Loading...
HomeMy WebLinkAboutR-1993-079 TransportationRESOLUTION NO. R-93-79 A RESOLUTION adopting a Six Year Transportation Improvement Program for the period of 1994 through 1999 for the construction of streets and arterial streets in the City of Yakima. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, after a public hearing on the matter, held at a regular meeting of the Yakima City Council on July 27, 1993, the City Council finds that the plan attached hereto should be adopted as the Six Year Transportation Improvement Program for the period of 1994 through 1999 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six Year Construction Program for the period of 1994 through 1999, a copy of which is attached hereto and by reference made a part hereof, is hereby adopted as the official Six Year Transportation Improvement Program for the City of Yakima. ADOPTED BY Tii , CITY COUNCIL this 27th day of July, 1993. ATTEST: T-ENGR-I TIP Resolution -- 1 ity Clerk c)„ CITY OF .,A CITY NO, 1485 COUNTY N0, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 21, 1993 ADOPTION DATE RESOLUTION N0, F ;R U ;I d C;0 C L R T A; I I S ; T 0 S : Y N A ;N L ;0 14 iw.nnnnnnnwnnnn**warm********nnn 1 1 DRAFT mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm I A J 0 0 F I I ,R I I 1 1 al I C 0 L R ; TOTAL A K ; WORK LENGTH PROJECT IDENTIFICATION / DESCRIPTION OF WORK ; S CODES ; (MI) I 1 1 I S i 1 1 :YAKIMA AVENUE/I-82 ET AL (GATEWAY PROJECT) C A R RSD 0 v E 11 (X) S T A T U S PROJECT COSTS IN THOUSANDS OF DOLLARS 8 FEDERAL OBLIGATION PLAN EXPENDITURE FOR ALL FUNDING TYPES 1994 1ST YEAR 1995 1996 91-99 2ND 1 3RD YEAR ; YEAR 4111, ; TOTAL STH FUNDS AND 6TH YEARS 12 :A,B,D,F 2.13 X 1850; 2173; I 1 1 1 ;INTERCHANGE AREA 4 G,H,I,K ;Reconfirmation of interchange are involving new structures, structure removal, 8,8 UTILITY roadway widening, grading drainage pavement, curb and gutter, sidewalks bikelpd. CODES ;way, street lights, signalization, landscaping, channelization, utility adjustments CGPTO Includes work on Fair Avenue and Yakima Avenue 19 ; 2 SOURCE OF FUNDS 8 8 0 1 1 8 8 RAP 8 CAPP UATA 8 LOCAL ; TIA ; FEDERALO FUNDS ; FUNDS ; FUNDS 8 8 1ST ; 2ND YEAR THRU ANNUAL 6TH ELENT YEARS I 0 I 10023; 1601 8018; 4048 PA, 404: I 8 I I I Y I I 0 RIW FED AID PROJECT N0. 8 ; 0 CONST 0 N -4628 -XXX 0 TOTAL 404; 00 I I I I I 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 I I 8 TRANSIT BASE FACILITY IMPROVEMENTS : 10 1 P N/A : ; F ; 1100; 1100 2200; 2200; 0 P.E. I I 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 I 1 I I 8 RIW Additions and alterations include a new administration building, welding and ; UTILITY FED AID PROJECT N0 0 paint bays, automated bus wash, hazardous storage building, parking lot, office 1 CODES 0 CONST remodel, bus pull-out, paving, drainage, fencing, lighting, landscaping and signing, 0 CGPTO ; -XXX 0 TOTAL 14 ; 3 NOB HILL BOULEVARD AT SOUTH 32ND AVENUE Parking lot development requires grading, drainage, paving, lighting, sidewalk, curb, gutter, landscaping and signing, 14 ; 4 BUS PULL-OUT STREET MODIFICATIONS (2 LOCATIONS) 1 11 P N/A : F ; 300; 1 1 1 1 1 1 1 1 1 11 ; P ; N ; F ; 150; 1 1 1 1 1 I 8 8 300; 60; 2408 P.E. 0 Y 0 RIW UTILITY FED AID PROJECT N0 8 CODES 8 CONST CGPTO -XXX 0 TOTAL 0 150 8 29: 1 211' 240; YAKINA VALLEY COLLEGE & EISENHOWER HIGH SCHOOL Minor street widening including right-of-way, sidewalk, curb, gutter, UTILITY landscaping and signing, ; CODES CGPTO 30; 1200 P.E. 13 0 R/W 10 FED AID PROJECT N0 8 8 CONST 91 -XXX 8 TOTAL 120 0 1 1 I 1 1 1 I I I 1 I I CITY OF JA CITY N0, 1485 COUNTY NO. 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 21, 1993 ADOPTION DATE RESOLUTION N0, p P ;R U ;I N C;0 C LR T A I S 0 S A L T Y N 0 DRAFT PROJECT IDENTIFICATION I DESCRIPTION OF WORK M A J 0 0 F R W C 0 L R A K S WORK CODES TOTAL LENGTH (MI) C A R R 0 V E R (X) S PROJECT COSTS IN THOUSANDS OF DOLLARS EXPENDITURE FOR ALL FUNDING TYPES 14 5 :NORTH 16TH AVENUE BUS TURNAROUND 11 P NIA 1994 ; 1995 ; 1996 1ST ; 2ND YEAR : YEAR 150: 3RD YEAR 91-99 4TH, 5TH AND 6TH YEARS TOTAL FUNDS ; 8 FEDERAL OBLIGATION PLAN 0 SOURCE OF FUNDS 0 LOCAL FUNDS RAP CAPP UATA TIA FUNDS 1 0 $ 1 $ $ FEDERAL$ FUNDS 0 $ 150 30 1ST ; 2ND YEAR ; THRU ANNUAL ; 6TH ELEMT ; YEARS 1200 P,E, ;AT THE LAKE ASPEN DEVELOPMENT ;Bus turnaround improvements including right-of-way, sidewalk, curb, gutter, 'landscaping, bus shelter and signing, 0 RIW UTILITY FED AID PROJECT N0 1 CODES 0 CONST CGPTO -XXX 1 TOTAL 1 1 6 BUS STOP ZONES - TRANSIT P ; NIA ;X;P 14 1 NOB HILL BOULEVARD AT SOUTH 48TH AVENUE Signalization; curb and gutter modifications; sidewalk modifications street light modifications; utility adjustments; pavement markings; signing 01 8 SIGNAL UPGRADEIPIRELANE PRE-EMPTION/STREET LIGHTS 6 ;B,D,F,G ; SIG ; ; U I,J,K,M 6 ;I,J 0 14: 5; 101; 120; 50; 50; 50; 50; 200; 200; 0 P.E. 0 RIO UTILITY FED AID PROJECT N0, 1 CODES $ CONST CGPTO -XXX 600 ; 0 TOTAL 9 600; 10; 19; 5110 P.E. ; 61; UTILITY CODES CGPTO N/A ; X : P ; 30; 30; 30; 90; 180 0 RIW ; 100; FED AID PROJECT NO 8 ;1 O CONST ; 350; M 4566 -XXX ; 8 TOTAL ; 511; 0 180; ; $ P,E. Upgrade existing signal systems with modern controllers; opticom; add street lights where needed UTILITY CODES CPT 1 RIW PED AID PROJECT N0. 