HomeMy WebLinkAbout10/01/2013 05C Tieton Drive Sanitary Sewer Replacement, TTC Construction, LLC, Final Payment; WW2358 1 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No..C_ For Meeting of: 10/1/2013 ITEM TITLE: Final Contract Payment for TTC. Construction, LLC - WW2358 Tieton Drive Sanitary Sewer Replacement (Standard Motion V -B- Accept the project and approve the final payment) SUBMITTED BY: Shelley Willson, Wastewater Manager - 509 - 249 -6815 SUMMARY EXPLANATION: This project (City Project No.WW2358) constructed approximately 670 LF of 8" PVC sanitary sewer pipe, 50 LF of 4" PVC sanitary sewer pipe, 3 sewer manholes, connection to existing sanitary sewer manhole and pipes, and surface restoration, Tieton Drive, between S. 40th Ave and S. 37th Ave. Final inspection for this project was made and the recommendation is that the project be accepted. This council action is to accept the project and approve the final construction costs. Project Engineer: Shelley Willson Contractor: TTC Construction, LLC Contract Award: 5/10/13 Contract Cost: $127,855.66 Retainage Due: $5,908.30 The above total contract cost is for construction only and does not include engineering and other costs. Resolution: Ordinance: Other (Specify): Final Contract Payment Contract: Contract Term: Start Date: • • End Date: Item Budgeted: Amount: Funding Source /Fiscal Wastewater Impact: Strategic Priority: Insurance Required? No Mail to: Phone: APPROVED FOR SUBMITTAL: City Manager a. RECOMMENDATION: Accept the project and approve final estimate. ATTACHMENTS: Description Upload Date Type D Final 812912013 Cover Memo City of Yakirrta TIETON DRIVE SANITARY SEWER REPLACEMENT 2220 East Viola City Project No.. . 2358 Yakima. WA 98901 HLA Project nro., 13044C TO i IC Construction, LLC Progress Estimate No. 2 AND FINAL 12871 Surnrrtitvew Road Yakirna.MVA 98908 Date July 24, 2013 tent . Contract Unit Estirnate 2 Qua i Contract ori Unit Otion 4 Price Qtionti to Date An' it Qiian 4" MI Mobilization $4.3'79.49 0% 100V0 $4.379,49 109°Z.L. 2 Project Temporary Traffic Control LS 1 $13.831 30 094, 100V. $13,831 30,' 100 . - ' 3 Removal of Structure and Obstruction LS 1 $33,851 71 0 100% S33,8515711 100 t $0.00 0°47 1 =Shoring or Extra Excavation LE 710 90,98 0 00 0 00 III' PVC Sanitary Sewer Pipe, 8 In. Dam 666 $34.62 0.00 665.00 $23022 30 100% In VC Sanitory Siiwer Nue 4 In. Diann LF On , M9.23 0.00 48.00 $3,323.04 107dio 1111 Concrete Cap Mil $200,00 0 00 30.00 i $6,000 00 100'4 8 Manhole 48 In. Dram , Type 1 EA 1 l $2.330 49 0 1 $2,330.49 100% =Shallow Manhole 48 In Diem., Type 3 EA Mil $1,982,51 0 1 51,932.51 100% ...„„. 10 Doghouse Manhole 48 In Diem. EA 1 $3,505.51 0 1 $3,505 51 100% ...... . 11 Select Backfill, as Directed CY 50 $33.3 0.00 15 60 $519.95 31% Crushed Surfac;n Base Course 9 835.7 0.00 119.30 $4 263,78 48% I IIN LIMA CI. 1/2" PG 64-28 TON 270 $109.85 0.00 16°7.54 $18,404 27 629/0 $312.28 2 , 8 $868 14 56 A 14 4-Inch Thick Cement Concrete Sidewalk MIEN r 6-Inch Thick Cement Concrete Approach at 15 SY 5 $334.81 0,00 2.78 $930 7'7 56% Driveways .. . , 16 ihtirlor Change FA ' EST $10.000,00; 0.00 , 952 78 $952.78 10% 1 - SUBTOTAL 5118,166 04 IIIIM item Contract Unit Estimate 2 Quartets Contract No Etescrtt on Urtit Quan Price Quatiti to Date Amorist Quantity SUBTOTAL, WORK TO DATE $118,168 04 PLUS MATERIALS ON HAND 80.00 SUBTOTAL AfV1OUNTS $118,166.04 8.2% STATE SALES TAX $9,689,62 TOTAL $127,855.66' L,ESS trotree RETA1NAGE $5 goa go LESS AMOUNTS PRES/IOUSLY PAID $121 047.36 AMOUNT NOW DUEi $0.00 Progress Estimate No. 1 $ 121,947 36 Progress Estirnate rig. 2 AND FINAL., $ $0.00 I fiereby certify that the foregoing is a truttti and correct statement of the work performed finder this Contract Michael T. Battle, PE . ACCEPTED herelsy accept the Frtal Progress Estimate arid Final Cataract Voucher Certificatiori, in accordance with Section 1-09 9 of the the5DO$ Starldard Specifications. . -146111h;:.. TTC Constructiort, LLC Date'