HomeMy WebLinkAbout06/16/2015 10 2016-2021 Six-year Transportation Program (TIP) AmendmentITEM TITLE:
SUBMITTED BY:
SUMMARY EXPLANATION:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 10.
For Meeting of: June 16, 2015
Public Hearing to consider: A) Resolution adopting the Six-year
Transportation Improvement Program for the years 2016 to 2021,
and to amend the Metropolitan Transportation Plan; and B)
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element
Debbie Cook, Director of Utilities and Engineering
Brett Sheffield, Chief Engineer
Attached is the 2016 — 2021 Six-year Transportation Improvement Program (TIP), along with an
explanation sheet that describes the information contained on the various columns of the Six-year TIP. No
new projects have been added.
Projects that that have been removed from the 2015 — 2020 TIP as they were completed or the funds were
obligated include:
• #3 Tieton Drive and 64th Avenue Intersection Improvements
• #10 E. Lincoln Avenue and 10th Street Roundabout
• #16 West Valley Middle School Safety Improvements
Project #33, N. 1st Street and `I' Street Signal Upgrade, has been removed because this work is being
included in the N. 1st Street Revitalization, MILK to 'N' Street project, renumbered #3.
Council and the public are welcome to add other arterial system projects to the list. The six-year TIP
project listing will be finalized at the June 18th hearing and sent to the Yakima Valley Conference of
Governments (YVCOG) after approval.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue of
federal revenue will be used.
The current plan for 2016 — 2021 includes ten projects that are funded. Funding for the remainder of the
projects will continue to be sought. The funded projects include:
#1 — Yakima Railroad Grade Separations, Phase 4
#2 — North 1st Street Revitalization, 'N' Street to SR 12
#3 — North 1st Street Revitalization, MILK to 'N' Street
#4 — East Nob Hill Boulevard and Fair Avenue Intersection Improvements
#6 — Powerhouse Road Sidewalk
#7 — Yakima Valley Transportation Company Preservation
#44 — Northside Alley Pavers
#45 — S. 80th Avenue Bridge
#46 — Wide Hollow Bridge
#47 — Lincoln Avenue Corridor Safety Improvements.
Six-year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal
Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on
which certain funds can be used and activities for which funds can be used and promotes the role of the
Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-
LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state
to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal
funds for the transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the
State of Washington for approved State funding agencies. The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington Transportation
System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation
network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant.
These projects have been identified through the planning process as the highest priority for the available
funding to the state's transportation program. Planning activities of state and local governments are
essential parts of integrated regional planning processes. Long range transportation planning is a part of
the comprehensive land use planning carried out by local governments. Citizen participation is an integral
part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year
transportation program. All local agencies are required to hold at least one public hearing during the
development of the six-year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking
will be integrated with other project needs and the total list will be reviewed and adjusted to the particular
need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to
incorporate the adopted six-year TIP for 2014 to 2019. This will ensure that we are in compliance with
the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The
amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the
"once a year" change required under the laws of the Growth Management Act.
Resolution: Ordinance:
Other (Specify): Six -Year TIP
Contract: Contract Term:
Start Date: End Date:
Item Budgeted: Amount:
Funding Source/Fiscal Impact:
Strategic Priority:
Insurance Required? No
Mail to:
Phone:
APPROVED FOR
SUBMITTAL:
RECOMMENDATION:
City Manager
Adopt the Six -Year TIP and amend the regional Metropolitan Transportation Plan and Comprehensive
Plan Capital Facilities Element.
