HomeMy WebLinkAboutR-1991-D5871 Bucher, Willis, & RatliffRESOLUTION NO. D '5871 A RESOLUTION authorizing the execution of an Agreement for Professional Consulting Services for the Yakima Center. WHEREAS, on January 15, 1991, the Yakima City Council approved the Phase II Yakima Convention Center Expansion Evaluation; and WHEREAS, the professional consulting firm of Bucher, Willis & Ratliff is willing to provide professional consulting services to the City of Yakima for the purpose of implementing said Phase II Yakima Convention Center Expansion Evaluation; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to enter into the attached Agreement for Professional Consulting Services, now, there- fore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute the attached and incorporated contract entitled "Agreement for Professional Consulting Services" with the consulting firm of Bucher, Willis & Ratliff, based in Kansas City, Missouri. ADOPTED BY THE CITY COUNCIL this � day of 1991. ‘>&1_,--771/- February , Mayor ATTEST: City Clerk (res/prfsnl.rp) • L „ AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES THIS AGREEMENT, entered into on this L?C'7.4.- day of February, 1991, by BUCHER, WILLIS & RATLIFF, Party of the First Part, herein- after referred to as the "Consultant," and the City of Yakima, Washington, Party of the Second Part, hereinafter referred to as the "Client," WITNESSETH: That the Client desires to have the Consultant provide profes- sional consulting services; and That the Client has selected Bucher, Willis & Ratliff to perform these services. NOW, THEREFORE, in consideration of these premises and the mutual convenants herein contained, the Parties hereto agree as follows: ARTICLE I SCOPE OF SERVICES The Consultant shall provide the following services: Task 1. The Consultant shall complete a mail survey, with a minimum of 1,000 outgoing mailings, of meeting planners, to deter- mine the number of meetings/events which can be anticipated for space utilization in 5,000 -foot increments; the number of attenders and spouses at those meetings; when meetings/events typically occur; and the type of facility in which the meetings/events are typically held. The purpose of this survey is to attempt to answer three primary questions: 1. What is the appropriate expansion of the Yakima Center in order for the community to maintain a competitive posi- tion in the present market; 2. How should that space be configured; and 3. Do the additional activities for which the Center will be competing occur when the Center is operating at capaci- ty. Page 1 of 4 Task 2. Upon completion of Task 1, the Consultant will determine the appropriate location and configuration of the proposed addition to the Center. Four products will be prepared in this task: 1. A preliminary site plan; 2. A preliminary floor plan of the facility, with addition; 3. An exterior drawing of the Center showing the main entry- way with the addition in place; and 4. A preliminary estimate of probable cost of the expansion (HVAC systems, sound systems, wiring, entryway, stage location, structural demands, removal of end wall of the Grand Ball Room, etc.). ARTICLE II COMPENSATION Client agrees to pay Consultant the following Lump Sum Fees for all of the services described in Article I above: Task ....... ........$3,780.00 Task 2 ...... ...... ......$4,500.00 ;provided, however, that the following Additional Expenses are not included in said Lump Sum Fees: 1. Mailing costs for surveys, 2. Lodging, meals, and transportation costs incurred for meetings in Yakima, and 3. Time spent in meetings in Yakima. Client shall pay Consultant for said Additional Expenses at the following rates: Partner......... . .....$125/Hour Associate ..... .. 000 00 00 0000 75/Hour Tourism Planner. 000 00 00 .0.. 