HomeMy WebLinkAboutR-2014-084 2015-2020 Six-Year TIP Adoption [FUNDING RESOLUTION] RESOLUTION NO. R- 2014 -084
A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period
of 2015 through 2020 for the construction of streets and arterials streets in
the City of Yakima and amending the Metropolitan Transportation Plan
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the ensuing
six year period, all as contemplated and required by State RCW 35.77.010 and applicable
Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City of Yakima, all as contemplated and
required by State and Federal law, and
WHEREAS, after public hearings on the matter, held at the regular meeting of the
Yakima City Council on June 3, 2014 and June 17, 2014, with proper public notice as required
by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as
the Six -Year Transportation Improvement Program for the period of 2015 through 2020 for the
construction of streets and arterial streets in the City of Yakima, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2015 through 2020, a copy of which
is attached hereto and by this reference made a part hereof, is hereby adopted as the official
Six -Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Metropolitan Transportation Plan along with Street Improvements, which are
also approved.
ADOPTED BY THE CITY COUNCIL this 17 day of June, 2014.
Micah Cawl y, Mayor
ATTEST:
0 A x,41 •
ity Clerk - - F .
•
_. - c`‘. C� •
W
AS \ �`r
A%%%
F x .11
4
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.
For Meeting of: June 17, 2014
ITEM TITLE: Public Hearing to consider: A) Resolution regarding Adoption
of the Six - Year - Transportation Improvement Program (TIP)
for the years 2015 to 2020, and to amend the Metropolitan
Transportation Plan, and B) Resolution Amending the Yakima
Urban Area Comprehensive Plan Capital Facilities Element.
SUBMITTED BY: Debbie Cook, PE, Director of Utilities and Engineering
Brett Sheffield, Chief Engineer - (509)- 576 -6797
SUMMARY EXPLANATION:
Attached is the 2015 - 2020 Six -Year TIP, along with an explanation sheet that describes the
information contained on the various columns of the Six -Year TIP. One project has been added
to the Six -Year TIP. The project is:
#49 Wide Hollow Road Bridge
Projects that have been removed from the 2014 - 2019 TIP as they were completed or the funds
were obligated include:
#2 - 64th Ave. Roadway Widening
#47 - 1st/Main & Nob Hill Corridor Safety Improvements
Council and the public are welcome to add other arterial system projects to the list. The Six -
Year TIP project listing will be finalized at the June 17th hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working
toward common standards and coordinated planning for public projects that impact both the City
and surrounding County areas. Agreement on these issues will be the first step toward the goal
of seamless transportation planning process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which State gas tax
revenue of Federal revenue will be used.
The current plan for 2015 - 2020 includes eleven projects that are funded. Funding for the
remainder of the projects will continue to be sought.
#1 - Yakima Railroad Grade Separations, Phase 4
#2 - North 1st Street Revitalization, 'N' Street to SR 12
#3 - Tieton Drive and 64th Avenue Intersection Improvements
#4 - E. Nob Hill Boulevard and Fair Avenue Intersection Improvements
#6 - Powerhouse Road Sidewalk
#7 - Yakima Valley Transportation Company Preservation
#16 - West Valley Middle School Safety Improvements
#47 - 2014 Alley Paver
#48 - S. 80th Avenue Bridge
#49 - Wide Hollow Road Bridge
#50 - Lincoln Avenue Corridor Safety Improvements
Six -Year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous
Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again
specifies the systems on which certain funds can be used and activities for which funds can be
used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning
and programming of projects. SAFETEA -LU requires each designated MPO to develop a
Transportation Improvement Program (TIP), and the state to develop a Statewide
Transportation Improvement Program (STIP) as a condition to securing federal funds for the
transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by
the State of Washington for approved State funding agencies. The STIP is a prioritized program
of transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the State's Transportation Program. Planning activities of
sate and local governments are essential parts of integrated regional planning processes. Long
range transportation planning is a part of the comprehensive land use planning carried out by
local governments. Citizen participation is an integral part of the planning process at all levels.
Local Agencies are required to develop and adopt a Six -Year Transportation Program. All local
agencies are required to hold at least one public hearing during the development of the Six -
Year Transportation Program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division.
The ranking will be integrated with other project needs and the total list will be reviewed and
adjusted to the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six -Year TIP for 2015 - 2020. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporate only those projects
that adopted in the STIP and is not subject to the "once a year" change required under the laws
of the Growth Management Act.