0 0 CONST ; $ -XXX ; 0 TOTAL ; $ $ CITY OF CITY N0, 1485 COUNTY N0, 3 SIX YEAR TRANSPORTATION HEARING DATE: JULY 21, 1993 IMPROVEMENT PROGRAM 1994 TO 1999 ADOPTION DATE RESOLUTION N0, I I � I F ;R IU :I N C 0 C L ; R T A l I I S T 0 S Y A N L 0 DRAFT PROJECT IDENTIFICATION / DESCRIPTION OF WORK A J 0 0 P R W C 0 L R A K S WORK CODES A Y 0 V TOTAL ; R LENGTH (MI) '(X) F PROJECT COSTS IN THOUSANDS OF DOLLARS 8 FEDERAL OBLIGATION PLAN U ; EXPENDITURE POR ALL FUNDING TYPES N' D ' 1994 1996 97-99 S T A T U 1ST YEAR 1995 2ND YEAR 01 9 SIDEWALK SAFETY PROGRAM 1 F,G N/A X P I0 10; 3RD YEAR 10 4TH, 5TH AND 6TH YEARS 30 TOTAL FUNDS SOURCE OF FUNDS 8 LOCAL FUNDS RAP CAPP UATA TIA FUNDS 8 FEDERAL/ FUNDS 0 1ST 2ND YEAR TNRU ANNUAL ; 6T11 ELENT ; YEARS 60 60 Install new sidewalk where none exists; curb and gutter 0I 10 BIKEWAYS I 1 1 1 11 Greenway bikeway / city pathway and bike lanes � I I I 1 I UTILITY CODES CPT FED AID PROJECT N0, -XXX NIA ;XIP I I I I 1 STORM DRAINAGE : 14 1B 1 i Provide for rehabilitation of existing system at spot locations to address complaints and claims and provide for new additions at spot locations to address complaints and claims 16 12 MEAD AVENUE 16TH AVENUE TO 11TH AVENUE Widening; grading; drainage; utility adjustments; curb and gutter; sidewalk; street lights; pavement markings; signing; signalization N/A I X I P I 1 1 1 10: 10 10: I 1 I 1 15; 5: I 1 1 1 1 24 ;A1 B1, D P; 0,50 1 U; 1035; I 1 1 I I I I I I I I 1 1 I 5 G,H,I,J UTILITY FED AID PROJECT N0, CODES -XXX 1 1 1 I 5 15 40; 40 1 1 I 1 I 1 I UTILITY CODES CGPTO nn*nnnn*nnnnnnnwnnnnnnn*nnnnll ** UATA SUPPLEMENT *****iA%Zh ***** t.t.t 1 n******I 1 1 1 1 1 1 1 I i i I 1 i I 1 UTILITY CODES CGPTO FED AID PROJECT NO -XXX 1035 2071 I I 1 I 1.- 828; P,E, R/W CONST TOTAL P,E, R/W CONST TOTAL P,E, R/W CONST TOTAL FED AID PROJECT N0, M -4510 -XXX P,E, R/W CONST TOTAL CITY OF - ..;A CITY N0. 1485 COUNTY N0, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 21, 1993 ADOPTION DATE RESOLUTION N0, I 1 I 1 P1 I P ;R U .I N C ; 0 C L; R T A'I I S T 0 S Y N A N L 0 11111111111111111111111111111111 DRAFT PROJECT IDENTIFICATION I DESCRIPTION OF WORK N A J 0 0 F R W CO L R A K S WORK CODES TOTAL LENGTH (NI) C A R R Y 0 V E R (K) U N D S T A T U S PROJECT COSTS IN THOUSANDS OF DOLLARS 0 FEDERAL OBLIGATION PLAN EXPENDITURE FOR ALL FUNDING TYPES 14 13 YAKIMA AVENUE 24 A,B,D,F 0,23 P 1994 IST ; 2ND YEAR : YEAR 550; 1995 1996 91-99 3RD YEAR 4TH, 5T11 AND 6TH YEARS SOURCE OF FUNDS g TOTAL FUNDS LOCAL FUNDS RAP CAPP UATA TIA FUNDS 550: 110 0 0 0 0 0 FEDERALO FUNDS 0 0 0 6TH STREET TO 9TH STREET G,H,I,J Remove and replace pavement surface; curb and gutter and sidewalk repair; K utility adjustment; drainage adjustments; street lights; signal system adjustments and and upgrade; pavement markings; signing 11 14 PACIFIC STREET 11 SOUTH 3RD STREET TO FAIR AVENUE Widening; pavement resurfacing; grading; drainage; curb and gutter repair; sidewalk; signalization; street lights; bus pullout; pavement markings; signing; utility adjustments 15;"I' STREET I 1 1 1 34 ;A,B,D,F 1 1 UTILITY CODES CGPTO 1ST YEAR ANNUAL ELENT 2ND THRU 6TH YEARS 4400 P.E. 0 RAW FED AID PROJECT N0, 0 0 CONST 0 M -4628 -XXX 0 TOTAL 1 1 0,60 '1 408 5 G,11,I,J K nwnnnnnn�nnn nnnnnnnnnnnwn nwnll ^^ UATA SUPPLEMENT ^^ 1 1 I I 1 I ;A,B,D,F,; 0.32 ;NORTH FIRST STREET TO 5TH AVENUE :Reconstruction and widening; curb and gutter; sidewalk; ;street light modifications; utility adjustments; pavement markings; signing I 1 1 G,I,J,K,M nnnnnw SJ. .LAL.LS. hnn*nn n:ln:n ^^ UATA SUPPLEMENT £:***:**SSS:*:*AS******;::;:L 408 82 321: I i 1 I I I UTILITY FED AID PROJECT N0. CODES CGPTO ; N -4608 -XXX I 1 I 1 1 S P.E. 0 RAW CONST 0 TOTAL I 1 1 I I 1- I 1 1 __ I 120. 