Loading...
HomeMy WebLinkAboutR-1993-052 Railroad Area-93-52 RESOLUTION NO. A RESOLUTION authorizing execution of a contract for engineering service with PLSA Engineering & Surveying. WHEREAS, the City of Yakima has need for consulting engineering services for the "Yakima Railroad Area - Public Domestic Water System Extension" design; and WHEREAS, the City does not possess adequate in-house engineering staff to perform the necessary design of the aforementioned public domestic water system extension; and WHEREAS, the City of Yakima has complied with the provisions of RCW 39.80 which concerns a procurement of engineering and architectural services by a city; and WHEREAS, the City Council deems it to be in the best interest of the City to contract with PLSA Engineering & Surveying for the design services on a portion of the "Yakima Railroad Area - Public Domestic Water System Extension" now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager, City Clerk, and Director of the Department of Engineering and Utilities are hereby authorized and directed to execute the attached and incorporated "Agreement" together with its attachments, including Task Orders 1 and 2. ADOPTED BY THE CITY COUNCIL this 1ST day of JUNE 1993. ATTEST: Mayor City Clerk AGREEMENT This Agreement, made and entered into this day of 199 , by and between the City of Yakima. Washington, hereinafter called the "CITY", and PLSA Engineering & Surveying , Consulting Engineers, hereinafter called "ENGINEER", is for the provision by the Engineer to the City of professional services in support of City's Yakima Railroad Area - Domestic Water Service Extention Project, under Ecology Grant #G9300117. In consideration of the covenants and agreements contained herein, and the terms and conditions hereof, the parties agree as follows: 1....SERVICES Engineer shall provide the City, professional consulting engineering services through a series of task orders as provided in Section 2, below. The professional services to which the parties may agree by task orders may include, but are not limited to those listed in Exhibit A, attached hereto and by this reference incorporated herein. 2....TASK ORDERS Prior to commencement of any services, the City and Engineer shall mutually agree upon and execute a task order for the specified services. The task order shall describe the services to be provided, the time for performance of the service, the provisions for fees for the services, and any provisions additional to this agreement. Execution of this Agreement and Task Order No., 1 by the City and the Engineer authorizes the Engineer to proceed with the services described in Task Order No., 1. Execution of each subsequent task order shall incorporate each subsequent task order into this agreement. The execution of this agreement does not obligate either of the parties hereto to provide or accept any services unless and until the parties have mutually agreed upon and executed a specific task order for such services. 3....TIME PERIOD FOR PERFORMANCE OF SERVICES The Engineer shall commence such services as are described on executed task orders in accordance with the time schedule set forth therein, and shall proceed with the provision of such services in a diligent manner. The Engineer shall not be responsible for delays caused by factors beyond the Engineer's control or which could not reasonably have been foreseen by the parties at the time the task order was executed. The anticipated schedule for the project is shown as Exhibit B. 4....PAYMENT TO ENGINEER A. Fees for Services. In each specified task order executed by the parties, the parties shall specify payment to the Engineer for services performed by either (1) agreeing to a fixed fee amount , or (2) agreeing to pay the Engineer utilizing the hourly rate and expense schedule. "Fee Schedule", attached VTRIRR69' hereto as Exhibit C and by this reference incorporated herein. Said fee Schedule is subject to revision by the Engineer not sooner than one year after the execution of this agreement, and no more that once each year thereafter. Under the fee schedule method, the parties shall agree on an