Loading...
HomeMy WebLinkAbout04/19/2022 06.D. Project Completion and Acceptance for Farmers Electric II, LLC. Project 2527 WW Pump Station Improvements 1 \III'or : BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.D. For Meeting of:April 19, 2022 ITEM TITLE: Project Completion and Acceptance for Farmers Electric I I, LLC. Project 2527 WW Pump Station Improvements SUBMITTED BY: Scott Schafer, Director of Public Works David Brown,Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager- (509)249- 6815 SUMMARY EXPLANATION: City Project 2527 replaced the operator interface, variable frequency drives, and associated sensors to improve sewer collection system reliability and efficiency at the Rudkin Road Pump Station. Final inspection for this project was made and the recommendation is that the project be accepted. Project completion is subject to issuance of Certificate of Payment by the Department of Revenue. A final payment of$17,950.00 (5% retainage) is due from the City to Farmers Electric II, LLC for the completion of the work completed at the City's Rudkin Road Pump Station. Project Manager: Marc Cawley Contractor: Farmers Electric II, LLC Payments: $370,488.00 Retainage Due: $17,950.00 Total Project Cost: $388,438.00 The total contract is for the construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: 2 Accept project ATTACHMENTS: Description Upload Date Type ❑ final 3/16/2022 Backup Material 3 RH2 ENGINEERING Richland 114 Columbia Point Drive,Suite C Richland,WA 99352 1.800.720.8052/rh2.com March 7, 2022 r$?— Mr. Marc Cawley you Operations Superintendent City of Yakima 0 220 E Viola Ave. um 1 C Yakima, WA 989001 Sent via: Email Subject:City of Yakima, Wastewater Pump Station Upgrades Project# 2527 ■ Recommendation for Acceptance of Contract Dear Mr. Cawley: 4,04 Farmers Electric II, LLC (Farmers) has completed work on the Rudkin Road Lift ' Station, Wastewater Pump Station Upgrades project in accordance with the �NI plans and specifications. RH2 Engineering, Inc., (RH2) recommends Final Acceptance of the contract at City of Yakima's (City) next scheduled council leeting. The project total is $388,483.00 which includes all contractor pay ,,,I J I Co' estimates, sales tax, and change orders. WASHINGTON The Final Contract Voucher Certificate and Change Order No 1 reconciling the LOCATIONS difference between the contract amount and final payment are attached to Bellingham this letter. Bothell (Corporate) The completion date for this contract has been established as March 7th, 2022. East Wenatchee The signed subcontractor release forms and affidavits of wages paid have been Issaquah submitted. These documents are also attached to this letter. Richland Tacoma The City will need to submit the Notice of Completion of Public Works Contract forms for release from the Washington State Departments of Revenue, OREGON Employment Security Department, and Labor and Industries. This is required LOCATIONS prior to the retainage bond being eligible for release. Medford Portland Per Division 1.43.20 in the Technical Specifications, this project is covered by a 1-year warranty to correct any defects in workmanship or materials following IDAHO completion of the construction project and acceptance by the City. The date of LOCATIONS project acceptance is defined as the date the final payment is sent to the Meridian Contractor from the Owner. 