Loading...
HomeMy WebLinkAboutR-1994-133 Chestnut Grove Development• RESOLUTION NO. R-94- 133 A RESOLUTION concerning the master application to redivide a portion of the existing Amended Plat of Chestnut Grove Development, creating a new 32 lot residential plat in the vicinity of 5101 W. Chestnut Ave. WHEREAS, on June 9, 1994, the Hearing Examiner held a public hearing to consider the master application (UAZO Prel Long Plat #1-94 and UAZO CL(3)#2-94) submitted by Group M Construction for property located in the vicinity of 5101 W Chestnut Ave., within lots 2 and 3 of the Amended Plat of Chestnut Grove Development, for • Redivision of lot 2 together with most of lot 3 of the existing Amended Plat of Chestnut Grove Development into 32 lots, and • Class 3 review of newly proposed multi -family, planned residential development providing 96 dwelling units on 11 duplex, 10 tri-plex and 11 four-plex lots, and • Administrative adjustment of development standards to allow tandem parking and to reduce building setbacks and lot coverage limits, and • Vacation of a portion of a public utility easement, resulting in a new easement and rerouting of an existing sewer main, and WHEREAS, on August 19, 1994 the Hearing Examiner issued his Examiner's Recommendation, recommending approval of the master application subject to several conditions, and WHEREAS, the project represented by the master application conforms in all essential respects to earlier forms of the project which have been previously approved by this Council, and WHEREAS, each voting Council member declared that he or she had had no contact with either the applicant or opponents of this preliminary plat, and the City Council determined by motion that the Recommendation of the Hearing Examiner should be adopted, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA. The Yakima City Council hereby affirms and adopts the Findings and Conclusions and Recommendation of the Hearing Examiner's Recommendation, Examiner No I94-4-22, a true copy of which Examiner's Recommendation is attached hereto as "Exhibit A" and is incorporated herein by reference All approvals, findings of compliance or compatibility expressed by this resolution lap\land use\chestnut grove\prelim plat res 9/23/94 11 12 AM Chestnut Grove Replat• Resolution Approving Preliminary Plat -- Page 1 are specifically conditioned on the pertinent requirements stated as part of the Hearing Examiner's specific Recommendation, on pages 10 through 13 of Exhibit A, which requirements are understood as conditions precedent to approvals and findings of compliance or compatibility City Council finds formally that, as a matter of fact, the master application for Redivision of a Portion of the Amended Plat of Chestnut Grove Development, including UAZO Sub/Prel Long Plat #1-94, UAZO CL(3) #2-94, and UAZO EC #6-94 conforms with the City of Yakima Zoning Title, YMC 14 25 110 and other applicable land use controls, and is hereby generally approved. As a matter of Class 3 review, the multi -family residential and planned residential aspects of the proposed subdivision are compatible with surrounding land uses. The requested administrative adjustments are approved. The preliminary long plat for the redivision of a Portion of the Amended Plat of Chestnut Grove Development, is hereby approved. The requested vacation and release of those utility easements shown on the previous Amended Plat of Chestnut Grove Development which lie within the boundaries of this redivision are approved, but this approval shall not have any effect until a final plat, showing new easements approved by the City Engineer, is duly recorded with the Yakima County Auditor ADOPTED BY THE CITY COUNCIL this 27th day of September , 1994 ATTEST Ka.)-„,2_0— City Clerk Mayor lap\land use\chestnut grove\prelim plat res 9/23/94 11 12 AM Chestnut Grove Replat: Resolution Approving Preliminary Plat -- Page 2 • ISSUED: AUGUST 19, 1994 Master Application by Group X Construction for Revising the Amended Plat of Chestnut Grove Development at 50th & Chestnut) EXAMINER'S RECOMMENDATION County No. Preliminary Plat #1-94 Examiner No. I94-4-22 A public hearing was conducted on June 9, 1994. The staff report presented by Larry Lehman recommended approval. There was some opposition from owners or residents of that portion of the Chestnut Grove plat already developed along 50th. The Examiner inspected the property prior to the hearing. SUMMARY OF RECOMMENDATION. This project should be approved. From the view of the site, the matters contained in the official record including the Staff Report, a review of both the Yakima Urban Area Comprehensive Plan and the Yakima Urban Area Zoning Ordinance, and from evidence received at the hearing, the Examiner makes the following: FINDINGS 1. Applicant. Group M Construction, represented by Tim Monahan. 2. Location. 5101 West Chestnut Avenue, consisting of lots 2 and 3 of the Amended Plat of Chestnut Grove Development. 