Resolution: Ordinance:
Other (Specify):
Contract: Contract Term:
Start Date: End Date:
Item Budgeted: Amount:
Funding Source /Fiscal Fund 142
Impact:
Strategic Priority: Improve the Built Environment
Insurance Required? No
Mail to:
Phone:
APPROVED FOR
SUBMITTAL: City Manager
RECOMMENDATION:
1. Hold the Public Hearing to consider adoption of Resolution approving the Six -Year TIP and
amending the regional metropolitan Transportation Plan and the Comprehensive Plan Capital
Facilities Element.
2. Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban
Area Comprehensive Plan Capital Facilities Element.
ATTACHMENTS:
Description Upload Date Type
D Resolution STIP 6/6/2014 Cover Memo
0 2015 - 2020 6/6/2014 Cover Memo
0 STIP explanation 6/6/2014 Cover Memo
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
vi
L, Project Identification 1 Y
(Local Agency)
U A. PIN /Federal Aid No. B. Bridge No. t ro Federal Funding R/W
7 C. Project Title a ' m t Phase
c z c o - Federal State State Local Total Envir. Required
OJ >. D. Street /Road Name or Number > V , - St Federal Fund
o a, Z a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
( o E. Beginning MP or Road - Ending MP or Road a a +r o Code
u a F. Describe Work to Be Done E H N 0 E a Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 1 Yakima Railroad Grade Separations - Phase 4 01 S 0.2 T CN 10/1/2014 STP(U) 562 88 650 650 EA Yes
Martin Luther King, Jr. Boulevard 06 P
from: N. 1st Street to: N. 1st Avenue 07 G 9/1/2009
Install art as project aesthetics for the railroad grade 08 0
separations, and construct raised sidewalk on the
south side of Lincoln Avenue
Totals 562 0 88 650 650 0
14 2 North 1st Street Revitalization 3 S 0.42 P CN 1 1/1/2015 1 STP(U) 1 2,6631
1 1 4161 3,0791 3,0791
1 1 CE No
North 1st Street 06 T
from: 'N' Street to: SR 12 0
C
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various
pedestrian and decorative elements.
Totals 2,663 416 3,079 3,079
16 3 Tieton Dr. & 64th Ave. 1/5 Improvements 13 S N/A P CN 1/1/2015 TIB 684 150 834 834 CE Yes
Tieton Drive 05 T
from: Tieton Dr. to: 64th Ave. 12 0 1/1/2015
S
Improve intersection by constructing a left -turn lane W
on Tieton Drive, installing a traffic signal system, curb, C
gutter, sidewalk and street lighting. G
Totals 684 150 834 834 0 0 0
14 4 E. Nob Hill Blvd. & Fair Ave. 1/5 Improvements 03 S N/A P RW 1/1/2015 STP(U) 187 29 216 216 CE Yes
Nob Hill Boulevard 04 T CN 6/1/2016 STP(U) 1,457 227 1,684 1,684
from: E. Nob Hill Blvd. to: Fair Ave. 31 W 1/1/2015
C
Widen Nob Hill Boulevard through the intersection, 0
construct left -turn lane, curb, gutter, sidewalk, street
lighting and drainage. Upgrade signal by installing
mast arm structures.
Totals 1,644 256 1,900 0 1,684
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
Pro
1 Fund Source Information Projects Only
U E A. PIN /Federal Aid No. B. Bridge No. ,n (Local Agency)
o Federal Funding R/W
c z C. Project Title E t - o a Phase
a, ° Federal State State Local Total Envir. Required
> D. Street /Road Name or Number > V _ u Start Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a +o •o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
u a F. Describe Work to Be Done (1% o ++ Code
,,, a Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 5 E. Lincoln Avenue & 10th Street Roundabout 03 P N/A P CN 1/1/2015 TIB 1,440 360 1,800 1,800 CE Yes
Martin Luther King, Jr. Boulevard 05
from: E. Lincoln Ave. to: N. 10th Street 06 1/1/2015
Construct a roundabout at the intersection of Lincoln
Avenue, 10th Street and MLK, Jr. Boulevard. Install
curb, gutter, sidewalk, street lighting and drainage.
Totals 1,440 360 1,800 1,800
17 6 Powerhouse Road Sidewalk 05 S 0.6 0 CN 1 1/1/2015 I TAP 1 2451
1 1 1 2451 2451
1 1 CE No
Powerhouse Road 12
from: Cowiche Canyon Rd to: Mobile Home Park
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
Totals 245 245 245
14 7 Yakima Valley Transportation Company Preservation 03 S 0.02 0 CN 1/1/2015 STP(E) 52 52 52 CE No
Lincoln Avenue
from: E. 'G' Street to: 1 -82
Remove and replace a portion of the existing trolley
rail in the vicinity of the intersection of 6th Avenue
and Yakima Avenue.