amount which represents the maximum fee to which Engineer shall be entitled under that task order. That amount shall represent the best estimate of the parties of the maximum cost of the Engineer's services specified in that task order. In the event the cost of services will exceed that estimate, the Engineer shall advise the City in advance, and in writing of such excess costs and shall provide no services in excess of the original estimated costs, without.written approval of the City. B. Estimated Fees. The estimated fees for anticipated task orders are shown on Exhibit A. C. Renegotiation of Fees. The Engineer reserves the right to renegotiate the fee or estimate of fee specified in any task order if the scope of services as specified in the task order is modified by the City or by others or by conditions beyond the control of the parties hereto, whereupon additional expenses shall be incurred by the Engineer. The City and the Engineer shall agree to such a change in fee and services in writing prior to the Engineer's provision of such modified or changed services. D. Time of Payments. Engineer shall periodically submit invoices for the un -billed portion of the services completed to that date. City agrees to pay the invoiced amounts within 30 days from the date of receipt of the invoice. E. Payment in the Event of Termination. In the event of termination of this Agreement, Engineer shall be compensated for services performed under this Agreement to the date of termination in accordance with the terms above. F. Permits and Advertising. City shall pay all regulatory permitting and advertising fees and all other project fees normally paid by the City for public works projects. 5....STANDARD OF PERFORMANCE Engineer shall perform his services in accordance with generally accepted engineering and consulting standards and shall be responsible for the technical soundness and accuracy of all work and services furnished pursuant to this Agreement. 6....TERMINATION Either party may terminate this Agreement at any time upon 30 days written notice to the other party. 7....OPINIONS OF COST Engineer has no control over the cost of labor, materials, equipment, or services provided by parties other aTRIRG93 ii than Engineer and its subcontractors. Engineer has no control over contractor's methods of determining prices, or other competitive bidding conditions or market conditions, and its opinions of probable project or construction costs are to be made on the basis of its experience with the construction industry. However, Engineer cannot and does not guarantee that proposals, bids, or actual project or construction costs will not vary from the opinions of probable costs prepared by the Engineer. 8....CONSTRUCTION AND SAFETY Engineer shall not be responsible for the means, methods, techniques, sequences, or procedures of construction selected by contractors or the safety precautions and programs and programs incident to the work of contractors. 9....OWNERSHIP OF DOCUMENTS The originals of all documents, including drawings and specifications, prepared by the Engineer shall remain the property of the Engineer. The Engineer shall provide the City with reproducible and/or non -reproducible copies of the documents, drawings, and specifications, and other work products as specified in each task order. It may further be required that the engineer provided additional copies on computer media of all documents, drawings, and specifications, and other work products as specified in each task order. Such documents, drawings, and specifications are not intended or represented by the Engineer to be suitable for reuse by the City or others on extensions of the services provided for the intended project or on any other project. Any reuse without the written verification or adaptation by the Engineer will be at the City's sole risk and without liability or exposure to the Engineer, and the City shall indemnify and hold harmless the Engineer from all loses, claims, damages, and expenses, including attorney's fees arising out of or resulting therefrom. Any such verifications or adaptations by the Engineer will entitle the Engineer to further compensation at rates agreed to by the parties. Engineer shall provide a reproducible copy of the final record drawings showing the construction project measurements when authorized to do so by task order. 