HomeMy WebLinkAboutR-2009-052 2009-2014 Six-Year Transportation Improvement Program (STIP) AmendmentRESOLUTION NO. R-2009-52
A RESOLUTION to amend the Six-year Transportation Improvement Program (TIP) for the
period of 2009 through 2014 to include projects affecting the City's
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year TIP for
the construction or repair of streets in the City of Yakima for the ensuing six year period, all as
contemplated and required by State RCW 35.77.010 and applicable Federal law, and
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year
Transportation Improvement Plan for the period of 2009 to 2014 to the Capital Facilities Element
of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under
RCW 36.70A.130(2B) and RCW 35.77.010, and
WHEREAS, a public hearing has been held by the Yakima City Council on amending the
6 -Year Transportation Improvement Plan on Tuesday, March 24, 2009, with proper public notice
as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2009' through
2014 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation
Improvement Plan attached.
ADOPTED BY THE CITY COUNCIL this 7th day of April, 2009.
David Edler, Mayor
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7-1-2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
To
N
o
ti—
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. StreeVRoad Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
g
N
Total Length I
m
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/VY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
Yakima Railroad Grade Separations - Phase 2
Lincoln Ave.
from: N 1st St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconslructon,
including realignment of Front Street.
01
06
07
08
S
0.2
T
P
G
0
S
PE
RW
CN
CN
CN
1/1/2009
6/1/2009
6/1/2009
6/1/2009
6/1/2009
STP(U)
STP(U)
STP(U)
500
1000
8150
OTHER
OTHER
FMSIB
OTHER
AIP
150
2500
1000
3000
1000
650
1000
11650
1000
3000
650
1000
6000
5650
1000
3000
EA
Yes
4/30/09
Totals 9,650 6650 1000 17300 7650 9650
14
2
Yakima Railroad Grade Separations- Phase 3
Martin Luther King, Jr. Blvd
from: N. 1st Sreet to: N. 1st Ave
Construct Grade Separation and adjacent roadway reconstruction including
Front Street
01 .
06
07
08
P
0.2
- T
G
O
PE
CN
CN
1/1/2009
6/1/2009
6/1/2009
STP(U)
STP(U)
ARRA -
175
2400
8000
FMSIB
OTHER
2000
1500
25
3975
200
8375
9500
200
8375
2000
7500
EA
Yes
4/30/09
Totals 10,575 3500 4000 18075 200 10375 7500
14
3
16TH AVENUE REALIGNMENT
16TH AVENUE REALIGNMENT
from: AHTANUM ROAD to: WASHINGTON AVENUE
Realign 16th Avenue out of the runway safely area of the Yakima Air
Terminal. Includes FAA funds.
01
08
S
1.0
P
0
W
S
CN
4/1/2009
3840
3840
3840
EA
Yes
11/2007
Totals 3840 3840 3840
00
4
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
P
N/A
G
3
T
W
P
PE
CN
1/1/2009
6/1/2009
STP(E)
STP(E)
18
1900
32
285
50
21851
50
2185
EA
No
Totals 1,918 317 2235 2235
Report Date: January 31, 2008
Page 1
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7-1-2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
' Status
Total Length
Utility Codes
Protect Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
lMM y>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
5
Purchase o/ 5 (five) transit buses - 35 foot low floor versions
from: to:
Acquire 5 (five) Gillig 35" low floor transit buses through the federal stimulus
program to replace 5 (five) unreliable Thomas buses
21
S
ALL
4/15/2009
ARRA - FTA
2000
2000
2000
CE
No
Totals 2,000 2000 2000
00
6
Acquisition of 3 (three) new Paratransit vehicles for Dial -A -Ride
from: to:
Purchase 3 (three) new Paratransit vehicles to replace 3 (three) older simile
unreliable units
21
S
ALL
4/15/2009
ARRA - FTA
150
30
180
180
CE
No
Totals 150 30 180 180
00
7
Transit Operating Expenditures
Various Funding Areas
from: N/A to: N/A
Supplemental Funding for Transit Service Operating.Expenses
12
22
23
24
31
S
N/A
CN
1/1/2009
5307
1655
1655
33101 3310
E
CE
No
Totals 1,655 1655 3310 3310
00
8
YVT Trolley Barn/Powerhouse Rehabilitation
S 3rd Ave
from: to:
Minor car barn and powerhouse restoration including property purchase
03
S
N/A
C
G
0
P
S
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(E)
STP(E)
STP(E)
36
205
255
36
205
255
36
205
255
CE
Yes
06/01 /07
Totals 496 496 496
Report Date: January 31, 2008
Page 2
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date: Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mmldd yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State -
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
0.4mi r
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
9
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: to:
Maintenance of Shelters, Benches and Signage throughout our Transit
Route System
22
31
S
N/A
ALL
1/1/2009
WSDOT
50
50
50
CE
No
Totals 50 50 50
00
10
William O. Douglas Trail
6th Ave Pathway & Bridge Decking
from: to:
Build pathway and install pathway decking on Naches River bridge with
partner William 0. Douglas Trail Fundation
32
08
06
S
1'.0
o
P
s
w
T
CN
4/1/2009
STP(E)
525
5251 525
CE
No
Totals 525 525 525
00
11
William O. Douglas Heritage Trails
Bridge Restoration & Trailhead
from: to:
Trailhead restoration, right of way acquisition partner with the William 0.
