Loading...
HomeMy WebLinkAboutR-1991-D5961 Public Works Trust• RESOLUTION NO P 5 9 6 1 A RESOLUTION authorizing the City Manager to sign all applications, loan agreements and amendments, and other documents relating to Public Works Trust Fund collection system planning, design, and construction loan financing WHEREAS, the City of Yakima has developed a plan for wastewater collection, treatment, and disposal for the Yakima Regional Urban Area, such plan being necessary to determine the needs of the area for health, safety and well being of the people; and WHEREAS, the plan is developed in accordance with the requirements of Public Law 92-500 and 95-217, and has set forth facilities and systems required to be constructed, improved and rehabilitated to serve the needs of the area, and WHEREAS, the costs of planning, design and construction of the wastewater collection are eligible for Public Works Trust Fund loan financing; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA. The City Manager is duly authorized to sign applications, loan agreements, and amendments, and other documents relating to wastewater facilities and collection systems planning, design, and construction programs. ADOPTED THIS day of 1991 ATTEST SRF Loan Resolution 7/3/91 cw CITY CLERK MAYOR EXISTING COLLECTION SYSTEM IMPROVEMENTS Even if the City should implement various options which would decrease current and future sewage flows, certain pipelines will require construction of replacement/parallel pipe as the result of capacity limitations. Table IX -4 indicates those pipelines which are currently over capacity during the maximum sewage flow season and will remain over capacity through 2025. The replacement/parallel pipe sizes shown in Table IX -4 and Figure IX -2 are based on the year 2025 and the assumption that all separate irrigation systems would be replaced or converted to the domestic water system. TABLE IX -4 PIPELINES NEEDING TO BE REPLACED IN 1986 WHICH ARE OVER CAPACITY REGARDLESS OF OTHER SYSTEM IMPROVEMENTS WHICH MAY BE MADE Exist Cap Comp.Flowl Repl.Pipc2 Basin Description Length -Slope cfsl_ finatu 114 32E46S 1595 @ 0.00043 18"; 2.22 5.81 P-24 114A 7E46E 185 @ 0.0038 12"; 2.20 4.45 R-18 1 14A I4E46E 480 @ 0.0040 12"; 2.26 4.59 R-18 116 72E45S 480 @ 0.0048 12"; 2.46 4.67 R-18 116 70E45S 483 @ 0.0029 12"; 1.92 4.87 R-18 118 15E27S 2233 @ 0.0034 8"; 0.70 1.17 R-10 118 20E27E 585 @ 0.00043 12"; 0.75 2.59 R-21 120 13E23S 1645 @ 0.0041 8"; 0.76 1.54 R-12 120 9E23E 706 @ 0.0029 12"; 1.91 2.30 R-15 120 I5E26E 340 @ 0.0030 12"; 1.96 2.40 R-15 120 13E26S 350 @ 0.0023 12"; 1.73 2.45 R-15 120 5E26E 480 @ 0.0020 12"; 1.60 2.56 R-15 202 4E29S 493 @ 0.00143 24"; 8.48 11.66 P-18 215 69W21E 365 @ 0.0038 8"; 0.75 0.85 R-10 215 3W 4E 3853 @ 0.00043 8"; 0.23 0.97 R-15 215 12W 4E 965 @ 0.0040 8"; 0.77 1.07 R-10 215 20W 4E 329 @ 0.0040 8"; 0.76 1.07 R-10 313 35E19E 327 @ 0.00033 20"; 2.44 4.77 R-27 313 41E30E 330 @ 0.00063 20"; 3.43 5.21 R-24 401 UE 64E 250 @ 0.00043 48";28.80 54.82 P-48 514 46W30S 394 @ 0.0018 10"; 0.93 1.51 R-15 514 47W30S 700 @ 0.0030 10"; 1.20 1.58 R-15 514 49W30S 690 @ 0.0019 10"; 0.95 1.58 R-15 514 51 W30S 305 @ 0.3840 6"; 1.10 1.58 R- 8 1 Computed flow in 2025 based on all irrigation systems replaced/converted. 2 P - Parallel; R - Replace. Verification of invert elevation is suggested. IX -7 November 3, 1989 Mr. Denney Covell Director of Engineering and Utilities City of Yakima 129 N. Second Street �. Yakima, Washington 98901 Re: City of Yakima Collection System Improvements Dear Denney: Enclosed is an updated copy of Table IX -4 from the Comprehensive Plan for Sewerage System, City of Yakima, and a written description of collection system improvements as shown on updated Table IX -4 and Figure IX -2. We have taken the liberty of adding a priority classification to these improvements and an opinion of probable construction cost to the description. You should add 30 percent to the construction cost figures shown on the description sheet to get to project costs. We also suggest that you add 6 percent to the total project cost to escalate costs from 1986 to 1990. The display board has been prepared for presentation of the pipelines shown in updated Table IX -4. We will be delivering the display board during the week of November 13, 1989. If you have any questions regarding the matter please feel free to give me a call. Sincerely, HQR ENGINEERING, Anthony