HomeMy WebLinkAboutBNSF Railway Company - Grade Crossing Signal Installation Agreement Washington Avenue Mile Post 87.68 Line Segment 48 U.S. DOT Number 099169B Yakima Valley Subdivision GRADE CROSSING SIGNAL INSTALLATION AGREEMENT THIS GRADE CROSSING SIGNAL INSTALLATION AGREEMENT (hereinafter called, "Agreement "), is executed to be effective as of July 30 , 2009, by and between the City of Yakima, a Political Subdivision of the State of Washington (hereinafter called, "AGENCY "), and BNSF RAILWAY COMPANY, a Delaware Corporation (hereinafter called, "RAILROAD "). WITNESSETH: WHEREAS, in the interest of aiding vehicular travel and public safety, the AGENCY is undertaking a project to install railroad crossing signals and activation equipment at Washington Avenue; WHEREAS, Washington Avenue is located at U.S. DOT crossing 099169B as indicated on Exhibit "A ", attached hereto and incorporated herein; WHEREAS, the parties agree that the RAILROAD will receive no ascertainable benefit from the installation of advance warning signs, pavement marking stop bars or crossing signal equipment (hereinafter collectively called, "Crossing Signal Equipment "); WHEREAS, AGENCY also desires RAILROAD to replace the existing crossing surface at Washington Avenue with a new 72 -foot long concrete and rubber crossing surface; WHEREAS, the AGENCY is paying for the acquisition and installation of crossing signal equipment at Washington Avenue with State and Federal funds pursuant to 23 U.S.C. § 130 "; and WHEREAS, the RAILROAD agrees to purchase and install, at AGENCY'S sole expense, the crossing signal equipment and the new crossing surface described in the scope of work herein, and upon the teens and conditions set forth below. NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I — SCOPE OF WORK 1. The term "Project" as used in this agreement includes any and all work related to the installation of Crossing Signal Equipment and the new crossing surface at U.S. DOT crossing 099169B, more particularly described on Exhibits "A" and "B" attached hereto and incorporated herein, including, but not limited to, any and all changes to telephone, telegraph, signal and electrical lines and appurtenances, installation of advance warning signs and pavement marking stop bars, installation of any new crossing surface, temporary and permanent track work, fencing, grading, alterations to or new construction of drainage facilities, preliminary and construction engineering and contract preparation. ARTICLE II — RAILROAD OBLIGATIONS In consideration of the covenants of AGENCY set forth herein and the faithful performance thereof, RAILROAD agrees as follows: 1. The RAILROAD will, using its own labor forces under applicable labor agreements, install the Crossing 1 Signal Equipment and the new crossing surface at Washington Avenue. The work will be performed at AGENCY'S expense and in accordance with the MUTCD and the plans and specifications approved by AGENCY. The plans and specifications are attached to this Agreement as Exhibit "B" and incorporated herein. 2. A detailed estimate of RAILROAD'S construction engineering, installation labor (including the costs, if any, of electrical service from a public utility) and material costs required for the Project are attached hereto as Exhibit "C" and incorporated herein. In the event construction for the Project has not commenced within six (6) months following the effective date of this Agreement, RAILROAD may, in its sole and absolute discretion, Exhibit ""„ �,, revise the cost estimates set forth in said "C". In such event, the revised cost estimates will become a part of this Agreement as though originally set forth herein. Any item of work incidental to the items listed in Exhibit "C" not specifically mentioned therein may be included as a part of this Agreement upon written approval of AGENCY, which approval will not be unreasonably withheld. 3. RAILROAD will furnish all labor, materials, tools and equipment for the railroad portion of the work required for the construction of the Project. 4. The RAILROAD will, at AGENCY'S expense, dispose of all scrap from the RAILROAD'S work hereunder. 