Douglas Foundation, including restoration of bridge , cleaning, rust removal
and painting
32
13
10
S
N/A
G
P
S
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(E)
STP(E)
STP(E)
65
150
285
65
150
285
65
150
285
CE
Yes
6/01/09
Totals 500 500 500
00
12
Transit Service to Terrace Heights
New University & Retail Links
from: to:
Provide Transit service to this growing area of Yakima County to include the
new University 8 Retail Shops.
22
S
N/A
ALL
1/1/2009
WSDOT
51
9
601 60
No
Totals 51 -.9 60 60
Report Date: January 31, 2008
Page 3
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
VA 'Cr
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008 Adoption Date: 7-15-2008
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/VY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
13
Nob Hill Blvd. Improvements
from: 64th Ave to: 72nd Ave
Construct curb, gutter, sidewalk, street lights, storm drain and intersection
improvements
06
S
0.55
G
T
PE
CN
2/6/2009
6/1/2009
ARRA-
950
150
150
950
150
950
CE
No
Totals 950 150 1100 1100 _
14
14
Nob Hill Blvd
Nob Hill Blvd
from: 49th Ave to: 64th Ave
Widen, curb, gutter, sidewalk, lighting, drainage -
04
P
77
p
C
G
O
T
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(U)
1000
TPP
TPP
200
1300
300
200
2000
500
200
4300
500
200
4300
EA
Yes
12/01/09
Totals 1,000 1500 2500 5000 5000
00
15
Annual Signal Upgrades
Local Selection
from: N/A 1o: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
1/1/2009
4/1/2009
4/1/2009
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
120
420
360
120
420
360
CE
No
Totals 600 240 60 900 120 780
00
16
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to. N/A
07
P
N/A
W
S
CN
6/1/2009
STP(U)
228
32
260
260
EA
No
Totals 228 32 260 260
Report Date: January 31, 2008
Page 4
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7/1/2008 Adoption Date: 7-15-2008
Resolution No.:
Functional
Class
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(M»
Federal '
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
-
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12 ,
13
14
15
16
17
18
19
20
21
00
17
Storm Drains/Vegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE
CN
1/1/2009
1/1/2009
100
900
100
900
100
900
EA
No
Totals 1000 1000 1000
17
18
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
76
W
T
P
S
PE
CN
1/1/2010
1/1/2011
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1996
I
136
1996
CE
No
Totals 1,054 945 133 2132 136 1996
16
19
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
76
C
G
P
T
PE
CN
9/1/2010
4/1/2010
STP(S)
STP
122
1730
TPP
TPP
23
206
7
70
152
2006
152
2006
CE
No
Totals 1,852 229 77 2158 152 2006
19
20
LongfiberRd BWashington Ave
Intersection
from: to:
New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn,
curb, gutter, sidewalks.