Totals 52 52 52
19 8 Adams Elem. /Washington M.S. Sidewalk Improvements 12 P N/A P PE 1 7/1/2015 SRTS 25 25 25 CE Yes
Various Streets T RW 1/1/2016 SRTS 50 50 50
from: to: 0 CN 5/1/2016 SRTS 253 30 283 283 5/1/2016
This project will make various pedestrian safety
improvements in the vicinity of Adams Elementary
School and Washington Middle School, such as,
constructing sidewalks, improving roadway crossings
and installing flashers
Totals 328 30 358 25 333
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
O c A. PIN /Federal Aid No. B. Bridge No. o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o -c Phase
a , c Federal State State Local Total Envir. Required
> D. Street /Road Name or Number o V v Start Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
o. — o Code
u_ a F. Describe Work to Be Done E H N H 5 a Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
19 9 Garfield Elementary Safety Improvements 12 P N/A P PE 7/1/2015 SRTS 12 12 12 CE Yes
Various Streets T RW 1/1/2016 SRTS 20 20 20
from: to: 0 CN 5/1/2016 SRTS 128 13 141 141 5/1/2016
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementary
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers and converting
Fairbanks Avenue and Jerome Avenue into one way
streets.
Totals 160 13 173 12 161
12 10 SR 12 & 16th Avenue Interchange 03 P N/A 0 PE 11/1/20161 STP(U) I 1 14 100 I 1 1001 CE No
Westbound ram p s of SR 12 06 CN 1/1/2017 STP U 779 121 900 900
from: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
Totals 865 135 1000 100 900
11 11 1 -82 & Lincoln Avenue Interchange 01 P N/A 0 PE 1/1/2016 STP(U) 260 40 300 300 CE No
Lincoln Avenue P RW 1/1/2017 STP(U) 173 27 200 200 200
from: E. 'G' Street to: 1 -82 G CN 6/1/2018 STP(U) 1,730 270 2,000 2,000
Reconstruct /extend off -ramp from existing 1 -82 off -
ramp for Lincoln Avenue to E. 'G' Street.
Totals 2,163 337 2,500 0 500 200 2,000
14 12 E. Yakima Ave. &Fair Ave. Signalization 12 P N/A P PE 11/1/20171 STP(U) 1 861 1 1 141 1001 1 1 1001 CE No
Yakima Avenue T CN 6/1/2018 STP(U) 519 81 600 600
from: E. Yakima Ave. to: Fair Ave. W
Install traffic signal at the intersection of Yakima S
Avenue and Fair Avenue. 0
Totals 605 95 700 100 600
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
1 Fund Source Informatio Projects Only
U A. PIN /Federal Aid No. B. Bridge No. c ,� (Local Agency)
a, Federal Funding R/W
c z C. Project Title to - a a Phase
a, ° Federal State State Local Total Envir. Required
> D. Street /Road Name or Number > V , 0 v St Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a +o •o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
u a F. Describe Work to Be Done a te + o ++ Code
� � ,,, � � a Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 13 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2017 20 20 20 CE No
S. 3rd Avenue T CN 9/1/2017 210 210 210
from: S. 3rd Ave. to: W. Washington Ave.
Upgrade the traffic signalization system 230 230 230
Totals 230 230
16 14 S. 1st St. & E. Washington Ave. I/S Improvements 03 P N/A P PE 1/1/2016 STP(U) 260 40 300 300 CE Yes
South 1st Street 06 W RW 1/1/2017 STP(U) 260 40 300 100 200
from: S. 1st Street to: E. Washington Ave. S CN 1/1/2018 STP(U) 1,211 189 1,400 1,400 1/1/2018
Realign intersection, widen E. Washington Avenue to T
accommodate an additional lane, replace curb, gutter 0
and sidewalk, and install a new traffic signalization
system.
Totals 1,731 269 2,000 400 200 1,400
17 15 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2016 STP(U) 223 35 258 258 CE Yes
South 48th Avenue 05 T RW 1/1/2017 STP(U) 519 81 600 600
from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2018 STP(U) 1,485 232 1,717 1,717 1/1/2018
S
Reconstruct and widen 48th Avenue, install curb, 0
gutter, sidewalk, street lighting and drainage system.