ATTACHMENTS:
Description Upload Date
1-11 Resolutions 6/8/2015
1-11 Six -Year Transportation Improvement Program 6/8/2015
1-11 Explanation Sheet 6/8/2015
Type
fesollu.utiion
E.iiixhii 15111
E.iiixhii 15111
RESOLUTION NO. R — 2015 -
A RESOLUTION adopting the Six -Year Transportation Improvement Program for the
period of 2016 through 2021 for the construction of streets and
arterials streets in the City of Yakima and amending the Metropolitan
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the
ensuing six year period, all as contemplated and required by State RCW 35.77.010 and
applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation
Plan to ensure compliance with the Growth Management Act and the regional transportation
plan for the construction of streets and arterial streets in the City of Yakima, all as
contemplated and required by State and Federal law, and
WHEREAS, after public hearings on the matter, held at the regular meeting of the
Yakima City Council on June 2, 2015 and June 16, 2015, with proper public notice as
required by RCW 35.77.010, the City Council finds that the plan attached hereto should be
adopted as the Six -Year Transportation Improvement Program for the period of 2016
through 2021 for the construction of streets and arterial streets in the City of Yakima, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2016 through 2021, a copy of
which is attached hereto and by this reference made a part hereof, is hereby adopted as the
official Six -Year Transportation Improvement Program for the City of Yakima, including
proposed amendments to the Metropolitan Transportation Plan along with Street
Improvements, which are also approved.
ADOPTED BY THE CITY COUNCIL this 16th day of June, 2015.
Micah D. Cawley, Mayor
ATTEST:
City Clerk
RESOLUTION NO. R — 2015 -
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the Six-year Transportation
Improvement Program (TIP) for the period of 2016 through 2021.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year
Transportation Improvement Program for the construction of streets and arterial streets in
the City of Yakima for the ensuing six year period, all as contemplated and required by State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the
Six-year Transportation Improvement Plan for the period of 2016 to 2021 to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated
and provided under RCW 36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, public hearings were held by the Yakima City Council on the Six-year
TIP on June 2, 2015 and June 16, 2015, with proper public notice as required by RCW
35.77.010; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six -Year Transportation Improvement Program for the period of 2016
through 2021 for the City of Yakima shall be incorporated as an amendment to the Capital
facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 16th day of June, 2015.
Micah D. Cawley, Mayor
ATTEST:
City Clerk
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road -Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
j y
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
Yakima Railroad Grade Separations - Phase 4
Lincoln Avenue
from: N. 1st Street to: N. 1st Avenue
Install art as project aesthetics for the railroad grade
separations, and construct raised sidewalk on the south
side of Lincoln Avenue
01
06
07
08
5
0.2
T
P
G
0
CN
1/1/2016
650
650
650
EA
Yes
9/1/2009
Totals 0 0 650 650 650 0
14
2
North lst Street Revitalization
North 1st Street
from: 'N' Street to: SR 12
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
3
06
5
0.42
P
T
0
C
CN 11/1/2018
1 STP(U)
I 2,7181
I 4241 3,1421 3,142
I
CE
No
Totals 2,718 424 3,142 3,142
14
3
North lst Street Revitalization
N. 1st Street
from: MLK Blvd. to: 'N'Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
06
12
P
0.98
P
T
G
C
CN
1/1/2016
TIGER
8,000
8,000
8,000
CE
Yes
12/31/2015
Totals 8,000 0 8,000 0 0
14
4
E. Nob Hill Blvd. & Fair Ave. 1/5. Improvements
Nob Hill Boulevard
from: E. Nob Hill Blvd. to: Fair Ave.
Widen Nob Hill Boulevard through the intersection,
construct left -turn lane, curb, gutter, sidewalk, street
lighting and drainage. Upgrade signal by installing mast
arm structures.
03
04
31
5
N/A
P
T
W
C
0
RW
CN
1/1/2016
6/1/2018
STP(U)
STP(U)
187
1,457
I 29
227
216
1,684
216
1,684
I
CE
Yes
1/1/2018
Totals 1,644 256 1,900 0 1,684
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
T,
C
u
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
5
Powerhouse Road Sidewalk
Powerhouse Road
rom: Cowiche Canyon Rd to: Mobile Home Park
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
05
12
5
0.6
0
CN
1/1/2016
TAP
245
245
245
CE
No
Totals 245 245 245
14
6
Yakima Valley Transportation Company Preservation
Yakima Avenue
rom: Yakima Avenue to: 6th Avenue
Remove and replace a portion of the existing trolley
rail in the vicinity of the intersection of 6th Avenue
and Yakima Avenue.
