Loading...
HomeMy WebLinkAboutR-2015-056 Engineering Services Agreement with Conley Engineering, Inc.A RESOLUTION RESOLUTION NO. R-2015-056 authorizing the City Manager to execute an agreement between Conley Engineering Inc. and City of Yakima for engineering services WHEREAS, the City of Yakima (City) owns and operates wastewater collection and treatment facilities in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City desires to retain Conley Engineering Inc , to provide support services for existing electrical systems together with Supervisory, Communications, and Data Administration (SCADA) in connection to the City of Yakima Wastewater Treatment Plant (WWTP) needed to meet current and anticipated regulatory requirements pertaining to wastewater, biosolids treatment and disposal processes, and other related wastewater treatment plant support services, and WHEREAS, Conley Engineer has provided the design and construction services on updated and existing treatment processes to ensure that necessary investments into the City's wastewater systems are identified to meet regulatory requirements, community growth, replacement needs, and operational efficiencies, and WHEREAS, with these ongoing mandated requirements, use of budgeted funding is required to continue the engineering support efforts to address these issues, and WHEREAS, the state of Washington requires these services to be performed by a Professional Licensed Engineer, therefore; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the amended engineering services agreement with Conley Engineering Inc. to provide continued support services for existing electrical and SCADA systems for the Wastewater Division not to exceed $100,000, now, therefore, ADOPTED BY THE CITY COUNCIL this 21st day of April, 2015. ATTEST: Micah Cawley/Mayor 2 Sonya CI'a!ar Tee, City tier CITY OF YAKIMA AND CONLEY ENGINEERING INC. PROFESSIONAL SERVICES AGREEMENT THIS PROFESSIONAL SERVICES AGREEMENT (hereinafter "Agreement") is made and entered into by and between the City of Yakima, a Washington municipal corporation (hereinafter the "City"), and Conley Engineering Inc., a Washington corporation and a company licensed to do business in Washington (hereinafter the "Engineer"). WHEREAS, the City desires to retain the Engineer to provide electrical engineering support services for existing electrical systems together with Supervisory Control and Data Acquisition (SCADA) in connection with recent additions and modifications to the City of Yakima Wastewater Treatment Plant (WWTP) needed to meet current and anticipated regulatory requirements pertaining to wastewater, biosolids treatment and disposal processes, and other related wastewater treatment plant support services; and WHEREAS, the Engineer has the experience and expertise necessary to provide such independent electrical engineering support services and is willing to provide the services in accordance with the terms and conditions of this Agreement. NOW, THEREFORE, in consideration of the mutual covenants, promises, and agreements set forth herein, it is agreed by and between the City and the Engineer as follows' 1. Scope of Support Services. The Engineer shall provide electrical engineering support services in connection with existing, recent additions, and modifications to the City of Yakima WWTP electrical and SCADA systems. The scope of services is described in more detail in Exhibit "A" attached and incorporated by this reference 2. Additional Support Services. a. City and Engineer agree that not all support services to be performed by Engineer can be defined in detail at the time this Agreement is executed, and that Additional Services not covered in Exhibit "A" may be needed during performance of the Agreement. City may, at any time, by written order, direct Engineer to revise portions of Basic Services previously completed in a satisfactory manner, delete portions of Basic Services, suspend Basic Services, terminate Basic Services or request that Engineer perform Additional Support Services beyond the scope of Basic Services. Such changes hereinafter shall be referred to as "Additional Support Services". b. If such Additional Support Services cause an increase or decrease in Engineer's cost of, or time required for, performance of any services under this Agreement, a contract price and/or completion time adjustment pursuant to this Agreement may be made and this Agreement may be modified in writing accordingly. c. Compensation for each such request for Additional Support Services will be negotiated by City and Engineer according to the provisions set forth in Section 4 Engineer shall not perform any Additional Support Services until authorized by City in writing, and once so authorized, such Additional Support Services shall be considered part of Basic Services If mutual agreement on compensation or time adjustment cannot be concluded, Engineer is required to perform the Basic and Additional Support Services, reserving a right for equitable adjustment; provided, that in no event shall any amount be allowed for anticipated profit or unperformed Basic Support Services or Additional Support Services. If City and Engineer cannot agree upon an equitable adjustment in the time for Additional Services beyond the scope of Basic Support Services within thirty (30) days of the Engineer's written request for equitable adjustment, performance of such Additional Support Services may be suspended by Engineer until City and Engineer mutually agree upon the time adjustment. 