Loading...
HomeMy WebLinkAbout06/07/2022 09. Public hearing to consider: A) Resolution adopting the Six-Year Transportation I mprovement Program for the period of 2023 through 2028, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Com Y�'1114'+ BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 9. For Meeting of: June 7, 2022 ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year Transportation I mprovement Program for the period of 2023 through 2028, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Public Works Director Bill Preston, City Engineer(509) 575-6754 SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The current plan for 2023 — 2028 contains a list of nine (9) funded projects that have yet to be constructed. The nine projects include: 1. North 1st Street Revitalization— Phase 3 2. Bravo Company Boulevard — Phase 1 3. Cowiche Canyon Trail - Phase 1 4. 72nd Avenue and W. Washington Avenue I mprovements 5. 34th Avenue & Fruitvale Boulevard, and 34th Avenue and River Road Roundabouts 6. Robertson Elementary School Safety Improvements 7. SummitviewAvenue Resurfacing 8. Pacific Avenue Sidewalk 9. E Nob Hill Blvd & Fair Ave I/S Improvements Attached is the complete 2023 — 2028 Six-Year TIP, which describes each project. The City will continue to seek funding for the remainder of the projects included in the 2023-2028 TIP. City Council and the public are welcome to add other arterial system projects to the TIP. The Six-Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. 2 In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA)and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STI P). The STI P is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-modal transportation network in the State of Washington. The STI P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TI P for 2023 to 2028. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six-Year TI P and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: No STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolutions ATTACHMENTS: Description Upload Date Type D Resolution a 5/3/2022 Resolution ❑ Resolution b 5/3/2022 Resolution D Draft 6 year trans impr program 5/17/2022 Backup Material 3 RESOLUTION NO. R-2022- A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2023 through 2028 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040 to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of arterial streets in the City of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on June 7, 2022, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six-Year Transportation Improvement Program for the period of 2023 through 2028 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six-year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six-Year Construction Program for the period of 2023 through 2028, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six-Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Transportation Systems Plan 2040 along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 7'h day of June, 2022. ATTEST: Janice Deccio, Mayor Sonya Clear Tee, City Clerk 4 RESOLUTION NO. R-2022- A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2023 through 2028. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2023 to 2028 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on June 7, 2022 with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2023 through 2028 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 7'h day of June, 2022. ATTEST: Janice Deccio, Mayor Sonya Clear Tee, City Clerk �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation Agency: Yakima DRAB a From 2023 to 2028 Courty: Yakima MPO/RTPO: Y':U00 Y hside N Outside v o w A. PIN/Project No. B.STIP ID 3 ° - ,may D. y zC. Project Title sLL 0. _ r D. Road Name ar Number v a u - I. E.Begin &End Termin - - F. Project Description G.Structure ID a i, i. - 03 I YAM 06.0?t11 0r',0 �2 F _ O a 04 L G u P 2 0 740 L E Yes 7 irrr. tUM 1st Street Perrtalis ation.Phase 3 ND to 1st Street te1L K 8ej!ehard to" r Street Reeeessior and w iden roa dieay,hike lanes,curb and gutter,sidewalks.curb ramps. illumination.arid signals. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Ends S CN 2023 NHFP 2.090 p00 0 0 2.000 D00 S CN 202: NHPP 2910,000 0 0 291000o S CN 's0's3 0 TIB 1,500 p00 0 1,500 000 S CN 1013 0 0 3,411900 3,411900 P CN 2023 NHPP 3,473 p00 0 0 3,473 p00 Totals 8,473 000 1,500 000 3,411 900 13,384,900 Expenditure Schedule Phase 1st 2nd 3rd .1th 5th &6th CN 7,000000 8,384900 0 0 0 Tdals 7,000.00 6,384900 0 0 0 Report Date: May 17, 2022 Page 1 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: Y':1:00 Y hside N Outside v a p — ti k P.. PItl/Project No. B.STIP ID - p s y c. Pmjed Title k. m r o. Road Name cc Number. n 3 - y S �y u ` LE ,'{ . E. begin &End Termin 5 - _ F. Project Descripti:r G.Structure 10 a 16 i. - 04 _ YAK11 08.07/22 0d 0T22 F-20P'_MMM 01 0 P S T W 0.220 EA NO P ravo Lb rrp any Po uleard, Phase 1 Bravo Lb rrp any Plod Fadread Tracks to Er Street i,aistnxt tour lane raadroaH section with median, hike lanes and roundahrons,install curb.gutter,sidem al4 ste et lighting and tonr drainage sgrt n,alone with water and`Y:Wersy:ers. — — — Fundng Status Phase Phase Start 'ear(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Ford= Total Fords S CN 2020 0 0 00p00.000 6.000 p00 Totals 0 0 6i00.000 6,000 p00 Expenditure Schedule Phase 1 t 2nd 3rd 4th 5th &6th CN 1,000 000 3,000 000 0 0 0 Tdals 3000 1.00 3,000 A00 0 0 0 Report Date: May 17, 2022 Page �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':U0C3 Y hside N Outside P. o w A. PIN/Project No. B.STIP ID 3 ° ,may = y r. z C. Project Title s LL _ ' r D. Road Name ix Number. 0 a o A & E.Begin &End Termin m z = `� w B .2 F. Project Descripticn G.Structure ID 3 a a o g 3 - EE 3 11485(024) YAK80 Or.0??Y1 M.07 2 R2021.XXX 28 1.DUD CE Yes Cowiche Canyon Trail-Ph a3: I =naoic he =amprri Trail Pa"ert,ou:e Foad w coned-le Canyon Lane ri5Nct a pathway.including p edestian bridge over Cowiche Creek Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 0 CWA 2316700 0 2316700 — Totals 0 2316700 0 2.316.700 Expenditure Schedule — Phase 1st 2nd 3rd 4th 5th &6th CN 600000 1716700 0 0 0 Tdals 600 A00 1716700 0 0 i� Report Date: May 17, 2022 Page �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':UOe Y hside N Outside v 0 P.. RIM/ProjectNo. B.STIP ID 3 T _ - _ y [_. Project Title := m k. - r E. Eoad Name or Number v a ` y _ - `,'s o. E. Begin &End Termiri 5 - - F. Project Descripticn G.Structure ID a 16 , - 14 4 i 8830(028) YAM Or,G?li`_ 0r,a �2 F _0'i'_sMA 21 u P 0 T MI' 0.050 0 E Yes _..72nd Avmue and W.Washington Arenue Inprotements S.72nd u,eriue _..72rel uaen ue to UU.UV3shington Are. kiprooe Intersection by constructing a roundabout. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2023 0 OTHER 800,000 0 800,000 — Totals 0 800,000 0 800,000 Expenditure Schedule — Phase 1st 2nd 3rd 4th 5th &Sth CN 800A00 0 0 0 0 Tdals 800 A00 0 0 0 i� Report Date: May 17, 2022 Page 4 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: Y'v.a,00 Y hside N Outside vT3 - p ti rr A. PIN/Project No. B.STIP ID - p s y z C. Project Title s LL _ °' r D. Road Name ix Number A a o A c E.Begin &End Terrain *' m s .2 - —I `= F. Project Descripticn G.Structure ID a p 16 i. - 03 5 l000S(473) YAK4408A?t01 0h.07 2 F,2012.XXX 21 '0 P ST W 0,200 CE ,_c 34thAvenue&Fruit/ale Boulevard,and 34th Avenue and River Fnad Fnundabouts 34th Ater!ue Fiver Road te Fort'vale Boulevard nipro,e the irate rae,Yioris of Rioer Road F: Fruit!ale B oule Hard.and N.34th Avenue grid Flioer Road by installing roundabouts. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Tot it Ftritl> S CN 2023 HSIP 788,308 0 87,590 ..?•.iti* S CN 2023 0 OTHER 1,000 A00 0 1.000000 P CN 2023 NHPP 1,228000 0 0 t 21S 00 Totals 2,016,308 1,000000 87,590 3,10S.F3£ Expenditure Schedule Phase 1st 2nd 3rd dth 5th S6th CN 300 000 2,803,808 0 0 0 Tdals 300 A00 2,803 A98 0 ic 0 Report Date: May 17, 2022 Page 5 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'v.4200 Y hside N Outside vT3 - a p ti k P.. FItl/Project No. B.STIP ID . A s y c. Project Title k. °' - r c B. Road Name cc Number v r a - y S �y u rr LE E Begin &End Termiri 5 - _ F. Froject Description G.Structure ID a 16 7 i. - IB 6 YAK88 Oh 0m1 Oh 07 2 F-20P'_sMA 28 C O P T 0.300 0 E No Fo hertson Elementary School Sa @ty Importements oaricros streets carious Is.ations to uanou s Iocad ens This prole ct mill make Saris us pedestrian cater,irrpr:oement inthe r:intp of RD herts:n Elementaryc Uehool,such as new sdemalk and asr Ym.4ra ti➢Aramps. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Funds State Find Code State Ends Lcal Fur& Total Finds S CN 2023 0 S FTF aaa 500 0 440560 Totals 0 440.560 i� 440.560 Expenditure Schedule Phase 1st 2nd 3rd 4th `th &6th CN 440560 0 0 0 0 Trials 440560 0 0 0 0 Report Date: May 17, 2022 Page 6 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'v.:1:00 Y hside N Outside v o w A. PIN/Project No. B.STIP ID 3 a' _ y zC. Project Title s LL �. _ r D. Road Name a Number v §i 3 u - u . E.Begin &End Termiri m - - F. Project Description G.Structure ID a i, i. - 03 7 YAK115 ur,0?!Y1 Or,a �2 F _02 04 0.100 CE No 5th Avenue and 0 Street Intersection Improvements N. 511-1 A:oenae Lincoln ::re to Chem/Ate IHt3 H.e irnprJ!!ernents to rote rsection of51h Avenue and'D'St.to improve pedestrian 3tety Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Furls State Fuld Code 'State Fonds Local Funds Total Ft iaz P PE 1O : 0 PedlBike Program ?8,000 0 i?.000 P CN 2023 0 PedlBike Program 174.000 0 174.000 Totals 0 250.000 0 250.000 Expenditure Schedule Phase 1st 2nd 3rd ath 5th &6th PE 76 A00 0 0 0 0 CN 174.000 0 0 0 0 Tdals 250A00 0 0 0 0 Report Date: May 17, 2022 Page 7 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a County: Yakima MPO/RTPO: Y':UOe Y hside N Outside v 0 k P.. NH/Project No. B.STIP ID 3 �T _ - _ y :_ Project Title m k. - 7, c B. Road Name cc Number vi a = y _ ti c E Begin &End Termin q 5 - - t F. Project Descripticr G.Structure ID a I6 -r i. - 17 YAK70 06 07t01 [H,07�2 F-P0P'_s$ 10 0.050 0 E No Bo. LUIN±d Installations . Earth :::oenue and i0ide Hollow Fb ad 'wide Hollow Road t< 0[tth .:::venue btallt .su4Ved(s)adjac ent to the Urrth A,erne Bridge and iiride Hollow Bridget> reduce boding issues. Joint project wrth Yakirza County. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P CN 2023 0 OTHER 176.000 0 176.000 Totals 0 176.000 i� 176.000 Expenditure Schedule Phase 1st 2nd 3rd 4th `th S6th CN 176.000 0 0 Cc 0 Totals 176 A00 0 0 0 0 Report Date: May 17, 2022 Page 8 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'.:UOC Y hside N Outside rn o w A. PIN/Project No. B.STIP ID 3 ° ,may = y C. Project Title s LL _ — r c D. Road Name ar Number A a o A Er E.Begin &End Termiri 43 m i 5� _ - F. Project Description G.Structure ID a o g 3 - is 9 YAK10 06,0?t11 U5 7'22 R-1012.XXX 01 0 P s T mi. a 550 EA Ver. E.••H••Street Eidension, Phase 1 E.••H••Street 15t Street to 7U Street Co nzmst ne"I road may inlcudtng water,sewer,curb.gutter.sidewalk,sbeet lighting and storm dr3iri3 ge _-item, Fundng Status Ptrise Phase Start Year(YYYY) Federal Fund Code Federal Fords State Find Code State Finds Local Funds Tcrtal Funds P PE 1024 BUILD 566.500 0 0 5?0500 P CN 2025 BUILD 5.438,400 TIB 1.320 A00 0 ?