5. The RAILROAD will finalize and complete billing of all incurred costs under this Agreement no later than one (1) year following installation of the Crossing Signal Equipment and the new crossing surface. ARTICLE III — AGENCY OBLIGATIONS In consideration of the covenants of RAILROAD set forth herein and the faithful performance thereof, AGENCY agrees as follows: 1 . AGENCY must perform, at AGENCY'S expense, the following work: a) Installation of a pavement marking stop bar in accordance with the Manual on Uniform Traffic Control Devices (hereinafter called, "MUTCD "). b) Installation of advance warning signs in accordance with the MUTCD, 2. The AGENCY will approve the location of the signals and signal bungalow prior to installation by RAILROAD. 3. Actual costs for engineering, materials and labor (including third party charges for the installation of electrical service) associated with the installation of the Crossing Signal Equipment and the new crossing surface must be paid by the AGENCY as provided in 23 Code of Federal Regulations (Revised 2001) including, but not limited to, Parts 1, 140 , 172 and 646 (hereinafter called, "23 CFR "). 4. In the event the services of a consultant are needed after execution of this Agreement due to any exigency of the RAILROAD and the Project, the AGENCY and the RAILROAD will mutually agree, in writing, as to the selection of a consultant and the applicable scope of work to be performed by such consultant. All work performed hereunder by any consultant and any resulting costs must be paid by AGENCY as a part of the costs for the Project. 5. During the installation of the Crossing Signal Equipment and the new crossing surface, RAILROAD will send AGENCY progressive invoices detailing the costs of the work performed by RAILROAD under this Agreement. AGENCY must reimburse RAILROAD for completed force - account work within thirty (30) days of the date of the invoice for such work. Upon completion of the Project, RAILROAD will send AGENCY a detailed invoice of final costs, segregated as to labor and materials for each item in the recapitulation shown on Exhibit "C ". Pursuant to this section, AGENCY must pay the final invoice within ninety (90) days of the date of the final invoice. RAILROAD will assess a finance charge of .033% per day (12% per annum) on any unpaid sums or other charges due under this Agreement which are past its credit terms. The finance charge continues to accrue daily until the date 2 payment is received by RAILROAD, not the date payment is made or the date postmarked on the payment. Finance charges will be assessed on delinquent sums and other charges as of the end of the month and will be reduced by amounts in dispute and any unposted payments received by the month's end. Finance charges will be noted on invoices sent to AGENCY under this section. 6. The AGENCY must have advanced railroad crossing warning signs and standard pavement markings in place at the crossing in accordance with the MUTCD prior to the acceptance of this Project by the AGENCY. The AGENCY assumes full responsibility for the maintenance of advanced warning signs and pavement markings and agrees to hold harmless and indemnify the RAILROAD for any claims, damages or losses, in whole or in part, caused by or due to the AGENCY'S failure to maintain the advanced warning signs and markings or other requirements of the MUTCD. 7. The AGENCY must give RAILROAD's Manager of Public Projects written notice to proceed with the railroad portion of the work after receipt of necessary funds for the Project. BNSF will not begin the railroad work (including, without limitation, procurement of supplies, equipment or materials) until written notice to proceed is received from Agency. 