HomeMy WebLinkAboutR-1990-D5838 R.W. Beck Water WellRESOLUTION NO.
A RESOLUTION authorizing the Cit l Manager and City Clerk of
the Cit} of Yakima to execute Amendment No. 1 to
the agreement with R. W. Beck & Associates for
professional engineering services.
WHEREAS, in connection with the water well and pumphouse
replacement of the Ranney Collector, it is necessary for the
Cit) to engage professional engineering services to provide
technical assistance during construction; and
WHEREAS, R. W. Beck & Associates has offered to perform
those professional serNices; and the City Council deems it to
be Jr) the best II Llerest of the City that Amendment No. 1 to
thc, a,reement document be executed 1DN the Cit, now, there-
fore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA.
The City Manager and City Clerk of the City of Yakima are
hercb authorized and directed to execute "Amendment No. 1 To
Professional rvices Agreement with Cit}, of Yakima Dated Ma%
1q, 1Q39," which Amendment is atta,hed hereto and by reference
made d part hereof.
ADuPlL-D BN THE C1TN COtNCIL this /3 da). of
399U.
ATTEST
res beck.j)
WV-1405-AA1-AA October 26, 1990
AMENDMENT NO. 1
To Professional Services Agreement
with City of Yakima
Dated May 19, 1989
The Professional Services Agreement between R. W. Beck and Associ-
ates and the City of Yakima for the Chesterly Park Well and Pump Station is
hereby amended as follows:
PROJECT: Change name to "Domestic Water Well Project"
PART I - SCOPE OF SERVICES
Change Parts I and II to the following:
I. General
The project consists of developing a domestic water well to replace
the capacity lost when the City closed its Raney wells. The work will
proceed in three phases. First, a hydrogeologic survey of selected sites
shall be performed and a report prepared for the City. Second, after a
site has been selected, specifications will be prepared and issued for
drilling the well. Third, a pump station and water main connecting the
well to the City's existing system will be designed and contract docu-
ments prepared.
II. Well Survey and Construction
1. Hydrogeologic Survey and Report
The Consultant will conduct a hydrogeologic survey of the Yakima area
to evaluate the feasibility of developing a well with a capacity be-
tween 2,000 and 3,000 gallons per minute (gpm) at one or more of sev-
eral selected sites. The Consultant will provide a report summariz-
ing hydrogeologic and engineering considerations and making recommen-
dations resulting from the study. The City will determine the pre-
ferred site for development.
2. Well Specifications
The Consultant will prepare specifications for drilling a well at the
proposed well site so that the City can advertise a contract to pros-
pective well drillers. The Consultant shall prepare and deliver a
camera-ready master of the specifications to the City for advertising
and bidding the project.
Amendment No. 1 -2- October 26, 1990
3. Services During Well Construction
The Consultant shall attend pre -construction conference, monitor the
well construction including full time (8 hours per day) on-site in-
spection during drilling of the lower section, document well con-
struction, prepare geologic log of the well, witness pump test and
geophysical logging, and make recommendations for the design of the
well and pump. Based on a water quality sample, the consultant shall
identify any treatment requirements for the well.
PART II - PAYMENT
Change the first sentence in the third paragraph to the following:
"On the basis of the Scope of Services outlined in this Agree-
ment, the estimated total amount to be paid by the Client for
services furnished and expenses reimbursed will be approximately
$84,320.
Except as specifically modified herein, the Professional Services
Agreement between R. W. Beck and Associates and the City of Yakima shall re-
main in full force and effect.
Approved for Client
By:
Approved for Consulting Engineer
By:
Date: t ( r s 5v Date:
ATTEST:
Citv Clerk
(try [oM'NACi 90- y i
(3042E)
iee_eqL&,) Ci-vt