HomeMy WebLinkAboutR-1995-087 Interlocal Agreement - City of Selah• RESOLUTION NO. R-95- 87
1
•
A RESOLUTION approving the Interlocal Agreement for Rehabilitation
of a portion of Naches Avenue within the City of Selah.
WHEREAS, the City of Selah will receive federal aid project funding
through the Washington State Department of Transportation to rehabilitate
portions of the roadway, sidewalks, curb and gutter pavement, and drainage of
that street known as Naches Avenue in Selah,
WHEREAS, the City of Selah desires the City of Yakima to perform the
construction of such federal aid projects and it would be in the public interest of
Selah and Yakima for Yakima to perform the Naches Avenue construction, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
YAKIMA
The City Manager and the City Clerk are hereby authorized and directed to
execute the attached and incorporated "Interlocal Agreement for Rehabilitation
of Naches Ave
ADOPTED BY THE CITY COUNCIL thisa0\-\` day of Sv�e, ,1995.
ATTEST 4KOd4
Q•c� City C1e
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. /1
For Meeting Of June 20, 1995
ITEM TITLE: Resolution Authorizing Interlocal Agreement with the City of Selah
for the construction of portions of Naches Avenue
SUBM11" 1'ED BY: Dept. of Community & Economic Development - Engineering Division
CONTACT PERSON/TELEPHONE: Fred French, City Engineer / 575-60
SUMMARY EXPLANATION:
The City of Selah will receive federal funding (ISTEA) for the rehabilitarion of portions of
Naches Avenue, from Wenas Avenue to Railroad Avenue, and from Second Street to Fourth
Street. City of Selah is not authorized to directly administer the federal funds and the Yakima
Engineering Division does have the authorization to directly administer these types of
projects.
The Engineering Division has the desire and ability to complete this project for the City of
Selah within the time frame desired.
The Engineering Division completed a similar project for Union Gap, Rainier Place, in 1991.
The agreement for this new project is the same as the 1991 Rainier Place project.
Resolution X Ordinance Contract Other (Specify) Agreement
Funding Source City of Selah
APPROVED FOR SUBMIT 1'AL:
City Manager
STAFF RECOMMENDATION: Pass the attached Resolution authorizing the City Manager
and City Clerk to sign the interlocal agreement with the City of Selah for the reconstruction of
portions of Naches Avenue, in Selah.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION: Resolution No. R-95-87.
June 15, 1995
INTERLOCAL AGREEMENT
FOR
REHABILITATION OF NACHES AVENUE
WITHIN THE CfI Y OF SELAH
THIS AGREEMENT, made and entered into by and between the City of Yakima,
a municipality of the State of Washington, hereinafter referred to as "Yakima",
and the City of Selah, a municipality of the State of Washington, hereinafter
referred to as "Selah", witnesseth":
WHEREAS, Selah will receive federal aid project funding through the
Washington State Department of Transportation, to rehabilitate portions of the
roadway, sidewalks, curb and gutter pavement, and drainage of Naches
Avenue, from Second Street to Fourth Street, and from Wenas Avenue to
Railroad Avenue, and a copy of the Washington State Department of
Transportation Project Prospectus concerning the same is attached hereto and
incorporated by reference; and,
WHEREAS, it would be in the public interest of Selah and Yakima for Yakima to
perform the Naches Avenue construction; and,
WHEREAS, these types of agreements are authorized by RCW 39.34; and,
WHEREAS, in consideration of the mutual covenants and agreements herein
contained;
IT IS NOW, THEREFORE, covenanted and agreed as follows:
1. Selah hereby authorizes Yakima to perform all work to rehabilitate portions
of the roadway, sidewalks, curb and gutter pavement, and drainage at
Naches Avenue between Railroad Avenue and Wenas Avenue, and between
Second Street and Fourth Street, as set forth and contemplated by the Project
Prospectus submitted to the Washington State Department of Transportation
relating to federal aid projects, attached hereto and incorporated by
reference. Yakima shall perform such work in compliance with the said
Washington State Department of Transportation Project Prospectus.
2. The above identified work shall be performed in accordance with the
Washington State Department of Transportation Standards, and shall be
completed on or before December 31, 1995.