720; 144; 516 0 P.E. I I ; I I I 1 I I 0 R/W UTILITY FED AID PROJECT NO 0 CODES 0 CONST i 0 CGPTO M 4641 XXX 0 TOTAL i 1 1 N I I I Y 1 I I 1 1 V 14 : 16:SUNNITVIEW AVENUE AT NORTH 48TH AVENUE I I 1 1 6 IB,D,F,G SIG ID 209 Signalization; curb and gutter modifications; sidewalk modifications street light modifications; utility adjustments; pavement markings; signing I I I,J,K,N 1 I 1 UTILITY CODES CGPTO 209; 42 161; 8 P.E. 0 R/W FED AID PROJECT N0 0 0 CONST 8 M 4596 -XXX 9 TOTAL 0 CITY OF YA. CITY N0, 1485 COUNTY N0, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0, U N C T 0 N A L A1A1i311A1111AlAAAAAAAAAAAAJ.AAAA DRAFT C;0 L A S S 0 ; PROJECT IDENTIFICATION J DESCRIPTION OF WORK 14 1 T : SOUTH 16TH AVENUE AT MEAD AVENUE M A J 0 OF R W C 0 L R A K WORK LENGTH U 5 ; CODES ; (MI) ; (X); S S I I 1 1 I 1 1 C A R R Y 0 V N 11 s T A T PROJECT COSTS IN THOUSANDS OF DOLLARS EXPENDITURE FOR ALL FUNDING TYPES 1994 ; 1995 ; 1996 1ST ; 2ND 3RD YEAR ; YEAR ; YEAR 6 1;B,D,F,G ; SIG ; ; U 1 I I 178; 97-99 8 FEDERAL OBLIGATION PLAN 8 SOURCE OF FUNDS 8 8 4TH, ; TOTAL ; RAP 5TH ; FUNDS ; ; CAPP AND ; ; UATA 6TH ; LOCAL ; TIA YEARS ; FUNDS ; FUNDS 178; 36; 142: 8 8 8 8 8 8 FEDERALB FUNDS 8 8 1 :Signalization; curb and gutter modifications; sidewalk modifications ;street light modifications; utility adjustments; pavement markings; signing I,J,K,M 14 18 NORTH 16TH AVENUE AT RIVER ROAD I I I UTILITY CODES CGPTO 1ST YEAR ANNUAL ELEMT 2ND TURU 611 YEARS 8 P,E, FED AID PROJECT N0 8 RAI 8 CONST M 4555 -XXX ; 8 TOTAL 6 ;B,D,F,G ; SIG : ; P I 1 1 i 1 Signalization; curb and gutter; sidewalk street lights: utility adjustments; pavement markings; signing I4 19 YAKIMA AVENUE AT 9TH STREET I I 1 1 i I,J,K,M 1 i I I 1 I 1 1 I I I I 209 I I 209 209 UTILITY CODES CGPTO ; 6 ;B,D,F,G ; SIG ; ; U I i I 1 1 209 209; I I 8 8 8 8 P,E, 8 RIW FED AID PROJECT NO 8 8 CONST N 4555 -XXX 8 TOTAL 8 8 8 P,E, 8 I,J,K,M 8 RAW Signalization; curb and gutter modifications; sidewalk modifications UTILITY FED AID PROJECT N0 8 street light modifications; utility adjustments; pavement markings; signing 1 CODES I I 8 CONST 8 CGPTO ; ; M 4628 -XXX 8 TOTAL 8 8 1 I 1 1 1 1 I 1 1 I 1 1 0 i I 1 I I I 1 I I 1 I I I 1 I 9 14 ; 20;WEST LINCOLN AVENUE ; 45 ;A,B,D,F ; 1,00 : : U1106; ; 1106 ; 8 P,E, I I 1 1 1 i i 1 i 1 I 1 1 I I i 1 1 1 1 1 1 i I PIERCE AVENUE TO NORTH 18TH AVENUE 6 G,H,I,J ; 8 RAW Pavement removal and replacement; drainage adjustments; utility adjustments; K ; UTILITY FED AID PROJECT NO, 8 curb, gutter and sidewalk repair; street light and signal system adjustment and ; CODES 8 CONST upgrade; pavement markings; signing; bus pullout ; ; 8 CGPTO M -4559 -XXX 8 TOTAL 0 1 I I 1 1 I V 1 1 8 1 1 I I I 1 I ,--_ 1 I CITY OF CITY N0, 1485 COUNTY N0. 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TU 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0, ;P P ;R U I N 610 C L'R T A I I S T 0 S 1 Y N ' A N L 0 DRAFT M :**:************************** A J 0 0 F R W C 0 L R PROJECT IDENTIFICATION / DESCRIPTION OF WORK ; S K S TOTAL WORK ; LENGTH CODES ; (MI) 16 21 YAKIMA AVENUE : 45 A,B,D,P1 0,60 C F' PROJECT COSTS IN THOUSANDS OF DOLLARS 0 FEDERAL OBLIGATION PLAN A U EXPENDITURE FOR ALL FUNDING TYPES R,N R Y 0 V E D T A R,T D (X) S X:U 1994 1ST YEAR 1995 ; 1996 2ND ; 3RD YEAR : YEAR 91-99 4TH, 5TH AND 6TH YEARS SOURCE OF FUNDS 0 TOTAL ; RAP FUNDS ; CAPP UATA LOCAL ; TIA FUNDS ; FUNDS 90: 890 980 0 0 0 0 , 0 FEDERAL, FUNDS 3 , 1 1ST STREET TO ITH AVENUE 6 G,H,I,J Pavement removal and replacement; drainage adjustments; utility adjustments; K curb and gutter and sidewalk repair; street lights and signal system adjustments and upgrade; remove and reinstall rubberized pad railroad crossings; pavement markings; signing; bus pullout 14 ; 22 'B' STREET : 14 :B,D,P,G ; 0,65 I I 1 1 PIERCE STREET TO NORTH IST STREET 56 I,J,K Realignment; Pavement reconstruction; drainage adjustments; utility adjustments; curb and vier; srde.alk repair; remove and reinstall rubberized pad R,R, Crossing; pavement markings; concrete median barrier; signing Implementation of previous study. ,'SCC3 AVV.N''i 16 ; 45 ;B,D,P,C ; 0,60 ; U UTILITY FED AID PROJECT N0, CODES CGPTO ; M -4690 -XXX ;PIERCE STREET TO NORTH 1ST STREET 6 I,J,K ;Pavement removal and replacement; drainage adjustment; utility adjustments; curb ;and gutter; sidewalk repair' street lights andsignal system adjustments and ;upgrade; remove and reinstall rubberized pad R,R, Crossings; pavement markings; signing � I I 1 24:SOUTH 3RD AVENUE ; 45 ;A,B,D,F ; 1,00 ; ; U 1 i I I I ;WASHINGTON AVENUE TO NOB HILL BLVD. 6 G,H,I,J 'Pavement removal and replacement; drainage adjustments; utility adjustments; K curb, gutter and sidewalk repair; street light and signal system adjustment and upgrade; pavement markings; signing; bus pullout 1ST YEAR ANNUAL ELENT 2ND THRU 6TH YEARS 0 P,E, 0 R/W 1 CONST 0 1 TOTAL 3 789; 189; 0 P.E. I 1 0 I 1 Y 1 R/W UTILITY PED AID PROJECT N0, 0 CODES 3 CONST I 0 CGPTO 1 M -'16°1 -XXX 0 TOTAL I 1 0 ... _II 902; 902' 0 P,E, 1 1 01 1 0 