8. The AGENCY agrees to provide, to the BNSF Manager of Evidence Preservation, such Project documentation and records as are agreed to between the parties including: any Project applications; any letters of approval and /or authorization forms (eg. PR -1240 or the equivalent); any and all payment Voucher forms requesting FHWA reimbursement (eg. PR -20 or the equivalent) or any other such Project authorizations or funding records as BNSF may request from time to time. Such records will be provided by the Agency to BNSF on a mutually agreeable schedule or within two (2) months after such records are generated or received by the AGENCY. Section 130 Documentation shall be provided to BNSF if one of the following manners: Manager Evidence Preservation 2600 Lou Menk Drive, AOB -3 Fort Worth, Texas 76131 Or Electronically to: Manager Evidence Preservation Section 130 @bnsf.com ARTICLE IV- JOINT OBLIGATIONS In consideration of the mutual covenants of the parties contained herein and the premises, the parties mutually agree as follows: 1. All cost records of the RAILROAD pertaining to the Project will be open to inspection and audit at any reasonable time by representatives of the AGENCY (including the legislative auditor and fiscal analyst for the AGENCY) and the Federal Highway Administration for a period of not less than three (3) years from the date of the final RAILROAD invoice under this Agreement. 2. Upon completion of the installation of the Crossing Signal Equipment and the new crossing surface, the RAILROAD, will, at its sole cost and expense, operate and maintain the Crossing Signal Equipment and the new crossing surface in proper condition. 3. Notwithstanding the preceding provision, if any regulations, ordinances, acts, rules or other laws subsequently passed or amended by the AGENCY or any other appropriate governmental or legislative authority increase the AGENCY'S portion of maintenance costs under this Agreement, RAILROAD will receive the benefit of any such regulations, ordinances, acts, rules or other laws and the AGENCY'S increased portion of maintenance costs will be incorporated into and made a part of this Agreement. 3 4. If a railway or a highway improvement project necessitates rearrangement, relocation, or alteration of the Crossing Signal Equipment or the new crossing surface installed hereunder, the costs for such rearrangement, relocation or alteration will be the responsibility of the party requesting such changes. 5. If any of the Crossing Signal Equipment is partially or wholly destroyed, then such repair and /or replacement costs must be distributed among the parties as follows: aj in the event the RAILROAD'S sole negligence destroys or damages the Crossing Signal Equipment, RAILROAD must reimburse AGENCY for the costs to replace or repair such Crossing Signal Equipment. b) In the even +. the Crossing Signal Equipment is damaged or destroyed by any other cause, AGENCY must, at its sole cost and expense, replace or repair such Crossing Signal Equipment. 6. If the Crossing Signal Equipment installed hereunder cannot, through age, be maintained, or, by virtue of its obsolescence, requires replacement, the cost of installation of new crossing signal equipment will be negotiated by the parties hereto on the basis of the current Federal Aid Railroad Signal Program participation and applicable AGENCY at the time of such replacement is warranted. 7. This Agreement will inure to the benefit of and be binding on the parties hereto, their successors, and assigns. 8. In the event any paragraph contained in this Agreement or any item, part, or term within any particular paragraph is determined by a court of competent jurisdiction to be invalid or unenforceable, the validity of the remaining paragraphs or items will not be affected; and the rights and obligations of the parties will be construed and enforced as if this Agreement did not contain that particular paragraph or item held to be invalid or unenforceable. 9. This Agreement may be signed in counterparts, any one of which will be deemed to be an original. The parties further agree that any facsimile copy of a party's signature is valid and binding to the same extent as an original signature. 4 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. BNSF RAILWAY COMPANY / *1 " , By: Printed Name: ,a -°-7. , SDi/ec.« Title: Asst Vice President Engineering Services CITY OF YAKIMA Printed Name:, Title: CITY CONTRAC r N; 9, RESOLUTION NO 5 The Burlington Northern & Santa Fe Railway Company TO ELLENSBURG TO PASCO \ J k EASTWARD APPR. 2443' 120' MIN. WESTWARD APPR. 2443' 49 MPH 49 MPH NEG Ass \ r E 80' ---a. '- 50' MIN. {- 50' MIN. -3► j/ /% / ,/ / ' T Y '" I 101 / ,„ Q GCP4000 r • R ____ Ril ,-.. --.,..