Loading...
HomeMy WebLinkAbout09-08-2021 YPC Agenda PacketL'ity—oFTakima Planning Commission PUBLIC HEARING City Hall Council Chambers Wednesday, September 8, 2021 it p.m. - 5:00 p.m. YPC MEMBERS: Chair Jacob Liddicoat, Vice -Chair Lisa Wallace, Leanne Hughes -Mickel, Al Rose, Robert McCormick, Philip Ostriem, and Mary Place Council Liaison: Kay Funk (District 4) CITY PLANNING STAFF: Joan Davenport (Community Development Director), Rosalinda lbarra (Community Development Administrative Asst.), Joseph Calhoun (Planning Manager), Eric Crowell (Associate Planner), Trevor Martin (Associate Planner), and Analifia Nfifiez (Planning Technician) uln� �W M, III. Staff Announcements IV. Approval of Meeting Minutes of August 25,2021 V. Public Hearings: Aspen Tree LLC. - "'Plat of Aspen Estates - Phase 2" Plat of Aspen Estates - Phase 2 W. Washington Ave. & S. 641h Ave. PLP#003-21 ummi= Yakima The meeting will also be recorded and posted on the Y-PAC website. Visit the Yakima '1111 web page for more information. 2015 1994 CIT'T0FTAAPvM7-- YAKIMA PLANNING COMMISSION PUBLIC HEARING City all Council Chambers -INS HEARING DATE: WednesdRiv. Sentemhe-D in" I Yakima Planning Commission Sign -In Sheet — 09/08/2021 City of Yakima Planning Commission (YPC) Meeting Minutes City Council Chambers August 25, 2021 Call to Order Chair Liddicoat called the meeting to order at 3:00 p.m. Roll Call YPC Members Present: Chair Jacob Liddicoat, Vice -chair Lisa Wallace, Mary Place, Al `• Leanne Hughes -Mickel YPC Members Absent: Phil Ostriem, Rob McCormick (excused) Staff Present: Joseph • Planning Manager and Trevor Martin, Associat Planner Others: Kay Funk Staff Announcements — Planning Manager Joseph Calhoun announced the following: • The public hearing for the Aspen Tree Phase 2 subdivision will be held at the ne meeting. • More discussion will be held on the Housing Action Plan implementation related addonal housing units. Auglysl 11, 2021 Meotirig Minytes — It was motioned by Commissioner Place and seconded Commissioner Rose to approve the meeting minutes of August 11, 2021 as presented. T motion carried unanimously. Public Hearing — 2021 Comprehensive Plan -Map Arneqo*OU, (Part 2 of 2) — Associa 0 M 0 0 0 lone 0 ................ rzm,?41�. PrU5U111 TUF UUMITIL-1711, UnalU LIC101coat ciosed ine puDiic nearing portio Commissioners discussed the project and Commissioner Hughes-Mickle motioned to adopt t findings as presented and to send 1he proposal to Yakima City Council for approv Commissioner Wallace seconded the motion and the motion passed unanimously. Planning Manager, Joseph Calhoun presented the staff report regarding Rick Hargraves CPA#005-21, RZ#005-21 & SEPA#015-21 a proposed change to the Future Land Use m designation for the south 17 feet of • parcel from • Mixed Use to -• Residenti and concurrent rezone • • Business (B-2) to Two -Family Residential (R-2) afl recommended - .f• The commissioners had no questions for Mr. Hordan. There were no • •- present for comment, Chair Liddicoat close the public hearing portion. Commission Place motioned to adopt the findings as presented and to send the proposal to Yakima Ci Council for approval. Commissioner Rose seconded the motion and the motion pass •.:. Planning Manager, Joseph Calhoun presented the staff report regarding Casey & Shawna Gamache a proposed change to the Future Land Use map designation for one parcel from Low Density Residential to Commercial Mixed -Use and concurrent rezone from Single -Family Residential (R-1) to Large Convenience Center (LCC) and recommended denial of the proposal. Chair Liddicoat stated he has a family relationship with the representative of the applicant and would not be voting on the proposal. Leanne Liddicoat of 3D Design presented on behalf of the applicant. Commissioner Rose provided feedback regarding neighbor complaints related to traffic, safety concerns and compatibility and asked Ms. Liddicoat follow-up questions. Commissioner Hughes-Mickle and Wallace asked follow-up questions on zoning. Ms. Liddicoat asked about the possibility of a limited recommendation by the Planning Commission and the applicant's eagerness to begin building within a couple years. There were no participants for public comment and the public comment portion of the hearing. There was a lengthy dialogue amongst commissioners on potential concerns related to the installation of a coffee stand in that parcel. The commissioners discussed approving with a development agreement that only allows a coffee stands, addresses traffic concerns, etc. They discussed a similar project at a separate intersections where the developers had to purchase a neighboring lot. Commissioner Rose moved to approve with the proviso that there is a development agreement between the owner and the city, and to modify the city's findings. Commissioner Place mentioned that in the motion Commissioner Rose stated the development agreement would be between the owner and the city which could change if the property was ever sold. Mr. Calhoun elaborated on development agreements and the specific conditions. City Attorney Sara Watkins advised that the motion should contain what modifications the commissioner wants to make to the City's findings. The motion failed for a lack of second. A discussion on a potential development agreement was held amongst commissioners with input from city staff. Commissioner Liddicoat suggested that the commissioners not be specific on what can go on the parcel since the property owners could come up with different ideas and many of the neighbor's complaints would be addressed by the municipal code. Commissioner Place motioned for denial of the findings, motion failed for lack of second. Commissioner Hughes-Mickle motioned to adopt the findings as presented and forwarded to Yakima City Council. Commissioner Rose seconded the motion. City Attorney Watkins asked for clarification on the motion and stated that adopting the City's findings would send a denial to City Council. Commissioner Place retracted her motion to deny the City's finding as she wants the project denied, not the City's findings to be denied. Commissioner Hughes- Mickle restated her motion and motioned reject the findings of staff and order that the findings be modified to include the following reasons for denial and order that the proposed comprehensive plan amendment and rezone be forwarded to the City Council with a recommendation of approval. Motion failed for lack of second. City Attorney answered questions about whether the commission has to decide on the recommendation related to the comprehensive plan amendment and rezone. Commissioners discussed spot rezones, traffic concerns, project specific proposals, etc. Commissioner Hughes-Mickle asked Ms. Liddicoat if the owner had considered building multi- family on the lot. Ms. Liddicoat explained that the owner did consider multi -family housing but due to setback constraint it did not seem feasible. Commissioner Rose provided some history for the area and stated he would like to see the project approved. Chair Liddicoat explained that even with a rezone LCC, due to the size constraints, limit the size of the building. Vice -Chair Wallace asked whether neighbor's complaints would be re -addressed with future review. Chair Liddicoat asked Commissioner Rose why he supported Commissioner Hughes-Mickle's first motion but not the second one if he wanted the project to move forward. Commissioner Rose explained that he was having a hard time hearing and did not hear the entire motion. Chair Liddicoat clarified the confusion. Commissioner Hughes-Mickle moved to reject the findings of staff and order that the findings be modified to include the reasons for denial and order that the proposed comprehensive plan amendment and rezone be forwarded to the Yakima City Council with a recommendation for approval. Commissioner Rose seconded the motion. With three ayes, one nay and with Chair Liddicoat abstaining, the motion passed. -2- Adjourn — A motion to adjourn to September 8, 2021 was passed with unanimous vote. Th meeting adjourned at approximately 4:40 p.m. i Chair Liddicoat Date This meeting was filmed by YPAC. Minutes for this meeting submitted by: Analilia NOFiez "Plat of Aspen Estates — Phase 2" PLP#003-21, TC1#011-21 & SEPA#023-21 r on Open Record Public Hearing September 8, 2021 EXHIBIT LIST Applicant: Aspen Tree LLC File Numbers: PLP#003-21 Site Address: W. Washington Ave. & S. 64th Ave, Staff Contact: Trevor Martin, Associate Planner CHAPTER A Staff RepoLT CHAPTER B Maps Estates"Plat of Aspen Phase Staff Report DEPARTMENT OF COMMUNITY DEVELOPMENT M a S10%, Joan Davenport, AICP, Director ,OWN 11 A ILVA6 Planning Division � P CITY Of YAKIMA Joseph Calhoun, Manager 129 North Second Street, 2m` Floor, Yakima, WA 98901 ask.planning@yakimawa.gov - www.yakimawa.gov/services/planning CITY OF YAKIMA PLANNING DIVISION'S FINDINGS OF FACT, CONCLUSIONS & RECOMMENDATION APPLICANT: APPLICANT ADDRESS: PROJECT LOCATION: NAME OF PLAT: TAX PARCEL NUMBERS: DATE OF REQUEST: DATE OF RECOMMENDATION: STAFF CONTACT: 10 Aspen Tree LLC. 2550 Borton Rd., Yakima, WA 98903 Vicinity of W. Washington Ave. and S. 64 th Ave. Aspen Tree Phase 2 181333-32406 June 25, 2021 September 8, 2021 Trevor Martin, Associate Planner 1. DESCRIPTION OF REQUEST: Preliminary Long Plat to subdivide one parcel, totaling approximately 4.82 acres, into 22 single- family residential lots in the R-1 zoning district. Sol ke, 0 *1 11010: A. Statement of Cause: Pursuant to YMC Ch. 14.20, the applicant's statement in the Preliminary Long Plat application dated July 14, 2020 — This proposed plat will subdivide approximately 4.82 acres into 22 Single -Family lots. Lot sizes will range from approximately 6,300 sq ft to 8,497 sq ft. The lots will have frontage on a public roadways which will be improved as part of this project. B. Urban Area Zoning Ordinance. The main purpose of the Yakima Urban Area Zoning Ordinance Yakima Municipal Co (YMC) Title 15 (UAZO) is to implement the Yakima Urban Area Com*prehensive Plan and promote the general health, safety and welfare of the present and future inhabitan I of the Yakima Urban Area. YMC § 15.01.030 describes the purpose and intent to promote the purpose of the UAZO. Subsection 15.03.020(B) of the UAZO indicates th the intent of the Single -Family Residential (R-1) zoning district is to: Yakima 00C. 2015 1994 1. Establish new residential neighborhoods for detached single-family dwellings free from other uses except those which are compatible with, and serve the residents of this district, which may include duplexes and zero lot lines if established during the subdivision process; 2, Preserve existing residential neighborhoods for detached single-family dwellings free from other uses to ensure the preservation of the existing residential character, and serve the residents of this district; and 3. Locate moderate -density residential development, up to seven dwelling units per net residential acre, in areas served by public water and sewer system. Detached single-family dwellings are the primary use in this district. The district is characterized by up to sixty percent lot coverage; access to individual lots by local access streets; required front, rear and side yard setbacks; and one and two-story structures. The density in the district is generally seven dwelling units per net residential acre or less. This zone is intended to afford single-family neighborhoods the highest level of protection from encroachment by potentially incompatible nonresidential land uses or impacts. Nonresidential uses within these zones are not allowed; except for public or quasi -public uses, which will be required to undergo extensive public review and will have all necessary performance or design standards assigned to them as necessary to mitigate potential impacts to adjacent residences. C. Processing. 1. The application for a Preliminary Long Plat was received on June 25, 2021. 2. The proposed plat is larger than nine lots, and is therefore being processed under the provisions of YMC Ch. 14.20 and YMC Ch. 6.88. I The application was deemed complete for processing on July 23, 2021. 4. This project underwent a State Environmental Policy Act review and a Determination of Nonsignificance (DNS) was issued for this plat on August 19, 2021; no appeals have been filed. 5. Pursuant to RCW Ch. 58.17, YMC § 1.42.030 and YMC § 14.20. 100, the City of Yakima Planning Commission (Planning Commission) is authorized to make a recommendation for approval or disapproval, with written findings of fact and conclusions to support the recommendation to the City Council on preliminary plats. Within ten working days of the conclusion of a hearing, unless a longer period is agreed to in writing by the applicant, the Planning Commission shall render a written recommendation which shall include findings and conclusions based upon the record. Ca C D E: J% 6. Public Notice: Public notice for this application and hearing was provided in accordance with: YMC Title 14, Subdivision Ordinance; YMC Title 15, Urban Area Zoning Ordinance and YMC Title 16, Development Permit Regulations and include the following actions and dates: a. Date of Application: June 25, 2021 b. Date of Developer's Notice of Complete Application: July 23, 2021 c. Date of Notice of Application: July 30, 2021 d. Date of Posting of Land Use Action Sign on the Property: July 30, 2021 e. Date of Mailing of Notice of DNS: August 19, 2021 f. Notice of Public Hearing July 30, 2021 7. Public Comment: The twenty -day public comment period for this application occurred from July 30, 2021, to August 19, 2021. At the conclusion of the public comment period, the City of Yakima received three (3) comments addressing the environmental impacts and compatibility of the proposed development from SEPA agencies. Comments are summarized below: L Yakama Nation: ". The project is within the ancestral lands of the Yakama, and lies within a high risk area for encountering cultural resources. We request an archaeological survey of the proposed undertaking inclusive of subsurface testing to identify any potential buried sites. Please ensure a copy of the report is sent to our program for review and comment." Staff response: A condition to update the existing cultural resources survey will be incorporated into the recommended conditions of this report. ii', Washington Department of Archaeology and Historic Preservation: "...Our statewide predictive model indicates that there is a high probability of encountering cultural resources within the proposed project area. Further, the scale of the proposed ground disturbing actions would destroy any archaeological resources present. Identification during construction is not a recommended detection method because inadvertent discoveries often result in costly construction delays and damage to the resource. Therefore, we recommend a professional archaeological survey of the project area be conducted and a report be produced prior to ground disturbing activities. This report should meet DAHP's Standards for Cultural Resource Reporting. We also recommend that any historic buildings or structures (45 years in age or older) located within the project area are evaluated for eligibility for listing in the National Register of Historic Places on Historic Property Inventory (HPI) forms. We highly encourage the SEPA lead agency to ensure that these evaluations are written by a cultural resource professional meeting the SOI Professional Qualification Standards in Architectural History. Please note that the recommendations provided in this letter reflect only the opinions of DAHP. Any interested Tribes may have different recommendations. 3 We appreciate receiving any correspondence or comments from Tribes or other parties concerning cultural resource issues that you receive..." Staff response: A condition to update the existing cultural resources survey will be incorporated into the recommended conditions of this report. iii. Washington Department of Ecology: "Project with Potential to Discharge Off -Site If your project anticipates disturbing ground with the potential for stormwater discharge off -site, the NPDES Construction Stormwater General Permit is recommended. This permit requires that the SEPA checklist fully disclose anticipated activities including building, road construction and utility placements. Obtaining a permit may take 38-60 days. The permit requires that a Stormwater Pollution Prevention Plan (Erosion Sediment Control Plan) shall be prepared and implemented for all permitted construction sites. These control measures must be able to prevent soil from being carried into surface water and storm drains by stormwater runoff. Permit coverage and erosion control measures must be in place prior to any clearing, grading, or construction. In the event that an unpermitted Stormwater discharge does occur off -site, it is a violation of Chapter 90.48 RCW, Water Pollution Control and is subject to enforcement action. Note: Projects involving less than 5 acres of soil disturbance, but more than one acre of soil disturbance may be eligible for an Erosivity Waiver." Staff response: the applicant will be required to obtain all necessary agencies prior to the issuance of any building permits. 