HomeMy WebLinkAboutR-1992-D6155 6-year TransportationRESOLUTION NO. D 6 1 5 5
A RESOLUTION adopting a Six Year Transportation Improvement Program
for the period of 1993 through 1998 for the construction of
streets and arterial streets in the City of Yakima.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a
Six Year Program for the construction of streets and arterial streets in the City
of Yakima for the ensuing six year period, all as contemplated and required by
State and Federal law, and
WHEREAS, after a public hearing on the matter, held at a regular
meeting of the Yakima City Council on July 21, 1992, the City Council finds that
the plan attached hereto should be adopted as the Six Year Transportation
Improvement Program for the period of 1993 through 1998 for the construction
of streets and arterial streets in the City of Yakima, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
YAKIMA:
The Six Year Construction Program for the period of 1993 through 1998, a
copy of which is attached hereto and by reference made a part hereof, is hereby
adopted as the official Six Year Transportation Improvement Program for the
City of Yakima.
ADOPTED BY THE CITY COUNCIL this D,Uday ofJuly, 1992.
ATTEST:
gt
Mayor
City Clerk
ENGTITL Al
PRELIMINARI 29 -JUN -1992 SIX TEAR TRANSPORTATION 'ROYENENT PROGRAM 1993 TO 1998
DRAFT CITY OF IAkinn CITY 80. 1485 HEARING DATE: JULI 21, 1992 ADOPTION DATE
COUNTI 80. 39 RESOLUTION N0.
P
P R
;U II
C L'R
T A I
I S T
0 S I
N
L 0
PROJECT IDENTIFICATION j DESCRIPTION OF PORK
14 1
TAKINA AVENUE/I-82
_._
N
A
J 0
0 F
R
W
C 0
L R
A K
S
WORK
CODES
TOTAL
LENGTH
(NI)
C
A
R
R
I
0
Y
E
R
(X)
PROJECT COSTS IN THOUSANDS OF DOLLARS t FEDERAL OBLIGATION PLAN
1
SOURCE OF FUNDS 1
t
EXPENDITURE FOR ALL FUNDING TYPES
1993 1994 1995 96-98
1ST
IEAR
2ND
TEAR
3RD
TEAR
4TH,
5TH
AND
6TH
IEARS
TOTAL
FUNDS
RAP
CAPP
UATA
LOCAL ; TIA
FUNDS ; FUNDS
12
A,B,D,P
0.18 : X
P
2351
5880
2113
10410
x -e
I618: 8328
1
9
1
1
FEDERAL,
FUNDS 1
t
1ST
IEAR
ANNUAL
ELENT
280
TRRU
6TH
TEARS
4041 P,E.
INTERCHANGE AREA 4 G,H,I,K
Reconfirmation of interchange are involving new structures, structure removal, 14,8
roadway widening, grading, drainage,pavement, curb and gutter, sidewalks,bikeipd.
way, street lights, signalization, andscaping, channelization, utility ajustments
11
2
eeexxe 1 1 1 1 I
FAIR AVENUE ' 24 1A,B,D,F 1.35 : ' P
1 1 1 1 1
TAKINA AVENUE TO NOB HILL BLVD. G,R,1,J
Widening involving resurfacing; grading; drainage; curb and gutter; sidewalk; K
street lights; signalization; channelization; utility adjustments; bus pullout;
signing; pavement markings
19
3 NORTH 1ST AVENUE
eseeexxxaseaxxxxxs
e 1 1 1 1 I
45 ;B,D ; 0.92 ; I ; F
11 1 11
TAKINA AVENUE TO II' STREET
Rehabilitate pavement surface; drainage and utility adjustments; pavement
markings; signing
14
4
NORTH FIRST STREET AT "0" STREET
Signalization; curb and gutter modifications; sidewalk modifications
street light modifications; utility adjustments; pavement markings; signing
1 1 1 1 1
I 6 II D,P,G SIG f P
I i 1 1 1
1,J,K,N
UTILITI
CODES
CGPTO
PED AID PROJECT N0.
N-4628-111
1 Icg22=.- l eeeaxxxei eeaex 1 1 1
1022; 1910: ' f 2992: 598: 2394: 9 P.E.
1--------1-------`1--------1 :--- -1 -1 t
t RN
UTILITI FED AID PROJECT 80. 1
CODES1 1 1 CONST
t 1
«CGPTO ; N -4611 -XXX - , t TOTAL
I 1 8 1
1 1 ----- 8 t 1
R/V
1 CONST
1 TOTAL
t-« -----
9
,
404
210
1 1 I 1
1 1 1 1 1 1 1 1
t
9
1 1813: 1813 : i P.E.
1 1 1 ' 1 RIR
UTILITI FED AID PROJECT 80, 0
CODES 1 CONST
1 1- 1
1 t
1 1 --
CGPTO: : -XII { t TOTAL
: axeexelxxe : .a ----x1...-----9
' 210; 36; : 1141 P.E.
1 1 1
i 1 1
1 1
1 RAW
UTILITI FED AID PROJECT NO 1
CODES1 9 CONST
t
CGPTO S 1 N 4519-111 9 TOTAL
1 1 1
1 ' ' 1
1 1
21
153
114
PRELIBi8ARI 29 -JON -1992
DRAFT
CITY OF IAKIMA CITY 10. 1485
COUNTY N0. 39
SII TEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
REARING DATE: JULY 21, 1992
ADOPTION DATE
RESOLUTION N0.
P
F R
U I
N C 0
C L R
T A I
I S T
0 S Y
8
L 0
PROJECT IDENTIFICATION I DESCRIPTION OF YORK
N
A
J 0
0 F
R
V
C 0
L R
S Y
S
WORK
CODES
TOTAL
LENGTH
(81)
C F
A U
R 8
R D
Y
0 S
V T
E A
R
(X); S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE TOR ALL FUNDING TYPES
1993
1ST
YEAR
1994
2ND
YEAR
1995
3RD
YEAR
96-98
4TH,
5TH
AND
ATH
TEARS
TOTAL
FONDS
f FEDERAL OBLIGATION PLAN
SOURCE OF FUNDS 1
1
LOCAL
FUNDS
RAP
CAPP
DATA
TIA
FUNDS
16 5
01
LINCOLN AVENUE AT NORTH 28TH AVENUE
6
B,D,F,G
SIG P ; 180
180
31,
1
1
1
1
1
1
FEDERAL'