03/10/22 11:52 AM J:\DATA\YAK\20-0032\60 SD C1PROJECT CLOSEOUT\RECOMMENDAT ION OF ACCEPTANCE-WASTEWATER PUMP STATION 20220307.DOCX 4 MR. MARC CAWLEY 3/7/2022 Page 2 Farmers' Performance and Payment Bond is in full force for 2 years after Final Acceptance, per the Bid Documents. Please contact us if you have questions on the above items. Sincerely, Clayton Anderson, PE Project Manager Enclosures or Attachments: 1. Final Contract Voucher 2. Change Order No. 1 3. Subcontractor Release Forms 4. Affidavits of Wages Paid 03/10/22 11:52 AM 1:\DATA\YAK\20-0032\60 SDC\PROJECT CLOSEOUT\RECOMMENDATION OF ACCEPTANCE-WASTEWATER PUMP STATION 20220307.DOCX f4:--'' __ Final Contract Voucher Certificate 5 .. City of Yakima Contractor Farmers Electric II,LLC Street Address 30 E.Hemlock City State Zip Date Othello WA 99344 2/9/2022 City Project Number State Project Number Federal-Aid Project Number Highway Number 2527 N/A N/A N/A Job Description(Title) Wastewater Pump Station Upgrades Date Work Physically Completed Final Amount Dec 29,2021 $359,000.00(Not including sales tax) Contractor's Certification I, The undersigned,having first been duly sworn,certify that I am authorized to sign for the claimant;that in connection with the work performed and to the best of my knowledge no loan,gratuity or gift in any form whatsoever has been extended to any employee of the City of Yakima nor have I rented or purchased any equipment or materials from any employee of the City of Yakima;I further certify that the attached final estimate is a true and correct statement showing all the monies due me from the City of Yakima for work performed and materials furnished under this contract;that I have carefully examined said fmal estimate and understand the same and that I hereby release the City of Yakima from any and all c 'ms of whatsoever nature which I ma have,arising out of the performance of said contract,which aA'not set estimate. ��ll KATHERINEAJOHNSON Notary Public ' Contractor Authorized Signature Required State of Washington Commission#75138 My Comm. Expires Dec 18, 2022alTIOPTUNIIMIIP -CM COk.\00�b��� T e Signature Name Subscribed and sworn to before me this (1 — day of {---c '0 . 20 oZ P X V 4 -t tr kT f___ A . -3-661 Cr)f) Notary Public in and for the State of Washington, residing at al evoct-�-Ytk. (.A) (7A- 1 RH2 Engineering Certificate I,Certify the attached fmal estimate to be based upon actual measurements,and to be true and correct. X Approved Date Z/ //ZO2Z Project E gineer/Projq t Administrator City of Yakima The City of Yakima hereby accepts the completed contract pursuant to Section 1-05.12 of the Standard Specifications. X Designee Date of Acceptance City of YAKIMA Farmers Electric❑,LLC Pay Estimate Summary Sheet Project: Project No.2527-Wastewater Pump Station Improvements Pay Est No. 2 . Cutoff Date: 1/4/2022 Carbad Contract at Award 'total Taal Taal Total Total Total %« QV to Dalo A9n to Dam Previa.Qty ?Furious Amt Qtytu Period Arm this Period 1tmnId D0106plion QIy Coos Unit Rice Amount Ccmplat Sales Tax Ram 1 11e110l-M000LIZAnON La $24,00000 _ 5 - S - S - 2 Job Trailer LS, $1,000.00 5 1.000.00 1.00 S 1,000.00 - $ • 1.00 S 1,0011.00 100% 3 Insurance Ls. 55,000.00 5 5000.00 1.00 S 5,000.00 1.00 S 5,000.00 - S - 100% 4 Bond US. S9,000.00 S 9,000.00 1.00 $ 9.000,00 1.00 S 9,000.00 - 0 - 100% S F3eehi al Permit LS. $1,000.00 S 1.000,00 1.00 5 1,000.00 - S - 1.00 S 1003.00 100% 6 Restr000tWaa6 