs associated with those additional 8 work days; and WHEREAS, the City Council of the City of Yakima finds that supplementing the Professional Services Agreement is in the best interests of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute a Professional Services Agreement Supplement 1 with HLA Engineering and Land Surveying, Inc., attached hereto and incorporated herein by this reference, not to exceed Twenty -Four Thousand, Five Hundred and Thirty -One Dollars ($24,531) to provide the Professional Services as described in the Supplemental Agreement. ADOPTED BY THE CITY COUNCIL this 17th day of January, 2023. 1,4441,44i4 (4,444,44144444,1"'444-- ete'46 Janice Deccio, Mayor ATTEST: Sony • aar Tee, City Clerk m,"1"jorir Washington State VW Department of Transportation Supplemental Agreement Number 1 Original Agreement Number 22039C Project Number NHPP-4596(007) Project Title Summitview Avenue Resurfacing Organization and Address HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Phone: 509-966-7000 Execution Date 9/7/2022 New Maximum Amount Payable 186,231.00 Completion Date 12/31/2024 Description of Work Construction engineering and administration services to resurface Summitview Avenue from just west of 40th Avenue to 48th Avenue, and 56th Avenue to 72nd Avenue (including through intersections of 56th Avenue and 72nd Avenue). The Local Agency of City of Yakima desires to supplement the agreement entered in to with HLA Engineering and Land Si.ryeyi and executed on 9/7/2022 and identified as Agreement No, 22039C All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: SCOPE OF WORK shall remain unchanged with the exception that eight (8) additional working days has occurred. 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read J1MLEQRJLQ1NNIIJ AI,,P P 111 Section V, PAYMENT, shall be amended as follows: PAYMENT shall be increased $24,531, for a new maximum amount payable of $186,231.00. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: HLA Engincering and Land Surveying, Inc. DOT Form 140-063 Revised 09/2005 Yakima CITY CONTRACT N RESOLUTION NO: proving Authority Signature CN Engineering Services (Consultant) Supplement 1 Fee Estimate (2022) City of Yakima Summitview Avenue Resurfacing CN Phase Negotiated Hourly Cost: Classification Licensed Principal Engineer Project Engineer Resident Engineer Contract Administrator III Reimbursables: Mileage Grand Total Hours Rate 24 x $210.00 24 x $155.00 96 x $128.00 24 x $142.00 Cost ($) $5,040.00 $3,720.00 $12,288.00 $3,408.00 Total $24,456.00 $75.00 $24,531.00 GAContracts & Task OrdersVakima \ 2022 \Summltview Avenue Resurfacing\CN Agreement \ 2022-11-30 Supplement 1 Consultant Services Estimate.xlsx 1 ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEM ENT Item No. 6.G. For Meeting of: January 17, 2023 Resolution authorizing supplemental agreement 1 with HLA Engineering and Land Surveying, Inc to provide Professional Construction Management, Observation and Administration Services for the Summitview Ave Project 2566 Scott Schafer, Director of Public Works * Bill Preston, City Engineer - (509) 576-6754 SUMMARY EXPLANATION: The City of Yakima's Summitview Avenue project included resurfacing from just west of 40th Avenue to 48th Avenue, and 56th Avenue to 72nd Avenue (including through intersections of 56th Avenue and 72nd Avenue). The City selected HLA to provide professional services for construction engineering and administration services on the Summitview project on Resolution 2022-112 and Contract 2022-153. The City desires to supplement the existing contract to account for a necessary addition of 8 working days and the costs associated. The Supplemental Agreement 1 is for $24,531.00. The Agreement has been attached for City Council review. The project is being federally funded with a Washington State Department of Transportation 2021 National Highway System (NHS) Asset Management Award, with no local match required. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution ATTACHMENTS: Description ❑ Resolution O Supplemental Agreement 1 Upload Date 12/28/2022 12/5/2022 Type Resolution Backup Material