HomeMy WebLinkAboutR-2009-103 Six-Year TIP for 2010 to 2015 and Amendment to Metropolitan Transportation Plan and Yakima UAC PlanRESOLUTION NO. R-2009-103
A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of
2010 through 2015 for the construction of streets and arterials streets in
the City of Yakima and amending the Metropolitan Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the ensuing
six year period, all as contemplated and required by State RCW 35.77.010 and applicable
Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City of Yakima, all as contemplated and
required by State and Federal law, and
WHEREAS, after a public hearings on the matter, held at the regular meeting of the
Yakima City Council on July 21, 2009, with proper public notice as required by RCW 35.77.010,
the City Council finds that the plan attached hereto should be adopted as the Six -Year
Transportation Improvement Program for the period of 2010 through 2015 for the construction of
streets and arterial streets in the City of Yakima, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2010 through 2015, a copy of which
is attached hereto and by this reference made a part hereof, is hereby adopted as the official
Six -Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Metropolitan Transportation Plan along with Street Improvements, which are
also approved.
ADOPTED BY THE CITY COUNCIL this 21E4 day of July, 2
ATTEST:
Citv Clerk
David Ed e , Mayor
s
Washi' State Department of Transportation
Agency: Y.
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pr am
From 2010 to
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
c
Uro
IF-
S U
�,
E
Q Z
Project Identification
A PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAN
Date
(MMNy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4thRequired
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
Yakima Railroad Grade Separations - Phase 2
Lincoln Ave.
from: N let St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconatructon,
Including realignment of Front Street.
01
06
07
08
S
0.20
T
a
W
S
CN
CN
1/1/2010
1/1/2010
STP(U)
DEMO
2668
8270
FMSIB
AIP
2200
3000
2000
6868
11270
..
6868
11270
EA
Yee
9/1/09
Totals 10,938 5200 2000 18138 18138
14
2
Yakima Railroad Grade Separations- Phase 3
Martin Luther King, Jr. Blvd
from: N. 1st Sreet to: N. 1st Ave
Construct Grade Separation and adjacent roadway reconstruction including
Front Street
01
06
07
08
P
0.2
T
G
o
CN
CN
8/1/2010
8/1/2010
STP(U)
ARRA -
650
8000
FMSIB
AIP
2000
1500
3768
6418
9500
6418
9500
EA
Yes
9/1/2009
Totals 8,650 3500 3768 15918 15918
00
3
Transit Operating Expenditures
Various fixed rates and locations
from: N/A to: N/A
Annual operating assistance from the FTA In support o1 our transit system;
fixed conte, paratranslt Dlal•A•Ride and vanpool program
12
22
23
24
31
S
WA
ALL
1/1/2010
I 5307
16011
1
1 1601
32021 3202
1
CE
No
Totals 1,601 1601 3202 3202
00
4
YVT Trolley Barn/Powerhouse Rehabilitation
S 3rd Ave
from: to:
Minor car barn and powerhouse restoration Including property purchase
03
S
N/A
c
G
0
S
T
W
CN
1/1/2010
_
STP(E)
255
2551 255
CE
Yes
06/01/07
Totals 255 255 255
Report Date: June 30, 2009
Page 1
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
—
to
03
Total Length I
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mrn/ddiyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(Mnyyyl
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
. 7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
5
William O. Douglas Trail
6th Ave Pathway & Bridge Decking
from: to:
Build pathway and install pathway decking on Neches River bridge with
partner William O. Douglas Trail Fundatlon
32
08
06
S
1.0
O
P
S
W
T
CN
1/1/2010
STP(E)
525
525
525
CE
No
Totals 525 525 525
00
6
William O. Douglas Heritage Trails
Bridge Restoration & Trailhead
from: . to:
Trailhead restoration, right of way acquisition partner with the William O.
Douglas Foundation, Including restoration of bridge , cleaning, rust removal
and painting
32
13
10
S
N/A
0
P
S
T
W
RW
CN
1/1/2010
1/1/2010
STP(E)
STP(E)
150
285
150
285
150
285
CE
Yes
6/01/09
Totals , 435 435 435
00
7
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: to:
On going Improvements to bus benches, shelters and signage Infrastructure
22
31
S
N/A
ALL
1/1/20101
1
50
50I 501
i
CE
No
Totals 50 50 50
00
8
Expanded Transit Service to Terrace Heights.
New University & Retail Links
from: to:
Extension of fixed route bus service only into the Terrace Heights area of
Yakima County ,
22
S
N/A
ALL
1/1/2010
CMAO
33
1
7
401 40
,
1
No
Totals 33 7 40 40
Report Date: June 30, 2009
Page 2
v. 5.7 - Supersedes previous editions
Washino"n State Department of Transportation
Wi
Agency: \
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pronram . -
From 2010 to 3
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority I
Number
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
2
in
Total Length
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddyyyy)
Fund Source Information
Federal Funding
State4th
Fund
Code
State
Funds
Local
Funds
Total
Funds
E.
