Loading...
HomeMy WebLinkAboutR-2009-101 Six-Year TIP for 2010 to 2015; Metropolitan Transportation Plan Amendment; Yakima UAC Plan - Set Hearing DateRESOLUTION NO. R-2009-101 A RESOLUTION setting the time and place for a hearing on July 21, 2009 in the City of Yakima Council Chambers to review and adopt the Six-year Transportation Improvement Program for the period of 2010 to 2015. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for the construction of streets and arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by State RCW 35.77.010 and applicable federal law; and WHEREAS, a public hearing must be held on said program before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That said program shall be presented for hearing and determination on Tuesday, July 21, 2009, at the hour of 7:00 p.m. in the Council Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may be heard, and that notice of such hearing be given as approved by law. ADOPTED BY THE CITY COUNCIL this 7th day of July, 2 9. A - ..vid Edler, Mayo ATTEST: 9. Appendices A. Six Year Form Instructions Heading Agency County No. City No. MPO/RTPO Hearing Date Adoption Date Resolution No. Amendment Date Column Number Enter name of the sponsoring agency. Enter the assigned number (see LAG Appendix 21.44). Enter the assigned number (see LAG Appendix 21.45). Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Enter the date of the public hearing. Enter the date this program was adopted by council or commission. Enter Legislative Authority resolution number (if applicable.) Enter the date this program was amended by council or commission. 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be one approved by FHWA.) Rural (< 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 Major Collector 08 - Minor Collector 09 - Local Access Description 00 - No Classification Urban (> 5000 pop.) 11 - Interstate 12 - Freeways & Expressways 14 - Other Principal Arterials 16 - Minor Arterial 17 - Collector 19 - Local Access 2. Priority Numbers. Enter local agency number identifying agency project priority (optional). 3. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work to be Completed. 4. Improvement Type Codes. Enter the appropriate federal code number. 01 - New construction on new alignment 02 - Relocation 03 - Reconstruction 04 - Major Widening 05 - Minor Widening 06 - Other Enhancements Description 07 - Resurfacing 08 - New Bridge Construction 09 - Bridge Replacement 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety/Traffic Operation/TSM 13 - Environmentally Related 26 14 - Bridge Program -Special 21 - Transit Capital Project 22 - Transit Operational Project 23 - Transit Planning 24 - Transit Training/Admin. 31 - Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project or phase that describes the current status. S - Project is `selected' by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to be relocated or are impacted by the construction project. C - CableTV- G - Gas 0 - Other P - Power S - Sewer (other than agency -owned) T - Telephone W - Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering, including Design (or Planning) RW - Right of Way or land acquisition CN - Construction only (or transit planning or equipment purchase) ALL All Phases: from Preliminary Engineering through Construction (Use only in Years 4, 5, & 6) 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. BIA BR CDBG CMAQ DEMO Discretionary DOD IC IM NHS 3037 - Bureau of Indian Affairs - Bridge Replacement or Rehab. - Community Development Block Grant (HUD) - Congestion Mitigation Air Quality - ISTEA Demo Project (Selected) - Ferry Boat Discretionary, Public Lands Highways, or Scenic Byways, etc. - Dept. of Defense - Interstate Construction - Interstate Maintenance - National Highway System - FTA Job Access/Reverse Commute 27 FTA Discretionary for Capital Expenditures 5307 - FTA Urban Areas 5309(Bus) - Bus 