03
5
0.02
0
CN
1/1/2016
STP(E)
521
521 52
CE
No
Totals 52 52 52
19
7
Adams Elem./Washington M.S. Sidewalk Improvements
Various Streets
rom: to:
This project will make various pedestrian safety
improvements in the vicinity of Adams Elementary
School and Washington Middle School, such as,
constructing sidewalks, improving roadway crossings
and installing flashers
12
P
N/A
P
T
0
PE
RW
CN
1/1/2016
1/1/2017
5/1/2017
SRTS
SRTS
SRTS
25
50
253
30
25
50
283
25
50
283
CE
Yes
5/1/2017
Totals 328 30 358 25 333
19
8
Garfield Elementary Safety Improvements
Various Streets
rom: to:
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementary
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers.
12
P
N/A
P
T
0
PE 11/1/2016
RW 1/1/2017
CN 5/1/2017
SRTS
SRTS
SRTS
121
20
128
I 13
I 121 12
20
141
20
141
CE
Yes
1/1/2017
Totals 160 13 173 12 161
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
12
9
SR 12 & 16th Avenue Interchange
Westbound ramps of SR 12
rom: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
03
06
P
N/A
0
PE
CN
1/1/2017
1/1/2018
STP(U)
STP(U)
86
779
14
121
100
900
100
900
CE
No
Totals 865 135 1000 100 900
16
10
1-82 & Lincoln Avenue Interchange
Lincoln Avenue
rom: E. 'G' Street to: 1-82
Reconstruct/extend off -ramp from existing 1-82 off -
ramp for Lincoln Avenue to E. 'G' Street.
01
P
N/A
0
P
G
PE
RW
CN
1/1/2017
1/1/2018
6/1/2019
STP(U)
STP(U)
STP(U)
260
173
1,730
40
27
270
300
200
2,000
300
200
200
2,000
CE
No
Totals 2,163 337 2,500 0 500 200 2,000
14
11
Yakima Avenue& Fair Ave. Signalization
E. Yakima Ave.rom: E. Yakima Ave. to: Fair Ave.
Install traffic signal at the intersection of Yakima
Avenue and Fair Avenue.
12
P
N/A
P
T
W
5
0
PE 1/1/20181 STP(U)
CN 16/1/2019 STP(U)
I 5191
1
I 81I 6001411
1001 600
CE
No
Totals 605 95 700 100 600
16
12
3rd Ave. Washington
(o rd Avenue
W. Washington Ave.
Upgrade the traffic signalization system
12
P
N/A
P
T
PE
CN
4/1/2017
9/1/2017
I
I
0 20
I 2101 210
230 230
20
210
230
CE
No
Totals 230 230 230
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
c. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
13
S. 1st St. & E. Washington Ave. 1/5 Improvements
03
P
N/A
P
PE
1/1/2017
STP(U)
260
40
300
300
CE
Yes
South 1st Street
06
W
RW
1/1/2018
STP(U)
260
40
300
100
200
rom: S. 1st Street to: E. Washington Ave.
5
CN
1/1/2019
STP(U)
1,211
189
1,400
1,400
1/1/2019
Realign intersection, widen E. Washington Avenue to
accommodate an additional lane, replace curb, gutter
and sidewalk, and install a new traffic signalization
system.
T
0
Totals 1,731 269 2,000 400 200 1,400
17
14
S. 48th Avenue Reconstruction
03
P
1.00
P
PE
1/1/2017
STP(U)
223
35
258
258
CE
Yes
South 48th Avenue
05
T
RW
1/1/2018
STP(U)
519
81
600
600
rom: Summitview Ave. to: Nob Hill Blvd.
W
CN
1/1/2019
STP(U)
1,485
232
1,717
1,717
1/1/2019
5
Reconstruct and widen 48th Avenue, install curb,
gutter, sidewalk, street lighting and drainage system.
0
Totals 2,227 348 2,575 0 258 600
16
15
Tieton Dr. & S. 5th Ave. 1/5 Improvements
12
P
N/A
P
PE
1/1/2017
STP(U)
69I
11
80I 80
CE
Yes
Tieton Drive
rom: Tieton Dr. to: 5. 5th Ave.
