BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEM ENT
Item No. 8.
For Meeting of: December 6, 2022
ITEM TITLE: Public hearing to consider: A) Resolution adopting the amended
Six-Year Transportation Improvement Program for the period of
2023 through 2028, and to amend the Transportation Systems Plan
2040; and B) Resolution amending the Yakima Urban Area
Comprehensive Plan Capital Facilities Element
SUBMITTED BY: Scott Schafer, Public Works Director
*Bill Preston, City Engineer(509)575-6754
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by state statute to update its Six-year
Transportation Improvement Program (TI P)for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
or federal revenue will be used.
On September 6, 2022 the City of Yakima (City) adopted R-2022-118 and R-2022-119 as
required by state statute to update its Six-year Transportation Improvement Program (TIP)for
submittal to the Washington State Department of Transportation. The City is amending the Six-
year TI P to include the following three unfunded additional projects:
• Systemic Pedestrian and Bicyclist Data Collection
• Systemic Pedestrian Safety Improvements
• Coolidge Road from 72nd to 84th Roadway I mprovements
Project information for each of the projects being considered is attached in the DRAFT Six-Year
Transportation Improvement Program.
City Council and the public are welcome to add other arterial system projects to the TIP. The
amended Six-Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley
Conference of Governments (YVCOG)after approval.
In order to utilize federal funds, such as those administered by the Federal Highway
Administration (FHWA) and the Federal Transit Authority(FTA), projects must be included in the
Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of
transportation projects, compiled from local and regional plans, along with the Washington
2
Transportation System Plan (WTP), which provides a backbone for developing projects for the
inter-modal transportation network in the State of Washington.
The STI P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Public participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element by incorporating the adopted Six-Year TI P for 2023 to 2028. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the Six-Year TIP and is not subject to the "once a year" change required under
the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima-area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolutions
ATTACHMENTS:
Description Upload Date Type
Resolution a 11/22/2022 Resolution
d Resdution b 10/21/2022 Resolution
d 2023-2022 Craft TIP 11/22/2022 Backup Material
3
RESOLUTION NO. R-2022-
A RESOLUTION amending the adopted Six-Year Transportation Improvement Program
(TIP) for the period of 2023 through 2028 and amending the
Transportation Systems Plan 2040.
WHEREAS, on September 6, 2022 the City of Yakima (City) adopted R-2022-118 as
required by state statute to update its Six-year Transportation Improvement Program (TIP) and
the Transportation Systems Plan 2040; and
WHEREAS, the City of Yakima desires to amend the adopted Six-Year Transportation
Improvement Program and the Transportation Systems Plan 2040 with the following additional
projects:
Systemic Pedestrian and Bicyclist Data Collection
Systemic Pedestrian Safety Improvements
Coolidge Road 72nd Ave to 84th Ave Roadway Improvements
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on December 6, 2022, with proper public notice as required by RCW
35.77.010, the City Council amends the Six-Year Transportation Improvement Program for the
period of 2023 through 2028 and the Transportation Systems Plan 2040; and,
WHEREAS, amending the Six-year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The amended Six-Year Construction Program for the period of 2023 through 2028, and
Transportation Systems Plan 2040, a copy of which is attached hereto and by this reference
made a part thereof, is hereby adopted and approved.
ADOPTED BY THE CITY COUNCIL this 6th day of December, 2022.
ATTEST: Janice Deccio, Mayor
Sonya Claar Tee, City Clerk
4
RESOLUTION NO. R-2022-
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the amended Six-year Transportation
Improvement Program (TIP) for the period of 2023 through 2028.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2023 to 2028 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW
36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on December 6, 2022 with the proper public notice as required by RCW 35.77.010; and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2023
through 2028 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 6th day of December, 2022.
