Loading...
HomeMy WebLinkAbout05/06/2014 05D 2014 1st Quarter Capital Improvements Projects ReportBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of: 5/6/2014 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ITEM TITLE: SUBMITTED BY: SUMMARY EXPLANATION: 2014 1st Quarter Capital Improvement Projects Report. Debbie Cook, PE, Director Utilities & Engineering Attached is the Engineering Division's 1st Quarter Capital Improvement Projects Memorandum and Report which includes Water/Irrigation and Wastewater Capital Improvement Projects. Also attached is the current project spreadsheet developed by the Sewer, Water, Irrigation, Streets, Traffic and Engineering Divisions. The current project listing assists in the planning of current and upcoming projects. It helps the divisions coordinate their work so that, for example, a street is not rebuilt or seal coated prior to planned underground work on the same street. Resolution: Ordinance: Other (Specify): Memorandum and Report Contract: Contract Term: Start Date: End Date: Item Budgeted: Amount: Funding Source/Fiscal Impact: Strategic Priority: Insurance Required? No Mail to: Phone: (509) 575-6120 APPROVED FOR SUBMITTAL: RECOMMENDATION: City Manager Accept the report ATTACHMENTS: Description Quarterly Report Capital Projects Spreadsheet Upload Date 4/2 /2014 4/2 /2014 Type Cover Memo Cover Memo MEMORANDUM April 23, 2014 TO: Mayor Micah Cawley Members of City Council FROM: Debbie Cook, PE, Director of Utilities & Engineering Robert Desgrosellier, Senior Engineer SUBJECT: 2014 Capital Improvement Projects: 1st Quarter INTRODUCTION This Quarterly Report is intended to provide an overview of the City's capital improvement projects for the 1st Quarter of 2014, including current project status, milestones, and any new developments that may significantly alter the schedules or costs of the projects. This narrative discusses Water/Irrigation Division, Wastewater/Stormwater Division and Engineering Division proj ects. CAPITAL IMPROVEMENT PROJECTS Railroad Grade Separations; Phase 3: Martin Luther King Jr. Blvd 1st St. to 1s` Ave. This project consists of re -constructing MLK Jr. Blvd. so the roadway will pass beneath the existing BNSF railroad tracks in the same manner as the recently constructed Lincoln Avenue underpass. The scope of work includes a bridge for Front Street that will pass over MLK Jr. Blvd. Bids were opened in November, 2012 and Mowat Construction Company of Woodinville, WA was the low bidder at $10,634,867.95. The contract was executed on January 25, 2013, and construction began in March, 2013. KBA, Inc., from Bellevue was selected to perform the inspection and contract administration. The work is progressing well. The BNSF Bridge has been completed and rail traffic was routed onto the bridge on November 18th. The Front Street Bridge deck has been poured and the bottom seal has been completed. They are installing the drainage items and completing the work required for the retaining walls. The work should be completed in the 3rd quarter of 2014, with contract closeout to be completed by the end of 2014. • Projected completion: 4th Quarter FY2014 2014 Citv-wide Street Resurfacing Project This years' grind and overlay project will resurface various street segments throughout the city based on their Pavement Condition Index (PCI). The scope of work will include pavement repair, resurfacing, replacement of limited areas of failed roadway, construction of ADA ramps and pavement markings. The streets segments identified represent 92 lane miles of roadway. As the project multiplies the amount of work on many different city streets at once, there will be an increase in the inconvenience to the travelling public. However, in spite of a short term of inconvenience, there are lower paving costs along with shorter times of grinding and overlaying 1 any given city street. As in 2013, the majority of the work is proposed to be done at night to lessen the impact on travelling public and adjacent businesses. The following streets sections are included: • W. Nob Hill Blvd., • N. 40th Avenue, • 16th Avenue, • N. 16th Avenue, • W. Walnut Street, • S. 24th Avenue, • Tieton Drive, • Tieton Drive, • Washington Ave. • Summitview, • S. 3rd Avenue, • Lincoln Avenue • MLK Jr. Blvd. • W. Nob Hill Blvd., • Mead Avenue • W. Yakima Avenue • W. Lincoln Avenue • 6th Street • S. 44th Avenue, • S. 5th Avenue, • "D" Street, • 4th Avenue, • S. 19th Avenue Railroad overpass to 3rd Avenue Summitview to Fruitvale Blvd. Nob Hill Blvd. to Englewood River Road to SR -12 1st Street to 7th Avenue Washington Avenue to Nob Hill Blvd. 16th to 32nd Avenues 40th to 48th Avenues 1st Street to 16th Avenue 56th to 62nd Avenues Walnut to "D" Streets 10th Street to 16th Avenue 10th Street to 7th Avenue 32nd to 48th Avenues 10 Street to 10th Avenue 12th to 16th Avenues 24th to 32nd Avenues Pacific Avenue to "H" Street Nob Hill Blvd. to Tieton Drive Walnut Street to Yakima Avenue 1st Street to 5th Avenue Division Street to MLK Jr. Blvd. Chestnut Avenue to Tieton Drive Bids for the project were opened on April 10th, with Columbia Asphalt and Gravel being the low bidder with an overall price of $16,206,237.02. Construction of the project will begin mid-May. • Project completion date: 4th Quarter 2014 Yakima Valley Trolley Barn & Museum Preservation Using State Enhancement funds, the City purchased the historic YVT Trolley Repair Barn and Substation on January 31, 2008. Funding also allowed for repairs to the west and south walls and the crane system. That work has been completed. Some funding still remains and will be used to remove and replace approximately 120 feet of bad track starting in the south lane of Yakima Avenue and continuing to the south along 6th Avenue. • Projected completion: 4th Quarter FY2014 2 South 64th Avenue Roadway Widening: Nob Hill Blvd to Tieton Drive This project will widen this section of 64th Avenue to a 39 -foot roadway (14'-11'-14') with curb and gutter on both sides of the road, and a 7 -foot sidewalk on one side of the road. Street lighting and a storm water runoff treatment system will also be