3. Application. This is a master application, containing the following elements: A. Redivision of a portion of an existing plat, developing a new 32 lot residential plat within what is now lots 2 and 3 of the Amended Plat of Chestnut Grove Development. B. Class 3 use for multi -family residential; develop- ment is to include three and four dwelling unit structures which are subject to Class 3 review and approval. Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE CIT' AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKMA. WASHINGTON 98907 (509) 248-0706 C. Class 3 use for planned residential development; permitting clustering of several structures on one parcel. D. Administrative adjustment of development standards to allow tandem parking and to reduce building setbacks. E. Vacate a portion of a public utility easement, resulting in a new easement and rerouting of an existing sewer main. 4. Current Zoning and Land Use. This property is currently vacant and zoned R-2. Adjacent properties have the following characteristics: Location Zoning Existing Uses North R-2 Undeveloped (This has been previously approved for a senior citizen multi -story building as proposed by Group M. Also to the north is the Leavitt Insurance Office, Kindercare, and other office and bank facilities.) Southeast (across Chestnut) R-2 Single family,/ duplexes Southwest (across Chestnut) R-2 Mini -storage and electrical substation East R-2 Undeveloped and duplex condominiums (These include the duplex condominiums on the cul-de-sacs on the east side of 50th, together with property currently being built out as duplex condominiums on the west side of 50th.) West R-1 Single-family residential and M-1 light - industrial (fruit packing) 5. Project Description and Background. Mr. Monahan has been working at developing this property since 1987. He has always had in mind a high density residential project, coupled originally with a senior citizen multi -story residential facility directly south of EXAMINER'S RECOMMENDATION - 2 Chestnut Grove Replat: Resolution Approving Preliminary Plat -- Exhibit A HEARING EXAMINEE' FC)R THE CITY AND C:CwNTV OF YAKIMA POST OFFICE BOX 4 YAKMA. (NASiIINGTON 913907 (5081248-0706 Kindercare, and some retail uses up in the vicinity of Conover Insurance. Since his activities in 1987, he has constructed 50th south from Summitview. All of the office development in the vicinity has occurred since construction of 50th. This includes the new Conover office, the dental offices, Dave Mahoney's export business, as well as the insurance office and the credit union. During the same time period, Tim Monahan has developed the east side of 50th with the cul-de-sacs and duplex condominiums. He is currently building out on the west side of 50th, leaving the large parcel west of 50th, south of Kindercare and the insurance office. This parcel has access primarily to Chestnut, together with a connection to 50th between Leavitt's insurance office and the northern -most duplex condominium. This proposal contemplates merging that portion of lot 3 which fronts on 50th with existing lot 1, which contains all of the duplex condominiums on both sides of 50th Avenue. As reflected on the site plans, the northeast corner of lot 3, approximately 60 feet by 105 feet, would become part of lot 1, deleted from this project, and presumably available for additional duplex condominium construction consistent with the current theme on North 50th avenue. Lot 2 and 3 are about 7 acres. This proposal would construct a loop road, with both entrances off Chestnut. The loop road would service 32 lots created out of existing lots 2 and 3. There would be 11 duplex lots, 10 tri-plex lots, and 11 four-plex lots. Creation of the lots is simply a long plat, which in this instance conforms with all the normal plat requirements. The proposal to include three and four dwelling unit structures on one lot requires Class 3 review in the R-2 zone. Thus, the multi -family residential aspect of this with'respect to the tri-plex and four-plex lots requires a higher level of review. The duplex lots are permitted outright in R-2. There is a possibility that some of these multi -family units may be separated from each other on the same lot, rather than connected in one structure like the typical duplex. If this project is built with separate buildings on one lot, the zoning EXAMINER'S RECOMMENDATION - 3 Chestnut Grove Replat: Resolution Approving Preliminary Plat - Exhibit A HEARING EXAMINER FOR THE Cm AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKIMA. WASHINGTON 98907 (509) 248-0706 ordinance treats that as a planned residential development requiring Class 3 review. Since the dwelling unit densities would not change, it is reasonable to use the same standards for reviewing the multi -family residential aspect and the planned residential development aspect.of this proposal. Because of the dwelling unit density, the applicant is requesting adjustment of the 50% lot coverage