8. Development Services Team (DST) Review: The proposal was reviewed by the DST team on August 3, 2021. Final comments of the DST members are summarized below. a. Codes: i. Addressing shall be as follows: Lot 2-1: 6118 Coolidge Rd Lot 2-12: 2101 S 61 st Ave Lot 2-2: 6116 Coolidge Rd Lot 2-13: 6101 Coolidge Rd Lot 2-3: 6114 Coolidge Rd Lot 2-14: 6103 Coolidge Rd Lot 2-4: 6112 Coolidge Rd Lot 2-15: 6105 Coolidge Rd Lot 2-5: 6110 Coolidge Rd Lot 2-16: 6107 Coolidge Rd Lot 2-6: 6108 Coolidge Rd Lot 2-17: 6109 Coolidge Rd Lot 2-7: 6106 Coolidge Rd Lot 2-18: 6111 Coolidge Rd Lot 2-8: 6104 Coolidge Rd Lot 2-19: 6113 Coolidge Rd Lot 2-9: 6102 Coolidge Rd Lot 17: 2018 S 62nd Ave Lot 2-10: 6100 Coolidge Rd Lot 18: 2100 S 62nd Ave Lot 2-11: 2103 S 61 st Ave Lot 26: 2019 S 61 st Ave ii. Pursuant to the Chapter 5 of the Washington State Fire Code (WSFC), publicly available fire hydrants will be required along streets spaced at intervals that will provide required fire flow coverage for proposed structures in accordance with WSFC Appendix C. iii. These findings are not intended to be an exhaustive review of this proposal. b. Engineering: This project requires Title 8 and 12 improvements, including but not limited to the following: i. YMC 8.60 and 12.05 — New curb, gutter and sidewalk, and storm drainage, shall be installed throughout the new development. New sidewalk shall be constructed per standard detail R5, including approved ADA ramp at intersections. Street section shall conform to standard detail R3. ii. YMC 8.64 — A residential driveway approach is required which meets the requirements of this chapter and standard detail R4. Driveway width shall be a max. of 20'. iii. YMC 8.72 — An excavation and street break permit shall be obtained for all work within the public right of way. iv. YMC 12.02 — Easements shall be established per this chapter. v. YMC 12.06.020 — Right of way — All interior roads are classified as a Local Access, requiring a total of 50'of right of way. vi. YMC 12.06.080 - Street lighting - Street lights shall be installed and shall meet the design and placement standards of the city engineer. Lighting improvements shall become the property of the city of Yakima upon installation and will thereafter be maintained by the city. vii. YMC 15.06.065 - No driveway approach on a local access street may be located closer to the street intersection corner than thirty feet as measured from the property line at the corner. viii. An ENG permit is required for all civil work to be performed on site. ix. All improvements and shall be completed prior to Certificate of Occupancy. c. Nob Hill Water i. Nob Hill Water is available to serve the new development. Nob Hill Water has been paid for new water mains and services and at this time is waiting to install. C Wastewater i. City sewer will need to be extended throughout development in accordance with YMC Title 12 and City of Yakima Standard Details. Wastewater will review and approve the Engineered drawings submitted for this work. kyAF-,I:J A. YMC § 15.05.020 (H): Site design requirements and standards: Access Required: All new development shall have a minimum of twenty -feet of lot frontage upon a public road or be served by an access easement at least twenty feet in width. The purpose of this standards is to provide for vehicular access to all new development; provided, the construction of single-family on existing legally established lots is exempt from the requirements of this section. I - - -NI-7 1. B. YMC § 15.05.030 (A): Creation of new lots — Subdivision Requirements: Table of Subdivision Requirements: • Establishes basic development criteria for lot size and width that must be met when reviewing an application for a new subdivision. For single-family dwelling construction in the R-1 zoning district, the required minimum lot size is 6,000 square feet. C. YMC § 15.05.055(1) New Development Improvement Standards Fire apparatus access roads for multiple -family residential developments and one- or two-family residential developments shall be subject to the provisions of Sections D1 06 and D107, respectively, of Appendix D of the International Fire Code (2009 Edition). Additionally, such residential developments shall be subject to the requirements of Section D105 of Appendix D, International Fire Code (2009 Edition), pertaining to aerial fire apparatus roads, as applicable. All provisions of the International Fire Code referenced above are hereby adopted and incorporated herein by this reference, as now existing or as hereafter amended and adopted by the city. Minimum requirements for the primary and secondary access will be at least twenty feet wide, unobstructed, paved lanes. D. YMC § 12.02.010 Establishment of Easements: Public utility easements shall be established for the location of new and proposed public utility lines serving new land divisions and land development. Public utility easements shall also be established across the front of new lots and redeveloped lots to provide for future utility access as determined necessary by the city engineer. Public utility easements shall be dedicated (granted) at the time that subdivision and/or land use approval is granted. E. YMC § 12.02.020 Easement location and width: Eight -foot -wide utility easements shall be dedicated along the front of each lot in subdivisions and short subdivisions. Easements for new and/or future utility lines shall be a minimum of eight feet in width, or twice the buried depth of the utility, whichever is greater. F. YMC § 12.03.010 Sewer service required: All new lots and development shall be served by a sanitary sewer line located adjacent to the lot or development site. G. YMC § 12.03.040 Minimum sewer line size: The minimum size for public sewer lines is eight inches in diameter. H. YMC § 12.03.070 Side sewer service: Each building containing sanitary facilities shall be served by a separate private side sewer line from a public main. 1. TRIC § 12.04.010 Water service required: All new lots and development shall be served by a public water supply line maintained �d by the city of Yakima, Nob Hill Water Company, or other water purveyor, and located adjacent to the lot or development site. The water line shall be capable of providing sufficient flow and pressure to satisfy the fire flow and domestic service requirements 0 the proposed lots and development as approved by the city Engineer in cooperation wil the code administration manager and water irrigation division manager. 12.04.020 Water line extension required: Water lines shall be extended to the point where the adjoining property owner's responsibility for further extension begins. This typically requires extension across the street or easement frontage of the developing property. In some cases it will require dedication of on easement and a line extension across the property or extension along two or more sides of the developing property. Extensions will be consistent with and implement the City's adopted water comprehensive plan. K. YMC § 12.04.040 Minimum size and material standards: New water lines in the city of Yakima water system shall be constructed of Class 52 ductile iron and shall be a minimum of eight inches in diameter. Improvements and additions to the Nob Hill Water Company system shall conform to the requirements of Nob Hill Water Company. YMC § 12.05.010 Sidewalk installation required: "Sidewalks shall be installed along both sides of all new, improved, and reconstructed streets... " 12.06.020 Right-of-way and pavement width standards: Right-of-way shall be dedicated and street surfacing provided in accordance with West Valley Neighborhood plan and Table 5-1 of the Yakima urban Area Transportation Plan. N. IRCW 58.17.280 and YMC Ch 14.15.090 — Naming and numbering of short subdivisions, subdivisions, streets, lots and blocks: Any city, town or county shall, by ordinance, regulate the procedure whereby short subdivisions, subdivisions, streets, lots and blocks are named and numbered. A lot numbering system and a house address system, however, shall be provided by the municipality for short subdivisions and subdivisions and must be clearly shown on the short plat or final plat at the time of approval. O. RCW 58.17.110 and YMC 14.20.120: The city, town, or county legislative body shall inquire into the public use and interest proposed to be served by the establishment of the subdivision and dedication. It shall determine: (a) If appropriate provisions are made for, but not limited to, the public health, safety, and general welfare, for open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools and school grounds, and shall consider all other relevant facts, including sidewalks and other planning features that assure safe walking conditions for students who only walk to and from school; and (b) whether the public interest will be served by the subdivision and dedication. 1. This proposed preliminary plat is approximately 4.82 acres in size and has been designed for single-family residences. 2. The Preliminary Long Plat is occurring one phase and thus the density calculation is based upon a single action of dividing 4.82 acres in to 22 residential lots. 3. The density calculations are listed below: Density for the proposed development as a whole: -->= 22 dwelling units / 3.59 acres (acreage with streets removed) 4= 6.13 Dwelling Units Per Net Residential Acre 4. The preliminarily platted rights -of -way are classified as residential access streets, requiring a total of 50 feet of right-of-way. 5. Full street improvements will be required for all preliminary platted right-of-way, 6. W. Washington Ave. is classified as a Minor Arterial requiring a total of 80' of right of way (40' half width) — existing right-of-way is adequate. 7. Environmental Review was completed for this development, and a DNS was issued on August 19, 2021. 8. gqajflg rdinanc+: The subject property is zoned Single -Family Residential (R-1). The proposed subdivision is consistent with the following zoning standards: a. Lot Coverage: The maximum lot coverage permitted in the R-1 zoning district is 60% and all lots will comply with that limitation. b. Lot Size: The preliminary plat indicates lot sizes that range from 6,300 sq ft to 8,477 sq ft., consistent with YMC § 15.05.030,Table 5-2 which provides that the minimum lot size for single family construction is 6,000 square feet. c. Lot Width: YMC § 15.05.030, Table 5-2, prescribes a minimum lot width of 50 feet for detached single family dwelling units. All proposed lots meet or exceed the minimum requirement. d. Density: With a density of about 6 dwelling units per net residential acre (6.13 du/nra), the proposed preliminary plat complies with YMC § 15.05.030(B) and YMC § 15.03.020(B) which prescribe a maximum of seven (7) dwelling units per net residential acre in the R-1 zone. 8 The 2040 Comprehensive Plan and Future Land Use Map designates the subject property as suitable for Low Density Residential development. Single-family detached dwellings are the predominant dwelling type. Other dwelling types may be allowed under certain circumstances, such as accessory dwellings and cottage housing. The permitted density is up to seven net dwelling units per acre for infill development. On larger sites (over two acres), more flexibility in lot sizes and layout are envisioned, provided overall density standards are met. Permitted maximum densities on large sites is up to seven gross dwelling units per acre. Density bonuses allowing up to six gross dwelling units may be allowed subject to conformance with traditional neighborhood design concepts. Generally, the proposed preliminary plat is consistent with the Comprehensive Plan's other provisions which encourage infill, recognize the need for public water and sewer, encourage disposal of surface drainage on -site, and encourage development consistent with the general land use pattern in the area. The Goals and Policies that apply to this designation and proposed land use are as follows: Goal 2.3. Residential uses. Preserve and enhance the quality, character and function of Yakima's residential neighborhoods. Policy 2.3. 1.13. Standard single family. Continue to allow for detached single family dwellings in residential districts. Policy 2.3.3 Create walkable residential neighborhoods with safe streets and good connections to schools, parks, transit, and commercial services. Policy 2.3.3.A Construct sidewalks along all new residential streets. Policy 2.3.3.0 Promote small block sizes to ensure good connectivity and reduced walking distances between residences and schools, parks, and services. Specifically: • Low density residential: Blocks between 400- 800 feet long are appropriate. ■ Mixed residential: Blocks between 300-660 feet long are appropriate. • Provide for through public through block connections for large residential blocks. Commercial and mixed -use designations: Configure development to provide pedestrian connections at 300 to 660 feet intervals. Configure development to provide vehicular connections at 600 to 1,320 feet intervals. Allow flexibility for private internal streets to meet connectivity objectives. Goal 5.2. Preserve and improve existing residential neighborhoods. Policy 5.2.1. Invest in and improve quality of life in existing neighborhoods. Goal 5.4. Encourage design, construction, and maintenance of high quality housing. Policy 5.4.3. Encourage development of well -designed new housing in coordination with population growth employment growth, and transportation goals. 9 As proposed, and with the recommended conditions, this preliminary plat meets all the design requirements of YMC Ch. 14.25 of the City's subdivision ordinance and the development standards of YMC Title 12. The recommended conditions are intended to ensure consistency with the provisions of the City's subdivision ordinance and that appropriate provisions are provided for the following: a. The proposed subdivision must be consistent with the provisions of the urban area zoning ordinance; b. The proposed subdivision must be consistent with the city of Yakima's comprehensive plan; c. The proposed subdivision must be consistent with the provisions of this title; and d. As required by RCW Chapter 58.17, the proposed subdivision must make appropriate provisions for: i. Public health, safety, welfare: The construction of new single-family dwellings will complement adjacent uses will promote the public health, safety and general welfare insofar as there is a need in this community for additional housing and insofar as this proposed preliminary plat would be required to comply with all applicable City development standards, and all conditions of approval specified by the City of Yakima Planning Commission. ii. Open spaces: The proposed lots are larger than minimum sizes required in the R-1 zoning district. Lot coverage of 60% or less in the R-1 zoning district will provide adequate light and air for future residents in accordance with the standards in the zoning ordinance without additional open spaces. iii. Drainage systems: Drainage system facilities will be provided in accordance with state and local regulations including the City of Yakima Municipal Code and the eastern Washington Storm Water Manual. iv. Streets, alleys, and other public ways: The subject property has frontage upon Washington Ave., designated as a Minor Arterial street which requires 80-feet of right-of-way. New interior streets will be designated as Local Access, requiring 50-feet of right-of-way. V. Transit Stops: Yakima Transit Routes 2 and 5 are accessible at the corner of Washington and 64 th Avenues, approximately 1 /10 of a mile to the west. vi. Water supplies: Public water is required to be used for domestic and fire flow purposes. An adequate water supply for this development is available from Nob Hill Water Company. vii. Sanitary waste disposal: Public sewer is required • service all •. City of Yakima sewer mains are within Washington Ave. and S 60th Ave, and are capable of being extended to handle the demands of this development. I 10 viii. Parks and playgrounds: Open space, parks, recreation, and playgrounds are located approximately within 1.8 miles of this subdivision due to the proximity of West Valley Park. The proposed preliminary plat is not located in a planned parks and recreation area. Provisions for parks and recreation areas are not necessary within the proposed preliminary plat due to the size, number and location of the proposed lots and provisions for playgrounds exist at the schools which children within the proposed preliminary plat would be attending, and could also be individually provided on the lots themselves which are of a size which would allow for playground areas as needed or desired. ix. Sites for schools: West Valle Middle and West Valley Jr High Schools are located approximately within 1.4 miles, and West Valley high School is located approximately within 1.8 miles of this subdivision. k Sidewalks: Sidewalks are required and will be provided along this developments frontage. Based upon standards above, a finding that the public use and interest will be served by the approval of this subdivision: This proposed 22-lot residential subdivision is consistent with neighboring land uses and better serves the needs of the City of Yakima than the undeveloped status of the property. 11. TRANSPORTATION CONCURRENCY: This application was reviewed and approved for consistency with YMC 12.08 Transportation Capacity Management Ordinance on July 27, 2021. The proposed development will not exceed the PM peak hour capacity of the City Arterial street system and reserve capacity exists on all impacted streets. This review does not include any site development or safety issues which may be discussed at the project level or SEPA review. 12. TIME LIMITATION: Upon preliminary plat approval the applicant has five years from the date of preliminary approval to submit the final plat. Thereafter, 30 days prior to the expiration of preliminary approval the applicant must submit to the City Council a written request asking to extend the approval period for a maximum period of one year (YMC § 14.20.160 YMC). Before the final plat can be recorded all required infrastructure must be engineered, completed and inspected or engineered and financially secured and receive final plat approval from the City Council. VI. CONCLUSIONS: 1. This Preliminary Plat complies with the general requirements for subdivision approval as specified by YMC Ch. 14.20 and Ch. 15.05. 2. The proposed subdivision meets the density standards of the R-1 zoning district having 6.13 dwelling units per net residential acre. 3. The proposed Preliminary Long Plat has primary access via W. Washington Ave. and new interior local access streets. 4. Affected streets have sufficient capacity for this proposal. 5. This proposed plat serves the public use and interest and provides for the possibility of creating new additional housing within the City of Yakima. 6. The Planning Commission has jurisdiction to review a recommendation to City Council. (RCW Ch. 58.17, YMC § 1.42.030, and YMC § 14.20. 100) 7. A Determination of Nonsignificance (DNS) was issued on August 19, 2021. 8. This preliminary subdivision complies with the goals and objectives of the 2040 Comprehensive Plan, the intent and purpose of the R-1 zoning district, the provisions of the Urban Area Zoning Ordinance, Subdivision Ordinance, Title 12 Development Standards and Chapter 12.08 the Traffic Concurrency Ordinance. 9. During project review it has been found that this request is in compliance with YMC §16.06.020 (B) for making a Determination of Consistency as follows: a. The proposed use is permitted within the R-1 zoning district. b. The proposed development is consistent with densities deemed appropriate for the R-1 zoning district by the Yakima Municipal Code, and is similar to densities of surrounding subdivisions. c. This proposal is consistent with existing development regulations for this location. 10. The proposed plat complies with the provisions of RCW 58.17.110 and YMC 14.20. 100, providing appropriately for: the public health, safety, and general welfare, open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools and school grounds, sidewalks and other planning features that assure safe walking conditions for citizen of the neighborhood. V11. RECOMMENDATION The Planning Division recommends that the 22-lot subdivision known as "Aspen Tree — Phases 2" be approved subject to the following conditions: 1. The applicant shall submit and gain approval of civil engineered plans which provide for design of all Title 12 development standards, including but not limited to curb, gutter, sidewalk, street lighting, stormwater, and street design. 2. Prior to approval of the final plat, all approved improvements shall be constructed or financially secured according to the standards and requirements of the City Engineer and YMC Title 12. 