Type r
RNV
Required
Dae
(Mh
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
9
Nob Hill Blvd
Nob Hill Blvd
from: 49th Ave to: 64th Ave
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
•n
P
C
G
Q
S
T
W
RW
CN
1/1/2010
6/1/2010
STP(U)
1000
TPP
1500
200
200
200
2700
200
2700
EA
Yes
6/01/10
Totals 1,000 1500
400 2900
2900
14
10
S 16th Ave & W Washington Ave Signal & Intersection.
S 16th Ave
from: S 16th Ave to: W Washington Ave
Included in Union Gap's Valley Mall Blvd. project
12
05
03
S
N/A
P
T
RW
4/1/2010
1
AIP
84
36
1201
40
1 80
CE
Yes
4/1/2010
Totals 84
36 120
40 80
16
11
66th Ave. & Summitview Intersection
N. 66th Avenue & Summitview
from: N.66thAve. to: Summitview Ave.
Widen for lett tum lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
S
20
G
0
P
S
T
W
C
CN
4/1/2010
1
600
6001
600
CE
Yes
4/1/2010
Totals
600 600
600
00
12
Coolidge Road Widening and Paving.
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
03
05
06
S
.50
S
W
P
T
CN
1/1/2010
CMAQ
540
214
754
I 754
CE
Yes
9/1/2009
Totals 540
214 754
754
Report Date: June 30, 2009
Page 3
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 7-21-2009 Adoption Date:
Amend Date:
Resolution No.:
Ta
s 2
c 8D.
LL
Priority I
Number
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
I Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)�
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddIyyyy)j
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
Required
q
Date
(MM/Y11
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
13
Acquisition of new Dial -A -Ride paratransit vehicles
from: to:
Purchase new vehicles to replace older, less reliable units
21
$
N/A
ALL
1/15/2010
5310
96
84
180'
180
CE
No
Totals 96 84 180 180
14
14
E. Lincoln & 10th Street Roundabout6/1/2011
from: E. Lincoln to: E. MLK Jr Blvd.
Roundabout construction at intersection curb, gutter, sidewalk, & street
lighting
03
06
P
N/A
PE
RW
CN
1/1/2010
1/1/2011
6/1/2011
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
200
500
1300
Yes
6/1/2011
Totals 1,731 269 2000 200 1800
12
15
S.R.12 & 16th Avenue Interchange
Interchange
from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
03
06
P
N/A
O
ALL
1/1/2010
STP(U)
1 865
135
10001 1000
CE
No
Totals 865 135 1000 1000
11
16
1-82 & Lincoln Avenue Interchange
1-82 Interchange
from: E. "G" Street to: 1-82
Reconstruct / extend off -ramp from existing 1.82 off -ramp for Lincoln Avenue
to E. "3' Street.
01
P
N/A
o
P
G
ALL
1/1/2011
1 STP(U)
865
j
135 (
10001
1
I
fff
EA
Yes
6/2011
Totals 865 135 1000
Report Date: June 30, 2009
Page 4
v. 5.7 - Supersedes previous editions
Washir
Agency: Yak..
'tate Department of Transportation
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Prr —am
From 2010 to
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
TC
o 2
t res o
e,
.o E
a: Z
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
a
c
2 >
E
rn
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Codes
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/Yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thu
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
17
E Yakima Avenue & Fair Avenue S(gnalization
from: E. Yakima Avenue to: Fair Avenue
Construct Traffic Signal
12
P
N/A
P
W
T
S
O
ALL
1/1/2010
STP(U)
865
135
1000
1000
CE
No
Totals 865 135 1000 1000
00
18
Fixed route Bus Services to Moxee along SR 24 Corridor
SR 24 Hwy Corridor/Park & Ride Lots
from: to:
JARC funded demonstration project to determine ridership potential to and
from the Moxee area Including stops at two Park & Ride lots along SR 24.
22
S
ALL
1/2/2010 1
5316 1
131 1
131
262
131 1
131 1
CE
No
Totals 131 131 262 131 131
14
19
E Nob Hill Blvd & Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
31
03
04
P
WA
O
P
w
RW
CN
1/1/2011
4/1/2011
STP(U)
STP(U)
173
865
27
135
200
1000
200
1000
CE
Yes
4/1/2001
Totals 1,038 162 1200 200 1000 ,
16
20
S 3rd Ave & W Washington Ave Signal
S3rdAve
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
T
PE
CN
4/1/2010
6/1/2010
13
214
13 13
2141 214
CE
No
Totals 227 227 227
Report Date: June 30, 2009
Page 5
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
c
02
c U
u.