Totals 2,227 348 2,575 0 258 600
14 16 West Valley Middle School Safety Improvements 12 S N/A P CN 11/1/20151 SRTS I 4991 I I 50I 5491 5491 I I CE No
S. 72nd Avenue T
from: S. 72nd Ave. to: Mead Ave. W
S
Install curb, gutter and sidewalk on the south side of 0
Zier Road from 72nd Avenue to 75th Avenue, and
install a traffic signal system and the intersection of
72nd Avenue and Mead Avenue.
Totals 499 50 549 549
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
1 Fund Source Informatio Projects Only
U A. PIN /Federal Aid No. B. Bridge No. c ,� (Local Agency)
a, Federal Funding R/W
c z C. Project Title to - o a Phase
a ° Federal State State Local Total Envir. Required
> D. Street /Road Name or Number > V , 0 v Start Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a +o •o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
u a F. Describe Work to Be Done a te + o ++ Code
� � ,,, � � a Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 17 Tieton Dr. & S. 5th Ave. I/S Improvements 12 P N/A P PE 1/1/2017 STP(U) 69 11 80 80 CE Yes
Tieton Drive W RW 1/1/2018 STP(U) 104 16 120 120
from: Tieton Dr. to: S. 5th Ave. S CN 6/1/2019 STP(U) 865 135 1,000 1,000 5/1/2019
Remove existing traffic signal and construct a T
roundabout, remove and replace curb, gutter, 0
sidewalk, street lighting and drainage
Totals 1,038 162 1,200 80 1,120
16 18 E. 'H' Street Extension, Ph. 1 01 P 1.10 P PE 1/1/2016 STP(U) 432 68 500 500 CE Yes
E. 'H' Street 08 T RW 1/1/2017 STP(U) 432 68 500 500
from: 1st Street to: Yakima River W CN 1/1/2018 STP(U) 2,162 338 2,500 2,500 12/1/2017
Construct new roadway including water, sewer, curb, S
gutter, sidewalk, street lighting and storm drainage 0
system.
Totals 3,026 474 3,500 500 500
16 19 Cascade Millsite Parkway 01 P 1.3 P PE 1/1/2016 STP(U) 350 54 404 404 CE Yes
North 10th Street 06 T RW 1/1/2017 STP(U) 2,750 425 3,175 3,175
from: 'H' Street to: Lincoln Ave. W CN 1/1/2018 STP(U) 3,950 486 4,436 4,436 1/1/2017
S
Construct new roadway including water, sewer, curb, 0
gutter, sidewalk, street lighting and storm drainage
system.
Totals 7,050 965 8,015 404 3,175 4,436
14 20 Yakima Downtown Future Initiatives, Phase 5 06 P 0.15 P PE 1/1/2016 OTHER 500 500 500 CE No
12 T CN 4/1/2017 OTHER 5,500 5,500 5,500
from: 1st Street to: 9th Street C
Install historic lighting, sidewalk modifications and S
other improvements. Exact improvement area(s) to
be determined
Totals 6,000 500 5,500
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
O c A. PIN /Federal Aid No. B. Bridge No. o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o -c Phase
a , c Federal State State Local Total Envir. Required
> D. Street /Road Name or Number o V v Start Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
o. — o Code
u_ a F. Describe Work to Be Done E H N H 5 a Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
19 21 75th Avenue Improvements 01 P 0.50 P PE 1/1/2018 STP(U) 87 13 100 100 CE No
75th Avenue 08 W RW 1/1/2019 STP(U) 173 27 200 200
from: Mead Ave. to: Nob Hill Blvd. S CN 1/1/2020 STP(U) 1,038 162 1,200 1,200
T
Construct a new two -lane roadway and widen 0
portions of existing roadway, install curb, gutter,
sidewalk, street lighting and storm drainage system.