FUNDS 1
1
1
Signaiization; curb and getter modifications; sidewalk modifications
street light modifications; utility adjustments; pavement markings; signing
6 ;SIGNAL UPGRADEIFIRELANE PRE-EMPTION/STREET LIGHTS
I,J,K,M
UTILITY
CODES
CGPTO
---
1ST
IEAR
ANNUAL
ELENT
2ND
TRRU
6TH
IEARS
1491 P.E.
1
18
1 RN
FED AID PROJECT 10 1
1 CONST r 131
1
K 4648411 1 TOTAL ; 149
1 ;
1
1
1 1 1 1 1 1 1 1 1 1 1 1
6 :41 ; NIA ; X P 30: 30; 30 90; 180; 180:
1 1 1 1 1 1 t 1 1 1 1 1
Upgrade existing signal systems with modern controllers; opticom; add street
lights where needed
01 '1
SIDEWALK SAFETY PROGRAM
Install nem sidewalk where none exists; curb and gutter
1 1 1 1 1
NIA I� P
1 1 1 1 1
01
8
BIKEWAYS
Greenway bikeway ► city pathway and bike lanes
I 1 I 1 1
1 1 1 1 1
1 1
10 10 10� 30 60: 60
1 1 1 1 1 1
UTILITY
CODES
CPT
1 P.E.
1
1 RN
FED AID PROJECT 10. 1
1 CONST
1
-III 1 TOTAL
1
' 1
UTILITI
CODES
CPI
1 :0 : NIA IP
f i i i 1
1 1 1
10;
1
1 1 1
1 1 1
1 t
1 1
FED AID PROJECT 80.
1 I
1 1
10: 10: i P.E.
1 1 1
1 1 1
RIO
UTILITY FED AID PROJECT 10. 1
CODES 1 1 CONST
i i -IIX o 1 TOTAL ,
1 1 ! 1 1
1 1 1
1 1 1 ;
1 i
1
1
1
i
0
1
__
P.E.
RIO
CONST
TOTAL
PRELIMINARY 29 -JUN -1992 SII YEAR TRANSPORTATION 'ROVENENT PROGRAM 1993 TO 1998
DRAFT CITY OF IAKInn CITI 10, 1485 REARING DATE: JULI 21, 1992
COUNTY N0. 39
ADOPTION DATE
RESOLUTION N0.
U
N C
C L
TA
I S
0 S
N
A
L
P
R
0
H
T
I
N
0
PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK
1 9
BUS STOP /ONES - TRANSIT
=822
N
A
J 0
0
R
W
C
LR
AK
S
S
1
WORK
CODES
'C P
A U
R N
R D
1
0 S
Y T
E A
TOTAL R T
LH
(NI)(X) S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST
YEAR
1994 1 1995
2ND
TEAR
0
NIA
X
P
75
=221
380
YEAR
96-98
4TH,
5TH
AND
6TH
TEARS
TOTAL
FUNDS
t FEDERAL OBLIGATION PLAN
t
SOURCE OF FONDS t
LOCAL
FUNDS
t
t
RAP , t
CAPP t
DATA : t
TIA ; FEDERALI
FUNDS FUNDS t
75: 75 225
450
10 STORN DRAINAGE
a2
1 1 1 1 1
14 1B
1 1 1 1 1
NIA 'ISP
Provide for rehabilitation of existing system at spot locations to address complaints
and claims and provide for new additions at spot locations to address complaints
and claias
17
11
RIVER ROAD
2222.2.2.2.2
UTILITY
CODES
CGPTO
t
t
1ST
TEAR
ANNUAL
ELEMT
2ND
THRU
6111
IEARS
4501 P.E.
' t
t RNV
FED AID PROJECT N0, t
t CONST
t
-IIX t TOTAL
t
1 1 4:2222= ..:.. 2.2.2.2.2---42.22
15; 5; 5: 15:2.2.2. 40' 40
1 1 1 1 1 1
24 :A,B,D,P 1 0.50 1 : P
1 1 1 1
1 1 1 /
NORTH 6TH AVENUE TO NORTH 1618 AVENUE 5 G,11,I,J
8111 acquisition; widening; pavement widening and resurfacing; grading; drainage; K
curb and gutter; sidewalk; street lights; utility adjustments; signal systems
pavement markings; signing; bus pullout
14
12
NORTH 16TH AVENUE AT RIVER ROAD
2
Signalization; curb and gutter; sidewalk street lights:
utility adjustments; pavement markings; signing
2=
a , 1
1 1
1 1 1 1 1
6 :B,D,F,G : SIG P
1 1 1 1 1
1 1 1 1 1
I,J,K,N
UTILITY
CODES
CGPTO
011111!
CODES
CGPTO
t
t
I P.E.
t RN
PED AID PROJECT N0 t
8 CONST
2.171 t TOTAL
1 t
t
= 2
1 1 1
1181; 1187 ;
1 1 1
1 1 1
9
f P.E.
t HIV
FED AID PROJECT 10. t
i CONST
-III t TOTAL
t
1 2 I 1 1
200, 1 1 2001 2001
1 1
1 1 1
UTILITI
CODES 1
CGPTO
1 1
1 1 1 1 1 21 1 1
, 1 1 1 1 1 1 1 1
=__1 t
8 P.E.
t RIW
FED AID PROJECT 10 t
I CONST
i _
M 4555-188 1 8 TOTAL
' 1 8
1 1 t
1 1 ,
PRELIMINARY 29 -JUN -1992
DRAFT
CITY OF YAEIMA CITY N0. 1485
COUNT! 80. 39
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
REARING DATE: JOLT 21, 1992
ADOPTION DATE
RESOLUTION N0.