`m
.o E
6:2
Z
Project Identification
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Ex (Local re Schedule
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M ate
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
4579
S 1st St. - E. Washington Ave. Intersection Improvement
S 1 st St.
from: S 1st St. to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
TO
PE
6/1/2010
STP(U)
252
38
290
290
EA
Yes
01/01/11
Totals 252 38 290 290
17
22
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: SummitviewAve. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
P
T
W
S
ALL
4/1/2011
I STP
1 2268
307
25751
1 525
2050
EA
Yes
4/1/2014
Totals 2,268 307 2575 525 2050
14
23
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New Intersection, signals, curb, gutter and sidewalk
03
12
P
N/A
0
S
T
PE
CN
1/1/2011
6/1/2011
STP(U)
STP(U)
51
383
8
61
59
444
1
59
444
CE
Yes
8/10/2010
Totals 434 89 603 503
16
24
4562
Tielon Dr - S 5th Ave. Intersection Protect
Tleton Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
,N/A
W
T
S
ALL
4/4/2011
I
STP(U)
I (
378
WSDOT
3781
,
768
758
I
CE
Yes
4/1/2014
Totals 378 378 758 756
Report Date: June 30, 2009
Page 6
v. 5.7 - Supersedes previous editions
.ifl.
Washir State Department of Transportation
Agency: Ya
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pr -am
From 2010 to - .5
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
To
6
Total Length I
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mrn/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envlr.
Type
R
IW
Required
Date
(MMIY1)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
25
E. 1-1" St. Extension
E. "H" St.
from: 1st St. to: Yakima River
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
01
08
P
1.1
0
S
T
W
PE
RW
CN
1/1/2011
1/1/2013
6/1/2014
STP(U)
STP(U)
STP(U)
-
2180
2180
1199
340
340
1871
2520
2520
3070
2520
2520
3070
CE
Yes
1/1/2014
Totals 5559 2551 8110 2520 5590
17
26
N. 10th St. Extension
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave.
Construct road including water, sewer, curb, gutter, sidewalk for future
development.
01
06
P
1.3
O
B
T
W
PE
RW
CN
1/1/2012
1/1/2013
6/1/2013
STP(C)
STP(U)
STP(U)
700
5500
7900
108
850
972
808
6350
8872
808
6350
8872
CE
Yes
1/1/2013
Totals 14,100 1930 16030 808 15222
00
27
West Side Transit Center
Acquire Property to Expand Operations
from: to:
Locate and acquire property for the placement ole West Side Transit
Center Operation
23
S
N/A
PE
1 1/1/2010
I
I
OTHER
50
I SOI 5011
Totals 50 50 50
17
28
-
Yakima Downtown Future Initiatives, Phase 4
from: Between 1st Street to: and 8th Street
On streets to be selected but contiguous to DFI's 1, 2 & 3; Historic lighting
sidewalk mods & more.
03
05
06
S
.30
T
PE
CN
1/1/2010
6/1/2010
OTHER
OTHER
1000
75
75 75
10001 1000
CE
No
Totals 1000 75 1075 1075
Report Date: June 30, 2009
Page 7
v. 5.7 - Supersedes previous editions
7® Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mmlddyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
FVW
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
29
Yakima Downtown Future Initiatives, Phase 5
from: 1st Street to: 9th Street
Install Historic Lighting, Sidewalk Modification 8 Other Improvements.
Exact Improvement area(s) to bo determined.
06
12
P
.60
P
W
S
T
O
CN
4/1/2010
OTHER
6000
6000
6000
CE
No
Totals 6000 6000 6000
00
30
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01'
•
P
N/A
PE
CN
CN
1/1/2010
4/1/2011
4/1/2011
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
120
420
360
120
420
360
CE
No
Totals 600 240 60 900 120 780
00
31
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
07
P
N/A
WCN
S
6/1/2010
I STP(U)
228
32
2601 260
EA
No
Totals 228 , 32 260 260
19
32
Longtiber Rd & Washington Ave
Intersection
from: to:
New Intersection construction and reconstruction, 3 -lane and 5 -lane w/turn,
curb, gutter, sidewalks.
