Loading...
HomeMy WebLinkAboutR-1994-072 Transportation Improvement Account• • • A RESOLUTION RESOLUTION NO. R-94- 72 authorizing the City Manager to sign all applications and amendments, and other documents relating to Transportation Improvement Account Urban Construction Prospectus modifying design and construction financing of Stage I for the Gateway Project. WHEREAS, the City of Yakima has developed a plan for reconfiguration of the Yakima Avenue/I-82 Interchange Area and Fair Avenue; such plan being necessary to open up the area to development and to improve the area health and safety through improved transportation access and circulation; and WHEREAS, the plan is developed in accordance with the requirements of Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), and has set forth systems required to be constructed, improved and rehabilitated to serve the transportation needs of the area, and WHEREAS, financing of capital improvements require prompt attention to capture a funding base necessary to fund Stage I design and construction activities; and WHEREAS, the cost of design and construction of the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project are eligible for Transportation Improvement Account financing, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is duly authorized to sign the attached application and other documents relating to increased funding from the Transportation Improvement Account for Stage I design and construction for the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project. ADOPTED BY THE CITY COUNCIL this 71-h day of June, 1994 cfLt ATTEST: MAYOR ) Glm c CITY CLERK Legal/bd Resolutions RES DD • • Plcooct 91$0(001)- a " Transportation Improvement Account (TIA) 1 1 URBAN CONSTRUCTION PROSPECTUS General Information Lead Agency City of Yakima Project Name and Termini Yakima Avenue/I-82 Interchange Area and Fair Avenue Project Lengtn in Miles 1.7 Miles Functiona' Classification (Enure mow must be co tee S., -were Fu cekreor Gassilo/nor. Syaem.) Principal X Minor Collector X Federal Route Number 4628, 4611 4648, 4694 Contact Person Dennis E. Covell & Address 129 North 2nd Street Yakima, WA 98901 Teleonone Number (509) 576-6313 Description of Proposed Improvements 1 Attach a legible vicinity map showing the project location. 2. Attach a sketch of the proposed roadway section, right of way to right of way conforming to applicable design standards. 3 Describe the type a work planned for this project in the space below and how it will improve the existing conditions. If necessary attach additional sheets. 4 Indicate the date the project will be advertised for bids and the estimated project completion date. 43 Stage 1 of the ultimate project has been refined because of the Value Engineering Study and because of accelerated development in the Terrace Heights area causing new traffic impacts on the project. The type of work now planned for Stage 1 is: Extend Fair Avenue from Lincoln/B Couplet to Spruce Street, crossing under Yakima Ave. and the existing fly -a -way ramp (Ramp F). Three lanes will be constructed with future widening to 5 lanes. Bridges will be built for ultimate configuration. Ramps G & H, and C & E will be revised. ;amp I providing access to 1-82 southbound from Fair Ave. will be constructed. Ramp J connecting Fair Ave. and Yakima Ave. will be constructed. Temporary Ramp B providing I-82 southbound off ramp access to Fair Ave. will be constructed. Yakima Ave. will be widened to provide 2 lanes per directional travel with a double left turn lane to access I-82 southbound from Terrace Heights Way the southside of Terrace Heights Way. 2 Traffic signals will be constructed. Illumination will be provided on Yakima Ave. and on Fair Ave. Landscaping TIB Form 190454 Rwued 0191 Page 1 of 6 project no 9E-180(001)-1 TRANSPORTATION IMPROVEMENT ACCOUNT (TIA) URBAN CONSTRUCTION PROSPECTUS DESCRIPTION OF