5309(FG) - Fixed Guideways 5309(NS) - New Starts 5310 - FTA Elderly/Disabled 5311 - FTA Rural Areas REV - Rural Economic Vitality Program STP(C) - STP Statewide Competitive Program STP(E) - STP Transportation Enhancements STP(S) - STP Safety Including Hazard and RR STP(R) - STP Rural Regionally Selected STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. CAPP - County Arterial Preservation Program CHAP - City Hardship Assistance Program TPP - Transportation Partnership Program AIP - Urban Arterial Program (formerly Arterial Improvement Program) PSMP - Pedestrian Safety & Mobility Program PTSP - Public Transportation Systems Program PWTF - Public Works Trust Fund RAP - Rural Arterial Program SCP - Small City Program SCPP - Small City Pavement Program FMSIB - Freight Mobility Strategic Investment Board WSDOT - WSDOT provided funding OTHER - Any other unlisted state fund codes 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (For Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter R/W Certification Date, if known. (This is "required" for Federally funded projects.) 28 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From. 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: o,, ra G v �, _o E fi Z Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done a� E dr aF. E . m in rn J 1°... I°- 2 0 . Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only e, s a ° ; Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RAN Required Date (MM Yl� Federal: Fund ' Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 - - Yakima Railroad Grade Separations - Phase 2 •G Lincoln Ave. from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructon, including realignment of Front Street. 01 06 07 08 . S 0.20 T O W S CN CN 1/1/2010 1/1/2010 STP(U) DEMO- 2668 8270 FMSIB -AIP • 2200 3000 2000 6868 11270 6868 11270 EA Yes 9/1/09 Totals 10,938 5200 • 2000 18138 18138 14 2 Yakima Railroad Grade Separations- Phase 3 Martin Luther King, Jr. Blvd - from: N. 1stSreet to: N. 1st Ave Construct Grade Separation and adjacent roadway reconstruction including Front Street - 01 06 07 08 P 0.2 T G • 0 CN CN 8/1/2010 8/1/2010 STP(U) ARRA- 650 8000 FMSIB AIP 2000 1500 3768 - 6418 9500 6418 9500 EA Yes 9/1/2009 Totals 8,650 3500 3768 15918 15918 00 3 Transit Operating Expenditures Various fixed rates and locations from: N/A to: N/A Annual operating assistance from the FTA in support of our transit system; fixed conte, paratransit Dial -A -Ride and vanpool program 12 22 23 24 31 S N/A ALL 1/1/2010 5307 1601 1601 3202 3202 CE• - No Totals . 1,601 1601 3202 3202 00 4 YVT Trolley Barn/Powerhouse Rehabilitation S 3rd Ave from: to: - Minor car barn and powerhouse restoration Including property purchase . 03 S N/A C G .O P S T W CN 1/1/2010 • STP(E) • 255 . 2551 _ 255' CE Yes 06/01/07 Totals 255 255 255 Report Date: June 30, 2009 Page 1 v. 5.7 - Supersedes previous editions �'Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done . Improvement Type(s) Status Total Length. Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Start (mm/ddlyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total. Funds Envir. Type FVW Required Date (MM/1 y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 William O. Douglas Trail 6th Ave Pathway & Bridge Decking from: to: Build pathway and install pathway decking on Naches River bridge with' partner William O. Douglas Trail Fundation 32 08 06 S 1.0 P S W T CN 1/1/2010 STP(E) 525 525 525 CE No Totals 525 525 525 00 6 William 0. Douglas Heritage Trails Bridge Restoration & Trailhead • from: to: Trailhead restoration, right of way acquisition partner with the William O. Douglas Foundation, including restoration of bridge , cleaning, rust removal and painting 32 13 10 S N/A O P S T W RW CN 1/1/2010 1/1/2010 STP(E) STP(E) 150 285 150 285 150 285 CE• Yes 6/01 /09 Totals 435 . 