Loading...
HomeMy WebLinkAboutR-2014-108 Professional Services Agreement with Golder Associates, Addendum 2A RESOLUTION RESOLUTION NO. R-2014-108 authorizing the City Manager to execute the attached and incorporated addendum 2 to the engineering and consulting services agreement with Golder Associates, Inc. for feasibility study for the consolidation of the Gleed and water treatment plant diversions project, not to exceed $68,009. WHEREAS, the City of Yakima Water/Irrigation Division requires engineering, consulting services and construction associated with the Water Treatment Plant Intake Project; and WHEREAS, the City of Yakima Water/Irrigation Division representatives have complied with the provisions of RCW 39.80 which concerns the procurement of engineering and architectural services by a city; and WHEREAS, the City of Yakima Water/Irrigation Division representatives will continue to comply with the provisions of RCW 39.80 which concerns the procurement of engineering and architectural services by a city for future engineering and architectural services; and WHEREAS, Golder Associates, Inc. has the necessary expertise and experience to perform and provide the required engineering services identified iin the attached and incorporated Addendum 2 and is willing to do so in accordance with the attached agreement; and WHEREAS, the City Council deems it to be in the best interest of the City to enter into an agreement with Golder Associates, Inc., for engineering and consulting services associated with Addendum 2 for the Water Treatment Plant Intake Project; and WHEREAS, the Bonneville Power Administration has issued a grant to fund the feasibility study; and WHEREAS, the City Council deems it to be in the best interest of the City to authorize the City Manager to execute all documents related to Addendum 2 associated with the Water Treatment Plant Intake Project; Now, Therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute the attached and incorporated Addendum 2 to the engineering and consulting services agreement with Golder Associates, Inc. for engineering and consulting services associated with a feasibility study for the consolidation of the Gleed and water treatment plant diversions project. Project. ADOPTED BY THE CITY COUNCIL this 19th day of August, 2014. ATTEST ®` Micah Qiwley, Mayor ti \% ity Clerk i.— r 7 r f f jf:..--E �. -T.-, ,.? For City of Yakima Use Only: Contract No. 2011-85 Project No 2335 Resolution No. R-2011-154 Resolution No. R-2014- /06 AGREEMENT FOR PROFESSIONAL SERVICES ADDENDUM NO. 2 This Addendum, hereinafter identified as Addendum No. 2, is hereby entered into and made a part of the Agreement between City of Yakima, Washington, and Golder Associates, Inc., for Professional Services first entered into on the 5th day of October, 2011, by the CITY OF YAKIMA, hereinafter called the "CITY," and GOLDER ASSOCIATES, INC., hereinafter called the "ENGINEER." WITNESSETH: That in consideration of the mutual covenants and agreements herein contained, the parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement: SECTION 2 - SCOPE OF SERVICES 2.1 Basic Services: In addition to the duties set forth in the underlying agreement, ENGINEER agrees to perform additional work tasks described in the attached Addendum No. 2 Exhibit A: Hydrotechnical Engineering Support for Review of Feasibility Study for the Consolidation of the Gleed and City of Yakima Diversions Scope of Work. This work will incorporate the results and information developed in a report titled "Naches River Preliminary Hydrotechnical Engineering Support for the Water Treatment Plant Intake", dated July 2012, which looked at the overall site issues and outlined a preliminary approach for mitigating river dynamics impacting the intake structure; and will also incorporate the geomorphic assessment results and hydrotechnical engineering analysis from the final design for the new intake floodplain stabilization structures for the Water Treatment Plant Auxiliary Intake, which is currently being completed. SECTION 5 - COMPENSATION 5.1 COMPENSATION ON A TIME SPENT BASIS AT SPECIFIC HOURLY RATES: For the services described in the attached Addendum No. 2 Exhibit A, compensation shall be on a time spent plus expenses basis at the ENGINEER's normal hourly billing rates shown on Exhibit B, attached to this agreement. This Addendum No. 2 shall not exceed $68,009 without written agreement of the