03
05
06
p
N/A
p
W
0
PE
CN
1/1/2010
1/1/2011
STP(U)
STP(U)
100
700
14
95
114
795
1
114
795
CE
Yes
7/1/2009
Totals 800 109 909 114 795
Report Date. January 31, 2008
Page 5
v 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
TotalRequired
Funds
Envir
Type
R/W
Date
(MM y>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20 •
21
14
21
E Nob Hill Blvd & S lath St
E Nob Hill Blvd
from: S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
p
1
C
S
W
T
CN
1/1/2009
STP(U)
240
42
282
282
CE
Yes
01/01/07
Totals 240 42 282 282
16
22
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
P
N/A
S
PE
CN
4/1/2009
7/1/2009
CMAQ
CMAQ
24
480
3
65
27
545
27
545
CE
No
Totals 504 68 572 572
14
23
E Nob Hill Blvd & Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
31
03
04
S
-
N/A
0
C
P
T
W
PE
1/1/2009
STP(U)
72
11
831 83
CE
Yes
10/01/2009
Totals 72 11 83 83
17
24
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
0
C
P
T
W
S
PE
RW
CN
1/1/2009
1/1/2010
6/1/2010
AIP
AIP
AIP
131
382
1667
20
59
260
151
441
1927
151
441
1927
EA
Yes
01/01/09
Totals 2180 339 2519 151 2368
Report Date: January 31, 2008
Page 6
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length I
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
• Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/Y>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
25
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
S
15
C
T
P
PE
CN
1/1/2009
6/1/2009
STP(E)
STP(E)
22
75
7
20
29
95
29
95
CE
Yes
03/01/09
Totals 97 27 124 124
17
26
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb, gutter, sidewalk
05
06
P
1.0
wPE
T
P
c
C
RW
CN
1/1/2012
6/1/2012
1/1/2013
STP(C)
STP(C)
STP(C)
272
349
2352
43
55
340
315
404
2692
315
404
2692,
EA
Yes
04/01/11
Totals 2,973 438 3411 3411
17
27
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
05
06
P
2
0
S
PE
RW
CN
1/1/2010
1/1/2011
6/1/2012
STP(U)
STP(U)
STP(U)
219
327
2980
34
51
244
253
378
3224
253
378
3224
EA
Yes
01/01/10
Totals 3,526 329 3855 253 378 3224
00
28
Pedestrian Bridge
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32
P
25
T
o
PE 1/1/2011
CN 3/1/2012
STP(E)
STP(E)
252
3150
34
412
286
3562
286
3562
CE
No
Totals 3,402 446 3848 286 3562
Report Date: January 31, 2008
Page 7
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars ,
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Date Required
MMIY
( »
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4thState
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
29
Gravel Road B.S.T
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
4/1/2009
6/1/2009
CMAQ
195
252
38
252
233
100
70
82
233
CE
No
Totals 195 290 485 100 70 315
16
30
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout
12
p
N/A
T
P
0
S
C
W
CN
10/1/2010
STP(S)
504
74
5781 578
CE
Yes
09/01/2009
Totals 504 74 578 578
14
31
S 48th Ave & Summitview Ave Signalization
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization
12
P
N/A
P
T
PE
RW
CN
1/1/2012
6/1/2012
8/1/2013
STP(S)
STP(S)
STP(S)
25
25
554
4
4
81
29
29
635
29
29
635
CE
Yes
06/01/12
Totals 604 89 693 693
16
32
S 3rd Ave & W Washington Ave Signal
S 3rd Ave
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
P
T
PE
CN
4/1/2009
6/1/2009
13
214
13
214
13
214
CE
No
Totals 227 227 227
Report Date: January 31, 2008
Page 8
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date: Resolution No.:
Functional
Class
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm!dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
33
S 16th Ave & W Washington Ave Signal 8 Intersection.
S 16th Ave
from: S 16th Ave to: W Washington Ave
Included in Union Gap's Valley Mall Blvd. project
12
05
03
S
N/A
P
T
PE
RW
CN
1/1/2009
6/1/2009
6/1/2009
AIP
AIP
AIP
120
84
880
52
36
383
172
120
1263
100
40
1263
72
80
CE
Yes
3/1/2009
Totals 1084 471 1555 1403 152
14
34
W Nob Hill Blvd Sidewalks
W Nob Hill Blvd
from: S 16th Ave to. S. 6th St.
Install missing sidewalks on southside of Nob Hill.