standard. The adjustment requested ranges from 58% to 76% lot coverage. At this point, there is a general desire to build one story rather than two stories units. If one story units are built, they tend to cover more of the lot. Two story units would more easily comply with the lot coverage limitations, but would be less accessible, particularly to senior citizens. In order to continue the sense of community created by the applicant on 50th, and as compensation for the increased lot coverage, the preliminary plat includes sidewalks on both sides of the street, which are not normally required by the city's subdivision ordinance. Another administrative adjustment is requested concerning tandem parking. The recent amendments to the zoning ordinance allowed tandem parking not only for single family housing, but also for duplexes. Formerly tandem parking had been prohibited for duplexes. Apparently the ordinance was not amended to allow the same for tri-plex and four-piex units. Mr. Monahan requests that tandem parking be allowed for all units. Tandem parking means allowing one car to park behind another, allowing two parking spaces to be counted as meeting the parking requirements. In other words, a car in a garage, and a car on the driveway leading into the garage stall would constitute two rather than one parking spaces. Allowing tandem parking will avoid further increasing lot coverage, allows more openness, and reduces development costs. The third adjustment deals with building setbacks from the front and side yards. The proposal for the tri-plexes and four-piexes is to reduce the front yard setback by one foot, from, 45 feet from the centerline to 44 feet. EXAMINER'S RECOMMENDATION - 4 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE CT' AND COUNTY OF YAK INIA POST C)FFICE BOX 4 YAKMA. WASHINGTON 98907 (509) 248-0706 With respect to duplexes, the request is for a 38 foot front yard setback, an adjustment reducing the setback 7 feet, from 45 to 38. The side yard setback adjustments deal with lots which have a street as a side yard. Normally side yard setbacks are measured 5 feet from the property line, but in this instance the lots have a side yard on the street. The setback in that instance is 40 feet from the centerline. This proposal is to reduce that 5 feet, from 40 to 35 feet. As originally approved in 1988, this same land could have built out with 120 units, utilizing 25 foot wide paved private roads. This proposal is for 96 units, with standard streets consisting of 50 feet of dedicated right-of-way and 32 feet of pavement, with sidewalks on both sides and all normal urban services. There has been an attempt over the years to maintain consistency in analysis of this project. As originally proposed, the overall dwelling unit density was calculated on the entire project, with some portions being higher density than others. Utilizing that same approach, this project, covering all of the 32 lots, results in a dwelling unit density of 18.32 units per net residential acre. It is difficult to compare this density with the 120 units permitted in the first approval in 1988, because that utilized private streets. Private streets are not subtracted from the total area, whereas public streets are, which results in a "net" residential area. Individual lots with a small number of units are much easier to finance and sell than the larger project originally envisioned. 6. Proposed Subdivision Specificat ,ons. 6.1 Total Area - Approximately 7 acres. 6.2 Number of Lots - 32 6.3 Lot Size. Lot size ranges from 7,001 to 8,905 square feet. The minimum permitted in R-2 for a detached single- family dwelling is 6,000 square feet. Duplexes may be built on a 7,000 square foot lot. Multi -family dwellings and planned EXAMINER'S RECOMMENDATION - 5 Chestnut Grove Replat: Resolution Approving Preliminary Plat - Exhibit A HEARING EXAMINER FOR THE CRY AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKIMA WASHINGTON 98907 (509)248.0706 residential developments are analyzed by dwelling unit density rather than lot size (YMC Chapter 15.07, Table 5-2). 6.4 Dvellinq_Jrnit Density - The dwelling unit density for this project is 18.3. The R-2 zone is intended to deal with densities normally up to 12 dwelling units per net residential acre, except that development up to 18 units per acre may be allowed as a Class 3 use pursuant to Table 4-1. (YMC 15.03.030(3)). 6.5 Water Supply - Public water. 6.6 Sanitary Sewage Disposal - Public sewer. 6.7 Storm Water Drainage - Onsite retention with respect to individual lots. 6.8 Public Street Drainage - Will be handled by drywells. 6.9 npeofHousing - Site built, one and two stories, subject to the 35 foot maximum building height limitation of the R-2 zone (YMC Chapter 15.05, Table 5-1). 