parties, the total contract cost, including Addendums No 1 and No. 2, shall not exceed $281,577 without written agreement of the parties hereto. II WITNESS 1NHEREOFtt arties hereto duly enter into and execute this Addendum No. 2, as of this day of i 2014. Other than specific amendments stated herein, all other terms, conditions and requirements of the underlying contract shall remain in full force and effect throughout the term of the underlying contract. Page 1 CITY OF YAKIMA S Printed Nam =. Tony O'Rourke. Title: Date: Attest City Manager City Contract No. 2011-85 Resolution No. R-2011-154 and R-2014-10 GOLDER ASSOCIATES, INC. ✓V'�itifiv� Signature Printed Name: Andreas Kammereck Title: Principal Engineer Date: ' C 1 — 2C9'7 —1 Page 2 ADDENDUM NO. 2 EXHIBIT A CITY OF YAKIMA — NACHES RIVER HYDROTECHNICAL ENGINEERING SUPPORT FOR REVIEW OF FEASIBILITY FOR THE CONSOLDIATION OF THE GLEED AND CITY OF YAKIMA DIVERSIONS SCOPE OF WORK During the term of this AGREEMENT, the ENGINEER shall perform professional services in connection with the following project: A scope of work is presented here to complete "Hydrotechnical Engineering Support for Review of Feasibility Study for the Consolidation of the Gleed and City of Yakima Diversions Scope of Work"_ This scope of work covers the following tasks (described in more detail in the subsequent section): Task 1 — Meetings Task 2 — Assemble/Review Data Task 3 — Feasibility Assessment Task 4 — Alternatives Identification Task 5 — Reporting Detailed descriptions of the services are provided as follows: Project Background: The Naches River in the reach where CoY and Gleed diversions are located was significantly altered through the creation of the current alignment of SR12 in 1970. At that time a complex structure of levees and grade breaks was established that allowed continued operation of the Gleed intake and the creation of the City of Yakima intake structure. Natural geomorphic changes have led to reconfiguration and degradation of the riverine structures to the point that significant investment is required to allow continued operation of both structures. In addition, the Gleed site is no longer safe to maintain and does not adequately protect fish life. For these reasons, Reclamation, WDFW, City of Yakima and BPA (Stakeholders) began a discussion in February, 2014 to consolidate the Gleed and the City of Yakima structures. There were three options considered. The first option was to consolidate the City of Yakima at the Gleed site. Due to the amount of infrastructure and investment at the existing City of Yakima site and, due to the change in elevation from the current City intake and Gleed, the lack of room for screens and parking area, and the likelihood of river incising and moving farther to the right bank resulting in bypass of the Gleed site, this is not a viable option. The second option is to maintain the two separate facilities in their current locations. This is not the preferred option as the Gleed site will continue to wrack debris leading to ongoing maintenance issues. The third (preferred) option is to consolidate the Gleed with the City of Yakima facility. This option is preferred because it uses an existing diversion that experiences no issues with debris wracking, provides for more efficient O&M, maximizes investments in a working facility (BPA funded the CoY screens in 2004 and eliminates the need for instream work at BPA ratepayer expense). The City of Yakima has independently undertaken geomorphic investigations to establish riverine stability for their intake and have proposed instream work to ensure sufficient water at their site. Assuming these improvements are permitted and funded makes the CoY consolidation the preferred option. Goals of Feasibility Study: Prior to final decision on consolidation, all engineering and legal constraints need to be identified. The goal of the feasibility study is to confirm that consolidating Gleed at the CoY facility is physically possible. This needs to occur at a level of detail adequate to make this determination, Page 3 but short of actual design. In accomplishing this goal, any technical, legal or financial obstacles identified will be assessed to determine if they constitute fatal flaws that would rule out the preferred alternative. Objectives: 1. Identify water rights (POD change application process, etc.), and other legal obligations to consolidating Gleed screens at the CoY site, including the maximum diversion amount the screens should be designed for, considering Gleed users' actual current usage versus their water right. 