HomeMy WebLinkAbout09/06/2022 06.H. Resolution authorizing a contract with Apex Mechanical LLC for the Lions Pool Facility Air Handling & Dehumidification System Improvements Project 2600 Y�'1114'+
#,L), :yes
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.H.
For Meeting of: September 6, 2022
ITEM TITLE: Resolution authorizing a contract with Apex Mechanical LLC for the
Lions Pool Facility Air Handling & Dehumidification System
I mprovements Project 2600
SUBMITTED BY: Scott Schafer, Director of Public Works
Bill Preston, City Engineer
Ken Wilkinson, Park and Recreation Manager(509) 576-6416
SUMMARY EXPLANATION:
The City of Yakima desires to enter into a contract with Apex Mechanical LLC to perform the
replacement of an existing air handler and cooling unit serving the City of Yakima's Lions Pool. Work
includes hydronic piping, a hydronic pump, controls, and electrical work associated with the scope.
The project at Lions Pool is funded by REET 1 funds. The contract with Apex Mechanical LLC is in
an amount not to exceed $616,227 and has been attached for City Council review.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Neighborhood and Community Building
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
Description Upload Date Type
D Resolution Lions Dehumidifier-Apex Contract 8/22/2022 Resolution
❑ Contract 8/9/2022 Backup Material
2
RESOLUTION NO. R-2022-
A RESOLUTION authorizing a Contract with Apex Mechanical LLC for the Lions Pool
Facility Air Handling and Dehumidification Project 2600
WHEREAS, the City of Yakima (City) desires to enter into a contract with Apex
Mechanical LLC to perform for the replacement of an existing air handler and cooling unit
serving the City of Yakima's Lions Pool; and
WHEREAS, the City used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects; and
WHEREAS, Apex Mechanical LLC was determined to be qualified to perform the
needed construction work; and
WHEREAS, the project is funded with REET 1 funds; and
WHEREAS, the contract will be null and void if bond and certificate and insurance not
received within specified timeframe; and
WHEREAS, the Scope of Work and Budget included in this contract meet the needs and
requirements of the City for this project; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to undertake the Lions Pool Facility Air Handling and Dehumidification Project 2600
and enter into a contract with Apex Mechanical LLC; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a Contract with Apex Mechanical
LLC, attached hereto and incorporated herein by this reference, not to exceed $616,227 (Six
Hundred and Sixteen Thousand Two Hundred Twenty-Seven) Dollars to provide the
construction as described in the Contract.
ADOPTED BY THE CITY COUNCIL this 6'h day of September, 2022.
Janice Deccio, Mayor
ATTEST:
Sonya Clear Tee, City Clerk
DEPARTMENT OF PUBLIC WORKS 3
Scott Schafer, Director
Engineering Division
129 North Second Street
a,.•' ` Yakima, Washington 98901
„,,, '" -` (509) 575-6111 • Fax (509) 576-6305
July 19, 2022
Apex Mechanical, LLC
1507 SE Eaton Blvd
PO Box 1652
Battle Ground, WA 98604
Re: Lions Pool Air Handling & Dehumidification System Improvements
City of Yakima Project No. RT2600
Dear Sirs,
The City Manager of the City of Yakima has authorized an award of the contract for the above referenced
project to your company on the basis of your bid submitted on July 13, 2022 in the amount of$616,227.00
(incl. tax).
This letter is official notification of the award of the contract to your company by the City of Yakima.
Enclosed are a copy of the proposal, three copies of the contract and a contract bond form. Please sign and
return all copies of the contract form to this office, along with the fully executed contract bond and certificate
of insurance, within ten (10) calendar days.
When these items have been approved, the City will execute the contract form and bind a set of signed
contract documents. The three completed sets of documents will be distributed to the City Clerk, City
Engineer and Contractor.
Once the Contract Bond and Insurance Certificate have been approved we will notify you to contact Bruce
Floyd, Construction Supervisor, of our office to schedule a pre-construction conference and to discuss
various forms and documentation that must be completed and turned into him at the Pre-construction
Conference. The Notice to Proceed will also be discussed at the Pre-construction Conference. Bruce's office
phone is(509) 575-6138.
For your information, we are enclosing a copy of the bid summary for this project.