constructed. The project is funded by a $900,000 Surface Transportation Program (STP) federal grant and $200,000 mitigation from the Wal-Mart Development Project. Bids for the project were opened on January 30th, with Granite Construction Co. being the low bidder with a price of $823,328. Construction began on March 4th. The excavations, widening of the roadway base and installation of the drainage items have been completed. Paving of the roadway will occur in May with the project open to traffic in June. • Project completion: 3rd Quarter FY2014 Cascade Mill Redevelopment Project This project includes multiple tasks to redevelop the former 225 -acre Boise Cascade Mill. Yakima was awarded $25 million in LIFT funding (Local Infrastructure Financing Tool) from the State of Washington to create a Revenue Development Area that will assist in the transition from the former mill to a mixed use economic catalyst including an estimated 4500 light manufacturing, office park, commercial, retail and entertainment jobs. The city has contracted with Lochner and Associates to provide engineering and design services for streets, infrastructure and I-82 interchange modifications. Partnerships in this project include Yakima County, WSDOT, Federal Highway, Yakima County Development Association (YCDA) and the Yakima valley Conference of Government (YVCOG). The City and County have committed an investment of over $4 million in early planning, design, and permitting efforts in order to develop the shovel ready projects. The current status of the project includes: 1. Interchange Justification Report Study, (approved by FHWA in May of 2013) underway to improve freeway access to I-82 and Cascade Mill site as well as connect to the County "East-West Corridor Road" — Yakima County project lead. NEPA review currently under preparation. 2. Design of the Cascade Mill Parkway (a North to South City Boulevard -type Street that will provide access to the mill site and include three roundabouts for intersections. City of Yakima project lead. The roundabout at Fair Avenue and Cascade Mill Parkway will be the first construction project and will improve safety as well as provide access into the redevelopment area for landfill clean-up. 3. Preliminary Design and alignment of "East-West Corridor Road" — Yakima County project lead. The existing H Street corridor will be improved from North 1st Street to 7th Street as part of this project. NEPA review currently under preparation. 4. Grant funding research, permitting and options for clean-up and remediation of former City of Yakima municipal landfill has begun with Department of Ecology. • Projected completion date: LIFT supported construction bond to be issued in 2017 3 North 1St Street Corridor Revitalization — 'N' Street to SR -12 In 2010, the City received a $25,000 planning grant through Yakima County SLED funding for the first segment of this project; a comprehensive approach to planning for future improvements to North First Street from "A" Street to the US -12/I-82 Interchange. The North First Street Improvement Study took place last year to develop a design and action plan to address potential arterial street design alternates including an analysis of resulting traffic flow, streetscape and landscape improvements, and required utility upgrades. The final study document was adopted by City Council on October 11, 2011. The City applied for, and received a $250,000 Surface Transportation Program (STP) federal grant for preliminary engineering on August 23, 2012. On January the City was awarded $2,718,000 for the construction of this project. A topographic survey has been completed. A landscape design consultant is being utilized to assist the city in preparation of the engineering plans. Preparation of engineering plans and construction specification will be completed by a private firm, to be contracted in 2014. Emphasis will be placed on under -grounding of utilities, as well as safety and improving the appearance of the corridor. Two additional construction phases have been identified for this project. • Phase 2: North 1st Street from N Street to H Street (2,500') at an estimated $3,500,000 in construction costs. Potential construction in 2017. • Phase 3: North 1st Street from H Street to Martin Luther King Jr. Boulevard (2,800') at an estimated construction cost of $4,000,000. Potential construction in 2019. We are in the process of entering into a contract with HDJ Design Group to perform the preliminary engineering on the project. We are applying for a Transportation Investment Generating Economic Recovery (TIGER) grant for the N. 1st Street Corridor from SR -12 to MLK Jr. Blvd. to combine with currently planned construction. • Phase 1 Projected completion date: FY 2015 (or later) 2012 City Safety Program Citywide Safety Improvements; & Lincoln Ave. Corridor Safety - 32"d Ave. to 5th Ave. This project is funded by a 100% federal Highway Safety Improvement Program grant of $840,000 and is divided into two pieces: Citywide Safety Improvements; and, Lincoln Avenue Corridor Safety - N. 32nd Avenue to N. 5th Avenue. The Citywide Safety Improvements ($400,000) will upgrade signal heads throughout the city from 8 -inch diameter to 12 -inch diameter, as well as constructing ADA ramps along 16th Avenue between Nob Hill Boulevard and River Road. The Lincoln Avenue Corridor Safety project will upgrade signal heads to 12 -inch diameter at 5th Avenue, 6th Avenue and 16th Avenue, construct ADA ramps at many of the crossroads, install sidewalk and replace sidewalk, remove trees blocking the sight distance at several intersections and install two overhead school flashers at the crosswalk for Robertson Elementary School. 