HomeMy WebLinkAbout07/07/2009 18 Six-Year TIP for 2010 to 2015; Metropolitan Transportation Plan Amendment; Yakima UAC Plan BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. I g
For Meeting of July 7, 2009
ITEM TITLE: Set Public Hearing date of July 21, 2009 to consider:
A) Adoption of the Six -year Transportation Improvement Program for
the years 2010 to 2015, and to amend the Metropolitan
Transportation Plan; and
B) Amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element.
SUBMITTED BY: William Cook, Director of Community and Economic Development -
CONTACT PERSON/TELEPHONE: Brett Sheffield, Chief Engineer, 576-6797.
SUMMARY EXPLANATION:
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
of federal revenue will be used.
The current plan for 2009 — 2014 included seventeen projects that were funded. This included
three projects that received 100% funding from the American Recovery and Reinvestment Act.
Funding for the remainder of the projects will continue to be sought.
A Public Hearing will be held to consider adoption of a Resolution approving the six -year TIP and
amending the regional Metropolitan Transportation Plan and Comprehensive Plan Capital Facilities
Element.
Continued on Page Two •
Resolution X Ordinance Contract Other (Specify) Six -Year TIP
Funding Source
APPROVED FOR SUBMITTAL:
;! , f City Manager
STAFF RECOMMENDATION:
Adopt the resolution to set July 21, 2009 as the hearing date to review and adopt the updated six -
year TIP and amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element.
BOARD /COMMISSION /COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
•
Page Two
A copy of the proposed 2010 — 2015 TIP is attached, along with an explanation sheet that
describes the information contained on the various columns of the Six -year TIP. Changes from the
2009 — 2014 TIP include the addition of two projects, removal of six projects and a modification to
the priority numbers of the various projects.
The added projects include:
• #8 Expanded transit service to Terrace Heights
• #18 Fixed route bus service to Moxee along the SR 24 corridor.
The projects that were .deleted from the 2009 — 2014 TIP have either been completed, are under
construction or will soon be under construction include:
• #3 16 Avenue Realignment
_ • #5 Purchase five new transit buses
• #6 Purchase three new paratransit vehicles
• #13 Nob Hill Boulevard Improvements from 64 Avenue to 72 Avenue
• #68 Nob Hill Boulevard Improvements from 68 Avenue to 72 Avenue '
• #77 Nob Hill Boulevard Overpass Repairs
Council and the public are welcome to add other arterial system projects to the list. The six -year
TIP project listing will be finalized at the public hearing held on July 21, and will then be sent to the
Yakima Valley Conference of Governments (YVCOG) to be included in the Statewide
Transportation Improvement Program list.
Six -year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21 Century (TEA -21) and previous
Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies
the systems on which certain funds can be used, and activities for which funds can be used and
promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and
programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation
Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement
Program (STIP) as a condition to. securing federal funds for the transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by
the State of Washington for approved State funding agencies. The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land use
planning carried out by local governments. Citizen participation is an integral part of the planning
2 — July 2, 2009
process at all levels. Local Agencies are required to develop and adopt a six -year transportation
program. All local agencies are required to hold at least one public hearing during the
development of the six -year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The
ranking will be integrated with other project needs and the total list will be reviewed and adjusted to
the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted six -year TIP for 2010 to 2015. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive
Plan as required. 'The amendment is limited to incorporate only those projects that adopted in the
STIP and is not subject to the "once a year" change required under the laws of the Growth
Management Act.
RESOLUTION NO. R -2009-
A RESOLUTION setting the time and place for a hearing on July 21, 2009 in the City
of Yakima Council Chambers to review and adopt the Six -year
Transportation Improvement Program for the period of 2010 to
2015.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year
program for the construction of streets and arterial streets in the City of Yakima for the
ensuing six -year period, all as contemplated and required by State RCW 35.77.010 and
applicable federal law; and
WHEREAS, a public hearing must be held on said program before final approval,
now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
That said program shall be presented for hearing and determination on Tuesday,
July 21, 2009, at the hour of 7:00 p.m. in the Council Chambers of the City of Yakima, at
Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may be
heard, and that notice of such hearing be given as approved by law.
ADOPTED BY THE CITY COUNCIL this 7th day of July, 2009.
David Edler, Mayor
ATTEST:
City Clerk
1
9. Appendices
A. Six Year Form Instructions
Heading
Agency Enter name of the sponsoring agency.
County No. Enter the assigned number (see LAG Appendix 21.44).
_ City No. Enter the assigned number (see LAG Appendix 21.45).
MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO
(if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution No. Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
one approved by FHWA.)
Description
00 - No Classification
Rural (< 5000 pop.) Urban (> 5000 pop.)
01 - Interstate 11 - Interstate
02 - Principal Arterials 12 - Freeways & Expressways
06 - Minor Arterials 14 - Other Principal Arterials
07 Major Collector 16 - Minor Arterial
08 - Minor Collector 17 - Collector
09 - Local Access 19 - Local Access
2. Priority Numbers. Enter local agency number identifying agency project priority (optional).
3. Project Identification. Enter (a) Federal Aid Number if previously assigned;
(b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number /Federal
Route Number; (e) Beginning and Ending Termini (milepost or street names);
and (f) Describe the Work to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
Description
01 - New construction on 07 - Resurfacing 14 - Bridge Program - Special
new alignment 08 - New Bridge Construction 21 - Transit Capital Project
02 - Relocation 09 - Bridge Replacement 22 - Transit Operational Project
03 - Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning
04 - Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin.
05 - Minor Widening 12 - Safety/Traffic Operation/TSM 31 - Non Capital Improvement
06 - Other Enhancements 13 - Environmentally Related 32 - Non Motor Vehicle Project
26
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
S - Project is `selected' by the appropriate selection body and funding has been
secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is listed
for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C - CableTV - G - Gas
0 - Other P - Power
S - Sewer (other than agency- owned) T - Telephone
W - Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL All Phases: from Preliminary Engineering through Construction
(Use only in Years 4, 5, & 6)
9. Phase Start Date. Enter the month /day /year in MM /DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
FTA Discretionary for Capital Expenditures
BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas
BR - Bridge Replacement or Rehab. 5309(Bus) - Bus
CDBG - Community Development 5309(FG) - Fixed Guideways
Block Grant (HUD) 5309(NS) - New Starts
CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled
DEMO - ISTEA Demo Project (Selected) - 5311 - FTA Rural Areas
Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program
Lands Highways, or Scenic Byways, etc. STP(C) - STP Statewide Competitive Program
DOD - Dept. of Defense STP(E) - STP Transportation Enhancements
IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR
IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected
NHS - National Highway System STP(U) - STP Urban Regionally Selected
3037 - FTA Job Access /Reverse Commute STP - WSDOT use only
•
27
•
11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless
of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds to be
used on this project.
