Loading...
HomeMy WebLinkAbout10/14/2014 00 Distributed to Council - Yakima Valley Trolleys Yakima Valley Trolleys Yakima Capital Improvement Budget Request 509 - 949 -4233 www.yakirnavalleytrolieys.org tare' 1 � :11111F_ • 4 s .r' or i., 0, . e i •50 .11 AO i r - 9 — " a I ,, I lr 0 f iir_ .___ . _ . t 4 4 % .... • 4.--' J. I El • ill ill . 1 ` T ..... , n ,/ - .. . 0 40 i i ll 4 . k , .--, ai . ,, ° OM I 1 IIIIK: .- i 7 ._ . 1 111411 i q l, • . ' .".: t •-. , ill i . i , , . • . . ... ii i . .„ ‘ . „,. *,,,, 4, —„, . I 1).w. • ' i lihr, 1141 s i \ il ,, • a . • .. . II • * - - 4..- 1/0/04/11111111 . _ I .,.. , 4 2 11 1 . i , 44 g , ..—. i 1 OP . � • .__ ��� ai rs ■ L '``. is 1 1 I It 'I 11111114111=1111=111141111UPLUILLUNWilillilli Yakima Valley Trolleys 2015 Budget Proposal 10 % of $13,423,995 YVT Capital Improvement Project 1. History The connection of Yakima and Selah via an electric railroad is important to both communities which have benefitted economically during the last 107 years because of its existence. Overdue infrastructure renewal along with vandalism on the Selah line require investment in the city owned asset. Crandall/Arambula recommended the expansion of vintage trolley service into Yakima's downtown core which would provide transportation between the Convention Center, the proposed plaza, Capital Theater, the Historic District and downtown merchants. Trolleys into the downtown core would enable visitors to leave their vehicles in hotel and Convention Center parking lots instead of occupying existing street parking spaces. The Yakima City Council provided $100,000 in 2014 for Yakima Valley Trolley capital improvements which is enabling YVT to increase trolley revenue. This allocation was leveraged by successfully launching an "In Kind Donation Program". The funds provided also qualified as a 2 to 1 match enabling YVT to apply for a $49,926 Heritage Capital Projects Grant through the Washington State Historical Society. As a non-profit corporation, YVT qualifies for many historical, cultural, artistic and state transportation grants in the public and private sectors. A 10% owner participation in the project, which is shovel ready, will enhance YVT's ability to acquire the balance of funding from the Washington State Department of Transportation and various private granting sources. 2. Scope of the Proposed Project Typically rail lines are built with a thirty to fifty year life span (assuming regular maintenance cycles). Union Pacific Railroad provided maintenance until donating the railroad to Yakima in 1985. From that point until today, the City of Yakima and YVT has been able to keep up with necessary repairs through grants, donations and tremendous support from a core of dedicated volunteers. A reinvestment in the asset is now necessary to ensure the lines function for another 30 to 50 years. The scope of the rehabilitation of the YVT line is from 2 Ave and Pine in Yakima, West on Pine, North on 6 Ave. The line then crosses over the Naches River on YVT's inspected and certified 105 year old bridge, along the Yakima River through Selah Gap into Selah. The total length is 3.5 miles with 1.6 miles on ballasted railroad track and 1.9 miles of track in city streets. The intent of the project is to replace the worn out infrastructure with new materials without changing historical significance. The refurbishment will allow for modern improvements on the line. Rail crossings will be upgraded at all legal pedestrian crossings along the right of way to comply with the Americans with Disabilities Act (ADA). Failing road surface around the rails will be replaced with a compliant gap formed for the rail wheels (flangeway) in the pavement. Rail vehicles and terminal stations will be tastefully modified to allow for boarding by all people, including those using assistive devices and those with mobility issues. To address