3. Term. The term of this Agreement shall commence upon execution hereof and shall terminate in five (5) years in accordance with Section 20. The Engineer shall provide such services as are described on executed task orders in accordance with the time schedule set forth in Exhibit A. When directed by the City, the Engineer shall proceed in a timely and diligent manner to provide all services required hereunder. 4. Consideration. a The City shall pay the Engineer for basic services described in Exhibit A, in accordance with the payment schedule set forth in Exhibit "B" Hourly rates may be increased once on an annual basis. Unless the parties otherwise modify this Agreement, the total compensation paid to the Engineer for support services provided under this Agreement shall not exceed One Hundred Thousand Dollars ($100,000.00). b. Direct Expenses are those necessary costs and charges incurred for Basic Services including, but not limited to. (1) the direct costs of transportation, meals and lodging, (2) insurance, letters of credit, bonds, and equipment and supplies, specific to the Basic Services and approved in advance by the City; and (3) Engineer's direct costs for subcontracted professional services, laboratory tests, analysis, printing and reproduction services, and CADD services. c Travel costs, including transportation, lodging, subsistence and incidental expenses incurred by employees of the Engineer and each of the Sub -consultants in connection with Basic Services, shall be subject to the following; • That a Maximum of U.S. INTERNAL REVENUE SERVICE allowed cents per mile will be paid for the operation, maintenance and depreciation costs of company or individually owned vehicles for that portion of time they are used for Basic Services. Engineer, whenever possible, will use the least expensive form of ground transportation. • That reimbursement for meals inclusive of tips shall not exceed a maximum of $40 per day per person. This rate may be adjusted on a yearly basis • Those accommodations shall be at a reasonably priced hotel/motel. • That air travel shall be by coach class, and shall be used only when absolutely necessary. d Telephone charges, in-house computer charges, in-house reproduction charges, first class postage, overnight mail and shipping and FAX charges are not included in the direct expense costs, but are considered included in the Schedule of specific Hourly Billing Rates. e. Professional Sub -Consultants. Professional Sub -consultants are those costs for Engineering, management consulting, surveying, geotechnical services and similar professional services approved in advance by the City Reimbursement for Professional Sub -consultants will be on the basis of 1 10 times the actual costs billed by the Professional Sub -consultant for services provided to the City through this Agreement. g. The Engineer shall submit to the City monthly invoices itemizing tasks accomplished and percent completed to date. Upon receipt of said monthly invoice, the City shall make payment to the Engineer within thirty (30) calendar days; provided, however, that all payments are expressly conditioned upon the Engineer's providing services that are satisfactory to the City. The Engineer shall maintain adequate files and records to substantiate all amounts itemized on the monthly invoices In the event that either party exercises its right to terminate this Agreement in accordance with Section 20, the Engineer shall be compensated in accordance with the above terms for all satisfactory services provided to the City up to the effective Agreement termination date. 5. Information Provided by the City. The Engineer shall provide guidance to the City in determining the data required for purposes of the contemplated services The City agrees to use reasonable efforts to provide data and information specifically requested by the Engineer 6. Status of Engineer. The Engineer and the City understand and expressly agree that the Engineer is an independent contractor in the performance of each and every part of this Agreement. No officer, employee, volunteer and/or agent of Engineer shall act on behalf of or represent him or herself as an agent or representative of the City The Engineer, as an independent contractor, assumes the entire responsibility for carrying out and accomplishing the services required under this Agreement. The Engineer expressly represents warrants and agrees that its status as an independent contractor in the performance of the work and services required under this Agreement is consistent with and meets the six -part independent contractor test set forth in RCW 51.08.195. The Engineer and its officers, employees, volunteers, agents and/or subcontractors shall make no claim of City employment nor shall claim against the City any related employment benefits, social security, and/or retirement benefits. Nothing contained herein shall be interpreted as creating a relationship of servant, employee, partnership or agency between the Engineer and the City. 7. Inspection and Audit. The Engineer shall maintain books, accounts, records, documents and other evidence pertaining to the costs and expenses allowable and consideration paid under this Agreement in accordance with generally accepted accounting practices. All such books of account and records required to be maintained by this Agreement shall be subject to inspection and audit by representatives of the City and/or the Washington State Auditor at all reasonable times and the Engineer shall afford the proper facilities for such inspection and audit. Such books of account and records may be copied by representatives of the City and/or the Washington State Auditor where necessary to conduct or document an audit. The Engineer shall preserve and make available all such books of account and records for a period of three (3) years after final payment under this Agreement. 