CAPP - County Arterial Preservation Program PWTF - Public Works Trust Fund
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnership Program SCP - Small City Program
AIP - Urban Arterial Program SCPP - Small City Pavement Program
(formerly Arterial Improvement Program)
PSMP - Pedestrian Safety & Mobility Program FMSIB - Freight Mobility Strategic Investment Board
PTSP - Public Transportation Systems Program WSDOT - WSDOT provided funding
OTHER - Any other unlisted state fund codes
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14.
(Auto - calculation in the "STIP Too" program.)
•
16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will
be required for this project. (This is "required" for Federally funded projects, but
may be filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter
R/W Certification Date, if known. (This is "required" for Federally funded projects.)
28
•
Washington State Department of Transportation S Year Transportation Improvement Program
�,�
Agency: Yakima from. .2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
• City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
• Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. C. .S a� Fund Source Information Expenditure Schedule Projects Only
c , (Local Agency)
o a _o E C . Project Title D T J c i . s Federal Funding RM.(
R e uired
m v fi Z D. Street/Road Name or Number a F. En 2 a Phase Federal: Federal State 4th Envir.
E I ° Start Fund Cost by Fund State Local Total Thru Date
E. Beginning MP or Road - Ending MP or Road ; y Funds Funds Funds 1st 2nd 3rd Type (MM/Ytj
. F. Describe Work to be Done (mm/dd /yyyy) Code Phase Code 6th
' • 1 2 3 • 4 5 6 7 8 9 • 10 11 12 13 14 15 16 1 18 19 20 21
CN 1/1/2010 STP(U) 2668 FMSIB 2200 • ' 2000 6868 6868 EA
• 14 1 01 S 0.20 T CN 1/1/2010 DEMO- 8270 AIP 3000 11270 11270 Yes
Yakima Railroad Grade Separations - Phase 2 06
Lincoln Ave. 07 G
• from: N 1st St to: N 1st Ave O
OS W 9/1/09
Construct Grade Separations and adjacent roadway reconstructon, S •
- including realignment of Front Street.
Totals 10,938 5200 • 2000 . 18138 18138
CN 8/1/2010 STP(U) 650 FMSIB 2000 3768 6418 6418 EA
14 2 - 01 P 0.2 T CN 8/1/2010 ARRA- 8000 AIP 1500 9500 9500
Yakima Railroad Grade Separations- Phase 3 06 Yes
Martin Luther King, J Blvd ' 0 G •
from: N. 1st Sreet lo: N. 1st Ave •
08 9/1/2009
• Construct Grade Separat and adjacent roadway reconstruction including
Front Street
Totals 8,650 3500 3768 15918 15918
' ALL 1/1/2010 1 5307 1 1601 1601 ' 32021 : 3202 CE
00 3 12 S N/A .
Transit Operating Expenditures 22 No
Various fixed rates and locations 23 -
• from: N/A • to: N/A 24
_ Annual operating assistance from the FTA in support of our transit system; 31
' fixed Conte, paratransit Dial -A -Ride and vanpool program
. Totals . 1,601 1601 3202 3202
03 S N/A C CN 1/1/2010 • STP(E) • 255 . 2551 . 255 CE
00 4 G
YVT Trolley Barn/Powerhouse Rehabilitation Yes
• S 3rd Ave .O
P
from: to: - S 06/01/07 •
Minor car barn and powerhouse restoration Including property purchase . T
• . W Totals 255 255 255
Report Date: June 30, 2009 Page 1 .v. 5.7 - Supersedes previous editions
•
•
•
•
•
I
i
4
. v 71 Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. . • Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal aid No. B. Bridge No. o v m Fund Source Information Expenditure Schedule Projects Only
` s N ' — C . Project Title E. ' ul
m o E ) ;„ f U L Federal Funding R/W
s U L D. Street /Road Name or Number ° 2 - Phase Federal Federal State 4th Required
ti Z E o •c a, State Lo Total. Envir. Date
E. Beginning MP or Road- Ending MP or Road f— = • Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/Y1)
F. Describe Work to be Done . a (mm /dd /yyyy) Code Phase ' Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
00 5 32 S 10 Q CN 1/1/2010 STP(E) 525 525 525 CE
William O. Douglas Trail 08 P No
6th Ave Pathway & Bridge Decking 06 S
W
from: to: T
Build pathway and install pathway decking on Naches River bridge with
partner William O. Douglas Trail Fundation
Totals 525 525 525
RW 1/1/2010 STP(E) 150 150 150
00 6 32 S N/A G CN 1/1/2010 STP(E) 285 285 285 CE Yes
William 0. Douglas Heritage Trails 13
Bridge Restoration & Trailhead • 10 P
S
. from: to: T
Trailhead restoration, right of way acquisition partner with the William O. 6/01 /09
Douglas Foundation, including restoration of bridge , cleaning, rust removal W W .
and painting Totals 435 . 435 435
00 7 22 S N/A ALL 1/1/2010 1 50 501 50 CE
StreetAssetAmenities (Transit) 31
No
Route Maintenance, Repair and Improvements
from: to:
On going improvements to bus benches, shelters and signage infrastructure -
Totals 50 50 50
00 8 22 S
N/A ALL • 1/1/2010 CMAQ 33 7 401 40
Expanded Transit Service to Terrace Heights No
New University & Retail Links -
from: to: . -
Extension of fixed route bus service only into the Terrace Heights area of _
Yakima County Totals 33 7 40 40
Report Date: June 30, 2009 Page 2 v. 5.7 - Supersedes previous editions
•
a.■
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. c t ^ Expenditure Schedule Projects Only
9 „ ^ co O m Fund Source Information
2 ,„ m a v (Local Agency)
o m o f C. Project Title w m F. J 0. L Federal Funding R/W
m o eL z D. Street /Road Name or Number nF i t: a Phase Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E t o - 5 • ° Start Fund Cost by Fund State Local Total Thru Envir. Date
mm/od/ Funds Funds Funds 1st 2nd 3rd Type (MM/Y
F. Describe Work to be Done a ( YYYY) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 .13 14 15 16 17 18 19 20 21
• 14 : 9 04 P 77 P RW • 1/1/2010 200 200 200
CN 6/1/2010 STP(U) 1000 TPP 1500 200 2700 2700 EA
Nob Hill Blvd C Yes
Nob Hill Blvd G
from: 49th Ave to: 64th Ave Q .
