HomeMy WebLinkAbout06/16/2009 17 Level 2 Domestic Water System Improvements, Phase 3, Final Contract Payment - Project No. WA2096 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON • AGENDA STATEMENT Item No. g /7 For Meeting Of 6/19/09 ITEM TITLE: Final Contract Payment for Level 2 Domestic Water System Improvements Phase 3 — City Project No.: WA2096 SUBMITTED BY: Dave Brown - Water /Irrigation Division Manager - Mike Shane - Water /Irrigation Engineer CONTACT PERSON /TELEPHONE: Mike Shane — Water /Irrigation Engineer 509- 576 -6480 SUMMARY EXPLANATION: This project replaced the existing overflow and drain piping for one of our 12MG reservoirs at the Level 2 site and completed the contract improvements to the Level 2 waterlines and reservoirs that have taken place over the past 3 years. Additional work was required to accommodate unforeseen conditions on the reservoir site. Work included installation of new 12" HDPE and 12" DI waterline and other minor items. All - additional work required was covered by existing bid items. Final inspection for this project was made and the recommendation is that the project be r accepted. This Council action is to accept the project and approve the final construction costs. Contractor: TTC Construction, LLC Contract Award: 2/17/09 Contract Cost: $42,020.36 Final Contract Cost: $63,203.21 Amt. This Payment: -0- The above total contract cost is for construction only and does not include engineering and other costs. Resolution _ Ordinance X Other (Specify) Final Contract Payment Contract Mail to (name and address): Funding Source Water Fund APPROVED FOR SUBMITTAL: ��' City Manager. STAFF RECOMMENDATION: Accept the project and approve final estimate. COUNCIL ACTION: • . • . S City of Yakima Water and Irrigation Division LEVEL 2 DOMESTIC WATER SYSTEM IMPROVEMENTS - PHASE 3 OVERFLOW RELOCATION - RESERVOIR 1 2301 Fruitvale Blvd. • City Project No.: WA2096 Yakima, WA 98902 HLA Project No.: 06028C-C TO: TTC Construction, LLC Progress Estimate No.: 3 AND FINAL • P.O. Box 365 . Yakima, WA 98907 Date: May 13, 2009 3i ?:•= 61 '; 0:0,1V +4 rsift,iiiftESIA Tgaiivg::V-Rdakiit e8 igqamtiar,4iia: .: twattiatwly,:-;:f.iNtZ,02.14,411 :4 ailOgUatZ tiZiAqMsergaig , !1, i5M g94***,•inetpOpiNIVQ:0610-fi- PtiOgOog :e rip.,440,W 1 Mobilization LS 1 81,117.16 0% 100% 51,117.16 100% 2 Removal of Structures and Obstructions LS 1 81,091.56 0% . 100% S1,091.56 100% • 3 12-Inch D.I. Pipe and Fittings, iri Place LF 70 S183.86 0 119 521,879.34 170% 4 12-Inch Butterfly Valve and Valve Box EA 1 82,659.27 0 1 S2659.27 100% . . 5 Reservoir Penetration For Pipe LS 1 51,246.73 0, 1 . S.1 73 . 100% 6 Air Vent Assembly LS 1 83,744.20 0% 100% S3.744.20 100% • 7 Slipline 12" (IPS) HDPE Pipe LF 85 S123.86 0 173 S21,427.78 204% 1 : 8 Shoi: :vg -zr Extra Excavatioi: , 1 LF : 55 i c 1 0 .;71 0 i 55 1 5570.60i 100% I 9 Minor Changes I FA EST S5,000.00 0.00 4.668.68 54.668.68 93% • SUBTOTAL 558.413 32 1 . TOTAL WORK TO DATE S58,413.32 PLUS MATERIALS ON HAND 80.00 . .... SUBTOTAL AMOUNTS S58.413.32 ., III . _. 8.2% STATE SALES TAX S4.789.89 TOTAL S63.203.21 I LESS TOTAL RETAINAGE S2920.67 LESS AMOUNTS PREVIOUSLY PAID S60.282.54 • . 1 • AMOUNT NOW DUE S0.00 . . . , Progress Estimate No, 1 S 28.428.79 Progress Estimate No. 2 S 31.853.75 . . Progress Estimate No. 3 AND FINAL S 0.00 • I hereby•cermy that the foregoing is a true and correct statement of the work performed under this Contract . . • 7 • . . ' , ---e.41-f - ( Gene W. Soules. PE • ACCEPTED: I hereby accept the Final Progress Estimate and Final Contract Voucher Certification, in accordance with Section 1-09 9 of the WSDOT Standard Specifications. " .4 ID ( ,•''', /,/ ."/ ,,,,Viti, - 2.0 —09 TTC Construction, LLC ,./ / - Date: Huibregtse, Lotman Associates, Inc. . .