12
P
2.5
P
T
S
PE
RW
CN
1/1/2010
6/1/2010
3/1/2011
STP(S)
STP(S)
STP(S)
55
107
321
8
19
57
63
126
378
63
126
378
CE
Yes
09/01/08
Totals 483 84 567 189 378
00
35
Beech St Pedestrian Connection
Beech St
from: Fair Ave to: Chalmers/Riverside
Construct pedestrian pathway under SR82 to Greenway
06
32
P
1.0
P
T
PE
RW
CN
1/1/2011
6/1/2011
1/1/2012
STP(S)
STP(S)
STP(S)
57
189
504
7
25
68
64
214
572
64
214
572
CE
Yes
09/01/10
Totals 750_ 100 850 64 786
16
36
WLincolnAveSidewalks
W Lincoln Ave
tram: N 56th Ave to: N 29th Ave
Sidewalks, meters and fire hydrants replacement or relocation
12
P
2 0
P
T
W
PE
RW
CN
1/1/2011
6/1/2011
1/1/2012
STP(S)
STP(S)
STP(S)
43
86
572
7
15
88
50
101
660
50
101
660
CE
Yes
09/01/11
Totals 701 110 811 811
Report Date: January 31, 2008
Page 9
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(wry)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
W Lincoln Ave 8 'B' St Realignment
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
P
.5
W
T
P
0
G
G
C
PE
RW
CN
1/1/2010
1/1/2011
1/1/2012
STP(E)
STP(E)
STP(E)
424
1047
1801
67
163
281
491
1210
2082
491
1210
2082
CE
Yes
09/01/11
Totals 3,272 511 3783 491 3292
16
38
School Safety Projects
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
12
p
NIA
w
PE
CN
1/1/2009
1/1/2009
PSMP
PSMP
13
239
2
48
15) 15
287 287
CE
No
Totals 252 50 302 302
14
39
E Nob Hill Blvd. Reconstruction
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
an hydrants
03
04
06
P
.85
C
G
P
S
T
W
PE
RW
CN
1/1/2010
1/1/2011
1/1/2012
STP(C)
STP(C)
STP(C)
546
1090
6539
84
170
1013
630
1260
7552
630
1260
7552
EA
Yes
1/1/2010
Totals 8,175 1267 9442 9442
17
40
S 72nd Avenue a W Washington Avenue
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
Intersection improvement, possible roundabout
01
12
06
P
N/A
WPE
T
P
RW
CN
1/1/2010
1/1/2011
1/1/2012
STP(C)
STP(C)
STP(C)
91
91
544
14
14
86
105
105
630
105
105
630
CE
Yes
1/1/2011
Totals 726 114 840 840
Report Date: January 31, 2008
Page 10
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-enTF
Aggency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification-
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
8.
in
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddiyyyy)
Fund Source Information
Federal Funding
State
Code
State
• Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MMJyy)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
41
4579
S 1st St. - E. Washington Ave. Intersection Improvement
S1stSt.
from: S 1st St. to. E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
T
O
PE
6/1/2009
STP
252
38
290
290
EA
Yes
01/01/11
Totals 252 38 290 290
16
42
4562
Tieton Dr - S 5th Ave. Intersection Project
Tielon Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
NIA
P
W
T
O
S
ALL
4/4/2010
STP(U)
378
WSDOT
378
7561 756
CE
E
No
-
Totals 378 378 756 756
17
43
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Summitview Ave. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
P
T
W
S
0
ALL
4/1/2009
STP
2268
307
25751
525
2050
EA
No
Totals 2,268 307 2575 525 2050
14
44
South 72nd Ave 8 Mead Ave Intersection _
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
P
N/A
O
S
T
W
PE
CN
1/1/2009
6/1/2009
STP(U)
STP(U)
51
383
8
61
59
444
1
59
444
CE
No
Totals 434 69 503 503
Report Date: January 31, 2008
Page 11
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date: Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project TitleFederal
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddtyyyy)
Fund Source Information
Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/Y>)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
45
William O. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
14
•82
P
N/A
O
P
w
PE
CN
1/1/2009
7/1/2009
STP(E)
STP(E)
10
109
2
17
12
126
12
126
CE
No
Totals 119 19 138 138
17
46
S 66th Avenue
S 66th Ave
from: Scenic Drive to: Summitview
Widen roadway, curb, gutter, sidewalk and utilities
•
04
08
P
.76
W
ST
O
PE
CN
1/1/2009
7/1/2009
STP(E)
STP(E)
23
1096
5
164
28
12601
28
1260
Yes
1/1/2009
Totals 1,119 169 1288 1288
16
47
66th Ave. & Summitview Intersection
N. 66th Avenue & Summitview
from: N. 66th Ave. to: Summitview Ave.