435 435 00 7 StreetAssetAmenities (Transit) Route Maintenance, Repair and Improvements from: to: On going improvements to bus benches, shelters and signage infrastructure 22 31 S N/A ALL 1/1/2010 1 50 SOI 501 CE No Totals 50 50 50 00 8 Expanded Transit Service to Terrace Heights New University & Retail Links - from: to: Extension of fixed route bus service only into the Terrace Heights area of Yakima County 22 S N/A ALL 1/1/2010 CMAQ 33 7 401 40 _ No Totals 33 7 40 40 Report Date: June 30, 2009 Page 2 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/Yl) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 .13 14 15 16 17 18 19 20 21 14 : 9 Nob Hill Blvd Nob Hill Blvd from: 49th Ave to: 64th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P 77 P C G Q S T W RW CN 1/1/2010 6/1/2010 STP(U) 1000 TPP 1500 200 200 200 2700 200 2700 EA Yes 6/01/10 Totals 1,000 1500 400 2900 2900 14 10 S 16th Ave & W Washington Ave Signal & Intersection. S 16th Ave from: S 16th Ave to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project 12 05 03 S N/A P T RW CN 4/1/2010 6/1/2009 AIP AIP 84 880 36 383 120 1263I. 40 1263 80 CE Yes 4/1/2010 Totals 964 419 1383 ' 1303 - 80 16 11 66th Ave. & Summitview Intersection N. 66th Avenue & Summitview from: N. 66th Ave. to: Summitview Ave. Widen for left turn lanes, intersection improvements, curb, gutter, handicap ramps and lighting 05 12 S .20 G o P S T W C CN 4/1/20101 600 600 6001 CE Yes 4/1/2010 ' Totals 600 600 600 00 12 Coolidge Road Widening and Paving. from: Both AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 05 06 S 50 S W T T CN 1/1/2010 CMAQ 540 214 .- 7541. 754 I L CE Yes 9/1/2009 Totals 540 214 754 754 Report Date: June 30, 2009 Page 3 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7-21-2009 Adoption Date: Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title(Local D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds R/W Required Date (MI yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th sin Envir. Type 2 3 4 5 6 7 8 9 . 10 11 12 13 14 15 16 17 18 19 20 21 00 13 Acquisition of new Dial -A -Ride paratransit vehicles from: to: Purchase new vehicles to replace older, less reliable units 21 S N/A ALL 1/15/2010 5310 96 84 180 180 CE - No Totals 96 84 180 180 14 14 E. Lincoln & 10th Street Roundabout from: E. Lincoln to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, & street lighting 03 05 06 P NIA PE RW CN 1/1/2010 1/1/2011 6/1/2011 STP(U) STP(U) STP(U) 173 433 1125 27 67 175 200 500 1300 200 500 1300 Yes 6/1/2011 Totals 1,731 269 • 2000 200 1800 12 15 S.R.12 & 16th Avenue Interchange Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout - 03 06- P N/A o ALL 1/1/2010 1 STP(U) 865 1 135 10001 10001 CE No Totals " 865 135 1000 1000 11 16 1-82 & Lincoln Avenue Interchange 1-82 Interchange from: E. "G" Street to: 1-82 Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to E. "0" Street. 01 p N/A O P G ALL 1/1/2011 1 STP(U) 1 865 1 1 135 1 10001 11 EA Yes 6/2011 Totals 865 135 1000 Report Date: June 30, 2009 Page 4 v. 5.7 - Supersedes previous editions Washington State Department of Transportation 1,0 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: o a c U 'o s a, 3 Z Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - MP or Road g g Ending F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (L ocal Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (Ml Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 17 E. Yakima Avenue & Fair Avenue Signali>ation from: E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 P N/A P W T S O ALL 1/1/2010 STP(U) 865 135 1000 1000 CE No Totals 865 135 1000 1000 00 18 Fixed route Bus Services to Moxee along SR 24 Corridor SR 24 Hwy Corridor/Park & Ride Lots from: to: JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park & Rlde lots along SR 24. 22 $ ALL 1/2/2010 5316 1311 131 1 2621 131 131 CE No . Totals 131 131 262 131 131. 