Outdoor Recreation Account
Project Sponsor: City of Yakima Project Number: 06-1851C
Project Title: William 0. Douglas Trail Connections Approval Date: 6/7/2007
A. PARTIES OF THE AGREEMENT
This Project Grant Agreement (Agreement) is entered into between the Recreation and Conservation Funding Board
(RCFB), P.O. Box 40917, Olympia, Washington 98504 -0917 and City of Yakima, 129 N Second St, Yakima, WA
98901(Sponsor) and shall be binding upon the agents and all persons acting by or through the parties.
B. PURPOSE OF AGREEMENT
This Agreement sets out the terms and conditions by which a grant is made from the Outdoor Recreation Account of
the State of Washington's General Fund. The grant is administered by the RCFB to the Sponsor for the project
named above.
C. DESCRIPTION OF PROJECT
The subject Project is described on the attached Project Summary.
D. TERM OF AGREEMENT
The Project Sponsor's on -going obligation for the above project is perpetual unless otherwise identified in this
Agreement.
E. PERIOD OF PERFORMANCE
The Project reimbursement period shall begin on February 1, 2008 and end on June 30, 2010. No expenditure made
before or after this period is eligible for reimbursement unless incorporated by written amendment into this
Agreement.
F. PROJECT FUNDING
The total grant award provided by the RCFB for this project shall not exceed $796,883.00. The RCFB shall not pay
any amount beyond that approved for funding of the project. The Sponsor shall be responsible for all total project
costs that exceed this amount. The contribution by the Sponsor toward work on this project at a minimum shall be as
indicated below:
Percentage Dollar Amount
RCFB - WWRP - Trails 46.42%
$796,883.00
Project Sponsor 53.58% $919,712.00
Total Project Cost 100.00% $1,716,595.00
•
G. RIGHTS AND OBLIGATIONS
All rights and obligations of the parties to this Agreement are subject to this Agreement and its attachments, including
the Sponsor's Application, Project Summary, Eligible Reimbursement Activities Report, Project Milestones, and the
General Provisions, all of which are attached hereto and incorporated herein.
Except as provided herein, no alteration of any of the terms or conditions of this Agreement will be effective unless
provided in writing. All such alterations, except those concerning the period of performance, must be signed by both
parties. Period of performance extensions need only be signed by RCO's Director.
The Sponsor has read, fully understands and agrees to be bound by all terms and conditions as set forth in these
documents.
H. COMPLIANCE WITH APPLICABLE STATUTES, RULES. AND RCO POLICIES
This Agreement is governed by, and the Sponsor shall comply with, all applicable state and federal laws and
regulations, including Chapter 79A.15 RCW, Chapter 286 WAC and published agency policies, which are
incorporated herein by this reference as if fully set forth. •
WWRP Project Agreement Outdoor Recreation Account
Chapter 79A.15 RCW, Chapter 286 WAC Page 1 of 2
PROJAGR.RPT
I. ADDITIONAL PROVISIONS OR MODIFICATIONS OF THE GENERAL PROVISIONS
1. On July 1, 2007, the name of the Interagency Committee for Outdoor Recreation changed to the
Recreation and Conservation Funding Board and the office name changed to the Recreation and
Conservation Office. The General Provisions of the Project Agreement do not reflect this change. To
allow immediate implementation of this project, the existing provisions are hereby incorporated into the
agreement. All references to the Board refer to the Recreation and Conservation Funding Board.
References to the Office refer the Recreation and Conservation Office.
2. Before reimbursement of any property acquisition or development related expenses, the sponsor must
comply with Governor's Executive Order 05 -05 regarding Archeological and Cultural Resources for the
scope of work approved in this Project Agreement. The Recreation and Conservation Office will issue
a notice to proceed when appropriate documentation has been received.
In the event that archaeological or historic materials are discovered during project activities, work in the
immediate vicinity must stop; the area must be secured, and the Sponsor must notify the concerned
tribe's cultural staff and cultural committee, the Recreation and Conservation Office, and Department of
Archaeology and Historic Preservation.