Widen, curb, gutter, sidewalk, lighting, drainage S 6/01/10
T
W Totals 1,000 1500 400 2900 2900
14 10 12 S N/A P RW 4/1/2010 AIP 84 36 120 40 80
CN 6/1/2009 AIP 880 383 1263 . 1263 CE
S 16th Ave & W Washington Ave Signal & Intersection. 05 T Yes
S 16th Ave 03 •
from: S 16th Ave to: W Washington Ave •
Included in Union Gap's Valley Mall Blvd. project 4/1/2010
Totals 964 419 1383 ' 1303 - 80
16 11 05 S .20 G CN 4/1/2010 600 6001 6001
66th Ave. & Summitview Intersection 12 o CE Yes
• N. 66th Avenue & Summitview • P
from: N. 66th Ave. to: Summitview Ave. S
Widen for left turn lanes, intersection improvements, curb, gutter, handicap T _ 4/1/2010 •
W
ramps and lighting
C Totals 600 600 600
00 12 03 S .50 S CN 1/1/2010 CMAQ 540 214 • 7541. 754 1 1 CE
• • Coolidge Road Widening and Paving. 05 • W Yes •
06 P
T
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter. 9/1/2009
•
Totals 540 - 214 754 754 '
Report Date: June 30, 2009 Page 3 ,
v. 5.7 - Supersedes previous editions
•
•
•
i •
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To T m A . PIN /F Aid No. B . B No. C' L a m Fund Source Information Expenditure Schedule Projects Only
F2 'o C. Project Title a 3 v o Federal Funding (Local Agency)
. _ _ > , J r.1 - L
c U D. Street /Road Name or Number ° T m a R/W
c a Z a 1- in 2 = Ph Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E 1- 5 ° Start Fund Cost b Fund State Local Total Thru Envir. Date
y Funds Funds Funds 1st 2nd 3rd T e
F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th yp (M »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
• 00 13 • 21 S
N/A ALL 1/15/2010 1 5310 96 84 1 180 180 CE
Acquisition of new Dial -A -Ride paratransit vehicles No
from: to: -
Purchase new vehicles to replace older, less reliable units .
Totals 96 84 180 180
14 14 03 P N/A PE 1/1/2010 STP(U) 173 • 27 200 200
RW 1/1/2011 STP(U) 433 67 500 500
E. Lincoln & 10th Street Roundabout 05 CN 6/1/2011 STP(U) 1125 175 1300 1300 Yes
06
from: E. Lincoln to: E. MLK Jr. Blvd. '
Roundabout construction at intersection curb, gutter, sidewalk, & street 6/1/2011
•
lighting
Totals 1,731 269 2000 200 1800
ALL 1/1/2010 I STP(U) 1 665 1 135 10001 10001 CE
12 15 03 P N/A o
S.R.12 & 16th Avenue Interchange 06 - No
Interchange
from: 16th Avenue to: S.R. 12
• Upgrade Interchange by constructing a Roundabout -
Totals . 865 135 1000 1000 ■
11 16 01 P N/A o ALL 1/1/2011 1 STP(U) 1 865 135 1 10001 1 1
1-82 & Lincoln Avenue Interchange P EA
1 -82 Interchange G Yes
•
from: E. "G" Street to: 1 -82
Reconstruct / extend off -ramp from existing 1 -82 off -ramp for Lincoln Avenue 6/2011
to E. "0" Street. - •
Totals 865 135 1000
Report Date: June 30, 2009 v. 5.7 - Supersedes previous editions
Page 4
•
•
i .
1
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: . 7-21-2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
•
• Project Identification Project Costs in Thousands of Dollars Federally Funded
A . PIN /Federal Aid No. B . Bridge No. c r v a) Fund Source Information Expenditure Schedule Projects Only
, m a N (Local Agency)
o m - o E C. Project Title d v r Federal Fundi R/W
c U a 3 D. Street /Road Name or Number ai- i n w a Phase Federal Federal State 4th Required
LL Z o - State Local Total Envir. Date
• E. Beginning MP or Roa - Ending MP or Road E 12 '' .9 Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru M1M Type ( Y)
F. Describe Work to be Done
1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 19 20 21
ALL 1/1/2010 STP(U) 865 1 135 1000 1000
• 14 17 12 P N/A P CE
E. Yakima Avenue & Fair Avenue Signali>ation W No
T
from: E. Yakima Avenue to: Fair Avenue S
O
Construct Traffic Signal '
•
•
I Totals 865 135 1000 1000
00 18 22 $ ALL 1/2/2010 5316 1 131 131 1 2621 131 131
CE
Fixed route Bus Services to Moxee along SR 24 Corridor No .
SR 24 Hwy Corridor /Park & Ride Lots
from: to: .
JARC funded demonstration project to determine ridership potential to and
from the Moxee area including stops at two Park & Rlde lots along SR 24. '
. Totals 131 131 262 131 131.