RJW UTILITY r'E0 A;C °i0.J)tT 50, CODES 0 CONST CGPTO ; 8 -4648 -XXX 0 TOTAL , I 1 1 __I 1 I ._, 1346; 1346; 0 P.E, 1 A 1 1 I 0 1 R/W UTILITY PED AID PROJECT N0, 0 CODES 9 CONST CGPTO ; ; M -4559 -XXX ; 1 TOTAL I 0 I I 1 1--- -"---' - ' 0 0 CITY O...,6IMA CITY NO. 1485 COUNTY N0, 39 SIX YEAR TRANSPORfATItN 1MPRO00MENi' PRo G.A0 i4 PO 1999 HEARING DATE: JULY 27, 1993- :WALNUT 993- ADOPTION DATE RESOLUTION NO. P, F R; DRAFT ° U I. N C 0 C L R T A I S T 0 S ; Y L 0 PROJECT IDENTIFICATION / DESCRIPTION OF WORK 19 25 NACRES AVENUE M A J 0 0 F R C 0 L R. A K WORK S : CODES S TOTAL LENGTH (MI) C A R R Y 0 v R (X) 11 N D T A T PROJECT COSTS IN THOUSANDS OF DOLLARS EXPENDITURE FOR ALL PUNDING TYPES 1994 1ST YEAR 1995 2ND YEAR 1996 97-99 3RD YEAR 4TH, TOTAL 5TH FUNDS AND 6TH YEARS D FEDERAL 041601108 PLAN 9 SOURCE OF FUNDS g 9 9 RAP 9 CAPP 9 UATA 9 LOCAL TIA FEDERALO FUNDS FUNDS FUNDS 9 45 iD,B,F,G 0,95 380 380 ;WALNUT STREET TO LINCOLN AVENUE ;Remove and replace pavement surface; curb and gutter and sidewalk repair; ;utility adjustment; drainage adjustment; street lights; pavement markings; ;signing; signal system adjustment and upgrade 1 1_ _' 16 26:NORTH & SOUTH 8TH STREET : 5 :B,D,F,C ; 0.85 D STREET TO CHESTNUT AVENUE I,J,K,N Pavement rehabilitation curb and gutter modifications; sidewalk modifications; street light modifications; utility adjustments; pavement markings; signing 14 21"B" STREET UTILITY FED AID PROJECT N0. CODES CGPTO -XXX 62E; ...-628;. 1 9 P.E. 8 RAI 9 CONST 9 9 TOTAL 1ST YEAR ANNUAL ELENT 2ND THRU 6TH YEARS 56 :B,D,F,G 0.80 U 590 UTILITY FED AID PROJECT NO CODES CGPTO ; M 4684 -XXX 590 9 P.E. 9 R/W 9 CONST 9 9 TOTAL 9 NORTH 1ST STREET TO 10TH STREET J Pavement removal and replacement; utility adjustments; curb and gutter; sidewalk repair; drainage adjustment; street lights; signal system adjustments and upgrade; paving markings; signing 14 28:LINCOLN AVENUE UTILITY CODES CGPTO 56 ;B,D,F,G ; 0,80 U 510: 510 FED AID PROJECT NO. 0 -4694 -XXX 9 P,E, 9 R/W 9 CONST 9 9 TOTAL 9 NORTH 1ST STREET TO 10TH STREET Pavement removal and replacement; utility adjustments; curb and gutter; sidewalk repair; drainage adjustment; street lights; signal system adjustments and upgrade; paving markings; signing UTILITY FED AID PROJECT N0, CODES CGPTO ; 0 -4648 -XXX 9 P.E. 9 R/W 9 CONST 9 9 TOTAL 9 = CITY OF i -.. CITY N0. 1485 COUNTY N0. 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0. P R U I N C 0 C L R T A I I S T 0 S Y N A N L 0 14 ; 29 DRAFT PROJECT IDENTIFICATION DESCRIPTION OF WORK M A J 0 0 P R C 0 L R A K S TOTAL WORK : LENGTH CODES : (MI) • C A R R Y 0 V E R (X) P U N D S T A T 11 PROJECT COSTS IN THOUSANDS OF DOLLARS 8 FEDERAL OBLIGATION PLAN EXPENDITURE FOR ALL FUNDING TYPES 1994 ; 1995 ; 1996 ; 97-99 4TH, 5TH 1ST ; 2ND ; 3RD AND YEAR YEAR : YEAR ; 6TH YEARS TOTAL FUNDS SOURCE OF FUNDS 8 RAP CAPP UATA LOCAL TIA FUNDS FUNDS SOUTH 3RD AVENUE AT DIVISION 6 B,D,F,G SIG U 235 235 8 8 8 PEDERALI FUNDS 8 8 Signalization; curb and gutter modifications; sidewalk modifications street light modifications; utility adjustments; pavement markings; signing 14 ; 30 16TH AVENUE I,J,K,M 5 ;D,P,G 0.30 ; UTILITY CODES CGPTO M 4559 -XXX FED AID PROJECT N0 345 345 500' SOUTH OF LINCOLN AVENUE TO ROOSEVELT STREET Remove and resurface roadway; curb and gutter and sidewalk repair; replace traffic loops; pavement markings signing 16 ; 31 NORTH STH AVENUE 5 ;B,D,F,G ; 0.85 LINCOLN AVENUE TO "I" STREET Pavement rehabilitation curb and gutter modifications; sidewalk modifications; street light modifications; utility adjustments; pavement markings; signing I,J,K,M 16 ; 32:YAKIMA AVENUE ; 45 ; A,B,D,F; 0.60 ' X ; U ;7TH AVENUE TO 16TH AVENUE 6 G,H,I,J ;Pavement removal and replacement; drainage adjustments; utility adjustments; curb K ;and gutter and sidewalk repair; street light and signal system adjustment, :upgrade and installation; pavement markings; signing; bus pullout I UTILITY PED AID PROJECT N0. CODES CGPTO ; M -4555 -XXX 1ST 2ND YEAR TNRU ANNUAL 6TH ELENT ; YEARS 8 P.E. 9 R/W 8 CONST 8 TOTAL 8 P.E. 8 8 RAW 8 CONST 8 TOTAL 1057: 1051: 8 P.E. 8 8 R/W UTILITY PED AID PROJECT N0 8 CODES 0 CONST 8 CGPTO ; ; M 4641 -XXX 8 TOTAL I 8 656 656, 8 P.E. 8 8 RAW UTILITY PED AID PROJECT N0. 8 CODES 88 CONST CGPTO ; ; M -4690 -XXX 8 TOTAL 8 8 CITY OF CITY N0, 1485 COUNTY NO, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0, I I Innnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn I I P 1 ;F R DRAFT U I II '.nnnwnwnnnnnnnnnnl.