10...DESIGN INTENT Engineer shall prepare design documents, drawings, and specifications with the understanding that he may be observing the quality and progress of resulting construction, for compliance with the intent design, and furthermore that such observation of any construction will be compensated by the City at the rates agreed upon by the parties hereto. 11...INDEMNITY The Engineer shall defend, indemnify, and hold harmless City from any and all claims or liabilities, including attorneys fees, arising out of Engineer's negligent performance of this Agreement. UTRIRG93 Engineer shall comply with all federal government, state and iii local laws and ordinances applicable to the work to be performed under this Agreement. Prior to beginning work under this Agreement, Engineer shall provide "Certificates of Insurance" as evidence that policies providing the following coverage and limits of insurance are in full force and effect. A. General Comprehensive Liability With respect to liability for injuries to or death of persons and with respect to liability for destruction of or damages to property, the insurance coverage shall be $500,000 combined single limit and such coverage shall include the special provisions listed below: 1. The City, its officers, employees, and agents shall be named as an additional insured and the coverage shall be applicable to and protect the City, its officers, employees, and agents.from liability arising from or relating to Engineer's activities relating to this Agreement. Such insurance shall be primary and other insurance maintained or carried by the City shall be separate and distinct and shall nor be contributing with the insurance listed hereunder. 2. Such insurance shall not include explosion, collapse, or underground exclusions commonly referred to as the "XCU" hazards. B. Automobile Comprehensive Liability With respect to liability for injury to or death of persons and with respect to liability for destruction of or damage to property, the City, its officers, employees, and agents shall be named insured and the insurance coverage shall be $500,000 combined single limit. Such insurance shall be primary and other insurance maintained or carried by the City shall be separate and distinct and shall not be contributing with the insurance listed hereunder. Failure of either or all of the named insured to report a claim under such insurance shall not prejudice the rights of the City, its officers, employees, and agents thereunder. The City, its officers, employees, and agents will have no obligation for the payment of premiums because of its being named as insured under such insurance. Prior to beginning work for property acquisition, development of contract plans and specifications, and construction management, the Engineer or its subcontractors shall provide evidence of errors and VTRIRG93 iv omissions coverage for a minimum of $250,000. City shall defend, indemnify and hold Engineer harmless from all claims or liabilities, including attorney's fees, arising out of City's negligent acts. 12...ATTORNEY'S FEES In the event suit or legal action is instituted to enforce any of the terms or conditions of this Agreement, venue shall be in Superior Court for Yakima County. The losing party shall pay to the prevailing party, in addition to the costs and disbursements allowed by statute, such sum as the court may judge reasonable as attorney's fees in such suit or action, in both trial and appellate courts. 13...ADDITIONAL SERVICES At the City's option and direction, Engineer shall provide additional engineering, observation, and/or planning services as authorized by mutually agreed task orders. 14...INDEPENDENT CONTRACTOR The parties intend that Consultant at all times be an independent contractor and not an employee of the City, and shall not be entitled to compensation or benefit of any kind except as specifically provided for herein. 