55/Hour Clerical 30/H our Misc. Costs At Cost ;provided, however, that Client's total obligation to pay Consul- tant under this Agreement shall not exceed a maximum of $10,000.00 for all fees, tasks, services, time, costs, and expenses of any kind or nature whatsoever, unless Client gives Consultant express written authorization to exceed said $10,000.00 limitation. Payment of Lump Sum Fees shall be due upon receipt by Client of Consultant's statement after completion of each Task. Payment of Page 2 of 4 Additional Expenses shall be due monthly upon receipt by Client of Consultant's detailed statement of time and costs. Payment of both Lump Sum Fees and Additional Expenses shall be made to Consultant by Client within thirty (30) days after receipt of proper billing by Consultant. Client shall not be responsible for any fees or expenses beyond those Lump Sum Fees and Additional Expenses specif- ically set forth above. ARTICLE III TIME SCHEDULE The Consultant shall complete Task 1 within ninety (90) days of written Notice -to -Proceed and Task 2 within one hundred fifty (150) days of Notice -to -Proceed. ARTICLE IV MISCELLANEOUS PROVISIONS 1. Change in Scope: The scope of services described in the proposal for each fixed scope project shall be subject to modification or supplement upon the written agreement of the contracting parties. Any such modifications in the scope of services shall be incorporated by supplemental agreement. At the time of such modification of services, equitable adjust- ments will be made by the parties in the time of performance and the compensation to be paid on the project. 2. Termination. The Client reserves the right to terminate this Contract at any time, upon written notice, in the event the services of the Consultant are unsatisfactory, or upon failure to perform the work with due diligence or to complete the work within the time limits specified by the proposal on any proj- ect; provided, however, that in the event of such termination the Consultant shall be paid for services rendered up to the time of termination in accordance with the payment provisions in Article II above. In addition to the foregoing, either party may terminate this Contract, with or without cause, upon thirty (30) days written notice to the other party. 3. Binding Upon Successors. This Agreement shall be binding upon the undersigned parties, their successors, partners, assigns, and legal representatives. Page 3 of 4 4. Notices. All notices and demands shall be in writing and sent to the parties hereto at their addresses as follows: To Client: To Consultant: City of Yakima City Hall 129 North 2nd Street Yakima, Washington, 98901 Bucher, Willis & Ratliff 7920 Ward Parkway, Suite 100 Kansas City, MO, 64114-2021 or to such addresses as the parties may hereafter designate in writing. Notices and demands shall be sent by registered or certified mail, postage prepaid. Such notices shall be deemed effective when mailed or hand -delivered at the addresses specified above. 5. Litigation. In the event that any suit or action is insti- tuted by either party to enforce compliance with or interpret any of the terms, convenants, or conditions of this Agreement, the prevailing party shall be entitled to collect, in addition to necessary court costs, such sums as the court may adjudge as reasonable attorney fees. The venue for any action to enforce or interpret this Agreement shall lie in the Superior Court of Washington for Yakima County, Washington. 