3. The Burlington Norhern Santa Fe Railway Company parcels will be purchased by the sponsor on an
extended acquisition timeline beginning 02/01/08 to 06/30/10. Parcel numbers include: 181309 - 34012,
181316- 22001, 181317 -12008 and 181308- 33003.
J. FEDERAL FUND INFORMATION
(none)
K. PROJECT GRANT AGREEMENT REPRESENTATIVE
All written communications sent to the Sponsor under this Agreement will be addressed and delivered to:
Project Contact RCFB
Name: Ray Paolella Recreation and Conservation Office
Title: Attorney Natural Resources Building
Address: 200 South Third Street PO Box 40917
Yakima, WA 98901 Olympia, Washington 98504 -0917
vvww.rco.wa.gov/rcfb/
These addresses shall be effective until receipt by one party from the other of a written notice of any change.
L. ENTIRE AGREEMENT
This agreement, along with all attachments, constitutes the entire agreement of the parties. No other understandings,
oral or otherwise, regarding this Agreement shall exist or bind any of the parties.
M. EFFECTIVE DATE
This agreement, for project #06 1851C, shall be effective upon signing by all parties.
STATE OF WASHINGTON
R E C R E A T I O I A N D C O N R ip.N OFFICE
BY: P fi DATE: �� O
Kaleen Cottingham0 ector
PROJECT NSOR
BY: . \\ S., . DATE:
TITLE:
Pre - approved as to form: /��7
BY: /S/ CITY CONTRAC r NO. A' //floe
Assistant Attorney General RESOLUTION NO
WWRP Project Agreement Outdoor Recreation Account
Chapter 79A.15 RCW, Chapter 286 WAC Page 2 of 2
PROJAGR.RPT
CommiK or
Aii Washington Wildlife and Recreation Program
RECRERTION Trails Category
Post - Evaluation Project Summary
TITLE: William O. Douglas Trail Connections NUMBER: 06 -1851C (Combined)
STATUS: Board Funded
SPONSOR: City of Yakima EVALUATION SCORE: 60.6250
BOARD RANKING: 2 of 24
COSTS: SPONSOR MATCH:
WWRP - Trails $796,883 46% Donated Labor
Local $919,712 54% Force Acct - Labor
Grant - State
Total $1,716,595 100%
DESCRIPTION: .
Yakima will use this grant to complete the William O. Douglas Trail by acquiring five missing links (four parcels and
one trail easement totaling 4.5 linear miles). In addition to purchasing land a trail will be constructed starting at "I"
Street and continuing north one mile to the Naches River bridge north end. A physically separated
pedestrian /bicycle bridge will be constructed over Cowiche Creek, together with bridge approaches to access the
trail located on abandoned railroad land. Renovations to an existing pedestrian bridge, trail markers and
interpretive signs, are also part of the planned development.
LOCATION INFORMATION:
Across Yakima County
COUNTY: Yakima
SCOPE (ELEMENTS):
Administrative costs Fencing & Gates Signing
Allowable land costs Incidentals Site Preparation
Architectural & Engineering Sales Tax Trails
ANTICIPATED ACREAGE:
Acres To Acres To Acres To
ACREAGE TYPE Be Acquired Be Dev /Restored Be Renovated
Riparian lands 5.00
Uplands 130.00
FISCAL YEAR: 2008 DATE PRINTED: January 28, 2008
1PAPSUM1.RPT William O. Douglas Trail Connections
ifi Com g ttee for
,_. 011T000fl Eligible Reimbursement Activities Report
RECRERTION
Project Sponsor: City of Yakima Project Number: 06 - 1851 C
Project Title: William 0. Douglas Trail Connections Approval: 6/7/2007
Acquisition Items:
Worksite Property Element Item
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Administrative costs Administrative costs
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Allowable land costs Easement - trail
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Allowable land costs Land
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Appraisal and review
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Closing
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Cultural resources
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Hazardous substances assess
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Recording fees
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Survey - boundary
#1, Douglas Hill - Trolley Bridge Douglas Hill- trolley bridge connecti Incidentals Title reports /insurance
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Administrative costs Administrative costs
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Allowable land costs Easement - trail
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Allowable land costs Land
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Appraisal and review
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Closing
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Cultural resources
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Hazardous substances assess
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Recording fees
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Survey - boundary
#2, Greenway - 40th - Powerhouse Rd Greenway -40th Avenue - Powerhous Incidentals Title reports /insurance
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Administrative costs Administrative costs
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Allowable land costs Easement - trail