14 19 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd • . from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 P N/A 0 P T W RW CN 1/1/2011 4/1/2011 STP(U) STP(U) 173 865 27 135 2U0 1000 200 1000 CEYes 4/1/2001 Totals 1,038 162 1200 200 '1000 16 20 S 3rd Ave & W Washington Ave Signal S3rdAve from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P .. N/A T PE CN' 4/1/2010 6/1/2010- 13 214 13 13 2141 214 CE No Totals 227 227 - 227 Report Date: June 30, 2009 Page 5 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Ti 4 ro 3 U Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number' E. Beginning MP or Road - EndingMP or Road F. Describe Work to be Done Improvement Type(s) Status • Total Length • Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule • (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir_ Type RNV Required Date ( Date Federal Fund • Code Federal Cost byFund • Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 . 10 11 12 13 14 .15 16 17 18 19 20 21 14 21 4579N/A S 1st St. - E. Washington Ave. Intersection Improvement S l st St. from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P P W S To PE 6/1/2010 STP(U) 252 38 290 290 EA Yes 01/01/11 Totals 252 38 290 290 17 22 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 P T W S O ALL 1 4/1/2011 1 STP 22681 1 1 307 25751 525 2050 EA Yes 4/1/2014 Totals 2,268 307 2575 - 525 2050 14 23 South 72nd Ave & Mead Ave Intersection South 72nd Ave • - from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 P N/A 0 P S T W PE CN 1/1/2011 6/1/2011 STP(U) • STP(U) 51 383 8 61 59 4441 59 444 CE. Yes 6/10/2010 Totals 434 69 503 503 16 24 4562N/A Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P P W T O S. ALL 4/4/2011 STP(U) 378 WSDOT 378 756 I- 756 CE Yes 4/1/2014 Totals 378 378 756 756 Report Date: June 30, 2009 Page 6 v. 53 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MSVY1) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 25 E. 14" St. Extension E. "H" St. from: 1st St. to: Yakima River Construct road including water, sewer, curb, gutter and sidewalk for future development. 01 08 P 11 0 S T W PE RW CN 1/1/2011 1/1/2013 6/1/2014 STP(U) STP(U) STP(U) 2180 2180 1199 340 340 1871 2520 2520 3070 2520 2520 3070 CE . Yes 1/1/2014 _ Totals 5,559 2551 8110 2520 5590 17 26 N. 10th St Extension N. 10th St. from: R St. to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future development.. 01 06 P 1.3 O S T W PE RW CN 1/1/2012 1/1/2013 6/1/2013 STP(C) STP(U) STP(U) 700 5500 7900 108 850 972 808 6350 8872 808 6350 8872 CE Yes 1/1/2013 Totals 14,100 1930 1603Q 808 15222 00 27 West Side Transit Center Acquire Property to Expand Operations from: to: Locate and acquire property for the placement of a West Side Transit Center Operation - 23 S N/A PE 1/1/2010 OIHEIi 50 501 50 - Totals 50 50 50 - 17 28 Yakima Downtown Future Initiatives, Phase 4 from: Between 1st Street to: and 8th Street On streets to be selected but contiguous to DFI's 1, 2 & 3; Historic lighting sidewalk mod's & more. - 03 05 06 S .30 P T PE CN 1/1/2010 6/1/2010 OTHER OTHER 1000 75 75 1000 75 1000 CE No Totals 1000 75 1075 1075 Report Date: June 30, 2009 Page 7 v. 5.7 - Supersedes previous editions Washington State Department of Transportation 7,0 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Utility Codes Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M >) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 29 Yakima Downtown Future Initiatives, Phase 5 from: 1st Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. 06 12 P .60 PE P CN W S T O - 5/1/2009 4/1/2010 OTHER OTHER - 400 6000 400 6000 400 6000 - CE No Totals 6400 6400 6400 00 30 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 1/1/2010 4/1/2011 4/1/2011 STIP (S) STP(S) STIP (S) 60 180 360 AIP 240 60 120 420 360. 120 420 360 CE No Totals 600 240 60 900 120 780 00 31 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 P1 N/A wCN s 6/1/2010 STP(U) 228 32 260 260 EA No Totals 228 32 260 260 19 32 Lonofiber Rd & Washington Ave Intersection from: to: New intersection construction and reconstruction, 3 -lane and 5 -lane w/tum, curb, gutter, sidewalks. 