Widen for len turn lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
P
.20
G
P
s
T
w
C
PE
RW
CN
1/1/2010
6/1/2010
7/1/2011
STP(S)
STP(S)
STP(S)
164
382
1090
25
60
170
189
442
1260
189
442
1260
CE
Yes
1/1/2010
Totals 1,636 255 1891 189 442 1260
14
48
40th Avenue and Summitview Signal Upgrade
40th Avenue
from: 40th Avenue to: Summitview
Signal upgrade, radius improvements, turn lane extension
12
P
N/A
W
S
T
P
o
PE
RW
CN
1/1/2010
1/1/2010
6/6/2010
STP(U)
STP
STP(U)
126
63
544
17
8
86
143
71
630
143
71
630
CE
Yes
1/1/2010
Totals 733 111 844 844
Report Date: January 31, 2008
Page 12
v. 5.7 - Supersedes previous editions
WAIFWashington State Department of Transportation
W
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7-1-2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
_Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM Y1)
Federal
, Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
49
12
P
N/A
WPE
RW
1/1/2010
1/1/2010
STP
STP
95
63
13
8
108
71
108
71
CE
40th Avenue and Englewood
T
CN
1/1/2011
STP
145
20
165
165
Yes
40th Avenue
from: 40th Avenue to: Englewood
S
P
Replace traffic signal poles, upgrade controller
1/1/2010
Totals 303 41 344 344
00
50
12
P
N/A
W.PE
1/1/2010
STP
126
18
144
144
16th Avenue and Fruitvale Blvd
16th Avenue
from: 16th Avenue to: Fruitvale Blvd
T
S
P
RW
CN
6/1/2010
1/1/2011
STP
STP
63
315
8
43
71
358
71
358
CE
Yes
Replace traffic signal poles, radius improvements, ADA ramps
6!1 /2010
Totals 504 69 573 573
14
51
12
P
N/A
W
PE
1/1/2010
STP
32
5
37
37
1st Street and I Street
T
CN
1/1/2011
STP
126
17
143
143
CE
1st Street
from: 1st Street to: I Street
S
P
No
Replace and upgrade traffic signal equipment
Totals 158 22 180 180
14
52
01
P
.25
W
PE
RW
6/1/2011
1/1/2012
STP(U)
STP(U)
820
3150
189
630
1009
3780
1009
3780
CE
Mead Ave. Railroad Grade Separation
T
CN
1/1/2013
STP(U)
6552
1008
7560
7560
Yes
Mead Ave.
from: Presson Place to: Maryland
S
P
Construct railroad overpass including all utilities
1/1/2012
Totals 10,522 1827 12349 4789 7560
Report Date: January 31, 2008
Page 13
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
v
5
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
6/1/2011
STP(U)
820
189
1009
1009
16
53
01
P
.25
0
RW
1/1/2012
STP(U)
3150
630
3780
3780
CE
Washington Ave. Railroad Grade Separation
P
CN
1/1/2013
STP(U)
6552
1008
7560
7560
Yes
Washington Ave.
from: Longfibre Road to:
S
T
Railroad grade overpass including all utilities
W
1/1/2012
Totals 10,522 1827 12349 12349
PE
6/1/2011
STP(U)
252
38
290
290
16
54
01
P
4.0
0
RW
1/1/2012
STP(U)
756
88
844
844
CE
Citywide Pathway Connections
P
CN
1/1/2013
STP(U)
1890
315
2205
2205
Yes
Yakima
from: to:
S
T
W
1/1/2012
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
Totals 2,898 441 3339 290 3049
PE
1/1/2011
STP(U)
2180
340
2520
2520
16
55
01
P
11
C
RW
1/1/2013
STP(U)
2180
340
2520
2520
CE
E.'H"St. Extension
08
8
CN
6/1/2014
STP(U)
1199
1871
3070
3070
Yes
E. "H" St.
T
Irom: 1st St. to: Yakima River
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
1/1/2013
Totals 5,559 2551 8110 8110
PE
1/1/2012
STP(C)
700
108
808
808
17"'
56
01
P
1.3
0
RW
1/112013
STP(U)
5500
850
6350
6350
CE
N. 10th St. Extension
06
CN
6/1/2013
STP(U)
7900
972
8872
8872
Yes
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave.