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Allowable land costs Land
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Appraisal and review
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Closing
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Cultural resources
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Hazardous substances assess
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Recording fees
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Survey - boundary
#3, Powerhouse Rd - Painted Rocks Powerhouse Rd.- Painted Rocks cor Incidentals Title reports /insurance
#4, Cowiche Canyon Road Cowiche Canyon Pathway Administrative costs Administrative costs
#4, Cowiche Canyon Road Cowiche Canyon Pathway Allowable land costs Easement - trail
#4, Cowiche Canyon Road Cowiche Canyon Pathway Allowable land costs Land
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Appraisal and review
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Closing
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Cultural resources
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Hazardous substances assess
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Recording fees
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Survey - boundary
#4, Cowiche Canyon Road Cowiche Canyon Pathway Incidentals Title reports /insurance
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Administrative costs Administrative costs
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Allowable land costs Easement - trail
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Allowable land costs Land
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Appraisal and review
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Closing
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Cultural resources
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Hazardous substances assess
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Recording fees
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Survey - boundary
#5, Summitview Rd - Trail Crossing Summitview Rd. -Trail crossing Incidentals Title reports /insurance
ELIGREIM.RPT January 28, 2008 Page: 1
ii • Interagency
Committee for
OUTDOOR Eligible Reimbursement Activities Report
RECREATION
Development/Restoration Items:
• Worksite Element Item Unit Quantity Description
#1, Douglas Hill - Trolley Bridge Architectural & Engineering A & E development Lump Sum 1.00
#1, Douglas Hill - Trolley Bridge Fencing & Gates Fencing - chain link Linear Ft 4,000.00 4 ft heavy duty chain link
fence
#1, Douglas Hill - Trolley Bridge Sales Tax Sales Tax Lump Sum 1.00
#1, Douglas Hill - Trolley Bridge Signing Interpretive signs Each 1.00 Various interpretive and
informational
#1, Douglas Hill - Trolley Bridge Site Preparation Clearing Acres 0.50 Removal of structures &
obstructions
#1, Douglas Hill - Trolley Bridge Site Preparation Erosion control Lump sum 1.00 Spill prevention plan
#1, Douglas Hill - Trolley Bridge Site Preparation Grubbing Acres 0.50 Clearing water birches,
sumacs, etc. for bridge
installation
#1, Douglas Hill - Trolley Bridge Site Preparation Site preparation - other Lump sum 1.00 N. of 6th Ave. to
ped -bike bridge
excavation, $60 /CY
#1, Douglas Hill - Trolley Bridge Site Preparation Site preparation - other Lump sum 1.00 6th Avenue excavation,
$60 /CY
#1, Douglas Hill - Trolley Bridge Site Preparation Traffic control Lump sum 1.00 Temp. control devices.
Traffic supervisor (8 hr x
$35 /hr)
#1, Douglas Hill - Trolley Bridge Trails Bridges Each 1.00 40 -foot wooden bridge,
5 -ton cap, with hand
railing
#1, Douglas Hill - Trolley Bridge Trails Bridges Each 2.00 Wing walls for wooden
bridge over creek
#1, Douglas Hill - Trolley Bridge Trails Bridges Each 1.00 Pedestrian -bike bridge
renovation
#1, Douglas Hill - Trolley Bridge Trails Railroad crossing Each 1.00 Pedestrian -bike bridge
path construction (wood
planking)
#1, Douglas Hill - Trolley Bridge Trails Surface base Miles 0.80 6th Avenue gravel base
#1, Douglas Hill - Trolley Bridge Trails Trails - asphaltic concrete Miles 0.10 Cowiche Creek bridge
approaches, 0.2 mi
#1, Douglas Hill - Trolley Bridge Trails Trails - asphaltic concrete Miles 0.80 6th Avenue (4 ft asphalt
footpath)
#1, Douglas Hill - Trolley Bridge Trails Trails - asphaltic concrete Miles 0.20 Pedestrian-Bike bridge
approaches, 10 -12 ft
wide bike -ped
ELIGREIM.RPT January 28, 2008 Page: 2
I mgenry
Committee for
OUTDOOR Legal Description
RECREATION
Project Sponsor: City of Yakima Project Number: 06 -1851 C
Project Title: William 0. Douglas Trail Connections IAC Approval: 06/07/2007
Worksite Name
Property Name
Legal Description
Worksite #1 Douglas Hill - Trolley Bridge
Douglas Hill- trolley bridge connecti
The legal description of the property purchased with funding assistance provided through this Project Agreement (and
protected by a recorded Deed -of- Right) shall be amended into the Project Agreement prior to reimbursement of the final
payment.