RW 1/1/2011 STP(U) 173 27 200 200
14 19 31 P N/A 0 CN 4/1/2011 STP(U) 865 135 1000 1000 CE
E Nob Hill Blvd & Fair Ave • 03
E Nob Hill Blvd • . 04 P •
from: E Nob Hill Blvd to: Fair Ave T
W 4/1/2001
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
Totals 1,038 162 1200 200 1000
PE 4/1/2010 13 13 13
16 20 12 P •• N/A T CN 6/1/2010 214 2141 214 CE No
S 3rd Ave & W Washington Ave Signal
S3rdAve •
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
Totals 227 227 227
Page 5 v. 5.7 - Supersedes previous editions
Report Date: June 30, 2009
•
•
i
■
1 iii Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
• City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
•
Project Identification Project Costs in Thousands of Dollars Federally Funded
-a A. PIN/Federal Aid No. B. Bridge No. E Fund Source Information Expenditure Schedule Projects Only
Y iu H m � , ' . (Local Agency)
4 ro : E C . Project Title > d s /W
Federal Funding R
3 U a` z D. Street /Road Name or Number `i. to 2 a • Phase Federal Federal State 4th Required
L E o N State Local Total Envir_ Date
E. Beginning MP or Road - Ending MP or Road 1- 5 . - Start Fund • Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (jimmy)
t)
F. Describe Work to be Done t (mm /dd /yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
4579 N/A p PE 6/1/2010 STP(U) 252 38 290 290 EA
14 21 12 P
S 1st St. - E. Washington Ave. Intersection Improvement W Yes
S1stSt. S
from: S 1st St. to: E Washington Ave. T O 01/01/11
Realign intersection, upgrade traffic signal
Totals 252 38 290 290
17 22 4587 03 P 1.00 P ALL 4/1/2011 1 STP 2268 307 25751 1 5251 2050 EA
S 48th Ave. Reconstruction T Yes .
• S 48th Avenue W •
from: Summitview Ave. to: Nob Hill Blvd. S
O 4/1/2014
Widen, curb, gutter, sidewalk, lighting, drainage
Totals 2,268 307 2575 525 2050
PE 1/1/2011 STP(U) 51 8 59 59
14 23 03 P N/A 0 P CN 6/1/2011 STP(U) 383 61 444 444 CE Yes
South 72nd Ave & Mead Ave Intersection 12
South 72nd Ave • - S
from: South 72nd Ave to: Mead Ave T
W 6/10/2010
New intersection, signals, curb, gutter and sidewalk
Totals 434 69 503 503
4562 N/ A P ALL 4/4/2011 STP(U) 378 WSDOT 378 7561 756 CE
16 24 12 P
Tieton Dr - S 5th Ave. Intersection Project W Yes
Tieton Drive T
from: 5th Ave. Intersection to: 0 • S. 4/1/2014
Replace traffic signal with roundabout
Totals 378 378 756 756
Report Date: June 30, 2009 Pages v. 53 - Supersedes previous editions
•
1
Alb. •
Washington State Department of Transportation Six Year Transportation Improvement Pr
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
Ta L y Expenditure Schedule Projects Only
' A. PIN /Federal Aid No. B. Bridge No. „ Fund Source Information
Y ` 0 9 (Local Agency)
g m o f C. Project Title d 3 ` o 2 Federal Funding RNJ
U ti Z D. Street /Road Name or Number ` c at - in : : a Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E I 5 -o Start F und Cos by Fund St L T 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done ti (mm /dd /yyyy) Code • Phase Code Funds Funds Funds 6th Type (MM/YY)
1 • 2 3 4 5 6 7 8 • 9 10 11 12 13 14 15 16 17 18 19 20 21
16 25 01 P 11 0 PE 1/1/2011 STP(U) 2180 340 2520 2520
RW 1/1/2013 STP(U) 2180 340 2520 2520 CE
E. 14" St. Extension
08 S CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes
E. "H" St.
from: 1st St. to: Yakima River T • ,
Construct road including water, sewer, curb, gutter and sidewalk for future
development. _
Totals 5,559 2551 ' 8110 2520 5590
17 26 01 P 1.3 O PE 1/1/2012 STP(C) 700 108 808 808
RW 1/1/2013 STP(U) 5500 850 6350 6350 CE
N. 10th St Extension
06 S CN 6/1/2013 STP(U) 7900 972 8872 8872 Yes
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave. T
W 1/1/2013
Construct road including water, sewer, curb, gutter, sidewalk for future _
development.
. Totals 14,100 1930 1603Q 808 15222
00 27 23 S N/A PE 1/1/2010 OIHtH 50 1 501 50
West Side Transit Center -
Acquire Property to Expand Operations
• from: to:
Locate and acquire property for the placement of a West Side Transit
Center Operation -
- Totals 50 50 50 - . •
PE 1/1/2010 OTHER 75 75 75
17 28 - 03 S .30 P CN 6/1/2010 OTHER 1000 1000 1000 CE
Yakima Downtown Future Initiatives, Phase 4 05 • T No
06
from: Between 1st Street to: and 8th Street
On streets to be selected but contiguous to DFI's 1, 2 8 3; Historic lighting .
• sidewalk mod's & more.
i Totals 1000 75 1075 1075
Report Date: June 30, 2009 Page 7 v. 5.7 - Supersedes previous editions
•
•
•
•
•
•
ANIL
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 t0 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
r
>, A. PIN /Federal Aid No. B. Bridge No. a) Fund Source Information Expenditure Schedule Projects Only
3 y = C. Project Title d T 0 2 o m (Local Agency)
• d o E I , d , t Federal Funding R/W o
U ti Z D. Street /Road Name or Number n y A w a Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E I-- 5 §, y Start Fund Cost by Fund State Local Total Thru Envir. Date
Funds Funds Funds 1st 2nd 3rd T
F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code 6th Type
(M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 5/1/2009 OTHER 400 400 400 '
17 29 06 P •60 P CN 4/1/2010 OTHER 6000 6000 6000 CE
Yakima Downtown Future Initiatives, Phase 5 12 W No
S
from: 1st Street to: 9th Street T
O
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined -
Totals 6400 6400 6400
00 30 01 P N/A PE 1/1/2010 STIP (S) 60 60 120 120
Annual Signal Upgrades CN 4/1/2011 STP(S) 180 AIP 240 420 420 CE
CN 4/1/2011 STIP (S) 360 360. 360 No
Local Selection
from: N/A to: N/A
Upgrade signals
Totals 600 240 60 900 120 780
N /A w 6/1/2010 STP(U) 228 32 2601 260 EA
00 31 07 P S No
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
Totals 228 32 260 260
19 32 03 P N/A P PE 1/1/2011 STP(U) 100 14 114 114
CN 3/1/2012 STP(U) 700 95 795 _ 7 CE
Longfiber Rd & Washington Ave 05 S Yes
Intersection 06 W
• T
from: to: O - 3/1/2012
New intersection construction and reconstruction, 3 -lane and 5 -lane w /tum,
•
curb, gutter, sidewalks.