4 Bids were opened for the Citywide Safety Improvement portion of the project on March 27th, with Transportation Systems, Inc. out of Sumner, WA being the low bidder with a bid of $382,166.50. Work on this project should begin in May. The Lincoln Avenue Corridor Safety portion of the project has begun, and right of way acquisition for the sidewalk construction should begin this spring, with construction anticipated in 2015. • Project completion date: 3rd Quarter 2015 lst/Main & Nob Hill Corridor Safety This project is funded by a 100% federal Highway Safety Improvement Program grant of $400,000. It is being done in conjunction with education and enforcement programs to reduce the number of severe accidents that occur in these two corridors. The improvements that will be made to the roadway include low cost fixes, such as, upgrading signal heads, installing "prepare to stop" when flashing signal system, install median curbs, upgrade/install sidewalk sections and upgrade ADA ramps, install countdown pedestrian signal heads, install speed radar signs, upgrade illumination, improve driveway ingress and egress, and upgrade the signal heads and illumination at Main and Ahtanum in Union Gap. Design has begun on this with an anticipated advertisement date in early spring and construction to be completed in 2014. • Project completion date: 4th Quarter 2014 West Valley Middle School Improvements This project is funded by a federal "Safe Routes to School" grant. It includes an educational and enforcement portion in the project. The improvements include installing a traffic signal at the intersection of S. 72nd Avenue and Mead Avenue, and constructing sidewalk on the south side of Zier Road from S. 72nd to 75th Avenues. Design began in March. Contingent on the right of way acquisitions, it is desirable to complete this project this year. • Project completion date: 4th Quarter 2014. Alley Pavers This project is funded by a federal "Congestion Mitigation/Air Quality" (CMAQ) grant. It will pave the alleys located within the following limits: Fruitvale Boulevard (north boundary), Lincoln Avenue (south boundary), 5th Avenue (east boundary) and 16th Avenue (west boundary). Design should begin this spring; it is anticipated that construction will occur this year. • Project completion date: 4th Quarter 2014 5 Fisher Golf Course Parking Lot Enlargement The Parks Departments' Golf Course has a parking lot adjacent to their club house with 12 marked parking stalls including one handicap parking stall. Up until the recent past, overflow golf parking could utilize Eisenhower High School's parking lot across 40th Avenue. However, with the reconstruction of Eisenhower and their entire property reconfiguration, the school parking lot that had been utilized has been eliminated. This project proposes to increase the size of the golf course parking lot by adding approximately 12 additional stalls and the existing lot will be reconstructed. Design will begin when this project is taken off of "hold". Construction could occur this year. • Project completion date: 3rd Quarter 2014 Water/Irrigation Division Capital Improvements Projects Automated Metering Infrastructure Improvements Internal discussions began in January 2010 to determine the future direction for meter reading. Inter -agency agreement approved by Council to coordinate efforts between Yakima, Selah and Nob Hill. Gray and Osborne (consultant) provided an initial report to outline current technologies and potential costs associated with the various options. A final summary report was also provided, outlining recommendations for Yakima, Selah and Nob Hill. Yakima worked with two vendors to install pilot systems (20 meters each near YVCC). A $5 million PWTF loan was approved. The Request for Proposal (RFP) process was completed and Badger Meter, Inc. was selected to provide the new system. Contracts were signed and approved in March, 2013, and construction nearly complete. Meters are continuing to be installed by City crews. Data collector installation is completed and approximately 18,000 of the nearly 19,000 meters have been installed. • Projected completion date: 2nd Quarter 2014 Water Treatment Plant Filter Backwash Lagoon Improvements The project will replace the unlined backwash recycle lagoon with new concrete lagoons, as well as upgrades to the WTP electrical service. Huibregtse, Louman Associates developed a preliminary design recommendation and report to submit to the Department of Health for approval. The project was submitted and selected for a 2011 Drinking Water State Revolving Fund (DWSRF) loan. Project design is complete. Bid opening for the project was July 17, 2013. A total of 9 bids were received, with a low bid of $3,548,390.87 being offered by POW Contracting, Inc. of Pasco, WA. Construction began in mid-October, 2013. The new lagoons are nearly completed, along with the new pump station building. The project is approximately 75% complete. • Projected completion date: 2nd Quarter 2014 6 SCADA System Upgrade The project will replace all of the components of the Water Treatment Plant's SCADA system, as well as all SCADA components at remotes sites such as wells and pump stations. The SCADA system provides automated controls and monitoring at the WTP and all major water facilities throughout the City. An RFQ was sent to 7 consultants to prepare a SOQ for the SCADA system design and construction management. Conley Engineering was the chosen consultant. Conley completed the design and specifications in December 2013. Bid opening for the project was December 20, 2013, with a bid of $222,892.00 being offered by Shannon Industrial Contractors, Inc. of Coeur d'Alene, ID. The engineer's estimate was $295,386.00. The portion of the project at the WTP is nearly completed. There are 10 remote sites to be upgraded, which will take place over the next 4 months. • Projected completion date: 3rd Quarter 2014 Water Treatment Plant Intake Improvements The project will evaluate the river and WTP intake structure for potential modifications and improvements to maintain the existing river location and flows to into the intake. We are currently working with Golder & Assoc. for Hydro -technical Engineering Support Services for design, permitting, funding, construction bid and inspection support of a new intake and flood plain stabilization structures. Ecology has issued a Watershed grant for $250,000 for this project. Conceptual design of new river structures was provided in December; final design is underway. • Projected