H. Kr Vice President AHK:ks enclosure HDR Engineering, Inc. Suite 200 Lincoln Plaza 11225 S E Sixth Street, Building C Bellevue, Washington 98004-6441 Telephone 206 453-1523 EXISTING COLLECTION SYSTEM IMPROVEMENTS Updated Table IX -4 indicates those pipelines which are currently over capacity during the maximum sewage flow season and will remain over capacity through 2025. The replacement/parallel pipe sizes shown in updated Table IX -4 are based on the year 2025 and the assumption that all separate irrigation systems would be replaced or converted to the domestic water system. UPDATED TABLE IX -4 PIPELINES NEEDING TO BE REPLACED IN 1989 WHICH ARE OVER CAPACITY REGARDLESS OF OTHER SYSTEM IMPROVEMENTS WHICH MAY BE MADE Exist Comp. Repi. .J Pipe Cap Flow Pipet . Des. Basin Description Length -Slope (cfs) (cfs) (inch) i 1 114 32E45S 1.595 @ 0.00043 Jr; 2.22 5.81 P-24 y Z 2 114A 7E46E 185 @ 0.0038 12"; 2.20 4.45 R-ir Z 3 114A 14E46S 480 @ 0.0040 12"; 2.26 439 R-18 3 116 72E45S 480 @ 0.0048 12"; 2.46 4.67 R-18 i 3 116 70E45S 483 @ 0.0029 1�"; 1.92 4.87 R-18 5 T 118 15E27S 2233 @ 0.0034 8"; 0.70 1.17 R-10 5 5. 118 20E27E 585 @ 0.00043 17; 0.75 2.59 R-21 ea 6 120 13E23S 1645 @ 0.0041 8"; 0.76 1.54 R-12 4, 7 120 9E23E 706 @ 0.0029 12"; 1.91 2.30 R-15 7 120 15E26E 340 @ 0.0030 12"; 1.96 2.40 R-15 7 120 13E26S 350 @ 0.0023 12"; 173 2.45 R-15 7 120 5E26E 480 @ 0.0020 12"; 1.60 2.56 R-15 711 202 4E29S 493 @ 0.00143 24"; 8.48 11.66 P-18-/ 9 215 69W21E 365 @ 0.0038 8"; 0.75 0.85 R-10 3 9 215 3W4E 3853 @ 0.00043 ji"; 0.23 0.97 R-15 -10 313 35E19E 327 @ 0.00033 20"; 2.44 4.77 R-27 S 10 313 41E30E 330 @ 0.00063 20"; 3.43 5.21 R-24 11 514 46W30S 394 @ 0.0018 10"; 0.93 131 R-15 4 11 514 47W30S 700 @ 0.0030 10"; 1.20 1.58 R-15 11 514 49W30S 690 @ 0.0019 10"; 0.95 1.58 R-15 11 514 51W30S 305 @ 0.3840 6'; 1.10 138 R-8 Computed flow in 2025 based on a irrigation systems replaced/converted. 2 P - Parallel; R - Replace. 3 Verification of invert elevation is suggested. YAKIMA COLLECTION SYSTEM DESCRIPTIONS 1. 18 inch pipeline located between E. Chestnut St. and E. Pine St,. in S. Union St.. Portions of this pipeline were relined in 1976. Additional parallel/replacement construction may be required south of Pine, including that section of 18 inch under Washington Junior High, upon further field investigation. Priority - 1 Cost - $284,600 2. 12 inch pipeline located between N. 8th and alley between N. 8th and N. 9th in E. Lincoln Avenue. Priority - 2 Cost - $ 26,200 3. 12 inch pipeline located between E. Lincoln Avenue and E. Yakima Avenue inalley between N. 8th and N. 9th. Priority - 2 Cost - $204,400 4. 8 inch pipeline located between E. "G" St. and E. Lincoln Avenue in alley between N. 7th and N. 8th. An alternate to this pipeline replacement would be to replace the 12 inch pipeline :in N. 8th St. within the same limits with an 18 inch to 21 inch pipeline. Priority - 5 Cost - $259,300 5. 12 inch pipeline in E. "G" St. between alley between N. 6th and N. 7th to N. 8th St.. Priority - 5 Cost - $ 87,000 6. 8 inch pipeline in alley between N. 2nd and N. 3rd between E. "N" St. and E. "I" St.. Priority - 6 Cost - $193,300 7. 12 inch pipeline in E. "I" St. between alley between N. 2nd and N.3rd and alley east of N. 6th. Additional replacement construction may be required south of this project upon further field investigation. Priority - 6 Cost - $247,100 8. 24 inch pipeline located at Division St. and extending to first man hole south of Division St. along west side of Union Pacific Railroad. Priority - 7 Cost - $ 69,800 9. 8 inch pipeline located between alley west of N. 24th Avenue and Clarke Avenue in the alley between Englewood Avenue and Power House Road, the westerly projection of McKinley Avenue, McKinley Avenue, and the alley south of McKinley Avenue. Priority - 3 Cost - $549,700 10. 20 inch pipeline located between alley west of S. 3rd Avenue and alley between S. 2nd Avenue and S. 1st Avenue in W. Nob Hill Boulevard. Priority - 8 Cost - $116,800 11. 10 inch and 6 inch pipeline located between Tieton Drive and 395 feet north of Nob Hill Boulevard in S. 36th Avenue and the alley west of S. 36th Avenue. Priority - 4 Cost - $263,900 Note: Each project listed herein should include a 30 percent allowance for engineering, legal, lands and rights-of-way, contingencies, etc. Refer to Appendix D of the Comprehensive Plan for Sewerage System for adjustment factors.