Totals 800 109 909 114 795
Report Date: June 30, 2009 Page 8 v. 5.7 - Supersedes previous editions
•
71 Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: - YVCOG i Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
Ti, T `m A. PIN /Federal Aid No. B. Bridge No. m f.. ru Fund Source Information Expenditure Schedule Projects Only
o N
-- C. Project Title d d 6 v t Federal Fundin (Local Agency)
$
C E U a 2 D. Street /Road Name or Number 2 › r n .9 Phase Federal Federal State 4th Required
t` E. Beginning MP or Road - Ending MP or Road E i 5 ° Start Fund Cost by Fund State Local Tot Thru Envir. Date
F. Describe Work to be Done a (mm /yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3 r d 6th Type (MM) y) •
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 33 04 P 1 C CN 4/1/2011 STP(U) 240 42 282 282
E Nob Hill Blvd & S 18th St 01 S CE Yes •
E Nob Hill Blvd W
from: S 18th St to: E Nob Hill Blvd T
• Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT - 01 /01/07
Project) possible curb, gutter and sidewalk
Totals 240 - 42 282 282
17 34 05 S 15 C I PE 1/1/2010 STP(E) 22 7 29 29
Zier Rd - S 75th Ave to S 72nd Ave 06 S CN 6/1/2011 STP(E) 75 20 95 95 C E Yes
Zier Rd T
from:•S 75th Ave to: S 72nd Ave P •
Minor widening, curb, gutter and sidewalk 6/1/2011
Totals 97 27 124 124
00 35 07 p N/A S PE 1/1/2011 50 50 50
Gravel Road B.S.T. - CN 6/1/2011 240 240 240 CE
Various Areas No
from: City Wide to:
Totals • 290 290 290
16 36 12 P N/A T CN I 10/1/2013 STP(S) 504 74 5781 I 578 CE
Powerhouse Rd & Englewood Ave P Yes
Powerhouse Rd 0
from: Powerhouse Rd to: Englewood Ave " S
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, W 1 0/1 /2013
possible roundabout
Totals 504 74 578 • 578
`1
Report Date: June 30, 2009 Page 9
v. 5.7 - Supersedes previous editions
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
'3 A. PIN /Federal Aid No. B. Bridge No. c t m N Fund Source Information Expenditure Schedule Projects Only
c v El..- . 2 o N (Local Agency)
o 2 E C. Project Title > ; B 3 o .c Federal Funding R/W
c U n z D . Street /Road Name or Number nt' 1° Phase Federal F ederal State 4th Required
E. Beginning MP or Road - Ending MP or Road E i 5 ° Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
• F. Describe Work to be Done a c` (mm /dd / yyyy) Code Phase C o d e F Funds Funds 6th Type (MM Y1)
1 2 3 4 5 6 7 8 9 10 11 • 12 13 14 15 16 17 18 19 20 21
14 37 12 P N/A P PE 1/1/2013 STP(S) 25 4 29 29
RW 6/1/2013 STP(S) 25 4. 29 29 CE
S 48th Ave & Summitview Ave Signalization T CN 8/1/2014 STP(S) 554 81 635 635 Yes
S 48th Ave •
from: S 48th Ave to: Summitview Ave
Signalization 8/1/2013
Totals 604 89 693 693
14 38 01 P .5 W PE 1/1/2012 STP(E) 424 ' 67 491 491
RW 1/1/2013 STP(E) 1047 • 163 1210 1210 CE
W Lincoln Ave & 'B' St Realignment 12 3 CN 1/1/2014 STP(E) 1801 281 2082 2082 Yes
W Lincoln Ave
from: W 5th Ave to: Custer St P
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G 1/1/2014
G
•
. C Totals 3,272 511 3783 • 491 3292
16 39 12 P N/A w PE 1/1/2010 PSMP' 13 2 15 15
School Safety Projects CN 1/1/2010 PSMP 239 48 2871 287 CE No
Various Locations - Citywide •
from: to:
Crossing flashers, sidewalks, signing, other features
Totals • 252 50 302 302 '
14 40 03 P .85 C PE 1/1/2012 STP(C) 546 84 630 630
RW 1/1/2013 STP(C) 1090 170 1260 1260 EA
E Nob Hill Blvd. Reconstruction 04 G CN • 1/1/2014 STP(C) 6539 1013 7552 7552 Yes
E Nob Hill Blvd. 06
from: S 6th Street to: S 18th Street P
Major roadway widening and reconstruction to 5 lanes with Intersection T . 1/1 /2014
improvements, curb, gutter, sidewalks, replacement or relocation of meters T
an hydrants W Totals 8,175 1267 9442 630 8812
•
Report Date: June 30, 2009 Page 10 v. 5.7 - Supersedes previous editions
.