completion date: 4th Quarter 2014 Fruitvale Canal Improvements This project will consolidate the river diversions for Fruitvale Canal with the existing diversions at the Nelson Dam. We are working directly with HDR/Fish Pro on fish screen/intake project options. We will continue to work with the Bureau of Reclamation, Washington Depart of Fish and Wildlife, Yakima County and North Yakima Conservation District on project design and options. A water right change in point of diversion has been submitter to Ecology and public notice has been completed. • Projected completion date: On-going Wastewater Division Capital Improvements Projects Industrial Wastewater Line Extension Wastewater division is actively pursuing the separation of high strength food process water (industrial waste) from the domestic sanitary sewer collection and treatment process. To serve existing and future food processing businesses the existing Industrial Waste line is being extended. Phase III to Noel Canning and Jewel Fruit. Huibregtse Louman Associates (HLA) will provide construction administration, design, and inspection. Construction began on March 2014 with Noel canning shut down to allow for installation of the private side service to the public main. POW was awarded the project and construction is underway. As part of constructing the new IW pipe, four sections of domestic sewer main will be re -lined to add structural stability to the deteriorated pipe. • Projected completion date: August 2014 Pipe Rehabilitation — General The wastewater division will be identifying pipeline segments that may be rehabilitated through manhole to manhole cured in place pipe repair. Eight lines have been identified to date as candidates. The project timing and size will be dependent on funding available for the project. Wastewater Division has identified pipelines for cured in place point repairs and has begun project specifications and descriptions for the pipe repairs. Final scope of the project will be determined after a cost review. • Projected completion date: on-going Wastewater Facility, Collection System Plan Update & initial Stormwater Comp Plan The last Wastewater Facility Plan was completed in February 2004. This project will update the current facility plan by providing current information on the existing wastewater facility and collection system infrastructure, regulatory requirements, future loadings, operation and maintenance, future capital improvements, rate structure and revenue forecasting. With the adoption of the new Storm water Regulations a comprehensive Storm water system plan is needed and will be implemented along with the Wastewater Facility and Collection system plan update. Akel Engineering Group, Inc. has completed capacity models for both systems and preparing a prioritized listing of projects based on existing flows and future capacity needs. Tom Coleman has updated the treatment plant facility plan with input from several on-going projects and studies along with the comprehensive sewer plan from Akel Engineering. Final edits are currently in progress. • Completion of final document for submission to ecology expected in 1st Quarter 2014 Levee set back Project, Greenway Trail Re-route and new Wastewater Outfall Staff continues to be involved in the Gap to Gap project for flood plain restoration which will include the Wastewater Treatment Plant to develop a new wastewater outfall. Yakima County selected a consulting team to conduct NEPA/SEPA review of overall Gap to Gap project. Location of new outfall strategy is being reviewed by Department of Ecology. Currently the old Wastewater spray field is being evaluated as a riparian outfall. An engineering report for alternatives like this will be developed and submitted to Ecology for approval. A consultant, Ridolfi Inc., is working on the design of the second phase of the project, which will involve developing a specific design of the outfall and an engineering report for Ecology review/approval. 8 • Phase I Project completion date: 4th Quarter FY2013. The State Salmon Recovery Funding Board has awarded the City a $275,400 grant for completion of Phase I of the project. This was increased to $375,400 when bids came in higher than anticipated by local Fish and Wildlife Recovery Board staff. • State Salmon Recovery funding board has awarded the project an additional $209,620 • Pre -design engineering report for project complete and 95% design complete. Permits for Army Corps of Engineers and State Department of Fish and Wildlife have been submitted. Construction contract awarded to KRCI of Wenatchee Washington. Excavation is complete, trail is complete and re -opened and planting is 90% complete. • Awarded more grants for future work. • $249,990 from Ecology for more habitat improvement and tree planting. • $56,000 from Washington Department of Fish and Wildlife for planting • $25,000 from US Fish and Wildlife for Planting • $1,300,000 from Yakima Basin Integrated Plan for moving the outfall* • "Pirate Plunder Adventure Race" Course is part of design criteria for new trail area • Constructing a noise barrier berm with on-site material to complement new Greenway Trail route and shelter site from freeway noise. • Projected: Phase II of project: tentatively planned for bid advertisement in early 2014 Industrial UASB Reactor and North End Power Distribution System Upgrade Project This project allows the City to treat high BOD industrial waste streams, like the waste stream from Del Monte, directly in the new UASB (Upflow Anaerobic Sludge Blanket) reactor opening up additional capacity for other domestic waste streams. The UASB reactor will also generate additional methane gas for use in a future sludge dryer project which is in the preliminary engineering phase. The project also includes upgrading the power distribution system for the North end of the treatment plant to improve reliability and future expandability. Much of this electrical gear in this area was installed in the 1960's and has reached the end of its useful life. A similar project for the South end of the plant was completed in 2009. A new Industrial Waste Pump Station was included as part of this project to complete this part of the project to make room for the new North End Power Distribution Building. Additionally, mechanical mixers in the existing aeration basins for enhanced biological phosphorus removal were installed with this contract. Project was awarded to Columbia Energy and Environmental Services. The project is complete with a few outstanding punch list items which are expected to be completed by April 30, 2014. • Projected completion date: April 30, 2014. 