Worksite #2 Greenway - 40th - Powerhouse Rd
Greenway -40th Avenue - Powerhouse Rd.
The legal description of the property purchased with funding assistance provided through this Project Agreement (and
protected by a recorded Deed -of- Right) shall be amended into the Project Agreement prior to reimbursement of the final
payment.
Worksite #3 Powerhouse Rd - Painted Rocks
Powerhouse Rd.- Painted Rocks connect
The legal description of the property purchased with funding assistance provided through this Project Agreement (and
protected by a recorded Deed -of- Right) shall be amended into the Project Agreement prior to reimbursement of the final
payment.
Worksite #4 Cowiche Canyon Road
Cowiche Canyon Pathway
The legal description of the property purchased with funding assistance provided through this Project Agreement (and
protected by a recorded Deed -of- Right) shall be amended into the Project Agreement prior to reimbursement of the final
payment.
Worksite #5 Summitview Rd - Trail Crossing
Summitview Rd. -Trail crossing
The legal description of the property purchased with funding assistance provided through this Project Agreement (and
protected by a recorded Deed -of- Right) shall be amended into the Project Agreement prior to reimbursement of the final
payment.
LEGALDSC.RPT January 28, 2008 Page 1
Luera
AV 0111110011 r Milestone Report By Project
EION
Project Number: 06 -1851 C
Project Name: William O. Douglas Trail Connections
Sponsor: Yakima City of
Project Manager: Adam Cole
X ! Milestone Target Date Comments /Description
X RFP Complete /Consultant Hired 10/31/2007
X ! Order Appraisal /Review 11/30/2007
Project Start 02/01/2008
A &E Complete /Permits Submitted 06/30/2008
Plans /Specs Reviewed Mgmt Agy 07/31/2008
Annual Project Billing 07/31/2008
Survey Complete 09/30/2008
Purchase Agreement Signed 10/31/2008
Environmental Assess Complete 12/31/2008
Special Conditions Met 01/31/2009 Ensure compliance with EO 05 -05
before reimbursement of property
costs.
Acquisition Closing 02/28/2009
Bid Awarded 03/31/2009
Recorded Documents to Mgmt Agy 04/30/2009
Construction Started 04/30/2009
Annual Project Billing 07/31/2009
Project Complete 06/30/2010
Special Conditions Met 06/30/2010 Four parcels owned by BNSF Railway
Co. will have a closing date of
06/30/2010.
Final Docs /Billing to Mgmt Agy 09/30/2010
X = Milestone Complete
! = Critical Milestone
MILESTO.RPT January 28, 2008 Page: 1
tECREATION AND CONSERVATION OFFICE FORM A - 19 State of Washington
Agency Name INVOICE VOUCHER •
Sponsor's Certificate. I hereby certify under penalty of perjury that the items
Recreation and Conservation Office and totals listed herein are proper charges for materials, merchandise or
P.O. Box 40917 services furnished to the State of Washington, and that all goods furnished
Olympia, WA 98504 and /or services rendered have been provided without discrimination because
of age, sex, marital status, race, creed, color, national origin, handicap,
religion or Vietnam era or disabled veterans status.