N C
C L
T A
IS
0 S
N
A
L
P
R
0
R
I
T
I
N
0
11 13
PROJECT IDENTIFICATION 1 DESCRIPTION OF YORK
NORTH 6TH AVENUE AT RIVER ROAD
M
A
J 0
0 P
R
c 0
L R
AK
S
6
YORK
CODES
B,D,P,G
C
A U
R N
R D
1
III
:O :S
:V :T
E:A
TOTAL R T
LENGTH : U
(NI) :(X): S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST
YEAR
SIG : : P : 180
1994: 1995 96-98
280
YEAR
310
YEAR
4TH,
5TH
AND
6TH
TEARS
TOTAL
FUNDS
1 FEDERAL OBLIGATION PLAN
1
SOURCE OF FUNDS f
LOCAL
FUNDS
1801 180
RAP
CAPP
UATA
TIA
FUNDS
t
t
1
t
t 1ST 2ND
t YEAR THRU
FEDERAL. ANNUAL 6TH
FUNDS f ELEMT TEARS
t
t
16
Signalizatian; curb and gutter; sidewalk street lights:
utility adjustments; pavesent earkings; signing
14
MEAD AVENUE
I,J,K,M
1 1 1 1
1 1 1 1
16TH AVENUE TO 11TH AVENUE
Widening; grading; drainage; utility adjustments; curb and gutter; sidewalk;
street lights; pavesent markings; signing; signalitation
17
15
11
16
24 :A,B,D,F : 0.50:
1 I 1 1 1
5 G,11,I,J
**u}uallea*141a141a4
x^ UATA SUPPLEMENT ^"
a.x.a***aaaa: *•
1 1 1 1 1
PACIFIC STREET ' 34 'A,B4O,1 ' 0,60 ' U
1 1 1 1
1 1 I 1 1
SOUTH 3RD STREET TO FAIR AVENUE 5 G,H,I,J
Widening; pavement resurfacing; grading; drainage; curb and gutter repair;
sidewalk; signalization; street lights; bus pullout; pavement markings; signing; ::xa
utility adjustments
** UATA SUPPLEMENT =^
UTILITY FED AID PROJECT NO
CODES 1
CGPTO -111 f
1 1 1 1
1 1 1 1 1
990; 99u 198 192:
1 I. 1 1 1
UTILITY PED AID PROJECT N0.
CODES 1
CGPTO : 8 -4510 -III :
1 1 1
1
1 1 1 1
I 1 1
391: 391: 18: 312:
, 1 1
t 1 1 1 1
1 P.E.
t R(W
f CONST
1
0 TOTAL
"I" STREET
1 1 I 1 1
1 1 1 1 1
NORTH FIRST STREET TO 16TH AVENUE
Reconstruction and widening; curb and gutter; sidewalk;
street light modifications; utility adjustments; pavesent markings; signing
: 4 0,85 ; U
1 I 1 1 1
G,I,J,K,M
I t
1 1
aaaaaaaauaaaaaaaaaaaa�xaaaaaa
^* IJATA SUPPLEMENT **
taaxaaaaaaaaaaaaa saaaaxaxaaaat
1 I I 1 1 1
1 1 1 1 1 1
12941
I 1
t
f
I P.E.
t RAW
f
9 CONST
TOTAL
t
f
UTILITY FED AID PROJECT N0.
CODES 1 1 1
CGPTO 1 1 8 -4608 -III
1 1
1 1
1
P.L.
f RAW
1 CONST
9
9
TOTAL
f
1294: 2591 1035:
1 i 1
UTILITY PED AID PROJECT NO
CODES
CGPTO : : M 4641 -XXX :
1 1 1
1 1
1 1
1 1
9 P.E.
t R18
9
CONST
9
I TOTAL
t
PRELIMINARI 29 -JUN -1992 SIX YEAR TRANSPORTATION PROVEMEBt PROGRAM 1993 TO 1998
DRAFT CITY OF YAKIMA CITY N0. 1485 HEARING DATE: JULY 21, 1992 ADOPTION DATE 1
COUNTY 10. 39 RESOLUTION N0.
�-------•-----_..
U
NC
C L
T A
I S
0S
8
A
L
{
P,
R;
0
0
PROJECT IDENTIFICATION DESCRIPTION Of WORK
19
11
NORTH 6TH AVENUE
19
N
A
J 0
0 P
R
W
C0
L R
A K
WORK
CODES
TOTAL
LENGTH
(MI)
24
A,B,D,F 0.50
C
A U
R N
R D
Y,
0 S
v1T
E : A
RST
U
(8): S
'U
PROJECT COSTS IN THOUSANDS OP DOLLARS
I FEDERAL OBLIGATION PLAN
EXPENDITURE FOR ALL FUNDING TYPES
1993
1994
1ST ; 2ND
YEAR 1 !EAR
1995
3RD
YEAR
96-98
4TH,
5TH
AND
6TH
YEARS
TOTAL
FUNDS
SOURCE OF FUNDS i
LOCAL
FUNDS
1936;
1936
GORDON ROAD TO FRUITVALE BOULEVARD 5 G,H,I,J
Widening; right-of-way aquisition; electric rail relocation; grading; K
drainage; utility adjustrents; curb and gutter; sidewalk;
street lights; parerent markings; signing; signalization
18 GORDON ROAD
C$- ---C C---�
1 :A,B,D,F : 0.45 : ; U
6
6
NORTH FIRST STREET TO NORTH 6TH STREET G,H,I,J
Bridge widening; right-of-way aquisition; pavement removal, replacement and
widening; grading; drainage; curb t gutter; sidewalk.
14
19
808 HILL BOULEVARD AT SOUTH 48TH AVENUE
__ _
UTILITY
CODES
CGPTO
RAP
CAPP
DATA
TIA
FUNDS
8
t
i
0
FEDERAL,
FUNDS 1
t
1ST
TEAR
ANNUAL
ELENT
2ND
TURD
6TH
TEARS
PED AID PROJECT 80,
1 1 = 1 1 - 1
f 3356: f 33566 6 � P.E.
' 8 RAW
UTILITY FED AID PROJECT N0. 0
CODES 0 CONST
'-- XIX
CGPTO 1 I TOTAL
--�
P.E.
RIW
CONST
f TOTAL
t
t
6 :B,D,P,G SIG :
I,J,K,N
Signalization; curb and gutter codifications; sidewalk codifications
street light codifications; utility adjustrents; parerent markings; signing
200
200;
t
:1 1 1
P.E.
UTILITY
CODES
CGPTO
t RIW
PED AID PROJECT NO t
t CONST
N 4566-188 1 8 TOTAL
1
14
20 SUNNITVIEW AVENUE AT NORTH 48TH AVENUE
6 ; SIG : U
Signalization; curb and gutter codifications; sidewalk modifications
street light codifications; utility adjustrents; pavement markings; signing
6 6
I,J,K,N
200 ' 200;
UTILITY
CODES
CGPTO
PED AID PROJECT 80
N 4596-X81
0
I P.E.
RAW
, CONST
t
0 TOTAL
t
t
0
PRELIMINARY 29-J0N-1992 SIE YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
DRAFT
CITY OF IAKINA CITY NO. 1485 REARING DATE; JULY 21; 1992 ADOPTION DATE
COUNTY 10. 39 RESOLUTION NO.
P
U
N C
C L
T A
IS
0 S
N
L
P
R
0
R
I
T
I
n
0
PROJECT IDENTIFICATION 1 DESCRIPTION OF YORK
14 21
SOUTH 16TH AVENUE AT NEAD AVENUE
A
J 0
0 F
R
V
C 0
L R
A K
,S
.