2. Determine the engineering feasibility of consolidating at the CoY site, including how new screens would be appended to the existing site and how the Gleed water would be conveyed to and provided at the Gleed ditch. 3. Determine whether and to what extent an abandoned Gleed facility would need to be decommissioned for biological and liability reasons and highway safety. 4. Identify alternatives for consolidating Gleed at the City of Yakima intake structure consistent with results of ongoing Golder study of instream improvements needed to sustain existing CoY diversion and with the goal of maintaining natural river processes as much as possible . Tasks: Task 1: Meetings: 1. Conduct an On -Site Meeting and project Kickoff with stakeholders. 2. Participate in regular technical work group meetings in Yakima through the course of the feasibility study, at least four meetings. 3. Present findings and effort to the stakeholder group in a wrap-up meeting. Task 2: Assemble Data: assemble pertinent project data for CoY Diversion and Gleed ditch requirements including but not limited to: 1. CoY project As -Built and record drawings. 2. CoY operational criteria and maintenance records. 3. Previous studies and reports. 4. Pertinent Gleed water rights information and irrigation scheduling. Task 3: Perform Feasibility Assessment: 1. Evaluate the existing Yakima structure and footprint for feasibility of adding up to 54 cfs (or less as determined in this study and in consultation with WDOE) of Gleed ditch's diversion rate relative to seasonality and hydrograph. 2. All alternatives should provide Gleed water users with independent control of their water. 3. Evaluate existing appurtenances (pipeline and forebay — screen requirements). 4. Perform feasibility level hydraulic analysis and generate a rating curve for existing condition of CoY intakes and proposed Gleed ditch consolidation to evaluate modified CoY operational head requirements. Task 4: Alternatives Identification: 1. Identify three alternatives to the existing CoY diversion structure for modification to support Gleed ID consolidation. 2. Prepare feasibility -level permitting, design and construction cost estimates for three alternatives +/- 25% contingency level, including costs for decommissioning the existing Gleed facility. 3. Make recommendations on potential river structures that may be required to support the three alternatives. Detailed design would be handled in future design phases using the USACE sediment and hydraulics model. 4. Estimate expected ongoing O&M costs for each alternative. Page 4 5. Provide synthesis of required point of diversion transfer information and strategy for transfer submittal with WDOE. 6. Provide synthesis of additional permitting requirements (ESA, USAGE, WADOE, WSDOT, Yakama County, FEMA, Other) to facilitate permitting strategy for preferred alternative. Task 5: Project summary reporting and presentation: Synthesize project effort in a technical report including all pertinent narrative, figures and calculations to support the selection of the preferred alternative and pre -design information to be developed for advancement of the preferred alternative. BUDGET SUMMARY A detailed itemization of costs is presented in an attached table, and is summarized below. Table 1: Budget Summary Task Budget Task 1 — Meetings $11,673 Task 2 — Assemble/Review Data $5,050 Task 3 — Feasibility Assessment $18,960 Task 4 — Alternatives Identification $16,820 Task 5 — Reporting $15,504 Total $68,009 Page 5 GOLDER ASSOCIATES INC. PACIFIC NORTHWEST PROFESSIONAL RATE SCHEDULE FOR CALENDAR YEAR 2013 Invoices from Golder Associates Inc. include all labor charges, other direct costs, and costs associated with in-house services. Charges include only those services directly attributable to the execution of the work. Time spent when traveling in the interest of the work will be charged in accordance with the hourly rates. Rates for Professional services related to expert testimony, including time spent in depositions and the preparation and presentations of testimony, are available upon request. Labor charges are based upon standard hourly billing rates for each category of staff. The billing rates include costs for salary, payroll taxes, insurance associated with employment, benefits (including holiday, sick leave, and vacation), administrative overheads, and profit. Rates by labor category are as follows: Billing Personnel Hourly Rate Level Category (U.S.