ATTEST: Janice Deccio, Mayor
Sonya Claar Tee, City Clerk
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title T. m m �• °' a
o a c D.Road Name or Number = c . o' ' c) m a. °' .0
c' o E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H m F.Project Description G.Structure ID a c CD H a
03 1 YAK92 06/07/22 06/07/22 R-2022-069 04 C G O P S 0.750 CE Yes
TW
North 1st Street Revitalization, Phase 3
North 1st Street
MLK Boulevard to"J"Street
Reconstruct and widen roadway,bike lanes,curb and gutter,sidewalks,curb ramps,
illumination,and signals.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 N H F P 2,090,000 0 0 2,090,000
S CN 2023 NHPP 2,910,000 0 0 2,910,000
S CN 2023 0 TIB 1,500,000 0 1,500,000
S CN 2023 0 0 3,411,900 3,411,900
S CN 2023 NHPP 3,473,000 0 0 3,473,000
Totals 8,473,000 1,500,000 3,411,900 13,384,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 7,000,000 6,384,900 0 0 0
Totals 7,000,000 6,384,900 0 0 0
Report Date: June 13, 2022 Page 1
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
04 2 YAK11 06/07/22 06/07/22 R-2022-069 01 O P S T W 0.280 EA No
Bravo Company Boulevard, Phase 1
Bravo Company Blvd
Railroad Tracks to'D'Street
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 0 6,000,000 6,000,000
Totals 0 0 6,000,000 6,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 3,000,000 3,000,000 0 0 0
Totals 3,000,000 3,000,000 0 0 0
Report Date: June 13, 2022 Page 2
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
00 3 /1485(024) YAK 80 06/07/22 06/07/22 R-2022-069 28 1.000 CE Yes
Cowiche Canyon Trail-Phase 1
Cowiche Canyon Trail
Powerhouse Road to Cowiche Canyon Lane
Construct a pathway, including pedestrian bridge over Cowiche Creek
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 CWA 2,316,700 0 2,316,700
Totals 0 2,316,700 0 2,316,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 600,000 1,716,700 0 0 0
Totals 600,000 1,716,700 0 0 0
Report Date: June 13, 2022 Page 3
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title T. m m �• °' a
o a c D.Road Name or Number = c . o' ' c) m a. °' .0
c' o E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H m F.Project Description G.Structure ID a c CD H a
14 4 /9939(028) YAK98 06/07/22 06/07/22 R-2022-069 21 O P S T W 0.050 CE Yes
S.72nd Avenue and W.Washington Avenue Improvements
S.72nd Avenue
S.72nd Avenue to W.Washington Ave.
Improve intersection by constructing a roundabout.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 OTHER 800,000 0 800,000
Totals 0 800,000 0 800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 800,000 0 0 0 0
Totals 800,000 0 0 0 0
Report Date: June 13, 2022 Page 4
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
,o 0. c D.Road Name or Number m o a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
03 5 /000S(473) YAK44 06/07/22 06/07/22 R-2022-069 21 O P S T W 0.200 CE Yes
34th Avenue&Fruitvale Boulevard,and 34th Avenue and River Road Roundabouts
34th Avenue
River Road to Fruitvale Boulevard
Improve the intersections of River Road&Fruitvale Boulevard,and N.34th Avenue
and River Road by installing roundabouts.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 H S I P 788,308 0 87,590 875,898
S CN 2023 0 OTHER 1,000,000 0 1,000,000
P CN 2023 N H P P 1,228,000 0 0 1,228,000
Totals 2,016,308 1,000,000 87,590 3,103,898
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 300,000 2,803,898 0 0 0
Totals 300,000 2,803,898 0 0 0
Report Date: June 13, 2022 Page 5
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
19 6 YAK88 06/07/22 06/07/22 R-2022-069 28 C O P T 0.300 CE No
Robertson Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of
Robertson Elementary School,such as new sidewalk and constructing ADA ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 SRTS 440,560 0 440,560
Totals 0 440,560 0 440,560
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 440,560 0 0 0 0
Totals 440,560 0 0 0 0
Report Date: June 13, 2022 Page 6
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
03 7 YAK115 12/06/22 12/06/22 R-2022-069 04 0.100 CE No
2023 City Safety-Systemic Pedestrian Safety Improvements, Signal Upgrades;
Curb Extensions at 5th Ave.and'D'St. I/S
N.5th Avenue
Lincoln Ave to Cherry Ave
Upgrade signal controllers at 10 intersections to allow for leading pedestrian
intervals. Install curb extensions at the intersection of 5th Avenue and'D'St.to
improve pedestrian safety.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 HSIP 45,000 0 0 45,000
S CN 2023 HSIP 272,000 0 0 272,000
Totals 317,000 0 0 317,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 45,000 0 0 0 0