8. Taxes and Assessments. The Engineer shall be solely responsible for compensating its employees, agents, and/or subcontractors and for paying all related taxes, deductions, and assessments, including but not limited to federal income tax, FICA, social security tax, assessments for unemployment and industrial injury and other deductions from income which may be required by law or assessed against either party as a result of this Agreement. In the event the City is assessed a tax or assessment as a result of this Agreement, the Engineer shall pay the same before it becomes due. 9. Nondiscrimination Provision. During the performance of this Agreement, Engineer shall not discriminate in violation of any applicable federal, state and/or local law or regulation on the basis of age, sex, race, creed, religion, color, national origin, marital status, disability, honorably discharged veteran or military status, pregnancy, sexual orientation and any other classification protected under federal, state, or local law. This provision shall include but not be limited to the following: employment, upgrading, demotion, transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, selection for training and the provision of services under this Agreement. 10. The Americans with Disabilities Act. The Engineer shall comply with the Americans with Disabilities Act of 1990, 42 U.S.0 § 12101 et seq. (ADA) and its implementing regulations and Washington State's anti -discrimination law as contained in RCW Chapter 49 60 and its implementing regulations with regard to the activities and services provided pursuant to this Agreement. The ADA provides comprehensive civil rights to individuals with disabilities in the area of employment, public accommodations, public transportation, state and local government services and telecommunications. 11. Compliance with Law. The Engineer agrees to perform those services under and pursuant to this Agreement in full compliance with any and all applicable laws, rules, and regulations adopted or promulgated by any governmental agency or regulatory body, whether federal, state, local or otherwise. 12. No Conflict of Interest. The Engineer covenants that neither it nor its employees have any interest and shall not hereafter acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of this Agreement. The Engineer further covenants that it will not hire anyone or any entity having such a conflict of interest during the performance of this Agreement. 13. No Insurance. It is understood the City does not maintain liability insurance for the Engineer and its officers, directors, employees and agents. 14. Indemnification. a. The Engineer agrees to hold harmless and indemnify the City, its elected officials, officers, employees, and agents from and against suits, actions, claims, liability, damages, judgments, costs of defense and expenses (including reasonable attorney's fees) which result from or arise out of the negligence of the Engineer, its officers, agents, employees or subcontractors in connection with or incidental to the performance or non-performance of this Agreement. b. The City agrees to hold harmless and indemnify the Engineer, its officers, employees, and agents, from and against suits, actions, claims, liability, damages, judgments, costs of defense and expenses (including reasonable attorney's fees) which result from or arise out of the negligence of the City, its officers, agents, employees or subcontractors, in connection with or incidental to the performance or non- performance of this Agreement. c. In the event that both the Engineer and the City are negligent, each party shall be liable for its contributory share of negligence for any resulting suits, actions, claims, liability, damages, judgments, costs and expenses (including reasonable attorney's fees). d. The foregoing indemnity is specifically and expressly intended to constitute a waiver of the Engineer's immunity under Washington's Industrial Insurance Act, RCW Title 51, as respects the other party only, and only to the extent necessary to provide the indemnified party with a full and complete indemnity of claims made by the Engineer's employees. The parties acknowledge that these provisions were specifically negotiated and agreed upon by them. e Nothing contained in this Section or this Agreement shall be construed to create a liability or a right of indemnification in any third party. f. This Section of the Agreement shall survive the term or expiration of this Agreement and shall be binding on the parties to this Agreement. 