3. All lots shall be served with public water from the Nob Hill Water Company. No individual domestic or irrigation wells shall be permitted for any of the lots. Prior to final plat approval, written verification from Nob Hill Water must be submitted to the Planning Division indicating that all construction required to provide each lot with domestic water has been completed and the fees paid. 4. All lots shall be provided with public sewer service according to YMC Title 12 standards. Prior to final plat approval, written verification from the City of Yakima Engineering V-0c. INDEX 0 12 Department must be provided to the Planning Division indicating that all sewer extensions have been completed and inspected or financially secured. 5. A minimum 8-foot wide public utility easement must be provided adjacent to all public road rights -of -way. 6. Easements for new and/or future utilities shall be a minimum of 16-feet in width, provided that the width of easements for buried utilities will be twice the depth of the planned excavation. 7. All public and private utilities shall be located underground, with the exception of telephone boxes and such similar structures. 8. All public and private utilities to be located within public road rights -of -way must be constructed prior to the start of road construction. 9. Fire hydrants shall be placed at the locations specified by the Building Codes and Planning Division and the Yakima Fire Department. All lots must be provided with adequate fire flow. 10. All permits required by the Yakima Regional Clean Air Authority shall be obtained and a copy provided to the City of Yakima Code Administration prior to commencement of site preparation. The developer shall designate during working hours a responsible party to serve as contact for suspected air quality violations. 11. NPIDES Permit and a Stormwater Pollution Prevention Plan shall be prepared and submitted to the City. 12. All addresses shall be as specified in Exhibit "A" of this report. All addresses must be clearly shown on the face of the final plat as required by RCW 58.17.280. 13. This plat shall be subject to the following notes, which must be placed on the face of the plat: a. The addresses shown on this plat are accurate as of the date of recording, but may be subject to change. The City of Yakima Building Codes Division is responsible for the confirmation or reassignment of addresses at the time of buildin• permit issuance. b. The owners shown hereon, their grantees and assignees in interest hereby covenant and agree to retain all surface water generated within the plat on -site. 14. Irrigation approval, for the Ahtanum Irrigation District, shall be shown on the face of th final plat. 15. A cultural Resources Survey shall be conducted on the subject site, if the applicant do not wish to have a cultural resources survey conducted on the site, an Inadvertent Discovery Plan (IDP) shall be prepared by the applicant, and a copy of the IDP shall b submitted to the City. 16. All other reE*,uirements of the set forth herein, shall be complied with in their entirety. U, 0 C. IT IN D 17X I,, i 13 17. Upon preliminary • approval, the applicant has five years to • the final • Thereafter, 30 days prior to the expiration of said approval the applicant must submit to the City • a written request asking to extend the approval period • a maximum period of • year. I-d .-AI-A 14 "Plat of Aspen Estates Phase Project Name: Site Address: File Number(s): -M -Uff IrRi NOW I I♦ 'M Mak M am= MEWSW 11DIENWIMMIUM ZONING MAP rAi Yakima Urban Area Zoning SIR Suburban Resiter�--a4 F-2 Tv, ; Fa oral Bu--Iintiss B-2 Business �3 -+3-oncal Business SCC Small C—o�veneic` Cer7er L--C Large Conven-erceC-e—er C BD, Ce ntra I E usi n e ss D s-cri c-L CC Ger-era' Comme--i-31 N'A '- - q77 lncustria� V-2 Hea.%--y lndustra P P V _j F Map Disclaimer: Information shown on this map is for planning and illustration purposes only. The City of Yakima assumes no liability for any errors, omissions, or inaccuracies in the information provided or for any action taken, or action not taken by the user in reliance upon any maps or information provided herein. Date Created: 6/29/2021 Project Name: ASPEN TREE LLC - "PLAT OF ASPEN ESTATES - PHASE Site Address: W WASHINGTON AVE & S 64TH AVE i FUTUnE LAND li$]� MAP Yakima Future Land Use Designations Low Dens -Ty Remdmnto| MixedResderza| � Cenzra|Business Core Cornnnerdal Corrrnercia|Mbxe�dUse Regiona|C\omrnercia! Community Mixed Use Industrial ' Map Disclaimer: Information shown on this map is for planning and illustration purposes only. The CityofYakima assumes noliability for any errors, omissions, or inaccuracies in the information provided or for any action taken, or action not taken by the user in reliance upon any maps or information provided herein. Project ,-,r. Name: r ASPEN ."PLAT i 1 ASPEN ESTATES ,' 'ry PHASE Site Address: ' ♦ S 64THAVE File nin r. iy.0 ! a . . .. i ' Proposal: Preliminary longplat to subdivide approximatelyr residential the •-I zoning district. VICINITY MAP co g4ttl 7 fi� i°' m. I _ _ r tf75Ri , WD Map Disclaimer: Information shown on this map is for planning and illustration purposes only. The City of Yakima assumes no liability for any errors, omissions, or inaccuracies in the information provided or for any action taken, or action not taken by the user in reliance upon any maps or information provided herein. Date Created: 6/29/2021 "Plat of Aspen Estates — Phase 2" i M , I N rkSHihGTAN A'T PROJECT LOCATION . W vMAICCf+. A. W WHITAAN ST G mUsirli s RD. OCCIDENTAL RD VICINITY MAP - N.T.S. PHASE s a PRELIMINARY PLAT OF "ASPEN ESTATES_' E PORTION O: THE SW 1/4, SECTION 33, TOWNSHIP I d l i I T i� I� la d S I 3 i I i 3 1 I r:T:47 q a mx W .: 1 G IN, MI `M � R.1a. W.M. HLA2803 Ri—Road �Nq rr Y a, WA 98902 A '3 �.. 5OR966.7000 FOR 509.965.3800 unmxhlNLRriLcnm 1 I ,� `"',��s i 3 :*s AR 9Y. OCR BY: MQH LEGAL DESCRIPTION THE NORTH 165 FEET OF THE SGUTHIAEt r 1/4 OF THE SOUTHWEST 1l4 OF "SECTION 33, CA'MBRIA 13 NORTH, RANGE 18, E.'N.M., Ewe, '—.T .VARTV3 d oulT `N£5 Y ',O THE FOLLO ANG DESCRIBED lAE: cwvnvamo Al THE NORTHWEST ;C;-§fir OF THE SOUTHWEST CHARTER OF 'HE it'3?E;..T 4>A.'e..5"Cn SalaSPITON ,. THENCE SOUTH 6929'29" EAST ALONG THE NORTH UNE OF SAID SJRDIIA904 539.75 FEET TO THE 10'INT OF BEGINNING OF SAID UNE; THENCE SOUTH 0'09'50" EAST 165,01 FEET TO THE SOUTH UNE OF THE NORTH tG5.00 FEET OF SAID SUBDIVISION AND TERMINUS OF SAID LINE; AND, e T'x'ER. All, -'HAY PON Or °,OF: 4 Or ?RAySHCRI PLAT RECORDED '..N BOOK all f , E*Gr "'s'F4A 5. a"x0,£ `s+-'a, -_ :'xJ{yTi z'E ME NUNEGR 2596713 RECORDS OF YAKpas WA D Al FDLUGAf511_ COMMEDDING AT `DHC SOP?9I%—�0 CORNER, OF SAID LOT 4; € ` E. NORTH X SO" WEST 1i3O#+'.0 SAOI WEST LINE 150 C1. FEET: NE THENCE SOUTH Q R SG' EAST 50,01 FEET; F: SOUTH 85'2r`,Mi" EAST 65T78 FEET TO TH'E EAST UN' OF SAID LOT 4: 'TI NCE SOUTH DOMN2a' EAST ALONG SAID SOUTH LINE 100.00 FEET TO THESOUTHEAST VONGNA ' OF SAID LCa A.: THENC ROTH 92S29" SPOT ALONG THE SOUTH LINE OF SAID LOT 4 A DISTANCE OF 753,31 FEET TO TH_ POINT OF 9E0NNNIA SITUATE IN YAKINA COUNTY, STATE OF WASHINGTON, A$#':., IT V Y. aT PROPERTY 3S ZONER R=1, Fd&f'LY RE DEN AL 2,, STREET UNROVERSAITS ET:AHL CONCORD TO CITY .s YAALMA STANt3A4's3S it* 9q-1 REAl w 3 SEAS, AS,R S PRO-VIDE.BY CITY OF YAKIMA.. 4 AL STORM "WATER GESAMATER YT NCR IMPERVIOUS SURFACES TO BE 'AWED � AN 01.5POSED OF ON S."E V. ACCORDANCE WITH CITY 7F YAKIMA STORt3'E{AT€ii ®. a^,z%4F+i: 6°UG C1°AGN EeE34aMEa�S 5 Y£5i-� is 'Roposm TO E1# # 'fl c'f R"ll Ham. %.tr " A' -"p a..:s S"BA, M 9dClUD-NG NALI®.S. FTT :'a�SS, 3;R F'r : ?'t W i�vO--ATIE G 6E �,. D MD C) '. 5"T4 a'*, Es €iY N{zE HC;6 lk&T`N"N Ea3 HmPART L A-VOIN& NOT SET C� 4�"'�'4k&NEG.'Ati,C, NCr` 5N0'4A# Cz: ` P EM v 5, FGAICk TV: - , 'Etk HOICt L'?,E.�.S A* Y.A7ORAL: OAS NAME An TRIT aD SH 01 1- THE PUBLIC r A�ai4:t3 '`„E r�L°,#-"'CY`c YyY £` NATE Y8"H Tk„ ,yAR:*tx0 VflUTY'V? OR ffA"sTALE.aY'O'e' i1 FAt;t m„ 7, r C.AL CCCLmO s e A 5— 45, r n 3 S SEA V, FRMA CENTERLINE OF ROUT Z OF WAY GO WA$HINSTION ACE, W SPIC 5 `n3+A-.Fs' FROM CENTERUNE OF RIGHT OF W #AY.. ANDg" S£:3Af;A Gid .... R. DTNE U A:. SOJNDARY SHOWN HEREON PREViO'JS'_Y SURVEYED. SEE SHORT PLAT W-173 FOR Q ADDITIO14AL INFORMAMON. Q d DEVELOPER ENQINEER!$URVEY LL BOARD ESTAT 5, LLC HI.A ENGINEERING AND LAND SURVEYING, INC. Z 25508ORTON RD:, 28M RIVER DRUM ®,.... YAKiIN WA 98903 YAKIMA INNSHfNGTO OVER --WOOD BURTON 0 RAN SASV429 TMARUA6*,.A d" O d ASPEN ESTATES - PHASE PARCEL 181333-32406 1 1 CITY OF YAKIMA, YAKIMA COUNTY, WASHINGTON D PRELIMINARY PLAT 2 N W E s ��sssta a�i�a aaysxa sxaFi �•vea, s o$ R re� PRELIMINARY !k RPLAT OF "ASP�N�TATE5.- 13 NORTH, RANGE 18 EAST, 2803 Ptive>•Road tc•r Y &I.,, WA 98902, 8902 y � 509.966-7000 L AFax 509.985.3800 , 6 r , W f U J < a a CITY (IF LL ' to l z O 0 a ASPEN 5 a 2 G1 ESTATES 2 SNI 20026 d,,g PARCEL 181333-32406 2 CITY OF YAKIMA, YAKIMA COUNTY, WASHINGTON - BI hPH PRELIMINARY LOT LAYOUT PHASE 2 2 "Plat of Aspen Estates — Phase 211 PLP#003-21, TCO#011-21 & SEPA#023-21 1&301111011010 "Plat of Aspen Estates — Pb,ase 2" PLP#003-21 , TCO#01 1-21 & SEPA#023-21 I a a 1 [00 M0 Name Comment Date Glenn Denman — Code---- See Attached. 08/03/2021 Administration Division Lisa Maxey — Code See Attached. 06/30/2021 Administration Division Mike Shane— Water/Irrigation See Attached 09/01/2021 Division Kirsten McPherson — Nob Hill Nob Hill Water is available to serve the 07/08/2021 Water new development. Nob Hill Water has been paid for new water mains and services and at this time is waitin Rcy to install. Dana Kallevig — Wastewater Sewer will need to be extended per Title 12 08/05/2021 Division requirements and COY Engineering Sewer Standard Details. COMMUNITY DEVELOPMENT DEPARTMENT Code Administration Division 129 North Second Street, 2nd Floor Yakima, Washington 98901 Phone (509) 575-6126 Fax (509) 576-6576 codes(qy)akimawa.gov www.buildingyakima.com Trevor Martin 129 N 2 nd St. Yakima, WA 98901 -- Yakima WON 2015 1994 COMMUNITY DEVELORWITIUDEPARTMENT Office of Code Administration 129 North Second Street, 2nd Floor Yakima, Washington 98901 L (509) 575-6126 Fax (509) 576-6576 codes*akimawa.gov www.buildingyakima.com To: City of Yakima Planning Division From: Lisa Maxey, Permit Project Coordinator Re: DST Comments for PLP#003-21 Aspen Estates Phase 2 - Preliminary Long Plat for 22 single-family lots. The prelimi"ary addressine for this oronosal is: Lot 2- 1: 6118 Coolidge Rd Lot 2-12: 2101 S 61't Ave Lot 2-2: 6116 Coolidge Rd Lot 2-13: 6101 Coolidge Rd Lot 2-3: 6114 Coolidge Rd Lot 2-14: 6103 Coolidge Rd Lot 2-4: 6112 Coolidge Rd Lot 2-15: 6105 Coolidge Rd Lot 2-5: 6110 Coolidge Rd Lot 2-16: 6107 Coolidge Rd Lot 2-6: 6108 Coolidge Rd Lot 2-17: 6109 Coolidge Rd Lot 2-7: 6106 Coolidge Rd Lot 2-18: 6111 Coolidge Rd Lot 2-8: 6104 Coolidge Rd Lot 2-19: 6113 Coolidge Rd Lot 2-9: 6102 Coolidge Rd Lot 17: 2018S62❑d Ave Lot 2-10: 6100 Coolidge Rd Lot 18: 2100 S 62nd Ave Lot 2-11: 2103 S 6l't Ave Lot 26: 2019 S 61't Ave prior to commence work • YMC 8.72. N PRELIMINARY PLAT OF W^*E "ASPEN ESTATES -PHASE 2" ksA{HH��?' SiA?E ?2EiERE E �e.i PORTION OF THE S4,... SECTION3, TOWNSHIP PRELIMINARY ADDRESSING 13 NORTH, RANGE 18 EAST, . . /30/ 1 L I ° z T_ _--o--T ---j w ° t PU_P d — — - 0 .7 �: � �a[p { .... tom:..., -_.. �. `U' P,�. ;�} Q.. ', � SAQ �'� m'JJ.�.# �t:� I 6 a EASEM j'7 t I tit 1 �, % t {a4 FIYBLIC f �nnlI��qq ttoa i �u 3 3 �k I t 17 �'U011% Q - * k Y. EASEME�J7 s+ J tJ'iA..I7Y• b tv & :§ �' 7 iL4SE14ENIn 3=i' a J ��Lt!� 22 t� ' m CS 91 10 PUKIC �' 5C } 'C rLyllC It ' saE rn LL 3 # 'i EAEMENT @ $ N zT?"'� .,... �! 79 ry NIA ev ca ci g t . 9 o-Ig co SW CORWR, L01 4 "'ti z e _y UTIII ..-.=a.._...a..A.— : 1 � EASEM-m 6103 3& §` 04 161m-gym _ ®, Vim. 1� g ' --- . teeTIT Pk 611 611 t 11 UJIUTk - 3 11 a EASEMENT 61 610 610 610 100'CIA LL LL LL LL - 9d.. LL - LL - 3s LL iq„ fl IL t' U- a+n �' N °? to ; Y e a 'ors, ® w m ?cry �4 en a rs m cn F w cr ,a t s ma cw cv cv +a g cm Fm F o- FOB 8 F ° F* � cva+ h� fl O O^ ON O fl =� u s O =za O W z `J z J z W �z J J d y `z "s. ., Ir: J 8 6110i k t TO: Trevor Martin, Assistant Planner RE: PLP#003-21 — W. Washington Ave. & S. 64 Ih Ave. (Parcel #18133332406) - ASPEN TREE LLC - "PLAT OF ASPEN ESTATES - PHASE 2" Project Description — Preliminary long plat to subdivide approximately 4.82 acres into 22 single- family residential lots in the R-I zoning district. This project requires Title 8 and 12 improvements, including but not limited to the following: YMC 8.60 and 12.05 — New curb, gutter and sidewalk, and storm drainage, shall be installed throughout the new development. New sidewalk shall be constructed per standard detail R5, including approved AA ramp at intersections. Street section shall conform to standard detail R3. YMC 8.64 — A residential driveway approach is required which meets the requirements of this chapter and standard detail R4. Driveway width shall be a max. of 20'. YMC 8.72 — An excavation and street break permit shall be obtained for all work within the public right of way. YMC 12.02 — Easements shall be established per this chapter. YMC 12.06.020 — Right of way — All interior roads are classified as a Local Access, requiring a total of 50'of right of way. YMC 12.06.080 - Street lighting - Street lights shall be installed and shall meet the design and placement standards of the city engineer. Lighting improvements shall become the property of the city of Yakima upon installation and will thereafter be maintained by the city. YMC 15.06.065 - No driveway approach on a local access street may be located closer to the street intersection corner than thirty feet as measured from the property line at the corner. An ENG permit is required for all civil work to be performed on site. All improvements and shall be completed prior to Certificate of Occupancy. Doc., "Plat ofAspeni ` Phase PLP#003-21,I jammulli ilogo . ... ...... STATE ENVIRONMENTAL POLICY ACT (SEPA) �4 (AS TAKEN FROM WAC 197-11-960) YAKIMA MUNICIPAL CODE CHAPTER 6.88 The State Environmental Policy Act (SEPA), RCW Ch. 43.21C, requires al governmental agencies to consi er t e I environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared I for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide \,. \ :1 help you and the agency#_.impacts• your ♦ 1f•:...... (and to reduce or \ i impacts from the _pmpim1lJf it can be done) and to help the ageney decide whether an EIS i required. This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questionsfrom f own observations or projectplansi need to hire experts.If you really • f not knowanswer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions I now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and I landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different Parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably Ova i Complete this checklist for non -project proposals, even though questions may be answered "does not apply." IN ADDITION, I complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For non -project actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected eographic area," respectively. e a r® ' r �' 1 1r ' f 1'+ • 1 A 1 1 1. Name Of Proposed Project (If Applicable): Preliminary Plat of Aspen Estates Phase 2 A l r i I f• I f• I I. �:. I] mill it ' 11 l i � �f •, • f c •fir:. `: , i •'. Revised 07/2014 _ _` Page 4 9. List any environmental inforn—jon you know about that has been prepared, -_ will be prepared, directly related to this proposal: There is a previous SEPA determination on the property for the Preliminary Plat of Aspen Estates. The environmental information prepared would be available at the City of Yakima Planning Department - ----------- 10. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain: There are no applications pending that directly affect the property. There is an approved Preliminary Plat of Aspen Estates on the property. The proposal would create a plat on future Tract A, the balance of the property for Preliminary Plat of Aspen Estates -Phase 1. 11. List any government approvals or permits that will be needed for your proposal, if known: City of Yakima - Preliminary Plat Approval City of Yakima - SEPA Determination. City of Yakima - Storinwater Approval. City of Yakima - Building Permit Approval. City of Yakima - Plan review and approval, and construction approval for municipal facilities constructed by private parties 412. GWe a- brief,butco`m`pJ`ete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.): The proposed Preliminary Plat of Aspen Estates will subdivide. approximately 4.82 acres into 22 single` family lots. The lot sizes will vary in size from approximately 6,300 square feet to 8,497 square feet. The lots will have frontage onto a public roadway, which will need to be improved as part of this project. The project will be a single phase. Access to the plat will be from public road extensions off S. 6111 Avenue, and S. 62nd Avenue. Nob Hill Water will serve the lots with domestic water, and City of Yakima Sewer will serve the sewerage needs. Storm water will all be contained on -site in retention swales, or underground infiltration. There are no existing surface bodies of water within the development although there is a lined irrigation pond in the southwest comer. The are no critical areas known to be on the site. '460eft,D JUIV 2 'r �021 01TY OF V, rl�ir PMIVN,INO DIWAi 13. Location of the proposal. Give sufficient information fora person to understand the precise location of your pro- posed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist.: The proposed Aspen Estates Phase 2 property is located along the south side of W. Washington Avenue at the southwest corner of the intersection of South 6o" Avenue and W. Washington Avenue. The SW Quarter of Section 33, Township 13 North, Range 18 E.W. Revised 07/2014 OU Page 5 B. ENVIRONMENTAL EL i,. -- 8 (o be completed by the applicant) Space Reserved for A eneY Comments 1. Earth a. General description of _ °p the site (✓ one): Pell- -flat ❑rolling ❑hilly [steep slopes Cj mountainous F1 other Gently Sloping b. What is the steepest slope on the site (approximate percent slope)? The steepest slope is approximately 2 percent. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. National Resources Conservation Service Soil Mapping was consulted regarding the on -site soils at the plant site. The USDA Soil Conservation Service (SCS) indicated the primary soil for the site is a Naches Loam which is a ML or A-4 soil type. The Naches Loam are considered prime farmland if irrigated. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. There are no known indications of unstable soils on site or in the immediate vicinity. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. The project consists of usual and normal embankment construction for new streets and building lots in Aspen Estates. As it applies to the entire development, there is minimal grading proposed for the private road and building lot development expected. No net increase or decrease in quantity of material is anticipated for the subdivision improvements. Backfilling for utilities will consist of crushed aggregate for pipe zone bedding and native material for trench backfill. All excess soil will be re -distributed on site for landscaping beds or used to fill the irrigation pond. f. Could erosion occur as a result of clearing, construction, or use'? If so, generally describe. It is possible erosion could occur during the construction phase of the development, but it is not expected. After construction is completed, each individual residential lot will be landscaped, and long-term erosion is unlikely to occur. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Aspen Estates will be constructed in accordance with -1 standards, with approximately 40-percent of the site will be covered with impervious surfacing. The lot coverage maximum in the R-1 zone is 60 percent. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: During the site development and construction activities, the contractor will be required to utilize appropriate erosion control Best Management Practices, and regulatory erosion control stormwater management plans will be implemented. Silt fencing and dust control measures will be implemented. Storm drainage improvements will be constructed to comply with City of Yakima standards. The site will be permanently stabilized post - construction by sodding and landscaping. ClTy j A� Revised 07/2014 Page 6 B. ENVIRONMENTAL EL MEi _ S (To be completed by the applicant) Space Reserved for Agency Comments 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Typical emissions of dust and automobile odors will be generated during construction. Dust control procedures will be in place during construction to limit the dust to the maximum extent practicable. Construction activity will be limited to area immediately adjacent to the construction area. Dust is not expected after construction as the site will be fully landscaped and irrigated, or will be covered with asphalt concrete pavement. After project completion, there will be no adverse effects on the air, the emissions will be from automobiles belonging to local residents and staff. Minimal emissions from commercial heating devices may occur after project completion. Approximate quantities are not known. b. Are there any off -site sources of emissions or odor that may affect your proposal? I � f so, generally describe. None are known to exist. _ .... --- c. Proposed measures to reduce or control emissions or other impacts to air, if any: The contractor shall comply with Yakima Regional Clean Air Agency regulatory requirements. The contractor may be required to use dust control measures such as watering of the construction area to eliminate wind-borne erosion if a problem arises. The contractor will also be required to clean mud and dust from public roadways as necessary. In addition, construction e ui ment will be well, maintained to,prevent excessive exhaust emissions. F3. Water a. Surfacc: 1. Is there any surface water body on or in the immediate vicinity � of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. There are no existing surface bodies of water within the development. There is a lined irrigation pond in the southwest corner of the Aspen Estates property. 2. Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. There is no work proposed in or adjacent to a surface body of water. __...w.3. Estimate�the amount of fill and dredge material that would be placed in or re moved from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. No fill or dredge material will be placed or removed from any surface water or wetlands. m .. _ 4; Will the proposal require surface water withdrawals or diversions? Give rsions. Give general l z description, purpose, and approximate quantities if known. The new development will not require any surface water withdrawals or diversions. a ---- ___ -- 5 Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. The proposal does not lie within the floodplain. 6. Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. The proposal' will not discharge any waste material to surface waters. b. Ground• Revised 07/2014 ® Page 7 l! groundwater 1' withdrawn,or will water 1' discharged to ground Give general description, purpose, 1 approximate quantities if known.The proposal will not• or discharge to ground water.Temporary dewatering during supplyconstruction of the sewer line is likely to occur, quantities are unknown. Domestic water proposed • •r Hill Water which has deep source 2. Describe be discharged into the ground from septic or othersources, if any (for example:1rindustrial,{ following Describe the general size of the system, numberthe number of such systems, the number of houses to be served (if applicable), or the of or 1` • to serve. I Waste materials will not be discharged from any sourceinto the ground. The t • ` will be • t to City of public Runoffc. Water (includingf Describe 1 of runoff(including1 d method of collection I disposal, (include quantities,rflow? Will this water flow into 1 r describe. • of • surfacewill be primarily from rainfall and snowmelt. The runoff is proposed to be collected and managed on -site via surface retention and infiltration facilities or underground infiltration facilities. Stormwater treatment and disposal facilities will be designed and sized in accordance with the Eastern Washington Storm Water Manual and City of Yakima standards. This project will not result in the discharge of storm water into a water body. 2. Could waste materials enter ground or surface waters? If so, generally describe. No waste materials are anticipated to enter ground or surface waters. 3. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Stormwater runoff from the roads will be retained, treated, and disposed of on -site via surface retention and infiltration facilities, or underground infiltration facilities. Stormwater from homes will be directed onto landscaped areas on each residential lot. Accepted BP engineering practices for stormwater drainage systems will be implemented to collect and manage the surface and runoff water impacts. ----------- ®_ ------- ---- -__ ._..� . Plants. a. Check ✓ types of vegetation found o ( ) y g n the site: � Deciduous Tree. r ❑ Aspen Other Evergreen Green: ❑ Fir Cedar El Pine ❑Other El Shrubs ® Grass ❑ Pasture Crop Or Grain ❑ Other Skunk Cabbage Wet Soil Plants. p ❑ Bullrush _.._._.m ..... _a ��u..._.. _.. 'VIP OF VAKIki Other WOther ater Plants: ❑ ilfoil ❑ Ee grass ❑ Water Lily , ------------- Other Types Of Vegetation: b. What kind w and amount of vegetation will be removed or altered? The development will be cleared of existing natural occurring pasture grasses and trees where necessary for the construction of the street, utility improvements, and home construction. c. List threatened or endangered species known to be on or near the site. There are no listed endangered or threatened plants on the project site or within the general project vicinity. wii.. Revised 07/2014 Page 8 R It11r 1.0-Vfl 9 1 1 vegetation on the site, if any: The completed residential homesites will be landscaped with typical residential lawns, trees, flowers, and shrubs. The completed residential apartment complex homesites will be landscaped with typical residential lawns, trees, flowers, and shrubs. Additionally, landscaping will occur within the parking areas, and along the property lines. 5. Animals - a. Check (-/) any birds and animals which have been observed on or near the site or are known to be on or near the site: E�irds Heron Eagle E]Songbirds Other Mammals: F1 Deer F1 Bear 0 Elk n Beaver Other Fish: El Bass Salmon El Trout El Herring 0 Shellfish b. List any threatened or endangered species known to be on or near the site. There are no known endangered or threatened species on or near the project site. c. Is the site part of a migration route? If so, explain. Most of Washington State is part of the Pacific Flyway migratory route for birds. 111iffall'"Wil I I IF I I I I I I I I I I I V I I I I I I I I I I I! 6. Energy and Natural Resources a. What kinds of energy (electric, natural c gas, oil, wood stove, solar) will be used to me the completed project's energy needs? Describe whether it will be used for heati manufacturing, etc. It is anticipated that electricity and/or natural gas will be the d do bd oprima sources of cooling anheating the resiences. Electricity will alse use• fr no] residential demands of lighting, etc. During construction: equipment fuel. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. The project will not affect the potential use of solar energy by adjacent properties. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: New construction will be built to Washington State Energy Codes and as required by the International Building Code. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could is as a result of this proposal? If so, describe. There are no known environmental health hazards that could i occur as a result of proposal. A fuel spill may occur as a result of construction activities. I Describe special emergency services that might be required. There are no known emergency services that would be needed as a result of this new building. Emergency medical aid may re uired should 'il*ur occii�du in o struqion. 2. Proposed measures to reduce or control environmental health hazards, if any: There are no known environmental health hazards associated with this proposal, therefore there are no proposed measures. The site is a historic pasture and the land was tested for arsenic during previous development and shown to be below the thresholds of concern. 11' bod,-Ykocy,��? Revised 07/2014 Page 9 Ingil 11 111mil IM11ligim I Llifi { 1 .. .. • f 1 What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short-term noise consists of construction activities associated with commercis construction. Construction• - can be expected fromapproximately 7:00 . to i • I r { f- -• i • •- -f r Proposed i reduce or i 11l noise impacts, No adverse noise1. f. •however,propose • restrict construction to 7:00 a.m. to 7:00 p.m.. In addition, we will comply with the City of Yakima and Yakima County Noise Ordinance, as it applies to this project. 8. 1 and Shoreline a. What is the current use of the site and adjacent properties? project area is curren open land but has been used as farmland and more recently orchard land. There is open I he cur located _ ! . '.: • the north and east of the subjectparcel. Residential homes located to the all sides of th� sub __E__ft_a's' the site —been used —for agriculture? If so, describe. The site hat - agriculturally for ground crop production and more recently fruit production. The site been used to p4__p-yow alfalfa, andgKow c. 1 ' l ' 1 • • _ • • 1 .EsUtes site. d. Will any structures be demolished? If so, what? None, e. What is the current zoning classification of f. What is the current comprehensive plan designation of r g. If applicable, what is the current shoreline master program designation of the site? Not applicable. specify.h. Has any part of the site been classified as an "environmentally sensitive" area? If so o • on i. r Approximately 1 people would reside or 1rk in the completed project? Approximately a4 people people per ome) would reside in the completedproject. Approximately h1 people w1 1 the completed project displace? N• - r r li°,'1 • 1 1 1 i 1 i` i.:: •'.: rf sf` I . Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,•'.ning fi properties determined that the properties are suitable for uses permitted in the respective single family zoning district. _,__Pro'qc rneq the current and future land use plans of the City of Yakima. Revised 07/2014 Rage 10 m� Rev B. ENVIRONMENTAL ELEMEN.S (To be completed by the applicant) Space Reserved for Agency Comments 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Approximately 105, middle income, single family housing units will be created. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None c. Proposed measures to reduce or control housing impacts, if any: Not applicable. — ---- - ---------- 10. Aesthetics a. What is the tallest height ' of any proposed structures, not including antennas; what are the principal exterior building materials proposed? Most likely less than 30 feet in max height. Principal building materials will consist of stone, brick, stucco, wood. b. What views in the immediate vicinity would be altered or obstructed? None known. c. Proposed measures to reduce or control aesthetic impacts, if any: The proposed buildings will be similar in appearance as neighboring buildings to further control aesthetic impacts. Compliance with zoning and building code regulations regarding building height, — lot coverage and setbacks will also be in effect. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Typical and normal residential and residential apartment security night lighting form dusk until dawn. b. Could light or glare from the finished project be a safety hazard or interfere with views? The light or glare is not expected to pose any safety hazards or interfere with any views. - — - — --------------------- c. What existing off -site sources of light or glare may affect your proposal? None. d. Proce posed measures to reduce or control light and glare impacts, if any: Proposed street lighting, security lighting, and possible accent lighting will be directed downward throughout the development. Encourage the use of lowest necessary wattage. 12. Recreation ---------- - — ---------- JUN a. What designated and informal recreational opportunities are in the immediate vicinity? West Valley Junior High School lies a 4,900 feet to the northwest of the subject City property and recreational activities take place at the school fields. City of Yakima owned W PX'q tip park West Valley Park at South 801 Avenue lies 6,100 feet to the northwest of the subject property and recreational activities take place at the park fields. Other known recreational activities in the general area consist of fishing, biking, golfing and walking/jogging. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None needed. -------- ised 07/2014 Page 11 B. ENVIRONMENTAL ELEMEI,.S (To be completed by the applicant) Space Reserved for ec Comments 13. Historic and Cultural Preservation a. Are there .��.._.... __........�_..._....�m.m�_�..e.�_�uv�_._.._ any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. According to the Department of Archaeology & Historic Preservation's (DAP) Washington Information System for Architectural and Archeological Records Data (WISAA ), there are no registered properties within or adjacent to the project limits. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural important known to be on or next to the site. There are no known landmarks or evidence of historic, archaeological, scientific, or other cultural significance located on or near the site. _- There r s, p � pacts, if any: There are no known impacts, � c. Proposed measures to reduce or control impacts, therefore no measures are proposed. If, during construction, artifacts are found, then work within the area will cease and the proper authority will be notified. 1. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The proposed Aspen Estates development has frontage along W. Washington Avenue to the north and South 601 Avenue to the east. The development has two access points. See site plan. b. Is site currently serviced by public transit? If not, what is the approximate distance to the nearest transit stop? Yes, nearest transit stop is immediately to the north along Washington Avenue. c. How many parking spaces would the completed project have? How many would the project eliminate? None In Aspen Estates, each homesite will have a minimum of 2 off-street parking spaces. There will be on -street parallel parking along the public roadway within the development. No parking spaces will be eliminated. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). The proposed development has frontage along W. Washington Avenue, and S. 6011 Avenue which will need to be widened as part of the Aspen Estates project. The development has two access points and will have public internal roads throughout the subdivision. See attached preliminary plat drawing. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. m _m . m f. How many vehicular trips per day would a generated by the completed project? If known, indicate when peak volumes would occur. IVA In Aspen Estates Phase 2, based upon the Ninth Edition (2012) of the Institute of Transportation Engineers (ITE) Trip Generation Manual, a single family residential project (Land Use 210) is anticipated to generate approximately 9.57 vehicle trips per weekday per residence. That equates to approximately 210 vehicle trips per day for (50% entering and 50% exiting). The estimated volume during the A.M. peak hour (7:00 a.m. to 9:00 a.m.) of adjacent street traffic (. Washington Avenue) is 0.74 trips per residence or 18 trips at full build -out of all ho esites (2S%entering, 750 exrtiri . The estimated volume during the P. . peak hour w, I Revised 07/2014 .# Page 12 B. ENVIRONMENTAL ELEMEN. S (To be completed by the applicant) Space Reserved for Agency -Comments (4:00 p.m. to 6:00 p.m.) of adjacent street traffic is 1.01 trips per residence or 22 trips at trips build -out of all homesites (63% entering, 37% exiting). g. Proposed measures to reduce or control transportation impacts, if any: No measures are planned. W. Washington Avenue has frontage improvements and the service level was designed to accommodate traffic loads from within the development. 15. Public Services ----------- -I---..-- - - --------- a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: The project will have probable incremental increased demand for fire and police protection, public safety services and schools could be anticipated, relative to the potential population increase. - --------- b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity, which might be needed. Water form Nob Hill Water and Sewer from the City of Yakima are available to serve the property and would be extended to serve new buildings. — — — - — — — ---------- 16. Utilities a. Circle utilities currently available at the site: electricily, natural gas,, water,. refuse septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity, which might be needed. Answered above Domestic Water: Nob Hill Water Association Sanitary Sewer: City of Yakima Refuse: City of Yakima or private company Power: Pacific Power Telephone: Qwest or Charter Irrigation: Ahtanum Natural Gas: Cascade Natural Gas Company C. SIGNATURE (To be completed by the applicant.) The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to ma its detisiom ------------------- Property Owner Agent Signature ate ui tad PLEASE COMPLETE SECTION "D" ON THE NEXT PAGE IF THERE IS NO PROJECT RELATED TO THIS ENVIRONMENTAL REVIEW Recelvet) IUN'? 