Totals 1,500 1,500
14 22 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2016 STP(U) 100 14 114 114 CE Yes
Washington Avenue 05 T RW 1/1/2017 STP(U) 100 14 114 114
from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2018 STP(U) 700 95 795 795 1/1/2018
Improve the Washington Avenue and Longfiber Road S
intersection by constructing an eastboung left -turn 0
lane on Washington and a northbound left -turn lane
on Longfiber, install or replace curb, gutter, sidewalk,
street lighting, storm drainage and safety flashing
signal
Totals 900 123 1,023 114 114 795
14 23 E. Nob Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2016 STP(U) 50 8 58 58 CE Yes
E. Nob Hill Boulevard 04 T RW 1/1/2017 STP(U) 50 8 58 58
from: E. Nob Hill Blvd. to: S. 18th Street W CN 1/1/2018 STP(U) 346 54 400 400 1/1/2018
Widen south leg for double left turn from westbound S
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals 446 70 516 58 58 400
17 24 Powerhouse Rd. & Englewood Ave. 1/5 12 P N/A P PE 1/1/2017 STP(S) 43 7 50 50 CE Yes
Powerhouse Rd. T RW 1/1/2018 STP(S) 87 13 100 100
from: Powerhouse Rd. to: Englewood Ave. C CN 1/1/2019 STP(S) 504 74 578 578 1/1/2019
Realign intersection, install curb, gutter, sidewalk and S
safety flashing signal. Possibly construct a 0
roundabout. W
Totals 634 94 728 0 50 678
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
O c A. PIN /Federal Aid No. B. Bridge No. o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o -c Phase
a , c Federal State State Local Total Envir. Required
> D. Street /Road Name or Number o V v Start Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
o. — o Code
u_ a F. Describe Work to Be Done E H N H 5 a Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 25 S. 48th Ave. & Summitview Ave. Signalization 12 P N/A P PE 1/1/2017 STP(S) 25 4 29 29 CE Yes
Summitview Avenue T RW 6/1/2017 STP(S) 25 4 29 29
from: Summitview Ave. to: S. 48th Ave. CN 1/1/2018 STP(S) 554 81 635 635 6/1/2018
Install traffic signal at the intersection of Summitview
Avenue and 48th Avenue.
Totals 604 89 693 58 635
14 26 W. Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2016 STP(E) 424 67 491 491 CE Yes
W. Lincoln Avenue 12 T RW 1/1/2017 STP(E) 1,047 163 1,210 1,210
from: W. 5th Ave. to: Custer St. W CN 1/1/2018 STP(E) 1,801 281 2,082 2,082 1/1/2018
S
0
Realign W. Lincoln Avenue, install curb, gutter, P
sidewalks, street lighting, drainage. G
Totals 3,272 511 3,783 491 1,210 2,082
14 27 E. Nob Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2016 STP(C) 546 84 630 630 CE Yes
E. Nob Hill Boulevard 04 T RW 1/1/2017 STP(C) 1,090 170 1,260 1,260
from: S. 6th Street to: S. 18th Street 06 W CN 1/1/2018 STP(C) 6,539 1,013 7,552 7,552 1/1/2018
S
Reconstruct and widen roadway to 5 lanes with 0
intersection improvements, curb, gutter, sidewalk, P
street lighting and drainage system G
Totals 8,175 1,267 9,442 630 1,260 7,552
14 28 S. 72nd Ave. & W. Washington Ave. 1/5 12 P N/A P PE 1/1/2016 STP(C) 91 14 105 105 CE Yes
S. 72nd Avenue 06 T RW 1/1/2017 STP(C) 91 14 105 105
from: s. 72nd Ave. to: W. Washington Ave. 0 CN 1/1/2018 STP(C) 544 86 630 630 1/1/2018
Improve intersection by installing a traffic signal S
system or roundabout. W
Totals 726 114 840 105 105 630
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
1 Fund Source Informatio Projects Only
U E A. PIN /Federal Aid No. B. Bridge No. ,� (Local Agency)
a, �, Federal Funding R/W
c z C. Project Title to - o a Phase
a, c ° Federal State State Local Total Envir. Required
> D. Street /Road Name or Number ( V 3 u v Start Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a +o •o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
u a F. Describe Work to Be Done ,,a o ++ Code
a Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 29 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2016 STP(E) 86 14 100 100 CE Yes
66th Avenue 04 T RW 1/1/2017 STP(E) 173 27 200 200
from: Summitview Ave. to: Scenic Dr. W CN 1/1/2018 STP(E) 1,096 164 1,260 1,260 1/1/2018
Reconstruct and widen roadway to three lanes, install S
curb, gutter, sidewalk, storm drainage system and 0
utilities.
Totals 1,355 205 1,560 100 200 1,260
14 30 N. 40th Ave. & Summitview Ave. Intersection 12 P N/A P PE 1/1/2016 STP(U) 126 17 143 143 CE Yes
N. 40th Avenue T RW 1/1/2017 STP(U) 130 20 150 150
from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2018 STP(U) 692 108 800 800 1/1/2018
Improve the intersection by constructing larger S
corner radii, lengthening the turn lanes, and 0
upgrading the traffic signal system.