CN 272,000 0 0 0 0
Totals 317,000 0 0 0 0
Report Date: November 16, 2022 Page 7
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
17 8 YAK70 06/07/22 06/07/22 R-2022-069 10 0.050 CE No
Box Culvert Installations
S.80th Avenue and Wide Hollow Road
Wide Hollow Road to 80th Avenue
Install box culvert(s)adjacent to the 80th Avenue Bridge and Wide Hollow Bridge to
reduce flooding issues. Joint project with Yakima County.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 OTHER 176,000 0 176,000
Totals 0 176,000 0 176,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 176,000 0 0 0 0
Totals 176,000 0 0 0 0
Report Date: June 13, 2022 Page 8
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
16 9 YAK10 06/07/22 06/07/22 R-2022-069 01 O P S T W 0.550 EA Yes
E."H"Street Extension, Phase 1
E."H"Street
1st Street to 7th Street
Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting
and storm drainage system.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 BUILD 566,500 0 0 566,500
P CN 2025 BUILD 5,438,400 TIB 1,320,000 0 6,758,400
Totals 6,004,900 1,320,000 0 7,324,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 566,500 0 0 0
CN 0 0 6,758,400 0 0
Totals 0 566,500 6,758,400 0 0
Report Date: June 13, 2022 Page 9
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
04 10 WA-13520 06/07/22 06/07/22 R-2022-069 01 S W 0.280 EA No
Bravo Company Boulevard, Phase 2
Bravo Company Boulevard
"H"Street to Railroad Tracks
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2025 0 OTHER 6,500,000 0 6,500,000
Totals 0 6,500,000 0 6,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 0 6,500,000 0 0
Totals 0 0 6,500,000 0 0
Report Date: June 13, 2022 Page 10
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
07 11 YAK103 06/07/22 06/07/22 R-2022-069 28 C O P T 0.500 CE No
Nob Hill Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of Nob
Hill Elementary School,such as new sidewalk and constructing ADA ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 SRTS 101,200 0 101,200
P CN 2027 0 SRTS 642,400 0 642,400
Totals 0 743,600 0 743,600
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 101,200 0
CN 0 0 0 0 642,400
Totals 0 0 0 101,200 642,400
Report Date: June 13, 2022 Page 11
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
07 12 WA-13522 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.530 CE No
W
Browne Avenue Sidewalk
Browne Avenue
7th Avenue to 16th Avenue
Replace damaged sidewalk panels.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2025 0 0 378,170 378,170
Totals 0 0 378,170 378,170
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 378,170 0 0
Totals 0 0 378,170 0 0
Report Date: June 13, 2022 Page 12
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
07 13 WA-13523 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.200 CE No
W
Pacific Avenue Sidewalk
Pacific Avenue
Fair Entrance to Jail Property
Construct sidewalk on south side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2023 0 TIB 250,000 0 250,000
Totals 0 250,000 0 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Report Date: June 13, 2022 Page 13
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
03 14 /4566(007) 2143 06/07/22 06/07/22 R-2022-069 03 C O P T W CE Yes
E Nob Hill Blvd&Fair Ave I/S Improvements
Nob Hill Blvd
E Nob Hill Blvd to Fair Ave
Widen Nob Hill Boulevard through the intersection,construct left-turn lane,curb,
gutter,sidewalk,street lighting and drainage. Upgrade signal, including mast arm
structures.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2024 STP(US) 1,175,110 0 189,831 1,364,941
Totals 1,175,110 0 189,831 1,364,941
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 1,364,941 0 0 0
Totals 0 1,364,941 0 0 0
Report Date: June 13, 2022 Page 14
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID . . CDCD 13 a
04 15 YAK104 06/07/22 06/07/22 R-2022-069 05 C G O P S 1.530 CE No
TW
Tieton Drive Resurfacing
Tieton Drive
S.48th Ave.to S.72nd Ave.
Grind and overlay,and ADA curb ramp replacement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 TIB 97,000 24,260 121,260
P CN 2025 0 TIB 1,108,800 277,200 1,386,000
Totals 0 1,205,800 301,460 1,507,260
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 121,260 0 0
CN 0 0 1,386,000 0 0
Totals 0 0 1,507,260 0 0
Report Date: June 13, 2022 Page 15
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
17 16 YAK93 06/07/22 06/07/22 R-2022-069 38 COT 0.600 CE Yes
Powerhouse Road Multi-Use Path
Powerhouse Road
Mobile Home Park to Cowiche Canyon Rd.