9 Fine Screen Project: Project will enable the plant to comply with the new biosolids regulations requiring a maximum of 3/8 aperture screens to reduce manufactured inerts in the biosolids generated at the facility. The project design was halted due to funding limitations. An alternative to meet the regulations is being pursued. This approach includes replacing the existing 1/2" aperture bars in the screens with 3/8" and rebuilding the drive units and washer compactors. Pricing from the original manufacturer has been received. One washer compactor has been rebuilt and parts for the second are being procured. Procurement of the replacement bars and installation of the bars is expected to be completed by December 2014. • Projected completion date: 4th Quarter 2014. Biosolids Dryer Project: Project will enable the plant to produce a marketable Class A exceptional quality biosolids for use as a fertilizer. The Pharmer/CDM-Smith engineering team was selected for the design of this process. Dryer equipment purchase bids were received in December 2013. Bids exceeded the budget for the dryer building, and other utility and infrastructure components. We are evaluating the project and reducing the scope to be within the approved budget. • Projected completion dates: Design 4th Quarter FY2014 Construction 4th Quarter 2015 Stormwater Capital Improvements Projects Yakima Underground Injection Control (UIC) / Water Quality Retrofits This project will design and construct prototype Underground Injection Control (UIC) retrofits to the City's' existing 814 UIC facilities. The Department of Ecology is providing a grant of $210,000 for the development of different methods to retrofit existing facilities & structures. OTAK, Inc. was selected as the lead consultant to assist the City with this project. A final technical memorandum has been written which proposes a method to assess relative risk to groundwater from stormwater UIC wells. The wells have been prioritized for retrofitting and City staff is now in the preliminary stages of designing a construction project that will use various retrofit methods. • Project completion date: 4th Quarter FY2014 PRIVATE PROJECTS (Current Listinji) Listing private developer projects shows the amount of private projects that are "on the books" and pending or under construction with some (not all shown) that go back several more years. These projects have all been approved since February 2008 and are either pending construction, under construction, started but not completed or recently completed. The projects, most recent at top, include: 10 Project Name Address Permit Type Status 2013 Washington Fruit 1007 River Rd. Site Improvements in construction Cub Crafters Airport Lane Site Improvements in construction Nob Hill Plaza Development 27th and Nob Hill Site Improvements in construction Denise Maxwell Sewer North 77th Ave Sewer in construction YVCC Palmer Replacement 16th and Nob Hill Site Improvements in construction Fieldstone Memory Care 40th and Englewood Site Improvements DONE Hollow Creek Place Hollow Creek Site Improvements apprvd for const. Sagebrush Apartments Beech Street Site Improvements in construction SS Stiener Watermain Washington Ave Water DONE Columbia Reach Grading 3107 River Road Site Improvements DONE Q Street Sewer and Water "Q" Street Sewer & Water apprvd for const. Lowes New Store Longfiber/V.Mall Blvd Site Improvements DONE Comp Mental Health -New Facilities 2nd and Walnut Site Improvements in construction McDonalds 1st and Yakima Ave Site Improvements DONE Pear Tree Place Phase 3 Powerhouse Site Improvements St. Lts. Left to do P3 Holdings Apartments 26th Ave Site Improvements in review Columbia Reach Water Extension 3107 River Road Water DONE 2012 Freemont Sewer Extension 811 Washington Sewer DONE Std Paint & Flooring - New Bldg 72nd Ave Site Improvements DONE Dolsen Storage Building 601 "R" Street Site Improvements apprvd for const. New Cot itercial Building 602 Nob Hill Site Improvements in review Yakima Air Park Airport Lane Site Improvements appvd 9/20/12 North Terminal Mixed Use Devel 24th and Washington Site Improvements in construction Davis High School 6th Avenue Site Improvements in construction West Valley Foursquare Church 8700 Nob Hill Site Improvements apprvd for const. New Clinic - Dr Emmett Nulph 215 S. 72nd ave Site Improvements DONE John I. Haas Technical Center 16th and River Road Site Improvements DONE Chestnut Townhomes 72nd and Chestnut Site Improvements Bonding rdwork Wash. Fruit - Cold Storage Add'n 1007 River Rd. Water appvd 6/19/12 YV Tech Phase 2 18th Street Site Improvements DONE Doug Lemon Development 12th & 13th Street Site Improvements St. Lts. Left to do Washington Heights Phase 3 78th Avenue Site Improvements in review 2011 Vaughn Bay Constr. - Apartments 1604 E Beech St Eng -Site -Imp in construction Vaughn Bay Constr. - Apartments 1402 E Beech St Eng -Site -Imp in construction Frosty Pack Warehouse 2820 River Rd Eng -Site -Imp ? Apple Valley Dental / Surgical 1009 S 44th Ave Eng -Site -Imp ? Goodspeed, Brad 2804 W Wash. Ave Eng -Site -Imp St. Lt. Left to do Central Valley Bank Addition 2205 S 1st St Eng -Storm Dmg ? Hops Extract -New Building 100 Block W. Lincoln Eng -Site -Imp pending Masonic Temple 16 N 7th Ave Eng -Site -Imp ? Eisenhower High School 611 S 44th Ave Eng -Site -Imp in construction Yakima Air Terminal 2401 S 21st Ave # 16 Eng -Storm Dmg pending Townhouse Apartments; 16th Ave 1603 Perry St Eng -Site -Imp in construction 11 AFFIRMATIVE ACTION GOALS & W/M/DBE PARTICIPATION W/M/DBE utilization has been included