03
05
06
P
N/A
S
W
T
O
PE
CN
1/1/2011
3/1/2012
STP(U)
STP(U)
100
700
14
95
114
795
1
114
795
CE
Yes
3/1/2012
Totals 800 109 909 114 795
Report Date: June 30, 2009
Page 8
v..5.7 - Supersedes previous editions
▪ Washir - State Department of Transportation
Agency: Y,
Co. No.: 3- 9 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pr- -ram
From 2010 to a
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
2
m
rn
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Coca! Agency
Federally Funded
Projects Only
Project Phase
Phase
Start
( mm/ddyyyy)
Fund.Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M�yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
33
E Nob Hill Blvd & S 18th St
E Nob Hill Blvd
from: S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
.1
C
S
W
T
CN
4/1/2011
. STP(U)
240
42
282
282
CE
Yes
01/01/07
Totals 240 42 282 282
17
34
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
S
15
C
S
T
P
PE
CN
1/1/2010
6/1/2011
STP(E)
STP(E)
22
75
7
20
29
95
29
95
CE
Yes
6/1/2011
Totals 97 27 124 124
00
35
Gravel Road B.S.T
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
1/1/2011
6/1/2011
50
240
50
240
50
240
CE
No
Totals 290 290 290
16
36
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout
12
P
N/A
T
P
0
C
W
CN
10/1/2013 1
STP(S)
504
1
74
5781
1
578
CE
Yes
10/1/2013
_
Totals 504 74 578 578
Report Date: June 30, 2009
Page 9
v. 5.7 - Supersedes previous editions
Ink
Washington State Department of Transportation
Wir
Agency: Yakima ,
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Heating Date: 7-21-2009 Adoption Date:
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
1
y
3
1°
k
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency
Federally Funded
Protects Only
Project Phase I
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MMNY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
1/1/2013
STP(S)
25
4
29
29
14
37
12
P
N/A
P
RW
6/1/2013
STP(S)
25
4
29
29
CE
S 48th Ave & Summitview Ave Siiinalization
T
CN
8/1/2014
STP(S)
554
81
635
635
Yes
S48thAve
from: S 48th Ave to: Summitview Ave
8/1/2013
Signalization
Totals 604 89 693 693
PE
1/1/2012
STP(E)
424
67
491
491
14
38
01
P
.5
W
RW
1/1/2013
STP(E)
1047
163
1210
1210
CE
W Lincoln Ave & 13' St Realignment
12
T
CN
1/1/2014
STP(E)
1801
281
2082
2082
Yes
W Lincoln Ave
from: W 5th Ave to: Custer St
o
1/1/2014
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
0
C
Totals 3,272 511 3783 491 3292
PE
1/1/2010
PSMP
13
2
15 15
16
39
12
P
N/A
W
CN
1/1/2010
PSMP
239
48
287I' 287
CE
School Safety Projects
No
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing. other features
Totals 252 50 302 302
PE'
1/1/2012
STP(C)
546
84
630
630
14
40
03
P
.85
C
RW
1/1/2013
STP(C)
1090
170
1260
1260
EA
E Nob Hill Blvd. Reconstruction
04
G
CN
1/1/2014
STP(C)
6539
1013
7552
7552
Yes
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
06
P
T
1/1/2014
Major roadway widening and reconstruction to 5 lanes with Intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
T
Totals 8,175 1267 9442 630 8812
an hydrants
W
Report Date: June 30, 2009
Page 10
v. 5.7 - Supersedes previous editions
Washine " State Department of Transportation
-enAgency: Ya
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pronram
From 2010 to i
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
1
0 m.2
t i c.
ZN cp
E
ti z
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mMdd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Type vi
R/W
Required
Date
(M'1U1 Y)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
41
S 72nd Avenue & W Washington Avenue
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
Intersection improvement, possible roundabout
01
12
06
P
N/A
W
T
P
O
PE
RW
CN
1/1/2011
1/1/2012
1/1/2013
STP(C)
STP(C)
STP(C)
91
91
544
14
14
86
105
105
630
105
105
630
CE
Yes
1/1/2013
Totals 726 114 840 105 105 630
17
42
S 66th Avenue
S 66th Ave
from: Scenic Drive to: Summitview
Widen roadway, curb, gutter, sidewalk and utilities
04
03
P
.76
W
S
o
PE
CN
1/1/2011
7/1/2012
STP(E)
STP(E)
23
1096
5
164
28
1260
28
1260
Yes
7/1/2012
Totals 1,119 169 1288 28 1260
14
43
40th Avenue and Summitview Signal Upgrade
40th Avenue
from: 40th Avenue to: Summitview
Signal upgrade, radius Improvements, turn lane extension
12
P
WAW
T
PO
PE
RW
CN
1/1/2012
1/1/2012
6/6/2012
STP(U)
STP
STP(U)
126
63
544
17
8
86
143
71
630
143
71
630
CE
Yes
6/1/2012
Totals 733 111 844 844
14
44
40th Avenue and Englewood
40th Avenue
from: 40th Avenue to: Englewood
Replace traffic signal poles, upgrade controller
12
P
N/A
W
8
P
o
PE
RW
CN
1/1/2012
1/1/2012
1/1/2013
STP
STP
STP
95
63
145
13
8
20
108
71
165
108
71
165
CE
Yes
1/1/2013
Totals 303 41 344 179 166
Report Date: June 30, 2009
Page 11
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title12
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
:2,
rn
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RIW
Required
Date
(Atiyyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 ,
20
21
00
45
16th Avenue and Fruitvale Blvd
16th Avenue
Irom: 16th Avenue to: Fruitvale Blvd
Replace traffic signal poles, radius improvements, ADA ramps
12
P
N/A
W
S
P
O
PE
RW
CN
1/1/2012
6/1/2012
1/1/2013
STP
STP
STP
126
63
315
18
8
43
144
71
358
144
71
358
CE
Yes
1/1/2013
Totals 504 69 573 215 358
14
46
1st Street and I Street
1st Street
from: 1st Street to: I Street
Replace and upgrade traffic signal equipment
12
PCN
N/A
W
T
S
P
O
PE
1/1/2010
1/1/2011
STP
STP
32
126
5
17
37
143
37
143
CE
No
Totals 158 22 180 37 143
16
47
Washington Ave. Railroad Grade Separation
Washington Ave.