6. Integration. This Agreement is a completely integrated con- tract representing the final and complete expression of the parties' agreement for professional consulting services. IN WITNESS WHEREOF, said parties have caused this Agreement to be signed by their duly authorized officers in two counterparts, each of which shall be deemed an original, on the day and year first written. CITY OF YAKIMA, WASHINGTON BUCHER, W Consulti & Archit By ATTEST: By & RATLIFF ers, ners BY hcLA-0--,-- et9-4-CAta--> „,„ -„- *w-c carrn - 5 Y-71 Page 4 of 4 - -* BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT C T. ITEM NO. FOR MEETING OF: January 15, 1991 ITEM TITLE: 1989 Convention Center Expansion Study SUBMITTED BY: Glenn K. Rice, Director of Comm & Econ Development CONTACT PERSON / TELEPHONE: SUMMARY EXPLANATION: Director of Comm. & Ec. Dev. ffey, General Manager of the Y Convention Center Last fall the Department of Community & Economic Development together with the Yakima Center submitted a proposal requesting approval for continuation of Phase II of the Convention Center Expansion Study which would assist in determining whether the Yakima Center should be expanded. Phase I of the study had been completed in 1989 for the City of Yakima by the firm of Bucher, Willis & Ratliff. The City Council removed this item from the Agenda because additional information was requested to make a more studied decision about the appropriateness of the Phase 1I Expansion Study. Phase II of the study, if approved by Council, would answer these questions: 1) What is the appropriate expansion of the Yakima Center in order for the community to maintain a competitive position in the market; 2) How should that space be configured; and 3) Do the additional activities for which the Center will be competing occur when the Center is operating at capacity. (Continued on next Page) Resolution EXHIBITS Ordinance Contract Minutes Map/Plan Notification List Other: (Specify) APPROVAL FOR SUBMITTAL: 't MANAGER STAFF RECOMMENDATION: Authorize the budgeted request to engage Phase I1 of the study. BOARD RECOMMENDATION: COUNCIL ACTION: In addition to determining the arnount of space needed, architects would determine the most appropriate location and configuration of any proposed addition. Included in this would be 1) A preliminary site plan; 2) A preliminary floor plan of the facility, with addition; 3) An exterior drawing of the Center; and 4) A preliminary estimate of probable cost of the expansion. Attached for your review is a report from the Yakima Center detailing by month from June 1988 through October 1990 the loss of revenue due to lack of available Convention enter space.. For that period of time the total amount for Events revenue losses amounts to $99,280. Convention Center losses due to ponvention revenue losses amounts to $142,315. The total revenues lost to the Yakima Center due to lack of available space and or date availability amounts to a total of $241,575. Perhaps the most telling comment, however, is the economic Impact for convention groups tabulated by using a multiplying factor of $100 per person per night showing a total economic impact Toss to the community for conventions of approximately $8,105,000. The total of all three revenue losses is $8,346,575. SUMMARY., On the basis of this additional information as provided by the Yakima Visitors & Convention Center, speaking to a loss of revenues and lack of availability of space due to limitations, Ma staff recommends that the Council authorize the budgeted request to engage Phase II of the study as previously noted. Yakima Valley :tier' Visitors & Convention Bureau 10 North 8th Street Yakima, WA 98901 (509) 575.1300 July 23, 1990 TO: Honorable Mayor Berndt Yakima City Council Members FROM: Lenore Lambert, President Yakima Valley Visitors and Convention Bureau SUBJECT: Yakima Center Expansion Study The Board of Directors of the Yakima Valley Visitors and Convention Bureau voted unanimously last year to support the Expansion Study of the Center by Bucher, Willis and Ratliff. It is now timely to implement the first two phases of the Study on Space Determination and Architectural Evaluation. The use of the Center continues to increase, and to retain our tourism revenues for the Valley we must plan now for our future expansion needs. t RECEtvE r, JUL 2 41990 cTY COMMUNITv ,1131,, 2119913 DEPARTMENT; DIVISION: 1990 MAJOR P.Q11GY ISSUEjJ ],IPIPLEMENTAL BUDGET RE2.11ES,TS Community and Economic Development Convention Center C. LREQUESTI 1. Approve a two phase study to assist in determining whether the Yakima Convention Center should be expanded. In Phase 1, the consultant proposes to answer three questions: 1) What Is the appropriate expansion of the Yakima Center In order for the Community to maintain a competitive position in the market; 2) How should that space be configured; and 3) Do the additional activities for which the Center will be competing occur when the Center is operating at capacity (cxrdinuing from the previous report findings that there is a need for simultaneous small meetings as weU as rnajor events). The fee for Phase I, including survey preparation, tbtbw-up telephone earls to a select group of meeting planners, survey tabulation and analysis, and summary report le $3,780. Tt.: next phIse of the evaluation, which can be stained concurrently weh Phase I, is an evaluation c the actual expansion. In addition determining the amount of space needed, the architects wits determine the most appropriate location and configuration of the proposed addition. Included in this Phase will be 1) A preliminary site plan; 2) A preliminary floor plan of the facility, wtth addition; 3) An exterior drawing of the Center showing the main entryway with the addition in piece; and 4) A preliminary estimate of probable cost of the expansion. In order to develop a preliminary budget, the architects will consider the following elements: HVAC systems, sound systems, wiring, entryways, stage location, structural demands (including the need to remove the end wall of the Grand Balt Room). The estimated fee for this Phase is 14,500. In addition to the phases outlined approximately $1,700 is budgeted for any trave' incurred by the consultants. 2. a. Fiscal Impact — 910,000. b. Proposed Funding Source —Center Beginning Fund Balance. c. Public Impact —Continued commitment by the City of Yakima to thoroughly research the possibility of expanding the Yakima Convention Center prior to rnaKing any tunher plans. d. Personnel Impact —None. e. Required Changes In City Regulations or Policies —None. 1. Legal Constraints, If applicable—Nor>fr. Viable Alternatives —None. g• 3. onctusiori andlor Staff Recommendation. Approve study as recommended. This 1 a budgeted policy issue. 4. Council Decision. This policy issue remains In budget, however, Council has tabled this issue until later in 1990. $ .OG&6 7 sr,0,90 228 Date: 10 NORTH 8h STREET To: YAKI'.',A V.A 9E :1 (509) 575-1300 From: Subject: RECEIVED JUL 3 01990 CITY tit YAKIMA COMMUNITY DEVELOPMENT July 25, 1990 Honorable Mayor Berndt and City Council Members Yakima Center Advisory Commission Kathy Coffey Center Expansion Study MOO •10.110. 41M00.1114•100.111m At a recent Center Advisory Commission meeting, the commissioners agreed unanimously to encourage the Yakima City Council to implement the next two stages of the Center Expansion Study. The 1990 Center budget allows for the continuation of the 1989 study by Bucher, Willis and Ratliff which recommends the following: Complete an architectural evaluation of expanding the present Convention Center. This evaluation includes three phases: I - Space Determination; II - Architectural Evaluation; and III - Design Plans. Phase I - Expansion Size and Configuration In Phase I, the Consultant proposes to answer three questions: 1) What is the appropriate expansion of the Yakima Center in order for the community to maintain a competitive position in the market; 2) How should that space be configured; and 3) Do the additional activities for which the Center will be competing occur when the Center is operating at capacity (continuing from the previous report findings that there is a need for simultaneous small meetings as well as major events). 