S
T
Construct road including water, sewer, curb, gutter, sidewalk for future
development.
W
1/1/2013
Totals 14,100 1930 16030 16030
Report Date: January 31, 2008
Page 14
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-n71 Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/V1I
Required
Date
(M,wyy)
Federal
Fund
Code
Federal
Cost byFund
Phas
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
57
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway in West Valley area including 53rd Ave, Wide Hollow,
641h Ave, Ahtanum including all utilities and signage
03
32
P
N/A
0
S
T
W
PE
CN
1/1/2012
6/1/2012
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No
Totals 1,260 164 1424 1424
17
58
34th Ave & River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
P
N/A
0
P
S
T
W
PE
CN
1/1/2011
6/1/2011
STP(U)
STP(U)
63
567
5
76
68I
643
68
643
CE
No
Totals 630 81 711 711
17
59
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines
and streetlights.
01
05
12
P
1.0
O
3
T
W
PE
RW
CN
1/1/2010
6/1/2011
1/1/2012
STP(U)
STP(U)
STP(U)
218
327
2980
34
51
244
252
378
3224
252
378
3224
CE
Yes
6/1/2011
Totals 3,525 329 3854 630 3224
16
60'
Frontage Road& "H"St. Loop
N. 8th St.
from: "H" St. to: 1-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
C
G
0
P
S
T
W
PE
RW
CN
1/1/2010
6/1/2010
1/1/2011
STP(U)
STP(U)
STP(U)
272
349
2352
43
55
340
315
404
2692
315
404
2692
CE
Yes
6/1/2010
Totals 2,973 438 3411 719 2692
Report Date' January 31, 2008
Page 15
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
, Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length I
Utility Codes
Project Costs in Thousands of DollarsFederally
Expenditure Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(My)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
61
Citywide Alleys
from: to:
Pave alleys throughout the city
07
P
.5
G
S
W
T
CN
6/1/2009
75
75
25
25
25
CE
No
Totals
75
75 25
25
25
14
62
Nob Hill Corridor
Nob Hill
Irom: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, lighting
03
04
P
2.7
C
G
0
P
S
T
W
PE
1/1/2010
STP(U)
120
17
137
1
137
CE
CE
Totals
PE
1 1/1/2011
STP(U)
120
120
17
17
137
1371
137
137
14
63
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
c
G
P
W
T
Totals
120
17
137
137
14
64
16th Ave. Corridor
16th Ave.
from: SR -12 to: (a,yhington Ave.Nalley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
04
P
3.5
c
0
P
T
W
PE
1/1/2012
STP(U)
120
17
1371
137
CE
Totals
120
17
137
137
Report Date: January 31, 2008
Page 16
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7-1-2008 Adoption Date: 7-15-2008
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberPhase
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
yp
Type
R/W
Required
Date '
IMM/Y17
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
65
S. 1st St/Main St. Corridor
S. 1st St./Main St.
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap to siden roadway, curb, gutter, sidewalk,
lighting.
04
P
2.0
C
G
O
P
S
T
W
PE
1/1/2012
STP(U)
120
17
137
137
CE
Totals 120 17 137 137
14
66
W Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley
City 8 County joint project to build/extend roadways.
01
04
06
P
6.0
C
G
O
P
S
T
W
PE
1/1/2012
STP(U)
120
17
137
137
CE
Totals 120 17 137 137
00
67
West Side Transit Center Placement Study
Acquire Property to Expand Operations
from: to:
Recent Annexations Mandate Transit Expansion to These Areas
23
S
N/A
PE
1/15/2009
OTHER
100
1001 100
-
Totals 100 100 100
16
68
W Nob Hill Blvd -S 68th Ave to S. 72nd Ave.