3. Yakima shall provide all engineering and administrative services necessary
to perform this Agreement. Prior to the commencement of work, Yakima
shall submit for Selah approval Yakima's preparation of plans, specifications,
and estimates which shall include all bid documents, contract provisions and
plan sheets, accompanied by the engineer's estimate of proposed
construction work. Selah must approve the above, including estimated
costs, prior to commencement of work.
4. Selah shall pay the actual costs of the above identified reconstruction work
performed by Yakima in accordance with the terms of this Agreement. The
costs of work shall include the actual cost of labor, equipment rental,
engineering, materials used in the construction or maintenance work
involved, fringe benefits to labor including Social Security, retirement,
industrial and medical aid costs, prorated sick leave, holidays and vacation
time, and group medical insurance. Yakima shall submit to Selah a certified
statement of the costs of work performed.
5. Selah and Yakima shall each enact a resolution in accordance with RCW
39.34.030 (2) to authorize this Interlocal Agreement, which Agreement shall
become effective upon the latter of A) the date of said Agreement, or B) the
date said resolutions each become effective.
6. It is understood and agreed between the parties hereto that Yakima will hold
harmless, indemnify and defend Selah, and its officers, employees, and
agents, from all claims, losses, demands, actions, and causes of action of any
nature whatsoever including but not limited to personal injury, property
damage, or death, which result from any act or omission of Yakima, its
officers, agents or employees which breaches Yakima's obligations under
this agreement.
7. This Agreement shall continue in duration until December 31, 1995,
provided, that in the event the Secretary of the Washington State
Department of Transportation terminates the above referenced Washington
State Department of Transportation City/County Agreement, Selah may
terminate this Interlocal Agreement upon notice to Yakima.
S. The Selah Director of Public Works shall be responsible for administering
this Agreement. Except for materials incorporated into the project, all
property used by either party to this agreement to accomplish the purpose
and intent of the Agreement shall remain the property of that party. Yakima
shall furnish to the Selah Director of Public Works copies of all documents
and letters relating to this project, together with all original tracings.
9. A copy of this Agreement shall be filed with the Selah City Clerk, the Yakima
City Clerk, and the Yakima County Auditor, and the Secretary of the State of
Washington.
10. In event of dispute under this Agreement, venue shall be Yakima County,
Washington.
IN WITNESS WHEREOF, the parties hereto have set their hands the day and
year below written.
CITY OF SELAH CITY OF YAKIMA
By
By .\—`,. :_c—,V
John Sweesy R. A. Zais,
Mayor City Manager
Date
DateG- ` /
ATTEST: ATTEST:
Kristi Burlingame
City Clerk
APPROVED AS TO FORM:
Kevin Roy
City Attorney
Karen Roberts
City Clerk
CITY CONTRACT NO. 95 Q D
%
Agilk
� Washington State
�I/ Department of Transportation
Federal Aid Project Prospectus
Prefix STPF
Route
)
Federal Aid
Project Number
Date
Local Agency
Project Number
Agency
CITY OF SELAH
Federal
Program
Title
Other
The project will consist of grinding the existing asphaltic concrete pavement down
to the old portland cement roadway underneath and overlaying the road segment with
asphalt concrete and lane striping, concrete curbs will be replaced as afforded.
• 20204
❑ 20205 • 20206 • 20209 •
ProjectTitle_& OVERLAY EAST AND WEST NACHES AVE.
Mailing Address
113 WEST NACHES AVE.
Project Termini From
RAILROAD AVE. & SOUTH SECOND STREET
To
WENAS AVE. NORTH FOURTH STREET
-7165
Tp Code
98947
From: MP To: MP
Length of Project
•
Miles
FGIometers
Award
Zi
Type
❑
0.30 •
Local ■ Local Forces
State • Railroad
Federal Agency
City Number
1155
County Number
39
County Name
YAKIMA
DOT Region
5
a1 FHWA ■ Others
EIS CE EA
Congressional District
4
Legislative Districts
14
Urban Area Number
5
TMA / MPO / RTPO
YVCOG
❑ 1 g ll ■ 111
PhaS9_
P.E.