W
5
RW
CN
1/1/2018
6/1/2019
STP(U)
STP(U)
104
I 865
16
I 135
120
1,000
120
1,000
5/1/2019
Remove existing traffic signal and construct a
roundabout, remove and replace curb, gutter,
sidewalk, street lighting and drainage
T
0
Totals 1,038 162 1,200 80 1,120
16
16
E.' H' Street Extension, Ph. 1
01
P
1.10
P
PE
1/1/2017
STP(U)
432
68
500
500
CE
Yes
E.'H'Street
08
T
RW
1/1/2018
STP(U)
432
68
500
500
rom: 1st Street to: Yakima River
W
CN
1/1/2019
STP(U)
2,162
338
2,500
2,500
12/1/2018
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
5
0
Totals 3,026 474 3,500 500 500
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
c. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
17
Cascade Millsite Parkway
North 10th Street
rom: 'H' Street to: Lincoln Ave.
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
06
P
1.3
P
T
W
5
0
PE
RW
CN
1/1/2016
1/1/2017
1/1/2018
STP(U)
STP(U)
STP(U)
350
2,746
3,837
54
429
599
404
3,175
4,436
404
3,175
4,436
CE
Yes
1/1/2018
Totals 6,933 1,082 8,015 404 3,175 4,436
17
18
Yakima Downtown Future Initiatives, Phases
rom: 1st Street to: 9th Street
Install historic lighting, sidewalk modifications and
other improvements. Exact improvement area(s) to
be determined
06
12
P
0.15
P
T
C
S
PE
CN
1/1/2017
4/1/2018
OTHER
I (OTHER
500
5,500
I 5,500500
500
5,500
CE
No
Totals 6,000 500 5,500
19
19
75th Avenue Improvements
75th Avenue
rom: Mead Ave. to: Nob Hill Blvd.
Construct a new two-lane roadway and widen
portions of existing roadway, install curb, gutter,
sidewalk, street lighting and storm drainage system.
01
08
P
0.50
P
W
5
T
O
PE
RW
CN
1/1/2018
1/1/2019
1/1/2020
STP(U)
STP(U)
STP(U)
87
173
1,038
13
27
162
100
200
1,200
100
200
1,200
CE
Yes
Totals 1,500 100 1,400
14
20
Washington Ave.&LongfiberRd.Intersection
Washington Avenue
rom: Washington Ave. to: Longfiber Rd.
intersection by constructing an eastboung left -turn
lane on Washington and a northbound left -turn lane
on Longfiber, install or replace curb, gutter, sidewalk,
03
05
06
P
N/A
C
T
W
5
0
PE
RW
CN
1/1/2017
1/1/2018
1/1/2019
STP(U)
STP(U)
STP(U)
100
100
688
14
14
107
114
114
795
114
114
795
CE
Yes
1/1/2019
Totals 888 135 1,023 114 114 795
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
c. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
E. Nob Hill Blvd. & S. 18th Street 1/S Improvements
E. Nob Hill Boulevard
rom: E. Nob Hill Blvd. to: S. 18th Street
Widen south leg for double left turn from westbound
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
01
04
P
0.10
C
T
W
5
PE
RW
CN
1/1/2017
1/1/2018
1/1/2019
STP(U)
STP(U)
STP(U)
50
50
346
8
8
54
58
58
400
58
58
400
CE
Yes
1/1/2018
Totals 446 70516 58 58 400
17
22
Powerhouse Rd. & Englewood Ave. 1/5
Powerhouse Rd.
rom: Powerhouse Rd. to: Englewood Ave.
Realign intersection, install curb, gutter, sidewalk and
safety flashing signal. Possibly construct a
roundabout.
12
P
N/A
P
T
C
5
0
W
PEI 1/1/2018
RW 1/1/2019
CN 1/1/2020
STP(S)
STP(S)
STP(S)
431
87
500
71 SOI
13 100
78 578
SOI
100
578
CE
Yes
1/1/2019
Totals 630 98728 0 50 678
14
23
S. 48th Ave. & Summitview Ave. Signalization
Summitview Avenue
rom: Summitview Ave. to: 5. 48th Ave.