W Nob Hill Blvd
from: S. 68th Ave. to: 721h
Reconstruct to minor arterial standards
04
03
P
.73
C
W
0
P
S
CN
6/1/2009
432
68
500
j
500
Totals 432 68 500 500
Report Date: January 31, 2008
Page 17
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-Aggency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
Project Title
C.;
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
co
c
3
9
t°-
Utility Codes I
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mmldd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAN
Required
Date
(MMn Y)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
69
Yakima Downtown Future Initiatives, Phase 4
from: "A" Street to: 3rd Street to Naches
Install Historic lighting, sidewalk modifications and other improvements
03
05
06
P
30
p
T
PE
CN
4/6/2009
6/1/2009
ARRA-
ARRA-
75
925
OTHER
OTHER
100
1400
175
2325
175
925
1400
CE
No
Totals 1,000 1500 2500 1100 1400
17
70
Yakima Downtown Future Initiatives, Phase 5
from: 1st Street to: 9th Street
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
06
12
S
60
p
W
S
T
0
PE
CN
5/1/2009
4/1/2010
OTHER
OTHER
400
2600
4001
2600
400
2600
CE
No
Totals 3000 3000 3000
00
71
Coolidge Road Widening and Paving.
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
03
05
06
S
50
S
W
T
T
CN 1
1/1/2009
CMAO 1
540
1
214
7541 7541 I
1
CE
No
Totals 540 214 754 754
16
72
Occidental Road Construction.
from: 58th Ave. to: 64th Ave.
Construct roadway
01
P
38
S
W
P
T
PE
1/1/2012
1
100
1001 1
1
100
Totals loo loo loo
Report Date: January 31, 2008
Page 18
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name• Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date: 7-15-2008
Amend Date: Resolution No.:
Functional
Class
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
$
>.
5
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/yti7
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
73
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
01
P
27
PE
1/1/2012
100
100
100
Totals 100 100 100
16
74
64th Ave. Roadway Widening.
from: Washington Avenue. to: Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
W
G
P
T
C
O
PE
1/1/2012
STP(U)
120
17
1371
137
EA
YES
7/4/2012
Totals 120 17 137 137
00
75
Purchase four new transit buses (replacements)
On-going vehicle replacement program
from: to:
Seek RFP's to acquire four new transit buses that will replace units that are
18 years of age. (six years past federal standards)
21
S
N/A
ALL
1/1/2009
5309(Bus)
1540
15401 1540
CE
No
Totals 1540 1540 1540
00
76
Acquisition of new Dial -A -Ride paratransit vehicles
Replace several older vehicles
from: to:
Upgrade Dial -A -Ride service by replacing several older vehicles with new
models.
21
S
N/A
ALL
6/1/2009
85
30
1151 115
CE
No
Totals 85 30 115 115
Report Date: January 31, 2008
Page 19
v. 5.7 - Supersedes previous editions
4111116.
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM yt7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
77
Nob Hill Overpass Repair
from: 1st Street to: Ledwich Ave
Make necessary repairs to Railroad Overpass (Bridge)
11
P
0.2
CN
4/1/2009
BR
1742
1742
1742
CE
No
Totals 1,742 1742 1742
14
78
E. Lincoln 8 10th Street Roundabout
from. E. Lincoln to: E. MLK Jr. Blvd.
Roundabout construction at intersection curb, gutter, sidewalk, 8 street
lighting
03
05
06
P
N/A
PE
RW
CN
1/1/2009
1/1/2010
6/1/2010
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
200
500
1300
Yes
4/1/2010
Totals 1,731 269 2000 200 1800
12
79
S.R.12 8 16th Avenue Interchange
Interchange
from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
03
06
P
N/A
O
ALL
1/1/2009
STP(U)
-
865
135
10001
1000
CE
No
Totals 865 135 1000 1000
11
80
1-82 & Lincoln Avenue Interchange
1-82 Interchange
from: E. "G" Street to: 1-82
Reconstruct / extend oft -ramp from existing 1-82 oft -ramp for Lincoln Avenue
to E."G' Street.