1 GER/ED f 'TY OF YAKIMA _ JUL 311990 1 OFFICE OF CITY MANAGER Berndt/Council -2- 7/20/90 Phase II - Architectural Evaluation The next phase of the evaluation, which can be started con- currently with Phase I, is an evaluation of the actual expansion. In addition to determining the amount: of space needed, our architects will work with Mr. Gil Langley to determine the most appropriate location and configuration of the proposed addition. Included in this Phase will be 1) a preliminary site plan; 2) a preliminary floorplan of the facility, with addition; 3) an exterior drawing of the Center showing the twain entryway with the addition in place; and 4) a preliminary estimate of probable cost of the expansion. Phase III - Construction Documents This portion of the study has not been funded and is not being recommended at this time. Continuation of this phase would be contingent based on the findings of Phases I and II. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT ITEM NO. ! 0 FOR MEETING OF: October 9, 1990 ITEM TITLE: 1989 Convention Center Expansion Study SUBMITTED BY: Glenn K. Rice, Director of Comm & Econ Development CONTACT PERSON / TELEPHONE: Glenn K. Rice, Director of Comm. & Ec. Dev. SUMMARY EXPLANATION: In 1989 the City of Yakima commissioned the firm of Bucher, Willis, & Ratliff through the Yakima Valley Visitors and Convention Bureau to prepare a preliminary analysis for expansion of the Yakima Center. The overall scope of the project included the following: A reassessment of Yakima's position in the convention and trade show market and an analysis of present facility utilization; The esti::Ashment of a profile of state wide and regional meetings and trade shows for which Yakima currently competes as well as a profile of meetings that could be solicited with expandir:g facilities. An examination of the impact of the Sun Dome on convention and trade show activities in Yakima county. Evaluation in number of available guest roomsas they relate to serving the current facilities and the expanded Convention Center. (Continued on next page) Resolution EXHIBITS Ordinance Contract Minutes Map/Plan Notification List Other: (Specify) APPROVAL FOR SUBMITTAL: MANAGER STAFF RECOMMENDATION: This is a Council policy issue. BOARD RECOMMENDATION: Yakima Center Advisory Comrission and Yakima Valley Visitors & Convention Bureau recc*mmnd Phase II of Study be authorized. COUNCIL ACTION: In June 1989 this report calls presented to the City Council In and for the 1990 Budget. The Yakima Valley Visitors & Convention Bureau requested the Council to authorize Phase 11 of the study which Is an architectural evaluation of the Center's expansion including an evaluation for determining the amount of space needed and the appropriate location and configuration of a proposed addition. Included would be a preliminary site plan, preliminary floor plan of the facility with addition, exterior drawings of the Center, and a preliminary estimate of probable cost for expansion. The Council, while budgeting the requested funds, tabled further consideration of this project. Current Status., At mid -year 1990 both the Yakima Center Advisory Commission and the Yakima Valley Visitors & Convention Bureau are recommending this issue be reconsidered and Phase 11 be authorized. •w File Event Debts Needed Economic Impact For Community Altendsnce Square Feet Approximate Amount Rent Lost Jun 106 Jan 019 Oct 149 Apr 007 Jun 083 N/F Sep 076 N/F Apr 072 Oct 016 Oct 169 Oct 121 Feb 020 Oct 036 Dec 007 May 040 Jun 121 Nov 051 School Food Service NW Food Processors Foreign Language Teachers Pacific NW District Key Clubs WA Migrant Council WA Rebekah Lodge House of Reprssertaty s WA Sole Trauma Canter Lack of sufficient specs at Center; going to Dome Lack of sufficient space; don't want Dome 10/14-15/94 413-7192 3/7-8/90 8/24-27/90 9/21-23/89 9/25-27/80 Lock of specs don? want Dome 4/80-95 10/27-29/90 10/13.14/94 10/18-20/95 3/91-94 3/PO.93 12/7-9/92 5117-19/91 