Washington State Department of Transportation Six Year Transportat Improvement Program •
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in'Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. 3 cs N d m Fund Source Information Expenditure Schedule Projects Only
m Y c A. Agency)
g m _o E C. Project Title a m j a r• Federal. Funding R/W
E r t = D. Street /Road Name or Number ° rn a Phase Federal Federal State 4th Required
Z E o •.. o State Local Total Envir. Date
E. Beginning MP or Road - Ending MP or Road Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/Yl�
F. Describe Work to be Done n - (mm/dd /yyyy) Code Phase Code 6th
1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 •18 19 20 21
STP(C) 91 14 105 105 •
17 41 01 p N/A yy P .1/1/2011
RW 1/1/2012 STP(C) 91 14 105 105 CE
S 72nd Avenue & W Washington Avenue 12 - T CN 1/1/2013 . STP(C) 544 86 630 630 Yes
S 72nd Ave 06
from: S 72nd Ave to: W Washington Ave P
O 1/1/2013
Intersection improvement, possible roundabout
. Totals 726 114 840 105 105 630
04 P .76 • W PE 1/1/2011 STP(E) 23 5 28 28
17 42
T CN 7/1/2012 STP(E) 1096 164 1260 1260
S 66th Avenue 08 T Yes • S 66th Ave
from: Scenic Drive to: Summitview P
O 7/1/2012
Widen roadway, curb, gutter, sidewalk and utilities •
Totals 1,119 169 1288 28 1260
14 43 12 P N/A W PE 1/1/2012 STP(U) 126 17 143 143
• S RW 1/1/2012 STP 63 8 71 71 CE
40th Avenue and Summitview Signal Upgrade CN 6/6/2012 STP(U) 544 86 630 630 Yes
40th Avenue T
P •
from: 40th Avenue to: Summitview •
O 6/1/2012
Signal upgrade, radius improvements, turn lane extension
Totals . 733 111 844 844
14 44 12 P N/A W PE 1/1/2012 STP 95 13 108 108
40th Avenue and Englewood T RW 1/1/2012 STP 63 8 71 71 CE
S CN 1/1/2013 STP 145 20 ' 165 165. Yes
40th Avenue P
from: 40th Avenue to: Englewood O - - 1/1/2013
Replace traffic signal poles, upgrade controller ,
-. .Totals 303 - 41 344 179 165
•
Report Date: June 30, 2009 Page 11 v. 5.7 - Supersedes previous editions
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima • From 2009 to 2014
• Co. No.: 39 Co. Name: Yakima Co. -
Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To A. PIN /Federal Aid No B. Bridge No. „ H Fund Source Information Expenditure Schedule Projects Only
o y Y a3 E , y N (Local Agency)
m o E C. Project Title > d o 5 o s Federal Funding RM/ • U t Z D. Street /Road Name or Number ` in w .6 Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Roa E 12 . o St Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mm /dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (M �
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2012 STP 126 18 144 144
00 45 12 P N/A W RW 6/1/2012 STP 63 8 71 71 CE
16th Avenue and Fruitvale Blvd T CN 1/1/2013 • STP 315 43 358 358 Yes
16th Avenue •
from: 16th Avenue to: Fruitvale Blvd P
1/1/2013
Replace traffic signal poles, radius improvements, ADA ramps
• Totals 504 69 573 215 358
14 46 12 • p N/A W PE 1/1/2010 STP 32 5 37 37
T CN 1/1/2011 STP 126 17 143 143 • CE No
1st Street and 1 Street
. 1st Street S •
from: 1st Street to: !Street P
Replace and upgrade traffic signal equipment _
Totals 158 22 180 37 143
• PE' 6/1/2013 STP(U) 820 189 1009 1009
P RW 1/1/2014 STP(U) 3150 • 630 3780 3780 C
16 47 01 P .25 �• E Y2S
Washington Ave. Railroad Grade Separation
•
. Washington Ave.
S
from: Longfibre Road to: T
W 1/1/2016
Railroad grade overpass including all utilities
• Totals 3,970 - 819 4789 4789
PE 1/1/2013 STP(U) 272 43 315 315
16 48 01 P 1 . 3 'H G RW 6/1/2014 STP(U) 349 55 404 404 CE Yes •
Frontage Road & " St. Loop
N. 8th St. o
from: "H" St. to: 1 -82 P -
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S 1/1/2015
future development and Terrace Heights connection. T • •
W . Totals 621 98 719 719
Report Date: June 30, 2009 • Page 12 v. 5.7 - Supersedes previous editions
•
i
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: • 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To > A. PIN /Federal Aid No. B. Bridge No. v E ' d 5 • Fund Source Information Expenditure Schedule Projects Only
c y ._ - E y N c o N (Local Agency)
U mc o f C. Project Title > a �. v c Federal Funding R/W
U L Z D. Street/Road Name or Number c
c o- 0) :° w Phase Federal Federal State 4th Required
L` E. Beginning MP or Road - Ending MP or Road 1- S o Start Fund Cost by ' Fund State Local Total 1st 2nd 3rd Thru Envir. Date
E
F. Describe Work to be Done a (mm /dd /yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/Y1)
1 2 3 4 5 6 7 8 9 10' 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2013 STP(U) 120 17 137 137
14 49 04 P 3.5 C CE
161h Ave. Corridor G - .
16th Ave. 0 •
from: SR -12 to: uhington Ave.Nalley Mall P
Widen roadway, curb, gutter, sidewalk, lighting. S
T
• - W .Totals - 120 17 .137 137
14 50 04 P 3.2 c PE 1/1/2012 STP(U) 120 17 1371 137 CE
40th Ave. Corridor - 0
40th Ave. G •
' from: SR -12 to: Washington Ave. P •
Widen roadway, curb, gutter, sidewalks, lighting. S
W
T Totals • . 120 17 • 137 137
PE 1/1/2011 STP(U) 120 17 137 137
14 51 03 P z. 7 c 1 1 CE
Nob Hill Corridor 04 G
Nob Hill 0
• from: 1 -82 to: S. 16th Ave. P
T
Widen roadway, sidewalk, curb, gutter, lighting
T
. W Totals 120. 17 137 137
14 52 04 P 2.0 C PE 1/1/2013 1 STP(U) 120 1 17 1371 1 137
CE
S. 1st St/Main St Corridor G
• S. 1st St./Main St. 0
. from: Nob Hill Blvd. to: Barker Mill Bridge P
T
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk,
lighting. T
W Totals 120 • 17 137 137
•
Report Date: ,June 30, 2009 Page 13
v. 5.7 - Supersedes previous editions
•
•
•
Af`
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name:. Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To >...._ � A. PIN /Federal Aid No. B. Bridge No. d rn m c , Fund Source Information Expenditure Schedule Projects Only
N ' C. Proj T itle E u. a o m (Local Agency)
tat o f d v r Federal Fu nding R/W
3 U d Z D. Street/Road Name or Number ` o F- i n Is a Ph Federal Federal State 4th Required
. " E. Beginning MP or Road - Ending MP or Road E 1. E iv Start Fund Cost by Fund State Local Total Thru Envir. Date
° mm/dd/ y Funds Funds Funds 1st 2nd 3rd T ype (M
F. Describe Work to be Done a ( yyyy) Code Phase Code 6th R