S
6
YORE(
CODES
TOTAL
LENGTH U
IMI) :11): S
C
A
R
R
1
0
V
E
R
P
U
N
D
S
T
A
T
PROJECT COSTS IN THOUSANDS OF DOLLARS t FEDERAL OBLIGATION PLAN
SOURCE OF FUNDS t
t
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST ; 2ND
TEAR TP.AR
1994 1995
3RD
TEAR
96-98
4TH,
5TH
AND
6TR
IEARS
TOTAL
FUNDS
LOCAL
FUNDS
RAP
CAPP
DATA
TIA
FUNDS
t
t
t
t
FEDERALI
FUNDS t
1ST
IEAR
ANNUAL
ELENT
2ND
THRU
6TH
YEARS
B,D,F,G SIG ; U
110
14
22
,Signalization; curb and gutter modifications; sidewalk modifications
;street light modifications; utility adjustments; pavement markings; signing
YAIIINA AVENUE AT 9TH STREET
I,J,K,M
6 :B,D,P,G : SIG : 0
1
200
UTILITY FED AID PROJECT N0
CODES
Signalization; curb and gutter modifications; sidewalk modifications
street light modifications; utility adjustments; pavement markings; signing
14
23
VEST LINCOLN AVENUE ! 45 1A,B,D,F 1.00 c U
{ . i
CGPTO : : N 4555-11i
P.E.
RN
CONST
t TOTAL
1
t
t
200: 1 1 P.1.
t Req
UTILITY FED AID PROJECT NO t
CODES i t CONST
t
CGPTO : M 4628-XXI t TOTAL
' t
PIERCE AVENUE TO NORTH I8TR AVENUE 6 6,R,I,J
Pavement removal and replacement; drainage adjustments; utility adjustments;
curb, gutter and sidewalk repair; street light and signal system adjustment and
upgrade; pavement markings; signing; bus pullout
16
24
YAKIMA AVENUE : 45 : A,B,D,F1 0.60 : I : 0
-----®®®..®®®®--..-....---------..-« 1 1 . . 1 1
1ST STREET TO ITH AVENUE 6 G,H,I,J
Pavement removal and replacement; drainage adjustments; utility adjustments;
curb and gutter and sidewalk repair; street fights and signal system adjustments
and upgrade; remove and reinstall rubberized pad railroad crossings; pavement
markings; signing; bus pullout
1059: 1058
UTILITY
CODES
CGPTO
FED AID PROJECT N0.
N-4559-111
1
t
9 P.E.
t R'N
1 CONST
I TOTAL
t
9
S=___ ___=====1====== I 1
44: 616: 6604 t t t P.E.
, e , , ---�-, 9
t 8111
UTILITY PED AID PROJECT N0. 9
. CODES . 0 CONST
1 CGPTO 4 N-4690-1111 0 TOTAL
1 , ,
t
PRELIMINARI 294U11-1992 SII TEAR TRANSPORTATION PROVEMENT PROGRAM 1993 TO 1998
DRAFT CITI OF TAn,"n CITY 10. 1485 HEARING DATE: JOLI 21, 1992
COUNTI 10, 39
ADOPTION DATE
RESOLUTION N0.
U
N C
C L
T A
IS
0 S
8
A
L
P;
I
0
R
I
T
Y
N
0
PROJECT IDENTIFICATION' DESCRIPTION OF WORK
14
25
'8' STREET
e
M
A
J0
OF
R
c 0
I, R
A K
WORK
CODES
TOTAL
LENGTH
(N1)
C
A
R
R
I
0
V
E
R
(I)
P
U
N
D
S
T
A
T
U
S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993 1994
1ST
YEAR
2ND
YEAR
1995
3RD
YEAR
96-98
4TH,
5TH
AND
6TH
TEARS
TOTAL
FUNDS
SOURCE OF FUNDS
LOCAL
FUNDS
RAP
CAPP
UATA
TIA
PONDS
1 FEDERAL OBLIGATION PLAN
1
1
1
!
1
1 IST 2ND
1 YEAR TBRU
FEDERAL, ANNUAL 6TR
FUNDS 1 ELENT IEARS
1
1
14 '11,0,F,G
0,65
11
154
154
PIERCE STREET TO NORTH IST STREET 56 I,J,K
Realignment; Pavement reconstruction; drainage adjustments; utility adjustments; curb
and gutter; sidewalk repair; remove and reinstall rubberized pad R.R. Crossing;
pavement markings; concrete median barrier; signing
Implementation of previous study.
16
26
14
21
= sfs=ss-=s======s=s =_______ 22 : : : 222 ; ;
NORTH & SOUTH 8TH STREET t 5 :B,D,F,G 1 0.85: : U
D STREET TO CHESTNUT AVENUE I,J,K,N
Pavement rehabilitation curb and gutter modifications; sidewalk modifications;
street light modifications; utility adjustments; pavement markings; signing
UTILITY PED AID PROJECT NO.
CODES
CGPTO N-4694-111
601: 601;
1 P.L.
t R/V
1 CONST
1 TOTAL
22222= 2222 _ 22==== _ I 1 i 1
"8" STREET : 56 :B,D,F,G 0.80 1 :
NORTH IST STREET TO 10TH STREET J
Pavement removal and replacement; utility adjustments; curb and gutter; sidewalk
repair; drainage adjustment; street lights; signal system adjustments and upgrade;
paving markings; signing
r
r
1 P.E.
1 118
UTILITI FED AID PROJECT 10 1
CODES 1 CONST
r
CGPTO 1 ; N 4684-111 1 TOTAL
8
__
1 ' _-
1 564; 564. ====1C=-:..= 1
JL.' � : 8 P.L.
1 1 1 -----'-------' --'-------!
1--------,--- 1- ,--...-• t-
8 RAW
UTILITI PED AID PROJECT N0. 1
CODES 1 CONST
CGPTO ' N -4694 -III 1 TOTAL
11
_ _ 1 1 i 1 __1 1 1 1 =2.122'_'--____--'---2222-' r
1 1 1 1 1 -i----�---- - -�
14 28 LINCOLN AVENUE ; 45 ;B,D,F,G : 0.60 ; ; 0 ; ; ; 862; 862; ; ; 1 P.E.