6/20-23/91 9/7-0/90 N/A - still in town 8260.000 880.000 8100.000 820,000 8150,000 820,000 820,000 81,995,000 8100.000 860,000 890,000 N/A (stiff in town) N/A (stiff in town) 8100.000 880,000 1180,000 $40,000 600 3200 400 500 200 500 200 200 950 500 300 450 4000 2000 500 300 600 200 40,000 50,000 20,000 20,000 15.000 20,000 14,000 20,000 40,000 20.000 25.000 25.000 40,000 30-40000 20,000 20,000 20,000 15,000 $4,000 84.000 82,090 83,500 81,045 83.520 81.500 82,640 821,245 82.640 81,380 83,135 $11,640 87,200 83,135 82,640 51.815 51,045 WA Education Assodatlon Eplscopel Conclave WA MNntenence Operators School Operators WA Elementary Nod Foods - (Moved to DOM la more space) Assemblies of God Dont* for (Moved to more swaco) WA Whsle Growers WA State Br Aeon. VFW Cattlemen's Assn. 88,105,000 29,900 834.000 5142,315 1300 People 1700 People 450 Rooms 400 Rooms divided by 33 events • 25,272 avg. sq.ft. Special Notes: Sep 087 Apr 134 Aug 011 NW Council of Computer Education WA Stale PTA Public School Employees of WA Too Mars for Minis Canter too Don? went to Mufti* to Don. and small Don? wan, t0 Monts to Dome, and Center too small 900 People 400 Rooms Yakima Center Loss of Revenue due to lack of available space or date availability Conventions, $142,315 June 1988 -- October 1990 Yakima Valley Visitors & Convention Bureau Sates Department Lost Business Duo to Lack of Date Availability of Center or Lack of Sufficient Space at Center inquiries for period of June 1988 though October 1990 File Event Dame NWoeu Economic Impact For Community Attendance Square Feel Approximate Amount Rent Lost Mar 123 Mar 003 May 124 Dec 141 Feb 040 Mr 064 Jun 117 Jan 106A Ocl 106 July 012 Oct 112 Mr 102 Jun 004 Jun 022 Apr 066 Dec 120 Council for Esoeptlonel ChNdren Order al Amaranth DeMoiay Conclave of WA Pac tic NW Shrine School Cunloulurn a Deve$t$ mins Mathnhatloe Coundl Tope WAS/VAMP OECA Edurtkar NW Lutheran Churches AWSP Free $ Aoospled limns WA 91M Food Daiwa Dept. of ConwriunIly Mme opmw1 EducMon al Young ChIldrrn 3117.18160 3/14-18100 4/20.22100 Feb -90 2/6.0/92 10/7-11/92 May 4.5/00 ,lune. 3rd wk; 1901-1009 311.3/90 2/20-3/2/91 9/6-0/91 6/20.23/91 11/6.6/91 6/16.20/91 *160,000 1240.000 $t 50,000 *600,000 $220,000 =600,000 $240.000 $1,600,000 $300.000 $40.000 $120,000 $100,000 $100.000 Lady e4 serfdom? pay - Awrdhrdwp hotel mane 10/23/99 10/9.10/92 $50.000 1150.000 600 600 500 3000 1100 1600 1200 1200 1000 400 600 600 900 260 760 20,000 20,000 20.000 30.000 40,000 30-40.000 20-30.000 30.000 16.000 20.000 20.900 30.000 20.000 16.000 20.000 13.135 15226 $3.135 93.135 94.000 :5225 92.090 $16.910 93,000 $3.135 =3.136 $3,136 $2.000 $2.000 *2.606 January 1990 Event Ltider21122slizi Aitendanca Jncome Lost Graduation/Reception 6/6/9 0 3 00 $ 575.00 Wedding Reception/dance 8/ 4/ 9 0 300 a 700.00 $ 1275.00 February 1990 15 -yr. Hispanic Birthday 10/20/90 300 $ 700.00 Wedding Reception 9/22/90 3 00 575.00 Wedding Reception/Dance 6/ 3 0/9 0 300 700.00 $ 1975.00 March 1990 Sanchez Wedding Reception w/dance Haak Wedding Reception w/dance 6/1 5/91 8/1 1 /90 3 00 $ 700.00 350 700.00 $ 1400.00 April 1990 Seminar -Word of Life 5/9/90 1000 $ 1045.00 Hispanic 15th Birthday Sat, Sept. 3 0 0 700.00 Wedding Reception 6/30/90 400 , 700.00 $ 2445.00 May 1990 Chippendales 6/1 or 2/90 4 -5 0 0 $ 700.00 Wedding Reception/dance 7/1 4/9 0 8 0 0 880.0Q $ 1580.00 June 1990 Chocolate Fantasy 3/16-17/91 1000 $ 1000.00 Wedding Reception Sat in Dec. 90 350 700.00 $ 1700.00 July 1990 Wedding Reception Sat in July 91 350 $ 700.00 Head Start 9/20-21/90 400 1400.00 Wedding Reception 7/27/90 300 700.00 15th Hispanic Birthday 9/29/90 2-300 700.00 $ 3500.00 August X90 Event DallieZied Attendance jpcome Lost Wedding Reception 6/1 /91 400 $ 700 y? Wedding Reception 8/17/91 350 700.00 Catholic Diocese 11/203/90 700 880.00 Conference 10/12/30 350 —MU& $ 2880.00 September 1990 Wedding Reception 5/18/91 350 $ 700.00 Wedding