6.10 Curb/ Streets - Chestnut Avenue will be revised on the north side, adjacent to this subdivision, to provide curb, gutter, and sidewalk, with new paving and streetlights as required. Chestnut is a local access street with 50 feet of right-of-way. Improvements to Chestnut shall be 16.5 feet from the centerline of the pavement to the back of the curb. The interior loop street will have a rolled curb, sidewalks on both sides, streetlights, and will be built to local access street standards, with 32 feet of pavement width. 6.11 Utility Easements - Easements will be reflected on the plat, with all utilities underground. This proposal requires vacating a small portion of a public utility easement within the amended plat of Chestnut Grove. A new easement serving the need provided by the vacated easement will be included as part of the plat. The existing sewer main within that portion of the vacated easement will be replaced within the new easement. There is no public benefit to maintaining the existing easement. 6.12 Parks and 114ygrouads - None are required by city ordinance. This project is located two blocks from the Holy EXAMINER'S RECOMMENDATION - 6 Chestnut Grove Replat: Resolution Approving Preliminary Plat -- Exhibit A HEARING EXAMINER' FOR THE CRY ANO COUNTY OF YAKIMA POST OFFICE BOX 4 YAK MA. WASHINGTON 973907 (509) 248-0706 Family grounds, twelve blocks from Summitview School, and eight blocks from Eisenhower. Gilbert Park is about ten blocks away. All of these facilities have large open areas. 6.13 Provision for Schools - No provisions for schools are made, and nothing is required by local ordinance. State law requires an affirmative finding when approving a subdivision that adequate facilities for schools are made. The West Valley School District requested that the developer pay a mitigation impact fee of $799,705.75. No one from the district attended the hearing, and the district did not appeal the SEPA determination. With respect to this specific project, it has been ongoing in various forms since 1988, and the land has been zoned R- 2 for a substantial period of time. It is reasonable to expect that the school district has been aware of this R-2 zoning, has anticipated its eventual development, and has therefore incorporated the possibility of its development in their prior long-term planning. This is not a change of use, nor is it a rezone. This project does not change the expected development trend of the area, and does not represent a surprise to the school district. Accordingly, provisions for schools are deemed adequate. 7. Class 3 Review of Multi -Family and Planned Residential Development - This project is consistent with the various development proposals which have previously been approved on this project, and averages the dwelling unit density over the entire parcel. The existing dwelling unit density on this project is 18.32 dwelling units per net residential acre. If the dwelling unit density of the previously developed duplex condominiums on both sides of 50th were included, the overall density would be below 18 units per acre. Accordingly, this project as proposed meets the upper limit dwelling unit limitation of the R-2 zone. The policy issue is whether to look at very small portions of the project or the entire project in determining dwelling unit density. In this instance, if one looked only at the planned residential development or multi -family development on the tri-plex and four- piex lots, the calculation would be about 25 units per net acre. EXAMINER'S RECOMMENDATION - 7 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE CITY AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKIMA. WASHINGTON 98907 (509) 248-0706 It is more appropriate, however, to view this project in its entirety, to maintain the continuity of analysis which has been utilized since 1988, and to measure the impact of this entire project on the surrounding area. If this were a small project, involving one lot with a four-plex in an existing built -out neighborhood, one lot with a very high dwelling density might not be permitted, even if overall density of the neighborhood, with the project, might be less than 18 units. The point is to look at the project at hand, including all of its components, not isolating any single factor. As designed, all street access will be off Chestnut. As 50th has been built and developed, there has been increasing concern about the amount of traffic on 50th. The street was designed with the potential traffic flows in mind. Nevertheless, currentresidents on the street complain of excess traffic. This projectwill channel the traffic to Chestnut. Some of that will inevitably utilize 50th, but with Chestnut's proximity to the cross street of 48th, and the parallel arterial of Tieton, the impact on 50th will be alleviated. Furthermore, and perhaps more importantly, when 50th was designed, it was intended to accommodate the traffic from this entire project. 