continued safety for the public, four intersections have been recommended for additional warning devices to alert motorist to the presence of a crossing vehicle. To improve the safety of the overhead contact system (OCS) and to alert authorities of a fallen wire or theft, upgrades are planned for traction power stations (TPS). These upgrades include improved remote monitoring systems along with safety systems for detecting and reacting to faults. The rail infrastructure will be upgraded to modern standards for street railways and the sub-grade in the ballasted trackway will be reconstructed to maintain the stability of the trackway for the life cycle of the investment. 3. Funding Sources General Fund 4. Public Impact YVT's vintage interurban trolleys are listed on the National Register of Historic Places and sets us apart from all of Eastern Washington. YVT will significantly increase destination tourism and reduce downtown parking pressure while improving quality of life for Yakima's residents, young and old. 5. Fiscal Impact 2 t $1 ,342,400 ,) 6. Personal Impact No impact on City Personnel 7. Required change in City regulations or policies None S. Legal Constraints None 9. Viable Alternatives None 3 Yakima- Selah Streetcar Line Reconstruction Compiled for YVT ' Part A: Trackwork, OCS, Substation, OCS Security System Type Cost Per Unit Units # of units extended cost per line Ballasted Track: v Ballasted Track (remove existing trackway, new- ties, welded rail, ballast- installed) 1.6 miles of ballasted track replaced g180 track ft 8448 $1 '' Sub Grade work on Ballasted track ($20-30/ft) (Ditching, removing overgrowth, filling and compacting subgr de g25 track ft 8448 5211 Retaining wall work ($1O0]/ft/20ftheight) $1 ft (avg ht) 600 $600 Bridget culvert work- as needed $40 total 1 $40 Driveway cros ings (in ballasted track- business, residential & city street crossing- built as embedded track in heavy use, as AC crossing in residential $170 track ft 473 $80,410 Paved Track: Paved track (remove to sub-grade, ironhorse ties, welded rail, concrete base, AC pavement surface- installed) 1.9 miles of paved track replaced. $350 track ft 10032 $3,511,200 Embedded Turnouts: Rebuild existing turnouts- (new machine, new stock & closure rails, welding up points and frogs) $15 each 6 $90 New St. Railway Turnouts g100 each 0 $0 Refurbished RR turnouts (new machine) $55 each O $0 Ballasted Turnouts: Refurbished Existing Turnouts (new machine, new ties as needed, welding up points and frogs) $8 each 7 $59,500 OCS work: (assume 80 ft avg spacing) Poles (wood)-lnstalled (replace existing- as needed) $1,000 each 357 $357 Poles (concrete- direct burial)- installed $3.000 each $0 Poles (metal- w/ foundation)- Std. Strength- Installed $4,500 each $0 Poles (metal- w/ foundation)- High Strength- Installed $6 each $0 Wire- 4/0- grooved- Material only $54 per mile 3.5 $1*9 Wire Installation & Fittings (span, insulators, clips, etc) $850'000 per mile 3.5 $2 Traffic Signal (warning lights to full signals on Walnut, MLK, Lincoln, Fruitvale) (price for full signal) $150 each 4 g600 Substation & Wire (005) Seurity System Work: Remote Substation (pad, building, rectifier, transformers, control system upgrade both substations) $73 total 1 $73 OCS Wire Security System $18 total 1 $18 ' Project Costs: Engineering cost (10%) per project 10% of total g1.032 Project management oversight (5%) per project 5% of total $516 Contingency (15%) per total project +15% $1 Total Cost Part A: $13/023,995 $13.42 Million Total P ject Cost Part A O4[os ��� per Page Cost . _ ...- . I . . _.- . li • 1. — 11 11 .. • . ,.. ' •.■ 0 116. 4 1 - . 11 I IIIIIIIII\ r • ... . 4 `I■ • 6 • • , .., . ilk I . • _. 111 • mi. , # - , 4 i ll I _ 4 A \ 4 4- Mr 1 A J. . \ . « . ■ . , 1111 1116 , • .,. i . . A 1 . As . ., 1. • : . .. . , - .. . ,.. 4 11 \ 4 I _ . 6 I 4 + -- 1 i _ . 6 ‘ 1 . \ 1 — ....