15. Insurance Provided by Engineer. a Professional Liability Insurance. On or before the date this Agreement is fully executed by the parties, the Engineer shall provide the City with a certificate of insurance as evidence of professional liability coverage with a limit of at least One Million Dollars ($1,000,000.00) for each wrongful act and an annual aggregate limit of at least Two Million Dollars ($2,000,000.00). The certificate shall clearly state who the provider is, the amount of coverage, the policy number, and when the policy and provisions provided are in effect. The insurance shall be with an insurance company rated A -VII or higher in Best's Guide. If the policy is on a claim made basis, the retroactive date of the insurance policy shall be on or before the date this contract is executed by both parties hereto, or shall provide full prior acts coverage The insurance coverage or substantially identical coverage sufficient to fully satisfy these requirements shall remain in effect during the term of this Agreement and for a minimum of three (3) years following the termination of this Agreement. b. Commercial Liability Insurance. On or before the date this Agreement is fully executed by the parties, the Engineer shall provide the City with a certificate of insurance as proof of commercial liability insurance with a minimum liability limit of One Million Dollars ($1,000,000.00) per occurrence/aggregate limit bodily injury and property damage. The certificate shall clearly state who the provider is, the amount of coverage, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Agreement. The policy shall name the City, its elected officials, officers, agents, and employees as additional insured as to this project only and shall contain a clause that the insurer will not cancel or reduce in limits the insurance without first giving the City thirty (30) calendar days' prior written notice The insurance shall be with an insurance company or a company rated A -VII or higher in Best's Guide and admitted in the State of Washington c Commercial Automobile Liability Insurance. On or before the date this Agreement is fully executed by the parties, the Engineer shall provide the City with a certificate of insurance as proof of commercial automobile liability insurance with a minimum liability limit of One Million Dollars ($1,000,000.00) per occurrence/aggregate limit bodily injury and property damage. The certificate shall clearly state who the provider is, the amount of coverage, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Agreement. The policy shall name the City, its elected officials, officers, agents, and employees as additional insured as to this project only and shall contain a clause that the insurer will not cancel or reduce in limits the insurance without first giving the City thirty (30) calendar days' prior written notice. The insurance shall be with an insurance company or a company rated A -VII or higher in Best's Guide and admitted in the State of Washington. d. Insurance Provided by Subcontractors. The Engineer shall ensure that all subcontractors it utilizes for work/services required under this Agreement shall comply with all of the above insurance requirements. However, professional liability will not be required unless the subcontractor is involved in design or Engineering services. 16. Delegation of Professional Services. The services provided for herein shall be performed by the Engineer and no person other than regular associates or employees of the Engineer shall be engaged upon such work or services except upon written approval of the City 17. Assignment. This Agreement, or any interest herein or claim hereunder, shall not be assigned or transferred in whole or in part by the Engineer to any other person or entity without the prior written consent of the City In the event that such prior written consent to an assignment is granted, then the assignee shall assume all duties, obligations and liabilities of the Engineer stated herein. 18. Waiver of Breach. A waiver by either party hereto of a breach by the other party hereto of any covenant or condition of this Agreement shall not impair the right of the party not in default to avail itself of any subsequent breach thereof. Leniency, delay or failure of either party to insist upon strict performance of any agreement, covenant or condition of this Agreement, or to exercise any right herein given in any one or more instances, shall not be construed as a waiver or relinquishment of any such agreement, covenant, condition or right. 19. Dispute Resolution. The parties shall strive to resolve all disputes through negotiation in good faith as the preferred approach to dispute resolution and may consider mediation as a supplement or alternative where mutually agreed to in writing. 20. Termination. Either party may terminate this Agreement at any time, with or without cause, by providing the other party with written notice of termination ten (10) calendar days prior to the termination date. Upon any such termination the City shall be responsible to compensate Engineer in accord with this Agreement for work completed and accepted by the City at the time of termination. 21. Severabilitv. If any portion of this Agreement is changed per mutual agreement or any portion is held invalid, the remainder of the Agreement shall remain in full force and effect. 