15...GOVERNING LAWS This Agreement is governed by the laws of the State of Washington. 16...COMPLETE AGREEMENT This agreement and referenced attachments contains the complete and integrated understanding and agreement between the parties and supersedes any understanding, agreement or negotiation whether oral or written not set forth herein. Amendments, changes, or modifications hereto shall not be valid unless in writing and duly executed by both parties. 17...NO THIRD PARTY BENEFICIARIES OTHER THAN THE STATE OF WASHINGTON The agreement gives no rights to anyone other than the City , Engineer, and the State of Washington, and has no other third -party beneficiaries. 18...ASSIGNMENT Neither party to this Agreement shall assign the Agreement, nor any interest arising herein, without the written consent of the other. The Engineer, with the City's consent, shall be authorized to employ or subcontract with any other party or entity it deems necessary for the performance of any of the services to be provided by the Engineer pursuant to the terms of this Agreement. 19...SEVERABILITY OF AGREEMENT In the event anv of the terms or clauses of this Agreement is held to be illegal or unenforceable by anv court or arbitrator, the remaining clauses and terms shall continue in full force and effect and shall be enforceable. VTRIRG93 v 20...MINORITY- AND WOMAN -OWNED BUSINESS; CITY -SPECIFIED SUBCONTRACTORS Engineer will comply with the City's directives in utilizing the services of City -specified subcontractors and/or minority and women -owned businesses on the Project. The firm selected by Engineer to meet said directives will be subject to approval by the City. Engineer's liability arising from the work of said subcontractors or businesses is limited to proceeds available from their insurance. CITY OF YAKIMA By: Richard A. Zais, Jr. City Manager ATTEST: Karen S. Roberts City Clerk City Contract No. WITNESSES uTRIRG93 PLSA Engineering & Surveying Consultant By: vi EXHIBIT A ANTICIPATED SCOPE OF SERVICES & FEES TASKS ESTIMATED FEES 1. Water Main - Plans & Specifications West Zone $ 106,448 2. Water Main - Plans & specifications East Zone -1 122,005 3. Total of All Tasks $ 228,453 The fees listed above are "estimated" and are the best estimates of the parties at the time this agreement was executed. The fees to be paid the Engineer are dependent, upon actual time required to accomplish each task. For this reason, the estimates listed above are subject to change and should only be used for general planning purposes. However, the total estimated cost will not be exceeded without prior written approval of the City. VTRIRG93 TASK ORDER NO. 1 WTRIRG93 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING PLSA Engineering and Surveying Yakima, Wa. TASK NO. 1- WEST ZONE SUMMARY SHEET TASK ELEMENTS MANHOURS EST. COST 1.1 Project Management. 304 $18,638 1.2 Obtain basic information for mapping. 152 $ 8,132 1.3 Collect field topographic data. 376 $19,564 1.4 Prepare base drawings in CAD. 192 $ 9,744 1.5 Develop preliminary design details. 208 $11,978 1.6 Coordinate with property owners. 188 $10,272 1.7 Create CAD plan/profile sheets. 272 $14,294 1.8 Prepare special provisions. 128 $ 7,002 1.9 Produce final construction documents. 128 $ 6,824 TOTALS 1948 5106,448 Anticipated Time of Completion: 16 weeks from the authorization to proceed. TASK ORDER NO. 1: AUTHORIZATION TO PROCEED. CITY OF YAKIMA By: Dennis E. Covell, P.E. Date By: Louie Wichert, L.S. Date WTRIRG93 1 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.1 PROJECT MANAGEMENT REQUIRED ACTIVITIES: a. Prepare for and attend periodic coordination meetings. b. Prepare and submit progress reports and billings. c. Coordinate with County, other agencies. d. Prepare application for County permit. INPUT REQUIRED Finalized contract with city for engineering services. Assistance from city as required to finalize County permit. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 64 Senior Surveyor 0 Senior Design Engineer 80 Engineer (EIT) 64 CAD Drafting Technician 16 Engineering Technician 48 Clerical Staff 32 Total 304 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.2 OBTAIN BASIC INFORMATION FOR MAPPING REQUIRED ACTIVH IES: a. Obtain plat & street right-of-way information and analyze. b. Research land subdivision data. c. Research and locate field monumentation. INPUT REQUIRED Final scope of project definition from City. Sewer, water and irrigation record drawings from City. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 8 Senior Surveyor 32 Senior Design Engineer 0 Engineer (EIT) 0 CAD Drafting Technician 0 Engineering Technician 112 Clerical Staff 0 Total 152 3 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.3 COLLECT HELD TOPOGRAPHIC DATA REQUIRED ACTIVITIES: a. Research and identify underground utility locations. b. Establish elevation benchmark system. c. Conduct field topographic survey Water mains, curbs, elevations, sidewalk, valves, manholes,power poles, fences, irrigation pipes., sewer, etc. d. Make field ties to all existing monumentation. INPUT REQUIRED City benchmark information. Product of Task Element No. 1.2. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 8 Senior Surveyor 48 Senior Design Engineer 8 Engineer (EIT) 32 CAD Drafting Technician 16 Engineering Technician 256 Clerical Staff 8 Total 376 4 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.4 PREPARE BASE DRAWINGS IN CAD REQUIRED ACTIVITIES: a. Import and manipulate electronic field data. b. Create CAD base mapping. c. Break base mapping into multiple standard sheets. d. Add borders, title blocks, north arrows, legends, etc. INPUT REQUIRED Products from Task Element No. 1.3. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 0 Senior Surveyor 8 Senior Design Engineer 16 Engineer (EIT) 16 CAD Drafting Technician 112 Engineering Technician 40 Clerical Staff 0 Total 192 5 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.5 DEVELOP PRELIMINARY DESIGN DETAILS REQUIRED ACTIVITIES: a. Tentatively locate water mains, valves. b. Select fire hydrant locations. c. Select tentative locations for service stubs. d. Develop grade lines. INPUT REQUIRED Base map produced under Task Element No. 1.4. Response from City to tentative water main locations shown on 35% submittal. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 40 Engineer (EIT) 64 CAD Drafting Technician 40 Engineering Technician 48 Clerical Staff 0 Total 208 6 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.6 COORDINATE WITH PROPERTY OWNERS REQUIRED ACTIVl'1'IES: a. Obtain list of owner's names from City. b. Contact occupants/owners; resolve service locations. INPUT REQUIRED List of owners prepared and furnished by the City. Partially complete project mapping showing property landmarks. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 24 Engineer (EIT) 40 CAD Drafting Technician 0 Engineering Technician 92 Clerical Staff 16 Total 188 7 SCOPE OF SERVICFS OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.7 CREATE CAD PLAN/PROFILE SHEETS REQUIRED ACTIVITIES: a. Add all design details to base maps. b. Prepare cover sheet and vicinity map. c. Produce check prints, revise after back checking and 75% review. INPUT REQUIRED Service line stub -out locations from owner contacts in Element 1.6. City review comments from check print review at 75% completion. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 24 Engineer (EIT) 24 CAD Drafting Technician 144 Engineering Technician 56 Clerical Staff 8 Total 272 8 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.8 PREPARE SPECIAL PROVISIONS REQUIRED ACTIVITIES: a. Collect and organize boiler plate text sheets. b. Collect and organize standard drawing details. c. Write special construction requirements. d. Prepare special detail drawing. INPUT REQUIRED Current and approved standard drawings and provisions from City. Concurrence from city on contents of special detail drawings. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 16 Engineer (EIT) 32 CAD Drafting Technician 16 Engineering Technician 32 Clerical Staff 16 Total 128 9 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING WEST ZONE Task Element No. 1.9 PRODUCE FINAL CONST. DOCUMENTS REQUIRED ACTIVITIES: a. Process 95% review documents. b. Produce, copy, collate and bind final documents. c. Deliver to City. INPUT REQUIRED 95% review comments from City. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENTS Project Manager 16 Senior Surveyor 0 Senior Design Engineer 24 Engineer (iii) 8 CAD Drafting Technician 16 Engineering Technician 32 Clerical Staff 32 Total 128 10 1 r M S 12TH AVE I c_11 o I D --< z N m S 13TH AVEI. S 12TH AVE S 11TH AVE 2 S 10TH AVE N QUEEN AVE -1 S 11 TH AVE 0 z 1) 0 QUEEN AVE rn 0 0 0 r D PLEASANT AVE S 11 H AVE co QUEEN A JE N r S 10 -H AVE S 8 AVE S 7 TH AVE D S S :BTH A V S 9Ti AVE S 8T'h AVE S 9TH AVE CORNELL Ay S 7T'iI AVE x HANRATTY S8H AVE m s 2ND AVE D z 2j8 1 a 0 N V7 0 -i m --i CORNELL AVE S 6T AVE c D S 5116 AVE S 4TH AVE CK A\ )WICH E AVE VOELKER .,QVC NGFIBR 'kr) 0 0 z rn RD AVE (BROADWAY) VE D -i m D 30 1 1 1 1 VOELKERI AVE S: 1:4.ST AVE LACI DON /. :•:l'' ✓, R >:.A z AVE LE WIQH AVE VOELKER AVE 0 z TASK ORDER NO. 2 WTRIRG93 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING PLSA Engineering and Surveying Yakima, Wa. TASK NO. 2'- EAST ZONE El SUMMARY SHEET TASK LIST MANHOURS EST. COST 2.1 Project Management. 308 $18,760 2.2 Obtain basic information for mapping. 160 $ 8,578 2.3 Collect field topographic data. 468 $24,305 2.4 Prepare base drawings in CAD. 252 $12,668 2.5 Develop preliminary design details. 244 $13,910 2.6 Coordinate with property owners. 230 $12,512 2.7 Create CAD plan/profile sheets. 328 $16,691 2.8 Prepare special provisions. 132 $ 7,219 2.9 Produce final construction documents. 140 S 7,362 TOTALS 2262 $122,005 Anticipated Time of Completion: 32 weeks from the authorization to proceed. TASK ORDER NO. 2: AUTHORIZATION TO PROCEED. CITY OF YAKIMA By: Dennis E. Covell, P.E. Date By: Louie Wichert, L.S. Date WTRIRG93 1 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.1 PROJECT MANAGEMENT REQUIRED ACTIVIT'IES: a. Prepare for and attend periodic coordination meetings. b. Prepare and submit progress reports and billings. c. Coordinate with County, other agencies. d. Prepare application for County permit. INPUT REQUIRED Finalized contract with city for engineering services. Assistance from city as required to finalize County permit. ESTINIATED MA.NHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 64 Senior Surveyor 0 Senior Design Engineer 80 Engineer (FIT) 64 CAD Drafting Technician 16 Engineering Technician 48 Clerical Staff 36 Total 308 2 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.2 OBTAIN BASIC INFORMATION FOR MAPPING REQUIRED ACTIVMES: a. Obtain plat & street right-of-way information and analyze. b. Research land subdivision data. c: Research and locate field monumentation. INPUT REQUIRED Final scope of project definition from City. Sewer, water and irrigation record drawings from City. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 8 Senior Surveyor 36 Senior Design Engineer 0 Engineer (EIT) 0 CAD Drafting Technician 0 Engineering Technician 116 Clerical Staff 0 Total 160 3 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.3 COLLECT FIELD TOPOGRAPHIC DATA REQUIRED ACTIVITIES: a. Research and identify underground utility locations. b. Establish elevation benchmark system. c. Conduct field topographic survey Water mains, curbs, elevations, sidewalk, valves, manholes,power poles, fences, irrigation pipes., sewer, etc. d. Make field ties to all existing monumentation. INPUT REQUIRED City benchmark information. Product of Task Element No. 2.2. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 12 Senior Surveyor 52 Senior Design Engineer 8 Engineer (EIT) 40 CAD Drafting Technician 16 Engineering Technician 332 Clerical Staff 8 Total 468 4 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.4 PREPARE BASE DRAWINGS IN CAD REQUIRED ACTIVITIES: a. Import and manipulate electronic field data. b. Create CAD base mapping. c. Break base mapping into multiple standard sheets. d. Add borders, title blocks, north arrows, legends, etc. INPUT REQUIRED Products from Task Element No. 2.3. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 0 Senior Surveyor 8 Senior Design Engineer 20 Engineer (FIT) 16 CAD Drafting Technician 160 Engineering Technician 48 Clerical Staff 0 Total 252 5 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.5 DEVELOP PRELIMINARY DESIGN DETAILS REQUIRED ACTIVITIES: a. Tentatively locate water mains, valves. b. Select fire hydrant Locations. c. Select tentative locations for service stubs. d. Develop grade lines. INPUT REQUIRED Base map produced under Task Element No. 2.4. Response from City to tentative water main locations shown on 35% submittal. ESTIMA i'hD MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 44 Engineer (EIT) 80 CAD Drafting Technician 48 Engineering Technician 56 Clerical Staff 0 Total 244 6 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.6 COORDINATE WITH PROPERTY OWNERS REQUIRED ACTIVITIES: a. Obtain list of owner's names from City. b. Contact occupants/owners; resolve service locations. INPUT REQUIRED List of owners prepared and furnished by the City. Partially complete project mapping showing property landmarks. ESTIMATED MANHOURS REQUIRED TO ACCOMPT.TSH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 28 Engineer (EIT) 52 CAD Drafting Technician 0 Engineering Technician 118 Clerical Staff 16 Total 230 7 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.7 CREATE CAD PLAN / PROFILE SHEETS REQUIRED ACTIVITIES: a. Add all design details to base maps. b. Prepare cover sheet and vicinity map. c. Produce check prints, revise after back checking and 75% review. INPUT REQUIRED Service line stub -out locations from owner contacts in Element 2. 6. City review comments from check print review at 75% completion. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 24 Engineer (EIT) 28 CAD Drafting Technician 188 Engineering Technician 64 Clerical Staff 8 Total 328 8 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE El Task Element No. 2.8 PREPARE SPECIAL PROVISIONS REQUIRED ACTIVITIES: a. Collect and organize boiler plate text sheets. b. Collect and organize standard drawing details. c. Write special construction requirements. d. Prepare special detail drawing. INPUT REQUIRED Current and approved standard drawings and provisions from City. Concurrence from city on contents of special detail drawings. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 16 Engineer (EIT) 36 CAD Drafting Technician 16 Engineering Technician 32 Clerical Staff 16 Total 132 9 SCOPE OF SERVICES OUTLINE AND MANPOWER ESTIMATE YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN ENGINEERING EAST ZONE E1 Task Element No. 2.9 PRODUCE FINAL CONST. DOCUMENTS REQUIRED ACTIVITihS: a. Process 95% review documents. b. Produce, copy, collate and bind final documents. c. Deliver to City. INPUT REQUIRED 95% review comments from City. ESTIMATED MANHOURS REQUIRED TO ACCOMPLISH ELEMENT Project Manager 16 Senior Surveyor 0 Senior Design Engineer 24 Engineer (EFT) 12 CAD Drafting Technician 16 Engineering Technician 36 Clerical Staff 36 Total 140 10 RANCH T CEI AVE LA FOLLETTE ''' kio.3 -S :VIOLA AVE E ARLINGT CENTRa,L A SLIGR Rp E. NOR 'HU TENNANT :Lk LINDY LN in 1 17; I 1(7)1 -1 VfE "LOGAN A BOGGESS LN AVE 4ERCH ST I tlecircr ••••-:..,:-• I co I — E VIOLA AV/S-. ST " .1: ±.:StMP:SON:.S.-T E MEAD AVE W KNO $7r: ks) (f) U TON AVE 0) (f) t) 12 OLD TOWN E KING ST E PIERCE ST (/) cn 0 <(1) -J -J (...) CAREY AV ROSS LN McNAIR AVE REED_L_ LILAC LN i 1"=1000' co PLSA INGINEERING-y SURVEYNG-PLIIININ ma) 575-6990 YAKIMA RALROAD AREA PUBUC WATER SYSTEM GENERAL VICINTY MAP tam irt: D.P31 AS MO. EXHIBIT B PHASING AND PROPOSED SCHEDULE QTRIRG93 PLSA ENGINEERING -SURVEYING -PLANNING 1120 W. LJNCOLN YAK/MA. WISNItGTON (509) 575-6990 YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN WEST ZONE 1993 1994 JUN 7 14 21 28 JUL 5 12 19 26 AUG 2 9 16 23 30 SEP 6 13 20 27 OCT 4 11 18 25 NOV 1 8 15 22 29 DEC 6 13 20 27 JAN 3 10 17 24 31 FEB 7 14 21 28 MAR 7 14 21 28 PROJECT NO. 1 ' , i ' 1) PROJECT MANAGEMENT 2) OBTAIN BASIC INFORMATION 3) FIELD TOPOGRAPHY 4) PREPARE BASE MAPS 5) DESIGN DETAILS 6) COORDINATE WITH PROP OWNERS 7) CREATE PLAN/PROFILE SHEETS 8) SPECIAL PROVISIONS 9) FINAL CONST DOCUMENTS PROJECT NO. 2 1 1 j ' I � i I 1) PROJECT MANAGEMENT 2) OBTAIN BASIC INFORMATION 3) FIELD TOPOGRAPHY 4) PREPARE BASE MAPS 5) DESIGN DETAILS 6) COORDINATE WITH