1 / 1 1 f 1 1 1-------' --2222-' ----' i
1 1 1 1 1 1 --_--1- 1 1---- 6-•__----�
PIERCE STREET TO NORTH 1ST STREET 6 I,J,K 1 RAI
Pavement removal and replacement; drainage adjustment; utility adjustments; curb UTILITY FED AID PROJECT 10. 1
and gutter; sidewalk repair; street lights and signal system adjustments and CODES r CONST
upgrade; remove and reinstall rubberized pad R,8. Crossings; pavement markings; signing 1
CGPTO { 8-4648-111 1 1 TOTAL
, 1
t
I I • ' _, • • • : 1
; PRELIMINARY 29-J01-1992
; DRAFT
CITE OF IAKINA CITY N0. 1485
COUNTI 10. 39
SIE YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
HEARING DATE: JULI 21, 1992
ADOPTION DATE
RESOLUTION N0.
N C
C L
T A
I s
0 S
N
A
L
P
R
0
R
I
T
Y
0
PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK
N
A
J 0
0 F
R
i; 0
L R
A K
$
'C P
A U
R N
R D
Y
0 S
V T
;E A;
TOTAL ; R T ; 1ST
WORK LENGTH : . U TEAR
CODES ; (MI) (X) S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993 1994 ; 1995
2ND
YEAR
3RD
YEAR
96-98
4TH,
5TH
AND
6111
!EARS
TOTAL
FUNDS
i FEDERAL OBLIGATION PLAN
SOURCE OF FUNDS 1
LOCAL
FUNDS
RAP
CAPP
UATA
TIA
FUNDS
t
t
FEDERAL.
FUNDS
1ST
IEAR
ANNUAL
ELENT
2ND
THRU
6TH
YEARS
16 29
SOUTH 3RD AVENUE
45
A,B,D,F 1.00 ; 0
1281
1281
WASHINGTON AVENUE TO 101 HILL BLVD.
Pavement removal and replacement; drainage adjustments; utility adinsteents;
curb, gutter and sidewalk repair; street light and signal system aljustment and
upgrade; pavement markings; signing; bus pullout
14
30
LINCOLN AVENUE
6 G,H,I,J
1 1 1 1 1
I 1 1 1 1
56 ;B,D,F,G ; 0.80 ; ; 0
1 1 1 1 1
UTILITY
CODES
CGPTO
FED AID PROJECT N0.
8-4559411
P.E.
RIR
CONST
TOTAL
546 546
NORTH 15T STREET TO 10TH STREET
Pavement removal and replacement; utility adjustments; curb and gutter; sidewalk
repair; drainage adjustment; street lights; signal system adjustments and upgrade;
paving markings; signing
ii
31
ENGLEVOOD AVENUE
1 1 1 1
J
1 1 1
24 :A, B,D,F I 1;63
40TH AVENUE TO 66TH AVENUE
Widening; pavement removal
;sidewalk; street lighting;
,signing
1 1
1 1
56 G,H,I,J
and replacement; grading; drainage; curb and gutter;
utility adjustments; bus pullout; pavement markers;
11
32
UTILITY FED AID PROJECT N0.
CODES
CGPTO
N -4648 -XXX
I I i 1 1 1 1 1 1
1
U 11
2192; 2192 • t
I 1 1 x 1 1 1 t
1 1 1 1 1 1 1 1 1 1
■
r
1
1
t
t
t
t
t
1 1 1 1 1
1 1 1 1 1
48TH AVENUE ; 24 ;A,B,D,F ; 1.60 ; ; U
1 1 1 1 1
1 1 1 1 1
WIDE HOLLOW CREED TO SUNMITVIEV 5 G,H,I,J
RIV acquisition; widening; pavement widening and resurfacing; grading; drainage;
curb and gutter; sidewalk; street lights; utility adjustments; signal systems
pavement markings; signing; bus pullout
1 1 1
1
C.E.
RIW
CONST
TOTAL
P.E.
0 RIV
DTILITI FED AID PROJECT N0. 0
CODES 0 CONST
11 t
CGPTO ; --
1-4652-1XX ; 0 TOTAL
I
1 1
1
t
1 1 1 t
43(9; 4319; ; ; t
1
1 1 1 1 t
1 1 1
I
UTILITI FED AID PROJECT 10. t
CODES 0
CGPTO ; 8-4581-118 1
1
RIV
CONST
TOTAL ;
1 1 1 0 1 1
1 1 1 C 1 1
PRELININARI 29 -JUN -1992
DRAFT CITY OF YAKIMA CITY 10. 1485
COUNTY N0. 39
SIX IEAR TRANSPORTATION ROYENENT PROGRAM 1993 TO 1998
i
REARING DATE: JOLT 21, 1992
ADOPTION DATE
RESOLUTION NO.
P.
P R
U I:
N C 0:
C L R.
T A II
I S T
0 S I
A NN
L 0 PROJECT IDENTIFICATION 1 DESCRIPTION 0P WORK
122222.22.22.3
11 '0311AKINA AVENUE
=-rL
16TH AVENUE TO 32ND AVENUE
Replace concrete pavement with A.C.
'adjustments; street lights
14
34
16TH AVENUE
H
A
J 0
0 F
R
V
C 0
L R
A K
S
WORK
CODES
TOTAL
LENGTH
(NI)
C
A
R
R
Y
0
V
E
R
(X)
PROJECT COSTS IN THOUSANDS OF DOLLARS
1 FEDERAL OBLIGATION PLAN
U ; EXPENDITURE FOR ALL FUNDING TYPES
N;
D ; 1993 1994 1995 96-98
S
T
A
T
U
S
1ST
YEAR
2ND
YEAR
3RD
YEAR
pavement; sidewalks; curb and gutter; utility
22222=2=222 2222
45
A,B,D,P
G,B,K
1.00
U
1 1 i
5 1D,F,G 1 0.30 1 1 U
4TH,
STH
AND
6TH
IEARS
TOTAL
FUNDS
SOURCE OF FUNDS 1
LOCAL
FUNDS
N246.1 1246
RAP
CAPP
UATA
TIA
FUNDS
1
1
!
!
FEDERALI
FUNDS 0
1
1ST
YEAR
ANNUAL
ELENT
2ND
THRU
6TR
IEARS
UTILITI FED AID PROJECT 10.
CODES
CGPTO
M -4628 -EXE
2 1 1222=2=--1--- .0 i i12
3301 330;- 1 1 0 P.E.