•
1 2 3 4 5 6 • 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2010 100 100 100
00 53 32 P N/A CN 1/1/2010 900 900 900 EA
Storm Drains /Vegetation No
Local Selection
from: City Wide to:
City Wide
Totals • . 1000 1000 1000
17 54 03 P 76 W PE 1/1/2011 STP(C) 109 27 136 136
CN 1/1/2012 STP(C) 945 TPP 945 106 19961 1996 CE
Reconstruction Rudkin Rd 08 T' No
Rudkin Rd P
from: E Viola Ave to: Rainier Place S
Reconstruct, excavate ballast, lop course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
Totals 1,054 945 133 2132 136 1996
16 55 03 P .76 C PE 9/1/2010 STP(S) 122 TPP 23 7 152 152
E Mead Ave Reconstruction 06 G CN 4/1/2011 STP 1730 TPP 206 70 2006 I 2006 CE No
,. E Mead Ave 0
from: Rudkin Rd to: Fair Ave P
Partner with City of Union Gap, reconstruct, excavate ballast, top course, S
curb, gutter, storm, acp T
Totals 1,852 229 77 2158 152 2006
17 56 04 P 1.3 0 PE 1/1/2011 AIP 131 20 151 151
RW 1/1/2012 AIP 382 59 441 441 EA
S 80th Ave - Tieton Dr to Zier Rd C CN 4/1/2012 AIP 1667 260 1927 1927 Yes
S 80th Ave P
from: Tieton Dr to: Zier Rd • T
Major widening, curb, gutter, sidewalk S 4/1/2012
• Totals 2180 339 2519 151 2368
•
,
Report Date: June 30, 2009 Page 14 v. 5.7 - Supersedes previous editions
. e
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
•
Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded •
To >, A. PIN /Federal Aid No. B. Bridge No. c r • m Fund Source Information Expenditure Schedule Projects Only
c' = E N c' o N (Local Agency)
o o E C. Project Title ; w J r Federal Funding RAW
U a Z D. Street /Road Name or Number a in c a Phase Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E l o — 5 ° Start Fund Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done t (mm /dd /yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (My)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 57 05 p 1.0 w PE 1/1/2013 STP(C) 272 43 315 315
RW 6/1/2013 STP(C) 349 • 55 404 404 EA
Englewood Ave - N 40th Ave to N 56th Ave 06 T CN 1/1/2014 STP(C) 2352 340 2692 • 2692 Yes
Englewood Ave P
from: N 40th Ave to: N 56th Ave O 1/1/2013
Widen roadway, curb, gutter, sidewalk O .
Totals 2,973 438 3411 • 3411
17 58 05 P 2 0 PE 1/1/2012 STP(U) 219 34 253 253
• EA
Englewood Ave - N 24th Ave to N 16th Ave W RW 6/1/2012 STP(U) 327 51 378 378
06 S CN 6/1/2013 STP(U) 2980 244 3224 3224 Yes
Englewood Ave
from: N 16th Ave to: N 24th Ave "
Widen, curb, gutter and sidewalk, water and sewer lines . - 6/1/2013
Totals 3,526 329 3855 631 3224
14 59 12 P 2 5 P PE 1/1/2012 STP(S) 55. 8 63 63
RW 6/1/2012 STP(S) 107 19 • 126 126 CE
W Nob Hill Blvd Sidewalks T CN 3/1/2013 STP(S) 321 57 378 378 Yes
W Nob Hill Blvd W
• from: S 16th Ave to: S. 6th St. s
Install missing sidewalks onscuthside of Nob Hill. -
3/1/2013
Totals . 483 ' 84 567 189 378
00 60 06 P 1.0 p PE 1/1/2012 STP(S) 57 7 64 64
RW 6/1/2012 STP(S) 189 25 214 214 CE .
Beech St Pedestrian Connection . 32 T CN 1/1/2013 STP(S) 504 68 572 572 Yes
Beech St
. from: Fair Ave to: Chalmers /Riverside
.. Construct pedestrian pathway under SR82 to Greenway - 1/1/2013
•j Totals 750 100 850 278 572
•
Report Date: June 30, 2009 Page 15
. v. 5.7 - Supersedes previous editions
•
•
•
•
i
i v .71 Washington State Department of Transportation • Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG - Amend Date: Resolution No.: •
Project Identification Project Costs in Thousands of Dollars Federally Funded
Y A. PIN /Federal Aid No. B. Bridge No. d H 0) v N Expenditure Schedule Projects Only
Fund Source Information (Local Agency)
o y . o a C. Project Title a v e r Federal Funding R/W
c U a D. Street/Road Name or Number ° r i ;? a Phase Federal Federal State 4 th Required
ti E o • - Stat Lo Total Emir. Date
E. Beginning MP or Road - Ending MP or Road I - o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/VY)
F. Describe Work to be Done a (mm /yyyy) Co Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 61 12 P 2.0 P PE 1/1/2013 STP(S) 43 7 50 50
RW 6/1/2013 STP(S) 86 15 101 101 CE
W Lincoln Ave Sidewalks T CN 1/1/2014 STP(S) 572 88 660 660 Yes
W Lincoln Ave
from: N 56th Ave to: N 29th Ave W
Sidewalks, meters and fire hydrants replacement or relocation 1/1/2014
Totals 701 110 811 811
PE 6/1/2012 STP(U) 820 189 1009 1009
14 62 01 P ' W RW 1/1/2014 STP(U) 3150 • 630 3780 3780 CE
Mead Ave. Railroad Grade Separation T CN 1/1/2013 STP(U) 6552 • 1008 7560 7560 Yes
Mead Ave. S
from: Presson Place to: Maryland 0 1/1/2014
Construct railroad overpass including all utilities '
Totals 10,522 1827 12349 1009 11340
PE 6/1/2011 STP(U) 252 38 290 290
16 63 01 P 4.0 O RW 1/1/2012 STP(U) 756 88 .844 844 CE
Citywide Pathway Connections S CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes
Yakima
from: to: T
W 1/1/2013
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
Totals 2,898 441 3339 290 844 2205
17 64 01 P N/A O PE 1/1/2012 STP(U) 63 5 681 68
• CN 6/1/2012 STP(U) 567 76 643 - 643
CE No
34th Ave & River Rd Improvements 12 P
• Fruitvale Blvd. S
from: 34th Ave. to: River Rd. T
intersection improvements including lumination, sewer, water, curb, water W
and sidewalks - •
Totals 630 81 711 711
Report Date: June 30, 2009 Page 16 v. 5.7 - Supersedes previous editions
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From .2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.:
• Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN/Federal Aid No. B. Bridge No. c E. v Fund Source Information Expenditure Schedule Projects Only
g C. Project Title B" W E o m (Local Agency)
o f 1 > d s F ederal Funding R/W
U li z D. Street /Road Name or Numb o ` o. in ' .5 -5 Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E 1 5 .o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mm /dd/yyyy) Cod Phase Code Funds . Funds Funds 6th Type (MM/YY)
1 2 3 . 4 5 •6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 65 01 P 1.0 0 PE 1/1/2012 STP(U) 218 34 252 252
RW 6/1/2013 STP(U) 327 51 378 378 CE
Englewood Ave 05 P Yes
Englewood Ave 12 s
•
from: 24th Ave to: 40th Ave T
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines W - /1 /2015
and street lights.