*.A**nnn*nn•nn*n I N C ;C L;R; T A ; I I S ; T' 0 S ; Y ,N I A N L 0 PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK 14 33 SOUTH FIRST STREET M A J 0 0 F R C 0 L R A K TOTAL WORK ; LENGTH CODES : (MI) S I I I I 5 ;B,D,F,G ; 0,85 11 I 1 I I 1 1 MEAD AVENUE TO WASHINGTON AVENUE Pavement rehabilitation curb and gutter modifications; sidewalk modifications; street light modifications; utility adjustments; pavement markings; signing PROJECT COSTS IN THOUSANDS OF DOLLARS 8 FEDERAL OBLIGATION PLAN C SOURCE OF FUNDS 8 ; 8 , I I I 8 TOTAL RAP ; 8 FUNDS CAPP ; 8 ; 1ST 2ND UATA ; 8 ; YEAR THRU LOCAL TIA ; FEDERAL, ; ANNUAL 6TH FUNDS FUNDS ; FUNDS 8 ; ELEMT YEARS 8 I I R I 1556; 1556; ; ; 8 P.E, tl 8 R/W 1 CONST 8 TOTAL A ; U EXPENDITURE FOR ALL FUNDING TYPES R R ; D 1994 1995 ; 1996 97-99 Y' 1 I I V T 44TH, E A ; 5TH R T , IST 2ND ; 3RD AND U ; YEAR YEAR ; YEAR 6TH (X! S ; YEARS I,J,K,M 14 ; 34 WASHINGTON AVENUE 23 ; A,B,D,F; 1,88 1 1 1 1 1 1 1 I I 16TH AVENUE TO 45TH AVENUE 456 G,H,I,J Widening; channelization; pavement removal and replacement; drainage adjustment; K utility adjustments; curb and gutter; sidewalk; street lights and signal system adjustments and upgrade; bus pullout; pavement markings; signing 17 ; 35 POWERHOUSE ROAD 34 ;A,B,D,F ; 0,40 ; U 1 I I 1 1 1 I I I 1 LINCOLN AVENUE TO ENGLEW00D AVENUE 5 G,H,I,J Widening; pavement widening and resurfacing; grading; drainage; curb and gutter; K sidewalk; street lights; utility adjustments; bus pullout; pavement markings; signing; pedestrian signal 19 36, YAKIMA AVENUE I I I I 45 ;B,D,F,G ; 0,40 ; I I 1 1 1 I I 1 1 I IST STREET TO 6TH STREET Remove and replace pavement surface; curb and gutter and sidewalk repair; utility adjustment; drainage adjustments; street lights; signal system adjustments and upgrade; pavement markings; signing I I I UTILITY CODES CGPTO ; ; M 4579 -XXX . I FED AID PROJECT N0 8 2785; 2785; ; 8 P.E. 1 1 8 I I 1 1 1 V 8 R(W UTILITY FED AID PROJECT N0, 8 CODES 8 CONST CGPTO ; ; M -4558 -XXX 8 TOTAL I i 1 1 I 1194; 1194; 1 i I 1 1 I I i 1 I 1 1 1 � I UTILITY CODES 8 P.E. 8 RAW FED AID PROJECT N0, 1 8 CONST 8 TOTAL 8 , 8 P.E. CGPTO M -4660 -XXX I 1 650: 650; 1 I UTILITY CODES CGPTO , R/W FED AID PROJECT N0, , 8 CONST 0 TOTAL -XXX 8 CITY OF Yh. CITY N0, 1485 COUNTY N0, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0, ;P F ;R U I N C 0 C L, R T A I I S 0 S : Y N, A ;N L ;0 DRAFT L* PROJECT IDENTIFICATION / DESCRIPTION OF WORK 16 ; 37:LINCOLN AVENUE AT NORTH 28TH AVENUE I I I I 101F N ; 1610 A IRI J 0 ;R; 0 F Y R IDI 1 I V1 I C 0' 1 I E L R ; TOTAL R A K ; WORK LENGTH S ; CODES (MI) :(X) 1 I 1 N D S T A T U S 6 18,D,0,0 ' SIG P I 17 38 Signalization; curb and gutter modifications; sidewalk modifications street light modifications; utility adjustments; pavement markings; signing ENGLEWOOD AVENUE PROJECT COSTS IN THOUSANDS OF DOLLARS 8 FEDERAL OBLIGATION PLAN EXPENDITURE FOR ALL FUNDING TYPES 1994 ; 1995 1996 97-99 I I 1 1 I 1 I I 1 I I I 4TH,I I I 5TH 1ST ; 2ND ; 3RD ; AND YEAR YEAR YEAR ; 6TH YOARS 188 TOTAL FUNDS 188; I,J,K,M , I I 24 ;A,B,D,F ; 1,63 SOURCE OF FUNDS 0 I 1 I I I 1 8 I 1 RAP 8 CAPP ; 8 1ST UATA ; 8 YEAR LOCAL ; TIA ; FEDERALO ; ANNUAL FUNDS FUNDS ; FUNDS 8 ; ELEMT 8 I I I 32; 1568 P,E, - 8 8 R/W UTILITY FED AID PROJECT NO 0 CODES 8 CONST I I CGPTO ; ; M 4648-X0X 8 TOTAL i # 8 -1 8 I I I 40TH AVENUE TO 66TH AVENUE 56 G,H,I,J Widening; pavement removal and replacement; grading; drainage; curb and gutter; K sidewalk; street lighting; utility adjustments; bus pullout; pavement markers; signing 17 ; 39 48TH AVENUE i I , I I 24 :A,B,D,0 : 1,60 1 I I WIDE HOLLOW CREED TO SUMMITVIEW 5 G,H,I,J R/W acquisition; widening; pavement widening and resurfacing; grading; drainage; K curb and gutter; sidewalk; street lights; utility adjustments; signal systems pavement markings; signing; bus pullout 17 40 YAKIMA AVENUE ;1 -1 2919 2919 I 1 UTILITY CODES CGPTO ; M -4652 -XXX I 1 FED AID PROJECT N0, 4515 4515; 45 i6,8,D,F 16TH AVENUE TO 32ND AVENUE G,H,K Replace concrete pavement with A.C, pavement; sidewalks; curb and gutter; utility adjustments; street lights 1,00 ; ; U I I 1 I I I I I I 1 I I UTILITY CODES CGPTO 0 P,E. 8 R/W 8 CONST 0 TOTAL 8 -8---- I 8 P.E. 8 2ND THRU 6TH YEARS 191 137; 156 8 RIW FED AID PROJECT N0. 8 8 CONST M -4587 -XXX 8 TOTAL 13031 1303 1 I UTILITY FED AID PROJECT N0, CODES CGPTO 0 -4628 -XXX I I I I I 1 I I 8 8 8 P.E. 8 R/W 8 CONST 8 8 TOTAL CITY 0) CITY N0, 1485 COUNTY N0. 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION NO, F N C C L T A I S os N A L P' R 0 R T � 0 DRAFT y PROJECT IDENTIFICATION / DESCRIPTION OF WORK M A J 0 0 F P, C 0 L R A K TOTAL WORK LENGTH CODES (MI) C F PROJECT COSTS IN THOUSANDS OF DOLLARS A U ' EXPENDITURE FOR ALL FUNDING TYPES R 0 D 1994 1995 1996 97-99 I 1 D I S I 1 V E A R T 1ST 2ND 3RD U YEAR YEAR YEAR (X15. 