Reception Last of June 350 700.00 Wedding Reception 7/13/91 300 700.00 Wedding Reception Feb or Mar/91 300 700.00 $ 2800.00 October 1990 Banquet 11 /15/90 400 $ 700.00 Class Reunion 3/3/91 300 700.00 S 1400.00 1990 Total $ 20,955.00 January 1989 vent 5 Wedding Receptions Yakima Dental Society Car Club Christmas Party Ike Class Reunion '69 Catholic Diocese Weight Watchers February 1989 2 Wedding Receptions w/dance D.O.V.IA Granger High Prom Class Reunion March 198? Wedding Reception w/dance WA Insurance Commission 12/9/89 April 1989 3 Wedding Receptions w/dance 1 Wedding Reception Roland Daze Spanish Dance Noe Spanish Dances Class Reunion Daiffahlezied 5/20/89 4/22/89 7/15/89 4/22/89 5/20/89 2/22/89 12/9/89 July/Aug '89 5/20/139 500 Every Saturday AM 60 At&Madan 250 150 400 300 300 200 9/9/89 10/7/90 4/10/89 4/15/89 8/89 6/3/89 5/3/89 8/12/89 8/19/89 5/6/89 7/15/89 7/15/89 7/89 Saturdays 8/89 400 300 260 200 300 150 200 300 300 150 300 600 600 300 Income Lost $ 3500.00 575.00 250.00 700.00 600.00 250.00 $ 5875.00 $ 700.00 700.00 575.00 575.00 700.00 $ 3250.00 $ 500.00 500.00 $ 1000.00 $ 700.00 700.00 500.00 575.00 1045.00 575.00 1 04 5.00 $ 5140.00 May 1989 Evert 4 Wedding Receptions w/dance Wedding Reception NW Nazarene College Yakima Schools Seminar Yakima Schools Seminar pates Needed 6/3/89 8/12/89 8/12/89 8/26/89 7/16/89 4th wk 6/89 4th wk 6/90 ,June 1989 Hispanic 15 -year Birthday 8/5/8 9 Yakima Schools Kickoff Brk 1 0/1 6/8 9 August 1989 College Graduation/Dinner 5/1 2/90 September 1989 Stone Church Polka Festival -Knights October 1989 Wedding Reception Rotary Dinner Pledge Dance November 1989 Wedding Reception YVC Gradu/Dinner/Dance YVC Dental Hygiene December 1989 Event Conference Inland Pipe/meet/dinner Catholic Youth Ministry 10/1 6/89 4/90 9/8/90 6/22/90 11/11/89 7/28/90 5/12/90 6/6/90 ratesitiZied 4/27-28/90 3/21/90 6/29-30/90 Attendance income Lost 250 $ 3050.00 300 250 3.400 100 4-500 250 250 350 300 700.00 1725.00 1725.00 $ 7200.00 $ 4400.00 x75.00 $ 45 5.00 2-300 S 700.00 300 500 3-500 350 150 500 3-400 . 250 S 575.00 700.00 $ 1275.00 S 700.00 575.00 500.00 $ 1775.00 S 700.00 700.00 500.00 $ 1900.00 Attendance income Lost 200 S 500.00 2-300 700.00 5-700 1760.00 $ 2960.00 1989 Total $ 36,050.00 Yakima Convention Center Loss of Revenue Due to Lack of Available Space: June 1988 3 Wedding Receptions $ 2625.00 1 Reception & Dance 575.00 2 Public Dances 2400.00 1 Meeting with food funtion 575.00 2 Tradeshows 600.00 1 Dinner / Dance ._2111.4 $ 7475.00 July 1988 4 Wedding Receptions 1 Meeting with food function 1 Meeting without food function $ 3500.00 880.00 700.00 $ 5080.00 August 1988 4 Wedding Receptions $ 3500.00 September 1988 3 Wedding Receptions $ 3500.00 3 Meetings without food functions 1200.00 1 Graduation 1045.00 2 Tradeshows 2090.00 1 Christmas Party 700.00 $ 8535.00 October 1988 3 Wedding Receptions 2 Public Dances 1 Meeting with food function 2 Conventions without food functions 2 Christmas Parties 1 Tradeshow 1 Meeting without food 1 Banquet $ 2625.00 2400.00 300.00 5445.00 1400.00 1045.00 300.00 575.00 $ 14090.00 November 1988 1 Meeting with food function $ 575.00 1 Meeting without food function 300.00 1 Luncheon 700.00 $ 1575.00 December 1988 2 Meetings without food functions $ 1200.00 1 Wedding Reception 800.0Q $ 2000.00 Total 1988 $ 42,255.00 Yakima Center Lost Business and Lost Economic Impact Due to lack of space availability or date availability 1. Totals: Center lost revenue (Events) Center lost revenue (Conventions) 2. Total economic impact lost to the Yakima community based upon convention groups unable to meet in Yakima due to a lack of space or date availability. $ 99,260 $142,315 $8,105,000 3. Combined total of economic impact lost $8.346.575 from all sources June 1988 --October 1990. Yakima Center Loss of Revenue due to lack of available space. or date availability Events Only $99,260 June 1988 -- October 1990