5 ml C'Ty W YAUVI& Page 13 Revised 07/2014 D. SUPPLEMENTSHEET k- NONPROJECT ACTI (o be com, ed by the Space Reserved For a licarit. JDO NOT USE THE FOLLOWING FOR PROJECT ACT'ION§J, A enc Comments Because these questions are very general, it may helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal or the types of activities that would likely result from the proposal and how it would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? The proposal will not increase discharges to water, air, release toxic or hazardous substances, or increase noise pollution. Proposed measures to avoid or reduce such increases are: This question is not applicable. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? The proposal will not create any adverse impacts on plants, animals, fish or marine life. Proposed measures to protect or conserve plants, animals, fish, or marine life are: This question is not applicable. - --- —— 3. How would the proposal be likely to deplete energy or natural resources? The proposal will not deplete energy or natural resources other than through normal building operations of commercial businesses. Proposed measures to protect or conserve energy and natural resources are: Energy efficient measures will be installed wherever practicable; for instance, water efficient fixtures will be used. 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? The proposal will not affect any sensitive areas or areas designated for governmental protection. Proposed measures to protect such resources or to avoid or reduce impacts are: This question is not applicable. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? The proposal will not affect land or shoreline use. Proposed measures to avoid or reduce shoreline and land use impacts are: This question is not applicable. 6How would the proposal be likely to increase increase demands on transportation or p p y public services and utilities? The proposal will have a slight increase of daily trips above the original road use, however the increase can be d by the existing surface streets which were from OF constructed d to accommodate heaacc�raffi surroundm land usesALAg m... �,.....,... ,. r. __ ..__ w m Proposed measures to reduce or respond to such demand(s) are. No negative impacts are anticipated. 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. The proposal is not known to conflict with local, state, or federal laws protecting the environment. , Revised 07/2014 — Page 14 "Plat o Aspen Estates Phase PLP#003-21,•ISEPA#023-21 129 NORTH SECONDr t VOICE:r9r9 r Answer all questions completely. If you have any questions about this form or the application process, please ask a Planner. Remember to bring all necessary attachments and the required filing - when the application is submitted.Planning Division cannot accept applicationJ application unless it is complete and the filing fee paid. Filing fees are not refundable. This consists of fourparts. PART GENERAL INFORMATION PART IV — CERTIFICATION are on this page. __ecif _o_11 and MUST be attached to this PART II and III contain additional information q ic to yoKp op s in lete the p Aspen Applicant's1. ailin_ i{r'• Rd. Information: ity Yakima St: LV�Ai *91 09 94 heck One: �2. Applicant's ` Property: 3. PropertyOwner's Information other Applicant): NO Descriptionii 4. Subject Property's Assessor's Parcel Number(s)' 181333-32406 5. Legal See Attached 6. Property Address:WashingtonAve./S. 64th Ave. Property's ■ SR ■ ■ •- ■ ■ HB El SCC ■ LCC ■ CBD ■ GC El AS ■ •r ■ 8. Type Of rr .Apply) F-1 Administrative Adjustment Environmental Checklist (SEPA Review) E Easement Release F-1 Type (1) Review El Right -of -Way Vacation 0 Rezone ■ Type ReviewConeurrency ■ Shoreline El Type (3) Review Non -Conforming Use/Structure 0 Critical Areas Review [I Preliminary Short Plat Appeal to HE / City Council Variance ■ Final Short■ Interpretation ■ Short Plat Amendment ■ Modification ■ Overlay District IN Preliminary _ PlatHome Occupation ■ Binding ■ Final Long PlatComprehensive Plan Text or Map Amendment ■ Planned Development ■ • ■ • { ■ Other: ATTACHEDMIME 'I 9. SEE SHEETS �a rr mrfflm{1� Page 13 Supplemental Application For: P"LMNARY LONG PLAT Oti 04 VACMA CITY OF YAKIMA, SUBDIVISION ORDINANCE, TITLE 14 I 1 11 w I 1111011102 IN 10, 1 H gal pyAg 1 W&W 0 .11 --7 8. PRELIMINARY PLAT REQUIRED: (Please use the attached City of Yakima Preliminary Plat Checklist) 9. TRAFFIC CONCURRENCY: (if required, see YMC Ch. 12.08, Traffic Capacity Test) 10. ENVIRONMENTAL CHECKLIST (required): ..... . .... I hereby authorize the submittal of the preliminary plat application to the City of Yakima for review. I understand that conditions of approval such as dedication of right-of-way, easements, restrictions on the type of buildings that may be constructed, and access restrictions from public roads may be imposed as a part of preliminary plat approval and that failure to meet these conditions may result in denial of the final plat. re (required) Date Note: if you have an6ZIjuestions about this process, please contact us Citq of Yakima. Plannin�u Division 129 N. 2nd St. Yakima, WA or 509-575-6183 Revised 08/2015 Page 14 ASPEN ESTATES - PHASE 2 LEGAL DESCRIPTION HLA PROJECT 20096 JUNE 23, 2021 THE NORTH 165 FEET OF THE SOUTHWEST 1/4 OF THE SOUTHWEST 1/4 OF SECTION 33, TOWNSHIP 13 NORTH, RANGE 18, E.W.M., RAW, A EXCEPT THAT PORTION LYING WESTERLY OF THE FOLLOWING DESCRIBED LINE: COMMENCING AT THE NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SAID SECTION 33; THENCE SOUTH 89029'29" EAST ALONG THE NORTH LINE OF SAID SUBDIVISION 539.76 FEET TO THE POINT OF BEGINNING OF SAID LINE; THENCE SOUTH 0°09'50" EAST 165.01 FEET TO THE SOUTH LINE OF THE NORTH 165.00 FEET OF SAID SUBDIVISION AND TERMINUS OF SAID LINE; AND TOGETHER WITH THAT PORTION OF LOT 4 OF THAT SHORT PLAT RECORDED IN BOOK 80 OF SHORT PLATS, PAGE 173, UNDER AUDITOR'S FILE NUMBER 2596713, RECORDS OF YAKIMA COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMECNING AT THE SOUTHWEST CORNER OF SAID LOT 4; THENCE NORTH 0°09'50" WEST ALONG SAID WEST LINE 150.01 FEET; THENCE SOUTH 89°29'29" EAST 90.01 FEET; THENCE SOUTH 0°09'50" EAST 50.01 FEET; THENCE SOUTH 89°29'29" EAST 663.78 FEET TO THE EAST LINE OF SAID LOT 4; THENCE SOUTH 0°06'28" EAST ALONG SAID SOUTH LINE 100.00 FEET TO THE SOUTHEAST CORNER OF SAID LOT 4; THENCE NORTH 89°29'29" WEST ALONG THE SOUTH LINE OF SAID LOT 4 A DISTANCE OF 753.31 FEET TO THE POINT OF BEGINNING; SITUATE IN YAKIMA COUNTY, STATE OF WASHINGTON. V:LEGAL DESCRIPTIONS/2020/20096 PH2 LEGAL.DOCX -1 —F Va The Washington State Growth Management Act (RCW 36.70A.70) requires all new development to be consistent with the existing or planned street system capacities. The City of Yakima adopted YMC Ch. 12.08 to implement this local requirement. The information you provide with this application will be used to estimate the impact of your development upon the PM Peak Hour traffic on the City of Yakima arterial streets. - ---------- Applicant Name: i. A s p e n Estaes, LLC Contact Person: Byron Bc-rton Ian 2550 Borton Rd. Yakima, WA 98903 FEE: $250 (Receipt # L&A10f 011 )' Project Address: Washington Ave./S. 64th Ave. Yakima, WA 98908 Parcel No(s): 181333-32406 RESIDENTIAL COMMERCIAL INDUSTRIAL Housing Type*. Single Family (Single -Family, Apartments, etc) Special Population* (Nursing Homes, etc) Other* (Group Home, Daycare, Church, etc) Number of Units 22 Lots *Uses must match tip with YMC Ch. 15.04, Table 4-1 Describe Use* Describe Use*- rITITAI M-1 r:m ig , gargillwaggiffAnxisarjJ ECRITM Parking Spaces__ (RequiredlProvided) mmnmm�= Submit this form with a site plan, the application fee, and any attachments to the City of Yakima, Permit Center, Yakima City Hall, 129 N. 2nd Street, Yakima, WA 98901. You will receive a Notice of Decision explaining the Findings of the resultinp analkisis. Please review the Decision when it is sent to on, as pou onlVir have 14 daps to file a Request for Reconsideration or an Appeal. Revised 08/2015 Page 12 NOMIM-0 M-Num- I I MIA 2 2 IOKKOI 0 [411111 IMM IMN Mll 0 ��NFM- 1.53MR1112M MEMMIIIN• Access to the plat will be from public road extensions off S. 62MII Avenue and S. 61 s' Avenue which will need to be completed as part of this project. Nob Hill Water will serve the lots with domesti# water, and City of Yakima Sewer will serve the sewerage needs. Storm water will all be contained on -site in retention swales, or underground infiltration. 11111ttaq mom nm: n 'F� G:\PROJECTS\2020\20096E\Plat Applications\Phase 2\2021-06-08 Aspen Estates Phase 2 Traffic Concurrency Project Description,docx "Pl;at of Aspen Phase PLP#003-21,1 k r= i; i 1 1I ,=M= -1 E='O=' Determination of Complete Application 07/23/2021 -2 .................................. Land Use Action Installation Certificate 7/ / 21 G-3 Notice of Application, Environmental Review, Public Hearing 07/30/2021 -: Legal Ad -3 : Press Release and Distribution Email -c: Parties and Agencies Notified -d: Affidavit of Mailing G-4 Notice of MitigatedDetermination of Non -Significance // 1 -: Parties and Agencies Notified -: Affidavit of Mailing -5 YPC Agenda and Packet Distribution List / 1/2 21 Aspen"Plat of Leanne Hughes -Mickel lean mexorn Rob McCormick rob@mccort-nickaircenter.com Al Rose Mary Place placeml,@charter.net Lisa Wallace Ka Funk —Council Liaison lisakwallace�hotmail.com y Sara Watkins —Legal Dept Ka ,Lj Sra.watkins akimawa.,ge iA U, ;4 !I I'ate Distributed: "a A a lkw**DEPARTMENT OF COMMUNITY DEVELOPMEN1 0"i 41MV Joan Davenport, AICP, Director 166. Planning DiViSiOD bF YAKWA Joseph Calhoun, Manager ni n 9 129 North Second Street, 2 n' Floor, Yakima, WA 98901 ask. p larm ing(oDyakimawa. EZOV I WWW.V govIs DETERMINATION OF NONSIGNIFICANCE 7 CITY OF YAKIMA, WASHINGTON August 19, 2021 PROJECT DESCRIPTION: Environmental review to permit a preliminary long plat to subdivide approximately 4.82 acres into 22 single-family residential lots in the R-1 zoning district. LOCATION: Vicinity of W. Washington Ave. & S. 64th Ave. PARCEL NUMBER: 181333-32406 PROPONENT. Aspen Tree� LLC. C/O Byron Borton ,ROPERTY OWNIER: Aspen Tree,C/O Byron Borton EAD AGENCY: City of Yakima IMNEW160r, a # ma_ I WIN" rol�' Ww"M Ila is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. This DNS is issued after using the optional DNS process in WAC 197-11-35 There is no further comment period on the DNS. I Responsible Official- 4q��� Position/Title: SEPA Responsible Official Phone 1�M 575�6183 Address: 129 N._2nd Stree_t,. Yakima, WA 98901 Z You may appeal this determinamri to: Joan Davenport, AICP, Director of Community Development, at 129 N. 2nd Street, Yakima, WA 98901. Ro later than: September 2, 2021. By method: Coni plete appeal gopl ication form a nd payment of $580� 00 @Mp,31 fop Tou should be prepared to make specific factual objections. Contact the City of Yakima Planning Division to read or ask about the procedures for SEPA appeals. Yakima 2015 1994 Nunez, Analifla 10 From: Nunez,Ana|i|ia Sent: Friday, August 2U'2UZ1810AK4 To: Brown, David; Calhoun, Joseph; Contreras, Pedro; Corona, Silvia; Davenport, Joan; Dean, James; DeBusschere, Suzanne; Denman, Glenn; Doan, Tony; Horton, Kelli; lbarra, Rosa|inda; KaAevig' Dana; Layman' Rand}; Markham, Aaron; Matthews, Archie; Maxey Lisa; K4e|oy, Randy; Murray, Matthew; Nunez, Ana|i|ia; PresLon, Bill; Riddle, Dan; Rodriguez, Jeremy; Schafer, Scott; Shane, Mike; Story, Gregory; Watkins, Sara; ZabeU' ]ohn;Zammaohi, Loretta; Ahtanum Irrigation District Beth Ann 8nu|otte;[uvv|ey, Marc; Chamber of Commerce; Department of Agriculture; Department of Commerce (CTED) Review Team; Department ofEcology; Department ofEcology Former Orchards; Department ofEcology Lori White; Department ofEcology SEPARegisLer; Department of Ecology -CRO Coordinator; Department of Fish and Wildlife; Department ofFish and Wildlife; Department ofFish and Wildlife Eric8artrand; Department of Fish and Wildlife Scott Downes; Department of Natural Resources; Dept ofSocial & Health Services Larry Covey; Dept. Archaeology & Historic Preservation 5EPAReview; Energy Facility Site Evaluation Council Stephen Posner; Henne,Dennis; |barra,Rosa|inda; KaUevig' Dana; Nob Hill Water Bob Irving; Nunez. Ana|i|ia;Office ofRural 8/ RarmworherHousing Marty Miller; Peterson, Robert; Riddle, Dan; Sergio Garcia; US Army Corps ofEngineers David Moore; VVAState Dept ofHealth, Kelly Cooper; VVA State Dept ofHealth, Office of Drinking Water; WA State Dept ofHealth, Office of Drinking Water; VVAState Parks & Recreation Commission; VVSDOT Paul Gonseth; VVSDQT South Central Regional Planning Office; VV5DOTAviation Max p|atts;VVVSD Angela Watts, Asst SuptofBus/Fin;VVVSD Mike Brophy, SupL;YakamaBureau of Indian Affairs Rocco Clark; YakamaNation Environmental Management Program Elizabeth Sanchey;Yakama'K|icWtatFisheries John Marvin; Yakama-K|ickitatFisheries Project John Marvin; Yakima County Building Official Harold Maclean; Yakima County Commissioners; Yakima County Flood Control District Dianna Woods; Yakima County Flood Control District Troy Havens; Yakima County Health District; Yakima County Health District Ryan |bach;Yakima County Planning Manager Tommy Carroll; Yakima County Planning Zoning/Sub Jason Ear|es;Yakima County Public Svcs Director, Lisa Freund; Yakima GreenvvayFoundation Ke||ie Connaughton;Yakima ` Regional Clean Air Agency HasanTahat;Yakima School District Jay Baucom;Yakima School District Stacey Locke; Yakima School District Trevor Greene; Yakima Valley Museum Peter Arnold, Exec Director; Yakima Valley Trolleys; Yakima Waste Systems Keith Kova|enko;YVCOG Lynn Deitrick Cc: Martin, Trevor; 'byron@bortonfruiLcom'; 'nnheit@h|aciviicom' Subject: NOTICE OFDNS-Aspen Tree SEPA#023-21 Attachments: NOTICE 0FDNS-Aspen Tree SEPA#023'21.pdf Attached is a Notice of DNS regarding the above -entitled project that was mailed out yesterday August 19, 2021. If you have anv nuestions about this -#ronosal. nIPaxa_Qo.-Ft­art assie-ted n1wiler Trevor Martri - trevor.martin0vakimawasov Analilia Nbilez Planning Technician '- City OfYakima Planning Division � p:5OA.575.M201 �7� N 12QNorth 2ndStreet, Yakima, Washington, A88U1 18133323001 CONGDON ORCHARDS INC PO BOX 2725 YAKIMA, WA 98907 18133331567 .i. • i TERRACE HEIGHTS r YAKIMA, WA .;.r 18133332403 18133332404 18133332405 KH PROPERTIES LLC MICK PROPERTIES LLC MICK PROP IES LLC 2101 S 88TH AVE 1707 S 74TH AVE 1707 S H AVE YAKIMA, WA 98908 YAKIMA, WA 98908 Y A WA 98908 18133333001 MOBILE CREEK LLC PO BOX 11530 YAKIMA, WA 98909 18133332409 WASHINGTON STATE PO BOX 41107 OLYMPIA, WA 98504 18133333425 ANA R VILLAVICENCIO PO BOX 11289 YAKIMA, WA 98909 18133333416 ANGELINA SANTANA SOTO 6100 CRESTFIELDS RD YAKIMA, WA 98903 18133331414 BENJAMIN T & MARGIT K TRICKETT 5808 W WASHINGTON AVE YAKIMA, WA 98903 18133334431 CHRISTIAN & SUSAN SAUNDERS 14306 SUMMITVIEW EXT YAKIMA, WA 98908 18133331560 DAISY PENA MARTINEZ 2014 S 60TH AVE YAKIMA, WA 98903 18133331439 DONALD D & SYLVIA MARLER 2010 S 60TH AVE YAKIMA, WA 98903 is r r fF. CORRECTIONS .O O 41015 OLYMPIA, WA.; i. 18133333429 ADAN F. MARIN BADILLO 6004 CRESTFIELDS RD YAKIMA, WA 98908 18133331501 ANDRE ARCAND 2012 S 59TH AVE YAKIMA, WA 98903 18133331559 ASHLEY GRACE CURTIN 2012 S 60TH AVE YAKIMA, WA 98903 18133333407 BRYAN FRANK ELLIS 6205 CRESTFIELDS RD YAKIMA, WA 98903 18133333024 CHRISTINA LYNN GUTIERREZ 6201 WALLA WALLA ST YAKIMA, WA 98903 18133331401 DAVID L & YVONNE K FOUSHAY 5820 W WASHINGTON AVE YAKIMA, WA 98903 18133333423 ERIC MOODY .O BOX 3262 UNION GAP, WA 98903 .r i ;, 6208 CRESTFIEELDS -r WA 98903 i 18133333414 R R ES 107 ROSE ST UNION GAP, WA 98903 18133333426 CANDACE DAWSON ii i r - Von I ..;. 18133331571 FLORES RAMIREZ & EDELMI GODINEZ 2001 S 60TH AVE YAKIMA,. 98903 18133331440 18133334416 18133331503 ERNESTO M & LINDA K SANCHEZ GENE P & JENNIFER A MURPHY GERALD R & LINDA L ANDERSON 2009 S 60TH AVE 5910 CRESTFIELDS RD 2016 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133334426 18133333405 18133331504 GILBERT & DINA ESCOBAR GINA M CATRON GLORIA & ARTHUR WIDENER 5908 W COOLIDGE RD 6209 CRESTFIELDS RD 2018 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133333023 18133331568 18133333411 GREGORY J GOODMAN JAIME & STEFANIE L VASQUEZ JAMES W FULLERTON 6804 BITTNER RD 1909 S 60TH AVE 6109 CRESTFIELDS RD YAKIMA, WA 98901 YAKIMA, WA 98908 YAKIMA, WA 98908 18133334411 18133331572 18133334412 JEFFREY & WILMA LEYENDEKKER JEFFREY N HOON JOHN A FERNANDEZ COBB 2003 S 60TH AVE 2200 S 60TH AVE 21846 34TH AVE S YAKIMA, WA 98903 YAKIMA, WA 98908 SEATAC, WA 98198 18133334433 18133333420 18133333424 JOHN R & COLLEEN J LIVINGSTON JOSE L GARZA JOSE T RUIZ SAUCEDO 5910 WHITMAN ST 6301 CRESTFIELDS RD 2109 S 61ST AVE YAKIMA, WA 98903 YAKIMA, WA 98908 YAKIMA, WA 98908 18133334409 18133333428 18133331502 JOSEPH MILLS JOSH & DANIELLE HASSANIN KAREN PARSONS 2100 S 60TH AVE PO BOX 11561 2014 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98909 YAKIMA, WA 98903 18133334413 18133331441 18133331569 KENNY R KING KENT & LESLEE HEBDON LARRY & LISA PURDY 2202 S 60TH AVE 5907 WHATCOM AVE 1911 S 60TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133334414 18133331563 18133331564 LELAND M & TONI M CHRIST LEON V LUU LEO�LUU 2206 S 60TH AVE7503 CRESTFIELDS RD 7503LDS RD YAKIMA, WA 98903 YAKIMA, WA 98903 YA903 18133334417 18133331562 18133333438 LYNETTE V MARSHALL LYNN D & CAROLYN L NOTMAN MARIANA SEVERINO GOMEZ 5908 CRESTFIELDS RD 2018 S 60TH AVE PO BOX 447 YAKIMA, WA 98903 YAKIMA, WA 98903 BEVERLY, WA 99321 18133334425 18133334423 18133333415 MATTHEW SHUEL MICHAEL W & KIRSTEN A WAGNER MIGUEL MUNGIA MARTINEZ 5910 COOLIDGE RD 12704 SUMMITVIEW EXT 6101 CRESTFIELDS RD YAKIMA, WA 98903 YAKIMA, WA 98908 YAKIMA, WA 98903 18133331573 18133334434 18133333409 MILO H. & FAYE M. MILUM NICHOLAS R ONEAL PABLO CESAR HERNANDEZ 5904 W WASHINGTON AVE PO BOX 11592 6201 CRESTFIELDS RD YAKIMA, WA 98903 YAKIMA, WA 98909 YAKIMA, WA 98903 18133331438 RICKY A CLARK 2011 S 60TH AVE YAKIMA, WA 98903 18133333035 RONALD & KRISTIN BENJAMIN 5903 WALLA WALLA ST YAKIMA, WA 98903 18133331565 STEPHEN & SONYA MERZ 2017 S 60TH AVE YAKIMA, WA 98903 18133331443 STEVEN M & GAIL MASON BRILLING 225 4TH AVE A603 KIRKLAND, WA 98033 18133331442 TED P & MARGARET A CELMER 1811 126TH AVE SE BELLEVUE, WA 98005 18133333431 VALENTIN SEVERINO 2105 S 61 ST AVE YAKIMA, WA 98903 81 Total Parcels - Aspen Tree, LLC/ Plat of Aspen Estates Phase 2 NyU o ,�- ON-5 18133331566 ROBERT & BARBARA MACIAS 1210 S 39TH AVE YAKIMA, WA 98902 18133331437 SALVADOR & ALMA RODRIGUEZ 2010 S 59TH AVE YAKIMA, WA 98903 18133334415 STEPHEN C & DENISE L WILMOTH 2208 S 60TH AVE YAKIMA, WA 98903 18133333427 TAMMY J & JACK P SEXTON 6001 CRESTFIELDS RD YAKIMA, WA 98903 18133334424 THOMAS M & PRISCILLA P TREVINO 5909 CRESTFIELDS RD YAKIMA, WA 98903 18133333412 VINCENT R & OPAL A DURNBAUGH 6108 CRESTFIELDS RD YAKIMA, WA 98903 c r u. • 2016 S 60TH AVE YAKIMA, WA 98903 7506 MUCCULLOUGHs YAKIMA, WA .;.0 r t Ahtanum Irrigation District Beth Ann Brulotte, Executive Assistant 10705-B Gilbert Road Yakima, WA 98903-9203 betlib@ahtanum.net • it Manager 1005 North Yakima, WA •;•0 City of Yakima - Engineering Division Dan Riddle, Street Inspector 129 N 2nd Street Yakima, WA 98901 Dan.Riddleftakimawq? &Qy Greater Yakima Chamber of Commerce 10 North 9th Street Yakima, WA 98901 '° ia itibor0itva€ inia.ore Cascade Natural Gas UnionCity of X. �. •• •ifi P.O.Box 3008 Union* WA "*1 •. Hill Water Association Bob Irving, Engineering Technician Drive Yakima, WA .;.0+ Marty Miller, Mike Paulson, 1400 Summitview Ave, Ste# 203 500 North Keys Rd Yakima, WA 98902 Yakima, WA 98901 Ia rt�> rats, o rfln. o rg United States Postal Service WA State Attorney General's Office Maintenance Dept. 1433 Lakeside Court, Ste# 102 205 W Washington Ave Yakima, WA 98902 Yakima, WA 98903 dq idorJaxnesRp§p . ov -*. • • Review Team, 1011 Plum St SE Olympia, WA' 0. A State Department of Ecology Lori White, lori.white@ecy.a. ov P.O.'i • 47703 Olympia, .81 Century Link Manager 8 South ►i I4 Yakima, WA .8.0 City of Airport b Peterson,Director 0•{ West M • Ave Yakima, WA 98903 Washington 2200 W. Washington Yakima, WA *i.C; North Yakima Conservation District Manager 1606 Perry Street, Ste. C Yakima, WA 98902 U.S. Army Corps of Engineers, Regulatory Branch David Moore, Project Manager P.O. Box 3755 Seattle, WA 98124-3755 tl��a.Pcfi_.1���?ot��;�ti�i�t�� a�•1ra�°.►ytilw WA State Department of Agriculture Kelly McLain, PO Box 42560 Olympia, WA 98504 kynddlnk)tgt, ,�ligov Alder St Union• WA •8*1 WA State Department of Fish and Wildlife WA State Department of Fish and Wildlife WA State Department of Fish and Wildlife, Eric Bartrand, Sc®tt.L?ovvnesGclfW ova �v SEPA Desk 1701 South 24th Ave PO Box 43200 Yakima, WA 98902 WA State Department of Fish and Wildlife Olympia, WA 98504 Eric,,Bartrifatcl(a»(1fw.w�1, o Tc�spai�`akq�taar�cdi .�it�a.flat� Sl l't"�sj�w�k s3f t�t�,g�ay A State Department of Health WA State Department of Natural WA State Department of Social & Health Kelly Cooper, Resources, SEPA Center Services, Office of Capital Programs PO Box 47820 PO Box 47015 Larry Covey Olympia, WA 98504 Olympia, WA 98504 ,:1 , ' L,'kj, Box45849 Ka lid c ?ffl of rltf� m rl, av e puc e n_kc tt lttr 4u° t fa Olympia, WA 98504 F m,_..._e� -• �:wrsy,t�tv�3r�x�dslt� wa,�rrs>; ii il• .ji i li Olympia, WA 0 ,. WA State Environmental Protection Agency NEPA Review Unit 1200 6th Ave. 155,14 -12 Seattle, WA 98101 i r 8902 Zier Road i ii+lam . i9 vonesspow r• i i i Office Yakama Bureau of Indian Affairs Rocco Clark, Environmental Coordinator P.O. Box 632 Toppenish, WA 98948 Yakama Nation Environmental Mgmt Program, Elizabeth Sanchey P.O. Box 151 Toppenish, WA 98948 e sa n�key-9ygkallla. c om CountyYakima i i Division Yakima County Water Resources Division Dianna ...Progam Analyst i` North 2nd Street, 4th Floor Yakima, WA .i1 Yakima School District Jay Baucom, Director of Maintenance Operations 104 North 4th Ave Yakima, WA 98902 bLit c(I j; cz � la spl7��� hls�al�,targ WA State Dept of Office Drinking 16201 . Ave,1 Spokane .. 99216 6 A State Governor's Office of Indian Affairs PO Box 40909 Olympia, WA 98504 Wi ii r - i . f _ ... 8902 ,. i Yakima, WA iiil WSDOT, Aviation i 1' Terminal St SW Tumwater, WA 98501 Yakama Indian Nation, Cultural Resources Program Johnson Meninick, P.O. Box 151 Toppenish, WA 98948 ProjectYakama-Klickitat Fisheries John Marvin, it Pence Road Yakima, WA 98909 CountyMud Yakima District Ryan lbach, Director /" Ahtanum Ridge Dr Ste#200 Union Gap, WA •89I' us Yakima County Public Services Lisa North128 i Street, 4th Floor Yakima, WA is •1 Yakima Greenway Foundation South111 s" Street Yakima, WA 98901 Yakima School District Stacey Locke, Assistant Superintendent of Operations 104 North 4th Ave�'°. '.'"i•. Q Yakima, WA 98902� ilLtv$pa1 A State Energy Facility Site Evaluation Council Stephen Posner, SEPA Officer PO Box 43172 Olympia, WA 98504-3172 s osner@utc.wa.gov A State Parks & Recreation Commission Jessica Logan, P.O. Box 42650 Olympia, WA 98504 rO Pauli i Rudkin Road Union98903 am Yakama Bureau of Indian Affairs Superintendent P.O. Box 632 Toppenish, WA 98948 Yakama Indian Nation, Yakima Tribal Council Ruth Jim, P.O. Box 151 Toppenish, WA 98948 Yakima County Building Department Harold Maclean, Building Official North128 2i Street, 4th Floor i 98901 hgv as i • i North2. Street, Yakima, WA :'1 Yakima County Water Resources Division Troy Havens, Manager 128 North 2nd Street, 4th Floor Yakima, WA 98901 Troy Ravages,? _2,Kakimq.wa.us Yakima Regional Clean Air Agency Hasan Tahat, Compliance and Engineering Division Supervisor 186 Iron Horse Ct # 101 Yakima, WA 98901 —a i vftnoil wprg Yakima School District Trevor Greene, Superintendent 104 North 4th Ave Yakima, WA 98902 Yakima Valley Canal Co Yakima Valley Conference of Governments Yakima Valley Museum Robert Smoot, Lynn Deitrick, Senior Planner Peter Arnold, Executive Director 1640 Garretson Lane 311 North 4th Street, Ste# 202 2105 Tieton Drive Yakima, WA 98908 Yakima, WA 98901 Yakima, WA 98902 Yakima Valley Trolleys Paul Edmondson, 313 North 3rd Street Yakima, WA 98901 Yakima-Tieton Irrigation District Sandra Hull, 470 Camp 4 Rd Yakima, WA 98908 Yakima Valley Trolleys PO Box 796 Yakima, WA 98907 Type of Notice: File Number: 07312,1 M-EMMMMMU Yakima Waste Systems Keith Kovalen Districcf-Managox PO Box 2830 Yakima, WA 98907 keithk@wasteconnections.com SEPA REVIEWING AGENCIES —updated 08/20/2021 rVISVEITINTLyfln., - Vicinity of W. Washi 1, Analilia Ndflez, as an employee of the City of Yakima Planning Division, have dispatched through the United States Mails, a Notice of Determination of Non - Significance (DNS); a true and correct copy of which is enclosed herewith; that said notice was addressed to the applicant, parties of record, listed SEPA agencies and all property owners of record within a radius of 300 feet of subject property; that said property owners are individually listed on the mailing list retained by the Planning Division; and that said notices were mailed by me on this 19th day of Auggst, 2021. statements made herein are just and true. Analili'Mifiez Nmmmmuz= DEP. TENT OF COMMUNITY DEVEL MENT Joan Davenport, JosephPlanning Division • a,-, NorthrFloor, Yakima, Y*90 ask.planning@yakimawa.gov•• • • •r ff roTiv F • • DATE: July 30, 2021 TO: SEPA Reviewing Agencies, Applicant, and Adjoining Property Owners FROM: Joan Davenport, AICP, Community Development Director APPLICANT: Aspen Tree, LLC. C/O Byron Borton FILE NUMBER: PLP#003-21 & SEPA#023-21 LOCATION: Vicinity of W. Washington Ave. & S. 64th Ave. TAX PARCEL NUBER(S): 181333-32406 DATE OF APPLICATION: June 25, 2021 DATE OF COMPLETENESS: July 23, 2021 PROJECT DESCRIPTION Preliminary long plat to subdivide approximately 4.82 acres into 22 single-family residential lots in the R-1 zoning district. DETERMINATION OF CONSISTENCY Pursuant to YMC § 16.06.020(A), the project considerations are determined to be consistent with applicable development regulations, as follows: 1. The type of land use: Preliminary Long Plat for 22 single-family homes 2. Level of Development: 22 single-family lots on 4.82 acres 3. Infrastructure and public facilities: The subject property is able to be served by public streets, water garbage collection, etc. 4. Characteristics of development: 22 single-family homes on lots ranging from 6,570 to 8,498 square feet. Pursuant to YMC § 16.06.020(B), the development regulations and comprehensive plan considerations are found to be consistent, as follows: 1. The type of land use: Preliminary Long Plat for 22 single-family homes 2. Density of Development: 4.56 dwelling units per net residential acre 3. Availability and adequacy of infrastructure and public utilities: The subject property is able to be served by public facilities. NOTICE OF ENVIRONMENTAL REVIEW This is to notify agencies with jurisdiction and environmental expertise and the public that the City of Yakima, Planning Division, has been established as the lead agency, under WAC § 197-11-928 for this project. The City of Yakima has reviewed the proposed project for provable adverse environmental impacts and expects to issue a Determination of Nonsignificance (DNS) per WAC § 197-11-355. The proposal may include mitigation measures under applicable codes and the project review process may incorporate or require mitigation measures regardless of whether an EIS is prepared. A copy of the subsequent SEPA threshold determination will be mailed to parties of record and entities who were provided this notice and may be appealed pursuant to YMC § 6.88.170. Required Permits: The following local, state, and federal permits/approvals may or will be needed for this project: Building Permit, Grading Permit Required Studies: N/A Existing Environmental Documents: None Development Regulations for Project Mitigation and Consistency Include: the State Environmental Policy Act, the Yakima Urban Area Zoning Ordinance, YMC Title 12—Development Standards, and the Yakima Urban Area Comprehensive Plan. RE UEST FOR WRITTEN COMMENT AND NOTICE OF PUBLIC HEARING; Agencies, tribes, and the public are encouraged to review and comment on the proposed project and Its probable environmental impacts. There is a 20-day comment period for this review. This may be your only opportunity to comment. 2015 a ✓ 1994 AM, . # n Ij 0 , 0 a 0 0 - 0 6 - . 0 - . 9 * . 0 a • The file containing the complete application is available for public review at the City of Yakima Planning Division, City Hall — 2nd Floor, 129 North 2nd Street, Yakima, Washington. If you have questions regarding this proposal, please call Trevor Martin, Associate Planner, at (509) 575-6162, or e-mail to trevor.martin@yakimawa.gov. DE Joan Davenport, AICP"Direotora ArWo if 1k INN, Division de Pianificuui6o %Joseph Calhoun, �� l29r�urt�Co||o2° �"�imo l/u�irna �V��g090| �-�U���'��������� " ` ` - --° "^ "°-~��uyk.p|umninu@vukimmvva.guv' El Departamento de Desarrollo Comunitario de la Ciudad de Yakima ha recibido una aplicaci6n por parte de un pnopinbaho/so|icib*nteyaebaeounavieoaobreeaamdicitud.|nformacibneobne|auticaudnde|apropiededen cueoUbn y |a mo|icitud es |o miguianbe: No. DE ARCHIVO: No. DE PARCELA(S): 30dm]u|io.3021 AgmnciaodeReusi6nAmbientm|.Go|ioitontmypropieb*hooAdyenenbao Joan Dovenpo¢A|CP. DiraobonadnDeaarn»UoCnmunitoho Aspen Tree, LLC. C8] Byron Borton PLp#003'21&SEPA#023'21 Vicinity ofVV.Washington Ave. &S. 64thAve. 181333'33406 June 25.2O21 July 23.2O21 pnaininorperorsubdividiraproxmadamente 4.82 a| Cbdi]o Municipal YMC §16.06.020A\. las cons/derac/onesdel proyeotosaUmterm|noncono|otanb*ocon |asaiguianbeanonnamap|ioab|ea: 1. B Upo de ueo herrene|: Viviendee unihami|ianea es un uom Close 1 en |a oona raaidencie| R'i. 2. Nivm|dedeaarroUo:23 |oteeunifmmi|ianao 3. !nfnaeetructunaeinmta|acioneepOb}ioes:Lapropiedadpuedenereen/ida porooUmopOb|icas.egua. dnen ja. reoo|accidndebaauna. etc. 4. CanaotedsUoeedel demarno||o:22viviendemunihami|ieresen|oteade8.57Oa8.408pies ouadoadoo. Conhznnea|CbdigoMunicipal Y[WC §16.06.020(B). kmnag|omentoadedesonnUoylaaconeideraounen del plan nompnahansivoson oohmnanbae.dmbaeiguienbamonere: 1. B Upo del ueo bnnena|: Revieibn de oubdiuieibn pne|iminorpenaroubdividiropnoximadammntm4.B2 acres an 22 |oteo neeidencia|me pana viviendee unihomi|ionea 2. Oenoidaddel daeennUo:4.5Gunidedesdeviviandaporacre nanidencio| 3. Diaponibi|idadyadeouaoidndeinfraoetnuctunsymarvinioopOb|icon:Lepropiedadpuedesorsemide porinsba|aoionaepOb|ioaa. AVISO DE REVISION AMBIENTAL: Eato es pana notifioora |ose8enciaacon ]urisdiccibn yexpehennia amU|anta| y o| pUb|ico qua la Ciudad de Yokimm. Division do 9|anificaci6n. se aobab|ono onnno |o egancia principal, de acuerdo con la Ley Estatal de Politica Ambiental de Washington (SEPA) bajo WAC §197'11-826 pana |a reviai6n deeebe pnoyeoto. La Ciudad deYohima ha revieodoe| ppoyocto pnopueabo pena poaib|eo impactoe ambiento|ee advereoe y eepene mmitir uno Deb*rmineoibn de No-8ignifioancio (DNS) pona eoha 9noyeot000n8ormee| procaeo ON8opoiona| enVVAC § 197-11-355. Le propueaba puede inc|uirmedidaode miUgecihnbajo(000bdi0ooep|inab|esye|prooeeodorewimihndel proyeotnpuodeincorpooaroraquerirmedideo de mitigaoibn indopendiantamenba deei se pnapons un E|8 (Oeo|arenidn de |mpectoAmbienta|). Una oopiade |e daterminaoibn de umbna| posterior se enviaoa e |ee personas y egenciaa que comenbanon y qum naoibienon eebeavioo.yeepuadeape|erdeeouendocon e|CbdigoMunicipal deYakima YyWC § 6.88170 Pmrmnisos Requwhdoe:Los akJukanteopenniooe/aprobeoionaalocales, mmtaba|ea.yfedena|eapuedenosenin neceaarioo poraante proyectm: PemnieodeConetnumcidn. Oemo|kci6n ` Emdud|os Requeridos:N/4 11 Los Remkmrnemtos de Desarro|kopmneUa8#UUgac|6ny Consistencia de Proyectos 8nc|myen:LaLey Esbaba| de Po|Dica Ambienta| de Washington, La Ondenonoo de 3bnifiueui6n del Area Urbana de Yakima, Los Est6ndares de Desarrollo del Tltulo 12, y el Plan Integral del Area Urbana de Yakima. de ,.=...icaum/"*mu/6 suueusmno/ecumenvuuvonenuooeo/ezyo/o/asnaoxes. Cuanoo/ooecsionfinal sea emitide.unacopiaeerdenvadaa|eopersonas quemendanoncumnnb*hosoquerecbieronemteavioo. B arohivo que conUane |a aplicaobn compdata eot6 dieponitde pans inepaccdn pOb|ioe on |o Oficina de P|anificacbnde|oCiudad deYakima aned12De|Norte |mCeUe2da.Yakima, WA. Si Uenm ouo|quier pregunta eobno auba prupueeba, puede oonbaobaro |a Qficina de P|anifioocibn a| (600 575- Lanningft Ad]untes: NoroaUvo, Oeenhpcidndel Proyacbo, Plan deSitio. Mapo WEfTELLYOUR 57OR ES'AKImAHERALD.COM El S01 de Yakima Ad Proof� This is the proof of r •r scheduled to run on dates indicated below. Please proof r notice carefully to check spellingand run dates, if you r to make changes Date: 07/30/21 Account #: 110358 Company Name: CITY OF YAKIMA PLANNING Contact: ROSALINDA [BAA,AP Address: 129 N 2ND STREET YAKIMA, WA 98901-2720 Telephone: (509) 575-6164 ME Account Rep: Simon Sizer Phone # (509) 577-7740 Email: ssizer@YAKIMAHERALD.CO Ad ID: 982975 Start: 08/04/21 Stop: 08/04/21 Total Cost: $292.00 Lines: 160.0 # of Inserts: 1 Ad Class: 6021 Run Dates: Yakima Herald -Republic 08/04/21 PUBLIC HEARING alliballoll", - - — In -House Distribution E-mail List - - -------- Revised 06/14/2021 Name Division E-mail Address Silvia —co—rona —Clerk's Office'--- 5i_lviakoro Liq@yLk'_hnqya._qoy, Lisa Maxey Code Administration Lisa�Maxgy@ Glenn Denman Code Administration Glenn.Dc 7—­_ L—uman I�LulLaw1go -0)yaL John Zabell Code Administration &hii.Ztbel I at ,yak ke-11i —Horton—Code Administration KcIIL Linda Rossignol Code Administration Lmda.Rossignqfl�akin�iawa_ oy Pedro Contreras Code —Administration Pedro, Contreras@bya Suzanne DeBusschere Code Administration Suzanne .Del ysseheredyAk nawa.goy Tony Doan Code Administration Tony. DoknLcD Joan Davenport Community Development Joan :DavqiVkrt@,yqkj i nawyq gpow' Rosalinda lbarra Community Development Rosafinda.lbarraot, in ak -gov yakirn Bill Preston Engineering M111Trestoralxryatiaaawa.&0_v Dan Riddle Engineering Dan Ks44jgCZi)y4Aoykimmva Aaron Markham Fire AarprijLiark Liarn @ a - LtAgqvaW4. "y Jeremy Rodriguez Fire jerenly,19 Sara Watkins Legal Sara: "latkins(kyakiniawa, Archie Matthews ONDS Archie.MatthewftykimaNvapov Joseph Calhoun Planning jqsgphQalhoun q)ykjmawq,,gqv Anali ia Nunez Planning An a] i I ia. nu nmgyak hriaw L-1-90—V Matt Murray Police Scott Schafer Publim�ec Works Scott..SchareQqjqjki Loretta Zammarchi Refuse Loretta.Zaniiiiai-ciiij@.yakiniaw Randy Layman Refuse Viand fa Zy;ikjMAAg1gqy ­_­_. -I------.---- —_ I Q Gregory Story Transit Q%gQry.5tqq@yakimLtAa gov James Dean Utilities Rana a.D nra 16yakirrig%a�_oy Dana Kallevig Wastewater Paga.Kallevi , �&akirnawa voy Randy Meloy Wastewater Rand y..MeloX4jkimawa, �qy Dave Brown Water/Irrigation David.Bro3yti@y jm Ak _awa-gov Mike Shane Water/Irrigation Mjkq�.,SItijne drnawa.gQv Outside Distribution Na—me' Address Included In Mai!ing�_ Pacific Power Attn: Estimating Department 500 N Keys Rd, Yakima, WA 98901 XYes El No Ll(ihlapLnolices Type of Notice: File Number(s): A -TV Or QV.�- 2�1 f- Date of Mailing: _T__ LAAV� $�o Nunez" Analifla From: NunezAna|i|ie Sent: Friday, July 30, 20214:47PK4 To: Brown, David; Calhoun, Joseph; Contreras, Pedro; Corona, Silvia; Davenport, Joan; Dean, . ]ames;DeBusschene, Suzanne; Denman, Glenn; Doan, Tony; Horton, KeUi;|barro, Rosa|ioda; KaUevig' Dana; Layman, Randy; Markham, Aaron; Matthews, Archie; Maxey Lisa; K4e|oy, Rand}; Murray, Matthew; Nunez, Ana|i|ia; Preston, Bill; Riddle, Dan; Rodriguez, Jeremy; Rossigno[Linda; Schafer, Scott; Shane, Mike; Story, Gregory; Watkins, Sara; Zab*M,John; Zammanchi' Loretta;Ahtanum Irrigation District Beth Ann Bru|o1 e; Cawley, Marc; Chamber ofCommerce; Department of Agriculture; Department ufCommerce ([TE[) Review Team; Department ofEcology; Department ufEcology Former Orchards; Department ofEcology Lori White; Department of Ecology 3EPA Register; Department of Ecology -CRO Coordinator; Department of Fish and Wildlife; Department of Fish and Wildlife; Department of Fish and Wildlife - Eric Bartrand; Department of Fish and Wildlife Scott Downes; Department of Natural Resources; Dept of Social & Health Services Larry Covey; Dept. Archaeology & Historic Preservation ' SEPA Review; Energy Facility Site Evaluation Council Stephen Posner; Henne, Dennis; |barra, Rosa|inda; KaUevig' Dana; Nob Hill Water Bob Irving; 0unaz,Ana|i|ie; Office of Rural & Farmworker Housing Marty Miller; Peterson, Robert Riddle, Dan; Sergio Garcia; USArmy Corps ofEngineers David Moore; VVAState Dept of Health, Kelly Cooper; VVAState Dept of Health, Office of Drinking Water, VVA State Dept ofHealth, Office ofDrinking Water; VVAState Parks& Recreation Commission; VVSDDT Paul Gonseth;VV3DOT ' South Central Regional Planning Office; VVSDDTAviation Max P|atts;VVVSO -Ange|aVVatts'Asst Suptuf8us/Fin;VVVSD Mike Brophy, Supt.;Yakama Bureau ofIndian Affairs Rocco Clark; YakomaNation Environmental Management Program Elizabeth Sanchey;Yakama 0ickitatFisheries John Marvin; YakamaK|ickitat Fisheries Project John Mon/in; Yakima County Building Official ' Harold Maclean; Yakima County Commissioners; Yakima County Flood Control District Dianna Woods; Yakima County Flood Control District Troy Havens; Yakima County Health District; Yakima County Health District Ryan |bach; Yakima County Planning Manager Tommy Carroll; Yakima County Planning Zoning/Sub ' Jason Eor|es; Yakima County Public Svcs Director, Lisa Freund; Yakima Greenvvay Foundation Ke||ie Connaughton; Yakima Regional Clean Air Agency HasanTohatYakima School District ]ayBaucom; Yakima School District Stacey Locke; Yakima School District Trevor Greene; Yakima Valley Museum Peter Arnold, Exec Director; Yakima Valley Trolleys; Yakima Waste Systems Keith Kova|enko;YV[OG'Lynn Deitrick Cc; Martin, Trevor Subject: NOTICE DFAPPLICATION, SEPAfkPUBLIC HEARING _ Aspen Tree -PLP#0U3'21 Attachments: NOTICE [>FAPPLICATION, SEPA��PUBLIC HEAR|NG�AspenTree PLP#003'21.pdf Attached is a Notice 0fApplication, Environmental Review and Public Hearing regarding the above -entitled project. If you have any questions about this propoom|, please contact assigned planner Trevor Martin at /\Oalilia Wfiez Planning Technician City of Yakima Planning Division p:5OB.575.0201 |129North 2ndStreet, Yakima, Washington, 080U1 Ahtanum Irrigation District Cascade Natural Gas Century Link Beth Ann Brulotte, Executive Assistant 8113 W Grandridge Blvd Manager 10705-B Gilbert Road Kennewick, WA 99336 8 South 2nd Ave, Rm#304 Yakima, WA 98903-9203 Yakima, WA 98902 bethb@ahtaiium.net %kT. Tr-TWOTTARIMM. 