10, 5 00
`tocaE::Agency-
Nearest tdflary:...:..::.:..
//7
ger 1 F fl4s:
0:44,
0-7, v6 3
percent.::
edeia€:s
R/W
0
0
Const.
Total
l 37, 7O:)
v-78 / g, 44 2, 2_
::description cif
.acillty` {Ei is ing• Des gn: aand *sent Conthton}
Roadway Width
44 FEET
Number of Lanes
. TWO
-F
and reflective cracking from the old portiand cement roadway underneath. The
project will begin at Railroad Ave. then west to Wenas Ave., and start again at S.
2nd St. then west to S. 4th St. The length of the project is approximately 0.30
mile with parking on both sides. East Naches was recently reconstructed east of
Railroad Ave.
escin a ono opd` o ri : •
New Construction �3-R
■
2-R
Roadway Width 1NumberofUmes
44 FEET TWO
The project will consist of grinding the existing asphaltic concrete pavement down
to the old portland cement roadway underneath and overlaying the road segment with
asphalt concrete and lane striping, concrete curbs will be replaced as afforded.
Local Agency Contact Person
JOE HENNE
Title
ASSISTANT DIRECTOR OF PTTRT.TC WORKS_
Phone
(SS9) FAR
Mailing Address
113 WEST NACHES AVE.
City
SELAH
WA
-7165
Tp Code
98947
Location Design Approval By
and
(CA Agencies Only)
Titl7
APP` °"�°° ""�0f�
Date
n/1T C.....� 1Aflst s
Revised 11/94
age 1 o
AGENCY
SELAH
PROJECT TITLE
GRIND & OVERLAY EAST & WEST NACHES AVE.
DATE
DESCRIPTION OF UTILITY RELOCATION OR ADJUSTMENTS AND EXISTING MAJOR STRUCTURES INVOLVED IN THE
PROJECT:
1
THIS PROJECT WILL ONLY REQUIRE ADJUSTMENTS TO EXISTING SEWER MANHOLES AND WATER
VALVE BOXES.
FAA INVOLVEMENT
Is any airport located within 2 miles of the proposed project? 0 Yes
El No
's
THIS PROJECT HAS BEEN REVIEWED BY THE LEGISLATIVE BODY OF THE ADMINISTRATION AGENCY OR AGENCIES,
OR ITS' DESIGNEE, AND IS NOT INCONSISTENT WITH THE AGENCY'S COMPREHENSIVE PLAN FOR COMMUNITY
DEVELOPMENT.
DATE:
AGENCY:
DOT Form 140-009 A Revised7/87 Page 3 of 3
BY:
(Mayor/Chairman)
Agency
SELAH
Project Tdie Date
GRIND & OVERLAY EAST & WEST NACRES AVE.
_Geometric •DesignData
Description
Through Route
Crossroad
Federal
Functional
Classification
• Principal Arterial
Urban • Minor Arterial
• colIeaor
❑ Principal Arterial
urban 0 Minor Arterial
• Collector
0 Major Coector
Rural ■ Minor Collector
■ Access Street/Road
• Major Collector
Rural • Minor Collector
0 Access Street/Road
Terrain
Flat • Roll ■ Mountain
• Flat • Roll ■ Mountain
Posted Speed
25
Design Speed
25
Existing ADT
4639
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Accident- :3 . ea( et ence'. .;:
Year
Property
Damage
Accidents
Injury Accidents
Fatal Accidents
Total Number
of Accidents
Number of
Accidents
Number of
Injuries
Number of
Accidents
Number of
Fatalities
1991
700
1
0
0
0
1
1992
1,300
1
0
0
0
1
1993
0
0
1994
1,000
1
4
0
0
1
:... , -fit. 'fl ,CC1: _. .. .. . lata 010: '0:zl ` iSit€II* ir92- 1000ilie t: .....