Totals 948 145 1,093 143 150 800
14 31 N. 40th Ave. & Englewood Ave. Intersection 12 P N/A P PE 1/1/2017 STP(U) 43 7 50 50 CE No
N. 40th Avenue T CN 6/1/2017 STP(U) 260 40 300 300
from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
Totals 303 47 350 350
16 32 N. 16th Avenue & Fruitvale Blvd. 1/S 12 P N/A P PE 1/1/2016 STP(U) 126 18 144 144 CE Yes
N. 16th Avenue T RW 1/1/2017 STP(U) 173 27 200 200
from: N. 16th Ave. to: Fruitvale Blvd. 0 CN 1/1/2018 STP(U) 400 62 462 462 1/1/2016
Improve the intersection by constructing larger curb S
radii, installing ADA ramps, and upgrading the traffic W
signal system.
Totals 699 107 806 144 200 462
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
1 Fund Source Informatio Projects Only
U A. PIN /Federal Aid No. B. Bridge No. c ,�
t (Local Agency)
a, a, Federal Funding R/W
c z C. Project Title E to - a a Phase
a, ° Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number > V in u St Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a +o •o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
u a F. Describe Work to Be Done ,,a o ++ Code
a Phase 6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 33 N. 1st Street & 'I' Street Signal Upgrade 12 P N/A P PE 1/1/2016 STP(U) 32 5 37 37 CE No
N. 1st Street T CN 6/1/2016 STP(U) 126 17 143 143
from: N. 1st Street to: 'I' Street W
S
Replace and upgrade traffic signal system 0
Totals 158 22 180 180
17 34 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2016 STP(C) 109 27 136 136 CE No
Rudkin Road 06 T CN 1/1/2017 STP(C) 945 TPP 945 106 1,996 1,996
from: E. Viola Ave. to: Rainier PI. W
S
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
Totals 1,054 133 2,132 136 1,996 0
16 35 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2017 STP(S) 122 TPP 23 7 152 152 CE No
E. Mead Avenue 06 T CN 1/1/2018 STP(S) 1,730 TPP 206 70 2,006 2,006
from: Rudkin Rd. to: Fair Ave. S
Partner with Union Gap to reconstruct E. Mead C
Avenue, install curb, gutter, sidewalk and storm G
drainage system. 0
Totals 1,852 229 77 2,158 152 2,006
17 36 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2018 AIP 131 20 151 151 CE Yes
S. 80th Avenue T RW 1/1/2019 AIP 382 59 441 441
from: Tieton Drive to: Zier Road 0 CN 1/1/2020 AIP 1,667 260 1,927 1,927 1/1/2020
S
Widen roadway to three lanes, install curb, gutter, W
sidewalk, street lighting and storm drainage system. C
Totals 2,180 339 2,519 2,519
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
O c A. PIN /Federal Aid No. B. Bridge No. o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o -c Phase
a , c Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number o V v S Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
o. — o Code
u_ a F. Describe Work to Be Done E H N H 5 a Phase 6th (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 37 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2018 STP(C) 272 43 315 315 CE Yes
Englewood Avenue 06 T RW 1/1/2019 STP(C) 349 55 404 404
from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2020 STP(C) 2,352 340 2,692 2,692 1/1/2020
S
Widen roadway to three lanes, install curb, gutter, 0
sidewalk, street lighting and storm drainage system. C
Totals 2,973 438 3,411 3,411
17 38 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/2018 STP(U) 136 21 157 157 CE Yes
Englewood Avenue 06 T RW 1/1/2019 STP(U) 173 27 200 200
from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2020 STP(U) 1,164 182 1,346 1,346 1/1/2020
S
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
Totals 1,473 230 1,703 1,703
14 39 Nob Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2018 STP(S) 55 8 63 63 CE Yes
Nob Hill Boulevard T RW 1/1/2019 STP(S) 107 19 126 126
from: S. 16th Ave. to: S. 6th Street S CN 1/1/2020 STP(S) 321 57 378 378 1/1/2020
Construct sidewalk in locations where it doesn't exist W
on the south side of Nob Hill
Totals 483 84 567 567
14 40 N. 34th Ave. & Fruitvale Blvd. 1/5 Improvements 12 P N/A P PE 1/1/2017 STP(U) 63 5 68 68 CE Yes
Fruitvale Boulevard T RW 1/1/2018 STP(U) 87 13 100 100
from: Fruitvale Blvd. to: N. 34th Ave. 0 CN 1/1/2019 STP(U) 567 76 643 643 1/1/2019
S
Improve intersection by installing a traffic signal W
system, curb, gutter and sidewalk. Widen leg south
of Fruitvale to inlcude a left -turn lane
Totals 717 94 811 68 743
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi Project Identification Expenditure Schedule
Pro
1 Fund Source Information Projects Only
U c A. PIN /Federal Aid No. B. Bridge No. ,n (Local Agency)
o Federal Funding R/W
c z C. Project Title t - o a Phase
a, ° Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number > V 0 u Start Feder Fund
c o E. Beginning MP or Road - Ending MP or Road a . +o _- - o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
u a F. Describe Work to Be Done �° o E. Cod
� � ,,, � � a Phase 6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 41 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2018 STP(U) 218 34 252 252 CE Yes
Englewood Avenue 05 T RW 1/1/2019 STP(U) 327 51 378 378
from: N. 24th Ave. to: N. 40th Ave. 06 W CN 1/1/2020 STP(U) 2,980 244 3,224 3,224 1/1/2020
S
Reconstruct and widen roadway to three lanes, install 0
curb, gutter, sidewalk, street lighting and storm
drainage system. Install sewer and water lines.