1
1 1 1 1 1 ! Rill
UTILITY PED AID PROJECT NO. 0
CODES ! CONST
-1
9
CGPTO ; ; N -4555 -III 0 TOTAL
1 1 1 «----- ' 9
,-- 1 1-------- -1
500' SOUTH Of LINCOLN AVENUE TO ROOSEVELT STREET
Remove and resurface roadva f curb and gutter and sidewalk repair; replace
traffic loops; pavement markings signing
16
35 EAST G STREET
2 2=211
NORTH 1ST STREET TO NORTH 8T11 STREET
Rehabilitate pavement surface; drainage and utility adjustments; pavement
markings; signing
11
36
SOUTH 6TH STREET
11122
1 1 1 1 1
45 :B,D,F,G ; 0.41 ' ' 0
1 1 1 1 1
1 1 1 1 1
J,K
IAKIMA AVENUE TO SOUTH FIRST STREET
Pavement rehabilitation curb and gutter modifications; sidewalk modifications;
street light modifications; utility adjustments; pavement markings; signing
1 P.E.
--! RAW
CONST
I TOTAL
1
1 1 i 2 =1=2'2----' -------' ----=121 i--1
109; 109: 1 P.E.
1
1-y---i--------i--_«.i-«-----1--«----i«-«---i--------1
1 1 1 1 1
1 1
45 :B,D,F,G ; 0.85 ' U
1 1 1 1
1 t 1 1 1
I,J,K,N
1 RIO
UTILITY FED AID PROJECT NO, t
CODES 1 CONST
1 1_
1 ,-
CGPTO : : N 4684 -11I : 1 TOTAL
1 1 1 1
, 1
1
19611 19611 1
1 0 P.E.
1 1 1
1 1 1 1
1 1 1 1 1 i 1 I
1 1 1 1 1 1 1 I
! RAW
UTILITY PED AID PROJECT NO !
CODES 1 1 CONST
CGPTO 1 1 N 4631 -XXX 1 0 TOTAL
1 1 1
1
1 1 1 1 1
1 1 1
PRELIMINARY 29 -JUN -1992
DRAFT
CITY OF IAKINA CITY N0. 1485
COUNTI N0. 39
SIX IEAR TRANSPORTATION IHPROVENENT PROGRAM 1993 TO 1998
HEARING DATE: JULY 21, 1992 ADOPTION DATE
RESOLUTION N0.
F
U
N C
C L
T A
15
0 S
N
L
16
PROJECT IDENTIFICATION I DESCRIPTION OF WORK
37:NORTH 5TH AVENUE
N
A
J 0
0 F
R
W
c0
I R
A K
S
5
WORK
CODES
B,D,F,G
TOTAL
LENGTH
(N1)
0,85
U
N
0
5
T
A
T
U
5
U
1 I
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST
YEAR
1994 ; 1995
2ND 3RD
TEAR 1 YEAR
96-98
4TH,
5TH
AND
6TH
TEARS
TOTAL
FUNDS
1011 : 1011
0 FEDERAL OBLIGATION PLAN
SOURCE OF FUNDS 0
0
LOCAL
FONDS
i
RAP
CAPP
DATA
TIA
FUNDS
0
0
0
8
FEDERALI
PusDS i
0
9
LINCOLN AVENUE TO #IN STREET
;Pavement rehabilitation curb and gutter modifications; sidewalk modifications;
;street light modifications; utility adjustments; pavement markings; signing
1,J,K,M
9 1 1 1
1
"ul
1
1 1 1 1 1 1
1 1 1 1
11 38 ENGLEW00D AVENUE ; 24 :A,B,D,F 1 0.68
POWERHOUSE ROAD TO 40TH AVENUE 5 G,H,I,J
Widening; right -of way aquisition; pavement removal and replacement; grading; K
drainage; curb 8 gutter; sidewalk; bridge widening
16 39
2 1 t 1 1 1
SOUTH 16TH AVENUE : 24 :A,B,D,F ; 0.50 ' U
1 1 1 i 1
1 t 1 1 1
WEST WASHINGTON AVENUE TO AHTANUN ROAD 5 G,H,I,J
Widening{ grading; drainage; utility adjustments; curb and getter; sidewalk; K
street lights; pavement markings; signing; signalization
JOINT PROJECT WITH IAKINA COUNTY
16
40
= 1 1 1 1 t
1 1 1 1 1
UTILITY FED AID PROJECT N0
CODES
1 1 1
CGPTO o N 4641-111
1 1 I 1 C 1
1 1 1 1 i
1 1 1 01
1310 1 ,31
1 i 1 1 1 1 1 TVI
1 1 1 1 1
1 1 1 t 1
UTILITY
CODES
CGPTO
4C!
FED AID PROJECT 10.
N-4652-II1
1ST
IEAR
ANNUAL
ELENT
2ND
TRRU
6TH
YEARS
I P.E.
I RN
0 CONST
1
I TOTAL
9
1
1 P.E.
1
9 RN
0
9 CONST
9
0 TOTAL
1
1
1 1 t 1 z_ i_.- s- -. 1
9
I 1841 184 i P.E.
1 r 1 1 1 1
1 RAW
UTILITI FED AID PROJECT N0. 0
CODES 1 CONST
1 8
CGPTO N 4555-1111 1 TOTAL
1 8--------
0
1 I I 1 1 1 , 1 9
6211 6211 8 P.E.
1
1
1 1 1 1 1 1 1
IAKINA AVENUE : 45 : A,B,D,F; 0.60 : I : U
1 1 t 1 1
1 1 1 1 1
1TH AVENUE TO 16TH AVENUE 6 G,R,I,J
Pavement removal and replacement; drainage adjustments; utility adjustments; curb K
and gutter and sidewalk repair; street light and signal system adjustment,
upgrade and installation; pavement markings; signing; bus pullout
1 1
1 1
1 1 1 1 t 1 t 1
1 i 1 1 1 1 1 i
UTILITI
CODES
CGPTO
1 R/W
FED AID PROJECT 10. 1
I CONST
N -4690-11I 1 TOTAL
1
1 1 0
1 0
PRELIMINARY 29 -JUN -1992
i DRAFT CITY OF IAKINA CITY N0. 1485
COUNTY 80. 39
P
U
NC
C L
TA
I S
0S
N
A
L
P
R
I
0
R
I
T
Y
8
0
SI1 YEAR TRANSPORTATION
REARING DATE: JULI 21, 1992
8018888? PROGRAM 1993 TO 1998
ADOPTION DATE
RESOLUTION N0.
PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK
11
41
PECHTER ROAD
N
A
J 0
0 P
R
V
C 0
L R
A K
IS
S
2
WORK
CODES
TOTAL
LENGTH
(NI)
U
N
D
S
T
A
T
U
S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993 ; 1994
1ST ; 2ND
IEAR ; YEAR
1995
3RD
YEAR
96-98
4TH,
STH
AND
6TH
IEARS
A,B,D,F ; 0.42
D
TOTAL
FUNDS
f FEDERAL OBLIGATION PLAN
--f
SOURCE OF FUNDS 9
1 f
I f
f
RAP 9
CAPP 9
UATA f
LOCAL TIA FEDERAL!