-. . INSTALL: CANTILEVERS. GATES & FLASHERS I CONTROL DEVICES: CONSTANT WARNING BMX - IN WASHINGTON AVE. DOT • 099 169 8 fr011* - OUT SALVAGE: NONE 1 --- 1 - INSTRUMENT HOUSE ® BELL BNSF RAILWAY CO. Warning device placement: (LOCATION) YAKIMA, WA {;,' METER Clearance to C.L. Track = Min. 12' (STREET) WASHINGTON AVE. • CROSSING CONTROLL CONNECTIONS Edge of Rood to C.L. Foundation: LS:0048 Min. 4' 3" with curb. M.P. 87.68 Q BIDIRECTIONAL CROSSING CONTROL Min. 8'3" without curb. UNIDIRECTIONAL CROSSING CONTROL Mox. 12' DOT 099-169-8 ORT House Clearance: 25' Min. to Near Roil DIVISION:NRTHWEST SUBDIVISION: YAKIMA. WA 30' Min. to Edge of Rood 1q COUPLER OR TERMINATION ALL LIGHTS TO BE LED NON CITY SCALE DATE: 06/29/2009 GUARD RAIL FILE: 0048087_68.dgn DDF /DDF 0048087_68.dgn 6/29/2009 12:29:14 PM so 8'-1 1/2" ► - FIELD PANEL -0-19 1/2"-.--,- -19 1/2 "- ►L-r-19 1/2"--b--L-4-19 1/2"-.,- - 191/2 " -+► � I I I / / GAGE PANEL —- - -- - I 8'11/2" / 12" 2'-3" FIELD PANEL ___ 4 0 —= I - — - — b— - — e- - - - - ,- - --i /j I 1 I 7" II I T I I '�,. //�/ . // 131/2" � - T __________ € og . _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ . , - - " p - - - - - - - - - - -- FRAME SPACER - \``� I I I I I I _ 131/4 " // 2' -5 1/2" _ 4' 1/2 " � LIFTING INSERT TYPICAL 13 1/2" -r - 4---- - y 10'-0" WOOD TIES ON 19 1/2" CENTERS 10 1/2" I ' I 10 1/4" . 22 1/2" ■ 4'-4 1/2" -- - 22 1 /2 "-► NOTES: - 8' -1 1/2' - - 1/4" RUBBER INTERFACE PAD TO BE PLACED BETWEEN PANEL AND TIES FOR 141 LB. RAIL SECTION. PAD TO BE NAILED TO TIES, CROSSING TYPE - 10W .. N o RAIL SIZE PANEL HEIGHT GAGE PANEL WEIGHT FIELD PANEL WEIGHT 141 a COMMON STANDARDS mill 115 7 1/8" 2850 LBS. 1550 LBS. "'" 133 -141 7 7/8" 3125 LBS. 1675 LBS. LAYOUT FOR CONCRETE PANELS ON 10' -0" LONG WOOD TIES (10W) 0 ITEM NUMBERS O 0 FILE OWNER: UPRR DATE: APRIL 24, 2001 CD 133 -141 LB. UPRR 133 -141 LB. BNSF 115 LB. UPRR 115 LB. BNSF 0 540 -1301 055590975 540 -0202 055590973 REV. NO.: 0 DWG NO: 200100 • 1 1/8" MIN COVER TO 3" x 2 -1/2" SIDE (MIN) x 3/8" 1/2" DIA. x 18" LONG DEFORMED REBAR (1 3/8" NOM.) A,STM A36 STEEL ANGLE (TYP) 1 1/8" MIN COVER TO BAR ANCHORS (16 PCS) (SIDE FRAME) 5/8" DIA. x 24" LONG DEFORMED 1/2" DIA. x 2 1/2" LONG REBAR (1 3/8" NOM.) BAR ANCHORS (16 PCS) (SIDE FRAME) HEADED ANCHOR STUD #5 REBAR 22" LONG (7 PCS) 10 WIRES ON 5" CENTERS (16 PCS TOTAL) (SIDE FRAME) he 10 WIRES (2 1/8" MIN. SPACING) h- 1 5/8" __ ___ 1..'_ �_ .mow. Pi ■ 1 I I / 46 "L . _•_! LONG TOP (7 PCS) 1 I 42" LONG BTM (7 PCS) 3 1/2" 8 WIRES ON 5" CENTERS 1-3 1/2" #5 REBAR 20" LONG (7 PCS) 9 WIRES (2 1/8" MIN. SPACING) - 101MRES —1 3/8" MIN COVER TO 2 1/4" NOM.) 1/2" DIA. x 2 LONG REBAR 1 3/8" MIN COVER TO (2 HEADED ANCHOR STUD REBAR (2 1/4" NOM.) (16 PCS TOTAL) (SIDE FRAME) CROSS SECTION - GAGE PANEL CROSS SECTION - FIELD PANEL I ■I 1 0 5 11 1/4 I lia 11 1/4 puma iu 171/2 ! ! + ! ! I I NOTES: 9 i 1 1 IF__ 1 0 . $_171/2 MIN. TRANSFER COMPRESSIVEISTRENGTH T 4500psi 27 27 r Iiiiiiiill -30 j '-- ----° -30 PRESTRESSING WIRE SHALL BE 5.25mm DIA. COMFORMING WITH - I- ASTM A-881 "STEEL WIRE DEFORMED, STRESS RELIEVED OR LOW 36 1/4 1Q 1 1 1 !a 36 1/4 ! b I ! ! I C ! RELAXATION FOR PRESTRESSED CONCRETE TIES" WITH A MINIMUM - - -- -- -42 1/2 i - - -- — - -o -42 1/2 BREAKING STRENGTH OF 8800 LBf. 48 3/4 48 3/ 4 ! WIRE SHALLED BE TENSIONED IN ACCORDANCE WITH PCI - 55 l - -- 55 REQUIREMENTS TO 6960LBf PER WIRE. 611/4 1 6 1/4 j CROSSING TYPE - 10W - -671/2 f T.-1-7-7- 1 ! ! I ! ! ! - -671/2 N 70 3/4 • �� 70 3/4 I 1 f 11 • 'Q q` °, r c i F c 1/2" DIA. x 12" LONG �• V 1 - I 1 i 1 I Mil!? COMMON STANDARDS DEFORMED BAR 11 I ! ! ! _b I ANCHOR (4 PCS TOTAL) Si 1 1 1 1 1 1 1 • -80 -- , ! + ,7 ! ! -80 ,1w (END FRAME) 86 1/4 I �; I 86 1/4 ,III I�I�I, - w i,..a 9 7 112 2) I :h �, i (971 PRESTRESSED CONCRETE 3/8" DIA. x 4" LONG HEADED 1/2" DIA. x 12" LONG 3/8 °' DIA. x 4" LONG PANELS FOR 10'-0" LONG ANCHOR STUD (4 (END TOTAL) (12 PCS TOTAL) ( END FRAME) HEADED ANCHOR WOOD TIES (1 OW) 1\:.1 (END (8 PCS TOTAL) CI (END FRAME) FILE OWNER: UPRR DATE: APRIL 24, 2001 ® FIELD PANEL GAGE PANEL .. REV. NO.: 0 DWG NO: 200101 0 -m- 0 0 t o ■{QI l o l 0 o5 1/2" DIA. x 12" LONG �� . .