22. Notices. Unless stated otherwise herein, all notices and demands shall be in writing and sent or hand delivered to the parties to their addresses as follows: TO City: TO Engineer: Marc Cawley, Wastewater Operations Superintendent 2220 East Viola Yakima, WA 98901 Patrick Conley, P.E 1433 Lakeside Court, Suite 100 Yakima, Washington 98902 Or to such other addresses as the parties may hereafter designate in writing. Notices and/or demands shall be sent by registered or certified mail, postage prepaid or hand delivered Such notices shall be deemed effective when mailed or hand delivered at the addresses specified above. 23. Third Parties. The City and the Engineer are the only parties to this Agreement and are the only parties entitled to enforce its terms. Nothing in this Agreement gives, is intended to give, or shall be construed to give or provide any right or benefit, whether directly or indirectly or otherwise, to third persons 24. Drafting of Agreement. Both the City and the Engineer have participated in the drafting of this Agreement. As such, it is agreed by the parties that the general contract rule of law that ambiguities within a contract shall be construed against the drafter of a contract shall have no application to any legal proceeding, arbitration and/or action in which this Agreement and its terms and conditions are being interpreted and/or enforced. 25. Integration. This written document constitutes the entire Agreement between the City and the Engineer. There are no other oral or written agreements between the parties as to the subjects covered herein No changes or additions to this Agreement shall be valid or binding upon either party unless such change or addition be in writing and executed by both parties 26. Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. 27. Venue. The venue for any action to enforce or interpret this Agreement shall lie in the Superior Court of Washington for Yakima County, Washington. 28. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which shall constitute one and the same Agreement. CITY OF 2 KIMA By: Tony i 'o�-, City Manager Date. tia CONLEY ENGINEE By: Patrick Conley P.E. , Pres ;d IN INC. 1- T,TEST: SoEya Claar, City Clerk City Contract No. 2 G/ S-/ 1) 3 City Resolution No. A"-- �4-)/5 - *••• F.!Wk. *,3 1.V * • YI v A • t. Exhibit "A" City of Yakima Wastewater Treatment Plant Facilities Electrical and SCADA support services Conley Engineering Inc. Scope of Work WORK PACKAGE 1 — Electrical and SCADA Support BASIC SERVICES - The Engineer shall provide engineering support services in connection with additions and modifications to the City of Yakima Wastewater Treatment Plant (WWTP) electrical and SCADA system needed to maintain current and anticipated regulatory requirements pertaining to wastewater and biosolids treatment and disposal processes. The Basic services shall for support of existing electrical and SCADA systems operations and issues that arise on an as needed basis. WORK PACKAGE 2 - Additional Support Services BASIC SERVICES - Additional support services may be negotiated and mutually agreed to in accordance with Article 2 of the Engineering Services Agreements. WORK PACKAGE 3 — SCADA Training Services BASIC SERVICES — Training of City designated personnel on typical skills and practices needed for additions to, modifications of or troubleshooting of the SCADA systems in use at WWTP. Per the City's request, training can include any or all of the following: PLC programming and troubleshooting, network switch programming and troubleshooting, human -machine interface (HMI) software programming and troubleshooting, operator interface (01) software programming and troubleshooting, or SCADA wireless radio network configuration and troubleshooting. EXHIBIT "B" SCHEDULE OF RATES FOR Conley Engineering Inc. BILLING RATES FOR 2015 Invoices from Conley Engineering, Inc include all labor charges, other direct costs, and costs associated with support services. Charges include only those services directly attributable to the execution of the work. Time spent when traveling in the interest of work will be charged in accordance with the hourly rates. Labor charges are based upon standard hourly billing rates for each category of staff The billing rates include costs for salary, payroll taxes, insurance associated with employment, benefits (including holiday, sick leave, and vacation), administrative overheads, and profit. Rates by labor category are as follows: "Sa4'.Y.�.eus �, y„ 2f°.:°�t .« .. ,k Personnel r n',°; ,:' :`` e _.r `4Haur`.I Rate:. Principal Engineer $160 Senior Professional Engineer $145 Registered Professional Engineer (PE) $130 Certified Software Engineer (MCSE) $130 Registered Communications Distribution Designer (RCDD) $115 Project Engineer $115 Software Project Engineer $115 Cad Designer $95 CAD Technician $80 Engineering Technician $80 Administrative $55 Subcontractor costs will be invoiced at cost. Other direct costs, including materials, travel, and subsistence will be invoiced at actual cost. Contract Supplemental Agreement Supplemental Agreement Organization and Address: Number: 1 Conley Engineering, Inc. 1433 Lakeside Court, Suite 100 Yakima, WA 98902 Original Contract Number: Execution Date of Supplement: 2015-103 November 1, 2018 City Engineering Project Number: n/a Completion Date of Supplement: April 21, 2020 Project Title: Maximum Amount Payable this Supplement: COY WWTP Facilities Electrical and SCADA $23,950.00 Support Services Maximum Total Amount Payable for the Agreement: $123,950.00 Section 11.4: Supplemental Agreement The City of Yakima,Washington desires to supplement the contract agreement