FUNDS ; FUNDS FUNDS 9
wx
1313
f
1ST
YEAR
ANNUAL
EL/NT
2ND
TURD
6TH
YEARS
1313
NORTH 40TH AVENUE TO SENIC DRIVE G,R,I,J
Widening; pavement removal and replacement; grading; drainage; curb and gutter; K
sidewalk; street lighting; utility adjustments; bus pullout; pavement markers;
signing
14
42
FRUITVALE BOULEVARD
L--==xxx x
NORTH 5TH AVENUE TO NORTH 40TH AVENUE
Pavement removal and replacement; drainage adjustments; utility adjustments;
curb, gutter and sidewalk repair; street light and signal system adjustment and
upgrade; pavement markings; signing; bus pullout
;JOINT PROJECT WITH IAKINA COURT!
14
z=xxxxxxxxxz=zzzzxxx===___»_x__xxx===xxx
{ 45
43:SOUTH FIRST STREET
;MEAD AVENUE TO WASHINGTON AVENUE
;Pavement rehabilitation curb and gutter modifications; sidewalk modifications;
;street light modifications; utility adjustments; pavement markings; signing
14
6
1 1 I
1 1 1
101,B,D,P 1.00
1 1 I
G,R,I,J
K
u
0
UTILITI FED AID PROJECT N0.
CODES
1 1 1
CGPTO ; N 4669-151
4261; 4261
f P.E.
9
811
1 CONST
t TOTAL
0
f
0
1 ,1 I 1
1 5 IB,D,P,G ' 0.85 1 I U
I,J,K,N
x= x 1 1 1 1
44;WASBINGTON AVENUE ; 23 ; A,B,D,F; 1.88 ;
I --------------------------------- 1 1 1 1
;16TH AVENUE TO 45TH AVENUE 1 456 G,R,I,J,
;Widening; channelization; pavement removal and replacement; drainage adjustment; 8
:utility adjustments; curb and gutter; sidewalk; street lights and signal system
adjustments and upgrade; bus pullout; pavement markings; signing
UTILITI
CODES
CGPTO
FED AID PROJECT NO.
M 4606-111
5 1 1 =_x= 1 1 1
11 1 1 1
1488; 1488;
I _may 1 1 1
i-
UTILITY
CODES
CGPTO
P.E.
818
9 CONST
f TOTAL
f
9
9
FED AID PROJECT 10
N 4519 -Ill
1 1 1
-------
U
1 I 1 1 1
1 1 1 1 1 1 1 1
2664i 2664
UTILITI
CODES
COPTO
P.E.
f 118
1 CONST
9 TOTAL
99
9 f
P.E.
FED AID PROJECT N0.
M-4558-111
99 118
9 CONST
f TOTAL
f
f
PRELIMINARY 29 -JON -1992
DRAFT
CITI OF IAKIMA CITI N0. 1485
COUNTY N0. 39
SII YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
HEARING DATE: JULY 21, 1992 ADOPTION DATE
RESOLUTION N0.
P
U
N C
C L
T A
I S
0 S
N
L
11
P
R
0
R
I
T
I
0'
PROJECT IDENTIFICATION i DESCRIPTION OF WORK
M
A
J 0
0 F
R
c 0
L R
A K
S
WORK
CODES
45:POWERHOUSE ROAD 34 :A,B,D,F
;LINCOLN AVENUE TO ENGLEVOOD AVENUE 5 G,H,I,i
Widening; pavement widening and resurfacing; grading: drainage; curb and gutter;
;sidewalk; street lights; utility adjustments; bus pullout; pavement markings;
;signing; pedestrian signal
TOTAL
LENGTH
(NI)
0.40
C F
A U
R N
R D
11
0 S
Y
E
R
(1i
a 1 1 1 1 1
I 1 1 1 1
14 ; 46'NOB HILL BLVD.
T
A
T
U
U
PROJECT COSTS IN THOUSANDS OF DOLLARS
FEDERAL OBLIGATION PLAN
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST
YEAR
; 24 ;A,B,D,P ; 1,60 ; ; U
1 I 1 1 1
11
1 1 1 1 1
S 1ST ST. TO IAKIMA RIVER G,H,I,J
Reconstruction and widening involving grading; drainage; pavement; curb and gutter; K,L,N
sidewalks; street lights; signalization; channelization; signing; utility adjustments;
path/bike way; bridge modifications
;
= : 1 1 1 1 1
41lVASHINGTOA AVENUE 24 :AID.?! 0.50 ; ; 0
, 1 1 1 1 1
:SOUTH FIRST STREET TO SOUTH 14TH STREET 1 5 I G,R,I,J 1 1 1
;Widening; right-of-way aquisition; grading; drainage; utility adjustments' K
curb & gutter; sidewalk; street lights; pavement markings; signing; signalization
;
;JOINT PROJECT WITH UNION GAP
1
1 e 1 1 1 1 1
1 1 1 1
19
48; NACRES AVENUE
;WALNUT STREET TO LINCOLN AVENUE
;Remove and replace pavement surface; curb and gutter and sidewalk repair;
;utility adjustment; drainage adjustment; street lights; pavement markings;
'signing; signal systee adjustment and upgrade
1994
2ND
!EAR
1995 96-98
4T11.
5TH
3RD AND
YEAR 6TH
IEARS
1142
TOTAL
FUNDS
1142
SOURCE OF FUNDS I
LOCAL
FUNDS
RAP
CAPP
DATA
TIA
FUNDS
UTILITY FED AID PROJECT A0.
CODES
CGPTO ; 8-4660-111
1 1
1 1
1 1 1 1 1 1 =
1
4Ra036: 1 OJU1 1I
1 1 1 �1
1 1 1 1 1 1
UTILITY
CODES
CGPTO
2159; 2159
1 Y< 1 1 1
1 1 1 t
; 45 ;D,B,F,G ; 0.95 ; ; 0
1 1 1 1 1
1 t 1 1 1
1 1 1
1 1
1 1
1 t
1
1 1
1
t
FEDERALI
FUNDS t
1
PED AID PROJECT 10.
8-4566-1111
UTILITY
CODES
CGPTO
I
P.E.
i
RIR
0 CONST
t
TOTAL
t
1 P.c.
1
1ST
YEAR
ANNUAL
ELENT
2ND
THRU
6TH
YEARS
1 RAW
I CONST
I TOTAL
1
1
1- ------1------
t P.E.