�II,. • DEFORMED BAR ANCHOR 11 1/4 I� 'I■I � I , I) 11 1/4 ,�I I�, (4 PCS TOTAL) -17 1/2 1„„,..,„ 17 1/2 (END FRAME) 27 27 p 30 � � � II 11 1/2" DIA. x 18" LONG DEFORMED 36 1/4 I _ 36 1/4 30 I III BAR ANCHORS (16 PCS) (SIDE FRAME) .1! O I,I'I -42 ,I O I O ll -4 / 1 1/2" MIN. 1/2" DIA. x 2 -1/2" LONG I1Iill 42 1/2 - EMI 1111 2 1 2 COVER HEADED 16 PCS TOTAL)) (SIDE FRAME) 48 3/4 •II■I�1� 48 3/4 I-- 111 ■ , -55 � _____ ���H•MEM 61 1/4 II■I,I'I 61 1/4 I II v �, \•r", , • 7 3/4 I� I�I�I -67 1/2 70 3/4I� -67 1/2 win t ,I�ir 1.. �■ t. 80 I1 LJI 80 II� I�' #5 REBAR 86 1/4 1---- 86 1/4 ■� 93" LONG TOP (4 PCS) W 1 1/2" MIN. 93" LONG BTM (3 PCS) y_,_ -92 1/2 ' �pl� ��I I l�I COVER � -92 1/2 11-"1 +iliil 1/�._-- I • -� MII.__ I_d��I _ #5 REBAR 19" LONG BOTTOM (7 PCS) 3/8" DIA. x 4" LONG - - _ -(97 1/2) -(97 1/2) HEADED ANCHOR 1/2" DIA. x 12" LONG #5 REBAR 22" LONG TOP (7 PCS) STUD (4 PCS TOTAL) DEFORMED BAR ANCHOR 3/8" DIA. x 4" LONG HEADED (END FRAME) (12 PCS TOTAL) ANCHOR STUD (8 PCS TOTAL) , CROSS SECTION - FIELD PANEL FIELD PANEL (END FRAME) (END FRAME) GAGE PANEL NOTES: CONCRETE COMPRESSIVE STRENGTH SHALL BE AS FOLLOWS: @ 28DAYS = 6000 psi MINIMUM @ SHIPMENT = 4000 psi MINIMUM 5/8" DIA. x 24" LONG #5 REBAR @ REMOVAL FROM FORMS = 2500 psi MINIMUM. 46" LONG TOP (7 PCS) #5 REBAR 1 1/2" MIN. DEFORMED BAR 42" LONG BTM (7 PCS) 93" LONG TOP (4 PCS) CROSSING TYPE - 10W COVER ANCHORS (16 PCS) 93" LONG BTM (4 PCS) 1 (SIDE FRAME) y ou N w �� = ��� IMINI f � i y ° d COMMON STANDARDS III�FI1 Iliellillyalinlerl 4. It I•11111111•Ird I PRECAST CONCRETE 3"x2- 1 /2 " SIDE (MIN) x 3/8" ASTM A36 PANELS FOR 10' -0" LONG 1 /2C x 2-1/2" D ( 1 6 P HEADED 1 1/2" MIN. AN TOTAL WOOD TIES (10W) ANCHOR STUD (16 PCS TOTAL) STEEL ANGLE (TYP) N COVER (SIDE FRAME) O O CROSS SECTION - GAGE PANEL FILE OWNER: UPRR DATE: APRIL 24, 2001 N) REV. NO.: 0 DWG NO: 200102 MATERIAL SPECIFICATIONS: ASTM A -36 O 1) STRUCTURAL STEEL SHALL CONFORM TO A TOLERANCES: 0 1) OUT OF SQUARE 3/16" (MEASURED ALONG THE DIAGONAL) O SPECIFICATIONS. IFIC STRUCTURAL WELDING TO F PER TO A CODE. o N 2) ALL EXPOSED STEEL TO RECEIVE ONE COAT PRIMER. 2) LENGTH, WIDTH, AND THICKNESS: + 1_1 /8 3) END ANGLES FOR GAGE PANEL SHOULD HAVE 3" GAP 3) THE BOTTOM SURFACE, WHICH WILL BE IN CONTACT WITH MINIMUM TO IMPROVE SHUNT RESISTANCE. REINFORCING THE TIES, SHALL NOT UNDULATE IN ANY DIRECTION MORE M TERI REQUIREMENT. ND LA OBE CO R TO MEET TO THAN 3/32 ". SEE SPECIAL TESTING NOTE 3 BELOW. BE ATTACHED TO GAGE FRAME. 4) REINFORCEMENT PLACEMENT SHALL BE +/ -3/4" HORIZONTAL, 4) CLADDING ON ENDS OF PANELS SHOULD EXTEND BEYOND +/-1/8" VERTICAL. CONCRETE 1/8" ( +1/8 ", -0') TO IMPROVE MATCH WITH FINISH: WI ADJACENT PANELS. 1) Al L RFCPQQFS AND MINOR CONCRETE SPALLS ARE TO BE 5) REINFORCING STEEL SHALL CONFORM TO CURRENT ASTM THE PROPER BONDING AGENT AND RE AR MAT R AL A615 SPECIFICATION, GRADE 60. IF ANY WELDING OF SURFACE OF THE REPAIRED AREA IS TO MATCH THE REINFORCEMENT STEEL IS REQUIRED, MATERIAL SHALL COLOR AND TEXTURE OF THE SURROUNDING AREAS. CONFORM TO ASTM A706 SPECIFICATION, GRADE 60. THE 6) CONCRETE MATERIAL MIXING, PLACING AND CURING TO 2) F NI H AS APPROVED BY ADS. THE ADDITION BE IN ACCORDANCE WITH PCI "MANUAL FOR QUALITY OF WATER TO THE CONCRETE SURFACE FINISH DURING CONTROL: PRECASTAND PRESTRESSED CONCRETE." CASTING IS NOT PERMITTED. MANUAL 115, EDITION 4. CEMENT SHALL HAVE NO MORE THAN 0.6% TOTAL ALKALI CONTENT. MAXIMUM WATER/CEMENT RATIO =0.44 SPECIAL TESTING: (BY WEIGHT). AIR ENTRAINMENT=6%+/- 1% IN PLASTIC 1) TWICE ANNUALY, VENDORS SHALL SUBMIT (VIA AN CONCRETE. SLUMP 3" MAXIMUM. INDEPENDENT TESTING LABORATORY TO THE RAILROADS) 7) COPIES OF THE CONCRETE DESIGN MIX TO BE SUBMITTED ASTM C666 FREEZE/THAW HE APPROVED MIXED DESIGN TO RAILROADS FOR APPROVAL PRIOR TO THE START OF *ASTM C227 MORTAR BAR METHOD THE CASTING OPERATION. *ASTM C1260 AT TOTAL ALKALI BURDEN = 0.06% 8) TOP SURFACE SHALL BE NON -CRACK DESIGN AND IS TO 2) GAGE PANELS SHALL BE DESIGNED WITH SHUNT BE SEALED TO PREVENT ION MIGRATION DUE TO SALTING. RESISTANT FEATURES IN ORDER TO PROVIDE A MINIMUM 9) CURING SHALL FOLLOW THE RECOMMENDATIONS AND ELECTRICAL RESISTANCE IN ACCORDANCE WITH THE PROCEDURES OF PCI IN 4TH EDITION DIVISION 4. STANDARD ELECTRICAL TEST (DWG 500930). A REPRESENTATIVE SAMPLE OF PANELS SHALL BE 10) 3/16" WEEP /INSPECTION HOLES SHALL BE PLACED EVERY 3) CHECKED PERIODICALLY FOR BOTTOM FLATNESS BY USING 2 -FT. MIN. ALONG THE TOP OF THE STEEL FRAME ALONG A STRAIGHT EDGE CALIBRATED TO WITHIN +/ -1/32" AND A LINE 