from: Longfibre Road to:
Railroad grade overpass including all utilities
01
P
25
O
P
S
T
W
PE
RW
6/1/2013
1/1/2014
STP(U)
STP(U)
820
3150
189
630
1009
3780
1009
3780
CE
Yes
1/1/2016
Totals 3,970 819 4789 4789
16
48
Frontage Road & "H" St. Loop
N. 8th St.
from: "H" St. to: I-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
G
0
P
T
W
PE
RW
1/1/2013
6/1/2014
STP(U)
STP(U)
272
349
43
55
315
404
315
404
CE
Yes
1/1/2015
Totals 621 98' 719 719
Report Date: June 30, 2009
Page 12
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Y.
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
a
E H
I
rn
Total length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNVD.
Required
Date
(mAwy)
Federal
Fund
Code
Federal
Cost by
Phase
1'st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
49
16th Ave. Corridor
16th Ave.
from: SR -12 to: a hington Ave.Nalley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
04
P'
3.5
C
G
0
P
S
T
W
PE
1/1/2013
STP(U)
120
17
137
137
CE
Totals
120
17
137 137
14
50
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
• c
0
G
P
S
W
T
PE 1
1/1/2012 1
STP(U) I
120
17
1371
137
CE
Totals
120
17
137 137
14
51
Nob Hill Corridor
Nob Hill
from: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, lighting
03
04
P
2.7
C
G
0
P
S
T
W
PE 1
1/1/2011
STP(U)
120
17
1371 1
137
CE
Totals
120
17
137 137
14
52
S. 1st St/Main St. Corridor
S. 1st St./Main St.
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk,
lighting.
04
P
2.0
c
G
0
P
S
T
W
PE 1
1/1/2013 I_
STP(U)
120
17
1371
I
137
CE
Totals
120
17
137 137
Report Date: June 30, 2009
Page 13
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
WrIF
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
m
4 N
c UD.
u_E.
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
Street/Road Name or Number
Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM'Yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
53
Storm DrainsNegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
CN
CN
1/1/2010
1/1/2010
100
900
100
900
100
900
EA
No
Totals 1000 1000 1000
17
54
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
.76
Vy
T
P
S
PE
CN
1/1/2011
1/1/2012
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1996
136
1996
CE
No
Totals 1,054 945 133 2132 136 1996
16
55
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
•76
C
0
P
T
T
PE
CN
9/1/2010
4/1/2011
STP(S)
STP
122
1730
TPP
TPP
23
206
7
70
152
2006
152
2006
CE
No
Totals 1,852 229 77 2158 152 2006
17
56
S 80th Ave • Tieton Dr to Zier Rd
S 80th Ave
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
O
F
T
W
S
PE
RW
CN
1/1/2011
1/1/2012
4/1/2012
AIP
AIP
AIP
131
382
• 1667
20'
59'
260
151
441
1927
151
441
1927
EA
Yes
4/1/2012
Totals 2180 339 2519 151 2368
Report Date: June 30, 2009
Page 14
v. 5.7 - Supersedes previous editions
Washiry State Department of Transportation
Agency: Y.
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Prnryram
From 2010 to 5
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
o 0
g 5
<L
A, 51v..
o f
a Z
Project Identification
A.ii;PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road • Ending MP or Road
F. Describe Work to be Done
e
i
E
E
g
r
j
utility Codes I
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
- Code
State
Funds
Local
Funds
Total
Funds
Tnvier.
R/W
Required
Date
(M
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14,
15
16
17
18
19
20
21
PE
1/1/2013
STP(C)
272
43
315
315
17
57
05
P
1.0
W
RW
6/1/2013
STP(C)
349
55
404
404
EA
Englewood Ave - N 40th Ave to N 56th Ave
06
T
CN
1/1/2014
STP(C)
2352
340
2692
2692
Yes
Englewood Ave
P
from: N 40th Ave to: N 56th Ave
O
1/1/2013
Widen roadway, curb, gutter, sidewalk '
C
Totals 2,973 438 3411 3411
PE
1/1/2012
STP(U)
219
34
253
253
17
58
05
p
2
0
RW
6/1/2012
STP(U)
327
51
378
378
EA
Englewood Ave - N24th Ave to N 16th Ave
06
S
CN-
6/1/2013
STP(U)
2980
244
3224
3224
Yes
Englewood Ave
from: N 16th Ave to: N 24th Ave
6/1/2013
Widen, curb, gutter and sidewalk, water and sewer lines
Totals 3,526 329 3855 631 3224
PE
1/1/2012
STP(S)
55
8
63
63
14
59
12
P
2.5
P
RW
6/1/2012
STP(S)
107
19
126
126
CE
W Nob Hill Blvd Sidewalks
W Nob Hill Blvd
1/i/
S
CN
3/1/2013
STP(S)
321
57
378
378
Y88
from: S 16th Ave to: S. 6th St.