0 FEDERAL OBLIGATION PLAN @ SOURCE OF FUNDS @ 4TH, TOTAL 5T11 FUNDS AND 6TH LOCAL YEARS FUNDS RAP CAPP DATA TIA FUNDS 16 ; 41 EAST G STREET NORTH 1ST STREET TO NORTH 8TH STREET Rehabilitate pavement surface; drainage and utility adjustments; pavement markings; signing 45 ;8,0,7,0 ; 0,47 ; U 1 I I I 1 I I J,K 741) 741 17 42 SOUTH 6TH STREET YAKINA AVENUE TO SOUTH FIRST STREET Pavement rehabilitation curb and gutter modifications; sidewalk modifications; street light modifications; utility adjustments; pavement markings; signing 17 43: ENGLEWOOD AVENUE 45 :8,0,7,0 0,85 1 1 ; I I I I I I,J,K,M 24 ;A,B,D,F ; 0.68 I 16 ; 44 I I I I POWERHOUSE ROAD TO 40TH AVENUE 5 G,H,I,J Widening; right -of way aquisition; pavement removal and replacement; grading; K drainage; curb & gutter; sidewalk; bridge widening SOUTH 16TH AVENUE 1 1 1 I i 1 I I I I I I I I 1 I 1 1 I 1 I I I I I I 1 1 I I 24 ;A,B,D,F 1, 0,50 : U UTILITY FED AID PROJECT N0, CODES CGPTO ; M 4684 -XXX i 1 I I 2056) 205611 @ @ @ @ @ @ FEDERAL@ FUNDS 0 @ @ P,E, @ (ST YEAR ANNUAL ELEMT 2ND TIIRU 6TH YEARS 0 RAW @ CONST @ @ TOTAL @ @ UTILITY FED AID PROJECT N0 CODES CGPTO ' N 4637 -XXX 1370; 1370 I 1 1 I 1 I I I I WEST WASHINGTON AVENUE TO AHTANUN ROAD 5 G,H,I,J Widening; grading; drainage; utility adjustments; curb and gutter; sidewalk; K street lights; pavement markings; signing; signalization JOINT PROJECT WITH YAKINA COUNTY I 1 I 1 UTILITY FED AID PROJECT N0, CODES 1 CGPTO N -4652 -XXX 820) 820 UTILITY CODES CGPTO 9 P.E. 8 R/W 0 CONST @ TOTAL @ 0 P.E. @ R/W @ 0 CONST @ 8 TOTAL @ P,E, @ @ R/W FED AID PROJECT N0. 0 0 CONST @ M 4555 -XXX @ TOTAL 0 @ @ 1 C L IR I T A I I S ; T 0 S; Y N' A N L (1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TU 1999 CITY OF . -..A CITY N0, 1485 COUNTY N0, 39 ^m r , 'n 1. 'n'�In�'i n"n'n li • PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK HEARING DATE: JULY 27, 1993 17 45 PECHTER ROAD '1 A 0 A S S Wi 0 R' K' ADOPTION DATE RESOLUTION N0. ?MEETP°'''OOT COSTS '8 TENSA o•`' DN' "R'• 8 FEDERAL OBLIGATION PLAN ' ,,,, 117 ihl luUluW L I EXP£; Drm'C, uR A'.i, . ,,, " ',, I a f.' T ESA TOTAL R T WORK LENGTH ; ; U CODES : (MI) (X) : S I I I 1 I I ;A,B,D,P ; 0,42 ; U I 1 I I I I I NORTH 40TH AVENUE TO SENIC DRIVE G,H,I,J ;Widening; pavement removal and replacement; grading; drainage; curb and gutter; K ;sidewalk; street lighting; utility adjustments; bus pullout; pavement markers; ;signing 14 46:FRUITVALE BOULEVARD ; 45 ;A,B,D,P ; 1.00 : ; U I I I I I I I ;NORTH 5TH AVENUE TO NORTH 40TH AVENUE 6 G,H,I,J ;Pavement removal and replacement; drainage adjustments; utility adjustments; K curb, gutter and sidewalk repair; street light and signal system adjustment and upgrade; pavement markings; signing; bus pullout ;JOINT PROJECT WITH YAKIMA COUNTY 14 47:NOB HILL BLVD. 1 i I I 1 I 1 I I 1 24 11IA,B,D,F 1.60 U 1 1 I I I :S 1ST ST, TO YAKIMA RIVER ;Reconstruction and widening involving grading; drainage; pavement; curb and gutter; 'sidewalks; street lights; signalization; channelization; signing; utility adjustments; path/bike way; bridge modifications G,H,I,J K,L,N 1 I I I i 1 1 1 1ST ; 2ND 3RD YEAR : YEAR YEAR 5TH FUNDS AND 6TH YEARS II 48:WASHINGTON AVENUE ; 24 ;A,B,D,P � 0,50 : U 1 I 1 I 1 I ;SOUTH FIRST STREET TO SOUTH 14TH STREET 5 G,H,I,J Widening; right-of-way aquisition; grading; drainage; utility adjustments; K ;curb & gutter; sidewalk; street lights; pavement markings; signing; signalization ;JOINT PROJECT WITH ENfuN CAP I 1 1435; 1435: 1 1 1 I UTILITY CODES CGPTO CAPP 8 DATA 1 8 LOCAL ; TIA FEDERALB FUNDS FUNDS FUNDS 8 8 I I 8 P,E, , 8 8 R/W PED AID PROJECT N0, 8 8 CONST 8 M 4669 -XXX 0 TOTAL 0---- 8 4461 4461: 8 P.E, 1 8 I I P 8 R/W FED AID PROJECT N0, 8 8 CONST 8 UTILITY CODES CGPTO : N 4606 -XXX 8 TOTAL 8 1ST 2T,1 YEAR MI; ANNUAL ; 6TH ELEMT ; YEARS 8 I 1 8 5055; 5055: 8 P,E. 1 1 1 1 I UTILITY CODES CGPTO 8 RAW PED AID PROJECT NO. 8 8 COO 8 N -4566 -XXX B TOTAL 8 Y 2257; 2257' 8 P.E. 1 I 0 8 R/W UTILITY PED AID PROJECT N0. 