71"M Manager 1005 North 16th Ave Yakima, WA 98902 City of Takima - Engineering Division Dan Riddle, Street Inspector 129 N 2nd Street Yakima, WA 98901 P-- IM 10 North 9th Street Yakima, WA 98901 chaintieftakinia.ft City of Union Gap irga.0 r P.O. Box 3008 Union Gap, WA 98903 �kffl a ima - I T astewater VlVisiorf- Marc Cawley, Wastewater Operations bog—IM1100" Nob Hill Water Association Bob Iry m* Office of Rural and Farm Worker Housing Pacific Power Marty Miller, Mike Paulson, 1400 Summitview Ave, Ste# 203 500 North Keys Rd Yakima, WA 98902 Yakima, WA 98901 MAMMh.org I I �* I �-, Maintenance Dept. 205 W Washington Ave Yakima, WA 98903 ;•State Nepartment of Commerc� Review Team, 1011 Plum St SE Olympia, WA 98504-3172 reviowb6aniftond WA State Department of Ecology Lori White, L T I .a rI or's-1wrel 1433 Lakeside Court, Ste# 102 Yakima, WA 98902 'TVA State Department of Ecology P.O. Box 47703 Olympia, WA 98504-7703 City of Yakima - Airport Rob Peterson, Director 2400 West Washington JAve Yakima, WA 98903 2200 W. Washington Ave Yakima, WA 98903 V, MOM my, I bVITrof U.S. Army Corps of Engineers, Regulatory Branch David Moore, Project Manager P.O. Box 3755 Seattle, WA 98124-3755 david.m i.00Le WA State Department of Agriculture Kelly McLain, PO Box 42560 Olympia, WA 98504 Rmclainoga&Lwag -, 'rov — k witHm --ui.I 1250 W Alder St Union Gap, WA 98903 iaLor@e(!XAva. m �Zff lff* - .71[amm MOKE Me MOSIt ffllwguull���� WA State Department of Fish and Wildlife WA State Department of Fish and Wildlife WA State Department of Fish and Wildlife, Eric Bartrand, Sko tLDo w riesCof i (w . jyAZj.�y SEPA Desk 1701 South 24th Ave PO Box 43200 Yakima, WA 98902 WA State Department of Fish and Wildlife Olympia, WA 98504 Eric.Bartrand@dfw.w I " eamYqkima@d(mL.wL EPAdesk@ Li(�LLwI.,gov S, WA State Department of Health WA State Department of Natural WA State Dept of Social & Health Services Kelly Cooper, Resources, SEPA Center Office of Capital Programs PO Box 47820 PO Box 47015 Larry Covey Olympia, WA 98504 Olympia, WA 98504 PO Box 45848 Olympia, WA 98504 M.qoyev is�Nv Preservation 1063 S Capitol Way, Ste 106 Olympia, WA 98504-8343 WA State Environmental Protection Agency NEPA Review Unit 1200 6th Ave. #155,14 D-12 Seattle, WA 98101 6109M.4-Aw 8902 Zier Road Yakima, WA 98908-9299 mon- WSDOT South Central Region Planning Office ,qC 41anpin&@hvsdA- v L_A, _ _ Yakama Bureau of Indian Affairs P.O. Box 632 Toppenish, WA 98948 &-c --- Program, Elizabeth Sanchey P.O. Box 151 Toppenish, WA 98948 gs a qL Yakima County Commissioners Yakima County Planning Division Jason Earles, Zoning/ Subdivision Secti 128 North 2nd Street, 4th Floor Yakima, WA 98901 a aMS Dianna Woods, Progam Analyst 128 North 2nd Street, 4th Floor Yakima, WA 98901 DR Yakima School District Operations 104 North 4th Ave Yakima, WA 98902 WA State Dept of Health, Office of Drinking Water Jamie Gardipe La tLijg:&,Lr 16201 E Indiana Ave, Ste# 1500 Spokane Valley, WA 99216 SEPA,reviewteani@dol -m�&gqv, i WA State Governor's Office of Indian Affairs PO Box 40909 Olympia, WA 98504 West Valley School District 8902 Zier Road Yakima, WA 98908 hmel. 7702 Terminal St SW Turnwater, WA 98501 Yakama Indian Nation, Cultural Resources Program Johnson Meninick, P.O. Box 151 Toppenish, WA 98948 Yakama-Klickitat Fisheries Project John Marvin, 760 Pence Road Yakima, WA 98909 Yakima County Health District Ryan Ibach, Director 1210 Ahtanum Ridge Dr Ste#200 Union Gap, WA 98903 Yakima County Public Services Lisa Freimi,-ad-gj*-r-,.�e�zice-,;-I-*-r 128 North 2nd Street, 4th Floor Yakima, WA 98901 R1— Yakima Greenway Foundation Kellie Connau ton, Executive Dire 111 South 18t];Street Yakima, WA 98901 WA State Energy Facility Site Evaluation Council Stephen Posner, SEPA Officer PO Box 43172 Olympia, WA 98504-3172 WA State Parks & Recreation Commission Jessica Logan, P.O. Box 42650 Olympia, WA 98504 irlss —ic a -1 fvm C-111111-1 -rb AW-A-Z91-V WSDOT Paul Gonseth, Planning, Enginwr 2809 Rudkin Road Union Gap, WA 98903 SOMEWOPLM Superintendent P.O. Box 632 Toppenish, WA 98948 Yakama Indian Nation, Yakima Tribal Council Ruth Jim, P.O. Box 151 Toppenish, WA 98948 Harold Maclean, Building Official 128 North 2nd Street, 4th Floor Yakima, WA 98901 bqroldjn&lean@qq�� 128 North 2nd Street, 4th Floor Yakima, WA 98901 O'Lilly % .. eso-Irces livision Troy Havens, Manager 128 North 2nd Street, 4th Floor Yakima, WA 98901 1- Yakima Regional Clean Air Agency Hasan Tahat, Compliance and Engineering Division Supervisor 186 Iron Horse Ct # 101 Yakima, WA 98901 Na-samrikw Yakima School District Yakima School District Stacey Locke, Assistant Superintendent of Trevor Greene, Superintendent Operations J04 North 4th Ave 104 North 4th Ave Yakima, WA 98902 Yakima, WA 98902 rc �Ireyor@�,qk-aiiks Yakima Valley Canal Co Yakima Valley Conference of Governments Yakima Valley Museum Robert Smoot, Lynn Deitrick, Senior Planner Peter Arnold, Executive Director 1640 Garretson Lane 311 North 4th Street, Ste# 202 2105 Tieton Drive Yakima, WA 98908 Yakima, WA 98901 Yakima, WA 98902 Iv 11 —1) - 4-6—L r —ic kl—ftv &—orz Ve Lr ' _�gIN,vill tg1i2.M qAg_ Yakima Valley Trolleys Yakima Valley Trolleys Yakima Waste Systems Paul Edmondson, PO Box 796 Keith Kovalenko, District Manager 313 North 3rd Street Yakima, WA 98907 PO Box 2830 Yakima, WA 98901 i fob a k i ma va 1.14r tro I lev 11-90TI&I Yakima, WA 98907 keithk@wasteconnections.com Sandra Hull, 470 Camp 4 Rd Yakima, WA 98908 w-& of Notice: Uc-- T" File Number: Ply A 00 - - Date of Mailing: 13a 1-2,1 05/03/2021 18133323001 CONGDON ORCHARDS INC PO BOX 2725 YAKIMA, WA 98907 18133331567 J & C PROPERTIES WASHINGTON LLC 2410 TERRACE HEIGHTS DR YAKIMA, WA 98901 18133332403 18133332404 18133332405 KH PROPERTIES LLC MICK PROPERTIES LLC MICK PROLE LLC 2101 S 88TH AVE 1707 S 74TH AVE 1707 S 7 AVE YAKIMA, WA 98908 YAKIMA, WA 98908 A' WA 98908 18133333001 MOBILE CREEK LLC PO BOX 11530 YAKIMA, WA 98909 18133332409 WASHINGTON STATE PO BOX 41107 OLYMPIA, WA 98504 18133333425 ANA R VILLAVICENCIO PO BOX 11289 YAKIMA, WA 98909 18133333416 ANGELINA SANTANA SOTO 6100 CRESTFIELDS RD YAKIMA, WA 98903 18133331414 BENJAMIN T & MARGIT K TRICKETT 5808 W WASHINGTON AVE YAKIMA, WA 98903 18133334431 CHRISTIAN & SUSAN SAUNDERS 14306 SUMMITVIEW EXT YAKIMA, WA 98908 18133331560 DAISY PENA MARTINEZ 2014 S 60TH AVE YAKIMA, WA 98903 18133332408 STATE OF WA DEPARTMENT OF CORRECTIONS PO BOX 41015 OLYMPIA, WA 98504 18133333429 ADAN F. MARIN BADILLO 6004 CRESTFIELDS RD YAKIMA, WA 98908 18133331501 ANDRE ARCAND 2012 S 59TH AVE YAKIMA, WA 98903 18133331559 ASHLEY GRACE CURTIN 2012 S 60TH AVE YAKIMA, WA 98903 18133333407 BRYAN FRANK ELLIS 6205 CRESTFIELDS RD YAKIMA, WA 98903 18133333024 CHRISTINA LYNN GUTIERREZ 6201 WALLA WALLA ST YAKIMA, WA 98903 18133331401 DAVID L & YVONNE K FOUSHAY 5820 W WASHINGTON AVE YAKIMA, WA 98903 18133332407 WASHINGTON STATE PO BOX 41112 OLYMPIA, WA 98504 18133333406 ALAN H & JANICE M LEWIS 6208 CRESTFIELDS RD YAKIMA, WA 98903 18133333430 ANGELA BUCHANAN 435 S 67TH AVE YAKIMA, WA 98908 18133333414 BENJAMIN & ALICE TORRES 107 ROSE ST UNION GAP, WA 98903 18133333426 CANDACE DAWSON 5002 E 111TH PL THORNTON, CO 80233 18133333413 CHRISTOPHER STUART THOM 6105 CRESTFIELDS RD YAKIMA, WA 98903 18133333410 DIANNA L VANDERSCHOOR 6200 CRESTFIELDS RD YAKIMA, WA 98903 18133331439 18133333423 18133331571 DONALD D & SYLVIA MARLER ERIC MOODY ERIK F FLORES RAMIREZ & EDELMI 2010 S 60TH AVE PO BOX 3262 GODINEZ YAKIMA, WA 98903 UNION GAP, WA 98903, 2001 S 60TH AVE ,�j YAKIMA, WA 98903 18133331440 18133334416 18133331503 ERNESTO M & LINDA K SANCHEZ GENE P & JENNIFER A MURPHY GERALD R & LINDA L ANDERSON 2009 S 60TH AVE 5910 CRESTFIELDS RD 2016 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133334426 18133333405 18133331504 GILBERT & DINA ESCOBAR GINA M CATRON GLORIA & ARTHUR WIDENER 5908 W COOLIDGE RD 6209 CRESTFIELDS RD 2018 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133333023 18133331568 18133333411 GREGORY J GOODMAN JAIME & STEFANIE L VASQUEZ JAMES W FULLERTON 6804 BITTNER RD 1909 S 60TH AVE 6109 CRESTFIELDS RD YAKIMA, WA 98901 YAKIMA, WA 98908 YAKIMA, WA 98908 18133334411 18133331572 18133334412 JEFFREY & WILMA LEYENDEKKER JEFFREY N HOON JOHN A FERNANDEZ COBB 2003 S 60TH AVE 2200 S 60TH AVE 21846 34TH AVE S YAKIMA, WA 98903 YAKIMA, WA 98908 SEATAC, WA 98198 18133334433 18133333420 18133333424 JOHN R & COLLEEN J LIVINGSTON JOSE L GARZA JOSE T RUIZ SAUCEDO 5910 WHITMAN ST 6301 CRESTFIELDS RD 2109 S 61 ST AVE YAKIMA, WA 98903 YAKIMA, WA 98908 YAKIMA, WA 98908 18133334409 18133333428 18133331502 JOSEPH MILLS JOSH & DANIELLE HASSANIN KAREN PARSONS 2100 S 60TH AVE PO BOX 11561 2014 S 59TH AVE YAKIMA, WA 98903 YAKIMA, WA 98909 YAKIMA, WA 98903 18133334413 18133331441 18133331569 KENNY R KING KENT & LESLEE HEBDON LARRY & LISA PURDY 2202 S 60TH AVE 5907 WHATCOM AVE 1911 S 60TH AVE YAKIMA, WA 98903 YAKIMA, WA 98903 YAKIMA, WA 98903 18133334414 18133331563 18133331564 LELAND M & TONI M CHRIST LEON V LUU LEON V 2206 S 60TH AVE 7503 CRESTFIELDS RD 750 ETFIELDS RD YAKIMA, WA 98903 YAKIMA, WA 98903 IMA, WA 98903 18133334417 18133331562 18133333438 LYNETTE V MARSHALL LYNN D & CAROLYN L NOTMAN MARIANA SEVERINO GOMEZ 5908 CRESTFIELDS RD 2018 S 60TH AVE PO BOX 447 YAKIMA, WA 98903 YAKIMA, WA 98903 BEVERLY, WA 99321 18133334425 18133334423 18133333415 MATTHEW SHUEL MICHAEL W & KIRSTEN A WAGNER MIGUEL MUNGIA MARTINEZ 5910 COOLIDGE RD 12704 SUMMITVIEW EXT 6101 CRESTFIELDS RD YAKIMA, WA 98903 YAKIMA, WA 98908 YAKIMA, WA 98903 i• NICHOLAS R ONEAL PABLO CESAR HERNANDEZ 5904 W WASHINGTON.i BOX 11592 6201 CRESTIFIELDS'r YAKIMA, WA 98903 YAKIMA, WA 98909 YAKIMA, WA 98903 18133331438 RICKY A CLARK 2011 S 60TH AVE YAKIMA, WA 98903 18133333035 RONALD & KRISTIN BENJAMIN 5903 WALLA WALLA ST YAKIMA, WA 98903 18133331565 STEPHEN & SONYA MERZ 2017 S 60TH AVE YAKIMA, WA 98903 18133331443 STEVEN M & GAIL MASON BRILLING 225 4TH AVE A603 KIRKLAND, WA 98033 18133331442 TED P & MARGARET A CELMER 1811 126TH AVE SE BELLEVUE, WA 98005 18133333431 VALENTIN SEVERING 2105 S 61 ST AVE YAKIMA, WA 98903 81 Total Parcels - Aspen Tree, LLC/ Plat of Aspen Estates Phase 2 18133331566 1 S 39TH x .;.0 18133331437 a 4r1' . "I silk' 2010 S 59THAVE YAKIMA, WA .;.i 18133334415 r • l: S 60TH AVE WA .;•i 18133333427 r - ;.� 18133334424 r , .i• CRES IELDS YAKIMA, WA .;.i 18133333412 •' r : x f,108 CRESTFIELDS WA 98903 18133331561 O .* • ii. S 60TH AVE YAKIMA, WA .;,i r: SELENE • DIAZ i v it . : s 7506 MUCCULLOUGH RD x 98903 ., •i,, x x A •;•, MIKE HEIT / HLA ENGINEERING & SURVEYING i Vl 2803 RIVER ROAD YAKIMA, WA 98902 A:1 \-f j 1 relay.'rAwl".1 Aspen Tree, LLC. c/o Byron Borton Vicinity of W. Washi 1, Analilia Nilhez, as an employee of the Yakima City Planning Division, have dispatched through the United States Mails, a Notice of Application, Environmental Review and Public Hearing, a true and correct copy of which is enclosed herewith; that said notice was addressed to the applicant, SEPA reviewing agencies, and all property owners of record within a radius of 300 feet of subject property; that said property owners are individually listed on the mailing list retained by the Planning Division; and that said notices were mailed by me on the 30th day of July, 2021. A'naii7fia Ndfiez Planning Technician LAND USE ACTION INSTALLATIO 70 CERTIFICATE Location of Installation (Check One): X Land Use Action Sign is installed per standards described in YMC §15.11.080(C). Land Use Action Sign is installed in an alternate location on the site. Note: this alternate location (if not pre -approved by the Planning Allanager) may not be acceptable by the Planning Division and is subject to relocation (at the owner's expense) to a more visible site on the properi)4 The alternative location is: The required notice of application will be sent to the applicant and property owners within a 300-foot radius after the Planning Division has received this v.v- to post a Land Use Action sign and return this form signed in a timely manner may cause a delay in the application review process. 1, hereby testify that the installed sign fully complies with the Land Use Action sign installation standards (see pg. 2), that the sign will be maintained until a decision has been rendered, and that the si2n will be returned within 30 dgys fibm the date the final decision is issued. Applicant's Name (Please Print) 7- Date 07 6-6- - 7 C70 Applicant's Phone Number Please fill out and sbm the above certifiej _LXr email to ask.planninggyakimawa.gov or in person/by mail to: City of Yakima, Planning Division, 129 North 211 Street, Yakima, WA 98901. Revised 04/2019 DEPARTMENT OF COMMUNITY DEVELOPMENT Joan Davenport, AICP, Director Planning Division Joseph Calhoun, Manager 129 North Second Street, 2nd Floor, Yakima, WA 98901 ask.planning@yakimawa.gov - www.yakimawa.gov/services/planning July 23, 2021 FILE NUMBER: APPLICANT: A 1, R&W: PROJECT LOCATION: TAX PARCEL NO: DATE OF REQUEST: SUBJECT: Dear Mr. Borton, PLP#003-21 & SEPA#023-211 Aspen Tree LLC. C/o Byron Borton 2550 Borton Rd., Yakima, WA 98903 Vicinity of W. Washington Ave. & S. 64 1h Ave, 181333-32406 June 25, 2021 Notice of Complete Application The application for your Preliminary Long Plat Subdivision (PLP#003-21) for the vicinity of W. Washington Ave. and S. 64 th Ave., was received on June 25, 2021. As of July 23, 2021, your application is considered complete as required by the City of Yakima's Municipal Code (YMC) and site plan checklist, as referenced in YMC § 15.14.030. Continued processing of your request will include, but is not limited to the following actions: 1. A Notice of Application, SEPA, and Public Hearing will be mailed out to properties within 300 feet for a 20 day comment period. 2. An open record public hearing has been tentatively scheduled before the Yakima Planning Commission on September 8 th 2021. 3. A recommendation will be forwarded from the Planning Commission onto the Yakima City Council after the open record public hearing. If you have any questions regarding this matter please call me at (509) 575-6162. Sincerely, Trevor Martin Associate Planner Yakima bg 2015 1994 "Plat of Aspen Estates — Phase 2" PLP#003-219 TCO#011-21 & SEPA#023-21 CHAPTER AL--- Nunez, Analilia NOWNIMMMMUM I I III I III I 1111 " From: Corrine Camuso <Corrine-Camuso@Yakama.com> Sent: Monday, August 23, 2021 9:47 AM To: Hanson, Sydney (DAHP); Martin, Trevor Cc: Davenport, Joan; Casey Barney; Jessica Lally Subject: Re: City of Yakima -Aspen Tree Subdivision (PLP#003-21)-Survey Requested (DAHP Project Tracking # 2021-08-05358) Thank you for contacting us regarding the proposed undertaking. The project is within the ancestral lands of the Yakama, and lies within a high risk area for encountering cultural resources. We request an archaeological survey of the proposed undertaking inclusive of subsurface testing to identify any potential buried sites. Please ensure a copy of the report is sent to our program for review and comment. Regards, RECEIVED AUG 2 3 2021 Corrine Camuso CITY OF YAKIMA Yakama Nation PLANNING DIV. Cultural Resources Program Archaeologist Office 509-865-5121 ext. 4776 From: Hanson, Sydney (DAHP) <Sydney.Hanson@dahp.wa.gov> Sent: Thursday, August 12, 20219:24 AM To: trevor.martin@yakimawa.gov Cc: Joan.Davenport@yakimawa.gov; Casey Barney; Corrine Camuso; Gregg Kiona; Jessica Lally; Kate Valdez; Noah Oliver Subject: City of Yakima_Aspen Tree Subdivision (PLP#003-21)_Survey Requested (DAHP Project Tracking # 2021-08- 05358) Hi Trevor, Attached is our letter regarding the project referenced in the subject line. Please contact me with any questions. All the best, Sydney Hanson, MA (she/her) I Transportation Archaeologist 360.280.7563 (cell) I sydney.hanson@dahp.wa.gov Department of Archaeology & Historic Preservation I nav�wdah �,wa. �ov I I 10 Capitol Way S, Suite 3 0 1 Olympia WA 98501 PO Box 48343 1 Olympia WA 98504-8343 My schedule: M-F 7:00 AM — 3:30 PM 41": Please consider the environment before printing this email 'V "V I VATn"' lit "Y" STATE OF WASHINGTON DEPARTMENT OF ECOLOGY 1250 West Alder Street - Union Gap, Washington 98903-0009 - (509) 575-2490 0332111M Trevor Martin Vktyknffir�� lon4i-a-wk City of Yakima 129 North 2 d Street Yakima, WA 98901 AUG 17 2021 Thank you for the opportunity to comment during the Optional Determination of Non Significance process for the preliminary plat of Aspen Estates, proposed by Aspen Estates LLC. We have reviewed the documents and have the follolAring comments. MHORK41MORM Pwiect with Jwntial to Dischaig 04f�Site If your project anticipates disturbing ground with the potential for stormwater discharge off -site, the NPDES Construction Stormwater General Permit is recommended. This permit requires that the SEPA checklist fullii disclose antici�.ated activities including Obtaining a permit may take 38-60 days. I I I I 1 19 I W, prepared and implemented for all permitted construction sites. These control measures must be able to revent soi rom bein 60 carried into surface water and storm drains b i stormwater runoff. Permit coverage 4 MI I '11MQUYALIMMIns IPTUMIs stINIMMORM 111mr-i*1015127-jelf �UIJIIIM -1 �111E — . I Note: Projects involving less than 5 acres of soil disturbance, but more than one acre of soil disturbance may be eligible for a Erosivity Waiver. unmom, questions about this permit. Sincerely, L Gwen Clear Environmental Review Coordinator Central Regional Office (509) 575-2012 crone va4b,ecv.