3/1/2013
Install missing sidewalks on southslde of Nob Hill.
Totals 483 84 567 189 378
00
60
06
•P
1.0
P
PE
RW
1/1/2012
6/1/2012
STP(S)
STP(S)
57
189
7
25
64
214
64
214
CE
Beech St Pedestrian Connection
32
T
CN
1/1/2013
STP(S)
504
68
572
572
Yes
Beech St
from: Fair Ave to: Chalmers/Riverside
1/1/2013
Construct pedestrian pathway under SR82 to Greenway
Totals 750 100 850 278 572
Report Date: June 30, 2009
Page 15
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberPhase
E. Beginning MP or Road • Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project. Phase
Start
(mm/dd/yyy}rj
Fund Source Information
Federal Funding
State "
Fund Code
State
Funds
Local
Funds
Total
Funds
Envlr.
Type
pJw
Required
Date
(MMM)
Federal
Fund
Code
Federal
Cost
Phasey
: 1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
61
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 56th Ave to: 29th Ave
N
Sidewalks, meters and fire hydrants replacement or relocation
12
P
2.0
P
T
S
W
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP(S)
STP(S)
STP(S)
43
86
572
7
15
88
50
101
660
50
101
660
C E
Yes
1/1/2014
Totals 701 110 811 811
14
62
Mead Ave. Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass Including all utilities
01
P
.25
W
3
P
O
PE
RW
CN
6/1/2012
1/1/2014
1/1/2013
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560
CE
Yes
1/1/2014
Totals 10,522 1827 12349 1009 11340
16
6301
Citywide Pathway Connections
Yakima
from: to:
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
P
4.0
O
8
T
W
PE
RW
CN
6/1/2011
1/1/2012
1/1/2013
STP(U)
STP(U)
STP(U)
252
756
1890
38
88
315
290
844
2205
290
844
2205
CE
Yes
1/1/2013
Totals 2,898 441 3339 290 844 2205
17
64
34th Ave & River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
P
N/A
0
P
S
T
W
PE
CN
i
1/1/2012
6/1/2012
STP(U)
STP(U)
63
567
5
76
68
643
,
68
643
CE
No
Totals 630 81 711 711
Report Date: June 30, 2009
Page 16
v. 5.7 - Supersedes previous editions
a
Wi f Washin-' - State Department of Transportation
Agency: Ya
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pre -ram
From 2010 to 3
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase I
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RINI
Date
(Myvyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
65
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines
and street lights.
01
05
12
P
1.0
O
S
T
W
PE:
RW.
CN
;
1/1/2012
6/1/2013
1/1/2015
STP(U)
STP(U)
STP(U)
218
327
2980
34
51
244
252
378
3224
252
378
3224
CE
Yes
1/1/2015
Totals 3525
329
3854 252
3602
14
66
W Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley
City & County joint project to build/extend roadways.
01
04
06
P
6.0
c
0G
P
S
T
W
PE
1 1/1/2013
1 STP(U)
1 120
1
17
137137
1
I
CE
Totals 120
17
137
137
16
67
Occidental Road Construction.
from: 58th Ave. to: 64th Ave.
Construct roadway
01
P
38
S
W
P
T
PEI 1/1/2013
1
1
1 100
1001
I 100
Totals
100
100
100
00
68
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
01
P
27
PEI 1/1/2013
I
1
1
1 100
1 1001
1
100
Totals
100
100 .
100
Report Date: June 30, 2009
Page 17
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberRequired
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1 Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Funds
Local
Funds
Total
Funds
Envir.
Type
RIW
Date
(Amy y)
Federal
Fund
Code
Federal
Cost by
Phase
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
69
64th Ave. Roadway Widening.
from: Washington Avenue. to: Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
W
G
P
T
C
O
PE
1/1/2013
STP(U)
120
17
137
137
EA
YES
7/4/2014
Totals 120 17 137 137
00
70
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
P
N/A
C
S
T
W
P
PE
CN
1/1/2013
6/1/2013
STP(E
STP(E)
18
1900
32
285
2185
50
2185
EA
No
Totals 1,918 317 2235 2235
16
71
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
P
WA
S
PE
CN
4/1/2011
7/1/2011
CMAQ
CMAQ
24
480
3
65
271
545
27
545
CE
No
Totals 504 68 572 572
00
72
Pedestrian Bridge
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32O
P
.25
P
PE
CN
1/1/2012
3/1/2013
STP(E)
STP(E)
252
3150
34
412
2861288
3562
3562
CE
No
Totals 3,402 446 3848 286 3562
Report Date: June 30, 2009
Page 18
v. 5.1 - Supersedes previous editions
Washi• (tate Department of Transportation
Agency: Ya.
