Loading...
HomeMy WebLinkAbout03/15/2022 06D Project completion and contract acceptance for 64th Ave & Ahtanum Rd Project 2474B US INE S S O F T HE C I T Y C O UNC I L YAK I M A, WAS HING T O N AG E ND A S TAT E M E NT I tem No. 6.D. F or Meeting of: March 15, 2022 I T E M T IT L E :P roject completion and contract acceptance for 64th Ave & A htanum Rd Project 2474 S UB M IT T E D B Y:S cott S chafer, Director of Public Works B ill Preston, City E ngineer S UM M ARY E X P L ANAT I O N: City P roject #2474 provided f or the 64th Avenue and A htanum Road I ntersection I mprovements. The C ity contracted with E S D D evelopment L L C dba E S F S olutions L L C to provide the improvements which included installation of a traffic signal system, new sidewalk, curb and gutter, and repaving with striping, traffic markings, and signage. Final inspection for this project was made and the recommendation is that the project be accepted. Project completion is subject to issuance of Certificate of P ayment by the Department of Revenue and authorizations from state agencies allowing f inal payment. A f inal payment of $0 (no retainage) is due from the City to E S F S olutions for the completion of the work. P roject Manager: Randy Tabert Contractor: E S F Solutions L L C Contract Awarded: 09/25/2020 Contract Cost: $529,702.82 Retainage Due: $ 0 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. I T E M B UD G E T E D:Yes S T RAT E G I C P RI O RI T Y:P ublic S afety AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R RE C O M M E ND AT I O N: A ccept P roject 1 AT TAC HM E NT S : Description Upload Date Type Completion Letter 11/29/2021 Backup Material Final Estimate 11/29/2021 Backup Material 2 3 City of YakimaPROJECT TITLE 64th Avenue & Ahtanum Rd Intersecion ImprovementsCity Engineering Division129 N 2nd StreetCity Project No.: 2474Yakima, WA 98901TO:ESF SolutionsDateItemUnit Bid Contract To Date % of AmountNo. Description QTY UNIT Price Amount Quantity Contract1 SPCC Plan 1 LS $500.00 500.00$ 1.00 100% 500.00$ 2 Mobiliaztion 1 LS $55,000.00 55,000.00$ 1.00 100% 55,000.00$ 3 Project Temporary Traffic Control 1 LS $17,600.00 17,600.00$ 1.00 100% 17,600.00$ 4 Removing Cement Conc. Sidewalk 5 SY $100.00 500.00$ 8.34 167% 834.00$ 5 Removing Cement Conc. Curb 5 LF $100.00 500.00$ 15.00 300% 1,500.00$ 6 Sawcut 800 LF $2.50 2,000.00$ 909.00 114% 2,272.50$ 7 Roadway Excavation Incl. Haul 117 CY $100.00 11,700.00$ 199.00 170% 19,900.00$ 8 Crushed Surfacing Base Course 225 TON $60.00 13,500.00$ 519.57 231% 31,174.20$ 9 HMA CL 1/2" PG 64-28 332 TON $108.00 35,856.00$ 434.00 131% 46,872.00$ 10 Planing Bituminous Pavement 2700 SY $4.50 12,150.00$ 2700.00 100% 12,150.00$ 11 Schedule A Storm Sewer Pipe 12 In Diam 10 LF $60.00 600.00$ 13.00 130% 780.00$ 12 Special Curb Inlet Type 2 2 EA $2,500.00 5,000.00$ 2.00 100% 5,000.00$ 13 ESC Lead 9 DAY $50.00 450.00$ 6.00 67% 300.00$ 14 Cement Concrete Traffic Curb & Gutter 765 LF $35.00 26,775.00$ 743.00 97% 26,005.00$ 15 Commercial Driveway Approach 1 EA $7,770.00 7,770.00$ 1.00 100% 7,770.00$ 16 Adjust Monument Case & Cover 1 EA $1,200.00 1,200.00$ 1.00 100% 1,200.00$ 17 Cement Concrete Sidewalk - 4 inch thick 410 SY $80.00 32,800.00$ 353.33 86% 28,266.40$ 18 Cement Concrete Sidewalk - 6 inch thick 100 SY $88.00 8,800.00$ 24.11 24% 2,121.68$ 19 Cement Conc Curb Ramp Type Parallel A 3 EA $2,000.00 6,000.00$ 3.00 100% 6,000.00$ 20 Mailbox support, Type 1 1 EA $600.00 600.00$ 1.00 100% 600.00$ 21 Traffic Signal System Complete 1 LS $240,000.00 240,000.00$ 1.00 100% 240,000.00$ 22 Permanent Signing 1 LS $3,500.00 3,500.00$ 1.00 100% 3,500.00$ 23 Paint Line 1800 LF $0.60 1,080.00$ 1836.00 102% 1,101.60$ 24 Plastic Stop Line 75 LF $10.00 750.00$ 71.00 95% 710.00$ Progress Estimate No.: FinalNovember 29, 2021Total4 ItemUnit Bid Contract To Date % of AmountNo. Description QTY UNIT Price Amount Quantity ContractTotal25 Painted Wide Lane Line 434 LF $3.00 1,302.00$ 434.00 100% 1,302.00$ 26 Plastic Traffic Arrow 10 EA $200.00 2,000.00$ 12.00 120% 2,400.00$ 27 Plastic Bike Lane Symbol 8 EA $200.00 1,600.00$ 8.00 100% 1,600.00$ 28 Plastic Crosswalk Line 288 SF $10.00 2,880.00$ 272.00 94% 2,720.00$ 29 Minor Change EST FA $10,000.00 $10,000.00 0.00 0% -$ 21-1 Materials on Hand 1 LS-$ Change Order 1 LS $10,523.44 $10,523.44 1.00$ 100% 10,523.44$ TOTAL 512,936.44$ 103% 529,702.82$ 5