Construct 10-foot wide multi-use path from 40th Avenue/US 12 intersection to
Powerhouse Road.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 Ped/Bike Program 44,500 5,500 50,000
P CN 2028 0 Ped/Bike Program 341,835 42,250 384,085
Totals 0 386,335 47,750 434,085
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 50,000 0
CN 0 0 0 0 384,085
Totals 0 0 0 50,000 384,085
Report Date: June 13, 2022 Page 16
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
07 17 YAK 107 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.450 CE No
W
88th Avenue Sidewalk
88th Avenue
Tieton Drive to Summitview Avenue
Construct sidewalk on east side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 SRTS 89,090 0 89,090
P CN 2024 0 SRTS 568,150 0 568,150
Totals 0 657,240 0 657,240
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 89,090 0 0 0 0
CN 0 568,150 0 0 0
Totals 89,090 568,150 0 0 0
Report Date: June 13, 2022 Page 17
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
16 18 YAK102 06/07/22 06/07/22 R-2022-069 21 P T 0.030 CE No
N 1st St& R St Signal
N. 1st St.
R Street to R Street
Install traffic signal at the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 STP 66,990 0 10,395 77,385
P CN 2028 STP 401,709 0 62,722 464,431
Totals 468,699 0 73,117 541,816
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 77,385
CN 0 0 0 0 464,431
Totals 0 0 0 0 541,816
Report Date: June 13, 2022 Page 18
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
14 19 YAK57 06/07/22 06/07/22 R-2022-069 11 CPT 0.010 CE No
18th Street Underpass
Yakima Avenue
Yakima Avenue to 18th Street
Replace the bridge on E.Yakima Avenue that crosses over 18th Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 BR 311,970 0 77,970 389,940
P CN 2027 BR 2,974,360 0 743,590 3,717,950
Totals 3,286,330 0 821,560 4,107,890
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 354,490 0
CN 0 0 0 0 3,379,950
Totals 0 0 0 354,490 3,379,950
Report Date: June 13, 2022 Page 19
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
04 20 YAK 108 06/07/22 06/07/22 R-2022-069 03 C G P S T 0.030 CE No
W
S. 1st Street and E.Washington Avenue Intersection Improvements
1st Street
Washington Avenue to Washington Avenue
Realign intersection,widen E.Washington Ave.for additional lane,replace curb,
gutter,sidewalk,and construct new signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2027 0 0 2,705,725 2,705,725
Totals 0 0 2,705,725 2,705,725
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 2,705,725
Totals 0 0 0 0 2,705,725
Report Date: June 13, 2022 Page 20
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
14 21 YAK14 06/07/22 06/07/22 R-2022-069 21 CO P S T CE Yes
W
Washington Avenue&Longfiber Road Intersection Improvements
Washington Avenue
Washington Avenue to Longfiber Road
Improve the Washington Avenue/Longfiber Road intersection by construction of
channelization,a signal,or a roundabout.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 0 0 100,000 100,000
P RW 2024 0 0 150,000 150,000
P CN 2025 0 0 1,000,000 1,000,000
Totals 0 0 1,250,000 1,250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 0 0 0 0
RW 0 150,000 0 0 0
CN 0 0 1,000,000 0 0
Totals 100,000 150,000 1,000,000 0 0
Report Date: June 13, 2022 Page 21
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
14 22 YAK84 06/07/22 06/07/22 R-2022-069 04 C G O P S 0.400 CE Yes
TW
16th Avenue and Tieton Drive Intersection Improvements
16th Avenue
16th Avenue to Tieton Drive
Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all
movements at the intersection. Upgrade the traffic signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 STP(UL) 358,512 0 53,592 412,104
P RW 2028 STP(UL) 1,498,607 0 233,893 1,732,500
P CN 2028 STP(UL) 1,640,683 0 252,483 1,893,166
Totals 3,497,802 0 539,968 4,037,770
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 412,104
RW 0 0 0 0 1,732,500
CN 0 0 0 0 1,893,166
Totals 0 0 0 0 4,037,770
Report Date: June 13, 2022 Page 22
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
04 23 YAK 109 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.500 CE Yes
W
Fair Avenue Sidewalk
Fair Avenue
Pacific Avenue to Nob Hill Boulevard
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2024 0 0 500,560 500,560
Totals 0 0 500,560 500,560
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 500,560 0 0 0
Totals 0 500,560 0 0 0
Report Date: June 13, 2022 Page 23
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID . . CDCD 13 a