in the past but is not included with this report. The Engineering Division continues to request apparent low bidders of public works contracts to document their efforts to achieve the City of Yakima's goal of 10% MBE, WBE or DBE participation goal prior to contract award. However, changes in state law due to the passage of Initiative 200 prohibit certain practices by contracting agencies (i.e. the City) for the award of public works projects such as requiring W/M/DBE subcontracting. While some contractors have voluntarily reported such information in the past, we have not received any such reporting last year. Although we do not receive such information voluntarily, the City must still meet certain of these federal requirements and each contractor must comply with the Standard Specifications that are included on each City Public Works Contract. The City is responsible to: • Conduct pre -construction conferences during which EEO and City policies are discussed with the contractor. • Monitor on-site compliance with the EEO and City policies. • Ensure our contractors locate, qualify, and increase the skills of minority groups, women employees, and applicants for employment as required by City policies. • Ensure the preparation of required EEO and related reports. 12 Proj Type Proj. No. Lead Division Project Name/Location Description of Work Project Lead Impacted Divisions Constrctn. Start Date Status/Schedule Notes 4/9/14 1 CIP 1818 Phase III Engineering R/R Grade Separation, Phase 111; Martin Luther King Jr. Blvd., ("B" St.) 1st St. to 1st Ave. Underpass on MLK Jr. Blvd. under railroad, Front Street over MLK Jr. Blvd. Brett Sheffield Engineering, Water/Irrigation, Wastewater, PW, Streets, IS March 4, 2013 Contractor: Mowat Const., Woodinville, WA Construction initiated 3/11/13; Work is 77% complete Entire bottom seal complete; Front St. Bridge & remaining secant pile walls are under way. Project work will extend into late 2014. 2 CIP 2311 Engineering 64th Avenue; Nob Hill Blvd. to Tieton Drive Roadway, Sidewalk (Pathway), Storm Drainage, Street Lighting Randy Tabert Engineering, Streets 3/03/2014 Funding is: $900K of STP & $200K of Wal-Mart mitigation; Granite Construction is low bidder Irrigation is complete; working on street lights, curb, gutter, sidewalk then paving later in May 3 CIP 2337 Special Projects Engineering) (&9� 9) Cascade Millsite Parkway New rights of way, public utilities, roads, lighting, roundabouts, sidewalks, pathway, infrastructure Joan Davenport Engineering, Streets & Traffic Eng., Water/Irrigation, ation, 9 Wastewater/Storm 2015 Roundabout at Fair Ave / Lincoln / MLK will be first project - TIBgrant pendingfor p l A proposed a north -south blvd style street includes 3 roundabouts. 2013 TIB application was unsuccessful 1st roundabout to replace 10th St. / Lincoln Ave. & p MLK Jr. Blvd intersection 4 CIP 2355 Engineering & Pro, Projects) (SpecialEnvironmental Sawmill Area - Phase 1: Entire Site Phase 2: Southern portion Brett Sheffield / Joan Daven port Engineering, Streets & Traffic Eng., Water/Irrigation, ationg Wastewater/Storm 2013 Consultant under contract; Landau Assoc's have been retained to provide environmental and geotechnical services for the Cascade Mill Site, excluding the landfill area Final Phase 1 and Phase 2 ESA complete. Phase 3 ESA to be scoped in 2014. 5 CIP 2336 Special Projects (& Engineering) 9 9) East-West Connector; "H" St. alignment from 1st St. to Terrace Heights; 9 Through Yakima Resources prop. New rights of way, public utilities, roads, lighting, signal(s),sidewalks, pathway, p Y. infrastructure Joan Davenport Engineering, Streets & Traffic Eng., Water/Irrigation, ation, 9 Wastewater/Storm 2017? NEPA review underway. Yakima Countyis project lead p l Consultant (H.W. Lochner) hired for creation of design alternatives and NEPA review (environmental) 6 CIP 2356 Special Projects (& Engineering) Interchange Justification Report (IJR) for modification of 1-82 and Yakima Avenue Working with WSDOT for modification of Yakima Ave / 1-82 Interchange Joan Davenport Engineering, Streets &Traffic Eng., tbd NEPA is currently underway for the IJR Consultants are working on preliminary design and alternatives. Public review process began with information meeting on 10-24-13. 7 CIP 2340 Special Projects (& Engineering) North 1st Street Corridor Revitalization; Phase 1: 1-82 to 'N' St. Design and construction of sidewalk, landscape and utility upgrades Joan Davenport Engineering, Streets & Traffic Eng., Water/Irrigation, Wastewater/Storm 2015 $250,000 of STP funds awarded for design of 1st Street from "N" Street to 1-82. $2.718M awarded for construction Project design to be complete 1st Q 2014. Civil plans and specifications to follow. DST discussion re: utility upgrades on 11/19/13; We're applying for a TIGER Grant; MLK to SR -12 8 CIP 2343 Engineering City-wide Safety Improvements (various locations) Upgrade signal heads from 8" diam. to 12" diam. Build ADA ramps on 16th Ave. between Nob Hill & River Rd. Randy Tabert Engineering, Traffic May 2014 Bids openend 3/27/14. Low bidder is Transportation Systems, Sumner, WA Work will start in May 9 CIP 2379 NEW!!! Engineering N. 40th Avenue, Summitview to Fruitvale Blvd. 16th Avenue, Nob Hill Blvd. to Englewood N. 16th Avenue, River Road to SR -12 W. Walnut Street, 1st Street to 7th Avenue S. 24th Avenue, Washington Avenue to Nob Hill Blvd. Tieton Drive, 16th to 32nd Avenues Tieton Drive, 40th to 48th Avenues Washington Ave., 1st Street to 16th Avenue Summitview, 56th to 62nd Avenues S. 3rd Avenue, Walnut to "D" Streets Lincoln Avenue, 10th Street to 16th Avenue MLK Jr. Blvd., 10th Street to 7th Avenue W. Nob Hill Blvd., 32nd to 48th Avenues Mead Avenue, 10th Street to 10th Avenue W. Yakima Avenue, 12th to 16th Avenues W. Lincoln Avenue, 24th to 32nd Avenues 6th Street, Pacific Avenue to "H" Street S. 44th Avenue, Nob Hill Blvd. to Tieton Drive S. 5th Avenue, Walnut Street to Yakima Avenue "D" Street, 1st Street to 5th Avenue 4th Avenue, Division Street to MLK Jr. Blvd. S. 19th Avenue , Chestnut Avenue to Tieton Drive Bob Desgrosellier These are all Grind