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Pr -am
From 2010 to _ .5
Hearing Date:
Amend Date:
7-21-2009
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency
Federally Funded
Projects Only
Project Phase l
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
73
William O. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
14
32
P
N/A
0
S
P
w
PE;
CN`'
s
1/1/2010
7/1/2010
STP(E)
STP(E)
10
109
2
17
12
126
12
126
CE
No
Totals 119 19 138 138
00
74
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway In West Valley area Including 53rd Ave, Wide Hollow,
64th Ave, Ahtanum Including all utilities and signage
03
32
P
WA
O
8
T
W
PE
CN
1/1/2013
6/1/2013
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No
Totals 1,260 164 1424 1424
00
75
Citywide Alleys
from: to:
Pave alleys throughout the city.
07
P
5
G
P
S
W
T
CN
6/1/2010
I 75
75I 25
25
25
CE
No
Totals 75 75 25 25 25
14
75
Summitview Ave. Grind & Overlay
from: 14th Ave ' to: 56th Ave
Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA
ramps
06
07
P
2.64
PE'
CN
1/1/2010
6/1/2010
ARRA-
ARRA-
50
1950
50
1950
50
1950
CE
No
Totals . 2,000 2000 2000
Report Date: June 30, 2009
Grand Totals for Yakima
114,050 21,592 25,563 161,205 41,298 26438 18,109 74,360
Page 19
v. 5.7 - Supersedes previous editions
•
•
RESOLUTION NO. R — 2009 -
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the Six-year Transportation
Improvement Program (TIP) for the period of 2010 through 2015
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year
Transportation Improvement Program for the construction of streets and arterial streets in
the City of Yakima for the ensuing six year period, all as contemplated and required by State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the
Six-year Transportation Improvement Plan for the period. of 2010 to 2015 to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated
and provided under RCW 36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year
TIP on July 21, 2009, with proper public notice as required by RCW 35.77.010; now,.
therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six -Year Transportation Improvement Program for the period of 2010
through 2015 for the City of Yakima shall be incorporated as an amendment to the Capital
facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 21st day of July, 2009.
ATTEST:
City Clerk
David Edler, Mayor
9. Appendices
A. Six Year Form Instructions
Heading
Agency
County No.
City No.
MPO/RTPO
Hearing Date
Adoption Date
Resolution No.
Amendment Date
Column Number
Enter name of the sponsoring agency.
Enter the assigned number (see LAG Appendix 21.44).
Enter the assigned number (see LAG Appendix 21.45).
Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Enter the date of the public hearing.
Enter the date this program was adopted by council or commission.
Enter Legislative Authority resolution number (if applicable.)
Enter the date this program was amended by council or commission.
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
one approved by FHWA.)
Rural (< 5000 pop )
01 - Interstate
02 - Principal Arterials
06 - Minor Arterials
07 - Major Collector
08 - Minor Collector
09 - Local Access
Description
00 - No Classification
Urban (> 5000 pop.)
11 - Interstate
12 - Freeways & Expressways
14 - Other Principal Arterials
16 - Minor Arterial
17 - Collector
19 - Local Access
2. Priority Numbers. Enter local agency number identifying agency project priority (optional).
3. Project Identification. Enter (a) Federal Aid Number if previously assigned;
(b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal
Route Number; (e) Beginning and Ending Termini (milepost or street names);
and (f) Describe the Work to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
01 - New construction on
new alignment
02 - Relocation
03 - Reconstruction
04 - Major Widening
05 - Minor Widening
06 - Other Enhancements
Description
07 - Resurfacing
08 - New Bridge Construction
09 - Bridge Replacement
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 - Safety/Traffic Operation/TSM
13 - Environmentally Related
26
14 - Bridge Program -Special
21 - Transit Capital Project
22 - Transit Operational Project
23 - Transit Planning
24 - Transit Training/Admin.
31 - Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
5 - Project is `selected' by the appropriate selection body and funding has been
secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is listed
for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C - Cable TV G - Gas
0 - Other P - Power
S - Sewer (other than agency -owned) T - Telephone
W - Water
8. Project Phase. Select the appropriate phase code of the -project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL - All Phases: from Preliminary Engineering through Construction
(Use only in Years 4, 5, & 6)
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the,
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
BIA
BR
CDBG
CMAQ
DEMO
Discretionary
-DOD
IC
IM
NHS
3037
- Bureau of Indian Affairs
- Bridge Replacement or Rehab
- Community Development
Block Grant (HUD)
- Congestion Mitigation Air Quality
- ISTEA Demo Project (Selected)
- Ferry Boat Discretionary, Public
Lands Highways, or Scenic Byways, etc.