04 24 YAK 110 06/07/22 06/07/22 R-2022-069 28 C G P S T 1.500 CE Yes
W
Nob Hill Boulevard Sidewalk
Nob Hill Boulevard
12th Street to 14th Street
Construct sidewalk on south side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2028 0 0 175,868 175,868
Totals 0 0 175,868 175,868
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 175,868
Totals 0 0 0 0 175,868
Report Date: June 13, 2022 Page 24
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID . . CDCD 13 a
04 25 YAK 111 06/07/22 06/07/22 R-2022-069 04 C G P S T 1.500 CE No
W
6th Avenue Roadway Improvements
6th Avenue
Walnut Street to River Road
Reconstruct roadway including trolley provisions.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 0 0 300,000 300,000
P PE 2023 0 0 700,000 700,000
P CN 2025 0 0 6,564,880 6,564,880
Totals 0 0 7,564,880 7,564,880
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 300,000 700,000 0 0 0
ALL 0 0 6,564,880 0 0
Totals 300,000 700,000 6,564,880 0 0
Report Date: June 13, 2022 Page 25
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
05 26 YAK 112 06/07/22 06/07/22 R-2022-069 04 C G P S T 0.030 CE No
W
Powerhouse Road and Englewood Avenue Intersection Improvements
Powerhouse Road
Englewood Avenue to Englewood Avenue
Install traffic signal at the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2028 0 0 1,014,431 1,014,431
Totals 0 0 1,014,431 1,014,431
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 1,014,431
Totals 0 0 0 0 1,014,431
Report Date: June 13, 2022 Page 26
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H F.Project Description G.Structure ID . . CDCD 13 a
04 27 YAK 113 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.010 CE No
W
Mead Avenue Pedestrian Signal
Mead Avenue
10th Avenue to 10th Avenue
Install pedestrian signal at the east leg of the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2028 0 0 418,030 418,030
Totals 0 0 418,030 418,030
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 418,030
Totals 0 0 0 0 418,030
Report Date: June 13, 2022 Page 27
f :t. B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID . . CDCD 13 a
04 28 YAK 114 06/07/22 06/07/22 R-2022-069 28 C G P S T 0.120 CE Yes
W
N. 16th Avenue Sidewalk
N. 16th Avenue
River Road to"J"Street
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2028 0 0 209,022 209,022
Totals 0 0 209,022 209,022
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 209,022
Totals 0 0 0 0 209,022
Report Date: June 13, 2022 Page 28
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
,o 0. c D.Road Name or Number m 0 . o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
00 29 WA-14321 06/07/22 06/07/22 R-2022-069 28 0.100 No
West Valley Schools Pedestrian Bridge
S.75th Avenue
S.75th Avenue to WV Community Park
Construct new pedestrian bridge over Wide Hollow creek connecting S.75th Avenue
to WV Park and schools
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 SRTS 2,000,000 0 2,000,000
Totals 0 2,000,000 0 2,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000,000 0 0 0 0
Totals 2,000,000 0 0 0 0
Report Date: June 13, 2022 Page 29
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
o a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' ° E
a m z < 0 <<
H F.Project Description G.Structure ID a c CD H a
00 30 WA-14324 12/06/22 12/06/22 R-2022-069 21 CE No
2023 City Safety-Systemic Pedestrian and Bicycle Data Collection
to
Collect pedestrian and bicycle counts at city street intersections to develop future
local road safety plans.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 H S I P 260,000 0 0 260,000
Totals 260,000 0 0 260,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 260,000 0 0 0 0
Totals 260,000 0 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 577,000 0 1,500,000 2,077,000
Report Date: November 16, 2022 Page 30
f :t# B. Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a
o a c D.Road Name or Number m c . o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c CD H a
05 31 WA-14955 12/06/22 R-2022-### 04 0.750 CE Yes
Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements
Coolidge Road
72nd Avenue to 84th Avenue
Rehabilitate existing pavement and update roadway to current city standards.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 0 0 200,000 200,000
P RW 2024 0 0 200,000 200,000
P CN 2025 0 0 1,100,000 1,100,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 200,000 0 0 0
RW 0 200,000 0 0 0
CN 0 0 1,100,000 0 0
Totals 0 400,000 1,100,000 0 0