and Overlay, pavement restoration projects; limits as shown Engineering, Streets, Traffic Eng., Water/Irrigation, Wastewater, Storm 5/1/14 Low bidder on all 5 proects is Columbia Asphalt and Gravel, Yakima. Entire project list adds up to 92 lane miles. Majority of work is specified for nighttime to alleviate most conflicts with vehicles. PreCon set for 5/7/14 Physical work may start May 12, 2014 10 CIP 2282 Engineering Tieton Drive and 64th Avenue Intersection Reconstruct intersection, widen for additional lane on Tieton Drive; add signal Randy Tabert Engineering, Streets 2015 Funded by TIB grant for 784K plus $200K of Wal-Mart mitigation; Design at 80%. R/way needs to be purchased to widen Tieton Dr. for adding a Left Turn Lane & new signal 11 CIP 2344 Engineering Lincoln Ave Corridor Safety - N. 32nd Ave. to N. 5th Ave. Sidewalk, ADA Ramps, overhead school zone crossing flashers & other safety imp's Brett Sheffield Engineering, Traffic 2015 Design at 20% RMlay needs to be acquired; ad / construct 2015 o Funded by a 100% Federal Grant 12 CIP 2357 Engineering 1st / Main & Nob Hill Corridor Safety Improvement Project Median barriers, signal upgrades; sidewalk & ADA ramps at various locations Brett Sheffield Randy Tabert Engineering, Traffic Late 2014 Grant for work in Yakima and Union Gap 13 CIP ???? NEW!!! Engineering Paving Gravel Alleys: Area bound by: Fruitvale to Lincoln & 5th to 6th Avenues Grade and pave existing gravel alleys Brett Sheffield Engineering, Streets, Water/Irrigation, Wastewater 2015 Design to start in spring 2014 Funded by Congestion Mitigation & Air Quality funding (CMAQ) 14 CIP 2380 NEW!!! Engineering West Valley Middle School Vicintiy Improvements Project Construct Traffic Signal on 72nd Ave. & Mead; Sidewalk on south side of Zier Road, 72nd to 75th Ave Brett Sheffield Engineering, Streets, Traffic Eng., Wastewater ? Late 2014? (2015?) Design to start in spring 2014 Safe Routes to School funding ($544,000 grant) Project total: $604,000 Proj Type Proj. No. Lead Division Project Name/Location Description of Work Project Lead Impacted Divisions Constrctn. Start Date Status/Schedule Notes 4/9/14 15 CIP ???? NEW!!! Engineering Fisher Golf Course Parking Lot S. 40th Avenue near Arlington Rebuild and expand parking lot Randy Tabert / Ken Wilkinson Engineering, Parks 2014 This is in Parks Dept. budget for this year On hold - waiting for realignment of priorities Expand & rebuild existing parking lot from 12 stalls to approx. 24 parking stalls 16 CIP ???? NEW!!! Engineering Powerhouse Road Sidewalk; 800' west of Pecks Canyon Road to Cowiche Canyon Road Construct curb & gutter, sidewalk and storm drainage Brett Sheffield Engineering, Streets, Storm 2015 Desgin to start later in 2014 Funded by $275,000 grant from Transportation Alternatives Program (TAP) 17 CIP New # Engineering YVT System Restoration ( 6th Ave. vicinity Yakima Ave. ) Remove and repair approx. 100 feet of trolley track Bob Desgrosellier Engineering Fall 2014 Prior CarBarn and other work was completed, leaving approx. $60K for track repair We have to amend existing federal submittals to include the proposed work within federal regulations 18 CIP 2143 Engineering E. Nob Hill Blvd & Fair Avenue, Intersection Improvements Widen intersection all 4 legs; purchase r/way; new signal Brett Sheffield / (Randy Tabert) Engineering, Traffic, Wastewater, Water/Irrigation Design only Design only at this time beginning 6/2008; Search for funding on-going Current funding for design only; (Drainage system for this intersection is included.) We applied for STP funding 19 CIP ???? NEW!!! Engineering Kissel Park Tennis Court Resurfacing Resurfacing Tennis Courts Brett Sheffield / Ken Wilkinson Engineering, Parks ? ? ? Details forthcoming Parks discussed with Engineering. Will pursue design/construction after further direction 20 CIP 2264 Phase 11 Wastewater Speedway/Race street Interceptor Wastewater/Collection Sys Engineering/ Shelley Willson Wastewater 1/1/13 Phase 11 of the Project has been completed. Further analysis of data is being reviewed for the best operational fix. Some backups occur where pipe enters the 48" main line to the WWTP. Solutions and mitigation measures are being evaluated. Implemented odor control measures & performed a survey of the inverts of the pipes & manholes. 21 CIP 1911 Wastewater Sewer Collection and storm water comprehensive plan update and development Wastewater/Collection Sys Strom Water System Shelley Willson / Ryan Anderson Wastewater/ Akel Eng 10/1/2010 Received 3rd draft for Comprehensive Sewer Plan and 3rd draft for stormwater master plan and narrative for Comprehensive plan. final drafts under review 22 CIP 2268 Wastewater WW Facility plan update Wastewater/Facility Ryan Anderson uudmewdier/L.oierndr I Engineering/Conley Engineering/Pharmer Gnnineerinn/Rrnnin NA Making final edits. Due date April 15, 2014 23 CIP 2306 2305 Wastewater Power Distribution & Industrial Waste Digester (UASB Reactor System) Wastewater/Facility Dean Smith Wastewater/ Pharmer Engineering Construction began in July 2012 Contract is substantially complete. Working on punchlist. Expect closeout by May 1st. 24 CIP Wastewater Riparian Outfall Project 1 Wastewater/Facility Ryan Anderson Wastewater 7/1/13 KRCI has completed phase 1 with exception of planing which will occur in October 2013. Will restore habitat, re-route Greenway Trail as part of "extended mixing zone" for alternative outfall. 25 CIP 2267 Wastewater Riparian Outfall Project 2 Wastewater/Facility Ryan Anderson Wastewater 2014 Funding is awarded to City for construction. Design is complete, engineering report conditionally approved by Ecology, legal review of construction specifications comple and we are ready to ask for bids once City Engineering completes review will be alternative discharge plan when Gap to Gap Levy Setback goes through or when Gap to Gap levy failure occurs. Also will support compliance with future TMDL requirements 26 CIP Wastewater Pipe rehabilitation/various pipe re-line Marc Cawley/ Shelly Willson Wastewater/Water 2014 March Identifying and prioritizing pipe segments for 2014 budget. Bid awarded to POW Construction. Contracts have been delivered to Legal and City Managers office. Notifications have been sent to all adjacent property owners. 