8 CODES 9 COO CGPTO : N 4558 -XXX 8 TOTAL I 1 8 CITY OF - A CITY NO, 1485 COUNTY NO, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM '9'14 TO 1999 HEARING DATE: JULY 27, 1993 - ADOPTION DATE RESOLUTION NO, — F ;R U ;I N C;0 C L; R T A I S 0 S N A ;N L ;0 19 DRAFT nnnny111111A******nnnn******nnnn ^nnnn *nnnn PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK N A J0 0 F R C 0 L R A K ; WORK S ; CODES S TOTAL LENGTH (MI) C A R R Y 0 V E R (X) U N D S T A T U S 49; CHESTNUT AVENUE ;1ST STREET TO 6TH STREET ;Remove and replace pavement surface; curb and gutter and sidewalk repair; :utility adjustment; drainage adjustments; pavement markings; signing 45 :B,D,F,G 0,40 I I 1 I PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL OBLIGATION PLN EXPENDITURE FOR ALL FUNDING TYPES 1994 1995 1996 ; 97-99 I I I I I I I 1 1ST ; 2ND YEAR ; YEAR 3RD YEAR 4TH, 5TH AND 6TH YEARS TOTAL FUNDS 19 SO:NORTH 2ND AVENUE 19 I I 45 ;B,D ; 0,10 ; ; U I I I I I I I 335 UTILITY CODES CGPTO 335 SOURCE OF FUNDS 8 8 1 1 ; CM RAP ; 0 CAPP ; 0 UATA 0 LOCAL ; TIA ; FEDERAL() FUNDS ; FUNDS ; FUNDS 0 1 { 8 I I 8 PE, 8 8 RIW PED AID PROJECT NO. 10 CONST 8 -XXX 8 TOTAL 8 8 ; 0 0 P.E. 69; 69 ;LINCOLN AVENUE TO 'D' STREET ; 8 R/W ;Rehabilitate pavement surface; drainage and utility adjustments; pavement markings; UTILITY FED AID PROJECT NO. 0 ' signing CODES 0 CONST 8 51 2ND AVENUE LINCOLN AVENUE TO WALNUT STREET Rehabilitate pavement surface; drainage and utility adjustments; pavement markings; signing 14 52 NORTH 40TH AVENUE 1 i 1 I 1 I I 1 i I I 1 1 I I 1 45 ;B,D ; 0,47 ; ; U 1 I I I I I I I I I 1 I I I 1 1 I 1 _.-"----I- I 1 1 24 ;A,0,D,F ; 0,51 ; ; P I I I I I I I I I I FRUITVALE BOULEVARD TO POWERHOUSE ROAD 5 G,H,I,J R/W acquisition; widening; pavement widening and resurfacing; grading; drainage; K curb and gutter; sidewalk; street lights; utility adjustments; signal systems pavement markings; signing; bus pullout CGPTO -XXX ; 0 TOTAL 8 1 1 I 8 423; 423; ; 0 P,E, ; 8 8 R/W UTILITY FED AID PROJECT N0, 8 CODES 6 CONST CGPTO ; -XXX ; 0 TOTAL 8 1 1 1 1 1 1 1 1 1 1 1 1ST YEAR ANNUAL ELEMT 2ND THRU 6TH YEARS 1322; 1322; 225; ; 10916 P.E. i 1 I I 0 R/W UTILITY FED AID PROJECT N0 8 CODES 6 CONST CGPTO ; ; H 4519 -XXX ; 0 TOTAL 1 1 8 I 1 I Y I 1 1 V 132 966 1097 CITY OF CITY N0. 1485 COUNTY N0, 39 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 HEARING DATE: JULY 27, 1993 ADOPTION DATE RESOLUTION N0, N C C L T A I S 0 S A L P R 0 R T 0 111111111111113111AA111A111111A1 DRAFT PROJECT IDENTIFICATION / DESCRIPTION OF WORK 17 531NORTH 40TH AVENUE A J 0 0 P R W C 0 L R A K WORK CODES TOTAL LENGTH (MI) C A R R Y 0 V E R (X) 24 A,B,D,F 0,45 U N D T A T U S PROJECT COSTS IN THOUSANDS OF DOLLARS 0 FEDERAL OBLIGATION PLAN EXPENDITURE FOR ALL FUNDING TYPES 1994 1995 1ST YEAR 2ND YEAR 1996 3RD YEAR 97-99 4TH, 5TH AND 6TH YEARS TOTAL FUNDS SOURCE OF FUNDS 8 LOCAL FUNDS RAP CAPP UATA TIA FUNDS 1490 1490 1490 f 8 8 8 8 FEDERALO FUNDS 8 8 ;POWERHOUSE ROAD TO ENGLEWOOD AVENUE 5 G,H,I,J ;R/W acquisition; widening; pavement widening and resurfacing; grading; drainage; K ;curb and gutter; sidewalk; street lights; utility adjustments; signal systems ;pavement markings; signing; bus pullout 19 ; 54; 4TH STREET 1 1 I I 1 1 I 1 1 I I 45 :B DI0.61 : U 1 1 1 I I I UTILITY PED AID PROJECT N0. CODES I I CGPTO ; -XXX 315: 375 1ST 2ND YEAR THRU ANNUAL 6TH ELEMT YEARS 8 P,E, 8 B R/W 8 CONST 8 TOTAL 8 0 P,E, ;WALNUT STREET TO PACIFIC STREET ; 0 RIO ;Rehabilitate pavement surface; drainage and utility adjustments; curb and gutter UTILITY PED AID PROJECT N0. 0 - ;sidewalk repair; pavement markings; signing ; CODES 0 CONST CGPTO ; -XXX 8 TOTAL 8 --_1_..--- -_I--- I - I 551 1 I 1 1 1 1 I 1 1 1 1 1 1 1 I 1 I I I I i I I I 1 I I I I I I I 1 1 1 1 1 1 I 1 I I 56 UTILITY FED AID PROJECT N0 CODES -XXX UTILITY FED AID PROJECT NO CODES -XXX 8 d P.E, 8 RAW 8 8 CONST 8 88 TOTAL 8 P,E, 8 RIO 8 CONST 8 8 TOTAL 0- 0---- 1ST - SIX YEAR iRANSPORiAT10W IMPROVEMENT PROGRAM a9 CITY /COUNTY CITY NO. COUNTY NO. HEARING DATE ADOPTION DATE RESOLUTION NO. F U N C T A 1 S O S N L P R 1 R 1 T Y N 2 PROJECT IDENTIFICATION/DESCRIPTION OF WORK 3 M AO 0J F R W O R A K S 4 WORK CODES 5 TOTAL LENGTH (MI) 6 C u AN R V N OG V R T X T S 7 8 PROJECT COSTS IN THOUSANDS OF DOL.I EXPENDITURE PLAN FOR ALL FUNDING TYPES SO 1ST YEAR 9 2ND YEAR 10 3RD AND 4TH YEAR 11 5TH AND 6TH YEAR 12 TOTAL FUNDS 13 LOCM FUND 14 11 City Ave./Street Namer Number Coon( goad Name or Number 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111111 1 1 L I I Li 1 1 1 1 LLl 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 III L1 1 1 1 1 11 1 L It 1 1_1_1 1 1 1 1 1 I I I 1 I I I I Beginning and Ending Termini 17 1 CODES 18 Describe Work to be Completed Describe Work to be Completed Describe Work to be Completed 111 11111111111111111111 1111111111111111111111111111111111 1111 1111 1111 1111 1111 11111 11 I► 111 Beginning and Ending Termini 17 UIILIIY CODES 18 Describe Work to be Completed 1111 1 Describe Work to be Completed Describe Work to be Completed 111 11111111111111►11111111111111111111111111111►111111111 1 111 111'1 I'LL 1111 1111 11111 11 11 111 Beginning and Ending Termini 17 1.11ILIIY CODES 18 Describe Work to be Completed 1 111 I Describe Work to be Completes Describe Work to be Completed II 11111111111111111111 1111111111111111111111111111111111 I III 1111 1111 ►III 1111 11111 11 II 111 Beginning and Ending Termini 17 UIILIIY CODES 18 Describe Work to be Completed 11111 ► Describe Work to be Completed Describe Work to be Completed JJJI 111111111111►111111►I1111111111ILL111►11111111►11111►1 1 111 1111 1 111_1 I►11_11111 11111 11 11 111 Beginning and Ending Termini __ 17 U/ILIIT CODES 18 Describe Work to be Completed 1 1 1 11 1 Describe Work to be Completed Describe Work to be Completed DOT 140-049 REVISED 5/91 DISTRIBUTION BY AGENCY:2 COPIES DISTRICT LOCAL PROGRAMS ENGINEER 1 COPY URBAN ARTERIAL BOARD 1 COPY C.R.A.B. (COUNTIES ONLY) 1 COPY M.P.O HEADING City/County . . . . .. . Enter name of local agency and appropriate county County Number .... . . . .. Enter the O.F.M. assigned number in code blocks. City Number .. Enter the O.F.M. assigned number in code blocks. Hearing Date: . .. Enter the date of action by the City Council or County Legislative Authority. Adoption: . . . . . Enter the date of action by the City Council or County Legislative Authority Resolution Number. . ... . Enter City Council or Co. Legislative Auth. resolution number (if applicable). COLUMN NO. 1 2 3 4 5 6 7 8 9 thru 12 Functional Classification Rural (under 5,000) Code Block . Enter the appropriate two digit code denoting the Federal Functional Classifications (Note: The Federal Functional Classifications shown on the official functional classification maps prepared by WSDOT.) Urban (Over 5,000) Code Block 1 2 Description 1 O 1 Principal Arterial—Interstate 1 O 2 Principal Arterial—Other (State) I O 6 Minor Arterial I O 7 Major Collector (FAS) I O 8 Minor Collector I O 9 Local (Access) 1 2 1 2 4 6 7 9 Local—(Access) Description Principal Arterial—Interstate Other Freeways Principal Arterial—or Expressways Principal Arterial—Other (FAM) Minor Arterial—(FAM) Collector -(FAM) (Note: If Rural or Urban Arterial Trust Funds (Col. 15) are to be used as funding source, the appropriate code number must be shown.) Priority No. . . Enter local agency project identifying numbers in priority order Project Identification . Enter appropriate information noted. Major Class of Work Enter the appropriate code number(s). 1 New construction on new alignment 6. Traffic control 2. Major widening (additional lanes) 7 Capital purchases 3. Minor widening (increase lane width, add shoulders) 8. Non capital improvements 4. Rehabilitation/reconstruction 9. Non motor vehicle use 5. Resurfacing Work Codes . A. Grading B. Draining C. Light Bituminous Surface D A.C. or P.C.C. Pavement E. Sealcoat F Curbs & Gutters G. Sidewalks H. Channelization I. Signalization J. Lighting K. Signing F P U. Total Length in Miles Carryover Project Funding Status . Funded Proposed for Funding. Funding is1Unknown Enter appropriate code letter(s). L. Bridge M. Landscaping N. O. P Q. R. S. T U. 10. Transit Capital Project 11 Transit Operating Project 12. Transit Planning Project Paths & Trails Bikeways Transit Facility Car/Van Pool Program High Occupancy Vehicle Lanes Surveillance Control & Driver Information Ferry Facility Project Studies Enter Length of project to nearest hundredth. . Enter (x) if project is carried over from previous year. (Funds were planned for expenditure but were not expended during previous year.) Use the funding code that best describes the likelihood of this project being constructed. years) Enter the estirnated project costs (in thousands of dollars) planned for (1st, 2nd, 3rd, 4, 5 & 6th 13 Total Funds . 14 thru 16 Funding by Source C. CAPP T TIA R. RAP U. UATA 17 Utility Codes 18 19820 C. G. P T S. W 0 expenditure in each year Enter total project cost. (This should equal Col. 9-12. It should also equal Col. 14-16.) Enter the dollar amount (in thousands of dollars) planned to be programmed under the appli- cable funding source column in appropriate coding blocks. For CAPP, RAP, etc. use the code followed by the amount. (The Federal programs require completion of Federal Obligation Plan, Columns 18 thru 20.) Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by proposed construction of the project. Cable (TV) Gas Power Telephone Sewers (Other than Agency Owned) Water Other Federal Project No. (xxxx-xxxx-xxx) ( A - 11 - C ) A.(4) B.(4) . C.(3) Federal Funding Obligation DOT 140-049 (BACK) 0x A-250 Program=BROS, BRM, BRS, RS, M, HES, RPP, RRS, etc. Route=Federal Route Number Sequence=Assigned at fund approval stage by State Aid. P.E. = Enter the amount (in thousands of dollars) of the proposed Federal funds to be obligated in the appropriate column. (This item should not include any phases for which Federal funds have already been autho- rized.) R/W = (Same as P.E.) Const = (Same as P.E.)