Totals 3,525 329 3,854 3,854
14 42 North /South Connector to West Valley 01 P 6.00 P PE 1/1/2017 STP(U) 432 68 500 500 CE Yes
Unknown Road 04 T
from: Ahtanum Rd. to: Summitview Ext. 06 W
S
Corridor study to determine the best location for a C
north /south limited access route in West Valley. City G
and County joint project. 0
Totals 432 68 500 500
14 43 18th Street Underpass 12 P N/A P PE 1/1/2017 BRAC 240 60 300 300 CE No
Yakima Avenue T CN 1/1/2018 BRAC 2,288 572 2,860 2,860
from: Yakima Ave. to: 18th Street 0
Replace the bridge on E. Yakima Avenue that crosses S
over 18th Street. W
Totals 2,528 632 3,160 300 2,860
17 44 88th Avenue Improvements 06 P 0.48 P PE 1/1/2017 STP(U) 43 7 50 50 CE Yes
88th Avenue 12 T RW 1/1/2018 STP(U) 52 8 60 60
from: Tieton Dr. to: Summitview Ave. C CN 6/1/2018 STP(U) 285 45 330 330 6/1/2018
G
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
Totals 380 60 440 50 390
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
A. PIN /Federal Aid No. B. Bridge No. a, o Federal Funding (Local Agency) R/W
c z C. Project Title E t -o a Phase
a , Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number o V _ u S tart Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, - = a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
o. — o Code
u a F. Describe Work to Be Done E H N H E a Phase 6th (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 45 64th Avenue Improvements 03 P 1.00 P PE 1/1/2017 STP(U) 200 32 232 200 CE No
64th Avenue 04 T CN 1/1/2018 STP(U) 1,600 249 1,849 1,849
from: Washington Ave. to: Nob Hill Blvd. 06 W
C
Widen roadway to three lanes, install curb, gutter, G
sidewalk, street lighting and storm drainage system. 0
Totals 1,800 281 2,081 200 1,849
14 46 North 1st Street Revitalization 06 P 0.50 P PE 1/1/2017 STP(U) 605 95 700 700 CE No
N. 1st Street 12 T CN 1/1/2018 STP(U) 5,165 806 5,971 5,971
from: MLK Blvd. to: 'N' Street G
C
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various
pedestrian and decorative elements.
Totals 5,770 901 6,671 700 5,971
19 47 2014 Alley Paver 07 S 3.5 P CN 1/1/2014 CMAQ 353 57 410 410 CE No
Alleys between Folsom Ave. and Fruitvale Blvd. T
from: 16th Avenue to: 6th Avenue C
Improve the air quality throughout this section of the 0
City by paving gravel alleys.
Totals 353 57 410 410
17 48 S. 80th Avenue Bridge 09 S 0.05 P CN 4/1/2015 DOE 75 0 75 75 CE
S. 80th Avenue T
from: Wide Hollow Rd. to: Plath Ave. 0
Replace existing two -lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
Totals 0 75 75
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
A. PIN /Federal Aid No. B. Bridge No. a, o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o a Phase
a, G Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number o - , _ . u Start Federal Fund
o E. Beginning MP or Road - Ending MP or Road 2 a , � w Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
D. — o Code
u a F. Describe Work to Be Done E H N H E r,-_ Phase 6th (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 49 Wide Hollow Road Bridge 9 S 0.05 P CN 4/1/2015 DOE 75 75 75 CE No
Wide Hollow Road T
from: 89th Avenue to: 88th Avenue 0
Replace existing two -lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
Totals 75 75
16 50 Lincoln Avenue Corridor Safety Improvements 07 S N/A P CN 4/1/2015 HSIP 300 0 300 300 CE Yes
Lincoln Avenue T
from: N. 32nd Ave. to: N. 5th Ave. 0 4/1/2015
Improve safety by installing larger signal lenses,
installing ADA compliant ramps, repairing damaged
sidewalk, installing new sidewalk, installing overhead
school flashers, etc.