•.75?.400 Totals 6.004,900 1.320.000 0 7324.P00 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 566500 0 0 0 CN 0 0 6,758,400 0 0 Tdals 0 566500 6,758 A00 0 0 Report Date: May 17, 2022 Page 9 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a County: Yakima MPO/RTPO: Y':1:00 Y hside N Outside v - o w A. PIN/Project No. B.STIP ID 3 ° - _ y C. Project Title s LL 3 k. _ �,, D. Road Name cr Number v §i a 5 y y { c E.Begin &End Termiri - - F. Project Descriptim G.Structure ID -, i D. 04 10 1A/A-13520 Oh,0?t11 Oh,0 ;22 F 2021 101 01 S W 0 200 EA No 8ram:, i,,rrrpanv Bo ulerrard.Phase 2 Erarn; Co rrp amr Bo ulecan1 "H"'areet to Fail road Tracks i,D n5mgt}Or lane raadroaqsection with median, hike la nes and roundabouts,install curb.gutter,sidem al4 ste et lighting and tonr g drainae sgrt g rr,along with water and*wersysems. - - - Fundng Status Phase Phase Start'r ear(YYYY) Federal Fund Code Federal Funds State Find Code State Fiords Local Funds Total Fords P CN 2625 0 OTHER 6600,[00 0 6.900 D00 Totals 0 6.500 000 0 6,500 p00 Expenditure Schedule Phase lost 2nd 3rd dth 5th &6th CN 0 0 6.500 A00 0 0 Tdals 0 0 6,500 A00 0 0 Report Date: May 17, 2022 Page 10 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':1:013 Y hside N Outside Pim o w A. PIN/Project No. B.STIP ID 3 a) - ,may H.y C. Project Title s LL _ P., D. Road Name cc Number A a o' a c E.Begin &End Termin '? m 3 52 _ `E F. Project Descripticn G.Structure ID a o g , i. - 07 11 YAK103 05 Ci7t01 Oh.O?22 R^_0^__XXX 28 C o P T 0.500 CE No Nab Hill Bemenbry School Satetp kipro,errent carious greets 4arious to rations to various ISrat On5 This pr:.je ct mill make various( dstrian Eatery irrprrfement itthe Hicinrtpot Nob Fill Bette riti Fy Sc hnol,such as nem sidemalk and cc,n3mstira ii,DAra rrps. Fundng Status Phrase Phrase Start Year(YYYY) Federal Fond Code Federal Fords State Find Code State Finds Local Funds Total Finds P PE 2026 0 SRTS 101.200 0 101.200 P CH 2027 0 SRTS 642.400 0 642.400 Totals 0 743.600 0 743.600 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 101200 0 CN 0 0 0 0 642.400 Tdals 0 0 0 101200 642A00 Report Date: May 17, 2022 Page II �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':U0r..; Y hside N Outside P. - o w A. PIN/Project No. B.STIP ID 3 ° �4 H. y z C. Project Title s :c 3 k. _ - r D. Road Name ar Number 0 a = y y u A c E.Begin &End Termin 5 - - F. Project Description G.Structure ID a I6 , i. - P? 12 UTA-13522 06.0?t11 Er,a �2 E _011 sMA 28 G P G T u 53E CE No as 8rowne Avenue Sidewalk Preto ne koenue ith Avenue to 1nth:aenue Replaced amated:dew alk panels. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Funds State Find Code State Finds Local Funds Total Finds P ALL 1025 0 0 378,170 378,170 Totals 0 0 378,170 378,170 xperditure Schedule Phase 1st 2nd 3rd dth `th 06th ALL 0 0 378,170 0 0 Tdais 0 0 378,170 0 0 Report Date: May 17, 2022 Page 12 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'n,00 Y hside N Outside v - a. — ti wp A. PIN/Project No. B.STIP ID a) - A = y C. Project Title s LL _ u r D. Road Name cr Number 0 a a. 0. E.Begin &End Termin *' i 52 - `� F. Project Descripticn G.Structure ID a p l6 dl 7 i. 0 07 13 WA-13523 06.0?!11 Db.O7 2 R^_0^__XXX 28 C. G P S T 0.200 CE No MI' Pacifc 'Avenue $idemalk Paoilo noenue Fair Entrance to-bil Property Co nzmst sideroalk on sgwth side of roadway. Fundng Status Phase PI- se Start Year(YYYY) Federal Furd Code Federal Fords State Fnd Code 'State Fronds Loo I Fun& Total Ponds S ALL 2020 0 TIN 250,000 0 2 0.000 Totals 0 250,000 0 2501:101:i Expenditure Schedule Phase 1st 2nd 3rd 4th `th aGth ALL 250 A00 0 0 0 0 Totals 250A00 0 0 0 0 Report Date: May 17, 2022 Page 13 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a County: Yakima MPOIRTPO: Y:U00 Y hside N Outside rn 0 P.. FIN/Project No. B.STIP ID 3 E. - _ y C. Project Title m �. - — r z o. Road Name or Number I 3 ` _ - u . E. begin &End Termiri a A F. Project Description G.Structure ID i, i. - os 14 !44n6(007) 2143 0c,0?!Y1 hr,a �2 F _ _RRR h3 E i7 P Tim' CE c E Not Hill Blvd&Fair Pore VS Improvements rhb Hill Blod E Nob Hill Plod to Fair Pop. 