Loading...
HomeMy WebLinkAbout02/16/2010 11 Nob Hill Blvd. Sanitary Sewer Final Contract Payment - City Project No. WW1977 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 1111 Item No. For Meeting Of 2/16/10 ITEM TITLE: Final Contract Payment for Nob Hill Blvd Sanitary Sewer City Project No.: WW1977 (Standard Motion V-B — Accept the project and approve the final payment) SUBMITTED BY: Doug Mayo — City Engineer Brett Sheffield - Chief Engineer CONTACT PERSON/TELEPHONE: Doug Mayo — City Engineer 509-576-6678 SUMMARY EXPLANATION: This project consisted of the construction of a sanitary sewer main improvements which included furnishing and installing approximately 2,270 linear feet of new 8" PVC sanitary sewer pipe, new precast concrete sewer manholes, cleaning and testing, surface restoration that included asphalt pavement, and other related improvements. Final inspection for this project was made and the recommendation is that the project be gh accepted. This Council action is to accept the project and approve the final construction costs. Contractor: Premier Excavation, Inc. Contract Award: 7/29/2009 Contract Cost: $85,991.95 Final Contract Cost: $78,993.05 Amt. This Payment: -0- The above total contract cost is for construction only and does not include engineering and other costs. Resolution Ordinance X Other (Specify) Final Contract Payment Contract Mail to (name and address): Funding Source Wastewater Collection System Project Fund (476) APPROVED FOR SUBMITTAL: -- City Manager STAFF RECOMMENDATION: Accept the project and approve final estimate. 411k0UNCIL ACTION: 111/1 CIIIII/ YAKIMA 1 11/ 1 PROJECT #1977 PROJECT NAME: NOB HILL BLVD. SS MAIN IMPROVEMENT PROJECT 2/19/2010 CONTRACTOR: PREMIER EXCAVATION PROGRESS ESTIMATE NO. Agenda Final BID TOTAL TO NO. ITEM BID UNIT UNIT PRICE CONTRACT DATE % OF QUANTITY AMOUNT QUANTITY CONT AMOUNT 1 SPCC PLAN . 1 LS $500.00 $500.00 100% 100% $500.00 2 MOBILIZATION 1 LS $2,000.00 $2,000.00 100% 100% $2,000.00 3 PROJECT TEMPORARY TRAFFIC CONTROL 1 LS $4,000.00 $4,000.00 100% 100% $4,000.00 4 CLEARING AND GRUBBING 1 LS $250.00 $250.00 100% 100% $250.00 5 SHORING OR EXTRA EXCAVATION 2270 LF $0.75 $1,702.50 2310 102% $1,732.50 6 MANHOLE 48 IN. DIAM. TYPE 1 8 EA $1,425.00 $11,400.00 8 100% $11,400.00 7 MANHOLE ADDITIONAL HEIGHT 48-IN. DIAM., T 10 LF $165.00 $1,650.00 2 20% $330.00 8 CONNECTION TO EXISTING MANHOLE 1 EA $1,500.00 $1,500.00 1 100% $1,500.00 9 PVC SANITARY SEWER PIPE, 8-INCH DIAN. 2270 LF $20.75 $47,102.50 2310 102% $47,932.50 10 REMOVAL AND REPLACEMENT OF UNSUITABLE MAT 20 CY $52.00 $1,040.00 ' 0 0% $0.00 11 CSTC FOR TRENCH BACKFILL 90 TON $17.00 $1,530.00 60 67% $1,020.00 12 SURFACE REPAIR 20 SY $90.00 $1,800.00 19 95% $1,710.00 13 MINOR CHANGES (ES 1 FA $5,000.00 $5,000.00 631.51 13% $631.51 SUBTOTAL $79,475.00 $73,006.51 8.2% WASHINGTON STATE SALES TAX $6,516.95 . $5,986.53 TOTAL $85,991.95 92% $78,993.04