Install traffic signal at the intersection of Summitview
Avenue and 48th Avenue.
12
P
N/A
P
T
PE
RW
CN
1/1/2018
6/1/2018
1/1/2019
STP(S)
STP(S)
STP(S)
25
I 25
554
41 291
4 29
81 635
29
29
635
CE
Yes
1/1/2019
Totals 604 89 693 58 635
14
24
W. Lincoln Ave. & MLKBIvd. Realignment
W. Lincoln Avenue
rom: N. 5th Ave. to: Custer St.
Realign W. Lincoln Avenue, install curb, gutter,
sidewalks, street lighting, drainage.
01
12
P
0.50
C
T
W
5
0
P
G
PE
RW
CN
1/1/2017
1/1/2018
1/1/2019
STP(E)
STP(E)
STP(E)
424
1,047
1,801163
1,210
I 671 491
281 2,082
491
1,210
I 2,082
CE
Yes
1/1/2019
Totals 3,272 511 3,783 491 1,210 2,082
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
T,
C
u
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
25
E. Nob Hill Boulevard Reconstruction
03
P
0.85
C
PE
1/1/2017
STP(U)
545
85
630
630
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2018
STP(U)
1,090
170
1,260
1,260
rom: S. 6th Street to: S. 18th Street
06
W
CN
1/1/2019
STP(U)
6,532
1,020
7,552
7,552
1/1/2019
5
Reconstruct and widen roadway to 5 lanes with
intersection improvements, curb, gutter, sidewalk,
street lighting and drainage system
0
P
G
Totals 8,167 1,275 9,442 630 1,260 7,552
14
26
S. 72nd Ave. & W. Washington Ave. 1/5
12
P
N/A
P
PE
1/1/2017
STP(C)
91
14
105
105
CE
Yes
5. 72nd Avenue
06
T
RW
1/1/2018
STP(C)
91
14
105
105
rom: s. 72nd Ave. to: W. Washington Ave.
0
CN
1/1/2019
STP(C)
544
86
630
630
1/1/2019
Improve intersection by installing a traffic signal
system or roundabout.
5
W
Totals 726 114 840 105 105 630
17
27
S. 66th Avenue Improvements
03
P
0.76
P
PE
1/1/2017
STP(E)
86
14
100
100
CE
Yes
66th Avenue
04
T
RW
1/1/2018
STP(E)
173
27
200
200
rom: Summitview Ave. to: Scenic Dr.
W
CN
1/1/2019
STP(E)
1,096
164
1,260
1,260
1/1/2019
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, storm drainage system and
utilities.
5
0
Totals 1,355 205 1,560 100 200 1,260
14
28
N. 40th Ave.&SummitviewAve.Intersection
12
P
N/A
P
PE
1/1/2017
STP(U)
126
17
143
143
CE
Yes
N. 40th Avenue
T
RW
1/1/2018
STP(U)
130
20
150
150
rom: N. 40th Ave. to: Summitview Dr.
W
CN
1/1/2019
STP(U)
692
108
800
800
1/1/2019
Improve the intersection by constructing larger
corner radii, lengthening the turn lanes, and
upgrading the traffic signal system.
5
0
Totals 948 145 1,093 143 150 800
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Iv
C
tg
•Code
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
N. 40th Ave. & Englewood Ave. Intersection
N. 40th Avenue
rom: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
12
P
N/A
P
T
PE
CN
1/1/2018
6/1/2018
STP(U)
STP(U)
43
260
7
40
50
300
50
300
CE
No
Totals 303
47 350 350
14
30
N. 16th Avenue & Fruitvale Blvd. 1/5
N. 16th Avenue
rom: N. 16th Ave. to: Fruitvale Blvd.
Improve the intersection by constructing larger curb
radii, installing ADA ramps, and upgrading the traffic
signal system.