$) C7 Practice/Program Leader $210 - $240 C6 Senior Consultant $180 - $210 C5 Senior Engineer/Scientist $155 - $180 C4 Senior Project Engineer/Scientist $135 - $155 C3 Project Engineer/Scientist $110 - $135 C2 Staff Engineer/Scientist $100 - $110 Cl Engineer/Scientist $80 - $100 D3 Senior Draftsperson $90 - $105 D2 Staff Draftsperson $75 - $95 D1 Draftsperson $65 - $80 T3 Senior Technician $90 - $110 T2 Staff Technician $70 - $90 T1 Technician $60 - $75 B3 Senior Admin Support $75 - $95 B2 Staff Admin Support $60 - $80 B1 Admin Support $50 - $70 Other direct costs, including materials, travel, subsistence, and subcontractor costs, will be invoiced at cost plus a minimum general and administrative fee of 15%. An Office Service Fee for direct project non -labor office costs including mail, telephone, fax transmissions, personal computers as well as reasonable and customary in-house photocopying will be billed at a minimum of 7% of the total labor fees. This Office Service Fee does not include CAD/GIS computers, color photocopies, outsourced photocopies/reproductions or drawing reproduction. These services will be billed at the following rates: SERVICE RATE CAD/GIS Computers $20/hour Color Photocopies $0 15/page (8.5 X 11) Color Plotter (D&E size) $12/plot Print Room Labor * $45/hour * Additional copy -center pricing can be provided upon request Rates for laboratory services and use of equipment owned by Golder Associates Inc. will be provided upon request. Nov 2012 GAI OMs Rate Schedule Des Golder Associates BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 5.F. For Meeting of: August 19, 2014 ITEM TITLE: SUBMITTED BY: SUMMARY EXPLANATION: Resolution authorizing execution of the attached and incorporated addendum 2 to the engineering and consulting services agreement with Golder Associates, Inc. for feasibility study for the consolidation of the Gleed and water treatment plant diversions project, not to exceed $68,009 David Brown, Water/Irrigation Manager, 509-575-6204 Debbie Cook, Utilities and Engineering Director During some long duration high flow events in 2010 and 2011 in the Naches River near the Water Treatment Plant the river started moving away from the Intake. In 2012 we contracted with Golder Associates to help find a solution. That project has progressed to a final draft design. We are convening a final Technical Advisory Group (TAG) to look at the design. The TAG has members from the organizations that would be involved in permitting, Washington Department of Fish and Wildlife (DFW), Bureau Of Reclamation (BOR), National Ocean and Atmospheric Administration (NOAA), Yakima County Flood Control Zone District (FCZD), and some interested organizations Yakama Nation, North Yakima Conservation District. Earlier this year we received a $250,000 grant from the Department of Ecology to implement phase 1 of the construction to move the river back toward the intake. The Bonneville Power Administration (BPA) and the Gleed Irrigation District joined in the discussions to see if it was possible to combine diversions. BPA if funding some improvements to the Gleed diversion and asked the question "Would it make since to combine diversions at Yakima?". It was determined by the group that it would be best for all entities and for the environment of they could be combined. However we don't know if it would work. The BPA is offering a grant of $68,009 to have the consultant Golder Associated perform a feasibility study to determine if the project is viable. This is Addendum 2 to the Contract with Golder Associates to perform that task and the $68,009 is fully funded by BPA. Resolution: X Ordinance: Other (Specify): Contract: X Start Date: When signed Item Budgeted: NA Contract Term: End Date: When complete Amount: Funding Source/Fiscal Grant from Bonneville Power Administration for full Impact: amount Strategic Priority: Improve the Built Environment Insurance Required? No Mail to: Andreas Kammereck, Golder Associates, 18300 NE Union Hill Rd., Suite 200, Redmond, WA 98052-3333 Phone: 503-230-4599 APPROVED FOR SUBMITTAL: RECOMMENDATION: Accept Grant ATTACHMENTS: Description ❑ Resolution ❑ Contract City Manager Upload Date 7/14/2014 7/14/2014 Type Resolution Contract