'widen Hah Hill Eau le,Gnl Trough the intersection,con—stmt le*.tum lane,tut, gamer,<d ewalk,street lighting and drainage. Upgrade signal.including mast arm :tortures. Fundng Status Phase Phase Start Year I'i {Y'{I Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds S CN 2024 3TP(US) 1.175.110 0 180.831 1,364,941 Totals 1,175.110 0 189.831 1.364,941 Expenditure Schedule Phase lit 2nd 3rd 4th 5th &6th CN o 1 384 a4l 0 0 0 Tdals I. 1. F4.$41 0 0 0 Report Date: May 17, 2022 Page 14 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'v.a'200 Y hside N Outside P. oa p — ti w A. PIN/Project No. B.STIP ID ° A yz C. Project Title sLL 3 k. _ u r D. Road Name ar Number v r B u S y u `..'S er E.Begin &End Terrain - F. Project Descripti:r G.Structure ID a 4,, i. - 04 15 YAK104 Oh,0?t11 0e.0 �. F _u__; 05 C E 0 P S 1.530 PE do ' T iiii Teton Dime Resurfacing Teton Linve Lnnd and ooeda v.3 nd °DAcuth ramp replacement. Fundng Status Phase Phrase Start Year(YYYY) Federal FtM Code Federal Fords State Ftrid Lode ;the Fads Local Funds Total Funds P PE 1015 0 TIP a?Aoo 24.260 121,260 P CN 2025 0 TI8 I,I03:too 277,200 1,386A00 Totals 0 1205200 301,480 1,507 260 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 121260 0 0 CN 0 0 1,386A00 0 0 Tdals 0 0 1,507260 0 0 Report Date: May 17, 2022 Page 15 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakirra MPO/RTPO: t^.:U0rs Y hside N Outside 1 - v o w A. PIN/Project No. B.STIP ID 3 ° ,may y C. Project Title s LL k. _ w sHr I. r D. Road Name ar Number v §i 3 = y y u c E.Begin &End Termiri . - - F. Project Description G.Structure ID a 16 i. - 17 16 YAK93 OrT0?!Y! Oh.a?722 F-2021.sq8 38 C i7 T 0.000 LE Yes Powerhouse Road Multi-Use Path Powerhouse Road Mobile Home Pa rk to Cow iche Canyon Rd. Construct 10-bot wide multi-use path tom90th Avenue/US 12 intersection to Powerhouse Road. Fundng Status Ptrise Phase Start Year(YYYYJ Federal Furd Code Federal Furds State Find Code State Finds Local Furds Total Finds P PE Ci 0 0 Ped181ke Program 44,500 5,500 50.000 P CH 2028 0 PedlBike Program 341,835 42,250 384,085 Totals 0 386,335 47,750 434,085 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 50A00 0 CN 0 0 0 0 384.085 Tdals 0 0 0 50A00 384.085 Report Date: May 17, 2022 Page 16 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: Y':U0P.; Y hside N Outside P. 5 p - - ti PI w A. PIN/Project No. B.STIP ID ° -3 pc; a D y C. Project Title s LL 3 _ r D. Road Name cc Number A a 5' a A 0. E.Begin &End Termiri '^as m i 5� `� F. Project Description G.Structure ID a p 16 t 7 a.. - 07 17 YAK 107 06.07t02 0007 2 R-1022.XXX 28 CUPST 0.450 LE No ' ii, Shh Atenoe Sidewalk : Erth :.venue Teton On ,e to 3amminie,o Avenue 1:bn nact sidewalk: on eat jde of roadway. Fundng Status Phi se Purse Start Year(YYYY) Federal Furd Code Federal Fords State Find Lode State Fonds Local Funds Total Funds P PE 1U : 0 S RI S a,080 0 80.00 P CN 2024 0 SRTS 5P' .150 0 588.150 Totals 0 657.240 0 657.240 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 89 A90 0 0 0 0 CN 0 588.150 0 0 0 Totals 89 090 568,150 0 0 0 Report Date: May 17, 2022 Page 17 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':U0r..; Y hside N Outside v o w A. PIN/Project No. B.STIP ID 3 ° - _ 1/2- C. Project Title s LLkk i ' _ H. r D. Road Name or Number A a o A c E.Begin &End Termiri 0 r. 