PROP OWNERS 7) CREATE PLAN/PROFILE SHEETS 8) SPECIAL PROVISIONS 9) FINAL CONST DOCUMENTS �~ P L S A YAKIMA RAILROAD AREA PUBLIC WATER SYSTEM DESIGN EAST ZONE El 1993 1994 °NG'"SURVE1ING—PlA""940 1120 W. ta+cotN YAKIMA, WASHINGTON (509) 575-6990 JUN 7 14 21 28 JUL 5 12 19 26 AUG 2 9 16 23 30 SEP 6 13 20 27 OCT 4 11 18 25 NOV 1 8 15 22 29 DEC 6 13 20 27 JAN 3 10 17 24 31 FEB 7 14 21 28 MAR 7 14 21 28 PROJECT NO. 3 1) PROJECT MANAGEMENT 2) OBTAIN BASIC INFORMATION 3) FIFI 0 TOPOGRAPHY 4) PREPARE BASE MAPS 5) DESIGN DETAILS I 6) COORDINATE WITH PROP OWNERS 7) CREATE PLAN/PROFILE SHEETS 8) SPECIAL PROVISIONS 9) FINAL CONST. DOCUMENTS PROJECT NO. 4 1) PROJECT MANAGEMENT 2) OBTAIN BASIC INFORMATION 3) FIELD TOPOGRAPHY I 4) PREPARE BASE MAPS i 5) DESIGN DETAILS 6) COORDINATE WITH PROP OWNERS 7) CREATE PLAN/PROFILE SHEETS 8) SPECIAL PROVISIONS 9) FINAL CONST. DOCUMENTS I - 1 i i EXHIBIT C FEE SCHEDULE Fees for services shall estimated based on the rate schedule set forth below. Rates shown include salary costs, overhead costs, profit. All rates shown are on a per hour basis. *� WTRIRG93 Project Manager Senior Surveyor Senior Design Engineer Engineer - EIT * CAD Drafting Engineering Tech * Clerical Staff* Labor Expenses Reimbursable Expenses ** Task No 1 (West Zone) Task No. 2 (East Zone El) $ 77.00 62.00 77.00 53.80 46.25 49.40 31.05 $ 1,050.00 1,300.00 Estimated average hourly rate for this employee category. Where individual wage rates vary from the average hourly rate listed above, the actual amount charged will be the employee's actual wage rate times 2.76 , which amount shall include salary costs, overhead cost and profit. Any employee category not listed will also be charged at their respective wage rate times 2.76 . Reimbursable expenses include travel expenses if required, computer-aided drafting equipment costs, expenses of additional insurance, including professional liability insurance, required by the City in excess of that normally carried by Engineer and Engineer's subcontractors, and other costs necessary to complete the project, but not list herein. BUSINESS OF THE CITY COUNCIL YAKIMA WASHINGTON AGENDA STATEMENT Item No. For Meeting of 6 - 1 - 93 ITEM TITLE: Consideration of a Resolution Authorizing Execution of an Agreement with PLSA Engineering & Surveying for design work in the Yakima Railroad Area. SUBMITTED BY: Denny Covell, Director of Engineering & Utilities CONTACT PERSON/TELPHONE: Dueane Calvin / 576-6480 SUMMARY EXPLANATION: Under the terms and conditions of the Grant Contract between the City and Ecology, it is imperative that the engineering work necessary to construct this Project be accomplished as soon as possible. Although the City's Engineering Division is participating in the design work, they do not presently have the capability to do all of the work required and do it in a timely manner. Using the advertized consultant roster established for 1993-94, the City selected PLSA Engineering and Surveying through the qualification and negotiation process. PLSA, a local consulting firm, will perform the balance of the design required to bring the Project's construction activities to a timely completion. This selection process has been reviewed and concurred in by the Department of Ecology. The total amount budgeted to accomplish the Engineering & Design work in the Project is $352,712.00. The cost of the work anticipated under the terms of this Agreement shall not exceed $228,453.00, as set forth in Exhibit A of said Agreement. This cost will be approximately two-thirds of the funds available for design and engineering, and the work involved is equal to the same ratio. The consultant service contract schedule shows PLSA's design work concluding no later than March of 1994. Resolution X Ordinance _ Contract X Other (Specify) Funding Source Department of Ecology Grant No. G9300117 APROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Staff recommends approval of the resolution authorizing this Agreement with PLSA Engineering & Surveying for the described services and at the prices. set forth therein. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution No. R-93-52