Loading...
HomeMy WebLinkAboutR-1994-095 6-year TransportationRESOLUTION NO. R-94-95 A RESOLUTION adopting a Six Year Transportation Improvement Program for the period of 1995 through 2000 for the construction of streets and arterial streets in the City of Yakima. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, after a public hearing on the matter, held at a regular meeting of the Yakima City Council on July 19, 1994, the City Council finds that the plan attached hereto should be adopted as the Six Year Transportation Improvement Program for the period of 1995 through 2000 for the construction of streets and arterial streets in the City of Yakima, now, therefore. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six Year Construction Program for the period of 1995 through 2000, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six Year Transportation Improvement Program for the City of Yakima. ADOPTED BY THE CITY COUNCIL this 19TH day of July, 1994 ATTEST: July 9, 1994 - City Clerk 7 Mayor SUMMARY 8/4/94 CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM --1995 TO 2000 Total Length (MI) Fund Status Project Costs in Thousands of Dollars Expenditure Types for all Funding Total Funds Source of Funds Prior- ity No. Project Identification Description of Work 1995 1st Year 1996 2nd Year 1997 3rd Year 98-2000 4th, 5th & 6th Years Local Funds RAP CAPP UATA TIA Funds Federal Funds 1 Yakima Avenue/I-82: Interchange Area Et Al (Gateway) Modify Interchange 2.13 F 11,227 500 11,727 3,337 7,986 404 2 Fair Avenue: Pacific Avenue to northernmost Spruce Street Widen/Reconstruct 0.69 F 1,115 1,115 151 964 3 Nob Hill Boulevard at South 48th Avenue New Signal; Widen/Reconstruct SIG F 600 600 78 522 4 Fruitvale Canal Pathway: North 20th Avenue to North 40th Avenue Install Pathway N/A F 36 574 610 122 488 5 Mead Avenue: 16th Avenue to 11th Avenue Widen/Reconstruct 0.50 B 1,035 1,035 650 385 6 Yakima Avenue: 6th Street to 10th Street Rehabilitate Pavement 0.23 B 714 714 449 265 7 Summitview Avenue at North 48th Avenue New Signal SIG B 300 300 188 112 8 Pacific Street: South 3rd Street to Fair Avenue Widen/Reconstruct 0.60 U 408 408 82 326 9 "I" Street: North 1st Street to 5th Avenue Widen/Reconstruct 0.32 U 720 720 144 576 10 South 16th Avenue at Mead Avenue New Signal SIG B 178 178 112 66 11 West Lincoln Avenue: Pierce Avenue to North 24th Avenue Rehabilitate Pavement 1.00 B 1261 1261 792 469 12 Yakima Avenue: 1st Street to 7th Avenue Rehabilitate Pavement 0.60 B 90 890 980 615 365 13 North 16th Avenue at River Road New Signal SIG P 209 209 209 T-RNGR-I TIP 1995 to 2000 Page 1 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue U = Unfunded SUMMARY 8/4/94 CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM --1995 TO 2000 Total Length (MI) Fund Status Project Costs in Thousands of Dollars Expenditure for all Funding Types Total Funds Source of Funds Prior- ity No. Project Identification Description of Work 1995 1st Year 1996 2nd Year 1997 3rd Year 98-2000 4th, 5th & 6th Years Local Funds RAP CAPP UATA TIA Funds Federal Funds 14 "B" Street: Pierce Street to North 1st Street Realign/ Rehabilitate 0.65 U 789 789 15 Lincoln Avenue: Pierce Street to North 1st Street Rehabilitate Pavement 0.60 B 747 747 469 278 16 South 3rd Avenue: Washington Avenue to Nob Hill Boulevard Rehabilitate Pavement 1.00 B 1,346 1,346 845 501 17 Naches Avenue: Walnut Street to Lincoln Avenue Rehabilitate Pavement 0.95 B 380 380 239 141 18 North & South 8th Street: "D" Street to Chestnut Avenue Rehabilitate Pavement 0.85 U 628 628 19 "B" Street: North 1st Street to 10th Street Rehabilitate Pavement 0.80 U 590 590 20 18th Street & Beech Street: Terrace Heights Drive to Fair Avenue Widen/Reconstruct 1.10 U 2,618 2,618 21 