entered into with Conley Engineering, Inc, and executed on April 21st, 2015 by Resolution No. 2015-056 and identified as Contract 2015-103 All provisions in the basic contract remain in effect except as expressly modified by this supplement.The changes to the agreement are described as follows Section 11.1: Scope of Services The additional work to be performed as part of this Supplemental Contract is to provide electrical engineering services for the Enaqua UV control system update project, as detailed in the attached amendment to Exhibit A. Section 11.3: Compensation Payment for this supplemented work will, as shown on Exhibit B, is not exceed $23,950, bringing the total amount of the Agreement to $123,950 If you concur with this supplement and agree to the changes as stated above, please sign the appropriate spaces below and return to this office for final action By: �' By: Aalaocrvr ( raov r - Consultant Signature City Manager NoY- 5, 240 1g Date CITY CONTRACT NO: RESOLUTION NO: Exhibit "A" City of Yakima Wastewater Treatment Plant Facilities Electrical and SCADA support services. Conley Engineering, Inc. Scope of Work Supplemental Agreement No. 1 November 2018 Work Package 4-Electrical engineering services for the Enaqua UV system replacement project Electrical Design and Programming Services: • Coordinate with Enaqua to determine which of the field IO points which will be connected to the Enaqua reactors in the field and which will be connected to a plant PLC. • Design work related to consolidating the existing SLC 5/05 PLC IO and control functions with the existing Micrologix 1400 PLC IO and control functions into a single* PLC in the existing plant PLC cabinet. • Coordinate with and give direction to plant personnel (Steve and Adrian) for modifications of field 1O wiring to enable the consolidation of PLCs noted above. • Selection of a possible protocol converter to enable plant PLCs on the Allen Bradley platform to communicate via Modbus TCP with the Enaqua controllers. • Provide PLC programming services for the consolidation of PLCs noted above. • Provide PLC programming services to implement controls of calls to the Enaqua reactors and controls of the plant equipment supporting the Enaqua UV system (channel influent gates, channel effluent gates, flow meters, and flow switches). City of Yakima WWTP Enaqua UV Upgrades ENGINEERING COST PROJECTIONS Programming/Drawings Startup/Troubleshooting Rate Hours Cost Hours Cost Principal $160.00 1 $160.00 1 $160.00 Sr PE $145.00 4 $580.00 4 $580.00 PE $130.00 60 $7,800.00 60 $7,800.00 MCSE $130.00 0 $0.00 0 $0.00 RCDD $115.00 0 $0.00 0 $0.00 Proj Engineer $115.00 0 $0.00 0 $0.00 Software Proj Engineer $115.00 0 $0.00 0 $0.00 CAD Designer $95.00 0 $0.00 0 $0.00 CAD Tech $80.00 30 $2,400.00 4 $320.00 Engineering Tech $80.00 12 $960.00 34 $2,720.00 Administrative $55.00 3 $165.00 3 $165.00 Total 110 $ 12,065.00 106 $ 11,745.00 Labor Sum $ 23,810.00 Projected Expenses $ 140.00 Total Projection $ 23,950.00 10/23/2018 i039 AM 1/1 2:\Businoss Development\Proposals\Pending Proposals\Yakima WWTP-UV RenavatlonsW V Addendum Breakout.alss ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 5.D. For Meeting of: April 21, 2015 Resolution authorizing an agreement with Conley Engineering Inc. to provide electrical engineering support services to the City Wastewater Division, not to exceed $100,000 Debbie Cook, Director of Utilities and Engineering Jeff Bond, Acting Wastewater Manager Marc Cawley, Wastewater Operations Superintendent SUMMARY EXPLANATION: In accordance with the scope of work agreed upon, Conley Engineering shall provide engineering support services in association with additions and modifications to the City of Yakima Wastewater Treatment Plant (WWTP) electrical and SCADA (Supervisory Control And Data Acquisition) system needed to maintain current and anticipated regulatory requirements pertaining to wastewater and biosolids treatment and disposal processes. The basic services shall be for support of existing electrical and SCADA systems operations and issues that arise on an as needed basis. Additional support services may be negotiated and mutually agreed to in accordance with Article 2 of the Professional Services Agreement. In addition to the basic electrical and SCADA engineering services, SCADA training services shall be included as part of this agreement. Training of City designated personnel on typical skills and practices needed for additions to, modifications of or troubleshooting of the SCADA systems in use at the WWTP. Upon the City's request, training can include any or all of the following: PLC programming and troubleshooting, network switch programming and troubleshooting, human -machine interface (HMI) software programming and troubleshooting, operator interface (Ol) software programming and troubleshooting, or SCADA wireless radio network configuration and troubleshooting. Resolution: X Other (Specify): Contract: X Start Date: Item Budgeted: Yes Funding Source/Fiscal Impact: Strategic Priority: Insurance Required? Yes Ordinance: Contract Term: 5 years End Date: Amount: $100,000.00 Wastewater Treatment - 473 Improve the Built Environment Mail to: Phone: APPROVED FOR SUBMITTAL: City Manager RECOMMENDATION: Staff respectfully requests Council approval of the resolution. ATTACHMENTS: Description Upload Date D resolution 4i14 2015 O contract 41142015 Type Resolution Contract