27 CIP 2327 Wastewater Industial Waste extension "Noel / Jewel" Industrial Wastewater Collection Sys. Marc Cawley / Shelly Willson Wastewater / Water / Stormwater / Streets / Engineering March 12-2014 Bid on 1/2/14; construction started 3/12/14; completion to be in May 2014. Bid awarded to POW Construction. Notifications have been sent to all adjacent property owners. under construction 28 CIP Wastewater Headworks Fine Screens Wastewater/Facility Dean Smith Wastewater Late 2013 or early 2014 Reduced project is underway to replace 1/2" bars with 3/8" and rebuild washer compactors. Expect completion in July of 2014. Received quote for replacement bars. An extension letter has been sent to DOE to meet the 3/8" maximum screen aperture requirement by December 2014. 29 CIP New Wastewater Biosolids Dryer Wastewater/Facility Dean Smith Wastewater 2015 Reevaluating scope to meet budget constraints. Received bids on December 9th. Came in higher than budget. Evaluating alternatives. Will re-bid reduced scope project. 30 CIP 2010 Water/Irrigation Fruitvale Canal Diversion Improvements Move Point of Diversion Dave Brown / Mike Shane / Alvie Maxey Water/Irrigation, USBR, Yakima County, WDFW, North Yakima Conservation District 2011/2014 USBR designing improvements at Nelson Dam fish screen for additional water. USBR project out of funding. City of Yakima working directly with HDR on fish screen/intake project options. Assessment report provided by HDR June 6, 2013 with design alternatives and recommendations. HDR finalized design report with options. Meeting with stakeholders held on Sept. 23, 2013 to discuss options. Final report completed by HDR report based on stakeholder comments. Applied to DOE for point of diversion change to Nelson Dam. Point of Diversion change on public notice 7/13 and 7/20/2012 31 CIP 2288 Water/Irrigation Misc. waterline improvements. Water facilities impacted by other improvements - MLK Underpass, N. 1st St., Grind and Overlay, Misc. sidewalk & transportation projects. Mike Shane / Emilio Lopez Water/Irrigation, Streets, Eng. 2013/14 On-going coordination with Engineering projects, sidewalk projects and misc. Transportation projects. Majority of work to be completed by in-house staff. Proj Type Proj. No. Lead Division Project Name/Location Description of Work Project Lead Impacted Divisions Constrctn. Start Date Status/Schedule Notes 4/9/14 32 CIP 2259 Water/Irrigation Recycle lagoons and new electrical service at the WTP Design and construction of new recycle lagoons; new 800 amp electrical service; new generator Dave Brown, Mike Shane, Jeff Bond Water/Irrigation 2013/14 HLA completed report for City and DOH on recommendations for design. Design Services agreement for lagoon project signed with HLA. Design is 100% (6/1/13). Section 106 in progress, SEPA in progress. 1st advertisement June 17, 2013. Bid Opening July 17, 2013. Preconstruction meeting scheduled for Oct. 3, 2013. Construction started Oct. 15th. Concrete lagoons nearly complete. Pump station construction progressing. Project 75% complete 2011 DWSRF Loan applied for and project chosen for funding. Loan approved. POW Contracting, Inc. low bidder at $3,548,390.87. 33 CIP 2259 Water/Irrigation WTP Telemetry System Upgrade Design and installation of new telemetry system at WTP and all remote sites Dave Brown, Mike Shane, Jeff Bond Water/Irrigation 2013/2014 6/10/13 - Sent our RFQ to 7 consultants to prepare SOQ for telemetry system design and construction management. Conley Engineering chosen for telemetry system design and construction services. Conley completed design Dec. 2013. Bid opening on Dec. 20, 2013. Single bidder was Shannon Industrial Inc. Project awarded and contracts signed 2/4/14. Preconstrution meeting 2/18/14. Project underway and being coordinated with WTP lagoon project. Engineer's Estimate - $295,386.00, Bid - $222,892.00 34 CIP 2261 Water/Irrigation Automated Meter Reading Installation of Automated Metering Infrastructure for domestic water services Dave Brown, Mike Shane , Emilio Lopez, James Dean Water/Irrigation, Wastewater, Utility Billing 2013 Internal discussion began in January 2010 to determine next course of action. G & 0 (consultant) provided study and recommendation for Yakima, Selah & Nob Hill. Report provided recommendations specific to each agency. Installed two 20 unit pilot tests near WCC. 12/12 -Reviewed 5 proposals. Badger Meter Inc. chosen and project to began June 2013. All Gateway data collectors and approx. 17,000 meters currently installed. 360 day contract. Project 95% complete. Inter -agency agreement approved by Council, Selah and Nob Hill. Funding identified in 2011 budget to begin project. $5M PWTF loan approved, funds available June 2012. Contract signed with Badger Meter 3/5/13 ($4.950,696.86). 35 CIP 2335 Water/Irrigation Naches River WTP Intake Improvements Modification of river intake, possible improvements in river to maintain existing location and flows to intake Dave Brown, Jeff Bond, Mike Shane Water/Irrigation 2013 Currently working with Golder & Assoc. for Hydrotechnical Engineering Support Services for final design, permitting, funding, and constmction bid and inspection support of a new intake and floodplain stabilization structures. Potholing in area around river for design purposes completed mid- July, 2013. A conceptual design for new river structures was provided in December, 2013 and final design is underway. Ecology has issued a Watershed grant for $250,000 for this project. 37 37 CIP 2323 Water/Irrigation West Yakima Irrigation System Ph. 2 Irrigation System Replacement in various neighborhoods Project areas include areas bounded by Summitview Ave., W. Lincoln Ave., N. 21st Ave. and N. 38th Ave. Dave Brown, Mike Shane 10/1/2014 Sent out RFP for consultant services 2/14. Two SOQ's received and evaluated. Negotiating contract with HLA for design and constmction services. Consultant agreement scheduled for Council approval 4/15/14