()nuance of"Work:
Preliminary Engineering Will Be Performed By
CITY OF YAKIMA
Others
100 %
Agency
Construction Will Be Performed By
CONTRACTOR
Contract
100
%
Agency
Environmental Considerations
NONE, PROJECT IS CLASSIFIED AS CLASS II
® Check if No RNV is Required - (DOT Fpm 262-060 and Endorsement must be on file with the CA Agency; refer to Chapter 25 LAG manual)
Right of Way and Relocation
Water Area Involvement
NONE, ONLY NATURAL RUN OFF ASSOCIATED WITH RAINFALL
DOT Form 140-009A
Revised 11/94
Page 2 of 3
� Washington State
VI/ Department of Transportation
Local Agency Agreement
Agency CITY OF SELAH
115 WEST NACHES AVE.
Address
SELAH, WA 98942
Project No.
Agreement No.
For Headquarters WSDOT use only.
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, US. Code Highways, (2) the regulations
issued pursuant thereto, (3) Office of Management and Budget Circulars A-102 and A-128, (4) the policies and procedures promulgated by the Washington State
Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the
Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be
obligated for the project may not exceed the amount shown herein on line s, column 3, without written authority by the State, subject to the approval of the Federal
Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency.
Project Description
Name GRIND & OVERLAY EAST & WEST NACHES AVE. Length 0 30 MTT,F
TerminiRAILROAD AVE. WEST TO N. WENAS AVE. /SOUTH 2ND ST TO N 4TH ST.
Description of Work
THE PROJECT WILL CONSIST OF GRINDING THE EXISTING ASPHALT CONCRETE PAVEMENT AND
OVERLAYING THE ROAD SEGMENT WITH ASPHALT CONCRETE AND LANE STRIPING.
'Federal participation in construction engineering (q) is limited to 15 percent of the total contract costs (line in, column 3).
The federal aid participation rate in this project will be determined by the Federal Government. The parties expect that it will be 86 • 5 percent; however, it is
understood that the rate may vary. The Local Agency agrees that this agreement is entered into without relying upon any representation by the state made outside
of this contract, or contained herein, as to what the federal participation rate will be. It further agrees that it will not condition any future actions with respect to the
project covered by this agreement upon past, current, or future representations as to the federal participation rate. The dollar amount of federal participation cannot
exceed the amount shown in line s, column 3. All costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency
DOT 144e2;°39 1ti94 t)
Type of Work
Estimate of Funding
(2)
Estimated Total
Project Funds
(2)
Estimated
Agency Funds
(3)
Estimated
Federal Funds
PE a. Agency work
b. Other
_.
1 0 ,f OOQ
SOO
1 r .
(%
r0
113 2
c. State services
d. Total PE cost estimate (a+b+c)
! 0 , ) U
14 ! 6
9, 0 g, Z
Right of Way e. Agency work
f. Other
_ __........._ ....
_ .....__._....
_
...__
g. State services
h Total R/W cost estimate (e+f+g)
J
C)
0
Construction i. Contract
j. Other
1.1_42/..°0°
_.
_.........._......
_.._.......__
1 j 0, 000
f t-(1.
__
_
/ 1-1, 8 5/.7
°(/4 / SZ
.._._
U c , r37:‘
k. Other
1. Other
m. Total contract costs (i+j+k+1)
Construction Engineering
n. Agency
o. Other
r
.. t.d (%v
. ..
t , S -OC..)
2.i
0
1.0
; ? u i
1 c2`
p. State forces
q. Total construction engineering (n+o+p)
r. Total construction cost Estimate (m+q)
d r '? J
2.0 � U)
. ' -, ' •.S
C, f , 5-C2(
17 , 0 7 5
/ 9 y 41 2_ Z
s. Total cost estimate of the project (d+h+r)
(3 ! (900
i '7, q ( r
! (( Lig
i Jl2
'Federal participation in construction engineering (q) is limited to 15 percent of the total contract costs (line in, column 3).
The federal aid participation rate in this project will be determined by the Federal Government. The parties expect that it will be 86 • 5 percent; however, it is
understood that the rate may vary. The Local Agency agrees that this agreement is entered into without relying upon any representation by the state made outside
of this contract, or contained herein, as to what the federal participation rate will be. It further agrees that it will not condition any future actions with respect to the
project covered by this agreement upon past, current, or future representations as to the federal participation rate. The dollar amount of federal participation cannot
exceed the amount shown in line s, column 3. All costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency
DOT 144e2;°39 1ti94 t)