8. Administrative Adjustments - The nature of the administrative adjustments have previously been outlined. They all meet the requirements of YMC §15.10.020. They allow flexibility of design and conformation of this project with the nature of the residential development already built as part of the Chestnut Grove project. The already built portions of this project represent some of the nicest neighborhood living to be found in Yakima. A real sense of community is developed by the coherent design coupled with street trees, sidewalks, and landscaping. These adjustments will facilitate the possible continuation of the existing quality development. 9. Phased Construction - Mr. Monahan hopes to develop this project in two phases. Phase one of the subdivision would include lots 1 through 15, representing the south half of the land. A EXAMINER'S RECOMMENDATION - 8 Chestnut Grove Replat: Resolution Approving Preliminary Plat - Exhibit A HEARING EXAMINER FOR THE Cm AND COUNTY OF YAICMA POST OFFICE BOX 4 YAKMA. WASHINGTON 98907 (509) 248-0706 private temporary easement would be provided north of lot 8 to connect the north ends of the loop road in order to aid traffic circulation and emergency vehicle access. The easement would be abandoned upon construction of the second phase. The phasing is appropriate, but the easement should be hard surfaced, although not necessarily built to local access street standards. The timing and installation of infrastructure with respect to phase one and phase two of the preliminary plat can certainly be accommodated. Presumably Mr. Monahan would receive preliminary plat approval for both phase one and phase two, and then come in and construct the infrastructure for phase one, after which he would receive final plat approval for phase one. Approval of the administrative adjustments and the multi- family planned residential development aspect can accommodate flexibility as to which lots are built out as duplex, tri-plex or four-piex lots. From the standpoint of both Class 3 review and the criteria for administrative adjustments, there is no reason not to allow the developer flexibility to make those decisions as late in the development as possible. The only requirement will be that the lot sizes and associated administrative adjustments must match the conditions of approval. 10. Urban Area Comprehensive Plan - This project complies with the plan, which contains a strong commitment to providing a variety of housing within areas receiving the full range of urban services. This type of infill development is specifically contemplated by not only the comprehensive plan but also the zoning ordinance. It makes efficient use of the existing transportation and infrastructure network, and is compatible with the adjacent residential and light industrial uses. The biggest problem with compatibility with the fruit packing is the tendency for truck drivers to utilize 50th and to park on Chestnut waiting until they can get into the warehouse area. Those are traffic enforcement problems related to the industrial use, and are not caused by this project. To the extent that Chestnut is improved and has two additional streets accessing it, there will be less of a tendency EXAMINER'S RECOMMENDATION - 9 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE CITY AND COUNTY OF YAKMA POST OFFICE BOX 4 YAKMA. WASHINGTON 98907 (509) 248-0706 for trucks to park along the shoulder in that area. Now it is vacant land and a good place to idle. 11. Yakima Qrban Area Zonina Ordipance. The various provisions of the ordinance have been reviewed above. This project, as adjusted, will be consistent with the goals and specific development standards of the ordinance. 12. $nvironmeatal Review. A Determination of Non- significance was issued by the City on March 25, 1994. 13. Notice. Public notice of the hearing was provided :in accordance with the ordinance. From the foregoing Findings, the Examiner makes the following: CONCLUSIONS 1. The Examiner has jurisdiction. 2. This master application conforms to the goals and policies of the Yakima Urban Area Comprehensive Plan, the intent of the Yakima Urban Area Zoning Ordinance, the provisions of the Yakima City Subdivision Ordinance, and will serve the public use and interest, subject to the conditions set forth in the Recommendation below. 3. All notice provisions of the ordinance have been complied with. Based upon the foregoing Findings and Conclusions, the Examiner submits to the Yakima Board of County Commissioners the following: RECOMMENDATION Approve this master application as follows: A. Approve the preliminary plat. Final plats may be submitted in two phases. A paved private temporary access easement shall be provided north of lot 8 in the event of phased approval. The easement shall be abandoned upon completion of the second phase. Final plat approval shall contain the following items: 1. The final plat shall be in substantial conformance with the preliminary plat under review, with respect to lot sizes, layout, road alignment and design, utility placement and easements, EXAMINER'S RECOMMENDATION - 10 Chestnut Grove Replat: Resolution Approving Preliminary Plat -- Exhibit A HEARING EXAMINER FOR THE CITY AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKIMA. WASHINGTON 98907 (509) 248-0706 street lights, fire hydrants and sidewalks; and shall be prepared in conformance with YMC 14.25. Sidewalks shall be constructed on both sides of the internal street system; rolled curbing shall be permitted. 