Loading...
HomeMy WebLinkAboutR-1993-071 TransportationRESOLUTIOI'Z NO. R-93 71 A RESOLUTION fixing the time and place for hearing on a Six Year Transportation Improvement Program for the period of 1994 through 1999. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, a public hearing must be held on said program before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That said program shall be presented for hearing and determination on Tuesday, July 27, 1993, at the hour of 2:00 o'clock p.m. on said day, in the Council Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may be heard, and that notice of such hearing be given as provided by law. ADOPTED BY THE CITY COUNCIL this 6th day of July 1993. ATTEST: CITY CLERK T-ENGR-I TIP 2 -- 7/2/93 MAYOR oDPAF1 CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM —1994 TO 1999 Total Length (MI) Project Costs in Thousands of Dollars Fund Status Expenditure Types for all Funding Source of Funds Prior- ity No. Project Identification Description of Work 1994 1st Year 1995 2nd Year 19% 3rd Year 97-99 4th, 5th & 6th Years Total Funds Local Funds RAP CAPP UATA TIA Funds Federal Funds 1 Yakima Avenue/I-82: Interchange Area Modify Interchange 0.78 F 5,880 2,173 8,053 1,207/ 6,442 404 2 Fair Avenue: Yakima Avenue to Nob Hill Blvd. Widen/Reconstruct 1.35 F 1,970 1,970 __/ 394 1,576 3 Signal Upgrade/Firelane Pre-Emption/Street Lights Modify Existing Signals N/A P 30 30 30 90 180 180 4 Sidewalk Safety Program New Sidewalks N/A P 10 10 10 30 60 60 5 Bikeways: Greenway Bikeway/City Pathway and Bike Improve Bikeways --N/A P 10 10 10 6 Bus Stop Zones -- Transit Bus Stops N/A P 75 75 75 225 450 450 7 Storm Drainage: Provide for Rehabilitation of Existing Systems Rehabilitate Drainage N/A P 15 5 5 15 40 40 8 Mead Avenue: 16th Avenue to llth Avenue Widen/Reconstruct 0.50 B 1,035 1,035 198 792 9 Nob Hill Boulevard at South 48th Avenue New Signal SPOT F 600 600 289 311 10 Pacific Street: South 3rd Street to Fair Avenue Widen/Reconstruct 0.60 408 408 78 312 11 "I" Street: North 1st Street to 5th Avenue Widen/Reconstruct 0.32 720 720 108 612 12 Summitview Avenue at North 48th Avenue New Signal SPOT B 209 209 13 Mead Avenue at South 16th Avenue New Signal SPOT B 178 178 14 North 16th Avenue at River Road New Signal SPOT 209 209 200 T-ENGR-I TIP 1994 to 1999 Page 1 -- 7/2/93 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue All Others Funded DRAFT CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM —1994 TO 1999 Total Length (MI) Fund Status Project Costs in Thousands of Dollars Expenditure T for all Funding p • s Total Funds Source of Funds Prior- it., No. Project Identification Description of Work 1994 lst Year 1995 2nd Year 1996 3rd Year 97-99 4th, 5th & 6th Years Local Funds RAP CAPP UATA TIA Funds Federal Funds 15 Yakima Avenue at 9th Street New Signal SPOT B 209 209 16 West Lincoln Avenue: Pierce Avenue to North 18th Avenue Rehabilitate Pavement 0.68 B 1,106 1,106 17 Yakima Avenue: 1st Street to 7th Avenue Rehabilitate Pavement 060 B 90 890 980 18 "B" Street: Pierce Street to North 1st Street Realign/ Rehabilitate 0.65 789 789 19 Lincoln Avenue: Pierce Street to North 1st Street Rehabilitate Pavement 060 B 902 902 20 South 3rd Avenue: Washington Avenue to Nob Hill Boulevard Rehabilitate Pavement 1.00 B 1,346 1,346 21 Naches Avenue: Walnut Street to Lincoln Avenue Rehabilitate Pavement 0.95 B ,�„ JAL' ,o„ �:� 22 North & South 