03 05 06 P N/A P PE CN S T T O 1/1/2011 3/1/2012 STP(U) STP(U) 100 700 - 14 95 114 795 114 _ 795 CE Yes 3/1/2012 Totals 800 109 909 114 795 Report Date: June 30, 2009 Page 8 v. 5.7 - Supersedes previous editions 71 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: - YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) ` Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM Y1� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P .1 C S W T CN 4/1/2011 STP(U) 240 42 282 - 282 CE Yes 01/01/07 Totals 240 - 42 282 282 17 34 Zier Rd-- S 75th Ave to S 72nd Ave Zier RdT from:S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 C S P PE CN 1/1/2010 6/1/2011 . STP(E) STP(E) 22 75 7 20 29 95 29 95 1 C E Yes 6/1/2011 Totals 97 27 124 124 00 35 Gravel Road B.S.T.- Various Areas from: City Wide to: p7. p N/A S PE CN 1/1/2011 6/1/2011 50 240 50 240 50 240 CE No Totals 290 290 290 16 36 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P 0 S C CN 1 10/1/2013 STP(S) 504 74 5781 I 578 CE Yes 10/1 /2013 Totals 504 74 578 578 Report Date: June 30, 2009 Page 9 v. 5.7 - Supersedes previous editions AdIN �"Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road g g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM Y1� Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 • 12 13 14 15 16 17 18 19 20 21 14 37 12 P N/A P PE RW 1/1/2013 6/1/2013 STP(S) STP(S) 25 25 4 4. 29 29 29 29 CE S 48th Ave & Summitview Ave Signalization T CN 8/1/2014 STP(S) 554. 81 635 635 Yes S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 8/1/2013 Totals 604 89 693 693 14 38 01 P .5 W PE RW 1/1/2012 1/1/2013 STP(E) STP(E) 424 1047 67 163 491 1210 491 1210 CE W Lincoln Ave & 'B' St Realignment 12 3 CN 1/1/2014 STP(E) 1801 281 2082 2082 Yes W Lincoln Ave from: W 5th Ave to: Custer St P Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 0 G 1/1/2014 C Totals - 3,272 511 3783 - 491 3292 16 39 12 P N/A W PE CN 1/1/2010 1/1/2010 PSMP PSMP 13 239 2 48 15 15 2871 287 CE SchoolSafetvProlects No Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features Totals 252 50 302 302 14 40 03 P .85 C PE RW 1/1/2012 1/1/2013 STP(C) STP(C) 546 1090 84 170 630 1260 630 1260 EA E Nob Hill Blvd. Reconstruction 04 G CN 1/1/2014 STP(C) 6539 1013 7552 7552 Yes E Nob Hill Blvd. 06 P from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with Intersection improvements, curb, gutter, sidewalks; replacement or relocation of meters S T 1/1/2014 Totals 8,175 1267 9442 630 8812 an hydrants W Report Date: June 30, 2009 Page 10 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in'Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal. Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/Yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 . 11 12 13 14 15 16 17 •18 19 20 21 17 41 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 , 06 p N/A 'W - S P O PE RW CN .1/1/2011 1/1/2012 1/1/2013 STP(C) STP(C) . STP(C) 91 91 544 14 14 86 105 105 630 105 105 630 CE Yes 1/1/2013 Totals 726 114 840 105 105 630 17 42 S 66th Avenue S 66th.Ave from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 08 P .76 W T T P O PE CN 1/1/2011 . 7/1/2012 STP(E) STP(E) 23 1096 5 164 28 1260 28 1260 Yes 7/1/2012 Totals 1,119 - 169 1288 28 1260 14 43 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview • Signal upgrade, radius improvements, turn lane extension - 12 _ P N/A W S T P O PE RW CN 1/1/2012 1/1/2012 6/6/2012 STP(U) STP STP(U) 126 63 544 17 8 86 143 71 630 143 71 630 CE Yes 6/1/2012 Totals 733 111 • 844 844 14 44 40th Avenue and Englewood 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller 12 P N/A W T S P 0 PE RW CN C 1/1/2012 1/1/2012 1/1/2013 STP STP STP 95 63 145 - 13 8 20 108 71 165 108 71 165. CE Yes 1/1/2013 .Totals 303 - 41 344 179 165 Report Date: June 30, 2009 Page 11 v. 5.7 - Supersedes