Totals 545 85 630 252 378
14 66 - 01 P 6.0 C PE 1/1/2013 STP(U) 120 17 1371 137 CE
W. Yakima North /South Connector to West Valley 04 G •
• Unknown road 06 O
from: North - South to: in West Valley P •
City & County joint project to build/extend roadways. S
T
W Totals 120 17 137 137
16 67 - 01 P .38 s PE 1/1/2013 - 1 100 1001 100 • •
Occidental Road Construction. W
P
from: 58th Ave. to: 64th Ave. • T
Construct roadway
Totals 100 100 100
00 68 01 P .27 PE 1/1/2013 100 I 1001 1 100
86th Ave. Road Construction
• from: Occidental to: Coolidge
•
• . Construct roadway
Totals 100 100 100
•
v. 5.7 - Supersedes previous editions Report Date: June 30, 2009 Page 17
•
•
•
•
•
•
•
f Transportation
�'� Washington State Department o p Six Year Transportation Improvement Program
-,®
Agency: Yakima From 2009 to 2014
•
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
•
Project Identification Project Costs in Thousands of Dollars Federally Funded
r A. PIN /Federal Aid No. B. Bridge No. - 6 d �, Fund Source Information
Expenditure Schedule Projects Only
N .T. °1 . v N (Local Agency)
o „ _o E C. Project Title - J o s Federal Funding FVyy
c U ti 2 D. Street /Road Name or Number o - in 1° a Phase Federal Federal State 4th Required
Li E. Beginning MP or Road - Ending MP or Road E I• .5 •o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code Funds Funds Funds 6th Type (MM YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 .
PE 1/1/2013 STP(U) 120 17 137 137
16 69 04 P 1.5 w I I I EA
64th Ave. Roadway Widening. 06 P YES
from: Washington Avenue. to: Tieton Drive. T
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. C . 7/4/2014
O
• Totals 120 17 137 137
PE 1/1/2013 STP(E) 18 32 50 1 50
00 70 03 P N/A G CN 6/1/2013 STP(E) 1900 285 2185 2185 EA
YVT Railway Rehabilitation & Museum C No
3rd Ave . S
from: 3rd Ave to: Pine St T
• Car Barn, Museum Restoration and Pathway W
P
Totals 1,918 317 2235 2235
PE 4/1/2011 CMAQ 24 3 27 27
16 71 - 01 P N/A S CN 7/1/2011 CMAQ . 480 - 65 545 545 CE
• Roadway City Wide Shoulder Improvements No
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
Totals 504 68 572 572
PE 1/1/2012 STP(E) 252 34 286 1 286
00 72 14 P .25 T CN 3/1/2013 STP(E) 3150 412 3562 3562 CE
Pedestrian Bridge 32 o No
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
Totals 3,402 446 3848 286 3562
Report Date: June 30, 2009 Page 18 v. 5.7 - Supersedes previous editions
•
•
•
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -21 -2009 Adoption Date:
City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
H
T,,, A. PIN /Federal Aid No. B. Bridge No. 3 „ Fund Source Information Expenditure Schedule Projects Only
N I n in c o y - (Local Agency)
g m $ E C. Project Title > ai o 3 c) r Federal Fundin R/W
c U a Z D. Street /Road Name or Number o in - Phase Federal Federal State Required
E. Beginning MP or Road - Ending MP or Road E r°- o 4th Start Fund Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done 1st 2nd 3rd
(mm /dd /yyyy) Code Phase Code Funds Funds Funds 6th Type (min)
• 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 •
00 73 14 P N/A O PE 1/1/2010 STP(E) 10 2 12 12
CN 7/1/2010 STP(E) 109 17 126 126 CE
• William 0. Douglas Pathway 32 P No
from: Pine St to: Cowiche Canyon W .
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
Totals 119 19 138 138
00 74 03 p N/A 0 PE 1/1/2013 STP(U). 315 38 353 353
YV'I- Pathway 32 0 CN 6/1/2013 STP(U) 945 126 1071 I 1071 CE No
YVT Railway Corridor. S
from: to: T
W
Development pathway in West Valley area including 53rd Ave, Wide Hollow,
64th Ave, Ahtanum including all utilities and signage
Totals 1,260 164 1424 1424 .
00 75 07 P 5 G CN 6/1/2010 75 75 25 25 25 CE
• Citywide Alleys P No
S
• from: to: VV
•T
Pave alleys throughout the city. • '
•
• Totals 75 75 25 25 25
PE 1/1/2010 ARRA- 50 . 50 50
• 14 75 06 P 2.64 CN 6/1/2010 ARRA- 1950 1950 1950 CE
Summitview Ave. Grind & Overlay 07 I No '
• from: 14th Ave • to: 56th Ave '
Grind 0.20' of ACP & replace with 0.20' of HMA, and instal required ADA ramps -
.. Totals 2,000 2000 2000
Grand Totals for Yakima 111,070 22,872 25,702 159,644 42,961 26438 18,109 71,136
•
Report Date: June 30, 2009 Page 19