'r3 m z - F. Project Description G.Structure ID a p 3 it 10 18 YAK102 06.0?t h 01 0 .07�2 E,^_0^_2.4$B 21 P T 0.050 CE No N 1st St&R St Signal N. 1st St. R Street to R Street hstall to fnc signal atthe intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2027 STP 88.990 0 10.395 77,385 - P CN 2028 STP 401.709 0 82.722 484,431 — Totals 468.699 0 73,117 541.816 E xpenjlture Schedule Phrase 1st 2nd 3rd 4th 5th &6th PE 0 0 0 0 77,385 CN 0 0 0 0 484.431 Tctals 0 0 0 0 i 541.816 Report Date: May 17, 2022 Page 18 ��_� Washington Stat o1Te Six Year Transportation Improvement Program v71 Department Transportation DRAT a From 2023 to 2028 Agency: Yakima Courty: Yakima MPO/RTPO: YVCOC Y hside N Outside rpill o D ° ti P2 r k A. PIN/Project No. B.STIP ID A = 5 C. Project Title := m • _ °' a A D. Road Name cc Number A a ii - a g c E.Begin &End Termiri r.0 '? m z .2 ['I q� v, w A F. Project Description G.Structure ID 3 a a 9 g ,u a 14 19 YAKS? 08A??22 [lb.O7 2 E,^_0 2.XXX 11 C P T 0.010 CE No 18th Street Underpass Yakima Axenue Yakima Axenue to 18th Street Replacethe bridge on E.Yakima Avenue that crosses over 18th Street. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2026 BR 311,970 0 77,970 389.940 P CN 2027 BR 2,974960 0 743,590 3,711950 Totals 3,286930 0 821,560 4,107,8901 E xpenilture Schedule Ptra se 1st 2nd 3rd 4th 5th &6th PE 0 0 0 354,490 0 CN 0 0 0 0 3,379950 Tctals 0 i 0 354490 3,379950 Report Date: May 17, 2022 Page 19 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: YVCOC Y hside N Outside rn.p A. — ti r A. PIN/Project No. B.STIP ID n - A 5 z C. Project Title s LL �. °' . '� D. Road Name ix Number. 0 B = � u y w c E.Begin &End Termin _ S _ LE law M F. Project Descripticn G.Structure ID a i, i. - 04 20 YAK 103 06.0?t01 08.0?22 F-PUP'_RRR 05 E G PST 0.030 E E No S.1st Street and E.Washington uoenue Inter anion Improvements 1st Street Int shinpton;.tenoe to UL`3shington :venue Realign interseo➢on.w iden E.i111'3 FJraton ue tor addrtiona l lane.replace curb, gutter,id ewalk.and constuct new signal. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Ends P ALL 2027 0 0 1. 05.725 1.70,725 Totals 0 0 2,705,725 2,705,725 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &6th ALL 0 0 0 0 2,705,725 Tdals 0 0 0 . 2,705,725 Report Date: May 17, 2022 Page 20 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: YVCOC Y hside N Outside oT r A. PIN/Project No. B.STIP 10 3 - H.5 C. Project Title m . 2 c D. Road Name cc Number 0 a a o' a - N c E.Begin &End Termin m z = { 3 5� v, w M F. Project Oescripticri G.Structure ID a p I6 tu _ x. - 14 21 YAK14 06.0m2 0h.0L22 R,`_0`_?.XXX 21 C. 0 P G T CE V_c MI' ffih hinptert F enue R Lonanber Road Intersection tnprovements tIE shirigton :::,e nue Ulb<.tiimnon •e:,e nue to Longiher Eb ad hprove the iIIt3 stun gto ri A,enue!Lonsliber Road intersecton byeonstruction of channelization,a signal.or a roundabout. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds — S PE 2023 0 0 100,000 100,000 P RW 2024 0 0 150,000 150,000 P CN 2025 0 0 1000,000 1,000p00 Totals 0 0 1250,000 1250 1:100 Expenditure Schedule Phase 1st 2nd 3rd ath 5th &6th PE 100,000 0 0 0 0 RW 0 150,000 0 0 0 CN 0 0 1.000U000 0 0 Tdals 100,000 150,000 1.000 fiil0 0• 0 Report Date: May 17, 2022 Page 21 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'.iU0t3 Y hside N Outside 1 — P. - a p — ti w A. PIN/Project No. B.STIP ID Ti A = y C. Project Title I 3 _ r D. Road Name ar Number v 3 � u - { c E.Begin &End Terrain - S `� F. Project Description G.Structure ID a i, - i. - 14 22 YAK84 a6 07m22 oh.W 2 F-LOL'_444 o4 0 G U P S 0.400 0 E Yes T iv 16th Aenue and Tieton Drive htersecdon tnpro,!ements 16thAtenue 16th Aten ue to Tieton Dive Re nsntot and widen 16M Avenue and Tieton Lime bar adding let-tim lanes for all movements atthe intersection. Upgrade the traniu Signal. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Finds P PE 2028 STP(UL) 358,512 0 53.92 412,104 P RW 2028 STP(UL) 1,498 507 0 2"0893 1,732,500 P CN 2028 STP(UL) 1,6401683 0 2511.433 1,893,166 Totals 3 4??t02 0 52 :388 4,037,770 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th &RYh — PE 0 0 0 0 412,104 — RW 0 0 0 0 1,732,500 — CN 0 0 0 0 1,893,166 Tdals 0 0 0 0 4,037,770 Report Date: May 17, 2022 Page 22 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: Y':1:0C Y hside N Outside P. w A. PIN/Project No. B.STIP ID 3 ° - �4 _ y C. Project Title s LL _ 7, D. Road Name cc Number A a o { c E.Begin &End Termiri '^ m i 5� - F. Project Description G.Structure ID 3 ca. a 9 g , i. - 04 23 YAK 1090E.0?!Yt 0E07 2 R2021.XXX 28 C. GPGT 0.400 CE Yes U0, F3irAtence Sidewalk Fair uaen ue Pas it: :h,enue to Nob Hill Fouleirard Co rwtnjot sidewalk on wet side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Fords State Find Code State Finds Local Funds Total Finds P ALL 2024 0 0 500 560 500 560 Totals 0 0 500,560 500,560 Expenditure Schedule Phase 1st 2nd 3rd 4th `th S6th ALL 0 500560 0 0 0 Tctals 0 500 560 0 0 0 Report Date: May 17, 2022 Page 23 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'tstO3 Y hside N Outside P. a p - ti w A. PIN/Project No. B.STIP ID ° A = y C. Project Title s LL _ �,, D. Road Name cc Number v Yi 3 y y { c E.Begin &End Termiri 5 - S `� F. Project Descripticn G.Structure ID a i6 4 - 04 24 YAK 110 08.0?t11 OB.07 2 F-2021.s$A 28 C G PST 1.500 E E Yes um Nob Hill Boulevard Sidewalk Nob Hill Boulevard 12th Steetto 14th Street Construct sidewalk on south side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Fords State Find Code State Finds Local Funds Tcrtal Ends P ALL 102* 0 0 175.868 175.'.?,: Totals 0 0 175.868 175.F62 Expenditure Schedule Phase 1st 2nd 3rd 4th `th &6th ALL 0 0 0 0 175.868 Tctals 0 0 0 0 175.868 Report Date: May 17, 2022 Page 24 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y':1:013 Y hside N Outside v a p — ti rr A. PIN/Project No. B.STIP ID ° A y z C. Project Title s LL S 4. _ u r O. Road Name cc Number 0 r B = � S y— { er E.Begin &End Terrain -F. Project Descripticn G.Structure 10 a i, . i. - 04 25 YAK 111 O6A7t22 fib UL22 F _u_s-k Oa r , PST 1.500 i_E No ' ati 8th Avenue F.ea'way lrrproce me me bit, ::.Hems e itrb Iran Street to River Ftad Recvn3mst maduiapincluding tmlleppn.HOSIons. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Furds St;te Pond Code State Finds Local Furds Total Ftrid S PE 2023 0 0 300,000 2u0.0u0 P PE 2023 0 0 700,000 700,000 P CN 2025 0 0 6564,880 6,564,880 Totals 0 0 7564,880 7,564,880 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th S6th PE 300 000 700 000 0 0 0 ALL 0 0 8,584A80 0 0 T•tals 300 A00 700,000 6,564280 ic 0 Report Date: May 17, 2022 Page 25 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'e;00 Y hside N Outside 1 — v p n — ti A. PIN/Project No. B.STIP ID n I1 .' A 5 i C. Project Title s LL �. = u r c D. Road Name ar Number A Ba - _ d . E.Begin &End Termiri _ w S _ 0 d F. Project Description G.Structure ID a i, i. - 05 26 YAK 112 08 A?t11 00.a?12 Rama'_444 04 C u P S T 0.030 0 E No Pimmert,muse Road and Englewood Posenue Intersedion Irtprovements ,u Pow ertrou re Road Englewood;:,en ue to Englewood Pomnue hstall tra in,: signal at the intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Fords State Find Code State Finds Local Funds Total Finds P ALL 102* 0 0 1014.431 1.014.431 Totals 0 0 1.014.431 1,014431 Expenditure Schedule Phase 1st 2nd 3rd dth `th &Sth ALL 0 0 0 0 1,014,431 Tdals 0 0 0 1. 