12
P
N/A
P
T
0
5
W
PE
RW
CN
1/1/2017
1/1/2018
1/1/2019
STP(U)
STP(U)
STP(U)
1261
173
400
I 18I 144
27 200
62 462
144
200
I 462
CE
Yes
1/1/2019
Totals 699
107 806 144 200 462
17
31
Rudkin Road Reconstruction
Rudkin Road
rom: E. Viola Ave. to: Rainier PI.
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
03
06
P
0.76
P
T
W
5
PE
CN
1/1/2017
1/1/2018
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1,996
136
1,996
CE
No
Totals 1,054
133 2,132 136 1,996 0
16
32
E. Mead Avenue Reconstruction
E. Mead Avenue
rom: Rudkin Rd. to: Fair Ave.
Partner with Union Gap to reconstruct E. Mead
Avenue, install curb, gutter, sidewalk and storm
drainage system.
03
06
P
0.76
P
T
S
C
G
0
PE
CN
1/1/2018
1/1/2019
STP(S)
STP(S)
122
1,730
TPP
TPP
23
206
7
70
152
2,006
152
2,006
CE
No
Totals 1,852
229 77 2,158 152 2,006
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Iv
C
tg
•Code
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
33
S. 80th Avenue Improvements
04
P
1.30
P
PE
1/1/2019
AIP
131
20
151
151
CE
Yes
S. 80th Avenue
T
RW
1/1/2020
AIP
382
59
441
441
rom: Tieton Drive to: Zier Road
0
CN
1/1/2021
AIP
1,667
260
1,927
1,927
1/1/2021
5
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
W
C
Totals 2,180 339 2,519 2,519
17
34
Englewood Avenue Improvements
05
P
1.00
P
PE
1/1/2019
STP(C)
272
43
315
315
CE
Yes
Englewood Avenue
06
T
RW
1/1/2020
STP(C)
349
55
404
404
rom: N. 40th Ave. to: N. 56th Ave.
W
CN
1/1/2021
STP(C)
2,352
340
2,692
2,692
1/1/2021
5
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
0
C
Totals 2,973 438 3,411 3,411
17
35
Englewood Avenue Improvements
05
P
0.50
P
PE
1/1/2019
STP(U)
136
21
157
157
CE
Yes
Englewood Avenue
06
T
RW
1/1/2020
STP(U)
173
27
200
200
rom: N. 16th Ave. to: N. 24th Ave.
W
CN
1/1/2021
STP(U)
1,164
182
1,346
1,346
1/1/2021
5
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
Totals 1,473 230 1,703 1,703
14
36
Nob Hill Boulevard Sidewalk Improvements
12
P
2.50
P
PE
1/1/2019
STP(S)
55
8
63
63
CE
Yes
Nob Hill Boulevard
T
RW
1/1/2020
STP(S)
107
19
126
126
rom: S. 16th Ave. to: S. 6th Street
5
CN
1/1/2021
STP(S)
321
57
378
378
1/1/2021
Construct sidewalk in locations where it doesn't exist
on the south side of Nob Hill
W
Totals 483 84 567 567
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Iv
C
u
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
N. 34th Ave. & Fruitvale Blvd. 1/5 Improvements
Fruitvale Boulevard
rom: Fruitvale Blvd. to: N. 34th Ave.
Improve intersection by installing a traffic signal
system, curb, gutter and sidewalk. Widen leg south
of Fruitvale to inlcude a left -turn lane
12
P
N/A
P
T
0
5
W
PE
RW
CN
1/1/2018
1/1/2019
1/1/2020
STP(U)
STP(U)
STP(U)
63
87
567
5
13
76
68
100
643
68
100
643
CE
Yes
1/1/2020
Totals 717 94 811 68 743
17
38
Englewood Avenue Improvements
Englewood Avenue
rom: N. 24th Ave. to: N. 40th Ave.
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, street lighting and storm
drainage system. Install sewer and water lines.