Sincerely,
Bill Preston, PE
City Engineer
end
cc: Bruce Floyd,Construction Engineer
Randy Tabert,Senior Engineer
Brenda Fehlhafer,Contract Specialist
Ken Wilkinson,Parks and Recreation Manager
File
4
CONTRACT
THIS AGREEMENT, made and entered into in triplicate, this day of , 2022, by and between the City of Yakima,
hereinafter called the Owner,and Apex Mechanical,LLC,a Washington Limited Liability Company,hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this agreement,the parties hereto
covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $616.227.00, for
Lions Pool Facility,Air Handling&❑ehumidification System Improvements,City Project No.RT2600,all in accordance with, and as
described in the attached Supplementary General Conditions of the Contract, which is incorporated by reference, and shall perform
any alterations in or additions to the work provided under this contract and every part thereof.This contract shall supersede any prior
contract between the parties concerning the subject matter of this contract.
Work shall start within ten (10) days after the Notice to Proceed and shall be completed in one hundred sixty-three(163)working
days.The first chargeable working day shall be the 11th working day after the date on which the City issues the Notice to Proceed.
If said work is not completed within the time specified,the Contractor agrees to pay to the Owner the sum specified in the Standard
Specifications for each and every day said work remains uncompleted after expiration of the specified time,as liquidated damages.
The Contractors shall provide and bear the expense of all equipment;work and labor of any sort whatsoever that may be required for
the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except
such as are mentioned in the specifications to be furnished by the City of Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the
materials and to do and cause to be done the above described work and to complete and finish the same according to the attached
plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the
attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the
conditions provided for in this contract.
III. INDEMNIFICATION. The Contractor shall release,indemnify,defend,and hold harmless the City,its elected and appointed officials,
officers, employees, agents, representatives, insurers, attorneys, and volunteers from all liabilities, losses, damages, and expenses
related to all claims, suits, arbitration actions, investigations, and regulatory or other governmental proceedings arising from or in
connection with this Agreement or the acts, failures to act, errors or omissions of the Contractor, or any Contractor's agent or
subcontractor, in performance of this Agreement, except for claims caused by the City's sole negligence. The City's right to
indemnification includes attorney's fees and costs associated with establishing the right to indemnification hereunder in favor of the
City.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full
performance of all the covenants herein contained upon the part of the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract,except as expressly
provided herein.
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 2022.
Ap ec ni i LLC
Co actor
B .
City Manager
Attest: hn Muonio _
(Print Name)
City Clerk Its: Member
(President,Owner,etc.)
Address: 1507 SE Eaton Blvd.
Battle Ground,WA 98604
BID SUMMARY MBI CONSTRUCTION
Lions Pool ENGINEERS APEX MECHANICAL, LLC BRUCE MECHANICAL, INC. SERVICES,INC.
Air Handling&Dehumidification-REBID ESTIMATE Battle Ground,WA Kennewick,WA Yakima,WA
City of Yakima Job No.RT2600
ITEM BID SECURITY 5%BID BOND 5%BID BOND 5%BID BOND
NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
1 BASE BID ALL WORK 1 LS $492,766.12 $492,766.12 $569,000.00 $569,000.00 $596,345.00 $596,345.00 $ 627,000.00 $627,000.00
SUB TOTAL: $492,766.12 $569,000.00 $596,345.00 $627,000.00
STATE SALES TAX 8.3%: $40,899.59 $47,227.00 $49,496.64 $52,041.00
TOTAL: $533,665.71 $616,227.00 $645,841.64 $679,041.00
CITY ENGINEERS REPORT
`-__`"""`,,` CITY OF YAKIMA
COMPETITIVE BIDS WERE OPENED ON 7/13/2022 rr�''��Y .YAi''1i�+,+
ALL BIDS HAVE BEEN REVIEWED BY THIS OFFICE. 4,.•'• '• �'',,,
I RECOMMEND THE CONTRACT BE AWARDED TO: :t'"'.5-- '�� Lions Pool
tcy.;
APEX MECHANICAL,LLC '',,, *•'•. •••. ,--'� AWARD MADE BY CITY MANAGER Air Handling&Dehumidification -REBID
,,'�‘� �)2poRATE� '--, PROJECT NO: RT2600
� �1/��
,,,,- -r- :___?--,--e_------9- -71 i,`:51.-}t_ ,)?, ‘ DATE:7/13/2022
ATE CITY ENGINEER DATE CITY MANAGER FILE: Lions Pool Air Handl Dehum REBID BID SUMMARY.xlsx
SHEET 1 OF 1