1.014431 Report Date: May 17, 2022 Page 26 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: rt4.200 Y hside N Outside P. A. PIN/Project No. B.STIP 10 JDa p wti A A = .- y z C. Project Title s LL _ °' s D. Road Name cc Number. A a o' { er E.Begin &End Terrain *' m i 5-c - F. Project Descripticr G.Structure ID a o g 7 a 04 27 YAK 113 06.0711 0b.07 2 R,^_0^__XXX 28 C. G PST 0.010 CE No mi. l,1~3d A,fi nue Pede stnan Signal h1e ad ::4e nue 10th risen ue to 10tth.Aenue hstall pedetnan signal at the east leg ofthe intersection. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Fords State Find Code State Finds Local Funds Total Finds P ALL 102* 0 0 418,030 418.00D Totals 0 0 418,030 418.030 xperlditure Schedule Phase 1st 2nd 3rd 4th `th 88th ALL 0 0 0 0 418,030 Totals 0 0 0 0 418,030 Report Date: May 17, 2022 Page 27 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'v:U00 Y hside N Outside P. a p — ti w A. PIN/Project No. B.STIP ID ° A = c C. Project Title s LL _ �,, D. Road Name cc Number A 3 y y S c E.Begin &End Termiri 5 - S `� F. Project Description G.Structure ID a 16 i - 04 28 YAK 11908A7122 fib.W 2 F-POP"_s$A 28 C G PS T 0.120 CE Yes it N. 18th Aienue Sidewalk N. 18th Aienue Rver Road to"J'Street Construct sidewalk on west side of roadway. Fundng Status Phase Phase Start Year(YYYY) Federal Furd Code Federal Furds State Find Code State Finds Local Furds Tc't I Et.rd: P ALL 102* 0 0 209.022 209.022 Totals 0 0 209.022 205022 Expenditure Schedule Phase 1st 2nd 3rd 4th `th &8th ALL 0 0 0 0 209022 Tctals 0 0 0 0 209 P22 Report Date: May 17, 2022 Page 28 �_ Washington State Six Year Transportation Improvement Program �// Department o1 Transportation From 2023 to 2028 Agency: YakimaDRAB a Courty: Yakima MPO/RTPO: Y':U00 Y hside N Outside 1 - v o w A. PIN/Project No. B.STIP ID r - ,r - _ y C. Project Title s LL _ - r D. Road Name ar Number A a o . E.Begin &End Termiri r '? m i 5� _ - F. Project Description G.Structure ID a o g , r. - 00 29 V A-14321 08.07/22 Or 07 2 F,?011 XXX 28 0 100 N, Ul@st Valley Schools Pedestrian Bridge S.75th Avenue S.75th A.enue to UW Community Park Construct new pedestrian bridge mertAilde Hollow creek connecting S.7511 Avenue to WV Park and schools Fundng Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Furds State Fuld Code Mate End= Lcs;I Fur& Tcrtal Erids P CN 2023 0 S F:TS LOUD LEE' 0 _.00E EIIOD Totals 0 2.000 A00 ir 2,000 A00 Expenditure Schedule Phase 1st 2nd 3rd 4th `th aGth CN 2000A00 0 0 0 0 Trials 2000 A00 0 0 0 0 Report Date: May 17, 2022 Page 29 �_ Washington State Six Year Transportation Improvement Program �// Department of Transportation From 2023 to 2028 Agency: Yakima DRAB a Courty: Yakima MPO/RTPO: Y'.:U00 Y hside N Outside v a — P.. FIN/Project No. B.STIP ID 3 T _ a y c Project Title m k. - Pt 5 o. Road Name cc Number I 3 ` y _ ti A E Begin &End Termin 5zi F. Project Descripticn G.Structure ID a 16 j a EE 30 WA.14324 08A?t11 Oda? 2 R-POP'_sMA 21 CE No 2033 i=irV Safety to zt pedestrian and [i pde art at citetr tutrrsesdcr t_ develop Lmre local road salty plans. Upgrade sprat equipment at several signalized intenrttlons and program for leading pedestian Inter‘al s. Fundng Status Phase Phase Start Year(YYYY) Federal Fund Lode Federal Funds State Find Code State Finds Loc;I Fund_ Total Ends P PE 2023 HSIP 239,400 0 26.600 2titi,m0 P CN 2023 HSIP 69,000 0 0 69.000 Totals 308.400 0 26.600 335,,000 Experditure Schedule Phase 1st 2nd 3rd 4th 5th &6th PE 286 p00 0 0 0 0 CN 69 A00 0 0 0 0 Tdals 335,000 0 0 0 0 Federal Funds State Finds Local Funds Total Finds Grand Totals for Yakima 25,230,549 19,546,235 25,716,462 70,493,246 Report Date: May 17, 2022 Page 30