Sponsor
City of Yakima BY
129 N Second St
Yakima, WA 98901 (TITLE) (DATE)
_,.: k'.'# .�. ` ' z: . � " x .i_, i�f4?�?i "u FY^ r .,� 4
�. � � �,. , f� rv_- }�.� �, _.,:� '���s �ri�B:e Com�ple'�ed�� �. aonso, ��`�s � � �:,�� �� � ��
Droject Number 06 -1851 C Invoice # Billing Period This is a Final Billing?
'roject Name William O. Douglas Trail Connections 1 From: To: Yes [ ] No [ I
' G pe •t f `' iy i �� Costs For This Billing
Project A :Ia � s f a E
( Non-Reimbursable
,ATEGORIES: A.reement j 1 � '
� dt r . - - Ex.enditures Match Total
.., - 3 a,?.. " : :°-` t : •Matt {i..F:"izi.:�.ts .`K« .x '�,r�rr lo ` ri� ti « .t tr s t; t
Land,. .
cater': h3zf« 5' �V1 � ;r ��.. :oa
a c + x s Est --, f a
Incidentals 4 � u
i, 4 . t ti ` 0 0
Land /Inc Subtotal $955,079.53 A ' • a '4 3 "' � fr � a " 'l
Admin Costs $47,658.47 __ _ �5 M' 1p 1 I�� i t
Acquisition Total ` . - . ' ' -
4 $1 ~ : , c } t �� i pp
. - ` " k `
x .. $'" �F {� _.. a ,: - 3.3'�f ;'`x.- �sj:.. ,.:0'114;144.4706.';'-:
r3. °' �5^� • 'S=X%:. �. { Y -r2 .... ..:3:01-Aft t P e : . t if'= v .< SY:i
Construction $595,525.99 ;SK ; - sp o
e` a ;-•: P . p 0
A &E $118,331.01 ,
�r�
Development Total $713,857.00 iii ";t . 0 "�
$1,716,595.00 $0.00
FUNDING & EXPENDITURE FORMULA
For RCO Use ONLY
';:�:"" Y'd'� =tiZ �..- ,.�;�`'' _ - otsr` ?.t ....tom:• 2� . . - : s7`
�� �„� '"l: : � �xp,� ? §.N.,
i <:.: �.�, t :.- � JFe 'i�{"..d"�+. v`�..e .; .``�:f'a- ' �'- .,a.. ^�.
.. ,, zr,.. _. 4•.,� Agre In oittlatton.:.. " . *;: . _ - r ...fie Wi g '` ry ,
:;..r.: .s.�..: ��.....,..�. ._,...._�._;,..._ <. r��< .. ._ . ����:. �•"�.,�:�,: �:a;�,.�'.,., °FrevtouRCORimburements. _
„
..P., .. .. �K.l _r±. x, i)'..4'. irn - 111.1.4 , 3*;
Sponsor: 53.58% $919,712.00 Total Billed
RCO Federal: Share Billed
2CO: WWRP - TR 46.42% $796,883.00 Share Approved
Advance Balance
Match Owed Balance
Share Retained
Share Paid
\greement Total: 100.00% $1,716,595.00 Match Bank
7 G UFF n , • >: , tt _::,
oc= Date'.. =' .�_,. >�: .. ,. .�, �� �: _.�� <<�� •F.� .
.:.�' -_.. vas ��.�� _�.:�: e t C1 oc N om,• � ��� � ��. :�;Ref'Doc#, �,� � �llendoi.Ni7mberr t'�.
�x _ ... ,: tt��. �:�.,�, M , _�,.�;�, . .. , ...:: �Veiior,.j'viessage :�:�: >. ,: ���:
000000Y104 -00 06 -1851 C
> z'.� . k:a'�r ;ors` _ zs : ° >•.t, <
_:�h� T r anC ode, . . .,,p�Fu ntl��� _ ° - r i,.� ,� _ , 1 � :�s::�• e;� %::,::� -� �-
a' • - ,�. =. ppn:li idex_,F,s.�.. r _ . � >"��FProq tndex.v�,� - � SuEi�Ob}rSutiSu b :;Obl:1; - ��:r:��.ProJect: #�- :.- .�...; =ice � = ;xw�'(nv #tg
210 070 106 92203 NZ 1
.�, � . ,., -, r:.,_. „.��;�; sir °` -- �� t - 1
t � �. .+v` '+;:. - _ -
�`ie<
! F'. •*' e %�., .a'p't
> s .� -,_ �.� ��.:. ., < �. ` ert tcation -F a �s,,� . .�. . �,. -
- :w,:�_..v . ,_ � r .E,,.. .� °- - oir:Pa ment -.