3/4" FROM OUTSIDE EDGE. 8 POSITIONS OF LATB FOLLOWS: �) CHECK FLATNESS AT 11) FLANGEWAY FILLER TO BE PERMANENTLY PREATTACHED EACH POSITION USING TAPER GAGE. AND HAVE THE FOLLOWING PROPERTIES: *TENSILE STRENGTH (ASTM D412) SSOPSI MIN. r - T _ _ > 2 "TYP. * ULTIMATE ELONGATION (ASTM D412) 400% MIN. r — = - —7�— *TEAR STRENGTH (ASTM D624) AT 25 DEGREES CELSIUS, T 150 -PLI MIN. * HARDNESS (ASTM D2240) 75+/-5% SHORE A GENERAL: 1) THE MANUFACTURER SHALL BE ISO 9000 OR AAR M -1003 *COMPRESSION SET (ASTM 395 METHOD B) 100 DEGREES CERTIFIED. ALL TESTING PERSONNEL SHALL BE A CELSIUS FOR 70 HOURS 45% MAX. MINIMUM OF ACI LEVEL I CERTIFIED. *ACCELERATED AGING TEST (ASTM D573) 70 HOURS AT 2) THE FABRICATOR SHALL BE RESPONSIBLE FOR LOADING 100 DEGREES CELSIUS MUST NOT EXHIBIT A REDUCTION AND PROPERLY SECURING ALL PRECASTCONCRETE MEMBERS IN PROPERTIES BY GREATER THAN 20 %. FOR SHIPMENT. *OZONE RESISTANCE TEST (ASTM D518) MUST HAVE NO 3) THE MANUFACTURER SHALL WARRANTY PRODUCT FOR A HOURS AT 0 DEGREES CELSIUS.50 PPHM OZONE FOR 96 ADI WORKMANSHIP. RS AGAINST DEFECTS IN MATERIALS *VOLUME RESISTIVITY = 1X10 (OHM -CM) OR GREATER 4) FACTURER (ASTM D257), BUT USING 18% NAri nnre rc_o ens �T�.,. ,. 4 e MA r UN O � TO PERMANENTLY MARK EACH PANEL WITH PLACE OF DISTILLED WATER FOR 168 HOURS AT 25 iv IN CONCRETE • @ IMPRINT FOR SIZE OF RAIL, WEIGHT OF DEGREES CELSIUS AND TESTED AT 500 VDC. MANUFA MANUFACTURER'S TURE, AND CROSSING TYPE. END O EACH * ELECTRICAL RESISTANCE MINIMUM RESISTANCE 10 MEGA PANEL TO BE STENCILED PAINTED WITH SIZE OF RAIL, WEIGHT OF PANEL AND CROSSING TYPE. OMS MEASURED AT 500 VDC. * LOW TEMPERATURE BRITTLENESS (ASTM D2137) AT -40 DEGREES CELSIUS. ,,,, *A SAMPLE SECTION OF THE FLANGEWAY MATERIAL SHALL , + ^ COMMON v ■ O� . \T /� �` jW � A {� . ■ UNION - S„ " ,F' - it 1 \ AJ 1 1 �1 PACIFIC BE OF 10 AT 50 DEGREES PHYSICALLY TESTED BY APPLYING A LATERAL FORCE '+' ,1 %, >� 11 I I I 1 LATERAL LB/IN NT OF HE I T ST IS THE MAXIMUM NOT TO EXCEED 1 /4 " (CR C ONLY). TEST RESULTS MUST GENERAL SPECIFICATIONS F BE SUBMITTED ITTED FOR OR RAILROAD APPROVAL. *MANUFACTURER TO DESIGN THE PREATTACHED FLANGEWAY ROAD (� ®R MAINTENANCE WITHOUT DAMAGING THE FLANGEWAY FILLER R ®A® CROSSINGS V1/ITH OR ANY OTHER COMPONENTS DESIGNED TO HOLD IT CONCRETE PANELS I TOGETHER.. CONCRETE L o9oi rtdgnh/28/2oo5oo pM FILE OWNER: UPRR [DATE: , REV. NO.: 1 [ D W G N O : 200901 MARCH 212003 A- MATERIAL SPECIFICATIONS: o TOLERANCES: rn 1) STRUCTURAL STEEL SHALL CONFORM TO ASTM A -36 SPECIFICATIONS. WELDING TO BE PER AWS CODE. 1 ) OUT OF SQUARE 3/16" (MEASURED ALONG THE DIAGONAL) N 2) ALL EXPOSED STEEL TO RECEIVE ONE COAT PRIMER. 2) LENGTH, WIDTH, AND THICKNESS: +/_1/8" -' 3) END ANGLES FOR GAGE PANEL SHOULD HAVE 3" GAP 3) THE BOTTOM SURFACE, WHICH WILL BE IN CONTACT WITH MINIMUM TO IMPROVE SHUNT RESISTANCE. REINFORCING TH TIES, SHALL NOT UNDULATE IN ANY DIR F MORE MATERIAL AND CLADDING TO BE CONSTRUCTED TO MEET THAN 3/32 ". SEE SPECIAL TESTING NOTE 3 B LOW. ELOW. SHUNTING REQUIREMENT. A NON - CONDUCTIVE SPACER TO BE ATTACHED TO GAGE FRAME. 4) REINFORCEMENT PLACEMENT SHALL BE +/_3/4" HORIZONTAL, +/ -1/8" VERTICAL. 4) CLADDING ON ENDS OF PANELS SHOULD EXTEND BEYOND CONCRETE 1/8" ( +1/8 ", -0') TO IMPROVE MATCH WITH FINISH: ADJACENT PANELS. 1) ALL RECESSES AND MINOR CONCRETE SPALLS ARE TO BE 5) REINFORCING STEEL SHALL CONFORM TO CURRENT ASTM THE PROPER BONDING AGENT AND REPAIR T MATERIAL NG A615 SPECIFICATION, GRADE 60. IF ANY WELDING OF SURFACE OF THE REPAIRED AREA IS TO MATCH THE REINFORCEMENT STEEL IS REQUIRED, MATERIAL SHALL COLOR AND TEXTURE OF THE SURROUNDING AREAS. CONFORM TO ASTM A706 SPECIFICATION, GRADE 60. 