Lincoln Avenue: North 1st Street to 10th Street Rehabilitate Pavement 0.80 U 570 570 22 South 3rd Avenue at Division New Signal SIG U 235 235 23 16th Avenue: 500' South of Lincoln Avenue to Roosevelt Street Rehabilitate Pavement 0.30 B 345 345 217 128 24 North 5th Avenue: Lincoln Avenue to "I" Street Rehabilitate Pavement 0.85 B 1,057 1,057 664 393 25 Yakima Avenue: 7th Avenue to 16th Avenue Rehabilitate Pavement 0.60 B 656 656 412 244 T-ENGR-1 TIP 1995 to 2000 Page 2 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue U = Unfunded SUMMARY 8/4/94 CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM --1995 TO 2000 Total Length (MI) Fund Status Project Costs in Thousands of Dollars Expenditure Types for all Funding Total Funds Source of Funds Prior- ity No. Project Identification Description of Work 1995 1st Year 1996 2nd Year 1997 3rd Year 98-2000 4th, 5th & 6th Years Local Funds RAP CAPP UATA TIA Funds Federal Funds 26 South 1st Street: Mead Avenue to Washington Avenue Rehabilitate Pavement 0.56 B 1,556 1,556 977 579 27 Washington Avenue: 16th Avenue to 45th Avenue Widen/Reconstruct 1.88 B 2,785 2,785 1,749 1,036 28 Yakima Avenue: 1st Street to 6th Street Rehabilitate Pavement 0.40 B 650 650 408 242 29 Nob Hill Boulevard: South 1st Street to Fair Ave (10th Street) Widen/Reconstruct 0.44 B 1,450 1,450 911 539 30 Lincoln Avenue at North 28th Avenue New Signal SIG P 188 188 26 162 31 Powerhouse Road: Lincoln Avenue to Englewood Avenue Widen/Reconstruct 0.40 U 1,194 1,194 32 Englewood Avenue: 40th Avenue to 66th Avenue Widen/Reconstruct 1.63 U 2,919 2,919 33 48th Avenue: Wide Hollow Creek to Summitview Avenue Widen/Reconstruct 1.60 U 4,515 4,515 34 Yakima Avenue: 16th Avenue to 32nd Avenue Rehabilitate Pavement 1.00 U 1,303 1,303 35 East "G" Street: North 1st Street to North 8th Street Rehabilitate Pavement 0.53 U 741 741 36 South 6th Street: Yakima Avenue to South 1st Street Rehabilitate Pavement 1.55 U 2,056 2,056 37 Englewood Avenue: Powerhouse Road to 40th Avenue Widen/Reconstruct 0.68 U 1,370 1,370 38 South 16th Avenue: West Washington Avenue to Ahtanum Road Widen/Reconstruct 1.06 U 820 820 T-ENGR-I TIP 1995 to 2000 Page 3 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue U = Unfunded SUMMARY 8/4/94 CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM --1995 TO 2000 Total Length (MI) Project Costs in Thousands of Dollars Expenditure Types for all Funding Source of Funds Prior- ity No Project Identification Description of Work Fund Status 1995 1st Year 1996 2nd Year 1997 3rd Year 98-2000 4th, 5th & 6th Years Total Funds Local Funds RAP CAPP UATA TIA Funds. Federal Funds 39 Fechter Road. North 40th Avenue to Scenic Drive Widen/Reconstruct 0.42 U 1,435 1,435 40 Fruitvale Boulevard. North 5th Avenue to North 40th Avenue Rehabilitate Pavement 2.18 U 4,461 4,461 41 Washington Avenue: South 1st Street to South 14th Street Widen/Reconstruct 0.22 U 2,257 2,257 42 Chestnut Avenue: 1st Street to 6th Street Rehabilitate Pavement 0.40 U 335 335 43 North 2nd Avenue: Lincoln Avenue to "D" Street Rehabilitate Pavement 0.10 U 69 69 , 44 2nd Avenue: Lincoln Avenue to Walnut Avenue Rehabilitate Pavement 0.47 U 423 423 45 North 40th Avenue: Fruitvale Boulevard to Powerhouse Road . Rehabilitate Pavement 0.51 U 1,322 1,322 46 North 40th Avenue: Powerhouse Road to Englewood Avenue Widen/Reconstruct 0 45 P 1,490 1,490 47 4th Street: Walnut Street to Pacific Street Rehabilitate Pavement 0.61 U 375 375 48 Bus Pull -Out Street Modifications Bus Stops N/A U 300 300 49 Bus Stop Zones -- Transit Bus Stops N/A U 50 50 50 50 200 50 Traffic Signs Upgrade to meet new standards N/A U 90 90 270 450 135 315 T-ENGR-1 TIP 1995 to 2000 Page A• F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue U = Unfunded •