8th Street: "D" Street to Chestnut Avenue Rehabilitate Pavement 0.47 628 628 23 "B" Street: North 1st Street to 10th Street Rehabilitate Pavement 0.80 590 590 24 Lincoln Avenue: North 1st Street to 10th Street Rehabilitate Pavement 0.80 570 570 25 South 3rd Avenue at Division New Signal SPOT 235 235 26 16th Avenue: 500' South of I.inrnln_ Avenue t_n_ Rnncevelt Street Rehabilitate Pavement 0.30 B 345 345 27 North 5th Avenue: Lincoln Avenue to "1" Street Rehabilitate Pavement 0.85 13 1,057 1,057 T-ENGR-1 TIP 1994 to 1999 Page 2 -- 7/2/93 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue All Others Funded DRAFii CITY OF YAKIMA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM —1994 TO 1999 Total Length (MI) Project Costs in Thousands of Dollars Expenditure Types for all Funding Source of Funds Prior- ity No. Project Identification Description of Work Fund Status 1994 1st Year 1995 2nd Year 1996 3rd Year 97-99 4th, 5th & 6th Years Total Funds Local Funds RAP CAPP UATA TIA Funds Federal Funds 28 Yakima Avenue: 7th Avenue to 16th Avenue Rehabilitate Pavement 0.60 B 656, 29 South 1st Street: Mead Avenue to Washington Avenue Rehabilitate Pavement 0.56 B 1,556 1,556 30 Washington Avenue: 16th Avenue to 45th Avenue Widen/Reconstruct 1.88 B 2,785 2,785 31 Powerhouse Road: Lincoln Avenue to Englewood Avenue Widen/Reconstruct 0.40 B 1,194 1,194 32 Yakima Avenue: 1st Street to 6th Street Rehabilitate Pavement 0.40 B 650 650 33 Lincoln Avenue at North 28th Avenue New Signal SPOT 188 188 31 149 Englewood Avenue: 40th34 Avenue to 66th Avenue Widen/Reconstruct 1.63 2,919 2,919 35 48th Avenue: Wide Hollow Creek to Summitview Avenue Widen/Reconstruct 1.60 4,515 4,515 Yakima Avenue: 16th Avenue to 32nd Avenue Rehabilitate36 Pavement 1.00 1,303 1,303 37 East "G" Street: North 1st Street to North 8th Street Rehabilitate Pavement 0.53 741 741 38 South 6th Street: Yakima Avenue to South 1st Street Rehabilitate Pavement 1.51 2,056 2,056 39 Englewood Avenue: Powerhouse Road to 40th Avenue Widen/Reconstruct 0.68 1,370 1,370 T-ENGR-I F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue All Others Funded TIP 1994 to 1999 Page 3 -- 7/2/93 DRAFT Ca p'Y OF YAKIMA SIX YEAR TRANSPORT & `'1 1," P OVEMFNT PROGRAM w. t u .r t999 Prior - it; No. 40 Proizo1 He.Vcificatie South F66: Avenue: West Washington Avenue to Ah anum : oad F..echter Avenue to ."..: sic D .cLb i.ii�a of Work ic€!'JRecc^.:struct Widen/Reconstruct Fruitva .� ,� ,_ : :,, :..,c :<&,eha°:Aitate 5th •- veivacE, i''avemez, Total Fond Status 1st Year Pro e_ Costs in h:> :isands of Dollars -€rre for all Funding Source of Funds s 1996 97-99 4th, 5th & 6th Total Local Years Funds r&yids 3rd Year Year 1.06 0.42 2.18 .struct 1.60 1sLL .o South.a Y. Street+ �i�'yden/Recce .:struct 45 46 47 48 49 50 s• tv tiara to Frsa u. bo v; „ t;o Powe; hotlaz Road i a e•evu:eM ' ''pavement :Zehabilitate Pavement 1.06 0.57 0.51 North 40th Avenue: Widen/Reconstruct 0.45 Powerhouse- Road to Englewood Avenue 4th Street: Walnut Street to Pacific Street "I" Street: 5th Avenue to 16th Avenue 820 820 1,435 1,435 1 -9 4, 6, ' `= 2,257 1 247 335 335 r RAP I "A' L! ATA TIA Federd9. PontFundsH -1 RehabilitaC,- Pavement 0.61 375 375 Widen/Reconstruct 0.57 1,140 1,140 171 10,962 4,874 5,661 40,454 61,951 ' 2,96S 10,703 1,314 T-ENGR-I TIP 1994 to 1999 Page 4 — 7/2/93 F - Funded P = Potentially Funded B = Potentially Funded with Bond Revenue All Others Funded