03
05
06
P
1.00
P
T
W
5
0
PE
RW
CN
1/1/2019
1/1/2020
1/1/2021
STP(U)
STP(U)
STP(U)
218
327
2,980
34
51
244
252
378
3,224
252
378
3,224
CE
Yes
1/1/2021
Totals 3,525 329 3,854 3,854
14
39
North/South Connector to West Valley
Unknown Road
rom: Ahtanum Rd. to: Summitview Ext.
Corridor study to determine the best location for a
north/south limited access route in West Valley. City
and County joint project.
01
04
06
P
6.00
P
T
W
5
C
G
0
PE
1/1/2018
STP(U)
1 4321
681 SOOT
SOOT
CE
Yes
Totals 432 68 500 500
14
40
Yakimareet Avenue Underpass
rom: Yakima Ave. to: 18th Street
Replace the bridge on E. Yakima Avenue that crosses
over 18th Street.
12
P
N/A
P
T
0
5
W
PE
CN
1/1/2017
1/1/2018
BRAC
BRAC
240
2,288
1 5721 2,8606 300
300
2,860
CE
No
Totals 2,528 632 3,160 300 2,860
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
T,
C
u
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
41
88th Avenue Improvements
88th Avenue
rom: Tieton Dr. to: SummitviewAve.
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
06
12
P
0.48
P
T
C
G
PE
RW
CN
1/1/2018
1/1/2019
6/1/2019
STP(U)
STP(U)
STP(U)
43
52
285
7
8
45
50
60
330
50
60
330
CE
Yes
6/1/2019
Totals 380 60 440 50 390
17
42
64th Avenue Improvements
64th Avenue
rom: Washington Ave. to: Nob Hill Blvd.
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
03
04
06
P
1.00
P
T
W
C
G
0
PE
CN
1/1/2018
1/1/2019
STP(U)
STP(U)
2001
1,600
I 321 2321
249 1,849
2001
1,849
CE
No
Totals 1,800 281 2,081 200 1,849
14
43
North 1st Street
N. Street
M KtBlvdRevitaliz to: 'N'
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on -street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various
pedestrian and decorative elements.
062
P
0 98
P
G
RW 6
CN 11/1/2017
TIGER
I 8,0001
I
100
I 8,000
100
8,000
CE
YesC
1/1/2017
Totals 8,100 0 8,100 100 8,000
19
44
Northside Alley Paver
Alleys between Folsom Ave. and Fruitvale Blvd.
rom: 16th Avenue to: 6th Avenue
Improve the air quality throughout this section of the
City by paving gravel alleys.
07
5
3.5
P
T
C
0
CN
1/1/2015
CMAQ
I 3531
571 4101 410
I
I
CE
No
Totals 353 57 410 410
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
v
C
u
•Code
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
45
S. 80th Avenue Bridge
S. 80th Avenue
rom: Wide Hollow Rd. to: Plath Ave.
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
09
5
0.05
P
T
0
PE
CN
1/1/2016
1/1/2017
DOE
DOE
25
75
0
0
25
75
25
75
CE
Totals
0 100 25
75
17
46
Wide Hollow Road Wide Hollow Road Bridge
rom: 89th Avenue to: 88th Avenue
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
9
5
0.05
P
T
0
PE
CN
1/1/2016
1/1/2017DOE
I
I DOE
7525
1
I 725I 25
75
I
CE
No
Totals
100 25
16
47
Lincoln Avenue Corridor Safety Improvements
Lincoln Avenue
rom: N. 32nd Ave. to: N. 5th Ave.
Improve safety by installing larger signal lenses,
installing ADA compliant ramps, repairing damaged
sidewalk, installing new sidewalk, installing overhead
school flashers, etc.
07
5
N/A
P
T
0
CN
1/1/2016
HSIP
3001
0
300
300
I
CE
Yes
1/1/2016
Totals
0 300 300
14
48
16th Avenue Corridor Improvement
16th Avenue
rom: SR 12 to: Washington Ave.
Study to determine strategies for improving the 16th
Avenue corridor
04
P
3.50
P
T
W
C
G
n
PE
1/1/2018
STP(U)
1201
171 1371
1371
Totals 120
17 137
137
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2016 to 2021
Hearing Date: 6/2/15 & 6/16/15 Adoption Date: 6/16/2015
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
49
40th Avenue Corridor Improvements
40th Avenue
rom: SR 12 to: Washington Ave.