.
� .. .... .- c..., « :. :- s:,.� �- ; e - _ rse v.$i`r.¢'A^N�,}+d.'s°a +. _..., m =!3'.:' ',::v!: y - - _e.. �:3Y". .�.k °'.2 »`:�.z ".,.*ni:...�z. ^ -
'roject Manager /Date Release Final Pmt [ j Division Supervisor /Date Accounting /Date
INVOICE.RPT 1 /28/2008 Current Funding
Press Release Template
City of Yakima offered grant to acquire and develop land for nonmotorized trail
activities.
(Yakima) - City of Yakima was awarded a grant of $796,883.00 from the Washington Wildlife and
Recreation Program, Outdoor Recreation Account, Trails category. The grant was awarded by the
Recreation and Conservation Funding Board (RCFB), and will be used for the following:
Yakima will use this grant to complete the William O. Douglas Trail by acquiring five
missing links (four parcels and one trail easement totaling 4.5 linear miles). The William O.
Douglas Trail is a 75 -mile trail that runs through Yakima and connects to Mount Rainier
National Park. The trail is 90 percent complete. In addition to purchasing land, Yakima will
construct a .8 -mile pedestrian pathway separated from Sixth Avenue and a short
bike - pedestrian pathway across Yakima's historic Naches River trolley bridge, giving trail
users access to the William O. Douglas hill climb and to the north bank of the Naches
River. Yakima will contribute $919,712 in a state grant, labor, and donated labor.
There were twenty -three applications submitted for consideration in the Washington Wildlife and
Recreation Program, Outdoor Recreation Account, Trails category. Each project went through an
evaluation process prior to being recommended for funding. The RCFB Board approved funding for
projects on Thursday, June 7, 2007.
Funding for the Washington Wildlife and Recreation Program, Outdoor Recreation Account, Trails
category comes from the sale of state general obligation bonds. City of Yakima will leverage local
contributions totaling $919,712.00 with grant monies to implement the project. Total estimated project
cost is $1,716,595.00. RCFB is the state's administrator of the grant program.
Contact: Ray Paolella, (509) 575 -6030 (sponsor project manager)
Adam Cole, (360) 902 -3084, AdamC @rco.wa.gov (RCFB project manager)
•
Amendment to Project Agreement
Project Sponsor: Cowiche Creek Conservancy Project Number: 07 -1598 C
Project Title: Cowiche Creek Protection & Restoration Amendment Number: 1
Amendment Type:
Project Sponsor Change
Amendment Description:
The City of Yakima is added as a secondary sponsor to the grant to hold title to the properties
acquired. The City of Yakima is responsible for ensuring property is used for its intended
purpose in perpetuity. The Cowiche Canyon Conservancy remains the primary sponsor for fiscal
responsibilities. Any dispute between the sponsor and co- sponsor must be resolved according
to the Remedies and Disputes sections outlined in agreement.
Agreement Terms
In all other respects the Agreement, to which this is an Amendment, and attachments thereto, shall remain
in full force and effect. In witness whereof the parties hereto have executed this Amendment.
State Of Washington Primary Project Sponsor
Recreation and Conservation Office
EXISTING
•
AGENCY:
BY: 6 6 BY: l Kaleen Cottingha
•
TITLE: Director TITLE: 7Y$ S tzt-tont
DATE: t t hvi/af DATE: --au !°Q ( 'L_Ut $
Pre - approved as to form:
BY: IS/
Assistant Attorney General
Secondary Project Sponsor
AGENCY:
BY:
TITLE:
•
DATE: N.� \ \‘
•
SAL Project Project Sponsor Change Amendment •
Salmon Funding Accounts Chapter 77.85 RCW, Chapter 286 WAC
AMENAGR2.RPT