2. Utility easements to be vacated shall be fully and accurately defined. Such vacation is subject to approval of the final amended plat reflecting new public utility easements and becomes effective when such amended plat is properly recorded with the Yakima County Auditor. 3. A11 lots shall be served with public sewer and domestic water. 4. All public and private utilities shall be placed underground. 5. Fire hydrants shall be provided and installed by the developer at locations and to the specification of the City of Yakima Codes Administrator. 6. City Engineer approval of street light, water, sewer and irrigation line plans, specifications and easements and drainage facilities for the public streets. 7. City Engineer approval of road improvement plans in conformance with the preliminary plat. Chestnut Avenue shall be improved with street surfacing, barrier curb, gutter, and 5 -foot wide sidewalks along the frontage of this site. Interior streets may be developed with barrier or rolled curbing, gutter, street lighting, and sidewalks. 8. A method of dust control during the construction phases shall be submitted to, and approved by, the Yakima County Clean Air Authority. A written copy of their approval shall be submitted to the Department of Economic Development prior to construction of any work phase. The developer shall designate a responsible party for contacts during working hours regarding alleged air quality violations. 9. Prior to recording the final amended plat or issuance of building permits, all required plat improvements, i.e. roads, utilities, streets, sidewalks, public water and sewer system and drainage facilities shall be installed, or a surety or bond EXAMINER'S RECOMMENDATION - 11 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE CITY AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKINA. WASHINGTON 98907 (509) 248.0706 pledged to ensure installation within one (1) year of subdivision approval. 10. Prior to recording the final plat, provision must be made to merge that portion of the existing lot 3 not included :in this replat with lot 1 of the .existing plat. 11. Specific location of duplex, tri-plex, and four-plex lots may be determined by the developer prior to final plat approval. B. The planned residential development with potential individual dwelling units separated by 5 feet or more, and multi- family dwelling units, should be approved subject to the following conditions: 1. Development shall be in substantial conformance to the site plan. 2. A maximum of 96 dwelling units shall be permitted. 3. A view obscuring 6 -foot high fence shall be required along the west property line of the subdivision prior to final plat approval. 4. Specific location of the tri-plexes and four-plexes, whether connected or freestanding, may be determined by the developer subject to compliance with set ]back and :lot coverage requirements. C. Adjustment of development standards is approved as follows: approved 1. Front yard set back adjustments: a. A 44 -foot setback from the centerline is for no more than 21 lots, accommodating the proposed tri- plex and four-plex development. b. A 30 -foot setback from the centerline is approved for 11 duplex lots. 2. Side yard setback adjustment. A side yard setback of 35 feet from the centerline is approved for 2 lots. 3. Lot coverage adjustments are approved for all 32 lots. The number of lots and the permitted lot coverage adjustment is set forth below. The actual lots and their permitted coverage shall be reflected on the final. plats. EXAMINER'S RECOMMENDATION - 12 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A lot HEARING EXAMINER FOR THE CITY AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAK IMA. WASH ING TON 91390 7 (509) 268.0706 No. of Lots Percentages 1 58% 2 60% 4 61% 1 62% 7 63% 1 64% 1 66% 1 68% 1 72% 2 73% 6 74% 5 76% D. Adjustment of parking standards to allow tandem parking for two vehicles to count as two spaces is permitted. E. Vacation of a portion of the utility easement crossing through lot 1 of the proposed subdivision, subject to approval of the final amended plat as proposed herein. The sanitary sewer main with the easement must be relocated into the proposed public right- of-way and existing main abandoned in place prior to final vacation of the easement. DATED this IG( day of August, 1994. Hearing Examiner EXAMINER'S RECOMMENDATION - 13 Chestnut Grove Replat: Resolution Approving Preliminary Plat — Exhibit A HEARING EXAMINER FOR THE C11v AND COUNTY OF YAKIMA POST OFFICE BOX 4 YAKIMA. WASHINGTON 98907 1509> 248-0706 Chestnut Grove Replat: Resolution Approving Preliminary Plat -- Exhibit A