2) THE DRIVING SURFACE IS TO HAVE A LIGHT BROOM 6) CONCRETE MATERIAL MIXING, PLACING AND CURING TO FINISH OR AS APPROVED BY RAILROADS. THE ADDITION BE IN ACCORDANCE WITH PCI "MANUAL FOR QUALITY OF WATER TO THE CONCRETE SURFACE FINISH DURING CONTROL PRECAST AND PRESTRESSED CONCRETE." CASTING IS NOT PERMITTED. MANUAL 115, EDITION 4. CEMENT SHALL HAVE NO MORE A TER/ EMENT RAT1O=0.4�N NT. MAXIMUM SPECIAL TESTING: (BY WEIGHT). AIR ENTRAINMENT % + /_ 1% IN PLASTIC 1) TWICE ANNUALY, VENDORS SHALL SUBMIT (VIA AN CONCRETE. SLUMP 3" MAXIMUM. INDEPENDENT TESTING LABORATORY TO THE RAILROADS) THE FOLLOWING TEST ON THE APPROVED MIXED DESIGN 7) COPIES OF THE CONCRETE DESIGN MIX TO BE SUBMITTED *ASTM C666 FREEZE/THAW TO RAILROADS FOR APPROVAL PRIOR TO THE START OF *ASTM C227 MORTAR BAR METHOD THE CASTING OPERATION. *ASTM C1260 AT TOTAL ALKALI BURDEN = 0.06% 8) TOP SURFACE SHALL BE NON -CRACK DESIGN AND IS TO 2) GAGE PANELS SHALL BE DESIGNED WITH SHUNT BE SEALED TO PREVENT ION MIGRATION DUE TO SALTING. RESISTANT FEATURES IN ORDER TO PROVIDE A MINIMUM 9) CURING SHALL FOLLOW THE RECOMMENDATIONS AND STANDARD ELECTRICAL TEST (DWG ACCORDANCE T HE PROCEDURES OF PCI IN 4TH EDITION DIVISION 4. A REPRESENTATI SAPLE OF PANELS SHALL BE 10) 3/16" WEEP/INSPECTION HOLES SHALL BE PLACED EVERY 3) CHECKED PERIODICALLY FOR BOTTOM FLATNESS BY USING 2 -FT. MIN. ALONG THE TOP OF THE STEEL FRAME ALONG A STRAIGHT EDGE CALIBRATED TO WITHIN +/-1/32" AND A LINE 3/4" FROM OUTSIDE EDGE. A TAPER GAGE AS FOLLOWS: 8 POSITIONS OF 11) FLANGEWAY FILLER TO BE PERMANENTLY PREATTACHED EACH POSITION USING TAPER GAGE. FLATNESS AT AND HAVE THE FOLLOWNG PROPERTIES: *TENSILE STRENGTH (ASTM D412) 850PSI MIN. ---=z:,--1---_-_----1 r TYP• *ULTIMATE ELONGATION (ASTM D412) 400% MIN. *TEAR STRENGTH (ASTM D624) AT 25 DEGREES CELSIUS, 150 -PLI MIN. * HARDNESS (ASTM 02240) 75+/-5% SHORE A. GENERAL: 1) THE MANUFACTURER SHALL BE ISO 9000 OR AAR M -1003 * COMPRESSION SET (ASTM 395 METHOD B) 100 DEGREES CERTIFIED. ALL TESTING PERSONNEL SHALL BE A CELSIUS FOR 70 HOURS 45 % MAX. MINIMUM OF ACI LEVEL I CERTIFIED. *ACCELERATED AGING TEST (ASTM 0573) 70 HOURS AT 2) THE FABRICATOR SHALL BE RESPONSIBLE FOR LOADING 100 DEGREES CELSIUS MUST NOT EXHIBIT A REDUCTION AND PROPERLY SECURING ALL PRECASTCONCRETE MEMBERS IN PROPERTIES BY GREATER THAN 20 %. FOR SHIPMENT. *OZONE RESISTANCE TEST (ASTM D518) MUST HAVE NO 3) THE MANUFACTURER SHALL WARRANTY PRODUCT FOR A CRACKING AFTER EXPOSURE TO 50-PPHM OZONE FOR 96 MINIMUM OF TEN YEARS AGAINST DEFECTS IN MATERIALS HOURS AT 40 DEGREES CELSIUS. AND WORKMANSHIP. *VOLUME RESISTIVITY = 1X10' (OHM -CM) OR GREATER 4) MAUNFACTURER TO PERMANENTLY MARK EACH PANEL WITH ANATER SOLUTION IN A CONCRETE IMPRINT FOR SIZE OF RAIL, WEIGHT OF (ASTM D257), BUT USING 18% NACL PLACE OF DISTILLED WATER FOR 168 HOURS AT 25 PANEL MANUFACTURER'S I.D., MONTH/DAY/YEAR OF DEGREES CELSIUS AND TESTED AT 500 VDC. MANUFACTURE, AND CROSSING TYPE. END OF EACH *ELECTRICAL RESISTANCE: MINIMUM RESISTANCE 10 MEGA PANEL TO BE STENCILED PAINTED WITH SIZE OF RAIL, WEIGHT OF PANEL AND CROSSING TYPE. OMS MEASURED AT 500 VDC. * LOW TEMPERATURE BRITTLENESS (ASTM D2137) AT -40 DEGREES CELSIUS. , % , '= , � UNION � � *A SAMPLE SECTION OF THE FLANGEWAY MATERIAL SHALL ''' ° "�` COMMON STANDARDS a BE PHYSICALLY TESTED BY APPLYING A LATERAL FORCE � ; I I I OF 10 LB/IN AT 50 DEGREES CELSIUS. THE MAXIMUM LATERAL DISPLACEMENT OF THE TEST IS NOT TO EXCEED BESUB MITTEDF O FOR ONLY). ROAD APPROVAL RSULTSMUST GENERAL SPECIFICATIONS FOR BE SUBMITTED FR RAIL *MANUFACTURER TO DESIGN THE PREATrACHED FLANGEWAY ROAD CROSSINGS WITH FILLER TO ALLOW FOR REMOVAL OF PANELS FOR MAINTENANCE WITHOUT DAMAGING THE FLANGEWAY FILLER OR ANY OTHER COMPONENTS DESIGNED TO HOLD IT CONCRETE PANELS TOGETHER.. FILE OWNER: UPRR IDATE: MARCH 21, 2003 REV. NO.: 1 ( DWG NO:200901 . \road crossings \200901 rl .dgn 03/27/03 10:12:40 AM * * * ** MAINTAIN PROPRIETARY CONFIDENT IALITY * * * ** BNSF RAILWAY COMPANY FHPM ESTIMATE FOR WASHINGTON LOCATION UNION GAP TO YAKIMA DETAILS OF ESTIMATE PLAN ITEM : PSI099169B1 VERSION : 1 PURPOSE, JUSTIFICATION AND DESCRIPTION REVISED TO NEW PRICING LIST 09/04/03 (THERE WAS NO APPROVED MATERIAL LIST AT THIS TIME) INSTALL CONSTANT WARNING AND (2) CANTILEVERS WITH (2) STUB GATES AT WAHINGTON AVE IN YAKIMA, WA. L/S 0048, MP 87.68, NORTHWEST DIV., YAKIMA VALLEY SUBDIV., DOT # 099169B. MONTHLY POWER UTILTIY COST CENTER: 61504 THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTIVE PACKAGES USED FOR ESTIMATING PURPOSE ONLY. THEY CAN BE EXPECTED TO CHANGE AFTER THE ENGINEERING PROCESS, DETAILED AND ACCURATE MATERIAL LISTS WILL BE FURNISHED WHEN ENGINEERING IS COMPLETED. CONTINUING CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. THIS ESTIMATE GOOD FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR MATERIAL, LABOR, AND OVERHEADS. * * * * * ** ** * * * * * * * * * * * ** * ** * * * * ** SIGNAL