%,va.Lyov Joan Davenport Community Development Director C|b/ of Yakima 129North 2ndStreet Yakima, VVA98BU1 In future correspondence please refer to: Project Tracking Code: 2021-08-05358 Property: City of Yakima —Aspen Tree Subdivision (PLP#003-21) Re: Survey Requested Dear Joan Davenport: Allyson Brooks Ph.D., Director State Historic Preservation Officer AUG _� ~ �°�' � �0�� PLANNING DIV. Thank you for contacting the Washington State Historic Preservation Officer (SHPO) and Department of Archaeology and Historic Preservation (DAHP) and providing documentation regarding the above referenced project. Theoeonnnnnmntaenabaaedontheinfonne1ion available at the time mfthis review gndonbehalf ofthe GHPOinoonfornmenoeVVaoh|ngtonState law . Should oddiUona|infornnat|onbe'oonneavailable, our assessment may berevised. Our statewide predictive model indicates that there is m high probability ofencountering cultural resources within the proposed project area. Further, the scale of the proposed ground disturbing actions would destroy any archaeological resources present. Identification during construction is not a recommended detection method because inadvertent discoveries often result in costly construction delays and damage tothe resource. Therefore, we recommend a professional archaeological survey ofthe project apmabeomnductedandorepmrtbepnoduoedpriorto ground disturbing activities. This report should meet DAHP`s Standards for Cultural Resource VVealso recommend that any historic buildings qrstructures (45years inage orolder) located within the project area are evaluated for eligibility for |ioUnQ in the National Register of Historic Places onHistoric Property Inventory (HP|)form. Wehighly encourageUhe SEPA lead agency to ensure that these evaluations are written by a cultural resource professional meeting the SOI Professional Qualification Standards in Architectural Histo[y. Please note that the recommendations provided in this letter reflect only the opinions of DAHP. Any interested Tribes may have different recommendations. We appreciate receiving any correspondence or comments from Tribes or other parties concerning cultural resource issues that you receive. Thank you for the opportunity bzcomment on this | that the Project TrackingNumberis-sharedxx|Ulonyhiredcu|turadrenource consultants and |s attached to any communications or submitted reports. Please also ensure that any reports, site forms, and/or historic property Inventory (HPI) forms are uploaded to WISAARD by the consultant(s). % Stale ofWashington ^ Department ofArchaeology & Historic Preservation P.O.Box 48343 ° Olympia, Washington 98504-8343 ^ (360) 586-3065 ^ -` vp*w.duhp.wo.gov ` , r= \\\ ED Should you have any questions, please feel free to contact me. 12 2021 Sincerely, ut- YAKIMA PLANNING DIV. Sydney Hanson Transportation Archaeologist (360) 280-7563 STA State of Washington - Department of Archaeology & Historic Preservation P.O. Box 48343 - Olympia, Washington 98504-8343 - (360) 586-3065 www.dahp.wa.gov AHTANUM IRRIGATION DISTRICT 10705 Gilbert Rd Ste B Yakima, Washington 98903-9203 Phone (509) 249-0226 — Fax (509) 249-0233 , 4c_ - - August 3, 2021 RECEIVED City of Yakima Planning Division Attention: Joan Davenport, AICP 129 North Second Street - 2nd FloorCITY OF YAK# A Yakima, Washington 989o1 COMMUNITY DEVELOPMENT Subject: PLP#003 21 SEPA023-2i Aspen Tree, LLC Parcel 1 333-324o6 Dear Ms. Davenport: Below please find our comments concerning the above -mentioned long plat application. While this property is listed on the application as falling within our boundaries for the purposes of irrigation, please note our records indicate the above -listed parcel has o surfacge giater irrigation light as established in the Final Decree (2019), the Conditional Final Order Subbasin No. 23 ( tanum)'(20ig), and the Final Schedule of Rights; dated May 9 2019 in State of Washi on e t. of Ecology' v. Ac 1aavlla, et al (2019). Additionally, our Board must sign off on the plat for this subdivision. The surveyor will need to provide us with the original Mylar, as well as one cau. for District signature. As our Board meets once per month, please telephone in advance for meeting dates to avoid delays. If any further information is required, you can contact us at (509) 249-0226 Sincerely, AHTANUM IRRIGATION DISTRICT qtmf D. George D. Marshall, Stream Patrolman G:bab Cc. Byron Borton, Aspen Estates LA Engineering and Land Surveying Inc. (Mike Heit) • • ! • '7-1 ff • Ca.,..a...... A 1. HAP Strategy I 1. Update city regUlations to rernove barriers to innovative housing types. LEAD EFFORT OBJECTIVES city Affordability Housing Supply Older Adult Options Stability Anti -Displacement Description. Most housing in the City of Yakima is single-family (65% of all housing inventory) or multifamily of three or more units (22% of all housing inventory). Supporting innovative housing types and arrangements will more fully meet the needs and preferences of Yakima's community members. For example, community engagement revealed that many Yakima residents seek multigenerational, senior, and more affordable housing opportunities that these types of innovative housing can facilitate. There are a wide variety of housing types that help reduce housing costs and fit into a small-town character. Each is defined below. Tiny homes are small dwelling units on a foundation or on a carriage with wheels with between 150-400 square feet of habitable floor area. They are affordable compared with traditional site -built homes. They may be located on their own lot, serve as an accessory dwelling unit, or be located in a village arrangement in a manufactured home or RV park. Their small size and cottage like nature make them compatible in single-family areas on their own lot or as an accessory dwelling unit. They may offer temporary or long-term housing for seasonal workers such as in a manufactured home or RV park. Senate Bill (SB) 5383, passed in May 2019, legally permitted tiny houses as permanent dwellings in Washington State; as a result, the State Building Council adopted International Residential Code standards that apply to tiny houses, effective in November 2020. SB 5383 also expanded RCW 58.17.040(5) of the subdivision statute to allow the creation of tiny house villages such as through a binding site plan and stops cities from prohibiting tiny houses in manufactured/mobile home parks. House Bill (HB) 1085, passed in 2018, also allows local jurisdictions to remove minimum unit size limitations on detached houses. 1 1 pilliiiill� 111 11111111 1 Congregate housing "sleeping rooms" are often in the 140-200 square_foo� range and may include private bathrooms and kitchenettes. Shared facirirti include kitchens, gathering areas, and other common amenities for residen] A small efficiency dwelling unit (SEDU) is a very small studio apartment including a complete kitchen and bathroom. Typically, the units will be as small as 220 square feet of total floor space, as compared to 300 square feet for the smallest typical conventional studio apartments. Microhomes are more affordable apartment units, and could be located in commercial, mixed -use, and high -density multifamily zones. Modular homes are structures that are built offsite, then transported to a permanent site. They differ from manufactured or mobile homes in that modular homes are constructed to meet the same state, regional, or local building codes as site -built homes, while manufactured homes adhere to national HUD code standards.) I I I I I III I I IS I i I I I Mill Ili I I i i I I 1! 1 1 1 1 1 i I I housing, and residents own stock shares in the corporation and participate in governance of the cooperative.2 Shared property, usually including a common house, is part of what defines this type of housing. These spaces allow residents to gather for shared meals, activities, and celebrations as well as the collaborative work required to care for the spaces. Multi -generational homes are designed to provide space for multiple generations living together under one roof, with each generation benefiting from their own separate space and privacy. The design of the home is similar to a single-family residence in outward appearance with an interior layout designed around common Other related dwelling unit types include cottages - a cluster of small dwelling units, generally less than 1,200 square feet, around a common open space - and zero -lot line development, which allows a zero or minimal setback normally required within a particular zone thus promoting efficient use of buildable land. Zero -lot line development is common with townhouse developments and may also be designed as an attached single-family home. The City of Yakima has made several changes recently to encourage the above housing types. Tiny houses on an individual lot are currently treated the some as a regular single-family home. The City has also updated its definition of multifamily development to include any residential use where three or more dwellings are on the same lot. This can be 3+ tiny homes, a duplex and a tiny home, or other combinations. A new manufactured home can be placed anywhere a single-family home can locate, consistent with state low. However, process and level of review for these housing types can be improved. For example, to build a tiny home on a new smaller single lot (smaller than the city's current minimum lot size requirement of 6,000 SF) one must go through a Planned Development process. Streamlining and simplifying the t t - review process for smaller housing types can further support encourage these housing types. Gaps Addressed. Yakima needs to create housing units at a rate of 295 units annually through 2040. Housing like tiny homes and modular housing is often less expensive to develop than traditional, single-family homes. These cost savings could help encourage and facilitate the development of more housing that can also be more attainable for households with lower incomes. This housing is often also more suitable for small households, for whom Yakima currently has a shortage of housing options. Cooperative housing can provide a more affordable opportunity for homeownership than traditional shortage of formworker housing. Innovative housing types can provide farmworkers with. high -quality housing that meets local codes, but at a lower cost to developers. Considerations. Additional options to encourage tiny homes, micro housing, cottage homes, multigenerational homes and others include: Allowing for different zoning/density options to incorporate the above -listed housing types. Density/massing and review process: Consider allowing a higher number of units than typical for the zone, due to smaller home size or where legacy pesticides are present. Some density increast is essential because the units are smaller and usually more expensive to build on a cost/square feet basis. Consider applying a maximum floor area ratio limit or an across the board allowed density for tiny houses, for instance one tiny house per 1,200 square foot of lot area. Consider reduced development standards such as lot coverage and setbacks for multi -generational homes. Design elements. Provide design standards in a manner similar to cottage housing clusters: Consider providing design standards for both common open spaces and semi- private open spaces for individual cottages. Permit construction of a shared community building to provide a space for gathering and sharing fools. Play close attention to how parking can/should be integrated with tiny house clusters. .%k"r-JB?M 77, MaTM Qbgg�j= Haystack Heights in Spokane is an intergenerational village that is close to downtown with clustered townhouses and flats to maximize efficiency, interaction, ani green space. Designed to include 39 units spread out among four buildings, the development includes spaces to share skills and facilities. 2. Tiny Horries Background - MRSC !1111 `� 111 11111111112!] 111' 1 !111 =111111 I I•IRS= May 14,2019 by Jill Dvorkin Living in tiny houses (also called tiny homes) is both an increasingly attractive and affordable housing option as well as a trending alternative lifestyle choice. However, because of significant regulatory barriers, this housing option has not yet gained traction in Washington State. This should hopefully change with the passage of ESSB 5383—a bill intended to enable the development of tiny house villages or communities throughout the state. Background What are they? V41115111 :115 111 I Rallwa houses are on wheels; some are built on permanent foundations. Many are the manifestation of creative DlYers and defy categorization. Depending on their characteristics, a different regulatory structure might apply. For Industries (L&I). However, the certification process has historically been challenging and not suited to a custom-built RV or a tiny house on wheels. (Note, however, there is now a i 4-a-MA 2&A!� vrMV1rm+3 I o obtain certification from L&I.) Site -built structures, on the other hand, must comply with the local building codes. Tiny i 1.141"Il ii ;111 J_-.J go ull 111 VAR If a tiny house is on wheels, local jurisdictions typically will look at this as an RV. Unless sited in a mobile-home/RV park or some other limited exception in a local zoning code 7pplies (e.g., RV used as a caretaker's residence), RVs may not typically be used as [!,,ermanent residences. If a tiny house is to be built on a foundation, the greatest obstacles relate to complying with the building codes (as noted above). However, local zoning and development regulations ;--Iso present challenges, such as minimum size and parking requirements. Further, Lmotential for community living. zing&= ESS13 5383 supports the development of tiny houses in several ways, as outlined in this section. • iqii� 111 11�1��Ijpi�'I�lii;i P1111111111111 111111111 1 liti! IM PIRM M a dwelling to be used as permanent housing with pernianent provisions for living, steeping, eating, cooking, and sanitation built in accordance with the state bailding code. '67 771 -7 SM7 7. S =c -, -t- n- M -e X- r -Ca- LT V i -rd M low T • f) - that these structures can be regulated in their own category and used as permanent residences. III! I I I'�� 1 "TUM In 2018, the International Code Council issued tiny house building standards in Apptndix Q of the International Residential Code (IRC). ESSB 5383 directs the State Building Council to adopt standards specific to tiny houses by December 31, 2019. The legislature expects the newli-issued IRC widance to become the basis for these standards. Local governments, • 0 I U-111-11IM-1 I for the J)Urpose of lease when no residential structure other than mobile honks or travel trailers are, permitted to be placed upon the land. 1101 "006,01101,110'roces ' MITses 'ITUR 'N'lleCIS, UILS dllk)11���Nt UI d IUUdI Uilluing N , y I P, S to CFedLe UI1J' house communities or villages. In addition, a new section is added to QagJgL3= RCW that will allow a city or town to adopt an ordinance to regulate the creation of tiny house communities. The bill also amends BLJM35JJ&M(3) to prohibit cities or towns from adopting ordinances that would prevent tiny houses with wheels from being used as a primary residence within manufacture d/mob ile home communities. However, a local government mrmy mobile home community provide such toilets and showers. Extends protections under Manufactured/Mobile Home Landlord -Tenant Ac-j' (MHLTA) The legislation extends protections of CbgpjgL59�to tenants of tiny house communities. The Northwest justice Project offers a_5unit QW, [gatio ns undpr the MH LTA. Waives competitive bidding requirements for construction of tiny houses by students III I -171777s, anit T ner g4ll'trnlnent C It C L I L eligible training programs for students can contract with community organizations, nonprofits, and others to build tiny houses for low-income housing, without regard It competitive bidding requirements. M-1,1741111117-M C C '•- ff-exrdfri-Ing Itypillirti-fil C it, - I It I#' ly-fri''ITTITUTIM= the planning process for adopting local regulations consistent with the new legislation. These actions could include: • Forming stakeholder advisory committees and encouraging community engagement. • Reviewing zoning maps and comprehensive plans to determine where tiny house communities could be located. • Identifying existing barriers to tiny houses in code (e.g., minimum size requirements). • Amending binding site plan regulations to include tiny houses and tiny houses with wheels. • Amending the local building code to incorporate new state standards for tiny houses (once adopted later this year). • Drafting regulations for siting tiny house communities. Resources and Further Reading 0 ESM-SIL51,181.3-0ma-1 fri—IlRew)a i :(2017) Spokesman- • •, rilil r r r� rr-r r.•. r r r r r r r r�r rr .. r r. I YMC Code Changes -- Tiny Hornes Ism MM111 w 11141AN" 1 15.04.150 Standards for mobile/manufactured home parks. A. Purpose, The purpose of this section is to establish standards and criteria for development and expansion of mobile/manufactured home parks within the urban area. These standards are provided to ensure uniform, coordinated development of mobile/manufactured home parks and to ensure the general health, welfare and safety of the occupants of mobile/manufactured homes that may be located within a park developed under these standards. These standards shall be applied in a manner that stresses minimizing costs. Alternatives that reduce costs and meet the intent of these standards will be encouraged. 19111100 11lkellipi-illigi�l - a A M o M_ a a ZIFIr-1 @Lqr�i ILAN I 211LOI Or'll L*js Mr&o1ol ir-jonjej &-]I r-M .. ', • . ',. •.:-. 1. All spaces shall be clearly delineated on the site plan and include dimensions and square footage for each space-, HEM111=111 = 5. Streets shall be shown on the site plan; V-10,73MMUT-TIMUM 7. The location of all solid waste containers and screening of containers shall be shown the site plan; and I 8. All facilities, utilities, improvements and amenities shall be shown on the site plan, including pathways, sidewalks, and recreational facilities, C. Development Standards, All mo.bile/manufactured home parks shall be developed in compliance with the underlying zoning district and shall be in compliance with this section. The NMI - -0 - • 1 0 11- - M FAD Lo I I I Lei a N 1 IM&MM • 2. Internal Street Paving. A minimum of twenty-four feet of paved internal street shall be required for access to each unit, paved in accordance with YMC 15.06.110. 3. Off -Street Parking. Two paved off-street parking spaces shall be provided for each mobile/manufactured home or recreational vehicle unit4"6WWanee-Mh*4s,-�YMG Qvpter�WQ& Tin HQUses/My Hous6s with Wheels sh,E 1� �g �Wkl �e f®reach �uni 4. Street Lighting. A street light shall be provided at each street intersection within the park. 6. Street Signs and Internal Directional Signs. All streets within the park shall be nam&•. utilizing blue street signs consistent with the appropriate jurisdiction's public street signs. Internal directional signs indicating unit/space numbers shall be placed at all street intersections within the park. [I my p f; 141011 HLom A A =tIlgAnyt; I C--] gm, I A is wrayly'r-1 Mw141114r-MVISM I ISO I I VM 11 L-71ARR I I R Rd V I HIR 12110 MIS IN W 9. Perimeter Sitescreening and Landscaping, The perimeter of a park shall be sitescreened with a six -foot -high, view -obscuring fence and shall include at a minimum a ten -foot -wide landscape strip adjacent to the fence and within the park consisting of a combination of shrubs, trees and groundcover. 10. Stormwater Drainage. All stormwater drainage shall be retained on site and a drainadn- plan shall be approved by the appropriate jurisdiction, I wall and access gate. 12. Play Area Requirement. Each unit shall provide a play area for children contained within of fifteen feet. D. Expansion of Existing Mobile/Manufactured Home Parks. All standards of this section shall 2pply to expansion of existing mobile home parks. The standards shall not apply to existing areas of a park not being expanded. The examiner may, at his or her discretion, reduce one or more standards of this section for newly expanded areas of a park if expansion plans also include improvements to the existing park area. F. Planned Development Under the Provisions of This Title. Development of a W-6—aTu*inAtsiT&i. m4eyITe �r�armei this title. A ■ 1 14.35.010 Purposj The purpose of this chapter is to provide a process for the division of land for the purpose of sale, lease, or transfer of commercial or industrial lots,,_ _11 ­­111��I� ftfii y, hous or travel trailers as an alternative to the subdivision process. I 1 14.35.020 Authority. alternate method of dividing land fori gL,�omrnercial or industrial landLor a or travel trailers.- 1 14.35.030 Applicability.