previous editions Washington State Department of Transportation WATIF Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (Mt,V,y) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 45 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 P N/A W T P PE RW CN 1/1/2012 6/1/2012 1/1/2013 • STP STP STP 126 63 315 18 8 43 144 71 358 144 71 358 CE Yes 1/1/2013 Totals 504 69 573 215 358 14 46 1st Street and !Street 1st Street from: 1st Street to: !Street Replace and upgrade traffic signal equipment 12 • P N/A W T S P PE CN 1/1/2010 1/1/2011 STP STP 32 126 5 17 37 37 1431 143 CE No Totals 158 22 180 37 143 16 47 Washington Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass including all utilities 01 P .25 �• P S T W PE' RW 6/1/2013 1/1/2014 STP(U) STP(U) 820 3150 189 630 1009 3780 • 1009 3780 CE Yes 1/1/2016 • Totals 3,970 - 819 4789 4789 16 48 'H Frontage Road & " St. Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 • G O P S T W PE RW 1/1/2013 6/1/2014 STP(U) STP(U) 272 349 43 55 315 404 315 404 CE Yes 1/1/2015 Totals 621 98 719 719 Report Date: June 30, 2009 Page 12 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State ' Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM 11� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 161h Ave. Corridor 16th Ave. from: SR -12 to: Vhington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting. 04 P 3.5 • o G 0 P S T W PE 1/1/2013 STP(U) 120 17 137 137 CE .Totals - 120 17 ..137 137 14 50 40th Ave. Corridor 40th Ave. from: SR -12 to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P - 3.2 C 0 G P S W T PE 1 1/1/2012 STP(U) 120 1 1 17 1 1371 137 CE Totals 120 . - 17 • 137 137 14 51 Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter, lighting 03 04 P 2.7 C G 0 P S T • W PE 1/1/2011 STP(U) 1201 17 ' 137 1 137 CE Totals 120. 17 137 137 14 52 S. 1st St/Main St. Corridor S. 1st St./Wain St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, lighting. 04 P 2.0 C G 0 P T T W PE 1/1/2013 1 STP(U) 120 1 17 1371 137 CE Totals 120 17 137 137 Report Date: June 30, 2009 Page 13 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name:. Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class 1 Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase cn r.4„ f � � Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd, 3rd 4th Thru 6th Envir. Type 2 3 4 5 6 • 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 53 Storm Drains/Vegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2010 1/1/2010 100 900 100 900 100 900 EA No Totals 1000 1000 1000 17 54 Reconstruction Rudkin Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, lop course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P 76 W T P S PE CN 1/1/2011 1/1/2012 STP(C) STP(C) 109 945 TPP 945 27 106 136 1996 136 1996 CE No Totals 1,054 945 133 2132 136 1996 16 55 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C G 0 P S T PE CN 9/1/2010 4/1/2011 STP(S) STP 122 1730 TPP TPP 23 206 7 70 152 2006 I 152 2006 CE No Totals 1,852 229 77 2158 152 2006 17 56 from: S 80th Ave - Tieton Dr to Zier Rd S 80th Ave Tieton Dr to: Zier Rd • Major widening, curb, gutter, sidewalk 04 P 1:3 0 C P T S PE RW CN 1/1/2011 1/1/2012 4/1/2012 AIP AIP AIP 131 382 . 1667 20 59 260 151 441 1927 151 441 1927 EA Yes 4/1/2012 Totals 2180 339 2519 151 2368 Report Date: June 30, 2009 Page 14 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done ' Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds TypeEnvir Type R/W Required Date (MM/Y11 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 57 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 p 1.0 WPE T P 0 O RW CN 1/1/2013 6/1/2013 1/1/2014 STP(C) STP(C) STP(C) 272 349 2352 43 55 340 315 404 2692 315 404 2692 EA Yes 1/1/2013 Totals 2,973 438 3411 3411 17 58 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines . 05 06 P 2 0 W S PE RW CN 1/1/2012 6/1/2012 6/1/2013 STP(U) STP(U) STP(U) 219 327 2980 - 34 51 244 253 378 3224 253 378 3224 EA Yes 6/1/2013 Totals 3,526 329 • 3855 631 3224 14 59 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: S. 6th St. Install missing sidewalks onscuthside of Nob Hill. 12 P 2 5 P T W S PE RW CN 1/1/2012 6/1/2012 3/1/2013 STP(S) STP(S). STP(S) 55. 107 321 - 8 19 57 63 126 378 63 126 378 CE Yes 3/1/2013 Totals • 483 ' 84 • ' 567 189 378 00 60 Beech St Pedestrian Connection . Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 - P 1.0 p T PE RW CN 1/1/2012 6/1/2012 1/1/2013 STP(S) STP(S) STP(S) 57 189 504 7 • 25 68 64 214 572 64 214 572 CE Yes 1/1/2013 Totals • 750 100 850 278 572 Report Date: June 30, 2009 Page 15 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/VY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16• 61 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave Sidewalks, meters and fire hydrants replacement or relocation 12 P 2.0 • P T W PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 43 86 572 7 15 88 50 101 660 50 101 660 CE Yes 1/1/2014 Totals 701 110 811 811 14 62 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P .25 W T P O . PE RW CN 6/1/2012 1/1/2014 1/1/2013 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE Yes 1/1/2014 Totals 10,522 1827 12349 1009 11340 16 63 Citywide Pathway Connections Yakima from: • to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities 01 P 4.0 O S T W PE RW CN 6/1/2011 1/1/2012 1/1/2013 STP(U) STP(U) STP(U) 252 756 1890 38 88 315 290 .844 2205 290 844 2205 CE Yes 1/1/2013 Totals 2,898' 441 3339 290 844 2205 17 64 34th Ave & River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. intersection improvements including lumination, sewer, water, curb, water and sidewalks - 01 12 P N/A 0 P S T W PE CN 1/1/2012 6/1/2012 STP(U) STP(U) 63 567 5 76 681 - 643 - 68 643 CE• No Totals 630 81 711 711 • Report Date: June 30, 2009 Page 16 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7-21-2009 Adoption Date: Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 65 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 0 P s T W PE RW 1/1/2012 6/1/2013 STP(U) STP(U) 218 327 34 51 252 378 252 378 CE Yes 1/1 /2015 Totals 545 85 630 252 378 14 66 W. Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley City & County joint project to build/extend roadways. 01 04 06 P 6.0 C G O P S T W PE 1 1/1/2013 STP(U) 1 120 17 1371 137 CE Totals 120 17 137 137 16 67 - Occidental Road Construction. from: 58th Ave. to: 64th Ave. Construct roadway 01 P .38 S W P T PE 1/1/2013 1 1 100 1001 100 Totals 100 100 100 00 68 86th Ave. Road Construction from: Occidental to: Coolidge Construct roadway 01 P 27 PE 1/1/2013 100 1001 100 Totals 100 100 100 Report Date: June 30, 2009 Page 17 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 69 64th Ave. Roadway Widening. from: Washington Avenue. to: Tieton Drive. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 06 P 1.5 W P T C O • PE 1/1/2013 STP(U) 120 17 137 137 EA YES 7/4/2014 Totals 120 17 137 137 00 70 YVT Railway Rehabilitation & Museum 3rd Ave . from: 3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 P N/A G C S • T W P PE CN 1/1/2013 6/1/2013 STP(E) STP(E) • 18 1900 32 285 50 2185 1 50 2185 EA No Totals 1,918 317 2235 2235 16 71 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder improvements, PM10 abatement. 01 P N/A S PE CN 4/1/2011 7/1/2011 CMAQ CMAQ 24 . 480 3 65 27 545 27 545 CE No Totals 504 68 572 572 00 72 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 14 32 P 25 T 0 PE CN 1/1/2012 3/1/2013 STP(E). STP(E) 252 3150 34 412 286 1 3562 286 3562 CE_ No Totals 3,402 446 3848 286 3562 Report Date: June 30, 2009 Page 18 v. 5.7 - Supersedes previous editions VI/ Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-21-2009 Adoption Date: Resolution No.: Functional Class _o E C. Project Identification A. PIN/Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency)R/VJ Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 73 William 0. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 P N/A 0 S W PE CN 1/1/2010 7/1/2010 STP(E) STP(E) 10 109 2 17 12 126 12 126 CE No Totals 119 19 138 138 00 74 YV'I-Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area including 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03 32 P N/A 0 0 S T W PE CN 1/1/2013 6/1/2013 STP(U). STP(U) 315 945 38 126 353 1071 I 353 1071 CE No Totals 1,260 164 1424 1424 00 75 Citywide Alleys from: to: Pave alleys throughout the city. 07 P 5 G P s VV •T CN 6/1/2010 75 751 25 25 25 CE No Totals 75 75 25 25 25 14 75 Summitview Ave. Grind & Overlay from: 14th Ave • to: 56th Ave Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA ramps 06 07 P 2.64 PE CN 1/1/2010 6/1/2010 ARRA- ARRA- 50 1950 50 1950 I 50 1950 CE No Totals 2,000 2000 2000 Report Date: June 30, 2009 Grand Totals for Yakima 111,070 22,872 25,702 159,644 42,961 26438 18,109 71,136 Page 19 v: 5.7 - Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 4- 1g For Meeting of July 7, 2009 ITEM TITLE: Set Public Hearingdate of July 21, 2009 to consider: A) Adoption of the Six-year Transportation Improvement Program for the years 2010 to 2015, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: William Cook, Director of Community and Economic Development - CONTACT PERSON/TELEPHONE: Brett Sheffield, Chief Engineer, 576-6797. SUMMARY EXPLANATION: A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. The current plan for 2009 — 2014 included seventeen projects that were funded. This included three projects that received 100% funding from the American Recovery and Reinvestment Act. Funding for the remainder of the projects will continue to be sought. A Public Hearing will be held to consider adoption of a Resolution approving the six-year TIP and amending the regional Metropolitan Transportation Plan and Comprehensive Plan Capital Facilities Element. Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt the resolution to set July 21, 2009 as the hearing date to review and adopt the updated six- year TIP and amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. BOARD/COMMISSION/COMMITTEE RECOMMENDATION: COUNCIL ACTION: Page Two A copy of the proposed 2010 — 2015 TIP isattached, along with an explanation sheet that describes the information contained on the various columns of the Six-year TIP. Changes from the 2009 — 2014 TIP include the addition of two projects, removal of six projects and a modification to the priority numbers of the various projects. The added projects include: • #8 Expanded transit service to Terrace Heights • #18 Fixed route bus service to Moxee along the SR 24 corridor. The projects that were deleted from the 2009 — 2014 TIP have either been completed, are under construction or will soon be under construction include: • #3 16th Avenue Realignment • #5 Purchase five new transit buses • #6 Purchase three new paratransit vehicles • #13 Nob Hill Boulevard Improvements from 64th Avenue to 72nd Avenue • #68 Nob Hill Boulevard Improvements from 68th Avenue to 72nd Avenue • #77 Nob Hill Boulevard Overpass Repairs Council and the public are welcome to add other arterial system projects to the list. The six-year TIP project listing will be finalized at the public hearing held on July 21, and will then be sent to the Yakima Valley Conference of Governments (YVCOG) to be included in the Statewide Transportation Improvement Program list. Six-year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to.securingfederal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning 2 — July 2, 2009 process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. AH local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six-year TIP for 2010 to 2015. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. 'The amendment is limitedto incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required underthe laws of the Growth Management Act.