- Dept. of Defense
- Interstate Construction
- Interstate Maintenance
- National Highway System
- FTA Job Access/Reverse Commute
27
FTA Discretionary for Capital Expenditures
5307 - FTA Urban Areas
5309(Bus) - Bus
5309(FG) - Fixed Guideways
5309(NS) - New Starts
5310 - FTA Elderly/Disabled
5311 - FTA Rural Areas
REV - Rural Economic Vitality Program
STP(C) - STP Statewide Competitive Program
STP(E) - STP Transportation Enhancements
STP(S) - STP Safety Including Hazard and RR
STP(R) - STP Rural Regionally Selected
STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless
of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds to be
used on this project.
CAPP - County Arterial Preservation Program
CHAP - City Hardship Assistance Program
TPP - Transportation Partnership Program
AIP - Urban Arterial Program
(formerly Arterial Improvement Program)
PSMP - Pedestrian Safety & Mobility Program
PTSP - Public Transportation Systems Program
PWTF - Public Works Trust Fund
RAP - Rural Arterial Program
SCP - Small City Program
SCPP - Small City Pavement Program
FMSIB - Freight Mobility Strategic Investment Board
WSDOT - WSDOT provided funding
OTHER - Any other unlisted state fund codes
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14.
(Auto -calculation in the "STIP Too" program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but
may be filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment '
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter
RMI Certification Date, if known. (This is "required" for Federally funded projects.)
28
•
•
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 11
For Meeting of July 21, 2009
ITEM TITLE: Public Hearing to consider:
A) Adoption of the Six-year Transportation Improvement Program for
the years 2010 to 2015, and to amend the Metropolitan
Transportation Plan; and
B) Amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the adopted Six-year
Transportation Improvement Program.
SUBMITTED BY: William Cook, Director of Community and Economic Development -
CONTACT PERSON/TELEPHONE: Brett Sheffield, Chief Engineer, 576-6797.
SUMMARY EXPLANATION:
Attached is the 2010 — 2015 Six-year TIP, along with an explanation sheet that describes the
information contained on the various columns of the Six-year TIP. Two transit projects have been
added to the six-year TIP. These projects are:
• #8 Expanded transit service to Terrace Heights
• #18 Fixed route bus service to Moxee along the SR 24 corridor.
Continued on Page Two
Resolutions X Ordinance Contract Other (Specify) Six -Year TIP
Funding Source
APPROVED FOR SUBMITTAL:
J.�
City Manager
STAFF RECOMMENDATION:
1. Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and
amending the regional Metropolitan Transportation Plan and the Comprehensive Plan
Capital Facilities Element.
2. Adopt the plan.
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
Page Two
Projects that that have been deleted from the 2009 — 2014 TIP as they were completed or the
funds were obligated include:
• #3 16th Avenue Realignment
• #5 Purchase five new transit buses
• #6 Purchase three new paratransit vehicles
• #13 Nob Hill Boulevard Improvementsfrom64th Avenue to 72"d Avenue
• #68 Nob Hill Boulevard Improvements from 68th Avenue to 72"d Avenue
• #77 Nob Hill Boulevard Overpass Repairs
Council and the public are welcome to addother arterial system projects to the list. The six-year
TIP project listing will,.be finalized at today's hearing and sent to the Yakima Valley Conference of
Governments (YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working toward
common standards and coordinated planning for public projects .that impact both the .city and
surrounding county areas. Agreement on these issues will be the first step -toward the goal of a
seamless transportation planning process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue.
of federal revenue will be used.
The current plan for 2010 — 2015 includes fifteen projects that are funded. Funding for the
remainder of the projects will continue to be sought.
Six-year Transportation Improvement Program (TIP) Background
O
r
On August 10, 2005, the President signed into law the Safe, Accountable,Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21St Century (TEA -21) and previous
Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again .specifies
the systems on which certain funds can be used, and activities for which funds can be used and
promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and
programming of projects: SAFETEA-LU requires each designated MPO, to develop a Transportation
Improvement Program (TIP), and the state to develop a, Statewide Transportation Improvement
Program (STIP) as a condition to securing federal funds for the transportation projects.
Projects listed in the STIP are_ the only projects that can be approved by the Federal: Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by
the State of Washington for approved State funding agencies. The STIP is a prioritized program of
transportation projects, complied from local *and regional plans, along with the Washington
Transportation System Plan (WTP), which 'provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally,
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
2 - July 15, 2009 •
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land use
planning carried out by local governments. Citizen participation is an integral part of the planning
process at all levels. Local Agencies are required to develop and adopt a six-year transportation
program. All local agencies are required to hold at least one public . hearing during the
development of the six-year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The
ranking will be integrated with other project needs and the total list will be reviewed and adjusted to
the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted six-year TIP for 2010 to 2015. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive
Plan as required. The amendment is limited to incorporate only those projects that adopted in the
STIP and is not subject to the "once a year" change required under the laws of the Growth
Management Act.