01
P
N/A
O
G
1 1 1 1 1 1 1 1 1 1
EA
Yes
6/2011
Totals
Report Date: January 31, 2008
Page 20
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
7-15-2008
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. StreeVRoad Name or Number
E. Beginning MP or Road - EndingMP or Road
9 g
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)R/W
Federally Funded
Projects Only
Project Phase
Phase
Start
(mn/ddiyyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
Required
Date
(MM/Y>)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
' 11
12
13
14
15
16
17
18
19
20
21
14
81
E Yakima Avenue & Fair Avenue Signalization
from: E. Yakima Avenue to: Fair Avenue
Construct Traffic Signal
12
P
N/A
P
W
T
S
O
ALL
1/1/2010
STP(U)
865
135
1000
1000
CE
No
Totals 865 135 1000 1000
14
82
Summitview Ave. Grind & Overlay
from: 14th Ave to: 56th Ave
Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA
ramps
06
07
P
2.64
PE
CN
4/6/2009
6/1/2009
ARRA -
ARRA-
50
1950
50
1950
50
1950
CE
No
Totals 2,000 2000 2000
Report Date: January 31, 2008
Grand Totals for Yakima
129,965 20,094 33,605 183,664 40,781 34775 37,505 70,603
Page 21
v. 5.7 - Supersedes previous editions
•
•
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of: April 7, 2009
ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six-year
Transportation Improvement Program (STIP) by adding six projects to the STIP.
SUBMITTED BY: William R. Cook, Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576-6678
Brett Sheffield, Chief Engineer 576-6797
SUMMARY EXPLANATION:
Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the
2009-2014 planning years. The City of Yakima has identified a need to amend the current Six Year
TIP to account for designated and potential funds from the American Recovery; and Reinvestment Act
(ARRA). The new projects include: 1) Nob Hill Boulevard Improvements; 2) dividing the Yakima
Railroad Grade Separations, Phase 2 into separate phases; 3) Yakima Downtown Future Initiatives,
Phase 4; 4) Summitview Avenue Grind and Overlay; 5) purchasing five new transit buses; and, 6)
purchasing three new paratransit vehicles.
The projects that have been designated to receive funds from the ARRA are: Nob Hill Boulevard
Improvements (priority number 13 - $950,000); purchasing five new transit buses (priority number 5 —
$2,000,000); and, purchasing three new paratransit vehicles (priority number 6 - $150,000). The Nob
Hill Boulevard Improvement project consists of constructing curb, gutter, sidewalk, street lights, a storm
drainage system and intersection improvements from 64th Avenue and 72nd Avenue. The remaining
three projects are candidates for ARRA funds or other funding as it may become available.
(Continued on Page 2)
Resolution X Ordinance Other (Specify)
Contract Mail to (name and address): Phone:
Funding Source:
APPROVED FOR SUBMITTAL: , City Manager
STAFF RECOMMENDATION: Adopt resolution amending the STIP
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
Page 2
Since we have secured enough funding to construct one underpass of the Yakima Railroad
Grade Separation Project we are splitting the project shown into separate projects or
phases. Current Phase 2 will become — Lincoln Avenue Underpass and new Phase 3 will
be Martin Luther King, Jr. Boulevard Underpass. See STIP priority numbers 1 and 2. As
the Lincoln and MLK Underpasses were planned to be constructed one at a time, it is
perfectly feasible to break them into two separated phases.
Phase 1 of the Yakima Railroad Grade Separations project, which relocated underground
utilities, was completed in the summer of 2007. Lincoln Avenue Underpass construction is
scheduled to begin in 2009. Lincoln Avenue is being constructed first because when a train
blocks Lincoln Avenue during the need for an emergency response to the west side of the
tracks the Fire Department response time will be at least two minutes shorter than having to
travel to use the Walnut Street Underpass. We have requested $8,000,000 of ARRA funds
to complete funding of the MLK Underpass.
The Yakima Downtown Future Initiatives, Phase 4 project requests $1,000,000 of ARRA
funds to provide new sidewalk and streetscape improvements to the north side of 'A' Street
from 3rd Street to Naches Avenue and to the east side of Naches Avenue between Yakima
Avenue and 'A' Street. This Phase 4 project is also in the current Senate Budget Proposal
for $1,500,000 in state funds. See STIP priority number 69.
The Summitview Avenue Grind and Overlay requests $2,000,000 of ARRA funds to replace
the aging pavement from 14th Avenue to 56th Avenue. See STIP priority number 82.
•
•