Totals 0 300 300
14 51 16th Avenue Corridor Improvement 04 P 3.50 P PE 1/1/2017 STP(U) 120 17 137 137
16th Avenue T
from: SR 12 to: Washington Ave. W
C
Study to determine strategies for improving the 16th G
Avenue corridor 0
Totals 120 17 137 137
14 52 40th Avenue Corridor Improvements 04 P 3.20 P PE 1/1/2017 STP(U) 120 17 137 137
40th Avenue T
from: SR 12 to: Washington Ave. W
C
Study to determine strategies for improving the 40th G
Avenue corridor. 0
Totals 17 137 137
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2015 to 2020
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 6/3/14 & 6/17/14 Adoption Date: 6/17/2014
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
vi
L, Project Identification Fund Source Information Expenditure Schedule Projects Only
A. PIN /Federal Aid No. B. Bridge No. a, o Federal Funding (Local Agency) R/W
c z C. Project Title E oa -o a Phase
a, G Federal State State Local Total 4th Envir. Required
> D. Street /Road Name or Number > - , _ u St Federal Fund
o E. Beginning MP or Road - Ending MP or Road a a, � a, Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
D. — o Code
u a F. Describe Work to Be Done E H N H E r,-_ Phase 6th (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 53 Nob Hill Boulevard Corridor Improvements 03 P 2.70 P PE 1/1/2017 STP(U) 120 17 137 137
Nob Hill Boulevard 04 T
from: 1 -82 to: 16th Ave. 0
S
W
Study to determine strategies for improving the Nob C
Hill Boulevard corridor. G
Totals 120 17 137 137
14 54 S. 1st Street /Main Street Corridor Improvements 01 P 2.00 P PE 1/1/2017 STP(U) 120 17 137 137
S. 1st Street /Main Street T
from: Nob Hill Blvd. to: Barker Mill Bridge 0
S
Joint project with Union Gap. Stucy to determine W
strategies for improving the 1st Street /Main Street C
corridor. G
Totals 120 17 137 137
16 55 E. 'H' Street Extension, Ph. 2 01 P 0.55 P PE 1/1/2016 STP(U) 432 68 500 500 CE Yes
E. 'H' Street 08 T RW 1/1/2018 STP(U) 432 68 500 500
from: 10th Street to: 1 -82 W CN 1/1/2019 STP(U) 2,162 338 2,500 2,500 1/1/2018
Construct new roadway including water, sewer, curb, S
gutter, sidewalk, street lighting and storm drainage
system.
0 474 3,500 500 3,000
9. Appendices
A. Six Year Form Instructions
Heading
Agency Enter name of the sponsoring agency.
County Number Enter the OFM assigned number (see LAG Appendix 21.44).
City Number Enter the OFM assigned number (see LAG Appendix 21.45).
MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution Number Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop.) Urban (Over 5000 pop.)
01 - Interstate 11- Interstate
02 - Principal Arterials 12- Freeways & Expressways
06 - Minor Arterials 14- Other Principal Arterials
07 - Major Collector 16- Minor Arterial
08 - Minor Collector 17- Collector
09 - Local Access 19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route
Number; (e) Beginning and Ending Termini (mile post or street names); and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
01- New construction on 07 - Resurfacing 14 - Bridge Program - Special
new alignment 08 - New Bridge Construction 21 - Transit Capital Project
02- Relocation 09- Bridge Replacement 22- Transit Operational
Project
03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning
04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin.
05- Minor Widening 12 - Safety /Traffic Operation /TSM 31- Non Capital Improvement
06- Other Enhancements 13 - Environmentally Related 32 - Non Motor Vehicle Project
25
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C - Cable TV G - Gas
O - Other P - Power
S - Sewer (other than agency- owned) T - Telephone
W - Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month /dav /year in MM /DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
FTA Discretionary for Capital Expenditures
BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas
BR - Bridge Replacement or Rehab. 5309(Bus)- Bus
CDBG - Community Development 5309(FG) - Fixed Guideways
Block Grant (HUD) 5309(NS) - New Starts
CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled
DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas
Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program
Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program
DOD - Dept. of Defense STP(E) - STP Transportation Enhancements
IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR
IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected
NHS - National Highway System STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP
Too" program.)
16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded proiects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded proiects only.)
27