WORK ONLY * * * * * * * * * * ** * * * * * * * * * * * * * * * * * ** THE STATE OF WASHINGTON IS FUNDING THIS PROJECT 100 %. • MAINTAIN PROPRIETARY CONFIDENTIALITY REVISED TO NEW PRICING LIST 09/04/03 DESCRIPTION QUANTITY U/M COST TOTAL S * * * * *** * ** LABOR * * * * * * ** ** ELECTRICAL LABOR F/POWER TRANS SYS 54.0 MH SIGNAL FIELD LABOR - CAP 1,360 960.0 MH 25,018 SIGNAL SHOP LABOR - CAP 64.0 MH PAYROLL ASSOCIATED COSTS 1,684 EQUIPMENT EXPENSES 19,305 DA LABOR OVERHEADS 8,698 INSURANCE EXPENSES 30,025 4,488 TOTAL LABOR COST 90,578 90,578 * * * * * * * * * ** ** MATERIAL * ** * * ** * * * * ** BATTERY 1.0 EA N BUNGALOW 6X6 5,089 1.0 EA N 8,612 BUNGALOW MATERIAL 1.0 LS N CABLE 4,574 1.0 EA N 3,384 CANTILEVER COMPLETE 2.0 EA N CHARGER 38,000 1.0 EA N 1,020 CONDUIT, PVC 4 ", SCH 80 140.0 FT N CONSTANT WARNING 546 1.0 EA N 18,890 ELECTRICAL MTRL 1.0 EA FIELD MATERIAL 1,500 FOUNDATION 1.0 LS N 4,236 GATE KEEPER 2.0 EA N 1,000 2.0 EA N 3,722 GATE MECH 2.0 EA N LAMP RESISTOR 15,070 I.0EAN 792 LED LIGHT ADJUSTMENT 24.0 EA N LED LIGHT GATE KIT 5,784 2.0 EA N 794 LIGHT OUT DETECTOR 1.0 EA N RECORDER 891 1.0 EA N 4,396 SHUNT, NBS 2.0 EA N TELLULAR MONITOR t 1.0 EA N 2,500 ,500 MATERIAL HANDLING USE TAX 75 OFFLINE TRANSPORTATION 10,286 1,215 TOTAL MATERIAL COST 134,138 134,138 * * * * * * * * ** OTHER * * * * * * * * ** AC SERVICE 1.0 EA N CONCRETE/FOUNDATION CANT. 5,000 2.0 LS N 3,000 CONTRACT DIR BORE 10 EA N 1 0,000 CONTRACT ENGR. FILL DIRT 1.0 EA N 6,000 SURFACE ROCK 10.0 CY N 250 10.0 CY N 250 TOTAL OTHER ITEMS COST 24,500 24,500 PROJECT SUBTOTAL CONTINGENCIES 249,216 BILL PREPARATION FEE 24,921 2,742 GROSS PROJECT COST LESS COST PAID BY BNSF 276,879 78,975 TOTAL BILLABLE COST 197,904 * * * ** MAINTAIN PROPRIETARY CONFIDENTIALITY * * * ** BNSF RAILWAY COMPANY FHPM ESTIMATE FOR YAKIMA LOCATION UNION GAP DETAILS OF ESTIMATE PLAN ITEM : PTR099169B VERSION : I PURPOSE, JUSTIFICATION AND DESCRIPTION LS 48 - MP 87.68 - MAIN TRACK PIP - YAKIMA, WA - REHABILITATE WASHINGTON AVENUE DESCRIPTION OF PROJECT AS PROVIDED BY PROJECT ENGINEER DTD YAKIMA VALLEY SUBDIVISION NORTHWEST NORTH DIVISION RDM VULGAS DE D. BEFORT BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO: 80% BILLABLE TO YAKIMA MAINTAIN PROPRIETARY CONFIDENTIALITY THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED BY LINE SEGMENT, MILE POST RANGES, AND IN SOME CASES TRACK NUMBER. THIS IS THE PRIMARY AREA FOR THE PROJECT. THERE WILL BE CASES WHERE WORK MAY OCCUR BEYOND THE DEFINED LIMITS. PROJECTS THAT INCLUDE SIGNAL, ELECTRICAL, OR TELECOMMUNICATION EQUIPMENT MAY REQUIRE ACTIVITY BEYOND THESE DEFINED TRACK LIMITS. ALL OR PORTIONS OF SOME PROJECTS MAY OCCUR IN AREAS WHERE NO MILEPOST SIGNS EXIST SUCH AS YARDS. THIS ESTIMATE IS GOOD FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR, MATERIAL, AND OVERHEAD. DESCRIPTION QUANTITY U/M COST TOTAL S * * * ** * * * ** LABOR * * * * •* * * ** PLACE FIELD WELDS - CAP 96.0 MH 2,186 REPLACE PUBLIC CROSSING - TOTAL REHAB 144.0 MH 3,127 SIGNAL FIELD LABOR - CAP 24.0 MH 632 SURFACE TRACK - REPLACEMENT - CAP 24.0 MH 565 UNLOAD BALLAST - REPLACEMENT - CAP 12.0 MH 261 UNLOAD CROSSING MATERIAL - PUBLIC - CAP 36.0 MH 782 PAYROLL ASSOCIATED COSTS 5,193 EQUIPMENT EXPENSES 4,377 DA LABOR OVERHEADS 8,079 INSURANCE EXPENSES 1,206 TOTAL LABOR COST 26,408 26,408 * * * * * * * * * * *** MATERIAL * * * * * * * * * * * ** BALLAST, ROCKY POINT (REPL DELTA) (HIPOL AND 200.0 NT ** 2,076 JOINT, COMPROMISE, 115 LB/112 LB, LH, 3L & 4L 1.0 PR ** 189 JOINT, COMPROMISE, 115 LB /112 LB, RH, IR & 2R 1.0 PR ** 188 TRACK PANEL, 136 LB 40 FT- 10 FT TIES - PANDROL 3.0 EA ** 14,619 RAIL, TRANSN,LH,25 FT, 136 -I/4 WORN 115 2.0 EA 2,817 RAIL, TRANSN,RH,25 FT, 136 -1/4 WORN 115 2.0 EA 2,817 WELDKIT, GENERIC FOR ALL RAIL WEIGHTS 12.0 KT 852 CONC 136 08 -SEC WITH FILLER FOR 10' WOOD TIES 72.0 FT 14,919 CONCRETE XING RAMP AND PANEL RESTRAINT, 1.0 ST 257 SIGNAL MATERIAL 3.0 DAY 450 MATERIAL HANDLING 1,952 ONLINE TRANSPORTATION 2,000 USE TAX 3,285 OFFLINE TRANSPORTATION 365 TOTAL MATERIAL COST 46,786 46,786 * * * * * * * * ** OTHER * * * * * * * * ** LEASED EQUIPMENT WITH OPERATOR 3.0 DAY 4,500 TOTAL OTHER ITEMS COST 4,500 4,500 PROJECT SUBTOTAL 77,694 CONTINGENCIES 7,605 BILL PREPARATION FEE 853 GROSS PROJECT COST 86, 152