Station LS. 5500.00 S 500.00 1.00 5 500.00 - 5 - 1.00 5 100% O&M Manuals LS, $2,000.00 S 2,000.00 100 $ 2,000.00 - 0 - 1.00 S 2,000.00 /00% 0 Cleanup LS. 51,000.00 S 1,000.00 1.00 $ 1,000.00 - $ - 1.00 5 1,000.00 100% 9 Trawl L.S. $3,500.00$ 3,500.00 1.00 S 3,500.00 - I - 1.00 $ 3.500,00 100% 10 01116c LS $1,000.00 S 1,000,00 1.00 $ 1,000.00 - S - 1.00 S 1,000.05 100% 11 11em02-Temp Bypass System LS. 536,000.00 - S - - S - - $ 12 Temp Plug LS. 53.000.00$ 3,000.00 I.0$ f 3,000.00 - 3 - 1.00 $ 3,000.00 100% II Electrical!lookup LS, $4,000.00$ 4,000.00 1.00 S 4,000.0D - 5 - LOD $ 4,000.00 100% 14 Cot1dr10 LS. 52,000.00 5 2,000.00 1.00 5 2,000.00 - S - 1.00 S 2,000,00 100% 15 Replace Retch LS, $2,000.00 S 2,000.00 1.00 S 2,0110.00 - S - 1.00 $ 2,000.00 100% 16 Bypass Pump Ls. 520,000.00 5 20.000.00 1.0D S 20,000.01 - S - 1.00 S 20,000.00 100% 17 Bypass Pump Submittal LS, S5,000.00 S 5,000.00 1.00 S 5,000.00 - 5 - t.00 $ 5,000.00 100% 10 Hem k3-MCC Replacement LS. $131,000.00 - S - - $ - - S - IS Submittals MCC L.S. 510,000.00 S 10,000.0/ 1.00 S 10,000.00 1.00 $ 10,000.00 - S - 100% 20 MCC Equipment L.S. S70,000.00$ 70,00000 1.00 5 70,000.00 - $ - 1.01 S 70,000.00 100% 01 Labor Install MCC LS, 527.09.00 S 27.000.00 1.00 S 27,000.00 - S - 1.00 $ 27,000,00 100% 22 Saba. Ean0nslalled) L.S. S3.500.00 5 3,501.00 1.00 5 3,500.00 - $ - 1.00 $ 3,500.00 105% 23 Air Compressor(Instaled) L.S. S3,000.00 5 3,000,00 100 5 3.000.110 - S - 1.0 ,0 0 $ 30.0 100% 24 We Wolf Flows(JnaaUed) Ls, 56,500.01 S 6,510.00 1.00 5 6.300.00 - S - 1.00 S 6.500.00 100% 25 Lilllim0 Pand(Installed, L.S. S6,000.01 5 6,000.00 1.00 $ 6,000.00 - S - 1,00 $ 6,000.00 100% 26 Tmnsf(I0000IlM) L5. S5,0011.00 5 5,000.00 1.00 5 5,000.00 - $ - 1.00 S 5,000.00 100% 27 Item84-VFD'S IS, 3146,010.00 S _ - S - $ 28 Submittals VMS LS. 510.00040 5 10,000.0D 1.00 5 10,000.00 1.00 $ 10,000,00 - $ - 100% 29 Flow Mear(lnstalled) LS. $15,000,00 S 15.000.00 1.00 $ 15,000.00 - S 1.00 $ 15,000.00 100% 30 VFll'S Panok US. $93.000.00$ 43.000.00 1.00 S 03,000.00 - $ - 1.00 S 93,000.00 100% 31 Labor LS. 520,000.00 S 20,000.00 1.00 5 20,000.00 - S 1.00 $ 20,010,00 100% 32 ARC Flash Training LS, $8.000.00 5 8.000,00 1.00 5 8,000.00 - S - 1.00 5 8,000.00 100% 33 Item 05-AalomaO0 C4,Irols LS. 320,000.00 - $ - - 0 - - S 34 Automatic Controls LS. 820,000.00 5 20,000,00 1.00 $ 20,000.00 - $ - 1.00 5 20,001).06 100% 35 Hem 86-Motor Granges LS. 520,100.51 - $ - - $ - - S - 36 ChaoSm US. $20,000.00E 20.000.00 0.10 5 2.000,00 - E - 0.10 5 2,000.00 10% SUBTOTAL S 377,000.00 $359,000.00 $ 34,000.00 $325,000.00 WA STATE SALES TAX-8.2% S 30,914.00 $ 29,438.00 $ 2,788.00 $ 26,650.00 1/4/2022 8.46 AM 1/2 City of YAKIMA Farmers Electric 11,LLC Pay Estimate Summary Sheet Project: Project No.2527-Wastcwalcr Pump Station Improvements Pay Est.No. 2 Cutoff Date: 1/4/2022 TOTAL WITH TAX S 407,914.00 S 388,438.00 S 36,788.00 S 351,650.00 5%RETAINAGE $ 17,950.00 $ 1,700.t111 $ 16,250.00 PAYMENT DUE TO CONTRACTOR S 335,400.00 Owner Signature,City of YAKIMA Date _Enginerc/Signature,RH2 in Dateccring,Inc Date Payments ate we and cones charge against the Dave:that the come tejuer and due:that nopanarrha rams halbecu paid:vrdrtai he u a ',wad fur the Caawcwr.Convecro:l'rNcr wrJ�l�r prcvail¢g waQ�Larc hr v Win',mica in acmrdance wish It,,prrhlyd Surrr mrt) dint 11 PayprtvailicrgW. f r raD r,. Contractor Signature,Farmers F.Iectn ,LLC Da* 1/4/2022 8:46 AM 2/2