1
t RAI
FED AID PROJECT 10. 1
1 CONST
N 4558-I1I I TOTAL
1 1
363; 363
1 1
UTILITI
CODES
CGPTO
1 1
I P.E.
; 1
1 8/W
FED AID PROJECT N0. 1
t COAST
1 1
-111 ; 1 TOTAL ;
1
PRELIMINARY 29-J0N-1992
I DRAFT CITY OF IAkINA CITY N0. 1485
COUNTY N0, 39
F
U
NC
C L
T A
I s
0 S
N
A
L
P'
0
0
SIX !EAR TRANSPORTATION "ROVENENT PROGRAM 1993 TO 1998
HEARING DATE: JUL! 21, 1992
ADOPTION DATE
RESOLUTION N0.
PROJECT IDENTIFICATION 1 DESCRIPTION OF WORK
a
19
49
YAKIMA AVENUE
5
N
A
J 0
OF
R
u
L 0
I, R
A K
45
WORK
CODES
TOTAL
LENGTH
(MI)
B,D,1,G ; 0,40
C
A
8
R
I
0
V
E
R
(I)
U;
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993
1ST
YEAR
1994
2ND
YEAR
1995
3RD
YEAR
96-98
4111,
5111
AND
6111
YEARS
622
TOTAL
FUNDS
1 FEDERAL OBLIGATION PLAN
1
SOURCE OF FUNDS 0
LOCAL
FUNDS
RAP
CAPP
UATA
TIA
FUNDS
t
1
1
t
0
t
FEDERAL,
FUNDS t
0
t
1ST
IEAR
ANNUAL
ELEMT
2ND
TRRU
6111
IEARS
622 0 P.E.
1ST STREET TO 6TH STREET
Remove and replace pavement surface; curb and gutter and sidewalk repair;
utility adjustment; drainage adjustments; street lights; signal system adjustments
and upgrade; pavement markings; signing
19
SO
CHESTNUT AVENUE
5
5
IST STREET TO 6TH STREET
Remove and replace pavement surface; curb and gutter and sidewalk repair;
utility adjustment; drainage adjustments; pavement markings; signing
1 1 1 1
45 ;B,D,F,C ; 0.40 U
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1
19 ' 51 2ND AVENUE ; 45 :8,D : 0.41 : 0
LINCOLN AVENUE TO WALNUT STREET
Rehabilitate pavement surface; drainage and utility adjustments; pavement
markings; signing
1 i 1 1 1
19
52
NORTH 2ND AVENUE
1 i
1 1
320:
1 1 1
1 1 1
UTILITY
CODES 1
CGPTO
UTILITY
CODES
1 1
CGPTO
1 1
1 1 1 1 1
45 :B,D 6 0.10 1 U
1 1 1 1 1
I 1 1 1 1
LINCOLN AVENUE TO 'D' STREET
Rehabilitate pavement surface; drainage and utility adjustments; pavement markings;
signing
5 5
YY
I Rill
FED AID PROJECT 10. I
1 CONST
-111 0 TOTAL
0
1 =1 1
320 - , Pl.
t RAN
TED AID PROJECT 10. 0
0 CONST
1 1
' -III
1 1
405: 405;
1 1 1
1 1 1
UTILITY
CODES
CGPTO
I TOTAL
t
t
1 1 t
1
1 t
P.E.
--0
I RAN
FED AID PROJECT 10. t
CONST
-III ; t TOTAL
0
1 1 1 1 1 1 1
66! 66i
1 11 '-------'-------'-------'
1 1 1--------1- 1- -
1 1 1 I 1 1 1=
1 1 1 1 1 1 1 1
UTILITY
CODES 1
CGPTO
110 AID PROJECT N0.
1 1 1
1 1 1
0
0
0 P.E.
0
1 RAN
t
1 CONST
f TOTAL
t
PRELIMINARY 29-J11i-1992
DRAFT
CITT OF YAKIHA CITY N0. 1485
COUNTY N0. 39
SI! TEAR TRANSPORTATION INPROYENENT PROGRAN 1993 TO 1998
REARING DATE: JULI 21, 1992
ADOPTION DATE
RESOLUTION N0.
e P
P R
U I
N C 0
C L R
T A I
15 T
0 S Y
A 1
L 0
PROJECT IDENTIFICATION 1 DESCRIPTION OF NORM
19 ; 53
4TH STREET
L
A
J 0
n F
R
V
C 0
L R
A K
C
A
8
A
r
0
V
E
P
U
N
D
T
A
TOTAL ; R T
YORK , LENGTH ; U
CODES ; (81) ;(I); S
PROJECT COSTS IN THOUSANDS OF DOLLARS
EXPENDITURE FOR ALL FUNDING TYPES
1993 ; 1994 ; 1995
1ST ; 2ND
YEAR IEAR
3RD
TEAR
96-98
410,
5TH
AND
6111
TEARS
TOTAL
FUNDS
1 FEDERAL OBLIGATION PLAN
SOURCE OF FONDS 1
t
LOCAL
FUNDS
RAP
CAPP
DATA
TIA
FUNDS
45
VALNUT STREET TO PACIFIC STREET
Rehahilitate pavement surface; drainage and utility adjustments; curb and gutter
sidewalk repair; pavement markings; signing
54 STREET L.I.D. PARTICIPATION
B,D,F,G ; 0,61 , , U
e e
e e
:8 0,V,G U11 1 1
359
359
1
1
1
1
1
1
FEDERAL!
FUNDS 1
1
UTILITI ?ED AID PROJECT 10.
CODES
CGPTO
0eK
FRONT STREET - YAKIMA AVENUE TO 'A' STREET
Pavement rehabilitation curb and gutter modifications; sidewalk modifications;
street light modifications; utility adjustments; pavement markings; signing
55
I,J,K,N
UTILITI FED AID PROJECT NO
CODES
CCM : -III
e e e
1ST
IEAR
ANNUAL
ELENT
2ND
THRU
6TR
YEARS
t P.E.
1 1
1 R!V
1 CONST
1 TOTAL
1
1
t
i POE,
1 RIV
1
11 CONST
t TOTAL
t
1
! ! 1 e e e e e e
1 1 1 1 1 e e e 6
e , e
1 1
e e e e e e e e e e e e e
56
e e e e e
e e e e e
I e
UTILITY
CODES
FED AID PROJECT NO
a e
-1!I
e e
e e
e e
1 P.E.
' 1
e e e m e t e e
e e e e e e e
UTILITI
CODES
1 P.E.
1 RIY
1
1 CONST
TOTAL
1
1
1 RIA
FED AID PROJECT 10 1
CONST
-III ; 1 TOTAL
1
1