PROPOSED IMPROVEMENTS #3 How will the project improve existing conditions? ANSWER •Relieve congestion on E. Yakima Ave./Terrace Heights Way and at the 8th/9th St. intersections with Yakima Ave •Improve access from the Fairgrounds/Sundome/Ball Stadium to 1-82 •Promotes economic development by preserving access to existing businesses and providing access to the Northwest quadrant of the interchange area. •Improves air quality •Reduce the number of accidents •Provide bicycle/pedestrian safe access across 1-82 #4 Date the project will be advertised for bids and the estimated project completion date ANSWER •Stage 1 initial contact ad date 11/22/94 •Stage 1 project completion dates Roadway & Structures 4/1/96 Landscaping 9/11/96 • • • pc,e�1►o9E - 1 8 0 (001)- 1 r Transportation Improvement Account (TIA) f I URBAN CONSTRUCTION PROSPECTUS Funding Sources Local match is considered to be eligible in-kind contributions and all funds other than Transportation Improvement Account (TIA) funds or Urban Arterial Trust Account (UATA) funds. The minimum local match is 20% of the total eligible project cost. List all funding sources and the amount of funds pledged for the project. Source . Private or Public? Amount of Funds CITY CF YPKM (ECD,' GLS TMX, Si?) RFL TC 1,836,041 CITY CF vicilyini 'IRA,N= KNE RELIC 218,168 ynicrm CIZNIY Sit) FUNDS RELIC 654,503 icor FRE 2,229,154 DEVELOPER R/W DEDICATION VALUE PRIVATE 1,190,363 TOTAL LOCAL MATCHING FUNDS I $ 6,128, i 229 List all agencies and/or private groups involved in the project. Describe their involvement. CITY OF YAKIMA LEAD AGENCY, LOCAL MATCH YAKIMA COUNTY CO-PARTNER , LOCAL MATCH WDOT, DIST. #5 CO-PARTNER , LOCAL MATCH GARY LUKEHART CO-PARTNER , LOCAL -MATCH TIB Form 190-054 Revised O3s1 Page 2 06 r lNo 9 E- 1 8 0 (001)- 1 Transportation Improvement Account (TIA) URBAN CONSTRUCTION PROSPECTUS Project Cost Estimate Predesign Phase Environmental study Total Design Predesign Study cost 328,750 1,418,760 1,747,510 Design g Phase Special Studies Design Engineering Total Right Design of Way Cost — 2,383,577 2,448,000 I 4,831,577 Construction Phase Contract Amount Other" Total Construction 1 Construction Engineering Cost 10,505,311 — 670,552 i 11,175,863 TOTAL PROJECT COST I 17, 754, 950 Value Engineering, Environmental, or Other Special Studies. - - Work performed by the local agency's own forces, and/or negotiated contracts with Utilities & Railroads ... Minimum Local Matching Ratio is 209E 1A. TOTAL ENGINEERING ( Design Engineering + 1 B. MAXIMUM EUGIBLE ENGINEERING (25% x Contract 1C. NON-EUGIBLE ENGINEERING COSTS (1A -1 B)(lf ID. TOTAL EUGIBLE PROJECT COSTS (Total Project USE LINE "P" OF LOCAL MATCH WORKSHEET 1E. 60GAL-MATGHING-rUNDS +Le. htetehingfietio-=x18}-4- 1F TIA FUNDS ( Total Project Cost -1 E) 1G. - TlA FUNDS SHOWN IN DESIGN PROSPECTUS 1H. BALANCE (1 G -1 F) ( Surplus is +, Deficit is • ) 11. REQUEST IS SUBMITTED FOR AN INCREASE IN (Attach an explanation for the increase.) Construction Engineering) Amount) less than 0, enter 0) Cost -1C ) f-10-) 11A FUNDS OF $ 1,160,568 3,054,129 2,626,328 �- 427,801 17,327,149 .�. 6,128,229 ._. 11, 626, 721 ....... 10, 466,153 —1,160,568 TIB Form 190464 Revised 03,91 Page 3016 Item A B C D E F G H J K L M >ti 0 P Q R LWtV0 VnLM.)L n vit1%.1/1GL 1 Application/Design Review Total Project Cost Application/Design Review Total TIA Funds Application/Design Review TIA Matching ratio (B/A )' Design Phase Total Project Cost Design Phase Total Eligible Project Cost Application Phase Total R/W Cost " Design Phase Total R/W Cost " R/W Cost Increase (G • F) is Allowable R/W Increase (C x H) " Eligible Project Cost Increase (E —A Eligible Projcct Percent Increase (J/A) x 100 Increase Factor (1.0 • K/100) min. = S Allowable Project Increase (C x J x L) Total Allowable TIA Increase (I + M) Total TIA Funds (B + N) Total Focal Funds (D - 0) Local Matching Ratio (P/D) TIA Matching Ratio (O/D) Value A 15.375.01E B 10,466,153 C .681 D 17,754,950 E 17,327,149 F G H I J 1,952133 K .127 L .873 M 1,160,568 N 1,160,568 0 11,626,721 P 6,128,229 Q .345156 R .654844 Request is submitted for an increase in TIA funds of S 1,160, 568 ( Attach an explanation for the increase) Use application costs for FY 90 & FY 91 projects and design review costs for FY 93 & FY 94 projects " For projects selected after the FY 90 program no special afowance will be made for any increase in R/W costs. Do not complete items F, G, H, & L It item J is more than S500,000 or item K is more than 20% above the application or design review estimate a TIB subcommittee must review the reason for the increase prior to design phase approval. TOTAL P.03 11105511,.., Proeea No 9 E- 1 8 0( 001) - 1 Transportation Improvement Account (TIA) IT-And I'� URBAN CONSTRUCTION PROSPECTUS TM Funding Analysis Predesign Phase Cost Environmental Study TM Funds Design Study TA Funds Total Predesign Predesign Local TA funds fundsd Total Predesign nu a tcr.r! APPROVED 1 -- -- 660,818 . 283,206 944,025 ACTUAL j 215,282 929,064 1,144,346 j 603,164 1,747,510 Design Phase Cost Special Studies 1 71A Funds Right of Way TIA Funds Design Enggineering TIA Funds Total Design TIA Funds Design Local i Funds Total Design Coat fruaL I) APPROVED-- 1,676,560 1,022,570 2,699,130 1,266,102 ! 3,965,232 ACTUAL 1,603,058 1,560,871 3,163,929 1 1,667,648 4,831,577 Estimated Construction Phase Cost Construction Construction Contract Other T1A Funds TIA Funds Construction Engineering TIA Funds Total � Construction Construction Local , TMA Funds 1 Funds 1 Total Construction Cost ma a Long 6,879,340 -- 439,106 7,318,446 1 3,857,417 11,175,863 Estimated Total Project Cost Total Predesign TM Funds Total Design TA Funds Total Construction TLA Funds Total Project TLA Funds Total Local Funds Total Project Cod RMBLocos 1,144,346 3,163,929 7,318,446 11,626,721 6,128,229 17,754,950 Use ACTUAL FUNDS when calculating Estimated Total Project Cost TIB Foran 190-054 Ree4sed 0391 Page 4 of 6 r Transportation Improvement Account (TIA) URBAN CONSTRUCTION PROSPECTUS Pioj.ct No 9 E- 1 8 0 (001) - 1 Demand for TIA Funds List demand for TIA funds for the time penod shown. Time Period Predesign Special Phase Studies Design Engineering Right of Way Construction Phase Total TIA Funds 1992 700,000 - 700,000 1993 444,346 -- 468,261 912,607 1994 i -- 936,523 1,047,750 60,000 2,044,273 1995 I i -- 156,087 555,308 6,758,446 7,469,841 1996 -- 500,000 500,000 i I i 1,144,346 -- 1,560,871 1,603,058 7,318,446 11,626,721 TIB Fpm 190-054 Revised 03/91 Page 5of6 Pro,ed No. 9 E _ 1 8 0 (001 )_ 1 I " Transportation Improvement Account (TIA) URBAN CONSTRUCTION PROSPECTUS Certification of Funding Certification is hereby given that Local and/or Pnvate Matching Funds and Other Funds associated with the construction phase of the project are available to coordinate with the proposed project development. This project has been reviewed by the Legislative Body of the Administering Agency or agencies or its designee, and is consistent with the Agency's comprehensive plan for community development. An Environmental Impact Analysis has been conducted and an Environmental Impact Statement or Negative Declaration of Environmental Impact as appropriate, has been circulated pursuant to RCW 42.21C, and that the results have been utilized in amving at the decisions reflected in the prospectus. The project is completely designed and ready to be advertised for bids for construction. All project nght of way required for the project is available, or if the right of way remains to be acquired. a Possesion and Use Agreement has been obtained for the parcels m question. All nght of way for this project has been acquired in accordance with WAC chapter 468-100. City of Yakima Lead Agency iVapdr'a /Clrairrrrarr5 3iyrwtury City Manager Date Signed Tig Form 190-054 Reosed 0191 Page 6 of 6