Study to determine strategies for improving the 40th
Avenue corridor.
04
P
3.20
P
T
W
C
G
0
5
PE
1/1/2018
STP(U)
120
17
137
137
Totals 17 137 137
14
50
Nob Hill Boulevard Corridor Improvements
Nob Hill Boulevard
rom: 1-82 to: 16th Ave.
Study to determine strategies for improving the Nob
Hill Boulevard corridor.
03
04
P
2.70
P
T
0
5
W
C
G
PE
1/1/2018
STP(U)
1201
171 1371
1371
Totals 120 17 137 137
14
51
S. 1st Street/Main Street Corridor Improvements
S. 1st Street/Main Street
rom: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap. Stucy to determine
strategies for improving the 1st Street/Main Street
corridor.
01
P
2.00
P
T
0
5
W
C
PE
1/1/2018
STP(U)
1201
171 1371
1371
Totals 120 17 137 137
16
52
E.' H' Street Extension, Ph. 2
E.'H'Street
rom: 10th Street to: 1-82
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
08
P
0.55
P
T
W
5
0
PE
RW
CN
1/1/2016
1/1/2017
1/1/2018
STP(U)
STP(U)
STP(U)
432
432
2,162
68
68
338
500
500
2,500
500
500
2,500
CE
Yes
1/1/2018
474 3,500 500 500 2,500 0
9. Appendices
A. Six Year Form Instructions
Heading
Agency
County Number
City Number
MPO/RTPO
Hearing Date
Adoption Date
Resolution Number
Amendment Date
Column Number
Enter name of the sponsoring agency.
Enter the OFM assigned number (see LAG Appendix 21.44).
Enter the OFM assigned number (see LAG Appendix 21.45).
Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Enter the date of the public hearing.
Enter the date this program was adopted by council or commission.
Enter Legislative Authority resolution number (if applicable.)
Enter the date this program was amended by council or commission.
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop.)
01 - Interstate
02 - Principal Arterials
06 - Minor Arterials
07 - Major Collector
08 - Minor Collector
09 - Local Access
Urban (Over 5000 pop.)
11- Interstate
12- Freeways & Expressways
14- Other Principal Arterials
16- Minor Arterial
17- Collector
19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number; (e) Beginning and Ending Termini (mile post or street names); and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
07 - Resurfacing
08 - New Bridge Construction
09- Bridge Replacement
01- New construction on
new alignment
02- Relocation
Project
03- Reconstruction
04- Major Widening
05- Minor Widening
06- Other Enhancements
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 - Safety/Traffic Operation/TSM
13 - Environmentally Related
25
14 - Bridge Program -Special
21 - Transit Capital Project
22- Transit Operational
23 - Transit Planning
24 - Transit Training/Admin.
31- Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C - Cable TV
O - Other
S - Sewer (other than agency -owned)
W - Water
G - Gas
P - Power
T - Telephone
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
BIA
BR
CDBG
CMAQ
DEMO
Discretionary
DOD
IC
IM
NHS
- Bureau of Indian Affairs
- Bridge Replacement or Rehab.
- Community Development
Block Grant (HUD)
- Congestion Mitigation Air Quality
- ISTEA Demo Project (Selected)
- Ferry Boat Discretionary, Public
Lands Highways, or Scenic Byways
- Dept. of Defense
- Interstate Construction
- Interstate Maintenance
- National Highway System
FTA Discretionary for Capital Expenditures
5307 - FTA Urban Areas
5309(Bus)- Bus
5309(FG) - Fixed Guideways
5309(NS) - New Starts
5310 - FTA Elderly/Disabled
5311 - FTA Rural Areas
REV - Rural Economic Vitality Program
STP(C) - STP Statewide Competitive Program
STP(E) - STP Transportation Enhancements
STP(S) - STP Safety Including Hazard and RR
STP(R) - STP Rural Regionally Selected
STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP
Too" program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded projects only.)
27